Synopsis HRMS
Synopsis HRMS
Project Synopsis
on
“Project Title”
“ Human Resources Management System”
Bachelor of Business Administration
(ComputerApplication)/BCA
Prof. Aswale.S.H.
Submitted By
Contact No : +919307737378
Email-id : [email protected]
Address : Sangamner
Tal. : Sangamner
Dist. : Ahmednagar
1.3Company Profile –
Email : [email protected]
Address : Sangamner
2.LITERATURE SURVEY
2.1Existing System –
2.2Proposed System –
2.3Feasibility Study –
How many workstations are required, how these units are interconnected so
that they could operate and communicate smoothly?
What speeds of input and output should be achieved at particular quality of printing?
This feasibility study is carried out by a small group or people who are
familiar with information system technique and are skilled in system analysis and
design process.
Proposed projects arc beneficial only if they can be turned into
information system that will meet the operating requirements of the organization.
This test of feasibility asks if the system will work when it is developed and
installed.
3.OBJECTIVE OF SYSTEM
Transparency.
• Save time.
4.METHODOLOGY
Waterfall model
Requirement
Gathering
Analysis
Design
Coding
Testing
Implement
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
5.HARDWARE & SOFTWARE REQUIREMENTS
HARDWARE REQUREMENTS
SOFTWARE REQUIREMENTS
Front-End: JAVA
Back-End: MySQL
6.BIBLIOGRAPHY
Website References:
The following links were searched and exploited extensively for the project development and
implementation.
I. http://www.java.sun.com/products\java
2. http://www.javaworld.com/
3. http://www.java2s.com/