This document contains a list of verifications to be done during the installation of the KONE
MonoSpace or KONE MonoSpace Special elevators.
Delivered components and installation methods may differ from the ones described. For more
details on how to install the elevators, see elevator specific AM instructions and delivery
documents. Always follow the installation site specific procedures. This document is not
intended to replace them.
Do the verifications and fill in the tables each day or whenever the installation phase has been
completed. All defects found must be listed in the remarks column. D in the done column means
defect to be corrected.
Corrective actions must be taken before tagging the done column with OK (including the name and
date) and continuing the installation. Both the fitter and superior must be positive that the items listed
are in an acceptable condition.
Responsibilities
Auditor = a competent person nominated to audit the completion of the QD document and the
installation of the elevator.
Superior = a competent person (e.g. supervisor or installation specialist) who confirms that the
installation phase has been completed.
Fitter = a competent person who installs the elevator and fills in the lists in this document with the
required information.
Target group: Fitters, supervisors, installation specialists and auditors who participate in elevator
installations.
Number of stops:____________________________
Travel: ____________________________________ m
Load: ____________________________________ kg
Plumbing:
QD DONE NOTE
2.
Before commissioning
QD DONE NOTE
7.
Auditor Date / /
Superior Date / /
Fitter Date / /
QD 1. SAFETY
Elevator number:
Fitter Date / /
QD 2. PLUMBING
Elevator number:
Elevator number:
If plumb wires:
The plumb wire is touching the pointer on the
alignment tool.
Fitter Date / /
Elevator number:
R 2.10
R 3.0
R 3.0
R 2.10
R 2.10
R 3.0
1 Safety Gear
The safety gear must be connected
to the overspeed governor and
Automatic Safety Gear Trigger.
Whenever it is necessary to
disconnect the man riding hoist
from the car:
1 Safety Gear
The elevator car must be secured
on the safety gear using the
Automatic Safety Gear Trigger.
2 Chains
The parking chain(s) must secure
the elevator car or installation time
platform to the guide rail bracket.
Fitter Date / /
Elevator number:
Done – OK, N/A = not applicable, D = defective or non conforming
If plumb wires:
The plumb wire is touching the pointer on the
alignment tool.
Fitter Date / /
Elevator number:
3. Door lock is adjusted properly. If required, the Emergency opening for car
door lock is installed.
Railing 1
Railing 2
4. The door sill and railing are positioned correctly in relation to the car.
Railing 2
2 mm gap
Fitter Date / /
QD 7. BEFORE COMMISSIONING
Elevator number:
R 3.0 R 2.10
Tachometer/encoder/resolver
cable is connected and cable
shield is earthed in both ends.
KDL16S
7. Overspeed governor:
R 2.10
R 3.0
12 Service book, complete circuit diagrams and rope labels are in the control
panel.
13 All grounding on the whole installation must be correctly connected to the
earth terminal.
Fitter Date / /
Elevator number:
2. Shaft:
3. Counterweight:
R 2.10
R 3.0
4. Pit:
10 Guide rails:
R 3.0
15 Safety chain check during RDF / NOTE: This list includes the most
inspection drive: common safety chain switches and
contacts. Check from the circuit
- RDF buttons in the controller and diagrams of the inspected elevator
the inspection unit on the elevator that all switches or contacts are going
car roof must not control the to be tested.
elevator simultaneously.
16 Elevator is cleaned:
- Headroom
- Brackets and guide rails
- Doors and landings (sills, top
tracks and moving parts)
- Car roof
- Car interior
- Pit
Fitter Date / /
Elevator number:
2. Doors:
Fitter Date / /