ITP For Installation of Structured Cabling For Communication

This inspection and test plan outlines the procedures for inspecting and testing the structured cable installation for the South Boarder Housing Project. It lists 4 key documentation activities that require approval prior to related work, including pre-qualifying subcontractors, approving shop drawings, approving materials, and approving the installation method statement. It also describes 3 levels of material and installation inspections to check compliance with specifications, including inspecting each material delivery and cable installation area. The plan designates responsibility for inspections between the contractor, consultant, and identifies approval requirements.

Uploaded by

Infas Yahya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views1 page

ITP For Installation of Structured Cabling For Communication

This inspection and test plan outlines the procedures for inspecting and testing the structured cable installation for the South Boarder Housing Project. It lists 4 key documentation activities that require approval prior to related work, including pre-qualifying subcontractors, approving shop drawings, approving materials, and approving the installation method statement. It also describes 3 levels of material and installation inspections to check compliance with specifications, including inspecting each material delivery and cable installation area. The plan designates responsibility for inspections between the contractor, consultant, and identifies approval requirements.

Uploaded by

Infas Yahya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION & TEST PLAN

REF. NO.

SOUTH BOARDER HOUSING PROJECT REV. NO.


DATE :
PAGE : 1 OF 1

ACTIVITY: Structured Cable - Installation

AREA/LOCATION:

ITP approved by CONTRACTOR's QA/QC: ITP approved by Consultant:


Signature: Signature:
Date: Date:
INSPECTION LEVEL
SERIAL NO. DESCRIPTION FREQUENCY SPECIFICATION / CRITERIA VERIFICATION RECORD
S/C CONTRACTOR Consultant

1 DOCUMENTATION
Once (Approval prior to
1.1 Pre-Qualification subcontractor Specifications and submittals. H H R
submit the submittal)

1.2 Shop Drawing Approval Each Shop Drawing Specifications and submittals. H H R

Each MAR ( prior to order


1.3 Material Approval Specifications and submittals. H H R
the material).

Once (Approval prior to


1.4 Method Statement Approval Specifications and submittals. H H R
start of activity)
2 MATERIAL INSPECTION

Check the Material as per approved


2.1 Each Delivery Specifications and submittals. H H H
submittal.

3 Installation

Each Area where applicable


3.1 Installation of the Cabling (As per Consultant Specifications and submittals. H H H
requirements)

LEGEND: H: HOLD W: WITNESS S: SURVEILLANCE R: REVIEW


ITP Sign-Off post completion of Works
CONTRACTOR APPROVAL Consyltant APPROVAL

NAME : NAME :

SIGN : SIGN :
DATE: DATE:

PAGE 1 of 1