Elevations and Schedules
Elevations and Schedules
61,200 20,050
5,000 5,500 5,500 5,500 5,000 8,200 5,500 5,500 5,500 5,000 5,000 5,000 5,000 5,000 5,050
+7.122 +7.122 +7.122 +7.122
705
705
+3.880 +3.880 +3.884 +3.884
+3.175 +3.175 200 x200mm concrete
1,280
1,280
blockwork plastered with
600
600
3,380
3,380
cement and finished with
2,100
2,100
2,075
2,075
FEEDER
a coat of paint to specilists
+0.500 +0.500 +0.500 +0.500 detail.
±0.000 ±0.000 ±0.000 ±0.000
200 x200mm concrete blockwork IT4 Roofing sheets, 200 x200mm concrete blockwork IT4 Roofing sheets, IT4 Roofing sheets,
plastered with cement and finished with a Conveyor belt 0.5mm gauge plastered with cement and finished with a Conveyor belt 0.5mm gauge 0.5mm gauge
coat of paint to specilists detail. minimum coat of paint to specilists detail. minimum minimum
A B C D E F G H I J K L 1 2 3 4 5
61,200 20,050
5,000 5,000 5,500 5,500 5,500 8,200 5,000 5,500 5,500 5,500 5,000 5,050 5,000 5,000 5,000
+7.122 +7.122
+6.100
3,385
5,000 5,000 5,500 5,500 5,500 8,200 5,000 5,500 5,500 5,500 5,000
a coat of paint to specilists
+0.500 +0.500 +0.500 +0.500 +0.500 detail.
±0.000 ±0.000 ±0.000 ±0.000 ±0.000
COPYRIGHT
The copyright of this drawing is vested in the
designers and any unauthorised reproduction
is an infringement of applicable laws
1,500 900
3D View
2,100
2,100
1,200 490
3D Front
View
600
600
Cell. 097-7783128
2D Symbol 2D Symbol
Client:
Element ID W-01 W-02 Element ID D-01 D-02
Quantity 17 4 Quantity 3 6 KAGEM EMERALD MINE LTD
As shown 11/30/2022
Drawing No.
Project Architect: