JKTD22028-29.C - NCR - WP2 - I - 2024 Subject Backfilling Road 2 Are Not Conducted Properly

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

JKTD22028-29.

C/NCR/WP2/1/2024

Material back fill road 2 use size rock out off tolerancy to
big

1. Evaluation the material back fill

2. Kajima will removal rock material back fill

1. Site manager/Superviser/Qc and logistic team must


provide training of standard requerement material back fill

2. Qc must be control material back fill

PT. Kajima Indonesia

Raditya Indra 16 January 2024