0% found this document useful (0 votes)
28 views15 pages

Chapter 5 (B) - CPU Scheduling

Uploaded by

Abdullah Butt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views15 pages

Chapter 5 (B) - CPU Scheduling

Uploaded by

Abdullah Butt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Chapter 5b: CPU Scheduling

Operating System Concepts – 9th Edition Silberschatz, Galvin and Gagne ©2013
Scheduling Algorithm

● First –come, First-serve (FCFS: Non-Preemptive)


● Shortest-Job-First Scheduling (SJF: Non-Preemptive)
● Shortest-Remaining-Time-First (Preemptive)
● Round-Robin Scheduling (RR: Preemptive)

Operating System Concepts – 9th Edition 5.2 Silberschatz, Galvin and Gagne ©2013
First- Come, First-Served (FCFS) Scheduling

● Consider the following three processes and their burst time

Process Burst Time


P1 24
P2 3
P3 3

● Suppose that the processes arrive in the order: P1 , P2 , P3


● We use Gantt Chart to illustrate a particular schedule

● Waiting time for P1 = 0; P2 = 24; P3 = 27


● Average waiting time: (0 + 24 + 27)/3 = 17

Operating System Concepts – 9th Edition 5.3 Silberschatz, Galvin and Gagne ©2013
FCFS Scheduling (Cont.)

● Suppose that the processes arrive in the order:


P2 , P3 , P1
● The Gantt chart for the schedule is:

● Waiting time for P1 = 6; P2 = 0; P3 = 3


● Average waiting time: (6 + 0 + 3)/3 = 3
● Much better than previous case
● Convoy effect - short process behind long process
● Consider one CPU-bound and many I/O-bound processes

Operating System Concepts – 9th Edition 5.4 Silberschatz, Galvin and Gagne ©2013
Shortest-Job-First (SJF)

● SJF – an algorithm in which the process having the smallest


execution time is chosen for the next execution. This
scheduling method can be preemptive or non-preemptive.
● SJF is optimal – gives minimum average waiting time for a
given set of processes
● How do we know what is the length of the next CPU
request
● Could ask the user
4 what if the user lies?

Operating System Concepts – 9th Edition 5.5 Silberschatz, Galvin and Gagne ©2013
Example of SJF

■ Consider the following four processes and their burst time

Process Burst Time


P1 6
P2 8
P3 7
P4 3

● SJF scheduling chart

P4 P1 P3 P2
0 3 9 16 23

● Average waiting time = (3 + 16 + 9 + 0) / 4 = 7

Operating System Concepts – 9th Edition 5.6 Silberschatz, Galvin and Gagne ©2013
Shortest-Remaining-Time-First (SRTF)
● Preemptive version of SJF is called shortest-remaining-time-first

Process Arrival Time Burst Time


P1 0 8
P2 1 4
P3 2 9
P4 3 5
● Preemptive SJF Gantt Chart

P1 P2 P4 P1 P3
0 1 5 10 17 26

● Average waiting time = [(10-1)+(1-1)+(17-2)+5-3)]/4 = 26/4 = 6.5 ms

Operating System Concepts – 9th Edition 5.7 Silberschatz, Galvin and Gagne ©2013
SRTF/SJF (Preemptive): Question?

■ Consider the following four processes and their burst time

Process Arrival Time Burst Time


P1 2 6
P2 5 2
P3 1 8
P4 0 3
P5 4 4

● Create SRTF/SJF(Preemptive) Scheduling chart?


● Calculate Average Turn-Around Time?
● Calculate Average waiting time?

Operating System Concepts – 9th Edition 5.8 Silberschatz, Galvin and Gagne ©2013
SRTF/SJF (Preemptive) - Solution
Process Arrival Time Burst Time Turn-Around Waiting Time
P1 2 6 15-2=13 13-6=7
P2 5 2 2 0
P3 1 8 22 14
P4 0 3 3 0
P5 4 4 6 2

turn-around time = CT - AT
Waiting time = TAT - BT

● SRTF/SJF(Preemptive) scheduling chart

P4 P1 P5 P2 P5 P1 P3
0 3 4 5 7 10 15 23

● Average waiting time = (7 + 0 + 14 + 0 + 2) / 5 = 26 / 5 = 4.6


● Average turn-around time = (13 + 2 + 22 + 3 + 6) / 5 = 9.2

Operating System Concepts – 9th Edition 5.9 Silberschatz, Galvin and Gagne ©2013
Round Robin (RR)

● Each process gets a small unit of CPU time (time quantum q).
After this time has elapsed, the process is preempted and
added to the end of the ready queue.
● If there are N processes in the ready queue and the time
quantum is q, then each process gets 1/N of the CPU time in
chunks of at most q time units at once. No process waits
more than (N-1)q time units.
● Timer interrupts every quantum to schedule next process
● Performance
● q large ⇒ FIFO
● q small ⇒ q must be large with respect to context switch,
otherwise overhead is too high

Operating System Concepts – 9th Edition 5.10 Silberschatz, Galvin and Gagne ©2013
Example of RR with Time Quantum = 4

■ Consider the following three processes and their burst time

Process Burst Time


P1 24
P2 3
P3 3

● The Gantt chart is:

P1 P2 P3 P1 P1 P1 P1 P1
0 4 7 10 14 18 22 26 30

● The average waiting time under the RR policy is often longer


● Typically, higher average turnaround than SJF, but better response

Operating System Concepts – 9th Edition 5.11 Silberschatz, Galvin and Gagne ©2013
Round Robin (TQ = 2) : Question?

■ Consider the following four processes and their burst time

Process Arrival Time Burst Time


P1 0 5
P2 1 4
P3 2 2
P4 4 1

● Create Round Robin (Preemptive) Scheduling chart?


● Calculate Average Turn-Around Time?
● Calculate Average waiting time?

Operating System Concepts – 9th Edition 5.12 Silberschatz, Galvin and Gagne ©2013
Round Robin (TQ = 2) - Solution
Process Arrival Time Burst Time Turn-Around Waiting Time
P1 0 5 12-0=12 12-5=7
P2 1 4 10 6
P3 2 2 4 2
P4 4 1 5 4

P1 P2 P3 P1 P4 P2 P1
Ready Queue:

turn-around time = CT - AT
● Round Robin (Preemptive) scheduling chart: Waiting time = TAT - BT

P1 P2 P3 P1 P4 P2 P1
0 2 4 6 8 9 11 12

● Average waiting time = (7 + 6 + 2 + 4) / 4 = 19 / 4 = 4.75


● Average turn-around time = (12 + 10 + 4 + 5) / 4 = 41 / 4 = 10.25.

Operating System Concepts – 9th Edition 5.13 Silberschatz, Galvin and Gagne ©2013
SRTF/RR: Class Activity?

■ Consider the following four processes and their burst time

Process Arrival Time Burst Time


P1 0 7
P2 1 5
P3 2 3
P4 3 1
P5 4 2
P6 5 1

● Create SRTF/SJF(Preemptive) Scheduling chart?


● Create RR(Preemptive) Scheduling chart with TQ = 2 ?
● Calculate Average Turn-Around Time?
● Calculate Average waiting time?

Operating System Concepts – 9th Edition 5.14 Silberschatz, Galvin and Gagne ©2013