EPC Forum 2023
EPC Forum 2023
EPC Forum 2023
Danny Stadler
François Thuault Head of Project Thomas Salitz Natale Pezzimenti
Direct eur - Branch M anager
M anagement & Civil engineer
Cont ract & Claim
Const ruct ion decommissioning projects
M anagement
BELECTRIC AUCOTEC AG EniRewind
Kurt VanStappen
Zhafran Sulaiman Mohamed El-Mehalawi Lidia Stepanyuk
Senior Project Head Department Manager,
M anager Decommissioning Global Improvement Project Controls & Estimating
Engie Tractebel Abandonment Leader - Projects Fluor
Petronas DOW
EPC AMSTERDAM
Srinivas Herve Baron
Ramulu Mark Cowley Senior Project Manager
Marco Falconi
Project Manager Contaminated sites
Vice President Solvay
Uniper expert and Operations
Researcher Petrofac Bert Rits
Rodney Turner ISPRA Akachidike Kanu Head of Projects
Professor of Project OMV
Management Projects Leader
Sherif El Nabawy
SKEMA Repsol Ahmed Abdel-Zaher
Engineering
Business School Manager , Khalifa
Mashel Gonyora
Daniel Hoffiz Dragon Oil
Manager SHE:Enablement, Maintenance Planning
Senior Counsel Manager, Asset Management
Jacob C. Jorgensen Compliance and Assurance
TotalEnergies Consultant (Sidpec)
Sen ior Legal Sasol
Counsel Maersk Pepijn Docter
Rudi Frederix Mark Langerhorst
Supply
Project Manager Project director
Project Manager for offshore wind
Operational Heinz Janiec
Worley Tata Steel Europe
Excellence Project Manager
Siemens Mobility Kevin Danton
Specialty Robert Blundell
Group Director
Craig Thomson Engineering Senior Legal Counsel Procurement & Contract
Prof. Sustainability Nordex UK Voltalia
Built Environment Norman K McLennan
Glasgow Caledonian Manag ing Direc tor & Gavin Lock Lee Dr. Yvonne Waterman
University Consultan t CP Project s - Cont ract Specialist asbest os liabilit y
M anagement Specialist law
Thierry Linares
Senior Managing Renato Nazzini Waterman Legal
Shell
Director, Construction Professor of Law Consultancy
Solutions King’ s Mark Jones
FTI Consulting College London Senior Project Manager Doina Dobre
Morgan Sindall Construction Senior Cost Estimator
Binny Bagga Vladislava & Infrastructure Emerald Cost Consulting
Vice President - Stefanova Grant Morrison
Madhu P Pillai
Energy Services "Head of Procurement
Advisor - Oil & Gas Director, Head of Category
Reserach Contracting"
Projects Management
Rystard Energy Solar Montage
Kentz (Kent) Maersk Drilling
Team
Fernando Pinto Wouter Perry Aamir Awan
Contracting and Moreno Bisio
Business Development Director Project
Procurement Head of Legal Affairs Wind,
Manager Management
Specialist Solar & Business Development
Stantec Group VINCI Construction
EDP ERG
41% Oil, Gas & Chemical 44% Project Owners 50% C Level Executives
21% Infrastructure & Others 56% EPC Contractors 33% Project & Contract Management
38% Energy Utility 17% Engineering & Procurement
Key Focus:
• Industry growth post pandemic opportunities in 2022
• War in Ukraine: the construction impact on European and global economies The domino effect of the Ukraine crisis on gas and
LNG Projects
• Stay ahead with forecast suggesting boost in market growth during the forecast period (2022-2023)
• Resolving restraining factors and navigating towards pre pandemic levels with rising oil & gas exploration activities
• Discover regional insights into driving factor towards rising EPC activities and further increasing the O&G footprint on the market.
• To what extent the project implementation schedule (including in particular the milestones and the final completion date), the
procurement plan and the transportation study have to be revisited and, possibly, amended.
• Overcome supply chain disruption and sourcing challenges likely to affect project delivery and margins
• The role of effective relationship management in successful large oil and gas projects Monitoring Negotiations to Mitigate Risk in
Multiple Party Contracts.
• Dealing with critical project drivers (time, cost, quality and scope) and how they are affected when Alert Levels change or are
redefined.
• Mitigating the risk of delays in power plant projects: An EPC contractor’s view on different contractual concepts
11:30 TBA
Conflict avoidance – early-stage engagement and contracting approaches 15:00 Keep Projects on track during Front-End Engineering ,
Appropriate ADR and managing the escalation of disputes Construction and Start up
Checkpoints in arbitration – staying creative to avoid the full fight
• Be patient in the Front-End-Engineering and specify
correctly the requiered achievments
Thierry Linares Senior Managing Director, Construction Solutions FTI Consulting • Keep change requests as low as possible, there are many
whises which will blow up a project
10:00 Risk management for floating offshore wind farms • Respect new technologies but don’t over estimate the
savings it could be end up in the opposite
• Have a clear stratetgy for the design, procurement,
• Different from fixed-bottom offshore wind farms construction and start up
• Business case sensitivities • Keep in mind the resource shortages, knowledge, skills and
• Interface management long delivery times.
• Operational challenges Heinz Janiec, Project Manager, Specialty Engineering
• Geographical expansion and cultural risks
Pepijn Docter, Project director for offshore wind Tata Steel Europe 15:30 Collaborative Principles for Better
Supply Chain Practice in Managing Projects
·The rationale for collaborative business practices across supply chains
10:30 Morning Coffee and Networking and why collaboration can be the jewel in the crown for organisations in
the private, public and 3rd sectors.
·Collaborative arrangements: Different supply chain perspectives, drivers
and interdependencies
11:00 Avoidance, management and efficient resolution of disputes
· Raising the game - the CRAFT 8 Stage Life Cycle Model and ISO
44001: The evolution and emergence of a new global standard for
collaborative working in managing projects.
· The importance of stakeholder engagement in harnessing the benefits
of collaborative working practices
· Commercial risk and pricing considerations associated with
collaborative versus traditional contracting arrangements in managing
projects.
· Pan-industry supply chain collaboration: An exemplar case study of
solutions developed by and for the energy sector.
Renato Nazzini Professor of Law King’ s College London 16:00 How to overcome the challenges Renewables
Energy Sector – SOLAR
09:30 TBA
Fernando Pinto
Contracting and Procurement Specialist
EDP
30 November 2023
Grant M orrison
Direct or, Head of Cat egory M anagement
Dr. Yvonne Waterman Specialist asbestos liability law M aersk Drilling
Waterman Legal Consultancy
15:30 Topic TBA
12:00 Business Lunch
Mark Jones
Senior Project Manager & Ambassador
Morgan Sindall Construction & Infrastructure
Aamir Awan
Director Project Management
VINCI Construction
EPC AMSTERDAM
ATTRACTING KEY INDUSTRY PROFESSIONALS:
Exhibitor Sponsor
Project Management , Contract & Claims Management
Project Control ,Strategy & Consulting, Project Leader
ship ,Risk Management
MORE INFO:
[email protected]
Engineering Procurement & Construction
Project Management Forum Virtual & In Person
27-28-29-30 November 2023 in Amsterdam, The Netherlands
EPC FORUM.
E-mail: [email protected]
Payment Conditions:
Ms. Mrs. Mr. Name:
Payment should be made in full immediately after submitting the signed booking form. Payment should
Surname:
always be made in Euros unless indicated otherwise. EPC Forum accepts all kinds of credits cards. Although
Job Title: the preferred means of payment is credit card, in a few cases the bank transfer option may be allowed ONLY
E-mail: on condition that the payment is made within 10 working days upon receiving the proforma invoice. The
fee of the event includes the possibility to download speakers’ presentations, access to the conference hall
Ms. Mrs. Mr. Name: & materials, refreshments, lunches and snacks. Each delegate will be responsible for their own hotel
Surname: accommodation and travel expenses, however EPC Forum will negotiate and offer the best possible hotel
Job Title: rates for its delegates in the same 4-star or 5-star hotel in which the event will take place.
E-mail:
Ms. Mrs.
Surname:
Job Title:
E-mail:
Mr. Name:
EPC AMSTERDAM Substitution Policy:
Substitution of delegate(s) is possible at any time without any extra fees. Nevertheless, EPC FORUM would
need at least 3 days prior to the event to make arrangements for the substitute(s).
Cancellation Policy:
COMPANY INFORMATION: Incase a delegate would like to cancel their participation for some unexpected eventualities, such
requests must be submitted in written and sent by post 4 weeks prior to the event in order to obtain a full
credit note for any future event organised by EPC Forum. The fees charged are strictly non-refundable. If
Organisation:
EPC Forum would decide to cancel an on-going event, the delegate would receive a 100% refund of their
VAT number: payment. Non-attendance, otherwise referred as a “no show” does not signify cancellation. EPC Forum will
(VAT No. for EU members / Tax number for non-EU members) not be held responsible for events canceled for reasons beyond its control such as natural disasters,
accidents, sabotage, trade or industrial disputes, outbreak of disease, hostilities, terrorism, etc. However, a
Mobile Number: full credit note would be given in each of these cases.
Office Phone Number:
Fax Number:
Email: Data Protection:
Address: EPC Forum agrees to keep clients’ information confidential in its database. The client gives EPC Forum the
City: authority to keep their information in its database and use the information in any way necessary in
Country: connection with the event, otherwise consent should be sought. Client information will be removed
immediately after receiving a written request by post.
PLEASE NOTE:
All booking forms submitted without a signature are considered invalid. EPC Forum reserves the right
to postpone the event to a later date or make changes to the location or confirmed speakers. If a client
decides to cancel their participation for these reasons the client will receive a full credit note which
AUTHORISATION AND ACCEPTANCE covers the amount paid to attend any future event organised by EPC Forum. The hotel information may not
OF TERMS & CONDITIONS: be provided at the time of booking but should be ready at least one month prior to the event. In
such case, please bear with us.
Name:
Date: Copyright:
The information included in this agenda is strictly meant for the company or person who directly received
this agenda from EPC Forum. Under NO circumstance should this agenda be published on the internet or
Signature:
be made available to the general public without the prior consent of EPC Forum. All intellectual property
This booking is invalid without a signature authorisation. rights in all materials produced and distributed by EPC Forum in connection with this event are expressly
The signatory must be authorised to sign on behalf of the contracting organisation. reserved and any unauthorised duplication, publication or distribution is strictly forbidden.