Chapter 5
Chapter 5
Chapter 5
The vice president of SC SunOil considering several options to meet demand (set up a facility in each region or consolidate plants in just few regions). SunOil is considering 2 plant sizes in each location.
Low capacity plants can produce 10 million units a year, whereas high-capacity plants can produce 20 million units a year. VP want to know what the lowest cost network should look like
Decision Variables
Demand Region - Production Allocation (Million Units) Plants L Plants H
Supply Region N. America S. America Europe Asia Africa (1=open) (1=open)
N. America 1.3322676E-15 0 0 0 0 0 0 = There's a formula
S. America 12 8 0 0 0 0 1 = Known/given
Europe 0 0 0 0 0 0 0 = Solver
Asia 0 0 4 16 0 0 1 = Formula & Solver
Africa 0 0 10 0 7 0 1
Constraints
Supply Region Excess capacity
N. America -1.332268E-15
S. America 0
Europe 0
Asia 0
Africa 3
N. America S. America Europe Asia Africa
Unmeet Demand 0 0 0 0 0
Objective Functions
Cost= $ 23,751.00
The Capacitated Plant Location Model
Management executives at both TelecomOne and HighOptic have decided to merge the two companies into a sing
assigned SC team to study the network for the combined company and identify the plants that could be shut down
Decision Variables
Demand City - Production Allocation (1000 Units) Plants
Supply City
Atlanta Boston Chicago Denver Omaha Portland (1=open)
Baltimore 0 8 2 0 0 0 1
Cheyenne 0 0 0 6 7 11 1
Salt Lake 0 0 0 0 0 1.776E-15 0
Memphis 10 0 12 0 0 0 1
Wichita 0 0 0 0 8.882E-16 0 0
Constrraints
Supply City Excess Capcity
Baltimore 8
Cheyenne 0
Salt Lake -1.776357E-15
Memphis 0
Wichita -8.881784E-16
Atlanta Boston Chicago Denver Omaha Portland
Unmeet Demand 0 0 0 0 0 0
Objective Function
Cost = $ 47,401.00
Based on Solver, it's optimal for TelecomOptic to close the plants in Salt Lake & Wichita, while keeping Baltimore, C
The total monthly cost of this network and operation is $47,401,000
o companies into a single entity called TelecomOptic. Management is debating whether all five factories are needed. It has
that could be shut down.
Capacity
18
24
27
22
31
= There's a formula
= Known/given
= Solver
= Formula & Solver
1 4
2 5
3 6
21 sum
32 sumproduct