CONFINED SPACE VENTILATION REQUIREMENTS – BEST PRACTICE

PURPOSE: To determine ventilation requirements in order to eliminate, reduce or control any space-specific and/or work-introduced
contaminants

DEPARTMEN VENTILATION REQUIREMENTS APPLICABLE FOR: __30__


Rastanura Refinery
T DAYS
START
DIVISION Rastanura Refinery Maintenance Department
DATE
FACILITY Area J72/J87/Plant 48 END DATE
Reaction Furnace, Thermal Oxidizer, Stack, Duct, Convertors, ENTITY EXECUTING THE
UNIT Binzagr
Condensers, Auxiliary Burners JOB
DESCRIPTION: TAG: SERVICE: HAZARDOUS SUBSTANCES: OP. TEMP: VOLUME OF CONFINED SPACE:
Convertor ____ oF ____oC _________ Bbl 5300 Ft3
MANHOLES (Indicate in drawings below those manholes where air movers will be installed)
PROCESS Number: _ __ Size: _600 mm Locations: ________________________ Number: ____ Size: ____ Locations:
EQUIPMENT _______________________
DATA Note: Opening vents, drains and other nozzles will enhance ventilation.
(CONFINED RELEVANT INTERNALS THAT MAY REDUCE VENTILATION (select all that apply):
SPACE)
□ Impingement plates □ Flow vanes/screens □ Baffles/weirs □ Trays □ Meshes □ Demisters □
Diverters □ Vortex breakers □ Coils □ Agitators/mixers □ Other (describe):
………………………………………………………………………………..
□ Cleaning □ Grit Blasting □ Coating □ Inspection □ Internals remove& reinstall□ Welding □ Scaffolding
SCOPE OF
□ Others _Refractory Works-
WORK:
________________________________________________________________________________
CONFINED SPACE
DRAWINGS:
(To be a current
approved
mechanical
drawing or a
general sketch
showing, at least,
manholes and
connections -
nozzles, taps, vents
and drains – and
relevant internals).

Saudi Aramco: Company General Use LP – T&I BP - Confined Space Ventilation Requirements - Form - v2 – March 2022
CONFINED SPACE VENTILATION REQUIREMENTS – BEST PRACTICE

VENTILATIO □ Natural ventilation (warning: not to be used as single means for PURPOSE OF □ Initial purging of space-specific
N TYPES TO initial purging and/or control/removal of airborne contaminants) VENTILATION: contaminants
BE USED: (Select all that apply)
□ Mechanical □ Control/removal of worked-introduced
(Select all that
□ Forced □ Draft □ Local exhaust/extraction contaminants
apply)
□ All of the above □ Comfort / cooling
□ All of the above
TOTAL VENTILATION VOLUME OF CONFINED SPACE SELECT REQUIRED AIR MOVER CAPACITY
REQUIREMENTS (RAMC) REMARKS
(with known confined M3 bbl l/sec CFM
space volume, select 16 100 □ 472 □ 1,000
RAMC. Add a 20-25%
80 500 □ 1,180 □ 2,500
correction factor for
air flow losses due to 160 1,000 □ 2,360 □ 5,000
internals. Round up to 800 5,000 □ 4,720 □ 10,000
the next RAMC figure)
1,600 10,000 □ 7,080 □ 15,000
(1) ≥ 4,000 ≥ 25,000 □ 9,440 □ 20,000
TYPICAL AIR 24” Jet Fans 10” Venturi type
MOVERS
CAPACITIES
(for the
selected Compressed Air Pressure Free Air Flow RPM Decibel Levels Compressed Air Pressure Free Air Flow Decibel Levels
RAMC, select (psi / bar) (CFM / M3/Hr) (@ 5 ft) (psi / bar) (CFM / M3/Hr) (@ 5 ft)
type and 40 / 2.75 8,104 / 13,769 1,565 92 40 / 2.75 4,898 / 8,321 76
number of Air 60 / 4.14 11,005 / 18,698 2,053 95 60 / 4.14 6,182 / 10,503 81
80 / 5.52 12,848 / 21,829 2,570 100 80 / 5.52 7,304 / 12,409 83
Mover(s) to
100 / 6.89 16,136 / 27, 415 3,138 112 100 / 6.89 8,220 / 13,965 85
meet
ventilation
requirements)
.
(2)
TYPE & □ Jet fans ______ Size: ____ Locations: ______________________ □ Fans □ Flexible ducts □ Flexible
NUMBER OF □ Venturis _2____ Size: __8”_ Locations: ________________________ OTHER AUXILIARY
AIR MOVERS Remarks: EQUIPMENT elbows □ Air chillers □
TO MEET ___________________________________________________ REQUIRED Saddle vents □ Air screens □ Other:
RAMC Note: Jet fans can be conveniently installed for either forced or draft (Select all that apply)
ventilation. ___________________

Name Badge # Position Company Signature Date

Saudi Aramco: Company General Use LP – T&I BP - Confined Space Ventilation Requirements - Form - v2 – March 2022
CONFINED SPACE VENTILATION REQUIREMENTS – BEST PRACTICE

Prepared by Safety Supervisor


(Maintenance / Abdul Wasai Quraishi 8472128 BFIM
Contractor):
Reviewed by (Plant /
Opert. Engineering):
Approved by Operations /
CSES:
Notes:
(1) To compensate for airflow losses due to internals, add 20 to 25% to estimated RAMC and round up to next higher RAMC.
(2) Typical air mover’s capacities shown are 24” diam. Jet Fans and 10” diam. Venturis. Performance data for different sizes air movers shall be obtained from each
manufacturer’s data sheets.
(3) Natural ventilation type shall always be used together with mechanical ventilation for initial purging and/or control/removal of contaminants. It shall never be used
as single means for contaminants control/removal or when there is a potential for developing a hazardous atmosphere.
(4) For additional information, refer to Saudi Aramco Construction Safety Manual, Vol. 2, part 1, Chapter I-6 – Confined Spaces.

Saudi Aramco: Company General Use LP – T&I BP - Confined Space Ventilation Requirements - Form - v2 – March 2022