Project Guidelines - 2024
Project Guidelines - 2024
GUIDELINES
SESSION
Jan- May 2024
Documents to be kept for record
1. Notice, requesting project problems from the faculty with the last date.
2. Notice, inviting project proposals from students with the last date.
3. Notice for the announcement of the Project Approval Committee team and Audit
dates.
4. Record of Project Approval Committee comments against each project proposal.
5. Record of Approved project basket.
6. Notice, sharing the project basket for allocation and guidelines (for project
allocation) with the last date.
7. Notification for the allocated projects, names of supervisors and evaluators.
8. Record of students with allocated projects, supervisors, and evaluators.
9. Notice for evaluation guidelines, dates, and evaluation rubrics.
10. Record of continuous evaluation (phase-wise, component wise).
11. Reflection report (continuous improvement, analysis of the outcomes, supervisor-
student interactions, quality of project report)
Project work
Project work provides students with complex problem soving skills through a process that
involves identifying opportunities, developing requirements, performing analysis and
synthesis, generating multiple solutions, evaluating solutions against requirements, considering
risks, and making trade-offs, to obtain a high-quality solution under the given constraints (e.g.
accessibility, aesthetics, codes, constructability, cost, ergonomics, extensibility, functionality,
interoperability, legal considerations, maintainability, manufacturability, marketability, policy,
regulations, schedule, standards, sustainability, or usability to name a few.provides).
Any planned piece of work designed with a specific purpose/outcome (to find information
about something, to produce something new, or to improve something), to be completed within
a specific period can be categorized as project work.
A few examples to illustrate both the concept and the general educational intentions:
Internal
Weekly End term
Proposals Approval Allocation Evaluations
interactions Evaluation
(5 phases)
1. PROJECT PROPOSALS
• Option will be available to all the faculty members where they can propose the projects
for students and select the co-supervisor.
• The No of projects proposed by the faculty will be decided by the respective Heads,
considering the student-to-faculty ratio involved and no of students allowed per group
(not exceeding 5)
For example:
Total students in a semester enrolled in project course – 60
Allowed team size – 4
Total no of faculty in the department – 3
No projects proposals are required from each faculty - (𝟔𝟎⁄𝟒) = 𝟓
𝟑
• Students can request projects by proposing an idea available in their CUIMS accounts.
• Students can propose only 1 idea.
• The suggested idea will be visible to all the faculty in the department.
• Any faculty member interested in supervising the project can accept the idea and, after
discussion with the student, will frame the objective and propose the project for
approval through vetting committee (same as Point 1.1).
• The status of the project will be notified to the student on CUIMS from time to time.
2. PROJECT APPROVALS
• HoD will formulate project approval/vetting committee with an objective to check the
quality and feasibility of the submitted projects.
Automatic mode
Manual Mode
• The status of all projects allocated for approval/vetting to Project Approval Committee
will be visible in the HoD Dashboard.
• All projects allocated for approval/vetting to the Project Approval Committee (as
deputed by the HoD) will be visible in their CUIMS account for approval/rejection.
• The status of the project after approval/rejection will be visible to the supervisors
• If rejected, the supervisor can propose the project again by incorporating the required
changes.
• Accepted projects will be visible as project basket on the HoD account.
3. PROJECT ALLOCATION
• All the students enrolled in the course will be able to give preference for projects
(maximum 10 percent of the total projects in the basket).
• Supervisor will be able to see all requests for the project in their portal.
• Supervisors will approve the students (out of students who have selected the project) to
create the team.
• Students not selected under the preference will be eligible for other selected projects.
• Students not selected under any preference will be able to request again.
• After the polling dates, unallocated/Non polled students can only be polled by the HoD.
4. INTERACTION OF THE TEAMS
5. PROJECT EVALUATION
• The departments can create the rubrics (approved rubrics from Office of AA) and assign
a program code that will follow the rubrics for evaluation.
• The rubrics will follow continuous evaluation containing 5 internal phases (including
work ethics) and the end-term phase.
5.2. PROJECT EVALUATION INTERNAL
• Continuous evaluation will be done by the evaluation panel (2 members) and supervisor
individually on their CUIMS portals.
• Evaluation panel can be created and allocated projects by the HoD. The supervisor
cannot be a panellist in their own project.
• The project team is required to show their progress on the tasks completed during the
period of the respective phase through documentation and presentation.
• Project work will be divided into 4 phases that will start only after the allocation of the
project.
Phase 1: Project scope and task planning
➢ Recognize the need (beneficiary/client) or relevant contemporary issues to
define the scope of the project work.
➢ Identify the problem either by engagement with the beneficiary/client or by
correlating the identified problem against the contemporary issue.
➢ Divide the work, identify the tasks, and create a Gant chart/ timeline to plan the
project.
2. To maintain the quality of the projects, HoD’s shall ensure that supervisors are not taking
more than 6 projects (6 x 5=30 students) (for more projects/faculty, inform the office of
Academic affairs in advance)
3. Supervisors will only be able to propose academic projects for the programs allocated to
them (linked to CUIMS, depending upon the current deputation).
4. For proposing project in department other than deputed department, request can be raised
from the HoD (of other department) to the office of Academic Affairs for including the
faculty in the list.
5. Team size
• Project courses for UG programs will be done in teams with a group size of 3-5
students depending upon the requirement of the project work. Supervisors can fix the
group size on CUIMS for projects while proposing the project.
• Exception for team size: Size below the minimum limit of 3 and beyond the
maximum limit of 5 is allowed when suggested by a governing council or the outcome
of project work is participation in govt/industrial competition. In such a case, team
size will be based on the guidelines issued by the agency.
6. Members of the “Project Approval Committee” shall be responsible for the quality of the
projects.
• They shall ensure that the level of the projects is as per the current skill set of the
students.
• The outcome is achievable in the mentioned period.
7. The Department shall notify the seating of supervisors during the project contact hours,
and venue with all the students.
8. Hod’s shall ensure that supervisors are not allocated any administrative work during project
contact hours, and supervisors are available for discussion with the project teams.
9. Attendance marking in CUIMS can be exempt from the project course.
10. For the monitoring of the student interactions, Supervisors shall maintain the CUIMS log
of the discussion with the project teams.
11. In case the supervisor leaves before the end of the session, HoD’s/project coordinator shall
ensure that project is shifted to a new supervisor, and it is allocated on CUIMS.
12. Rubrics will be accessible to students on CUIMS, and all the supervisors and co-supervisors
shall evaluate the students strictly as per the RUBRICS.
13. Dates for Internal evaluation will be spread across a week (shall be visible to faculty and
students on CUIMS).
• Supervisors/panelists who fail to evaluate the groups and submit marks on CUIMS
during the allocated time will have to get permission in writing from the Dean of
Academic Affairs stating the reason for the same.
• Project groups/members failing to appear for the evaluation during the allocated time
shall be marked zero by the evaluators.
• Course will be considered incomplete under following conditions:
a) Student is not enrolled in the course (NR).
b) Student is enrolled in the course but not registered for project (not polled).
Roles and Responsibilities of the Stakeholders
Students
1. Selection
• (Self-Ideated) - Students can forward a request to all the faculty members of the
department for being the supervisor.
• (From Basket) - Select the project from the basket shared by supervisors.
2. Discussion
• Meet the supervisor and co-supervisor twice a week for
discussion/review/evaluation.
i. Log of interaction (minutes of the meeting) will be maintained by the
supervisor on CUIMS.
3. Evaluation
• Appear for evaluation within the specified timelines (5 times internal and 1 time
for end-term)
• Failing to appear for evaluation within the timeline will result in zero marks
for the particular phase.
• Evaluation will be as per the rubrics (visible on CUIMS)
• Evaluation will be done by the supervisor and co-supervisor and marks will be
reflected on CUIMS.
• Hod/project coordinator can be approached (if not satisfied with the evaluation)
4. Submission
• Complete the project and attain the predefined outcome.
• Incorporate the inputs of the supervisor and co-supervisor.
HOD
1. No of the projects/faculty
Decide the no of projects per faculty, considering the student-to-faculty ratio involved
and no of students allowed per group (not exceeding 5)
For example:
Total students in a semester enrolled in project course – 60
Allowed team size – 4
Total no of faculty in the department – 3
No projects proposals are required from each faculty - ((60∕4)/3) =5
2. Fix the time slots in the timetable, when the availability of the supervisor, co-supervisor
and students can be ensured at the same time.
3. Constitute Project approval Committee
4. Appoint Project Coordinator (can be multiple, if the batch size is bigger).
5. Monitor the process, through CUIMS (project proposals, discussion sessions,
evaluations)
6. Ensure a new supervisor is allocated for the project teams, in case the supervisor leaves
the university.
7. Constitute the panel for end-term evaluation.
8. Ensure that the marks are uploaded for the evaluations.
9. Create grades for submission to the office of the controller of examination.
10. Completely responsible for overall execution of projects, marks uploading, evaluations,
project team creation , supervisor venue uploading, allocation of supervisors and Examiners,
grading of students and any data related to projects required by Egov, CoE or PVC AA
office.
1. Ensure that the level of the projects is as per the current skill set of the students.
2. Ensure that the outcome mentioned in the proposal is achievable in the mentioned
period.
Project Coordinator
1. Will be given responsibility as MSC for the Project Courses (for allocation of rights on
CUIMS).
2. Ensure equal no of projects to all faculty members.
3. Documentation for the record.
4. Timely dissemination of information to supervisors, co-supervisors and students.
5. Assist HoD in monitoring the process, through CUIMS (project proposals, discussion
sessions, evaluations).
6. Assist HoD in creating grades for submission to the office of the controller of
examination.
7. Grievance redressal of students.
Supervisor
Evaluation panelist
ERP
1. Support the office of Dean Academic Affairs in digitizing the process on CUIMS.
Controller of Examination
1. Collect the distributed marks along with Grade sheets for Award submission.