SIGNATURE DATE
Shwetadreesh
REVIEWED BY :
Ranganath 2020-06-29
ISSUE/REVISION INDEX
Issue Revision
Revision Details
Code No. By Rev’d. App. Date
00 GY SR SK 2020-06-29 Released for Review and Comments
Issue Codes: RC = Released for Construction, RD = Released for Design, RF = Released for Fabrication, RI = Released for Information, RP
= Released for Purchase, RQ = Released for Quotation, RR = Released for Review and Comments.
TABLE OF CONTENTS
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 2 of 33
687537-4700-20-SR-0001
EXECUTIVE SUMMARY...........................................................................................................................5
1 INTRODUCTION...........................................................................................................................6
3.1 METHODOLOGY..........................................................................................................................8
3.2 Scenarios......................................................................................................................................8
3.2.1 Scenario-1...................................................................................................................8
3.2.2 Scenario-2.................................................................................................................10
3.2.3 Scenario-3.................................................................................................................11
3.3 Results........................................................................................................................................13
3.4 Summary Of the Results...........................................................................................................13
3.5 Observation................................................................................................................................14
3.6 Conclusion.................................................................................................................................14
3.7 Reference...................................................................................................................................15
APPENDIX-A..........................................................................................................................................16
APPENDIX-B..........................................................................................................................................19
APPENDIX-C..........................................................................................................................................22
APPENDIX-D..........................................................................................................................................25
APPENDIX-E...........................................................................................................................................28
APPENDIX-F...........................................................................................................................................31
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 3 of 33
687537-4700-20-SR-0001
List Of Table
List Of Figures
Acronyms
A Ampere
CB Circuit Breaker
CT Current Transformer
kV Kilo Voltage
kA Kilo Ampere
MV Medium Voltage
PT Potential Transformer
SS Substation
Ur Rated Voltage
SA Surge Arrester
EXECUTIVE SUMMARY
ENMAX Power Corporation (EPC) hired SNC-Lavalin to Transient Recovery Voltage Study, to evaluate
the circuit breaker capability at Substation # 20 located at WEST WILLHURST, Calgary. The main
purpose of this study is to assess the Circuit Breaker Performance at Substation # 20, to ensure it
successfully the interrupt the fault current under worst case condition and to avoid the Circuit Breaker
damages in fault condition.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 6 of 33
687537-4700-20-SR-0001
1 INTRODUCTION
This report summarizes the results of Transient Recovery Voltage study carried out for New MV
switchgears at ENMAX Substation No 20. TRV study was carried out to assess the ability of new circuit
breakers to successfully interrupt fault currents under worst case fault scenarios.
TRV levels were assessed against the IEC standard breaker capability curves as outlined in IEC
standard 62271-100.
3.1 METHODOLOGY
The following steps were taken in this Study which we mentioned below,
a. We need to calculate the Thevenin equivalents and update them in the presently provided
Existing TRV models.
b. Then we ran and created 3-Phase & 1-Phase Fault on the Incomer Side (HV Terminals) of the
substation, to calculate the Impedance (Positive & Zero Sequence) values of the Network.
c. After that we deleted all the Remaining Substations which is present outside of Sub 05.
d. Then we modelled the Thevenin’s Equivalent Source for the Sub 05.
e. We run the modelling to find the errors if any in the network, before proceeding further.
f. Debugging the error after that we updated the existing modelling as per the given New SLD
which is provided by the customer.
g. Revised the Model and we created the 3phase Fault (Ungrounded & Grounded) across the
terminals of the Circuit Breakers, Bus & Outgoing Feeders as per the Scenarios.
h. Based on the results with respect to the scenarios to ensure that the new breakers which is
successfully interrupt the Fault current under worst case condition or not.
i. And to determine if there are any breaches in the TRV Capability as per the Standard Practise
IEC 62271-100.
j. Based on the results which we get from the PSCAD, all the Circuit Breakers of TRV is well
within the limit as per the IEC Standard. Here there is no violation is happened in the Substation
05. So, we don’t suggest any mitigation technique for this Study.
3.2 Scenarios
3.2.1 Scenario-1
In this scenario, both the incomer circuit breakers from transformers T1 & T3 at 13kV bus are in
closed condition, with bus couplers are in open condition. A terminal fault is created at one of the
outgoing load feeder circuit breakers.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 9 of 33
687537-4700-20-SR-0001
Description:
In Normal Scenario, the Case-1 TRV study is performed in one of the Outgoing feeders of the Circuit
Breaker in 13kV bus. We created the 3Phase Ungrounded Fault across the Circuit Breaker Terminal
which is highlighted and the Time of applying Fault is 0.1166667[s] and we considered as a Permanent
Fault. After applied the fault, the circuit breaker will operate after 3 cycles 0.1666667[s] to open it. Then
we analyzed and compared the TRV voltage results of the selected CB as per the IEC Standard
Practice. The Simulation results are attached in Appendix-A.
Description:
In Normal Scenario, the Case-1 TRV study is performed in one of the Outgoing feeders of the Circuit
Breaker in 13kV bus. We created the 3Phase Grounded Fault across the Circuit Breaker Terminal
which is highlighted and the Time of applying Fault is 0.1166667[s] and we considered as a Permanent
Fault. After applied the fault, the circuit breaker will operate after 3 cycles 0.1666667[s] to open it. Then
we analyzed and compared the TRV voltage results of the selected CB as per the IEC Standard
Practice. The Simulation results are attached in Appendix-B.
3.2.2 Scenario-2
In this scenario, one of the incomer circuit breakers from transformers T1 & T3 at 13kV bus are in
open condition, with bus coupler in closed condition. A terminal fault is created at the Bus
coupler.
Description:
In Case-3 TRV study is performed in Bus-Coupler of the Circuit Breaker in 13kV bus. We created the
3Phase Ungrounded Fault on the Main bus which is highlighted and the Time of applying Fault is
0.1166667[s] and we considered as a Permanent Fault. After applied the fault, the circuit breaker will
operate after 3 cycles 0.1666667[s] to open it. Then we analyzed and compared the TRV voltage
results of the selected CB as per the IEC Standard Practice. The Simulation results are attached in
Appendix-C.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 11 of 33
687537-4700-20-SR-0001
Description:
In Case-4 TRV study is performed in Bus-Coupler of the Circuit Breaker in 13kV bus. We created the
3Phase Grounded Fault on the Main bus which is highlighted and the Time of applying Fault is
0.1166667[s] and we considered as a Permanent Fault. After applied the fault, the circuit breaker will
operate after 3 cycles 0.1666667[s] to open it. Then we analyzed and compared the TRV voltage
results of the selected CB as per the IEC Standard Practice. The Simulation results are attached in
Appendix-D.
3.2.3 Scenario-3
In this scenario, both the incomer circuit breakers from transformers T1 & T3 at 13kV bus are in
closed condition, with bus couplers are in open condition. And one of the Outgoing feeder
breakers is in open and the Bus-tie is in Closed condition in the circuit. A terminal fault is created
on the Bus-tie breakers.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 12 of 33
687537-4700-20-SR-0001
Description:
In Case-5 TRV study is performed in Bus-Tie of the Circuit Breaker in 13kV bus. We created the
3Phase Ungrounded Fault on the Bus-tie bus which is highlighted and the Time of applying Fault is
0.1166667[s] and we considered as a Permanent Fault. After applied the fault, the circuit breaker will
operate after 3 cycles 0.1666667[s] to open it. Then we analyzed and compared the TRV voltage
results of the selected CB as per the IEC Standard Practice. The Simulation results are attached in
Appendix-E.
Description:
In Case-5 TRV study is performed in Bus-Tie of the Circuit Breaker in 13kV bus. We created the
3Phase Grounded Fault on the Bus-tie bus which is highlighted and the Time of applying Fault is
0.1166667[s] and we considered as a Permanent Fault. After applied the fault, the circuit breaker will
operate after 3 cycles 0.1666667[s] to open it. Then we analyzed and compared the TRV voltage
results of the selected CB as per the IEC Standard Practice. The Simulation results are attached in
Appendix-F.
3.3 Results
The TRV Study is analyzed for ENMAX Substation 05 and we created the 3P Ungrounded & Grounded
faults across the Circuit Breaker Terminal, Outgoing Feeders and the Bus.
Summary of results observed under Scenario 1, 2 & 3 for various types of fault cases are tabulated in
Table 1 below.
3.5 Observation
It is Observed from the summary of the results, the fault contribution under Case 1, 2, 3, 4, 5 & 6 is
observed to be 55% respectively of circuit breaker rating of 25kA. Hence TRV is observed to be within
the T60 capability envelope.
3.6 Conclusion
From the TRV studies carried out for New 13kV switchgear at ENMAX Substation, it is observed that
the TRV and RRRV levels are well within the capability of the new 13kV circuit breakers is assessed as
per IEC 62271-100. Hence the selected 13kV breakers at ENMAX Substation 20 are adequate for the
application.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 15 of 33
687537-4700-20-SR-0001
3.7 Reference
[1] IEC Std 62271-100, High Voltage Switchgear and Control Gear for Alternating Current Circuit
Breakers.
[2] IEEE C37.011-2019, Application Guide of Transient Recovery Voltage for AC High Voltage
Circuit Breakers with rated maximum voltage above 1000V
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 16 of 33
687537-4700-20-SR-0001
APPENDIX-A
Simulation results
: Graphs
ifrms_20B13
16.0
13.234
14.0 0.000
12.0 -13.234
10.0 Min 0.000
Max 13.642
8.0
Diff 13.642
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.24
0.00
f -4.21
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 17 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20B13 ENVA_20B13
80.00
-2.587
60.00 0.000
40.00 2.587
Min -11.097
20.00
Max 11.089
0.00 Diff 22.186
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20B13 ENVB_20B13
80.00
-9.127
60.00 0.000
40.00 9.127
Min -11.102
20.00
Max 15.903
0.00 Diff 27.004
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.37
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 18 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20B13 ENVC_20B13
80.00
2.090
60.00 0.000
40.00 -2.090
Min -11.092
20.00
Max 11.100
0.00 Diff 22.191
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.38
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 19 of 33
687537-4700-20-SR-0001
APPENDIX-B
Simulation results
Figure 6.TRV across Breaker _ BRK_20B8_20B13
: Graphs
TRV_20BT1
20.0
5.985
15.0 0.000
-5.985
10.0 Min -12.226
5.0 Max 11.047
Diff 23.273
0.0
-5.0
-10.0
-15.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.28
0.00
f -3.59
: Graphs
ifrms_20B13
16.0
13.208
14.0 0.000
12.0 -13.208
10.0 Min 0.000
Max 13.731
8.0
Diff 13.731
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.25
0.00
f -4.01
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 20 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20B13 ENVA_20B13
80.00
-2.587
60.00 0.000
40.00 2.587
Min -12.490
20.00
Max 11.089
0.00 Diff 23.579
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20B13 ENVB_20B13
80.00
-9.127
60.00 0.000
40.00 9.127
Min -11.102
20.00
Max 13.650
0.00 Diff 24.751
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.37
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 21 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20B13 ENVC_20B13
80.00
2.090
60.00 0.000
40.00 -2.090
Min -11.092
20.00
Max 11.100
0.00 Diff 22.191
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.38
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 22 of 33
687537-4700-20-SR-0001
APPENDIX-C
Simulation results
: Graphs
TRV_20BT1
20.0
5.986
15.0 0.000
-5.986
10.0 Min -11.060
5.0 Max 11.047
Diff 22.108
0.0
-5.0
-10.0
-15.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.28
0.00
f -3.59
: Graphs
ifrms_20BT1
16.0
13.246
14.0 0.000
12.0 -13.246
10.0 Min 0.000
Max 13.661
8.0
Diff 13.661
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.25
0.00
f -4.02
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 23 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20BT1 ENVA_20BT1
80.00
-2.697
60.00 0.000
40.00 2.697
Min -11.080
20.00
Max 11.071
0.00 Diff 22.151
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20BT1 ENVB_20BT1
80.00
10.886
60.00 0.000
40.00 -10.886
Min -11.068
20.00
Max 15.601
0.00 Diff 26.669
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.48
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 24 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20BT1 ENVC_20BT1
80.00
9.491
60.00 0.000
40.00 -9.491
Min -11.074
20.00
Max 11.064
0.00 Diff 22.138
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.44
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 25 of 33
687537-4700-20-SR-0001
APPENDIX-D
Simulation results
: Graphs
TRV_20BT1
20.0
5.985
15.0 0.000
-5.985
10.0 Min -12.226
5.0 Max 11.047
Diff 23.273
0.0
-5.0
-10.0
-15.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.28
0.00
f -3.59
: Graphs
ifrms_20BT1
16.0
13.219
14.0 0.000
12.0 -13.219
10.0 Min 0.000
Max 13.754
8.0
Diff 13.754
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.25
0.00
f -4.02
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 26 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20BT1 ENVA_20BT1
80.00
-2.698
60.00 0.000
40.00 2.698
Min -12.226
20.00
Max 11.071
0.00 Diff 23.297
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20BT1 ENVB_20BT1
80.00
10.886
60.00 0.000
40.00 -10.886
Min -11.088
20.00
Max 13.544
0.00 Diff 24.632
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.48
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 27 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20BT1 ENVC_20BT1
80.00
9.490
60.00 0.000
40.00 -9.490
Min -11.074
20.00
Max 11.064
0.00 Diff 22.138
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.44
.
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 28 of 33
687537-4700-20-SR-0001
APPENDIX-E
Simulation results
: Graphs
ifrms_20BT
16.0
13.230
14.0 0.000
12.0 -13.230
10.0 Min 0.000
Max 13.720
8.0
Diff 13.720
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.25
0.00
f -4.01
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 29 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20BT1525 ENVA_20BT1525
80.00
-2.482
60.00 0.000
40.00 2.482
Min -11.109
20.00
Max 11.101
0.00 Diff 22.211
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20BT1525 ENVB_20BT1525
80.00
-9.072
60.00 0.000
40.00 9.072
Min -11.114
20.00
Max 15.907
0.00 Diff 27.021
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.37
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 30 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20BT1525 ENVC_20BT1525
80.00
1.984
60.00 0.000
40.00 -1.984
Min -11.104
20.00
Max 11.112
0.00 Diff 22.216
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.38
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 31 of 33
687537-4700-20-SR-0001
APPENDIX-F
Simulation results
: Graphs
ifrms_20BT
16.0
13.202
14.0 0.000
12.0 -13.202
10.0 Min 0.000
Max 13.820
8.0
Diff 13.820
6.0
4.0
2.0
0.0
-2.0
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.25
0.00
f -4.01
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 32 of 33
687537-4700-20-SR-0001
: Graphs
TRVA_20BT1525 ENVA_20BT1525
80.00
-2.483
60.00 0.000
40.00 2.483
Min -12.640
20.00
Max 11.101
0.00 Diff 23.741
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.29
0.00
f -3.42
: Graphs
TRVB_20BT1525 ENVB_20BT1525
80.00
-9.072
60.00 0.000
40.00 9.072
Min -11.114
20.00
Max 13.677
0.00 Diff 24.791
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.37
Study Report Revision
ENMAX SUB-20 TRV Study No Date Page
Document No.
01 2023-06-29 33 of 33
687537-4700-20-SR-0001
: Graphs
TRVC_20BT1525 ENVC_20BT1525
80.00
1.985
60.00 0.000
40.00 -1.985
Min -11.104
20.00
Max 11.112
0.00 Diff 22.216
-20.00
-40.00
-60.00
-80.00
sec 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.30
0.00
f -3.38