1. Gantt charts are used for project scheduling and tracking. They show the tasks, milestones, and deadlines of a project in a bar chart format. 2. Configuration and revision refer to different versions of software. Configuration is the current approved state of the software while revision refers to changes made to the software. 3. Software reliability is a measure of how well software performs the functions for which it was designed under normal operating conditions over a specific period of time.

Uploaded by

Anurag Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
391 views2 pages

Software Project Management-7th-2022-23-Btech

1. Gantt charts are used for project scheduling and tracking. They show the tasks, milestones, and deadlines of a project in a bar chart format. 2. Configuration and revision refer to different versions of software. Configuration is the current approved state of the software while revision refers to changes made to the software. 3. Software reliability is a measure of how well software performs the functions for which it was designed under normal operating conditions over a specific period of time.

Uploaded by

Anurag Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Registration No :

-- 2
Total Number of Pages : 02
02 3 Course: BTech
Sub Code: RCS7D001
2/ 2
th
8 0
7 Semester/Regular/Back Examination: 2022-23

9 - 2 BRANCH(S): CSE/EEE
SUBJECT: Software Project Management

10 Time : 3 Hour
Max Marks : 100
Q.Code : L120
- - 2
Answer Question No.1 (Part-1) which is compulsory, any eight from Part-II and any two

2 0 23
from Part-III.
The figures in the right hand margin indicate marks.
02 /
2 8 / Part-I

9-
Q1 Answer the following questions : (2 x 10)

10
a) What is Gantt chart? Mention its importance.
b) Give two reasons that lead to stress.
-- 2
c)
2 3
Define configuration and revision in context of software.
0
d)
e) Write the importance of product flow diagram. 2/ 2
Mention any two criteria for selecting a proper process model.

f) Give two reasons that lead to stress.


2 8 /0
g)
-
Name any two methods of improving motivation.

109
h) Define the term software reliability.
i) Difference between process metrics and product metrics.
j) State two drawbacks of statistical testing.

-- 2
Q2 02 3 Part-II
Only Focused-Short Answer Type Questions- (Answer Any Eight out of (6 × 8)
Twelve)
0 2 /2
a)
28 /
What do you mean by project planning? Discuss the essential steps to be carried
out during project planning.
b) 9 -
Describe the necessity of software configuration management. Discuss briefly
0
1
configuration management activities.
-- 2
c) Describe briefly about earned value analysis for cost monitoring.
2 3
d)
2 3 --2 / 2 0
What is team structure? Categorize team structure and explain each citing their

e)
advantages and disadvantages.
20 /0 2
Explain the use of PERT to evaluate the effects of uncertainty.

0 2
f) / - 2 8
What does Halstead’s volume metric represent conceptually? How according to

- 28/ g) 109
Halstead is the effort dependent on program volume?
Explain how Putnam’s model can be used to compute the change in project cost

10 9 with project duration. What are the main disadvantages of using the Putnam’s
model to compute the additional costs incurred due to schedule compression?
h) Why is it necessary for a project manager to decompose the tasks of a project
using work breakdown structure (WBS)? To what granularity level are the tasks
decomposed? Explain your answer.
i) What are the important types of risks that a project might suffer from? How would
identify the risks that a project is susceptible to during project planning stage?
j) Discuss the salient features of the organizational reporting structure of the SQA

k)
group as recommended by SEI CMM and ISO 9001.
-- 2
List four metrics that can be determined from an analysis of a program’s source

02 3
code and would correlate well with the reliability of the delivered software.
l)
2/ 2
Explain the different characteristics of software quality

2 8 /0 Part-III
09 -
Only Long Answer Type Questions (Answer Any Two out of Four)

Q3 1
Briefly explain the agile software development model. Give an example of a project (16)
for which the agile model would be suitable and one project for which the agile
model would not be appropriate.
- - 2
Q4 a)

2 0 23
State the advantages of function point over Lines of Code (LOC). List all the value
adjustment factors. What are the metric for specification quality?
(8x2)

0 /
2with
b) /
Consider a project
8 input =50
No. of2user

0 9
No. -
of output =40
1 No. of user files = 0635
No. of Enquiries =
-- 2
No. of external interface =04 0 2 3
All CAF and weighting factor are average. Compute
2 / 2function point.
8 /0development projects according to
Q5 a) What are the different categories of software
COCOMO estimation Model? Give9examples - 2 of software product development (8x2)

1
projects belonging to each of these 0categories.
.

- -
average experience on similar types of project. 2 The project schedule is not tight.
b) A project size of 200 KLOC is to be developed software development team has

2 3 staff size and productivity of project


Calculate effort, development, time ,average
0
2 / 2
Q6 a) What do you understand by
advantages of TQM? Does
8 / 0ISO 9000 standard aim for TQM?
total quality management (TQM)? What are the (8x2)

9 - 2 quality initiative? To which category of industries is it


b) What is the Six
applicable?1
0 Sigma
--
Explain the Six Sigma technique adopted by software organization2
2
with respect to the goal, the procedure, and the outcome
- 0 2 3
2 3 - / 2
2 0 /0 2
0 2 / - 2 8
2 8 / 0 9
9 - 1
10