School of Construction Management and Engineering
CE2QCT: Introduction to Quantification
and Computerised Taking Off
2023-24 – Set Exercise
Module Convener: Dr Upeksha Madanayake Marker: Dr Upeksha Madanayake
Title: Set Exercise Weight: 70% of module
Word Target: Not Applicable but in accordance to NRM2 and measurement protocols
Due Date: before 12:00 midday (UK) 7th Assessment and Feedback date: 18th January
December 2023 2024
Assignment should be submitted via blackboard on or before the due date. If Blackboard is not
accessible,please e-mail an electronic copy to [email protected]; using the module
code as subject and resubmit via blackboard when it is available.
Penalty for late submission: University Code of Practice on the Assessment of Taught Programmes,
section 6URL: http://www.reading.ac.uk/web/FILES/exams/CPATP.pdf
Assignment Brief
You have been appointed as the Quantity Surveyor for a two-storey bungalow project and
using the drawings provided in the Appendix, you are required to complete the following
tasks.
TASK 1: Traditional Measurement
Using traditional measurement conventions, measure the SUBSTRUCTURE of the bungalow in
accordance to NRM2. The work is to be undertaken by traditional methods (i.e. handwritten or
word processed) and presented on standard dimension papers. Your submission should
comprise of the following items:
a) A complete taking-off list, query sheet and dimension check, including relevant
considerations and assumptions (These can be prepared using Excel, Word or similar
tool).
b) A set of coloured drawings, with relevant annotations, sketches and mark-up.
c) A complete and accurate setting down of dimensions (quantities) and descriptions of
relevant building works in accordance to NRM2 using the standard / traditional
dimension paper (either excel sheet or hand written).
Definition: The substructure is to the underside of lowest floor finishes including damp-proof
membrane, standard foundations, up to and including the damp-proof course.
1
TASK 2: Computerised Measurement
Using a computer based estimating tool (preferably generated from CostX), transpose your taking
off to produce an unpriced Bill of Quantities (BoQ) with ALL the quantities and unit of measurement
extracted from the take-off sheet (prepared in Task-1), but without the unit rates and/or pricing.
You are not allowed to use Excel or handwritten means in this task.
PRESENTATION
All your work should be presented as one scanned (or saved as) PDF document in a clear and
structured manner, with each task clearly presented. Both your traditional and computerised
submissions will need to be amalgamated into one PDF report for uploading to Turnitin.
GUIDELINES
You are presenting this to the Commercial Lead and therefore, a high level of professionalism is
required. Please refer to Ms Excel templates (on Blackboard) which can be used to complete the
taking off. You are allowed to edit the template as you deem fit to suit your presentation or use
your own template
You will be expected to submit ALL the items listed above, including a cover page with your
name and student number, as one single document in PDF format. Ensure that all your
ubmissions (whether scanned or printed to PDF) are clear/legible, well-structured and
professionally presented.
Assessment Criteria
Assessment Criteria Marks
TASK-1
A complete taking-off list, query sheet, and dimension check including 15
professionally handling of issues, gaps and inconsistencies in information.
Accuracy and professionalism in the presentation of coloured drawings and 10
related annotations and/ or sketches.
A complete and accurate setting down of dimensions (quantities) and 40
descriptions of relevant building works , Proper use of dimension sheet,
including accurate waste calculations and setting down of dimensions using
proper conventions of traditional measurement
TASK-2
Preparation of unpriced BoQ demonstrating the proper use of computerised 30
technologies, including setting out reports in a clear and easy to follow
manner; The format and structure of the BQ or other pricing document
should be in accordance with NRM2 standards and industry best practice
Overall presentation, communication and professionalism 5
TOTAL 100
Overall weighted mark 70%
2
- End of the Assignment Brief -