Welding Q4
Welding Q4
Date:
Company:
1. WHICH AWS CODE DEALS WITH STANDARD
WELDING TERMS AND DEFINITION ----------------------
-
A) AWS A 2.4 B) AWS A 3.0 C) AWS A 1.1 D) AWS A
4.3
ANSWER:
2. WHICH ASME CODE DEALS WITH GAS
TRANSMISSION AND DISTRIBUTION OF PIPING
SYSTEM------------------------
A) ASME B 31.8 B) ASME B 31.3 C) ASME B 31.4
D) ASME B 31
ANSWER:
3. GTAW PROCESS CAN BE USED FOR ALL PASSES
FOR BUTT WELDS IN PIPING AND NOZZLE LESS
THAN ------------------NOMINAL DIAMETER
A) 20MM B) 1” C) 250 MM D) 30MM
ANSWER:
4. LOW HYDROGEN ELECTRODE MEANS ----------------
--------
A) LESS THAN OR EQUAL TO 8 GRAM OF
HYDROGEN PER 100 GRAM OF DEPOSITED
WELD METAL.
B) LESS THAN OR EQUAL TO 8 ML OF HYDROGEN
PER 100 GRAM OF
DEPOSITED WELD METAL.
C) LESS THAN OR EQUAL TO 0.8 ML OF
HYDROGEN PER 1000 GRAM
DEPOSITED WELD METAL.
D) BOTH A AND B
ANSWER:
ANSWER:
6. IF THE PROCEDURE IS NOT QUALIFIED IN THE
VERTICAL POSITION
THEN THE DIRECTION OF WELDING SHALL BE---
------------------------
A) 48
B) 4
C) 24
D) 12
ANSWER:
10. THE USE OF NITROGEN AS A BACKING GAS
FOR STAINLESS STEEL
IS NOT PERMITTED (TRUE OR FALSE)
ANSWER:
11. THE BACK PURGE FOR CARBON AND LOW
ALLOY STEEL REDUCE
THE OXYGEN LEVEL BELOW -------------------
A) 2%
B) 1%
C) 0.5%
D) 6%
ANSWER:
12. THE MINIMUM DISTANCE BETWEEN TWO
PARALLEL BUTT WELD
SHALL BE ---------------------
A) 25 MM
B) 60MM
C) 20MM
D) BOTH A & C
ANSWER:
13. THE PREHEAT TEMPERATURE SHALL BE
ESTABLISHED OVER A MINIMUM DISTANCE
OF -------------------ON EACH SIDE OF THE
WELD.
A) 75MM
B) 70 MM
C) NONE OF THE ABOVE
D) 60MM
ANSWER:
14. THE MNIMUM PWHT SOAK TIME SHALL BE --
--------HOURS
A) 1.5 HOURS
B) 20 MIN
C) 1
D) 10 MIN
ANSWER:
15. THE REPAIR EXCEED 30%, THEN
RADIOGRAPHY SHALL INCREASE
TO -----------------------------
A) 30%
B) 60%
C) 50%
D) NONE
ANSWER:
16. WELD JOINT MAY BE REPAIRED ATLEAST ----
-------------------
A) SINGLE
B) TWICE
C) INFINITY
D) NONE
ANSWER:
17. THE REMOTE CURRENT CONTROL SHALL BE
USED IF THE
WELDING IS MORE THAN ----------------------
FROM THE WELDING
POWER SOURCE
A) 25M
B) 35M
C) 30M
D) BOTH B & C
ANSWER:
17. THE ELECTRODE SHALL BE STORED
CONTINUOUSLY IN OVEN AT
MINIMUM---------------------------CELCIUS
A) 200 DEG
B) 150 DEG
C) 145 DEG
D) NONE OF THE ABOVE
ANSWER:
18. AN OPENED SAW FLUXES SHALL BE STORED
IN A CONTAINER AT
------------------CELCIUS
A) 65 DEG
B) 70 DEG
C) 75 DEG
D) 60 DEG
ANSWER:
19. PRIOR TO USE ALL ELECTRODE SHALL BE
DRIED AT 260-430 D CEL
FOR --------------------------HOURS MINIMUM
A) 24 HR
B) 2 DAYS
C) NONE
D) 2 HR
ANSWER:
20. ALL WELDS ARE 100% RADIOGRAPHED NEAR
THE -------------------
OF PAVED ROAD, RAIL ROAD, AND AIR PORT
CROSSING.
A) 600M
B) 700M
C) 60M
D) BOTH A AND B
ANSWER:
21. WHICH SAES DEALS WITH WELDING
REQUIREMENTS FOR PRESSURE VESSEL-------
-----------------
A) W-10
B) W-11
C) W-14
D) W-17
ANSWER:
22. WHICH ONE IS NOT RELATED WITH
WELDING PROCEDURE SPECIFICATION
A) PRE HEAT
B) POSITION
C) FILLER METALS
D) NONE OF THE ABOVE
ANSWER:
23. ELECTRODES SHALL BE RE-DRIED ------------------
---------TIMES
A) 2
B) 1
C) RE-DRIED IS NOT ALLOWED
D) NONE
ANSWER:
24. WELDING CLEARANCE SHALL NOT BE LESS
THAN--------------------------
ALL AROUND THE PIPE
A) 400 MM
B) 900MM
C) 600 MM
D) NONE OF THE ABOVE
ANSWER:
25. WHAT IS THE MAXIMUM SMAW ELECTRODE TO
BE USED FOR NON LOW HYDOGEN ELECTRODE S----
-------------------
A) 4MM
B) 5MM
C) 6MM
D) NONE
ANSWER:
26. THE TIME FOR SECOND OR HOT PASS DURING
VERTICAL UP PROGRESSION IS-----------------------------
-
A) 6 MIN
B) 5 MIN
C) 15MIN
D) 1 HOURS
ANSWER:
27. SAIC-W-2048 DENOTE------------------------
A) PRE,DURING,FINAL WELDING INSPECTION
OF PIPELINES
B) SELECTION OF NDE
C) WELD SUMMARY
D) TEMPERATURE TIE-IN
ANSWER:
28. SATR –W-2013 DENOTE----------------------------------
A) WEEKLY WELDER REPAIR RATE
B) WEEKLY WELDER REPAIR RATE AND TRACER
WELD REPORT
C) WEEKLY WELD STATUS
D) NONE
ANSWER:
29. IN “E7018” ELECTRODE, THE NUMBER (1)
REFER TO
A) T.STRENGH
B) POSITION
C) CHEMICAL CHARACTERISTIC
D) NONE
ANSWER:
30. IN “EXXT-X” ELECTRODE, THE LETTER (T)
DENOTE----------------------
A) T.STRENGH
B) TUBULAR
C) POSITION
D) ALL THE ABOVE
ANSWER:
31. “ERXXS-X” RELATED TO WHICH PROCESS ---------
---------------
A) SMAW
B) GMAW
C) MMAW
D) FCAW
ANSWER:
32. IF THE WELD JOINT IS WET OR MOISTURE ON
THE SURFACE THEN HEATING FOR A DISTANCE OF-
--------------------------FROM THE WELD JOINT
A) 200MM
B) 100MM
C) 250MM
D) 75MM
ANSWER:
33. FOR PIPELINE LESS THAN 16” DIA ----------------
-----------------CLAMP
MAY BE USED
A) INTERNAL
B) EXTERNAL
C) BOTH A & B
D) INTERNAL ONLY
ANSWER:
34. WHAT IS THE FORMULA FOR HEAT INPUT?
35. IF A WELDER IS QUALIFIED FOR 0.75” DIA,
THEN WHAT IS THE MIN & MAX DIA HE IS
QUALIFIED?
ANSWER:
44. THE PWHT SHALL BE APPLIED OVER AN AREA
EXTENDING ATLEAST -----------------------TIMES THE
THICKNESS OF THE MATERIAL TO BE WELDED
FROM THE EACH END OF THE WELD NOT LESS
THEN -------------------FROM EACH END OF THE WELD
A) 3 & 25 MM
B) 6 & 20 MM
C) NONE
D) 1.5 & 20 MM
ANSWER:
45. SAES –W 015 STANS FOR
A) 5MM
B) 3MM
C) 7MM
D) 8MM
ANSWER:
48. ASME SEC II C DEALS WITH ------------------------
A) FERROUS MATERIALS
B) NON FERROUS MATERIALS
C) FILLER METALS,RODS,ELECTRODES
D) ALL THE ABOVE
ANSWER:
49. ASME SEC IX DEALS WITH-------------------
A) PRESSURE VESSEL
B) NDT
C) WELDING & BRAZING QUALIFICATION
D) NONE
ANSWER:
50. HI-LO GAUGE IS USED TO MEASURE-----------------
-----
A) MISALIGNMENT
B) ROOT GAP
C) ALL THE ABOVE
ANSWER:
ANSWERS
1. B
2. A
3. B
4. B
5. A
6. B
7. C
8. TRUE
9. C
10. TRUE
11. B
12. C
13. A
14. 1
15. C
16. B
17. C
18. A
19. D
20. C
21. A
22. D
23. B
24. B
25. B
26. C
27. A
28. A
29. B
30. B
31. B
32. B
33. C
34. H.I
35. A
36. D
37. D
38. OO
39. TRUE
40. SHALL NOT BE USED
41. B
42. C
43. FALSE
44. A
45. A
46. B
47. B
48. C
49. C
50. C