Unconventional Hydrocarbon
Unconventional Hydrocarbon
Unconventional Hydrocarbon
Unconventional Hydrocarbon
Coal Bed Methane (CBM)
Coalbed Methane (CBM), an unconventional source of natural gas is now considered as an alternative source for augmenting India’s energy resource. India has the
fifth largest proven coal reserves in the world and thus holds significant prospects for exploration and exploitation of CBM. The prognosticated CBM resources in
the country are about 92 TCF (2600 BCM) in 12 states of India. In order to harness CBM potential in the country, the Government of India formulated CBM policy
in 1997 wherein CBM being Natural Gas is explored and exploited under the provisions of OIL Fields (Regulation & Development) Act 1948 (ORD Act 1948) and
Petroleum & Natural Gas Rules 1959 (P&NG Rules 1959) administered by Ministry of Petroleum & Natural Gas (MOP&NG).
CBM blocks were carved out by DGH in close interaction with Ministry of Coal (MoC) & Central Mine Planning and Design Institute (CMPDI), Ranchi. Under the
CBM policy, till date, four rounds of CBM bidding rounds have been implemented by MOP&NG, resulting in award of 33 CBM blocks [including 2 blocks on
Nomination and 1 block through Foreign Investment Promotion Board (FIPB) route] which covers 16,613 sq. km out of the total available coal bearing areas for
CBM exploration of 26,000 sq. km. To date, most CBM exploration and production activities in India is pursued by domestic Indian companies. Total prognosticated
CBM resource for awarded 33 CBM blocks, is about 62.4 TCF (1767 BCM), of which, so far, 9.9 TCF (280.34 BCM) has been established as Gas in Place (GIP).
The Gondwana sediments of eastern India host the bulk of India’s coal reserves and all the current CBM producing blocks. The vast majority of the best prospective
areas for CBM development are in eastern India, situated in Damodar Koel valley and Son valley. CBM projects exist in Raniganj South, Raniganj East and
Raniganj North areas in the Raniganj coalfield, the Parbatpur block in Jharia coalfield and the East and west Bokaro coalfields. Son valley includes the Sonhat North
and Sohagpur East and West blocks. Currently, commercial production has commenced from Raniganj South CBM block operated by M/s. GEECL since July 2007.
Current CBM production (March 2015) is around 0.77 MMSCMD from 5 CBM blocks which includes test gas production from 4 CBM blocks and commercial
production from 1 CBM block. Seven more CBM blocks are expected to start commercial production in near future. The total CBM production is expected to be
around 4 MMSCMD by end of 12th plan as per XII plan document.
Five exclusive shale gas and oil locations were released in the year 2014-15
Proposal for submission of more exclusive locations in Broach Depression are at the final stage.
Drilling of exclusive shale gas well GNSGA (Gandhar Ext-II) in Gandhar area completed, carried out shale gas specific log studies of Combay shale section.
Drilling of two dual objective wells GGAH (Gandhar Ext. VI) & KLXF (kadi ML) has been completed and cores have been collected
Two locations (GNSGB (Gandhar Ext.I) & GNSGC (Gandhar Ext.III) in Gandhar area of Combay basin are under drilling.
LAQ and Site preparation for released locations are in progress.
Laboratory studies of Combay shale for exclusive shale gas/ oil well (IMSGA) and other dual objective wells (SKBH, GGAF & GGAH) are completed.
KG Basin:
Source rock logging & evaluation Study and field and Laboratory investigation study for Raghavapuram Shale (HG-HR) were completed on core samples of
Wells MSAC and SUWAA in Malleswaram Block.
Two Exclusive shale gas/oil locations WGSGA in West Godavari Block and MASGA in Mahadevpatanam Block were released and are under Land
acquisition.
Proposal for submission of third exclusive location MD-SG-1 in Mandapeta Block is in final stage.
One conventional well WPGAA in Godavari Block is under drilling, Extensive coring and Laboratory studies and shale gas specific logging are planned.
Drill sites for three conventional wells NGSAA in West Godavari Block, GMTAA in Kavitam Additional Area Block and SPM-AA in South Penumadam Area
in Godavari Block are completed.
Cauvery Basin:
Two exclusive locations for shale gas/oil assessment, KUSGA in Kuthalam ML and TKDSGA in L-I PML were released.
A dual objective well PDAB in the L-II block was drilled. Two conventional cores were cut in the well for Shale Gas assessment.
Special logs like NGS, DSI and ECS were recorded in the target formation Andimadam.
Lab studies of the cores & cutting of well PDAB, such as sedimentological, biostratigraphic , petrophysical and source rock studies were carried out.
The desorption studies of the two cores of well PDAB as well as the two cores cut in the well ASAE (drilled in 2013-14) were completed.
Lab studies were carried out for evaluation of shale gas / oil potential of Kopili formation on core sample collected in two conventional exploratory wells: #
Geleki-373 (GKBO) in Namti PML block and # Lakwa-578 (LDG) in Lakwa PML block.
National Commission for Women (NCW) Helpline No: 7827170170, Website: www.ncwwomenhelpline.in
Copyright © 2024 Directorate General of Hydrocarbons (DGH), Noida India. All Rights Reserved.
Page Last Update :: 23/01/2024
Visitors Since March 2018 :: 003045309