Risk For Group 3 1
Risk For Group 3 1
Risk For Group 3 1
CREW
Lazarus Hughes, Mary-Kate Lally, Lauren
Smith, Joe Venn
DATE TIME
START FILMING
23rd of January
FINISH FILMING 24 of January
CONTACT DETAILS
HAZARDS
1 Audience or Public Safety X
2 Cables x
3 Camera Cranes / Dolly / Slider / Drones
4 Derelict Buildings
5 Electricity
6 Fire - Flammable materials etc
7 Hazardous Terrain - Slipping / Tripping / Falling
8 Hazardous Terrain – Sand / Mud / Gravel etc
9 Manual Handling – Heavy lifting
10 Noise / Sound levels x
11 Medical Conditions – Allergies / Health problems etc
12 Physical Exertion
13 Stunts / Dangerous activities
14 Theft of Equipment
15 Weapons – Prop Guns / Knives / Swords etc
16 Weather Conditions - Hot / Cold / Rainy / Windy / Snow etc
17 Working with Animals
18 Working with Children
19 Working with Disabled / Elderly
20 Working at Night
21 Working on or near Water
22 Vehicles
22 Other -
PRODUCTION RISK ASSESSMENT Sheet 1 of 2
The members of the L Use inside voices, don’t shout to The crew
We could disrupt others Public loud, make sure to keep the door
work due to the Levels of shut
Sound
PRODUCTION RISK ASSESSMENT Sheet 2 of 2
Signed:
Producer
Date:
Signed:
Tutor or Technician