Highway Project
Highway Project
HIGHWAY ENGINNERING II
Student Name Id No
Aeman Mesfin
Elias Gebreselassie
Abel Getachew
Amhaselassie Seifu
Danay Amanuel
Beaman Amsalu
Dejen Desalegn
Bereket Tekeba
Section - A
Description……………………………………………………………………………………….1
Structural Design………………………………………………………………………………...2
Determination of
AADToi………………………………………………………………………………………….2
Mix Design
Report...……………………………………………………………………………………… 10
Reference……………………………………………………………………………………… 12
TSEHAY MEWUCHA-KURATA GAZET ROAD PROJECT DETAILS
For a main access road found in Northern Wollo Zone, Amhara Region, The traffic count was
carried out by taking representative week in season 1(quarter 1) of the year 2013 E.C which is
summarized in Table 1 shown below. Analysis of data of the previous traffic counting years
indicated that seasonal factor is 0.95, 0.98, 1.05, and 1.01. For season 1, season 2, season 3, and
season 4 respectively. Whereas the normal annual traffic growth given is 3% and sub grade
design CBR OF 17%.
According to the schedule, the design construction may take 3 years. It will be constructed
beginning from 2016 and to be opened for traffic at the beginning of 2019.
Do the geometric design by considering the given parameters
Structural design based on ERA(2013): Pavement design report
Mix design report if double surface treatment is selected over granular base
course due to financial constraints.
Given Ingredients: Both layer chippings with flakiness index=18
Larger chippings Nominal size=20mm with Median size= 17mm
Smaller chippings Nominal Size=10mm with Median size= 8mm
consider bitumen selected is 150/200 penetration grade to be made from
5% softener mixed with 95% 80/100 penetration grade.
TABLE 1: TRAFFIC COUNT AS AN AVERAGE DAILY TAFFIC (ADT) VALUE REPRESENTING
SEASON 1 IN 2014 E.C.
VEHICLE ADTi0
CLASS AT SEANSON 1 OF 2014 E.C
TRUCK TRAILER 38
LARGE TRUCK 40
MEDIUM TRUCK 35
LARGE BUS 10
SMALL BUS 18
SMALL TRUCK 38
AUTOMOBILE 80
4 WD VEHICLES 21
PCUs(BAJAJI, GARIES,…,) 300
Structural Design
1. Determination of AADTio
Vehicle class ADToi
2014 AADTio
Season 1
Truck Trailer
38 40
Large Truck 40 42.10526
Medium 36.84211
Truck 35
Large Bus 10 10.52632
Small Bus 18 18.94737
Small Truck 38 40
Automobile 80 84.2105
4WD Vehicles 21 22.10526
PCUs 300 315.789
v. Small Bus
No Axle EALF1 Axle 2 EALF2 TFi
1
1 3450 0.020777 5050 0.1154 0.136177
2 4000 0.040426 4450 0.065315 0.105742
3 2150 0.002474 3850 0.034038 0.036512
4 2400 0.004058 3900 0.036073 0.040132
5 2200 0.002743 4150 0.04771 0.050454
6 2200 0.002743 4150 0.04771 0.050454
7 2450 0.004453 4050 0.042751 0.047203
8 2550 0.005331 4050 0.042751 0.048082
9 2050 0.001997 2650 0.006339 0.008335
10 2300 0.003351 2900 0.00951 0.012861
TF Avg. = 0.001286
vi. Small Truck
No Axle EALF1 Axle 2 EALF2 TFi
1
1 1850 0.001258 1600 0.000655 0.001912
2 2050 0.001997 2200 0.002743 0.00474
3 1400 0.000359 1000 7.9E-05 0.000438
4 1750 0.00098 1650 0.000752 0.001731
5 1050 9.83E-05 1700 0.00086 0.000958
TF Avg. 0.000192
CESAL=∑(Ti x TFi)
25.589605 93512.215
4WD VEHICLES 26 24.86541 91 0 0
365.56578 1335888.7
PCUs 95 355.2202 99 0 0
∑CESAL= 3846860
Design options
R2 = 0.8
Type of Terrain Basic R for For increased Spread rates for penetration grade
MC3000 durability Binders
80/100 pen
Flat 0.8 0.864 0.7776
Uphill Grade>3 0.72 0.7776 0.699
Downhill 0.88 0.9504 0.855
Grade>3
REFEERENCE