Excel

The document contains details of tasks, resources, and relationships for a construction project. There are 11 tasks listed across multiple work breakdown structures (WBS) including landscaping, painting, flooring, and interior decorating. Each task is shown as not started with original durations. Resources assigned to each task include project managers, painters, carpenters, cement, and laborers. Predecessor and successor relationships are defined between tasks.

Uploaded by

s4hana work
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Excel

The document contains details of tasks, resources, and relationships for a construction project. There are 11 tasks listed across multiple work breakdown structures (WBS) including landscaping, painting, flooring, and interior decorating. Each task is shown as not started with original durations. Resources assigned to each task include project managers, painters, carpenters, cement, and laborers. Predecessor and successor relationships are defined between tasks.

Uploaded by

s4hana work
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

TASK

task_code status_code wbs_id wbs_name task_name target_drtn_hr_cnt


Activity ID Activity Status WBS Code (*)WBS Name Activity Name Original Duration(d)
A1000 Not Started 29-11-2023.1.1 landscape level of the land 3
A1010 Not Started 29-11-2023.1.1 landscape lay flooring tile 24
A1020 Not Started 29-11-2023.1.1 landscape artifical grass 10
A1030 Not Started 29-11-2023.1.2 painting finish exterior wall 5
A1040 Not Started 29-11-2023.1.2 painting paint the wall 2
A1050 Not Started 29-11-2023.2.1 flooring take out old tile 3
A1060 Not Started 29-11-2023.2.1 flooring lay new tile 5
A1070 Not Started 29-11-2023.2.1 flooring polish the tile 6
A1080 Not Started 29-11-2023.2.2 interior decor remove old item 5
A1090 Not Started 29-11-2023.2.2 interior decor paint the wall 0
A1100 Not Started 29-11-2023.2.2 interior decor decorate interior 10
A1110 abc
A1120 123
A1130 aaa

Page 1
TASK

start_date end_date resource_list


(*)Start (*)Finish (*)Resources
30-11-2023 09:00:00 02-12-2023 18:00:00 P[ROJECT MANAGER, CEMENT, glabour
03-12-2023 09:00:00 31-12-2023 18:00:00 PAINTER, BRICK, PIPE
11-12-2023 09:00:00 22-12-2023 18:00:00 CARPENTER, PIPE
23-12-2023 09:00:00 29-12-2023 18:00:00 P[ROJECT MANAGER, DESIGN ENGG, CEMENT, BRICK, glabour
30-12-2023 09:00:00 31-12-2023 18:00:00 PAINTER, CARPENTER, jcb, glabour
26-12-2023 09:00:00 30-12-2023 09:00:00 PAINTER, CARPENTER, crane
21-12-2023 09:00:00 26-12-2023 18:00:00 DESIGN ENGG, P[ROJECT MANAGER, JCB
28-12-2023 09:00:00 04-01-2024 18:00:00 PAINTER
05-01-2024 09:00:00 09-01-2024 18:00:00 CEMENT
11-01-2024 09:00:00 11-01-2024 09:00:00 BRICKS
19-01-2024 09:00:00 30-01-2024 18:00:00

Page 2
TASK

delete_record_flag
Delete This Row

Page 3
TASKPRED

pred_task_id task_id pred_type PREDTASK__status_code TASK__status_code


Predecessor Successor Relationship Type (*)Predecessor Activity Status (*)Successor Activity Status
A1000 A1010 FS Not Started Not Started
A1010 A1020 FS Not Started Not Started
A1020 A1030 FS Not Started Not Started
A1030 A1040 FS Not Started Not Started
A1040 A1050 FF Not Started Not Started
A1050 A1060 SS Not Started Not Started
A1060 A1070 FS Not Started Not Started
A1070 A1080 FS Not Started Not Started
A1080 A1090 FS Not Started Not Started
A1090 A1100 FS Not Started Not Started

Page 4
TASKPRED

pred_proj_id proj_id predtask__projwbs__wbs_full_name task__projwbs__wbs_full_name


(*)Predecessor Project (*)Successor Project (*)Predecessor WBS (*)Successor WBS
29-11-2023 29-11-2023 29-11-2023.1.1 landscape 29-11-2023.1.1 landscape
29-11-2023 29-11-2023 29-11-2023.1.1 landscape 29-11-2023.1.1 landscape
29-11-2023 29-11-2023 29-11-2023.1.1 landscape 29-11-2023.1.2 painting
29-11-2023 29-11-2023 29-11-2023.1.2 painting 29-11-2023.1.2 painting
29-11-2023 29-11-2023 29-11-2023.1.2 painting 29-11-2023.2.1 flooring
29-11-2023 29-11-2023 29-11-2023.2.1 flooring 29-11-2023.2.1 flooring
29-11-2023 29-11-2023 29-11-2023.2.1 flooring 29-11-2023.2.1 flooring
29-11-2023 29-11-2023 29-11-2023.2.1 flooring 29-11-2023.2.2 interior decor
29-11-2023 29-11-2023 29-11-2023.2.2 interior decor 29-11-2023.2.2 interior decor
29-11-2023 29-11-2023 29-11-2023.2.2 interior decor 29-11-2023.2.2 interior decor

Page 5
TASKPRED

predtask__task_name task__task_name lag_hr_cnt predtask__rsrc_id


(*)Predecessor Activity Name (*)Successor Activity Name Lag(d) (*)Predecessor Primary Resource
level of the land lay flooring tile 0 PM
lay flooring tile artifical grass 0 PAINTER
artifical grass finish exterior wall 0 CARP
finish exterior wall paint the wall 0 PM
paint the wall take out old tile -2 PAINTERR1
take out old tile lay new tile -4 PAINTERR1
lay new tile polish the tile 0 DE
polish the tile remove old item 0 PAINTERR1
remove old item paint the wall 0
paint the wall decorate interior 0

Page 6
TASKPRED

task__rsrc_id critical_flag delete_record_flag


(*)Successor Primary Resource (*)Critical Delete This Row
PAINTER Y
CARP Y
PM Y
PAINTERR1 Y
PAINTERR1 Y
DE Y
PAINTERR1 Y
Y
Y
Y

Page 7
PROJCOST

task_id cost_name TASK__statarget_cost act_cost remain_costotal_cost delete_record_flag


Activity I Expense It (*)ActivityBudgeted CActual CosRemaining At CompletDelete This Row

Page 8
RSRC

rsrc_short rsrc_name rsrc_type unit_id role_id def_qty_per_hr


Resource I Resource (*)ResourcUnit of Me(*)Role ID Default Units / Time(h/d)
R1 PROJECT Labor 8
DER1 DESIGNE Labor 8
SER1 SITE ENG Labor 8
CARPR1 CARPENTLabor 8
PER1 PAINTER Labor 8
PLUMR1 PLUMBERLabor 8
BR1 BRICK R1Material 0
CEMENTRCEMENTRMaterial BAG 0
JCBR1 JCBR1 Nonlabor 0
HYDRAR1HYDRAR1Nonlabor 0
PMR1 PROJECT Labor 8
SETR1 SITE ENG Labor 8
DESR1 DESIGN Labor 8
CARPTR1 CARPENTLabor 8
PAINTER PAINTER Labor 8
CEMENT_CEMENT Material BAGS 0
BR_R1 BRICK Material Each 0
PIPE PIPE Material FEETS 0
jcbr12 jcb Nonlabor 0
craner12 crane Nonlabor 0
PM P[ROJEC Labor 8
DE DESIGN Labor 8
SE SITE ENG Labor 8
CARP CARPENTLabor 8
PAINTER PAINTER Labor 8
CEMENT CEMENT Material BAGS 0
BRICK BRICKS Material Each 0
PAINT PAINT Material Each 0
JCB JCB Nonlabor 0
E&C ResouE&C ResouLabor 8
Trades Trades Labor 8
PurchasingPurchasingLabor 8
Engineerin Engineerin Labor 8
Elev Inst Elevator InLabor Trades 8
Elec Electrician Labor Trades 8
Floor Floor and Labor Trades 8
Operator Operator Labor Trades
Plumb Plumber Labor Trades 8
FCarp Finish Car Labor Trades 8
RCarp Rough CarpLabor Trades 8
GenLabor Laborer-CoLabor Trades 8
IrnWrk IronworkerLabor Trades 8
Exc Excavator Labor Trades 8
KimP Paul Kim Labor Manage 8
Project ConProject ConLabor Manage 8
InsEng Instrument Labor Engr
HVAC HVAC Labor Trades
glab glabour Labor 0

Page 9
TASKRSRC

task_id TASK__status_code rsrc_id role_id acct_id task__task_name rsrc_type


Activity ID(*)Activity Status Resource ID Role ID Cost Account ID (*)Activity Name (*)Resource Type
A1000 Not Started PM level of the land Labor
A1010 Not Started PAINTER lay flooring tile Labor
A1020 Not Started CARP artifical grass Labor
A1030 Not Started PM finish exterior wall Labor
A1030 Not Started DE finish exterior wall Labor
A1040 Not Started PAINTERR1 paint the wall Labor
A1040 Not Started CARPTR1 paint the wall Labor
A1050 Not Started PAINTERR1 take out old tile Labor
A1050 Not Started CARPTR1 take out old tile Labor
A1060 Not Started DE lay new tile Labor
A1060 Not Started PM lay new tile Labor
A1070 Not Started PAINTERR1 polish the tile Labor
A1000 Not Started CEMENT_R1 level of the land Material
A1010 Not Started BR_R1 lay flooring tile Material
A1010 Not Started PIPE lay flooring tile Material
A1020 Not Started PIPE artifical grass Material
A1030 Not Started CEMENT_R1 finish exterior wall Material
A1030 Not Started BR_R1 finish exterior wall Material
A1040 Not Started jcbr12 paint the wall Nonlabor
A1050 Not Started craner12 take out old tile Nonlabor
A1060 Not Started JCB lay new tile Nonlabor
A1080 Not Started CEMENT remove old item Material
A1090 Not Started BRICK paint the wall Material
A1000 Not Started glab level of the land Labor
A1030 Not Started glab finish exterior wall Labor
A1040 Not Started glab paint the wall Labor

Page 10
TASKRSRC

cost_per_qty start_date end_date delete_record_flag


(*)Price / Unit($/h) (*)Start (*)Finish Delete This Row
2500 30-11-2023 09:00:00 02-12-2023 18:00:00
100 03-12-2023 09:00:00 10-12-2023 18:00:00
100 11-12-2023 09:00:00 22-12-2023 18:00:00
2500 23-12-2023 09:00:00 29-12-2023 18:00:00
800 23-12-2023 09:00:00 29-12-2023 18:00:00
200 30-12-2023 09:00:00 31-12-2023 18:00:00
200 30-12-2023 09:00:00 31-12-2023 18:00:00
200 26-12-2023 09:00:00 30-12-2023 09:00:00
200 26-12-2023 09:00:00 30-12-2023 09:00:00
800 21-12-2023 09:00:00 26-12-2023 18:00:00
2500 21-12-2023 09:00:00 26-12-2023 18:00:00
200 28-12-2023 09:00:00 04-01-2024 18:00:00
450 30-11-2023 09:00:00 02-12-2023 18:00:00
8 03-12-2023 09:00:00 10-12-2023 18:00:00
120 03-12-2023 09:00:00 31-12-2023 18:00:00
120 11-12-2023 09:00:00 11-12-2023 09:00:00
450 23-12-2023 09:00:00 23-12-2023 09:00:00
8 23-12-2023 09:00:00 23-12-2023 09:00:00
3400 30-12-2023 09:00:00 30-12-2023 09:00:00
3000 26-12-2023 09:00:00 26-12-2023 09:00:00
3400 21-12-2023 09:00:00 21-12-2023 09:00:00
450 05-01-2024 09:00:00 09-01-2024 18:00:00
8 11-01-2024 09:00:00 11-01-2024 09:00:00
100 30-11-2023 09:00:00 30-11-2023 09:00:00
100 23-12-2023 09:00:00 23-12-2023 09:00:00
100 30-12-2023 09:00:00 30-12-2023 09:00:00