Awetu River Chanelization Form BECHO Bridge To BISHISHE Bridge Description Unit Qty ETB Unit Pric Amount Item No
Awetu River Chanelization Form BECHO Bridge To BISHISHE Bridge Description Unit Qty ETB Unit Pric Amount Item No
Awetu River Chanelization Form BECHO Bridge To BISHISHE Bridge Description Unit Qty ETB Unit Pric Amount Item No
ETB
Item No. Description Unit Qty
Unit pric Amount
1. SURVEYING AND SETTING OUT
1 Lab test for all material as ordered by the engineer lum 1 30,000.00 30,000.00
2 Surveying and Setting out ml 250 200.00 50,000.00
SUB TOTAL 1 80,000.00
2.Excavation and Earth Work
2.1 Site clearing and grubbing -
Site Clearing, and grubbing along the Chanel line and structures to
an average depth of 200mm from natural ground level and water
level to remove organic materials, debris, plastics, surplus plants
over the river and dirty collection. Site clearing and grubbing work
also consists of the removal and uprooting of trees(including all m² 8,750 7.00 61,250.00
girths diameter) , brushes, other vegetation, rubbish, fences ,
removal of stumps and roots and other objectionable material that
obstructs the work and filling and compacting the cavities resulting
from grubbing with approved material along the drainage line.
Overlay 30cm thick C-25 Concrete for under gabion bedding mad 3
3.2 M 375 3,500.00 1,312,500.00
over the compacted Hard rock and well vibrated
form works shall be timbered or steel or combination of two
3.2.1 m² 300 165.00 49,500.00
sufficient to the wet concrete without leakage
3.3 Hard core for under bedding 20cm thick under the concrete m² 1250 150.00 187,500.00
Supply and assemble Gabion boxes of 3mm Double twisted
Hexagonal galvanized and pvc coated wire mesh type 100mm
3.4 x80mm with binding wire at 50cm interval and the Rock size to the -
face of the mesh should be greater than 100mm. Each Gabion box
should be tied to each other 3mm wire
a)Gabion size of 2.5m x1m x1 m pcs 1000 2,000.00 2,000,000.00
b) Gabion size of 2m x 1m x 1m pcs 500 1,700.00 850,000.00
c) Gabion size of 1.5m x 1m X1m pcs 500 1,200.00 600,000.00
d) Gabion size of 1m x 1m x1m pcs 500 800.00 400,000.00
SUB TOTAL 3 8,374,500.00
4. Masonry and Sanitary structure
class c-20 concerete of 5cm thick casted insitu for 5cm capping
4.5 M3 3 3,300.00 9,900.00
layer including form works
Backfill Supply, spread and compact 20cm, or more of sub-base
4.6 granular material or gravel sub-base as directed and approved by M3 22 185.00 4,070.00
the Engineer, in drainage channel bedding
4.7 suplly and fix Reinforced concrete pipe on class B bedding nominal diameter
pcs 600mm 132 4,000.00 528,000.00
SUB TOTAL 4 752,720.00
5. Recretional works
5.1 supply and fix standard ozbread Tanica, Shara, katrinus deluxe, breezemand
2
empire grass7250
equally fix350.00
for aestetic purpose which
2,537,500.00
uses for both aesthetic and to
5.2 supply and fix above 1.5m length Trees which uses for nutrition mango, Orange,
no Avocado trees
100
center to
200.00
center of 5m the price all necessery
20,000.00works to grow up th
5.3 cast in situ concrete C-25 10cm thick concrete walkway structure including
M3 formwork, false work,
150 joints
3,500.00
and class u surface finish525,000.00
5.4 cast insitu 30*10 cm shaped concrete curb stones having C-25 strength along
M3 the walkway 30 3,600.00 108,000.00
5.5 form works shall be timbered or steel or combination of two sufficient to m
the
2
wet concrete without
300 leakage
165.00 49,500.00
SUB TOTAL 5 3,240,000.00
6. installation of wire mesh Fence and gate work
6.1 Trench Excavation for concrete to fix angle iron post on it. M3 6.8 75.00 510.00
6.2 cast insitu 40cm x 40cm x 50cm shaped concrete under the vertical angle M
iron to anchor having6.8
3
C-25 strength
3,200.00 21,760.00
6.3 Supply and fix wire mesh fencing of 2mm diameter wires well alligned m2 2000 250.00 500,000.00
6.4 supply and fix in position 60*60*3 and 350cm long angle iron center to center
ml 400cm respectively
291.67 anchored
200.00in 50cm depth and all 58,334.00
poles plumbed vertically and
6.5 ditto but supply and fixing position Horizontally on top and bottom of ironmlpost RHS 40x40x3mm
1000 200.00 200,000.00
6.6 Supply and fix metal framed fence gate partially grilled and sheet metal covered
No (3m x 2.20m in 4size)
10,000.00
doors for entrance. 40,000.00
SUB TOTAL 6 820,604.00
Sub TOTAL (1+2+3+4+5+6) 23,080,324.00
VAT 15% 3,462,048.60
Grand Total 26,542,372.60
Item No. Description Unit
Site Clearing, and grubbing along the Chanel line and structures to
an average depth of 200mm from natural ground level and water
level to remove organic materials, debris, plastics, surplus plants
over the river and dirty collection. Site clearing and grubbing work
also consists of the removal and uprooting of trees(including all m²
girths diameter) , brushes, other vegetation, rubbish, fences ,
removal of stumps and roots and other objectionable material that
obstructs the work and filling and compacting the cavities resulting
from grubbing with approved material along the drainage line.
SUB TOTAL 2
3. Gabion Wall
Overlay 30cm thick C-25 Concrete for under gabion bedding mad 3
3.2 M
over the compacted Hard rock and well vibrated
form works shall be timbered or steel or combination of two
3.2.1 m²
sufficient to the wet concrete without leakage
3.3 Hard core for under bedding 20cm thick under the concrete m²
Supply and assemble Gabion boxes of 3mm Double twisted
Hexagonal galvanized and pvc coated wire mesh type 100mm
3.4 x80mm with binding wire at 50cm interval and the Rock size to the
face of the mesh should be greater than 100mm. Each Gabion box
should be tied to each other 3mm wire
a)Gabion size of 2.5m x1m x1 m pcs
b) Gabion size of 2m x 1m x 1m pcs
c) Gabion size of 1.5m x 1m X1m pcs
d) Gabion size of 1m x 1m x1m pcs
SUB TOTAL 3
Construct 50cm4.thick Masonry
hard and Sanitary
basaltic structurestone masonery
or equivalent
units (shaped and dressed square /nearly square, and durable),
Excavating
coursed (first of soft
& material
second forsortmasonry work, sanitation and
and random/uncoursed river
basaltic
4.1 diversion situated with in the following depth ranges
(rubble)) for masonry drainage channels, FOR masonry manhole, below flow M3
surface level includingand/or
Abutment/foundation removal of excavated
Retaining walls material
on outletfrom theassite
drains per
the order of clients well bedded in cement mortar ratio 1:3 & price
4.2 M3
shall include
Cart cost of all
away removal materials,
of surplus labour charge,
excavated materialcuring,
5 km pointing
away from in
4.3 cement mortar of 1:3 mix to exposed masonry and installation of M3
the site
cast to indicated
in situ concretearea
C-25for30cm
sanitation
thickand river diversion.
concrete bedding structure
4.4 drainage spouts spaced 4m at the center of deck slab and weep M3
including
class c-20formwork,
concerete false work,
of 5cm joints
thick and class
casted insituufor
surface
5cm finish
capping
4.5 Backfill
holes forSupply,
abutment,spread and compact
150mm above water20cm,level
or more
at 3mof sub-base
c/c both M3
layer including form works
4.6 granular
vertical &material or gravel
horizontal sub-base
staggered & all as directed finishing
necessary and approved
works by as M3
the
per Engineer,
4.7 suplly
theand fix in drainage
of the channel
Reinforced
instruction concretebedding
Engineer pipe
in pcs 600mm
on class B bedding nominal diameter
-charge.
SUB TOTAL 4
5. Recretional works
5.1 supply and fix standard ozbread Tanica, Shara, katrinus deluxe, breezemand 2
empire grass equally fix fo
5.2 supply and fix above 1.5m length Trees which uses for nutrition mango, Orange, no Avocado trees center to c
5.3 cast in situ concrete C-25 10cm thick concrete walkway structure including M3 formwork, false work, joints a
5.4 cast insitu 30*10 cm shaped concrete curb stones having C-25 strength along M3 the walkway
5.5 form works shall be timbered or steel or combination of two sufficient to m the
2
wet concrete without leakage
SUB TOTAL 5
6. installation of wire mesh Fence and gate work
6.1 Trench Excavation for concrete to fix angle iron post on it. M3
6.2 cast insitu 40cm x 40cm x 50cm shaped concrete under the vertical angle M iron
3
to anchor having C-25 streng
6.3 Supply and fix wire mesh fencing of 2mm diameter wires well alligned, m 2
6.4 supply and fix in position 60*60*3 and 350cm long angle iron center to center ml 400cm respectively anchor
6.5 ditto but supply and fixing position Horizontally on top and bottom of ironmlpost RHS 40x40x3mm
6.6 Supply and fix metal framed fence gate partially grilled and sheet metal covered No (3m x 2.20m in size) door
SUB TOTAL 6
Sub TOTAL (1+2+3+4+5
VAT 1
Grand T
ETB This perod excuted
Qty
Unit pric Amount Qty Amount
8700.00 60,900.00
- -
26176.00 4,842,560.00
9,812,500.00 9,791,773.81
-
1000 2,000.00 2,000,000.00 912.00 1,824,000.00
500 1,700.00 850,000.00 500 850,000.00
500 1,200.00 600,000.00 500 600,000.00
500 800.00 400,000.00 500 400,000.00
8,374,500.00 6,805,544.00
1 30,000.00
228 45,600.00
75,600.00
8700 60,900.00
0 -
18728.68 2,022,697.95
0 -
20468.68 2,865,615.86
0 -
26176.00 4,842,560.00
9,791,773.81
2280 1,596,000.00
374.40 1,310,400.00
273.60 45,144.00
1200.00 180,000.00
0 -
912.00 1,824,000.00
500 850,000.00
500 600,000.00
500 400,000.00
6,805,544.00
0 -
0 -
0 -
0 -
0 -
0 -
0 -
-
0 -
0 -
0 -
0 -
0 -
-
0 -
0 -
0 -
0 -
0 -
0 -
-
16,672,917.81
2,500,937.67
- 19,173,855.48
Take Off Sheet
Project :- Construction of Awetu river chanelization form BECHO Bridge to BISHISHE bridge
Location :- Jimma City Bacho Bore Kebele payment -1
Employer :- Jimma City Administration Page No :- 1
Contractor :- Said Mohamed GC
Consultant :- Jimma City Inferastrucure department Counter part Engineer
______________ ____________________
Prepared by Checked by
Take Off Sheet
Project :- Construction of Awetu river chanelization form BECHO Bridge to BISHISHE bridge
Location :- Jimma City Bacho Bore Kebele payment -1
Employer :- Jimma City Administration Page No :- 2
Contractor :- Said Mohamed GC
Consultant :- Jimma City Inferastrucure department Counter part Engineer
______________ ____________________
Prepared by Checked by
JIMMA CITY ADMINISTRATION
CERTIFICATE OF FIRST PAYMENT page No- 01
Project :- Construction of Awetu river chanelization form BECHO Bridge to BISHISHE bridge Date:- 08/06/2013
Location :- Jimma City Bacho Bore Kebele
Amount (Birr)
Employer :- Jimma City Administration
Contractor :- Said Mohamed GC Main Contract 23,080,324.00
Consultant :- Jimma City Inferastrucure department Counter part Engineer Supplementary Contract
VAT(15%) 3,462,048.60
Variation Orders
Total Sum with 15% vat 26,542,372.60
AVERAGE METHOD
228 5.716 4.5 5864.336181818
EXCAVATION FOR GABION WALL STRUCTURE RIGHT SIDE
AVERAGE METHOD
228 5.802 4.5 5952.665454545
TOTAL 1539
AVERAGE METHOD
228 2.770 15 9474.0218
AVERAGE METHOD
228 1.242 5 1415.88
CARTAWAY OF EXISTING (SILT) WATER WAY
SLOPE ELE
AVERAGE METHOD
228 1553.551 5 1771048.2
BULK EXCAVATION
1709.95
AVERAGE CUT 2.24 TOTAL 1711.334
VOLUME OF BASALTIC #REF! 1.384
ROCK FILL
Design Leevel of
chainage DEPTH DESIGN LEVEL WIDTH LENGTH VOLUME M^3
0+00 0 1709.95 1.384 1711.33 4.5 0 0
0+25 25 1709.95 1.45 1711.44 4.5 25 163.125
0+50 50 1709.95 1.34 1711.52 4.5 25 150.75
0+75 75 1709.95 1.704 1711.65 4.5 25 191.7
0+100 100 1709.95 1.722 1711.67 4.5 25 193.725
0+125 125 1709.95 1.382 1711.33 4.5 25 155.475
0+150 150 1709.95 1.462 1711.41 4.5 25 164.475
0+175 175 1709.95 1.259 1711.21 4.5 25 141.6375
0+200 200 1709.95 1.328 1711.28 4.5 25 149.4
0+225 225 1709.95 1.279 1711.23 4.5 25 143.8875
0+228 228 1709.95 1.072 1711.02 4.5 3 14.472