Excavation & String Rectification-HIRA
Excavation & String Rectification-HIRA
Organization (Process) Organization (Process) Sub / Environmental Aspect / Consequence (or) Impact Additional Controls Required or
Sl. No. Activity / Issue / Needs Activity / Description of Issue /
& Expectations of Description of Needs &
Reputational Aspect / Legal
Aspect / Financial Aspect / Risk Type Condition of Process
Activity
including Potential
Emergencies / Legal Cause(s) Existing Risk Controls Proposed (Eg: Objectives / Other
Interested Party Expectations Functional or Operational / Implications Mitigation Plans( if any)
Quality Aspect)
1.Hit by the moving vehicles 1.Barricading the work area ,aisle markings
2.Engaging the competent Operators
2.Fall from height while carrying out the Mnaula 3.Taking of aproval
cutting of trees. from relavant authorities and ensure PTW
3.Power supply improper Isoaltion taken
1.Work near to moving 4.Cut injuries while doing the manual materila 4.Imparting of tool box and HIRA talk before start of work
vehicles/equipment handling/shifting /puling /pushing 5.Avoiding of manual material handling as much as possible
2.Manual cutting & Material 1.Fatality/Several Injury 5.While carry out the breaking of hard rock /stone 6.Maintaining ofexposed
minimum of 3 meter electrical clearance from 1.Engaement of Competent
Removal /cleaning of surface handling 2.Fall from Height using the jack hammer high voltage live lines /Experienced Personnel for
1 encumbrances 3.Electrocution while using power OHS Non-Routine 3.Eye Injury/Breathing 6.Careless /reckless operation by the driver,Side 7.Ensure that operator not using of cell phone during handling .
tools difficulty mirror are not in clean condition resulting poor Equipment /machinery Operations
4.Presence of underground /over vision to the operator 8.Usage of insulated hand tools
head services /utilities. 7.Not using the insualted hand tools 9.Usage of job specific PPE works for performing heavy
5.Use of sharp hand tools 8.During the heavy machine operatingtie dust machinaery activities Nose Mask/Goggles
generation 8.Ensure the availablity of flagman while doing the Excavation
work.
9.To make sure all the requirement mentioned in the Excavation
check list are fulfilled