Load Calculation
Load Calculation
PLATE 100-A
Instruction: Analyze, design and detail the given roof truss framing.
Given:
▪ Proposed Four-Story condominium building located at Amistad, Camp 7, Baguio City
▪ Flat Terrain
▪ Use weld connection (use U=1.0)
▪ If double angle is used, assume 5 mm gusset plate in between angles.
▪ Use A36 steel.
Required:
▪ Wind Load Calculation (see appendices)
▪ Truss Analysis (STAAD software)
▪ Member Forces-Load Combination (use Microsoft Excel)
▪ Design Calculation
▪ Detailing of Roof Truss
▪ Present detailed and itemized PROJECT REPORT in pdf file (scanned and/or handwritten calculations)
▪ Submit all supporting documents and files to CANVAS-excel, dwg file, staad file.
APPENDICES
JOB INFORMATION
PROJECT TRUSS ANALYSIS ENGR. RUP JOB NO. 1
SUBJECT WIND LOAD CALCULATION DATE SHEET 1
NO.
DESIGN PARAMETERS
I. DEAD LOADS
Roofing Weights = 0.15 KPa
Sag Rod = 0.05 KPa
Purlins = 0.10 KPa
Utilities:
Electrical = 0.05 KPa
Ceiling = 0.10 KPa
Ceiling Framing (Metal Fuming) = 0.15 KPa
II. LIVE LOAD
Roof Live = 0.70 KPa
III. WIND LOAD
Occupancy Category: III-Special Occupancy Structures
Site Location: #2257 Smith Drive, Asin Road, Baguio City
Wind Velocity = 250.00 Kph 69.44 m/s
Exposure =B
Tributary Width (w ) = 3.50 m
Roof Angle = 22.0 °
Kzt = 1 FLAT TERRAIN
Mean Height (z) = 13.5m
ANALYTICAL PROCEDURE (NSCP-2015)
qz=0.613KzKztKdV2 N/m2
z= 13.25 zg= 365.76 α= 7
Kz = 2.01(z/zg)2/α
Kz = 0.78
Kzt = 1 Flat Terrain
Kd = 0.85 Main Wind Force Resisting System
qz = 1.96 Kpa
P=qh[(GCpf)-(Gcpi)]
Winward Leeward
Case I Gcpi = 0.18 0.18 Enclosed Buildings
Case II Gcpi = -0.18 -0.18 Enclosed Buildings
Gcpi = -0.69 -0.37 Roof Angle 0°