SC-I 020.10.22 Control Points After Dismantling For Indiction Machine Ver B
SC-I 020.10.22 Control Points After Dismantling For Indiction Machine Ver B
SC-I 020.10.22 Control Points After Dismantling For Indiction Machine Ver B
Motors & Generators Control points after dismantling, 2013-10-18 Valid 1(5)
cleaning and drying for induction
machines
Division/Department Prepared by Approved by Security level
Control phase
Control after dismantling, cleaning and drying
2 Insulation testing
Insulation resistance a Stator winding to earth and SC-I 020.10.52
between phases
Resistance element
Heater
3 Voltage test b Electrical strength SC-I 020.10.58
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
Copyright 2011 ABB.
Document kind Document identity Revision
Motors & Generators Control points after dismantling, 2013-10-18 Valid 2(5)
cleaning and drying for induction
machines
Division/Department Prepared by Approved by Security level
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
Copyright 2011 ABB.
Document kind Document identity Revision
Motors & Generators Control points after dismantling, 2013-10-18 Valid 3(5)
cleaning and drying for induction
machines
Division/Department Prepared by Approved by Security level
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
Copyright 2011 ABB.
Document kind Document identity Revision
Motors & Generators Control points after dismantling, 2013-10-18 Valid 4(5)
cleaning and drying for induction
machines
Division/Department Prepared by Approved by Security level
Other details:
21 Mechanical coupling a Cracks Visual
b Distances inspection
c Bolts
d Fittings
e Key
f Key slot
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
Copyright 2011 ABB.
Document kind Document identity Revision
Motors & Generators Control points after dismantling, 2013-10-18 Valid 5(5)
cleaning and drying for induction
machines
Division/Department Prepared by Approved by Security level
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without
express authority is strictly forbidden.
Copyright 2011 ABB.