NHM-AFO-101900-MT-00-000014 (A0) Method Statement For Library of Nature Installation
NHM-AFO-101900-MT-00-000014 (A0) Method Statement For Library of Nature Installation
NHM-AFO-101900-MT-00-000014 (A0) Method Statement For Library of Nature Installation
RESPONSE SUMMARY
LCEC comments:
- The referenced shop drawings which the contractor is using in this MSRA are non-commented and have no approval status
drawings. USE ONLY APPROVED SHOP DRAWINGS.
- The related shop drawings are currently C status. ALL COMMENTS MUST BE ATTENDED BEFORE STARTING THE WORK.
- Use only approved material and accessories, and as per manufacturer’s recommendations.
- Consultant has no objection on the contractor’s method of installing the library of nature, SUBJECT TO adherence to all
comments.
HSE Comments:
• MS Session 5: Subcontractor roles and responsibilities shall be specified
• Logistic plan shall be updated and reviewed for the storage and transporting the library of nature installation materials
• Lift plan shall be developed for the usage of spider crane. The positioning of spider crane shall be assessed by a
competent appointed person
• ALEC to conduct PJOD for the activity. Follow authority and project-specific requirements at site.
Attachments (if any): List down attachments in order and indicate the reference number where available.
Related Reference
Distribution
ORIGINATOR’S INFORMATION
REVIEWED AND APPROVED BY GENERAL
REQUESTED BY: REVIEWED AND RECOMMENDED BY:
CONTRACTOR FOR ISSUE
Distribution
METHOD STATEMENT
FOR
METHOD
Mark Manito /
01 For approval Lana Jammal Rami Aboualfa
Rajin Kunnenoth
Site Engineer /
Project Manager Head of Projects
QCHSE Manager
CONTENT
1. INTRODUCTION ....................................................................................................................................... 4
2. SCOPE OF WORK: ..................................................................................................................................... 4
3. DEFINITIONS & ABBREVATIONS:........................................................................................................ 4
4. REFERENCES: ........................................................................................................................................... 5
5. ROLE AND RESPONSIBILITIES: ............................................................................................................ 5
6. WORKING ACCESS: ............................................................................................................................... 10
7. LIGHTING: ............................................................................................................................................... 10
i. Safety Lighting: ......................................................................................................................................... 10
ii. Task Lighting: ............................................................................................................................................ 10
8. PLANT & EQUIPMENT: ......................................................................................................................... 10
i. General:...................................................................................................................................................... 10
ii. Plant & Equipment Schedule: .................................................................................................................... 10
iii. Personal Protective Equipment: ............................................................................................................. 11
iv. Power:..................................................................................................................................................... 11
v. Working Platforms:.................................................................................................................................... 11
9. MATERIALS:............................................................................................................................................ 11
10. CONSTRUCTION SEQUENCE / METHOD OF WORK: ...................................................................... 11
11. PROGRAMME .......................................................................................................................................... 14
12. RISKS & CONTROLS: ............................................................................................................................. 15
i. Hazards / Risks .......................................................................................................................................... 15
ii. Control Measures / Permits........................................................................................................................ 15
13. TECHNICAL INFORMATION ................................................................................................................ 15
14. EMERGENCY ARRANGEMENTS ......................................................................................................... 15
i. General ....................................................................................................................................................... 15
ii. Fire Precautions ......................................................................................................................................... 15
iii. Communication.......................................................................................................................................... 15
3
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
1. INTRODUCTION
The Purpose of this Method statement is to provide the Control Sequence and methodology that will be used for the
installation of Library of Nature in Natural History Museum – Abu Dhabi.
2. SCOPE OF WORK:
4. REFERENCES:
1. Project Quality Plan (PQP)
2. Project Safety & Security Plan (PSSP)
3. OSHAD CoP
4. Other references (Shop drawings, design calculations, RFI etc.) if applicable
Quality Manager:
Design Manager:
7
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
Site Engineer:
QA/QC Engineer:
8
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
• Conduct internal verification/inspections for the implementation of corrective and preventive actions
for the site NCRs and deficiencies identified by the QA QC Team. Verify the effectiveness of corrective
and preventive actions.
• Analyse the status of QA QC activities, prepare the trends including submittals, inspections, tests,
deficiencies identified & NCRs and communicate to QA QC Manager/Project team
• Conduct snagging – De-snagging inspections coordinating with subcontractors, ALEC execution Team
and Consultants.
• Lead and guide the inspection team to achieve the project Goals.
Site Surveyor:
General Foreman:
• Will supervise the work to ensure that technical, Quality and SAFETY requirement are met
• Will go through the project scope of work such as drawings, specification, Quality Plans, project program
• Will prepare site daily report
• Will co-ordinate labor and sub-contractor in order to achieve program requirements
• Will ensure compliance with stated Quality requirements
• Will ensure comply with Safety requirements and regulation
• Will attend daily site meeting and communicate his report with the Line Manager
• Will participate in training and development of his subordinates
• Will organize with the Site Engineer or Section Engineer to ensure the availability of plant, equipment and
labor to his designated work activities
• Will closely monitor the usage of consumable and materials by his crew in order to minimize wastage
• Will co-ordinate with Site Engineer regarding material requisition orders
• Will Maintain high standards of housekeeping on site
9
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
Responsible persons for each stage of work are marked against each phase of work in work sequence section.
6. WORKING ACCESS:
The access / egress for the construction vehicles for the installation of activities shall be as per the logistic Plan.
Ensure Proper coordination with all interfacing contractors for Logistics, access prior to commencement of all
activities.
7. LIGHTING:
i. Safety Lighting:
The minimum safety lighting as per general requirements (Minimum 50 lux) will be provided.
i. General:
• Appropriate plants and equipment shall be used for the execution of the activity. The plant, tools and
equipment shall be checked visually prior to use.
• Only authorized applicator approved and trained by the manufacturer to install manufacturer's products
• All Operators shall be trained and certified by the 3 rd party where required
• No defective plant and equipment shall be allowed to use on site
5 Podium Ladder
6 Power Drill
8 Vacuum/Blower
Common Hand Tools (Hammers, Screw Drivers, etc.)
9
10
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
iv. Power:
The Power supply used on site for power tools shall be 110V only. 230v or higher voltage power supply
shall be provided to site welfare areas and other site establishment.
v. Working Platforms:
• The working platforms for the task shall be firm and stable.
• The elevated working platforms for the activity shall be provided by means of cup lock scaffold system
• The scaffolds for the activity shall be built by competent scaffolders trained by third party.
• The built scaffolds shall be inspected and signed off by a third party trained inspectors / supervisors
• Were necessary access shall be provided by means of scaffold
• The working platforms shall be used as only platforms for working and shall not be used for loading
heavy material or equipment on to it.
9. MATERIALS:
11
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
Reference
Responsible
DESCRIPTION OF SEQUENCE / METHOD OF WORK /Verifying
person
Document
1. Deliver the Tools and Materials with the delivery truck (10ton) from Rely
Logistic MSRA
Factory to Site Loading/Unloading Bay.
Manager &
2. Once the truck reached the Site Loading/Unloading Bay, Position the truck Site Layout /
for proper unloading access then start to unload the Tools and Materials by Engineer/ Routing
Forklift/Manual depending on packaging size and weight (all heavy materials Constructio Plan
will be unloaded by forklift and the rest are manual) and load it on top of the n Manager,
movable trolley to travel up to the unloading point/store area. Site Forman
3. Secured the Tools/Materials within the trolley and put rope/lashing belt if and HSE
needed then manually travel (push/pull) the trolley loaded with
tools/materials carefully from delivery loading/unloading area to the area for
final unloading/store.
4. Once reached the final unloading/store location, unload the tools and
materials from trolley and place/arrange each materials properly to ensure
access of using each item are as per sequence. (Use forklift for heavy items
and manual for light items)
Reference
Responsible
DESCRIPTION OF SEQUENCE / METHOD OF WORK /Verifying
person
Document
8. Start drilling the holes using Power Drill as per plan sequence of installation.
9. Ensure holes depth are as per requirement and as per frame & plate holes
location.
10. Vacuum/clean all the holes and ensure they are clean and ready to received
anchor bolts.
11. Install the M20 anchor bolts fixation for each holes with the proper height,
alignment, and level.
12. Ensure anchor bolts are fixed properly and correct.
13. Start installation of bottom metal structures as illustrated in the drawing and
below screen shot.
14. Ensure that they were installed in proper elevation, alignment, and level prior
to nuts tightening.
15. Install Manually and attach the Upper section of the frame (Male/Female
technique) as illustrated in drawing as “Stage 2”
16. Install Manually and attach the Cladded frame as illustrated in drawing as
“Stage 3”
13
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
Reference
Responsible
DESCRIPTION OF SEQUENCE / METHOD OF WORK /Verifying
person
Document
17. Install manually and with scaffolding for upper part the L angles illustrated
in drawings as Stage 4 with self-screwing screws. Screen
18. Ensure that they were installed in proper elevation, alignment, and level Contractor /
prior to screws tightening By Buttery drill. Supplier
19. Use spider crane to shift the material and boom lift/mobile scaffolding to
assets the fixing of the cladded part marked on the drawing as (Stage 5 &
6).
20. Install the Upper Part Cladded ( Stage 5 & 6) – Male and Female technique
21. Ensure upper part is installed properly, aligned, level, and stable.
22. Install the MS10 bolts for each holes.
23. Ensure bolts are fixed properly and correct and tightened By Buttery drill.
24. Do all the joints sealing and apply the final touch up of paint to the joint.
25. Repeat steps 15-25 until 18 ribs are fixed/installed.
26. Install the projection surface, Ensure it is fixed properly, aligned and levelled
with screws to the ribs.
27. Clean the area and keep all the tools, equipment, and materials
properly/safely and ensure garbage are disposed properly every time before MSRA /
ITP
leaving the site.
28. On last day of installation, ensure whole area are clean, all tools, equipment, QC
and unused materials are pull-out properly and garbage are disposed inspector
properly before leaving the site. Keep the barricade tape if needed.
10.3 QUALITY CONTROL
1. Site Management and QAQC personnel should monitor the installation to
ensure it is done according to the approved drawings.
2. Ensure phases of inspection and testing are completed as detailed in approved
ITP.
11. PROGRAMME
14
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
i. Hazards / Risks
i. General
• The Site HSE department shall be responsible to arrange and coordinate with site execution teams in arranging
Day & Night emergency procedures
• In case of any emergency the CRM will be informed about the emergency
• Emergency assembly point shall be allotted and communicated to all the operatives in involved in the job
• Ensure clear access to the emergency assembly area with signage’s in place.
• No construction activity shall block the access leading to the emergency assembly point. In case of any
deviation the access has to divert and the same shall be communicated to all the operatives on site.
• Fire extinguishers shall be put in place in each working zone and a clear access shall be provided to the
location
• All the operatives shall be trained for fire precautions on site
• A fire warden is appointed and trained from each team of operatives
iii. Communication
The communication on site shall be through mobile provided by the contractor or by two-way wireless radio
systems
15. TRAINING
• Necessary safety or operational training shall be provided to the operatives involved in the activities
16. SUPERVISION
15
MS ref no.: NHM-AFO-
101900-MT-00-000014
NATURAL HISTORY MUSEUM
Rev : A0
METHOD STATEMENT FOR LIBRARY OF NATURE
Date : 18-12-2023
18. HOUSEKEEPING
(If applicable)
20. ATTACHMENTS
1. Risk Assessment
2. ITP
16
HAZARD IDENTIFICATION & RISK ASSESSMENT
EMP NO NAME
RISK ASSESSOR RE0697 MANU SURENDRAN
CONSTRUCTION MANAGER RE0916 LANA JAMMAL
ENGINEER RE0924 MARK
SAFETY DEPARTMENT RE0725 RAJIN
LOGISTICS MANAGER RE0874 JEAN MARDINI
FMD MANAGER RE0143 KHALID JAMIL
SUBJECT MATTER EXPERT
1. MANPOWER REQUIRED FOR TASK 25
2. WORK NOTIFICATION STATUS N/A
3. ESTIMATED / PLANNED START DATE 20th December 2023
4. DURATION OF ACTIVITY 90 days
5. NIGHT WORK AND EQUIPMENT TBS
6. EQUIPMENT AND MATERIALS Basic hand tools/machines/ /Measuring tape/Markers/Line and point / /
/Mobile elevating working platform/ podium Ladders/Mobile Aluminum
Scaffolding/Hilti
7. OVERHEAD SERVICES /
UNDERGROUND SEQUENCE OF No
WORKS ACTIVITY
8. SUBCONTRACTORS TO BE USED No
9. INTERFACE WITH PUBLIC No
10. ADJACENT ACTIVITIES & INTERFACE
Yes, General Construction
WITH OTHER SUBCONTRACTORS
11. LOGISTICS, LOADING, DELIVERY Pickup 10 ton / Forklift / Boom loader/ Spider Crane/ scaffolding
12. SPECIFIC PPE REQUIRED Hand Gloves/Helmet/ Safety Goggles/Face mask/Reflective vest/Safety
Shoes/Safety harness with shock absorber/PVC Gloves /Full Face Respirator
NPF 400/Face Shields.
13. ENVIRONMENTAL Air pollution / Dust
14. ELEVATED POSITIONS Yes, Podium Ladder / Scaffold and MEWP/ Spider Crane/
15. CONFINED SPACE ENTRY No
16. HOARDING / FENCING /
Working area barricading
BARRICADING/ DEMARCATION
17. ACCESS / EGRESS Yes
18. SECURITY REQUIREMENTS TBS
19. TRAFFIC Yes
20. PERMIT TO WORK REQUIREMENTS Yes
21. WORK NEAR WATER No
Page 1 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 2 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
HIERARCHY OF CONTROLS
PROJECT NAME NATURAL HISTORY MUSIUM PROJECT CODE ALC23003
DESCRIPTION OF TASK /
THE LIBRARY OF NATURE
ACTIVITY
RISK ASSESSMENT NO NHM-AFO-101900-MT-00-000014 RA REV NO A0
TASK SITE LOCATION NHM –SAADIYAT CULTURAL WATERFRONT-ACT-2
Page 3 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 4 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 5 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 6 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 7 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 8 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
6 Use of podium Hazards ▪ Fatality 5 5 25 ▪ If employees bring their own y 1 5 5 • Construction Manager
ladders for access & ▪ Falls of persons ▪ Serious personnel equipment for working at height the • Site engineer
egress during all ▪ Falling materials Injuries employer must check it and assess its
• Site Supervisor
steps of the activity ▪ Property damage suitability
for bolting and fixing ▪ Work at height must be planned, • Foreman
the metal supervised and carried out safely • Safety Officer
▪ Risk assessment and planning should ADM COP reference
frame.(Fixation Stage
2, ) take into account the effects that • COP 2.0
weather can have on outdoor work • COP 17
at height • COP 22
▪ If it is not reasonably practicable to
avoid or prevent a fall, employers • COP 23
should ensure both the distance of • COP 36
the fall and its consequences are
minimized
▪ A weekly inspection is to be carried
out for working platforms and after
adverse weather conditions
▪ Safe means of access to the work
location must be provided using
ladders, scaffolding, mobile elevated
work platforms or mobile tower
scaffolds.
▪ Life line must be installed for the roof
work and secured with wire rope
clips and inspected by competent
inspector.
Page 9 of 43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 10 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 11 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 12 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 13 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 14 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
8 Work at heights Hazards ▪ Fatality 5 5 25 ▪ If employees bring their own Y 1 5 5 • Construction Manager
(using scaffolding, ▪ Falls of persons ▪ Serious personnel equipment for working at height the • Site engineer
ladders, etc.) the ▪ Falling materials Injuries employer must check it and assess its
• Site Supervisor
fixing Fixation Stage ▪ Property damage suitability
2,3,4,5,6) optional ▪ Work at height must be planned, • Foreman
supervised and carried out safely • Safety Officer
▪ Risk assessment and planning should ADM COP reference
take into account the effects that • COP 2.0
weather can have on outdoor work • COP 17
at height • COP 22
▪ If it is not reasonably practicable to
avoid or prevent a fall, employers • COP 23
should ensure both the distance of • COP 36
the fall and its consequences are
minimized
▪ A weekly inspection is to be carried
out for working platforms and after
adverse weather conditions
▪ Safe means of access to the work
location must be provided using
ladders, scaffolding, mobile elevated
work platforms or mobile tower
scaffolds.
Page 15 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 16 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 17 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 18 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 19 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 20 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 21 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 22 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 23 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 24 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 25 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 26 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
12 Use of hand tools to Hazards ▪ Hand injuries 4 4 16 ▪ Personnel must conduct visual Y 1 4 4 • Construction Manager
fixing the screw M10 ▪ Damage Hand tools ▪ Feet injuries examination prior to use the tool. • Site engineer
MS BOLT ▪ Homemade / ▪ Body injuries ▪ Personnel must ensure the tools are
• Construction Manager
makeshift tools ▪ Eye injuries fit for the purpose.
▪ Incorrect tools and ▪ Slips, Trips and fall ▪ Supervisor must ensure that correct • Site engineer
usage Body impact, crushing, or tools are being used properly. • Site Supervisor
▪ Improper storage punctured ▪ Makeshift tools are prohibited. • Foreman
▪ Congested work area ▪ Sharp tools are to remain sheathed. • Safety Officer
▪ Keep tools stored in an orderly
manner on tool benches or in tool
chests.
▪ All defective tools/appliances to be
removed on work area for
replacement.
▪ Never subject a tool to a strain
beyond its capacity.
▪ Do not leave tools lying on moving
machinery.
▪ Full attention of the user while using
hand tools and to the work area.
▪ Employee shall take reasonable care
of their own and other people’s
health and safety.
Page 27 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 28 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 29 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 30 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 31 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 32 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 33 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 34 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 35 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 36 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
Page 37 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
18-12-2023
APPROVED BY LANA JAMMAL RE0916 Sr. Project Manager
Page 42 of
43
HAZARD IDENTIFICATION & RISK ASSESSMENT
REVIEWED BY
Ramaiah Ambikapathy 537448 Construction Risk Advisor 18-12-2023
ALEC CRM
RISK ASSESSMENT DATE REVIEW PERIOD DATE OF NEXT REVIEW
18-12-2023 6 months 17-06-2023
Page 43 of
43
INSPECTION AND TEST PLAN (ITP)
Document No.: NHM-AFO-101900-MT-00-
NATURAL HISTORY MUSEUM - 000014
Activity: LIBRARY OF NATURE
GENERAL CONTRACTOR WORKS Revision: A0
Date: 18-12-2023
Page: 1 of 2
Activity Verifying Inspection/Testing
Sl. (Description of activity/ Controlling Acceptance Document Authority
Frequency Sub-
No. operation requiring Document Criteria and/or Consult
Contr ALEC
ant
Lab Client Remarks
inspection/ testing) Record actor
1 PRELIMINARY ACTIVITIES
Submission of Documents &
1.1 Prior to
Approval of:
Shop Drawing - SD All related start of
Review
Method statement – MSS documents to be production P H R
submittals document
Inspection Test Plans – ITP approved /
installation
Risk Assessment – RA
2 PRE-CONSTRUCTION ACTIVITIES
Prior to Visual /
Check material approval against Complying with
2.1 MIR start review P H H
delivery on site specs
production document
MS, ML, ITP, Shop Prior to Visual /
Conformity check on material Against material
2.2 drawings & Related start review P H H/A
arrival approval document
Documents. production document
3 CONSTRUCTION ACTIVITIES
3.1 Activity Title
Surface to be ready
Visual /
Surface preparation – Visual and clearance Prior to
3.1.1 Method statement review
Inspection. approval to start installation H H R
document
installation
MEP clearance,
MSRA and Visual /
Structure – Installation of Base Site pictures & Prior to P
3.1.2 material/shop drawing review H H/A
Plates Related approval cladding
document
Documents.
LEGEND:
R- Review H – Hold Point S – Surveillance
4.1 As Built Drawings / Records Drawing, DS All documentation All Areas DRG, DS P R A
4.2 Resolve deviation/ NCR issues Spec, MS, Drawing Engineer’s Approval Each NCR NCR P R A
Approved by
4.3 Test Reports(Pull out) (If Applicable) Specs., MS As per spec Test Report P R A
Engineer
LEGEND:
R- Review H – Hold Point S – Surveillance
MS BOLT (B1) M10 x 60mm 108 ECO HARD SURFACE ST-01 A 9100 YES G 6864 NO M 7930 NO
01 02 03
HIT-HY 200 + HIT-Z-R M20 SUSTAINABLE TIMBER WD-02 B 7930 NO H 9100 YES N 6964 YES
(ADHESIVE) ANCHOR BOLT (B2) M20 x 120mm 108
PROJECTION SCREEN PT PT-09 C 6964 YES I 7930 NO O 6864 NO
MS FLAT HEAD BOLT (B3) M6 x 100mm 32 D 6864 NO J 6964 YES P 9100 YES 04 05 06
E 9100 YES K 6864 NO Q 7930 NO
F 7630 NO L 9100 YES R 6964 YES
07 08 09
GENERAL NOTES:
ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
K
drawing and specifications. The review is only for the general conformance
700x300x5MM THK FIBER GLASS with design concept and general compliance with the information in the
G ACCESS PANEL WITH DOOR HINGE
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
construction; coordinating his works with that of all trades; and performing his
J work in a safe and satisfactory manner. This approval represents our review
M of the submitted document only for those modifications requested herein or in
previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
previously reviewed submittal is specifically disapproved. It is understood that
Engineer’s notation on submittal is not to be construed as authorization for
M10 MS BOLT (B1) additional work cost.
N Reviewed by…………….……………...........…....Date…………………..…….
3MM THK MS PLATE WELDED CONTRACTOR CERTIFICATION
E WITH SHS MALE (MT09) THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
FIXATION STAGE-6 DOCUMENTS
Eyas Mohammed
O 140x140x3MM THK MS SHS MALE (MT09)
.....................................................................................................................................................
NAME SIGNATURE
F FIXATION STAGE-5
REFERENCE IFC DRAWINGS
P DRG. NO NHM-BAL-101900-DG-22-2D4B18-C0
60x60x3MM THK MS
L-ANGLE FOR FIXATION SHS FRAME
(MT09)
02
C (MT09) EMPLOYER:
Miral Asset Management LLC
PO BOX 147774,Miral HQ,
Yas Island Opp. W arner Bros.™ W orld
Abu Dhabi, United Arab Emirates.
B (MT09)
PROJECT MANAGEMENT CONSULTANT
R Office No. 1304 | Ali Bin Hamouda
Building | Khalifa Street | P.O Box
A PROJECTION
111627 | Abu Dhabi | U.A.E.
08-12-23 VR/BSM
DRAWING TITLE :
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE
3D PRESENTATION VIEWS
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-809 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
MECCA
01 02 03
04 05 06
07 08 09
10500
GENERAL NOTES:
ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
1
NHM-AFO-101900-DG-00-2D5B00-811
00
105
18
1 0.0
NHM-AFO-101900-DG-00-2D5B00-812
0°
RESULT STATUS:
A Approved
B Approved with Comments
C Revise & Resubmit
IMPORTANT: Corrections or comments made to the drawings during the
review do not relieve the contractor from compliance with the requirements of
drawing and specifications. The review is only for the general conformance
4074
with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
construction; coordinating his works with that of all trades; and performing his
work in a safe and satisfactory manner. This approval represents our review
of the submitted document only for those modifications requested herein or in
previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
previously reviewed submittal is specifically disapproved. It is understood that
Engineer’s notation on submittal is not to be construed as authorization for
additional work cost.
Reviewed by…………….……………...........…....Date…………………..…….
CONTRACTOR CERTIFICATION
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
DOCUMENTS
Eyas Mohammed
.....................................................................................................................................................
02 NAME SIGNATURE
40
5340
15
4
NHM-AFO-101900-DG-00-2D5B00-811
9190
OWNER:
EMPLOYER:
Miral Asset Management LLC
PO BOX 147774,Miral HQ,
Yas Island Opp. W arner Bros.™ W orld
Abu Dhabi, United Arab Emirates.
Phone: +971 (02) 406 8888
Fax: +971 (02) 406 8899
www.miral.ae
4465
111627 | Abu Dhabi | U.A.E.
°
.68
44 MAIN CONTRACTOR:
ALEC Engineering and Contracting
L.L.C.
P.O.Box 27639
3 Dubai U.A.E
Tel: 04-429 0599
NHM-AFO-101900-DG-00-2D5B00-811 Fax: 04-429 0216
1
NHM-AFO-101900-DG-00-2D5B00-814
PROJECT NAME :
650
SAADIYAT CULTURAL WATERFRONT
1 : 30 SECTOR NO : PLOT NO :
BS FFL LVL ACT-2 PLOT SC11-012
-6988
PROJECT DESCRIPTION :
ELEVATION
2 1 : 20
A2 ISSUED FOR CONSTRUCTION ATIF 08-12-23
A1 ISSUED FOR CONSTRUCTION ATIF 07-10-23
A0 ISSUED FOR CONSTRUCTION ATIF 16-09-23
REV NO DESCRIPTION DRAWN DATE
DRAWING REVISIONS
PROJECT ID : DRAWN BY: DRAWING SIZE :
B1N-2021-007568 ATIF A0
SUBMISSION DATE : CHECKED BY : SCALE :
DRAWING TITLE :
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE LAYOUT
PLAN & ELEVATION
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-810 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
MECCA
01 02 03
5MM THK
FIBER GLASS CLADDING
04 05 06
92
52
150x150x3MM THK MS SHS
GLASS PANELS (MT-09)
02 (BY OTHERS)
7950
2045
800x114MM THK COUNTER
CONIAN SOLID SURFACE
9100
1585
Level 10
(ST-01) CAMEO WHITE (BY OTHERS)
4105 -2702
PROJECTION
SURFACE AFFIXED TO
RESULT STATUS:
STRUCTURAL SCREEN
2900
A Approved
67 6MM FIBER GLASS WITH
15
B Approved with Comments
PAINTED FINISH (PT-09) IMPORTANT: Corrections or comments made to the drawings during the
review do not relieve the contractor from compliance with the requirements of
drawing and specifications. The review is only for the general conformance
3610 with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
construction; coordinating his works with that of all trades; and performing his
817
work in a safe and satisfactory manner. This approval represents our review
of the submitted document only for those modifications requested herein or in
1 50x50x3MM THK MS SHS previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
NHM-AFO-101900-DG-00-2D5B00-815
WELDED WITH SHS (MT09)
50
previously reviewed submittal is specifically disapproved. It is understood that
20
Engineer’s notation on submittal is not to be construed as authorization for
SUPPORT THE (ST-01) CONIAN additional work cost.
1762
1608
Reviewed by…………….……………...........…....Date…………………..…….
1150
CONTRACTOR CERTIFICATION
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
DOCUMENTS
BS FFL LVL
MID STRUCTURE SECTION
Eyas Mohammed
.....................................................................................................................................................
-6988
3
NAME SIGNATURE
SECTION-1
DRG. NO NHM-BAL-101900-DG-22-2D4B18-C0
1 1 : 30
OWNER:
35
Phone: +971 (02) 406 8888
Fax: +971 (02) 406 8899
M20 MS
www.miral.ae
(MT-09)
59
ANCHOR BOLT PROJECT MANAGEMENT CONSULTANT
Office No. 1304 | Ali Bin Hamouda
02 BASE STEEL
14.86 STRUCTURE (MT-09)
LEAD DESIGN CONSULTANT :
°
Office 6-7 Ground floor,
Block A, Emarat Atrium Building
Sheikh zayed Road, Dubai, UAE
(MT-09)
5°
.4
MAIN CONTRACTOR:
14
2292
ALEC Engineering and Contracting
L.L.C.
P.O.Box 27639
1476
Dubai U.A.E
Tel: 04-429 0599
Fax: 04-429 0216
SECTOR NO : PLOT NO :
(PT-09) ACT-2 PLOT SC11-012
36
PROJECT DESCRIPTION :
92
14 STRUCTURE FRAME
FOR GLASS PANEL
(BY OTHERS)
96
22
08
25
A2 ISSUED FOR CONSTRUCTION ATIF 08-12-23
A1 ISSUED FOR CONSTRUCTION ATIF 07-10-23
A0 ISSUED FOR CONSTRUCTION ATIF 16-09-23
REV NO DESCRIPTION DRAWN DATE
DRAWING REVISIONS
2
SUBMISSION DATE : CHECKED BY : SCALE :
As indicated
1 : 25 08-12-23 VR/BSM
DRAWING TITLE :
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE SECTIONS
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-811 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
1
2 NHM-AFO-101900-DG-00-2D5B00-813 GLASS PANEL FRAME
NHM-AFO-101900-DG-00-2D5B00-812 5MM THK 02 (BY OTHERS) MECCA
114
THE SSF 800x114 THK
1310 CONIAN SOLID SURFACE ST-01) 01 02 03
30x30x2mm THK MS SHS
(MT-09)
5MM THK
5MM THK 04 05 06
FIBER GLASS CLADDING THE
FIBER GLASS
SSF
CLADDING THE SSF
959
SELF DRILLING SCREW (MT09)
07 08 09
30x30x2mm THK MS 60x60x3MM THK MS
1608
SHS (MT-09) 6
L-ANGLE FOR FIXATION SHS
NHM-AFO-101900-DG-00-2D5B00-813 FRAME (MT09) GENERAL NOTES:
ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
3MM THK MS PLATE (MT-09) REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
838
737
150x150x3mm THK MS SHS
TEMPORAY 96
(FEMALE) WELDED WITH SHS
650
700x300 DOOR OPENING .2
2°
54.
9°
5 (MT-09)
FOR (ACCESS PANEL)
.7
0
83
NHM-AFO-101900-DG-00-2D5B00-815
0°
430 150x150x12MM THK MS
150
M10 MS BOLT 5 BASE L-ANGLE (MT-09)
NHM-AFO-101900-DG-00-2D5B00-812
02 3 150 1000 150
3047
336
RESULT STATUS:
500
60x60x3MM THK MS L-ANGLE FOR 3 1 : 10
IMPORTANT: Corrections or comments made to the drawings during the
review do not relieve the contractor from compliance with the requirements of
drawing and specifications. The review is only for the general conformance
FIXATION SHS FRAME (MT09) with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
500
quantities and dimensions; selecting fabricating process and techniques of
150x150x12MM THK MS construction; coordinating his works with that of all trades; and performing his
PROJECTION SURFACE AFFIXED TO BASE L-ANGLE (MT-09)
work in a safe and satisfactory manner. This approval represents our review
of the submitted document only for those modifications requested herein or in
STRUCTURAL SCREEN
3845
previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
6MM FIBER GLASS WITH WHITE
138
previously reviewed submittal is specifically disapproved. It is understood that
500
150
Engineer’s notation on submittal is not to be construed as authorization for
WATER BASE PAINTED FINISH (PT-09) M20 MS additional work cost.
4134
500
CONTRACTOR CERTIFICATION
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
150x150x3mm THK MS SHS DOCUMENTS
12
(FEMALE) WELDED WITH SHS
576 (MT-09) 12 66 72 Eyas Mohammed
.....................................................................................................................................................
500
NAME SIGNATURE
DRG. NO NHM-BAL-101900-DG-22-2D4B18-C0
800x114 THK COUNTER
674
CONIAN SOLID SURFACE (ST-01)
LAYOUT STRUCTURE FRAME (BY OTHERS) BASE L-ANGLE DETAIL
1 5 1:2
1 : 10 150x150x12MM THK MS
50x50x3MM THK MS SHS
624
02 3 29 28 M20 MS
Abu Dhabi UAE
Phone:
Fax:
+971 (02) 444 0444
+971 (02) 444 0400
ANCHOT BOLT
WELDED WITH SHS EMPLOYER:
(MT-09)
PO BOX 147774,Miral HQ,
988
NHM-AFO-101900-DG-00-2D5B00-812
PROJECT MANAGEMENT CONSULTANT
BS FFL LVL
02 SHS (MT-09) Office No. 1304 | Ali Bin Hamouda
Building | Khalifa Street | P.O Box
111627 | Abu Dhabi | U.A.E.
1300
LEAD DESIGN CONSULTANT :
M20 MS 278 Office 6-7 Ground floor,
M20 MS
Block A, Emarat Atrium Building
185
ANCHOR BOLT
Sheikh zayed Road, Dubai, UAE
T +971 4 388 1616
E [email protected]
130
MAIN CONTRACTOR:
1 : 20 ALEC Engineering and Contracting
100
L.L.C.
P.O.Box 27639
Dubai U.A.E
Tel: 04-429 0599
Fax: 04-429 0216
60
R EXHIBITION SUB CONTRACTOR:
150
273
(FEMALE) WELDED WITH SHS (FEMALE) WELDED WITH SHS
187
(MT-09) (MT-09) PROJECT NAME :
500
106
495
534
568
650
150
766
806
02 5MM THK ABU DHABI,UAE
FIBER GLASS CLADDING THE
188
7
SSF ZONE :
NHM-AFO-101900-DG-00-2D5B00-812 3 SAADIYAT CULTURAL WATERFRONT
273
150
60x60x3MM THK MS SECTOR NO :
ACT-2
PLOT NO :
PLOT SC11-012
60x60x3MM THK MS L-ANGLE FOR FIXATION SHS
60
5 FRAME (MT09) PROJECT DESCRIPTION :
L-ANGLE FOR FIXATION SHS
100
60
FRAME (MT09)
185
5°
82
130
60
.9
WITH SHS (MT09) .8
9°
97
81
.8 6
3MM THK MS PLATE WELDED 7° NHM-AFO-101900-DG-00-2D5B00-812
SELF DRILLING SCREW (MT09)
WITH SHS (MT09)
12
(MT-09) 7 1:1 4
REV NO DESCRIPTION
DRAWING REVISIONS
DRAWN DATE
6 1:2
08-12-23
DRAWING TITLE :
VR/BSM As indicated
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE STEEL
STRUCTURE FRAME DETAIL
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-812 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
MECCA
5
30
8
22
5MM THK FIBER GLASS 01 02 03
FIXED SHS WITH SCREW
04 05 06
30x30x2mm THK MS SHS
59
5
7 (MT-09)
5MM THK
300
FIBER GLASS CLADDING 07 08 09
54
6
GENERAL NOTES:
ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
5MM THK
FIBER GLASS CLADDING
55
0
56
TEMPORARY
2
3350
700x300x5MM THK
ACCESS PANEL WITH DOOR HINGE RESULT STATUS:
(FIBER GLASS CLADDING) A Approved
B Approved with Comments
C Revise & Resubmit
IMPORTANT: Corrections or comments made to the drawings during the
609
review do not relieve the contractor from compliance with the requirements of
DOOR HINGE (MT-09) drawing and specifications. The review is only for the general conformance
with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
construction; coordinating his works with that of all trades; and performing his
2 work in a safe and satisfactory manner. This approval represents our review
NHM-AFO-101900-DG-00-2D5B00-813 of the submitted document only for those modifications requested herein or in
previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
previously reviewed submittal is specifically disapproved. It is understood that
355
Reviewed by…………….……………...........…....Date…………………..…….
02 CONTRACTOR CERTIFICATION
300
Eyas Mohammed
.....................................................................................................................................................
NAME SIGNATURE
60x60x3MM THK MS
L-ANGLE FOR FIXATION SHS
FG CLADDING FRONT VIEW REFERENCE IFC DRAWINGS
381
8095
TOP STRUCTURE FRAME 6MM THK MS PLATE
1
268
4745
Fax: +971 2 658 4532
88
TEMPORARY
140x140x3MM THK MS SHS 700x300x5MM THK MAIN CONTRACTOR:
ACCESS PANEL (FIBER PROJECTION SURFACE AFFIXED TO ALEC Engineering and Contracting
MALE (MT-09)
L.L.C.
STRUCTURAL SCREEN
P.O.Box 27639
30x30x2mm THK MS
Dubai U.A.E
2
764
ZONE :
SAADIYAT CULTURAL WATERFRONT
PROJECT DESCRIPTION :
TUBE SECTION
294
4 PROJECT ID :
B1N-2021-007568
DRAWN BY:
ATIF
DRAWING SIZE :
A0
5 1:3
08-12-23
DRAWING TITLE :
VR/BSM As indicated
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE FIBER
GLASS CLADDING DETAIL-1
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-813 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
MECCA
2 01 02 03
NHM-AFO-101900-DG-00-2D5B00-814
04 05 06
590 07 08 09
GENERAL NOTES:
2341 ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
GLASS PANEL
(BY OTHERS)
RESULT STATUS:
A Approved
B Approved with Comments
C Revise & Resubmit
IMPORTANT: Corrections or comments made to the drawings during the
5MM THK review do not relieve the contractor from compliance with the requirements of
drawing and specifications. The review is only for the general conformance
FIBER GLASS CLADDING
300
with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
construction; coordinating his works with that of all trades; and performing his
work in a safe and satisfactory manner. This approval represents our review
of the submitted document only for those modifications requested herein or in
previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
previously reviewed submittal is specifically disapproved. It is understood that
Engineer’s notation on submittal is not to be construed as authorization for
additional work cost.
Reviewed by…………….……………...........…....Date…………………..…….
3
NHM-AFO-101900-DG-00-2D5B00-814
CONTRACTOR CERTIFICATION
02 THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
DOCUMENTS
DRG. NO NHM-BAL-101900-DG-22-2D4B18-C0
5
6942
OWNER:
EMPLOYER:
Miral Asset Management LLC
PO BOX 147774,Miral HQ,
Yas Island Opp. W arner Bros.™ W orld
Abu Dhabi, United Arab Emirates.
Phone: +971 (02) 406 8888
Fax: +971 (02) 406 8899
www.miral.ae
3
E [email protected]
W www.wmeglobal.com
PROJECT NAME :
ZONE :
305 SAADIYAT CULTURAL WATERFRONT
SECTOR NO : PLOT NO :
ACT-2 PLOT SC11-012
PROJECT DESCRIPTION :
DRAWING TITLE :
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE CORNER
FIBER GLASS CLADDING DETAIL-2
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-814 A0
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV
LAND KEY : NORTH
140 07 08 09
GENERAL NOTES:
2°
R5 ALL LEVELS SHOWN IN THIS DRAWING BASED ON THE LOCAL
2090
45.0
REFERENCE WITH ±0.00 SSL = +6.00m DATUM ELEVATION
9
118
2°
1774
45.0
60 460 174
Ø 5150
0
ø 453
172 700
90
review do not relieve the contractor from compliance with the requirements of
17
drawing and specifications. The review is only for the general conformance
with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
02 construction; coordinating his works with that of all trades; and performing his
work in a safe and satisfactory manner. This approval represents our review
of the submitted document only for those modifications requested herein or in
previous submissions or as specifically noted by Contractor in this
°
.27
submission. Any other modification to this drawing by the Contractor of
previously reviewed submittal is specifically disapproved. It is understood that
CONTRACTOR CERTIFICATION
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT
DOCUMENTS
3
.....................................................................................................................................................
19
NAME SIGNATURE
1 : 20
.2
1318
4°
DRG. NO NHM-BAL-101900-DG-22-2D4B18-C0
3MM THK MS PLATE
WELDED WITH L- ANGLE
(MT-09)
02
SCREW FOR FIXATION OWNER:
ø
0
R 155
Department of Culture and Tourism
R2
Abu Dhabi UAE
Phone: +971 (02) 444 0444
Fax: +971 (02) 444 0400
3885
LEAD DESIGN CONSULTANT :
Office 6-7 Ground floor,
Block A, Emarat Atrium Building
1500
R Sheikh zayed Road, Dubai, UAE
0
20
E [email protected]
80
W www.wmeglobal.com
0
7
MAIN CONTRACTOR:
NHM-AFO-101900-DG-00-2D5B00-815
ALEC Engineering and Contracting
L.L.C.
P.O.Box 27639
Dubai U.A.E
Tel: 04-429 0599
Fax: 04-429 0216
21.00
° EXHIBITION SUB CONTRACTOR:
PROJECT NAME :
WELDED WITH SHS (MT09) CONIAN SOLID SURFACE ACT-2 PLOT SC11-012
1027
40
COUNTER SECTION
DRAWING REVISIONS
1
PROJECT ID : DRAWN BY: DRAWING SIZE :
SHOP DRAWING REFERENCE ABBREVIATIONS & SYMBOLS LEGEND NOTES RFI REF:- IFC DRAWING REFERENCE
ACT 2 LIBRARY OF NATURE COUNTER &
CONICAL SCREEN DETAIL
DISCIPLINE :
ICONIC FEATURES
DRAWING NO : REV NO:
1 NHM-BAL-101900-DG-22-2D4B18-C0 1 NHM-BAL-101900-DG-22-2D4B18-C0
NHM-AFO-101900-DG-00-2D5B00-815 A1
Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV Sl No DRAWING TITLE DRAWING NO REV