Mechl BOQ Main Building - Done
Mechl BOQ Main Building - Done
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
BI Elbow, 90 deg.
8 100mm no 9 323.51 372.04 111.61 37.20 520.85
9 65mm no 4 107.39 123.50 37.05 12.35 172.90
50mm no 3 78.96 90.80 27.24 9.08 127.13
10 32mm no 0 150.02 172.52 51.76 17.25 241.53
11 25mm no 450 91.00 104.65 31.39 10.47 146.51
BI Tee Equal
12 100mm x 100mm no 2 528.68 607.98 182.39 60.80 851.17
13 75mm x 75mm no 13 462.13 531.45 159.43 53.14 744.03
14 65mm x 65mm no 4 335.05 385.31 115.59 38.53 539.43
50mm x 50mm no 2 78.96 90.80 27.24 9.08 127.13
15 32mm x 32mm no 8 145.78 167.65 50.29 16.76 234.71
16 25mm x 25mm no 137 95.30 109.59 32.88 10.96 153.43
BI Tee Reducer
17 100mm x 75mm no 1 2,145.00 2,466.75 740.03 246.68 3,453.45
18 100mm x 65mm no 1 2,145.00 2,466.75 740.03 246.68 3,453.45
75mm x 50mm no 8 1,040.00 1,196.00 358.80 119.60 1,674.40
19 75mm x 32mm no 10 1,040.00 1,196.00 358.80 119.60 1,674.40
20 75mm x 25mm no 74 1,040.00 1,196.00 358.80 119.60 1,674.40
21 65mm x 32mm no 0 756.00 869.40 260.82 86.94 1,217.16
22 65mm x 25mm no 16 756.00 869.40 260.82 86.94 1,217.16
23 50mm x 32mm no 0 365.00 419.75 125.92 41.97 587.65
24 32mm x 25mm no 8 188.00 216.20 64.86 21.62 302.68
BI Reducer
25 75mm x 50mm no 0 845.00 971.75 291.53 97.18 1,360.45
26 65mm x 50mm no 5 645.00 741.75 222.52 74.18 1,038.45
65mm x 32mm no 5 385.00 442.75 132.83 44.28 619.85
27 50mm x 32mm no 1 253.00 290.95 87.29 29.10 407.33
28 32mm x 25mm no 6 100.00 115.00 34.50 11.50 161.00
29 25mm x 15mm (Bell Reducer) no 206 71.00 81.65 24.49 8.17 114.31
BI Union Patente
32 25mm no 1 197.40 227.01 68.10 22.70 317.81
Page 1 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Valves and Accessories
Pressure gauge
34 4" face dial, 1/4 NPT no 1 7,686.00 8,838.90 2,651.67 883.89 12,374.46
Auxiliary Valve
37 32mm no 1 3,260.00 3,749.00 1,124.70 374.90 5,248.60
Sprinkler Heads
Supply and installation of Automatic Sprinkler
Heads including fittings and other miscellaneous
items as shown and as required to complete the
system.
42 Recessed Pendent type, 68 deg. C, chrome finish no 202 732.00 841.80 252.54 84.18 1,178.52
43 Horizontal Sidewall, 68 deg. C, chrome finish no 4 735.00 845.25 253.57 84.52 1,183.35
Fire Extinguishers
Supply and installation of portable fire
extinguishers including supports, accessories and
other miscellaneous items to complete the system.
SUNDRIES
45 ____________________
46 ____________________
47 ____________________
Page 2 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Page 3 of 38
AMOUNT
80,500.00
697,328.11
291,478.52
69,509.79
10,089.87
20,713.36
208,134.36
4,687.66
691.59
381.38
0.00
65,929.50
1,702.35
9,672.38
2,157.72
254.25
1,877.65
21,020.32
3,453.45
3,453.45
13,395.20
16,744.00
123,905.60
0.00
19,474.56
0.00
2,421.44
0.00
5,192.25
3,099.25
407.33
966.00
23,547.86
0.00
8,213.90
317.81
Page 4 of 38
AMOUNT
2,072.87
12,374.46
5,316.22
49,678.16
5,248.60
6,891.77
9,901.50
41,860.00
449,479.80
238,061.04
4,733.40
177,288.53
Page 5 of 38
AMOUNT
2,713,627.26
Page 6 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Airconditioning System
VRF Units
6 10mm diameter m 184 180.00 207.00 62.10 41.40 310.50
7 16mm diameter m 184 260.00 299.00 89.70 59.80 448.50
8 19mm diameter m 30 400.00 460.00 138.00 92.00 690.00
9 29mm diameter m 8 900.00 1,035.00 310.50 207.00 1,552.50
10 41mm diameter m 22 1,500.00 1,725.00 517.50 345.00 2,587.50
Insulation
Supply and installation of rubber insulation,
complete with fittings, supports and other
miscellaneous materials as shown and as required
to complete the system.
VRF Units
15 10mm diameter m 184 75.00 86.25 25.88 17.25 129.38
16 16mm diameter m 184 90.00 103.50 31.05 20.70 155.25
17 19mm diameter m 30 110.00 126.50 37.95 25.30 189.75
18 29mm diameter m 8 150.00 172.50 51.75 34.50 258.75
19 41mm diameter m 22 190.00 218.50 65.55 43.70 327.75
Insulation
Supply and installation of rubber insulation,
complete with fittings, supports and other
miscellaneous materials as shown and as required
Page 7 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
to complete the system.
Equipments
Supply and installation of the following equipment
including piping connection, electrical connection,
accessories, hauling, positioning and other
miscellaneous items as shown and as required to
complete the system.
Main Building
22 PAHU-1/ACCU-1, 1.5HP Wall Mounted set 6 49,995.00 57,494.25 17,248.27 11,498.85 86,241.38
23 PAHU-2/ACCU-2, 2.5HP Wall Mounted set 4 68,995.00 79,344.25 23,803.27 15,868.85 119,016.38
24 PAHU-3/ACCU-3, 2.5HP Ceiling Cassette set 3 86,000.00 98,900.00 29,670.00 19,780.00 148,350.00
25 PAHU-4/ACCU-4, 3HP Wall Mounted set 5 74,998.00 86,247.70 25,874.31 17,249.54 129,371.55
26 PAHU-5/ACCU-5, 3HP Ceiling Mounted set 2 113,000.00 129,950.00 38,985.00 25,990.00 194,925.00
27 PAHU-6/ACCU-6, 3HP Ceiling Cassette set 9 134,998.00 155,247.70 46,574.31 31,049.54 232,871.55
Ventilation System
Duct Works
Ancillaries
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
47 550mm x 350mm no 2 4,433.00 5,097.95 1,529.39 1,019.59 7,646.93
50 F-1, 47lps, 60w Ceiling Cassette Type no 3 2,000.00 2,300.00 690.00 460.00 3,450.00
51 F-2, 142lps, 110w Ceiling Cassette Type no 18 3,500.00 4,025.00 1,207.50 805.00 6,037.50
52 F-3, 472lps,375w Propeller Wall Fan Industrial Type no 3 8,500.00 9,775.00 2,932.50 1,955.00 14,662.50
53 F-4, 1416lps, 2.25kw Centrifugal Ceiling Inline no 2 36,578.00 42,064.70 12,619.41 8,412.94 63,097.05
54 F-5, 2360lps, 3.75kw Centrifugal Ceiling Inline no 2 65,797.00 75,666.55 22,699.96 15,133.31 113,499.82
SUNDRIES
56 ____________________
57 ____________________
58 ____________________
Page 9 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Page 10 of 38
AMOUNT
86,250.00
127,926.00
30,049.50
79,350.00
202,342.50
57,132.00
82,524.00
20,700.00
12,420.00
56,925.00
53,302.50
10,401.75
21,821.25
51,577.50
23,805.00
28,566.00
5,692.50
2,070.00
7,210.50
247,572.00
Page 11 of 38
AMOUNT
142,830.00
517,448.25
476,065.50
445,050.00
646,857.75
389,850.00
2,095,843.95
207,000.00
300,150.00
978,075.00
103,500.00
17,250.00
2,587,500.00
3,105,000.00
207,000.00
17,250.00
2,070,000.00
2,371,875.00
155,250.00
17,250.00
17,871.00
21,976.50
23,908.50
25,047.55
32,775.00
12,937.50
Page 12 of 38
AMOUNT
15,293.85
25,047.55
32,775.00
10,350.00
108,675.00
43,987.50
126,194.10
226,999.65
20,700,000.00
Page 13 of 38
AMOUNT
39,482,522.15
Page 14 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
DIVISION 26 – ELECTRICAL
14 Supply and installation of grounding and bonding item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
materials complete with conduits, wires and all
necessary materials, accessories as shown and as
required from the drawings and specifications
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
29 Supply of labor, consumables and ncessary testing item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
equipment needed to complete the above work in
accordance with the testing procedure required by the
designer, owner and the project manager
30 MDP1 (for villa) - shared cost assy 1.00 490,000.00 563,500.00 169,050.00 56,350.00 788,900.00
Main: 1000AT, 2P, 230V (IT)
Branches:
3 - 450AT/600AF, 2P, 230V (IT)
2 - 225AT/225AF, 2P, 230V (IT)
2 - 100AT/100AF, 2P, 230V (IT)
Enclosure and mounting as required
31 MPD-2 (for mantai bldg) assy 1.00 490,000.00 563,500.00 169,050.00 56,350.00 788,900.00
Main: 1000AT, 3P, 230V (IT)
Branches:
1 - 800AT/800AF, 3P, 230V (IT)
1 - 300AT/400AF, 3P, 230V (IT)
Enclosure and mounting as required
34 MDP-MB (for mantai bldg) assy 1.00 392,000.00 450,800.00 135,240.00 45,080.00 631,120.00
Main: 800AT, 3P, 230V (IT)
Branches:
1 - 300AT/225AF, 3P, 230V (IT)
1 - 250AT/400AF, 3P, 230V (IT)
1 - 225AT/225AF, 3P, 230V (IT)
1 - 200AT/100AF, 3P, 230V (IT)
3 - 50AT/50AF, 2P, 230V (DR)
Enclosure and mounting as required
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Branches:
3 - 30AT/50AF, 2P, 230V (DR)
9 - 20AT/50AF, 2P, 230V (DR)
2 - Space
Enclosure and mounting as required
Wiring Devices
42 Single pole switch set 20.00 90.00 103.50 31.05 10.35 144.90
43 Two-gang switch set 32.00 130.00 149.50 44.85 14.95 209.30
44 Three-gang switch set 27.00 180.00 207.00 62.10 20.70 289.80
Page 17 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
45 Two-gang, three-way switch set 4.00 280.00 322.00 96.60 32.20 450.80
46 Three-gang, three-way switch set 14.00 300.00 345.00 103.50 34.50 483.00
47 Single convenience outlet set
48 Single convenience outlet, HD set 11.00 364.00 418.60 125.58 41.86 586.04
49 Duplex convenience outlet set 69.00 160.00 184.00 55.20 18.40 257.60
50 Duplex convenience outlet, weatherproof (WP) set 2.00 320.00 368.00 110.40 36.80 515.20
51 60A, 1P in NEMA-3r enclosure assy 1.00 29,400.00 33,810.00 10,143.00 3,381.00 47,334.00
52 40A, 1P in NEMA-3r enclosure assy 1.00 19,600.00 22,540.00 6,762.00 2,254.00 31,556.00
53 30A, 1P in NEMA-3r enclosure assy 1.00 14,700.00 16,905.00 5,071.50 1,690.50 23,667.00
54 300A, 3P in NEMA-1 enclosure assy 1.00 147,000.00 169,050.00 50,715.00 16,905.00 236,670.00
55 125A, 3P in NEMA-1 enclosure assy 1.00 61,250.00 70,437.50 21,131.25 7,043.75 98,612.50
56 50A, 3P in NEMA-1 enclosure assy 1.00 24,500.00 28,175.00 8,452.50 2,817.50 39,445.00
57 400kVA, 230V, 3Ø, 60Hz prime genset (for mantai bldg) set 1.00 2,615,000.00 3,007,250.00 902,175.00 300,725.00 4,210,150.00
Transfer Switches
58 2x1000A, 3P, 230V ATS with voltmeter & ammeter assy 1.00 582,000.00 669,300.00 200,790.00 66,930.00 937,020.00
(ATS-2 for mantai bldg)
LIGHTING
Interior Lighting
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
60 120mmØ recessed circular pinlight; 6W daylight (PL1) set 300.00 500.00 575.00 172.50 57.50 805.00
61 100mmØ moisture-resistant circular pinlight; 5W set 19.00 500.00 575.00 172.50 57.50 805.00
daylight (PL2)
62 Wall-mounted decorative light; warm white (WM1) set 46.00 800.00 920.00 276.00 92.00 1,288.00
63 LED tube light or LED striplight for cove ceiling; warm m 48.00 500.00 575.00 172.50 57.50 805.00
white (ST1)
64 120mmØ surface mounted outdoor die-cast lighting set 78.00 1,500.00 1,725.00 517.50 172.50 2,415.00
fixture w/ LED bulb; 6W warm white (SM1)
65 2-1200mm LED tube light w/ prismatic casing; 18W set 66.00 2,000.00 2,300.00 690.00 230.00 3,220.00
daylight (FL1)
66 1200mmx600 LED panel light; daylight (LPI) set 64.00 4,800.00 5,520.00 1,656.00 552.00 7,728.00
67 Exhaust fan set 20.00 2,000.00 2,300.00 690.00 230.00 3,220.00
Emergency Lighting
68 Wall mounted emergency light set 7.00 1,500.00 1,725.00 517.50 172.50 2,415.00
69 Illuminated exit and directional exit sign set 6.00 1,500.00 1,725.00 517.50 172.50 2,415.00
Exterior Lighting
70 Outdoor floor-mounted up-light; 2W warm white (FM1) set 33.00 1,000.00 1,150.00 345.00 115.00 1,610.00
Special Lighting
71 Chandelier lighting; verify design with architect set 7.00 15,000.00 17,250.00 5,175.00 1,725.00 24,150.00
SUNDRIES
72 ____________________
73 ____________________
74 ____________________
Page 19 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
DIVISION 26 – ELECTRICAL
Page 20 of 38
AMOUNT
126,787.50
35,500.50
52,164.00
10,867.50
8,694.00
0.00
5,554.50
5,409.60
170,724.40
84,492.80
303,275.70
568,974.00
140,697.90
80,500.00
24,029.25
3,236.10
17,001.60
0.00
196,613.20
362,153.40
503,382.60
8,114.40
1,236.48
11,023.27
68,972.40
11,712.75
273.70
3,316.60
Page 21 of 38
AMOUNT
80,500.00
788,900.00
788,900.00
197,225.00
39,445.00
631,120.00
39,445.00
Page 22 of 38
AMOUNT
39,445.00
39,445.00
177,502.50
157,780.00
23,667.00
197,225.00
2,898.00
6,697.60
7,824.60
Page 23 of 38
AMOUNT
1,803.20
6,762.00
6,446.44
17,774.40
1,030.40
47,334.00
31,556.00
23,667.00
236,670.00
98,612.50
39,445.00
4,210,150.00
937,020.00
Page 24 of 38
AMOUNT
241,500.00
15,295.00
59,248.00
38,640.00
188,370.00
212,520.00
494,592.00
64,400.00
16,905.00
14,490.00
53,130.00
169,050.00
Page 25 of 38
AMOUNT
13,249,138.79
Page 26 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
DIVISION 27 – COMMUNICATIONS
TELEPHONE/DATA SYSTEM
7 Intermediate distribution frame (IDF) - provisional set 3.00 8,000.00 9,200.00 2,760.00 920.00 12,880.00
8 Telephone / Data outlet set 12.00 1,232.00 1,416.80 425.04 141.68 1,983.52
9 Supply of labor, consumables and necessary testing item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
equipment needed to complete the above work in
accordance with the testing procedure required by the
Designer, Owner and the Project Manager
Page 27 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
16 Supply of labor, consumables and necessary testing item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
equipment needed to complete the above work in
accordance with the testing procedure required by the
Designer, Owner and the Project Manager
OTHERS
17 Allow cost for the provisions of telephone / data item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
system at Mezzanine floor of Mantai Building
18 Allow cost for the provisions of community anntena item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
television system at Mezzanine floor of Mantai Building
SUNDRIES
19 ____________________
20 ____________________
21 ____________________
Page 28 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
DIVISION 27 – COMMUNICATIONS
Page 29 of 38
AMOUNT
129,830.40
6,568.80
5,313.00
117,568.64
738.99
28,980.00
38,640.00
23,802.24
80,500.00
54,917.10
Page 30 of 38
AMOUNT
2,898.00
15,707.16
492.66
7,245.00
1,030.40
80,500.00
80,500.00
80,500.00
Page 31 of 38
AMOUNT
755,732.39
Page 32 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
9 Fire alarm control panel, 10 loop (assumed) set 1.00 52,855.00 60,783.25 18,234.98 6,078.33 85,096.55
10 Smoke detector no 47.00 2,756.00 3,169.40 950.82 316.94 4,437.16
11 Fire alarm manual pull station no 6.00 1,830.00 2,104.50 631.35 210.45 2,946.30
12 Fire alarm bell no 6.00 1,722.00 1,980.30 594.09 198.03 2,772.42
13 End of line resistor no 3.00 1,134.00 1,304.10 391.23 130.41 1,825.74
14 Supply of labor, consumables and necessary testing item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
equipment needed to complete the above work in
accordance with the testing procedure required by the
Designer, Owner and the Project Manager
OTHERS
15 Allow cost for the provisions of fire detection and alarm item 1.00 50,000.00 57,500.00 17,250.00 5,750.00 80,500.00
system at Mezzanine floor of Mantai Building
Page 33 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
SUNDRIES
16 ____________________
17 ____________________
18 ____________________
Page 34 of 38
CORON BOUTIQUE RESORT
Coron, Palawan, Philippines
UNIT RATE
ITEM DESCRIPTION UNIT QUANTITY
MATERIAL MATERIAL LABOR OTHERS TOTAL
Page 35 of 38
AMOUNT
48,667.08
26,545.68
10,143.00
1,545.60
3,079.13
4,310.77
2,342.55
3,316.60
85,096.55
208,546.52
17,677.80
16,634.52
5,477.22
80,500.00
80,500.00
Page 36 of 38
AMOUNT
Page 37 of 38
AMOUNT
594,383.02
Page 38 of 38