Tile Skirting
Productivity Calculation Rmt 270
Days 5
Per Team 1
Mason JCB
0.03
13
1
0.00 1.00
Mason Labour
0.30
18
3
3.00
Mason Labour
0.17 3.13
0 31
0 31
0.00 31.00
Mason Labour
0.08 0.73
2 22
2 22
1.00 11.00
Mason Labour
0.03 0.36
139 1885
1 10
0.00 5.00
Mason Labour
0.22 1.36
462 2848
3 16
3.00 16.00
Mason Labour
0.24 3.40
6 85
6 85
3.00 43.00
Mason Labour
0.16 1.12
25 180
13 90
6.00 45.00
Mason Labour
0.10 0.15
16 24
5 8
3.00 4.00
Carpanter Helper
0.10 0.15
15 23
3 5
2.00 2.00
Carpanter Helper
0.18 0.30
131 225
9 15
4.00 8.00
Carpanter Helper
0.22 0.38
210 361
7 12
3.00 6.00
Carpanter Helper
0.15 0.23
300 450
20 30
10.00 15.00
Binder Helper
6 8 700 500
420 560 4200 4000
16 22 67846.15 86153.846
4.00 5.00 154000
Mason Labour
0.72 1.78
47 115
2 6
1.00 3.00
0.94 3.34
235 834
12 42
3.00 10.00
0.07 0.29
9 35
2 9
1.00 4.00
0.62 1.75
81 228
5 15
3.00 8.00
0.09 0.25
14 37
2 5
1.00 3.00
0.08 0.26
263 910
11 36
5.00 18.00
0.06 0.17
47 142
2 7
1.00 4.00
0.20 0.12
700 420
35 21
9.00 5.00
0.03 0.04
9 12
2 2
2.00 2.00
0.18 0.41
24 55
3 7
1.00 3.00
Mason Helper
0.50
68
8
0.00 4.00
Mason Helper
0.20 0.58
5 16
3 8
3.00 8.00
0.50
14
4
0.00 2.00
0.10 0.15
18 27
3 4
1.00 2.00
0.05 0.05
119 119
12 12
6.00 6.00
0.05 0.05
41 38
4 4
2.00 2.00
0.06 0.05
159 143
11 10
5.00 5.00
0.06 0.03
390 227
13 8
4.00 3.00
0.22 0.25
15 18
4 4
2.00 2.00
LABOUR PRODUCTIVITY / OUTPUT COEFFECIENTS IN CONSTRU
Mason / Carpanter /
Description of Works Unit Quantity
Fabricator / Painter
General Works
Loading / Unloading of Cement Bag at Plant Bag 140
Civil Works
Foundation Excavation
Excavation & Getting Out upto Depth 1.5 to 3.0 Metre Cum 1
Excavation & Getting Out upto Depth 1.5 to 3.0 Metre Cum 1
Excavation & Getting Out upto Depth 1.5 to 3.0 Metre Cum 1
Excavation & Getting Out upto Depth 1.5 to 3.0 Metre Cum 20
Concreting Works
Conventional Plywood Shuttering Works - Shuttering Making, Fabrication, Shifting & Erection & Deshutt
Foundation Shuttering Sqm 1 0.10
Masonary Works - Including, Mixing of Mortar, Shifting of Materials, Scaffolding & Curing
Brick Work 230mm Thick Walls (650 to 700 Bricks/ Per Mason) Cum 1 0.72
Brick Work 230mm Thick Walls (530 to 550 Bricks/ Per Mason) Cum 1 0.94
Half Brick Work 115mm Thick (625 to 650 Bricks / Per Mason) Sqm 1 0.09
Half Brick Work 115mm Thick (470 to 500 Bricks / Per Mason) Sqm 1 0.12
Flooring Works
Concrete Flooring Works
Tile Flooring in Staircase Riser & Treads - Cutting & Fixing Sqm 0.25
Stone Flooring in Staircase Riser & Treads - Cutting & Fixing Sqm 0.195
Kota Stone Flooring in Staircase Steps & Risers- Cutting & Fixing Sqm 0.30
Painting & Finishing Works - Including Surface Prepration & Scaffolding (Note for Old Surfaces Painting
1mm Thick - Birla Putty Sqm 0.045
Internal Finishings
White Wash / Colour Washing Works - Two Coats Sqm 0.030
External Finishings
Exterior Texture / Weather Shield Paint including Priming Coats Sqm 0.060
0.96 Foundation
0.63 Trench
0.30
0.23
2.25
8.00
& Curing
1.78 Upto Plinth Level
3.34 Super Structure Works Above Plinth Level
0.25
0.43
Without Grouting (Joint to Joint Finish)
0.04
0.43
0.48
With 3mm Spacer with Epoxy Grout in Groove Filling
0.53
0.50
0.40
0.70
0.58
0.70
0.38
0.50
53.82 53.82
or Old Surfaces Painting Factors are 50% Applicable) 550 350