1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in
AutoCAD format and manuals in PDF format, for offered item shall be submitted.
Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Quality Assurance Plan with the technical bid.
3. The bidder shall have to submit all the required type test reports for the offered
item. Bid without type tests will not be considered for evaluation.
4. The bidder must fill up all the points of GTP for offered item/s. Instead of
indicating “refer drawing, or as per IS/IEC”, the exact value/s must be filled in.
5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.
7. Please note that the evaluation will be carried out on the strength of content of
bid only. No further correspondence will be made.
8. The bidder shall bring out all the technical deviation/s only at the specified
annexure.
INDEX
Sec. No. Particulars Page
no.
1.1 SCOPE : 6
1.1.3 GUARANTEE 6
1.2 TRANSPORT 6
1.3 STANDARDS 6
1.4 DRAWINGS 7
1.5 TYPE OF TRANSFORMER 8
1.6 DESIGN 8
1.7 TANK 9
1.8 UNDER CARRIAGE 10
1.9 CORE 11
1.10 WINDING 12
1.11 INSULATING OIL 14
1.12 INSULATION 14
1.13 TEMPERATURE RISE 14
1.14 FREQUENCY 15
1.15 PARALLEL OPERATION 15
1.16 IMPEDANCES 15
1.17 TAP CHANGING MECHANISM 15
1.18 OIL PRESERVING EQUIPMENT 18
1.19 BUSHINGS 18
1.20 COOLING 19
1.21 CENTRE OF GRAVITY 22
1.22 ACCESSORIES 22
1.23 TERMINALS 25
1.24 CURRENT TRANSFORMERS 25
1.25 TERMINAL MARKING 25
1.26 CLEANING AND PAINTING 25
1.27 PACKING AND TRANSPORT 26
1.28 LABLES 26
1.29 INSPECTION 26
1.30.1 INSTALLATION CHECKS 30
1.30.2 COMMISSIONING CHECKS 30
1.30.2 TESTING (Type, Spl & Routine) 30
1.30.3 TEST ON TRANSFORMER TANK 32
1.30.4 TEST AT SITE 33
1.31 TESTS ON OLTC 34
1.32 TEST REPORTS 34
1.34 LOSS/DAMAGES 34
1.35 TECHNICAL AND GUARANTEED PARTICULARS 34
1.36 INSRUCTION MANUALS 34
1.37 DEVIATION FROM SPECIFICATION 35
1.38 TRANSFORMER LOSSES AND EVALUATION OF BID 35
1.39 PENALTY FOR HIGHER LOSSES 35
1.40 REJECTION 36
SECTION: I
DETAIL SPECIFICATION OF 150/100 MVA, 220/132 kV &
50 MVA, 132/66 KV AUTO TRANSFORMERS
1.1 SCOPE:
1.1.2 The scope of work shall also include EITHER complete erection, testing and
commissioning of all the equipments/accessories furnished under this
specification OR only supervision of erection, testing and commissioning of
all the equipment furnished under this Specification, as indicated in Schedule
– A of the commercial bid.
Each transformer shall be supplied with (i) one number of Oil storage tank as
per cl. no. 2.8, (ii) 3 nos. of oil sampling bottles as per cl. no. 2.9, (iii) Fiber
optic sensors On Line Moisture and Gas In Oil Analyser as per Annexure II,
(iv) Nitrogen Injection System For Protection Against The Fire & Explosion as
per specification no. GETCO/E/TS-FF/2902 DTD.JUNE 2008, attached with
this specification as Annexure III.
However, Bidder has to quote for the accessories equipments/
Material, indicated in Schedule-A of commercial Bid.
1.1.3 GUARANTEE:
1.2 TRANSPORT:
1.2.1 The equipment to be furnished under this specification shall be packed for
transportation in such a manner as may facilitate easy handling and avoiding
any damage during transit.
1.3 STANDARDS:
1.3.1 The Power Transformers covered under this specification shall comply with
the requirements of the latest edition of IS: 2026 (amended up to date)
except specified herein. However, in the event the offered equipment
conforms to any other standard, the salient points of difference between the
standard adopted and the specified standard shall be clearly brought out in
the bid.
1.4 DRAWINGS:
1.4.1 Drawings in AutoCAD format and in hard copy, incorporating the following
particulars shall be submitted by each bidder with the bid.
1.4.2 The successful bidder shall submit the following drawings in AutoCAD format
and in hard copy for the approval of the purchaser within commencement
period.
i) General out line drawing showing front, side elevation and plan of the
transformer and accessories with detailed dimensions. The clearances
between HV and LV terminals and ground should also to be shown.
iv) Large scale drawings of high, medium and low-tension windings of the
transformers showing the nature and arrangement of insulators and
terminal connections.
1.4.3 The bidder may submit any other drawings found necessary in addition to the
drawings mentioned above or as asked during detailed engineering.
1.5.1 The transformers shall be of oil immersed type suitable for outdoor installation.
The type of working shall be as specified in specific Technical requirements
given in Section - II of this Specification.
1.6 DESIGN:
1.6.1 The autotransformer shall be used for bi-directional flow of rated power. The
transformer and accessories shall be designed to facilitate inspection,
cleaning and repairs and for operation where continuity of supply is the
primary consideration. All apparatus shall be designed to ensure satisfactory
operation under sudden variations of load and voltage as may be met with
under working conditions of the system including those due to short circuits.
1.6.2 All materials used shall be of the best quality and of the class most suitable for
working under the conditions specified and shall withstand the variations of
temperatures and atmospheric conditions arising under working conditions
without inner distortion or deterioration or setting up of undue stresses in any
part & also without affecting the strength and suitability of the various parts for
the work which they have to perform.
1.6.3 All outdoor apparatus, including bushing insulators with their mountings, shall be
so designed as to avoid pockets in which water can collect. All connections and
contacts shall be of ample cross-sections and surfaces for carrying continuously
the specified current without undue heating and fixed connections shall be
secured by bolts or set screws of ample size, adequately locked. Lock nuts shall
be used on stud connection carrying current.
1.6.5 The transformer shall be capable of being loading in accordance with IS:
6600/IEC-354. There shall be no limitation imposed by bushings, tap
changers etc. or any other associated equipments.
1.6.6 The transformer and all its accessories including CTs etc shall be designed to
withstand without any injury, the thermal and mechanical effects of any
external short circuit to earth and of short circuits at the terminals of any
winding for a period of 3 secs. The short circuit level of the HV and LV
system to which the subject transformer will be connected is 40 kA (sym,
rms, 3 phase fault on 400, 220 and 132 kV) & 25 kA (sym, rms, 3 phase fault
on 66, 22 and 11 kV).
1.7 TANK:
1.7.1 The transformer tank and cover or bell type tank shall be fabricated from
good commercial grade low carbon steel suitable for welding and of adequate
thickness. The thickness of each side plate shall be indicated in GTP. The tank
and the cover shall be of welded construction. All seams shall be welded and
where practicable they shall be double welded. The tank wall shall be reinforced
by stiffener of structural steel for general rigidity. The tank shall have sufficient
strength to withstand without permanent distortion (i) filling by vacuum, (ii)
continuous internal gas pressure of 0.35 atmospheres with oil at operating level
and (iii) mechanical shock during transportation. The tank cover shall be bolted
to the tank and the transformer design shall be such that the tank will not be
split between the lower and upper cooler connection for untanking.
1.7.2 A man-hole with a welded flange and a bolted cover shall be provided on the
tank cover. The man-hole shall be of a sufficient size to ease access to the lower
ends of the bushings, terminals etc.
1.7.3 All bolted connections to tank shall be fitted with suitable oil-tight gasket, which
shall give satisfactory service under the operating conditions. Special attention
shall be given to the methods of making the hot oil-tight joints between the tank
and cover as also between the cover and the bushings and all other to ensure
that the joints can be remade satisfactorily and with ease, with the help of semi-
skilled labours. Where compressible gaskets are used, steps shall be provided to
prevent over compression. Bushings, turrets, cover of accessories, holes and
other devices shall be designed to prevent any leakage of water into or oil from
the tank. There should not be any leakage at least for three years and this
should be guaranteed. All the gaskets to be provided shall be of RC70C or RC80C
grade. Necessary tests certificates from manufacturer shall be submitted along
with acceptance test report. The gasket to be used shall not be older than One
year.
1.7.4 Suitable guides shall be provided for positioning the various parts during
assembly or dismantling. Adequate space shall be provided between the covers
and windings and the bottom of the tank for collection of any sediment.
1.7.5 Lifting eyes or lugs shall be provided on all parts of the transformer requiring
independent handling during assembly or dismantling. In addition, the
transformer tank shall be provided with lifting lugs and bosses properly secured
to the sides of the tank for lifting the transformers either by crane or by jacks.
1.7.6 The design of the tank, the lifting lugs and bosses shall be such that the
complete transformer assembly filled with oil can be lifted with the use of those
lugs without any damage or distortions.
1.7.7 The tank shall be provided with two suitable copper alloy or any other suitable
material lugs for the purpose of grounding.
1.7.8 The tank shall be equipped with the following valves with standard screw
connection for external piping. All valves up to and including 100 mm shall be of
GM and larger valves shall be of Cast Iron bodies with GM fittings. They shall be
of full way type with internal screw and shall open when turned counter clock
wise when facing the hand wheel, along with suitable locking in open and close
positions.
i) One drain valve of adequate size with eccentric reducer and flange,
located on the low voltage side of the transformer. This valve shall be
equipped with a small sampling cock. The draining valve must be at
bottommost location of the tank.
ii) One filter valve of adequate size with eccentric reducer and flange,
located at the top of tank on the high voltage side. The opening of this
valve shall be baffled to prevent airation of oil.
iii) One filter valve of adequate size with eccentric reducer and flange,
located on the high voltage side of the transformer above the bottom
of the tank.
iv) Suitable valves shall be provided to take sample of oil from the OLTC
chamber during operation of transformer.
v) A valve of other suitable means shall be providing to fix the on line
dissolved Gas monitoring system to facilitate continuous dissolved gas
analysis. Location and size of the same shall be finalized during
detailed engineering.
vi) Pressure relief valve of adequate size & number/s shall be provided on
main tank as well as for OLTC.
vii) All hardware used shall be cadmium plated / electro galvanised.
viii) Necessary provision for installation of ‘HYDRAN – M2’ or equivalent On
Line monitoring system, shall be made for satisfactory performance
through out the life of transformer. Location and size of the same shall
be finalized during detailed engineering.
1.8.1 The transformer tank shall be supported on a structural steel base equipped
with forged steel single flanged wheels suitable for moving the transformer
completely with oil.
1.8.2 Jacking pads shall be provided. It shall be possible to change the direction of the
wheels through 900 when the transformer is lifted on jacks to permit movement
of the transformer both in longitudinal and transverse direction. A standard track
gauge (preferably 1676 mm) in both longitudinal and transverse directional shall
be chosen.
1.8.3 Pulling eyes shall be provided to facilitate movement of transformer and they
shall be suitably brazed in a vertical direction so that bonding does not occur
when the pull has a vertical component.
1.9 CORE:
1.9.1 The transformer may be of core or shell type. The core shall be built up
with high-grade non-ageing cold rolled grain oriented silicon steel
laminations having high permeability and low hysterisis loss. The core
material shall be prime CRGO, which shall be procured directly from
manufacturer or through accredited marketing organization of reputation.
1.9.1 (a) The thickness of lamination shall be 0.27 mm or less. Surface insulation
of laminations shall be rust resistant and have high inter laminar
resistance. Insulation shall withstand annealing temperature as high as
8500 0C. Insulation shall be resistant to hot cooling medium. Laminations
are not to be punched.
1.9.1 (b) Bidder should have in house core cutting facility for proper monitoring &
control on quality & also to avoid any possibility of mixing of prime
material with defective/second grade material. This should be indicated
invariably in the QAP. The purchaser may witness the core-cutting
process. In case the in-house core cutting facility is not available, then
the same shall be carried out in the presence of the representative of
GETCO.
1.9.1(c) Bidder will offer the core for stage inspection and get approval from
purchaser during manufacturing stage. The bidder has to produce
following documents at the time of stage inspection for confirmation of use
of prime core materials.
i) Invoice of supplier
ii) Mills of approved test certificates
iii) Packing list
iv) Bill of lading
v) Bill of entry certificate by custom.
1.9.2 After being sheared, the laminations shall be treated to remove all burrs and
shall be re-annealed to remove all residual stresses. The insulation of the
lamination shall be insert to the action of hot transformer oil. Paper and
varnish insulation will not be accepted. The nature of insulation should be
specified in the bid.
1.9.3 The core shall be rightly clamped to ensure adequate mechanical strength
and to prevent vibration during operation. The clamping structure shall be so
constructed that eddy currents will be minimum.
1.9.4 The core shall be provided with lugs suitable for lifting the complete core and
coil assembly of the transformer.
1.9.5 The core and the coil assembly shall be so fixed in the tank that shifting will
not occur when the transformer is moved or during a short circuit.
1.9.6 The transformer shall be designed in such a way that the flux density in the
steel core corresponding to the rated operating voltage and the rated
frequency shall be not exceeding 1.727 tesla.
1.9.7 Core and Frame terminals should be brought out on transformer top so as to enable
meggaring.
1.9.8 The core and the coil assembly shall be so fixed in the tank that shifting will not
occur and cause any damage when the transformer is moved shifted, or during a
short circuit. The maximum flux density in any part of core or yoke at 10%
continuous over voltage condition shall not exceed 1.9 tesla.
1.9.9 The complete core and core coil assembly of bolt less core type transformer shall be
so assembled that the axis and the plate of outer surface of the coil stack shall not
deviate from the vertical plane by more than 25 mm.
1.9.10 In case transformer with variable flux, the voltage variation which would affect
flux density at every tap shall be kept in view while designing the transformer.
Transformers shall be designed to withstand the following over fluxing conditions:
1.10 WINDING:
1.10.1 The conductor for winding shall be of electrolytic grade copper. The winding
shall be so designed that all coil assemblies of identical voltage ratings shall
be interchangeable and field repairs can be readily done, without special
equipment. The coils shall be supported between adjacent sections by
insulating spacers and the barriers, bracings and other insulation used in the
assembly of the windings shall be arranged to ensure a free circulation of the
oil and to reduce hot spots in the windings. The insulation paper shall be of
high quality and the value of degree of polymerization shall not be less
than 1200 Pv and the necessary test certificate shall be submitted
along with the stage inspection report. Provision shall be made in the
tank, for taking sample, in future, of paper for testing purpose and
location shall be easily accessible and indicated on the transformer
tank by affixing special caution plate.
1.10.2 The insulation of the coils shall be such as to develop the full electrical
strength of the windings. All materials used in the insulation and assembly of
the windings shall be insoluble, non-catalytic and chemically inactive in the
hot transformer oil and shall not soften or otherwise be adversely affected
under the operating conditions.
1.10.3 All threaded connections shall be provided with locking facilities. All leads
from the winding to the terminal board and bushings shall be rigidly
supported to prevent injury from vibration. Guide tubes shall be used where
practicable.
1.10.4 The windings shall be clamped securely in place so that they will not be
displaced or deformed during short circuits. The assembled core and
windings shall be vacuum dried and suitably impregnated before removal
from the treating tank. The copper conductors used in the coil structure shall
be best suited to the requirements and all permanent current carrying joints in
the windings and the locks shall be welded or brazed.
1.10.5 Windings shall be subjected to a shrinkage treatment before final assembly, so that
no further shrinkage occurs during service. Adjustable device shall be provided for
taking up any possible shrinkage of coils in service if required.
1.10.6 The conductor shall be transposed at sufficient intervals in order to minimize eddy
currents and equalize the distribution of currents and temperature along the
windings.
1.10.7 The tapping winding shall be provided separately from main winding to minimize the
out of balance forces in the transformer at all voltage ratios.
1.10.8 Transformer shall be designed and constructed to withstand, without damage, the
thermal effects on external short circuits (SC) for 3 seconds under conditions
specified in IS: 2026 (Part-I, amended up to date).
1.10.9 Bidder shall invariably indicate in the GTP, the cross sectional area of all windings
with respect to the current density adopted.
1.10.10 Bidder shall have to submit the calculations for thermal & dynamic ability to
withstand short circuits.
1.11.1 The oil for first filling together with 10% extra shall be supplied with each
transformer. The oil shall comply in all respects with the provisions of the
latest edition of IS: 335 (as amended upto date). Particular attention shall be
paid to deliver the oil free from moisture having uniform quality throughout in
non-returnable steel drums. The quantity of oil for first filling of each
transformer shall be stated in the bid.
1.12 INSULATION:
1.12.1 The dielectric strength of winding in insulation & of the bushings shall
conform to the values given in IS: 2026 (as amended up to date).
1.12.1.1 The partial discharges in the transformer at the time of dispatch shall
not be more than 500 pC.
1.12.1.2 The Maximum Limit of value of tan delta shall be 1% for windings,
0.5% for bushings and 0.2 % for oil other.
1.12.2 For rated system voltage of 66, 132 and 220 kV, the following impulse and
power freq. withstand test voltage may be offered.
System Voltage Impulse Test Voltage Power Freq. Voltage
66 kV 350 kVp 160 kV
132 kV 650 kVp 275 kV
220 kV 1050 kVp 460 kV
1.12.3 The HV winding of the transformer shall have graded insulation. The
insulation class of the neutral end of the windings shall be graded to 95 kV
(Impulse) and 38 kV (Power frequency) withstand.
1.13.1 The transformer shall be installed out-door without any protection from sun
and rain. The maximum hot spot temperature rise shall be limited to 1050 C
with Class - A insulation. Each transformer shall be capable of operating
continuously at its normal rating without exceeding the temperature rise limits
specified as under:
1.13.2 The transformer shall be free from abnormal noise (other than humming) and
vibration.
1.14 FREQUENCY:
1.14.1 The transformer shall be suitable for continuous operation with a frequency
variation of + 3 % from normal of 50 Hz without exceeding the specified
temperature rise.
1.15.1 The similar ratio transformers shall operate satisfactorily in parallel with each
other if connected between high voltage and low voltage bus-bars. Also,
wherever specified, the transformers shall be suitable for parallel operation
with existing transformers. The details of existing transformers will be
provided.
1.16 IMPEDANCES:
1.16.1 Supplier shall indicate the guaranteed impedance and tolerances and also
the upper and lower limits of impedances, which can be offered without an
increase in the quoted price. Impedance shall include positive and zero
sequence and shall be expressed in terms of the branches of the star
connected equivalent diagrams, all on the same KVA base and the range
shall be for each branch of the equivalent circuit in turn. The transformer
impedances shall be as specified in Section - II of this Specification.
1.17.1.1 Each transformer shall be provided with on load tap changing mechanism.
This shall be designed for remote control operation from switchboard in the
control room. In addition the tap changer shall include the followings:
a) An oil immersed tap selector and arcing switch for arc suppressing tap
selector, provided with reactor of resistor for reduction of make & break
arcing voltage and short circuits.
1.17.1.2 The on load tap changer shall be so designed that the contacts do not
interrupt arc within the main tank of the transformer. The tap selector and
arcing switch or arc suppressing selector switch shall be located in one or
more oil filled compartments. The compartment shall be provided with a
means of releasing the gas produced by the arcing. It shall be designed so as
to prevent oil in the tap selector compartment from mixing with the oil in the
transformer tank. A Buchholtz relay shall be provided to indicate accumulation
of gas and alarm thereof.
1.17.1.3 The tap changer shall be capable of permitting parallel operation with other
transformer of the same type.
1.17.1.4 The transformer shall give full load output on all taps. The manual operating
device shall be so located on the transformer that it can be operated by an
operator standing at the level of the transformer track. It shall be strong and
robust in construction.
1.17.1.5 The control scheme for the tap changer shall be provided for independent
control of the top changers when the transformers are in independent service.
In addition, provision shall be made to enable parallel control also at times so
that the tap changers will be operated simultaneously, when one unit is in
parallel with another so that under normal condition the tap charger will not
become out of step and this will eliminate circulating currents. Additional
features like master, followers and visual indication during the operation of
motor shall also be incorporated.
1.17.1.6 Necessary interlock blocking independent control when the units arc in parallel
shall be provided.
1.17.1.7 Under abnormal conditions such as may occur, if the contactor controlling one
tap changer sticks, the arrangement must be such as to switch off supply, to
the motor so that an out of step condition is limited to one tap difference
between the units. Details of out of step protection provided for the taps
should be furnished in the bid.
1.17.1.8 The contactors and associated gear for the tap change driving motors shall be
housed in a local kiosk mounted adjacent to or on the transformer. The motor
shall be suitable for operation with 3 ph, 415 Volts, 50 Cycles external power
supply.
1.17.1.9 In addition to the above equipment, the supplier shall supply a separate panel
for installation in purchaser’s control room for remote operation with the
following accessories.
- Remote tap position Indicator of digital type, device for indicating ‘ON’ &
‘OFF’ of Fan / Motor / Pump of cooler control.
1.17.1.10 Complete particulars of the tap changing gear including the capacity of the
motor shall be stated in the bid.
1.17.1.11 Tap changer shall be suitable for bidirectional power flow. The tap changer
rating shall be more than maximum rated current of transformer.
The cranking device for manual operation of the OLTC gear shall be
removable and suitable for operation by a man standing at ground level. The
mechanism shall be complete with following:
a) Mechanical tap position indicator which shall be clearly visible
b) A mechanical operation counter
c) Mechanical stops to prevent over-cranking of the mechanism beyond the
extreme tap position
d) The manual control considered as back up to the motor operated load tap
changer control shall be interlocked with the motor to block motor start-up
during manual operation. The manual operation mechanism shall be
labeled to show the direction of operation for raising the HV terminal
voltage and vice-versa
1.17.2.1 The AVR relay shall be provided, if asked in particular bid, as per
specification indicted in Annexure – I, The scheme shall detect (i) failure of
auxiliary supply, (ii) failure of PT supply and (iii) failure of mechanism to
complete the tap changing operation. The relay shall have necessary
contacts to be connected to the alarm & / or to the Annunciator available in
the panel for visual and audible indication of the failure of trip circuit. The
AVR relay shall be compatible to SCADA operation of any make. However,
the RTCC panel shall be fully operatable even in case of non utilization of AVR
relay.
1.17.2.2 All the necessary wiring shall be carried out in RTCC panel and schematic
drawings shall be submitted with the technical bid and during detailed
engineering for approval in duplicate.
1.18.1 Air cell type conservator tank is to be provided for oil conservator system.
1.18.2 Bidder shall offer diaphragm type oil sealing in the conservator to prevent
oxidation and contamination of oil due to contact with water. In this type of oil
preservation system, conservator shall be fitted with a dehydrating filter
breather.
1.18.3 In this system, using a flexible Diaphragm shall prohibit contact of oil with
atmosphere or nitryle rubber reinforced nylon cloth air cell.
(a) Diaphragm used shall be suitable for continuous operation in an
atmosphere of 100 0C to which transformer oil is likely to rise.
(b) The connection of the air cell to the top of the reservoir shall be by an
air proof seal permitting entrance of air into the cell only.
(c) The diaphragm of the conservator shall withstand the vacuum during
installation and maintenance. Otherwise provision shall be made to
isolate the conservator from main tank during vacuum by providing
vacuum sealing valve in the pipe connecting the main tank with the
conservator.
1.19 BUSHINGS:
1.19.1 The bushings shall have high factor of safety against leakage to ground and shall
be so located as to provide adequate electrical clearances between bushings and
grounded parts. Bushings of identical voltage rating shall be interchangeable. All
bushings shall be equipped with suitable terminals of approved type and size and
shall be suitable for bimetallic connection. The insulation class of the high voltage
neutral bushing shall be properly coordinated with the insulation class of the
bushings of the high voltage winding.
1.19.2 Each bushing shall be so coordinated with the transformer insulation that all flash
over will occur outside the tank.
1.19.3 All main winding and neutral leads shall be brought out through out door type
bushings which shall be so located that the full flashover strength will be utilized
and the adequate phase clearance shall realized.
1.19.4 All porcelain used in bushings shall be of the wet process, homogeneous and
free from cavities or other flaws. The glazing shall be uniform in colour and free
from blisters, burrs and other defects.
1.19.5 The bushings for 66 kV and above shall be of the oil filled condenser type (hermetically
sealed) and shall conform to the latest edition of IS: 2099 & IS: 3347. 36 kV bushings for
neutral shall be solid porcelain or oil communicating type. Dimensions shall confirm to IS:
2099 & IS: 3347 (Part – V). The characteristics of the oil used in the bushings shall be
the same as that of the oil in the transformer. Oil filled condenser type bushing shall
be provided with fittings viz. oil level gauge, oil filling plug, Tap for capacitance
and delta test, etc.
1.19.6 All bushings shall have puncture strength greater than the dry flashover value.
1.19.7 Main terminals shall be solder-less terminals and shall be suitable for ACSR
”Moose” Conductor. The spacing between the bushings must be adequate to
prevent flashover between phases under all conditions of operation.
1.19.8 Special adjustable arcing horns may also be provided for the bushings as per IS:
3716 - 1966.
1.19.9 The bidder shall give the guaranteed withstand voltages for the above and also
furnish a calibration curve with different settings of the co-ordination gap to the
purchaser to decide the actual gap setting. Bidder’s recommendations are also
invited in this respect.
1.19.10 Bushing CTs should be provided for REF protection as specified in Section –
II Cl. 2.5. The bushing shall be removable without disturbing the CTs.
1.19.11 Bushings of identical rating shall be interchangeable.
1.19.12 The STC rating shall be 40 kA for 3 sec for 132 kV & above class and 25 kA
for 3 sec for 66 kV and below class.
1.19.13 The height of live part shall be so arranged that minimum clearance up
to plinth shall be maintained as per safety clearances from latest CBIP
guide.
1.20 COOLING:
1.20.1.1 Each cooler unit shall consist of a totally enclosed, oil immersed motor
pump and a forced air-cooled heat exchanger/radiators. Motor and pump
shall be enclosed in an oil tight container with motor leads brought through
hermetically sealed bushings. Each cooler unit shall be detachable from the
transformers without disturbing the oil in the transformer tank. Moving parts of
motor and pump shall be readily removable without dismantling of cooler and
with minimum spillage of oil. Fans shall be located so that they are readily
accessible for inspection and repair. Heat exchangers, fans and oil pumps
shall be completely interchangeable.
1.20.1.2 All cooler shall be attached to and mounted on the transformer tank.
1.20.1.5 Cooler units shall be connected to the tank by machined steel flanges welded
to cooler units and to the tank and provided with gaskets. Each cooler unit
shall be provided with an indicating shut-off valve, which can be fastened in
either open or closed position. A separate oil-tight black flange shall be
provided for each tank connection for use when the cooler unit is detached.
Each cooler unit shall have a lifting eye, an oil drain at the bottom and a vent
at the top.
1.20.1.6 An oil flow indicator with alarm contacts shall be furnished with each pumps
assembly to indicate normal pump operation and direction of oil flow.
1.20.1.7 Fans or blowers for air blast cooling shall be mounted so as to ensure that no
damage to the coolers can arise from vibration of the fans. Wire mesh
screens shall be fitted to prevent accidental contact with the blades, the mesh
being not greater than 2.5 cm.
1.20.1.8 In cases of ONAN / ONAF / OFAF type cooling, the transformer shall be
capable of giving a continuous output of at least 50 % of rated full output with
all the artificial cooling out of service and without exceeding the temperature
rise. In case of ONAN / ONAF type of cooling the transformer shall be
capable of giving continuous output of at least 75 % of the rated full output
with all the artificial cooling out of service and without exceeding temperature
rise. In case of ONAN or ONAF type of cooling, the transformer shall have
two sets of radiators.
1.20.1.9 For OFAF cooled transformers with ONAN rating, piping system shall permit
bypassing of oil pump and operation of the transformer at the ONAN rating, in
case forced oil system develop any troubles.
1.20.2.1 The radiating section / tubes provided shall have sufficient cooling surface to
limit the temperature rise to the values specified under Clause 1.13 of this
specification. The radiating sections / tubes shall be connected to the tank
cooler assembly headers by machined steel flanges with adequate gaskets to
avoid oil leakage. Each radiator unit shall be provided with positive operated
gate type oil leak proof shut-off valve, which can be fastened in either closed
or open position and separate oil tight flange shall be provided for each tank
connections for use when the radiator unit or cooler assembly is detached. It
shall be possible to take out any of the radiating tubes without disturbing the
transformers. Each radiator unit shall have a lifting arrangement and oil drain
at the bottom and a vent at the top.
1.20.3.1 Cooler units shall be suitable for operation with 415 Volts, 3 phase, 50 Hz
external power supply.
1.20.3.2 Control equipment for oil pump and for motors shall be mounted in a
marshalling cabinet adjacent to the transformer and it shall include the
necessary contactors with automatic control and annunciation equipment and
provision for manual control.
1.20.3.3 A single metal enclosed main isolating switch with Miniature Circuit Breakers
shall be provided for the cooling plant contactor group.
1.20.3.5 The bidder shall specify the loading of the transformers in case of failure of
one or more set of fans or pumps.
1.20.3.7 The bidder shall provide for blower indicator in the cooling circuit in the remote
control panel.
Following lamp indications with annunciation shall be provided in cooler
control cabinet
a) Control supply failure
b) Cooling fan failure for each bank
c) Cooling pump failure for each pump
d) No oil flow or Reverse flow for pumps
e) Common thermal overload trip
One potential free initiation contact for all the above conditions shall be wired
independently to the terminal blocks of cooler control cabinet.
1.20.3.8 The fan circuit shall be operated at different Temperature for group I fans and
group II fan from WTI. The pump circuit shall be also operated from same
WTI contacts at diff. Temp.
1.20.3.9 The connection shall be bolted type having CB – 30 and CT connector shall
be of link type it can be shorted for testing or checking circuit.
1.21.1 The center of gravity of the assembled transformer shall be low and as near the
vertical centerline as possible. The transformer shall be stable with or without oil.
1.22 ACCESSORIES:
trip contacts and contacts for switching in and switching out the
cooling system at pre-determined temperatures.
b) For OFAF Transformers:
A dial Image sensing type thermometer for indicating oil
temperature fitted with maximum pointer and adjustable alarm and
trip contacts.
iii) One magnetic type oil level gauge with low alarm contacts and dial
showing minimum, maximum and normal oil levels. The gauge shall
readable from the transformer base level. A low gas pressure electric
alarm device shall also be provided, if the transformer is equipped with
inert gas pressure equipment.
vi) One filter valve located at the top of tank on the HV side.
vii) One filter valve located near the bottom of tank of the HV side of the
transformer.
xi) Heat exchangers or radiators complete with pumps, motors, fans etc.,
described in Clause 1.20.
xiii) Eye bolts and lugs on all parts for ease of handling.
xxii) Tap changer remote control panel complete with all accessories to be
installed in the Purchaser’s control room.
1.22.2 The equipment and accessories furnished with the transformer shall be suitably
mounted on the transformer for satisfactory operation, Inspection and
maintenance and the mounting details shall be subject to the approval of the
purchaser. All valves shall be provided either with blind companion flanges or
with pipe plugs for protection.
1.22.3 Indication, alarm and relay equipment shall have contacts suitable for operation with
110 V/220 V D.C. Supply.
1.22.4 All cables from all equipment/device shall be arranged by manufacturer with proper
clamping arrangement
Any other accessories or appliances recommended by the manufacturer for the
satisfactory operation of the transformer, shall be given and indicated in the bid.
1.23 TERMINALS:
1.23.1 The bushing shall be equipped with terminals suitable for connection with
ACSR Zebra / Moose / Panther conductor. The short time current rating of
connector shall be of 40 kA /3 see for HV and 25 kA/3sec for LV & neutral.
1.24.1 The bidder shall include in the scope of supply the multi ratio type turret
mounted current transformer on all phases of HV, LV & neutral leads of the
power transformers for restricted earth fault protection, as well as for standby
earth fault protection.
1.25.1 Each terminal including the neutral shall be clearly marked on both the primary
and secondary side in accordance with the diagram of connection supplied with
the transformers.
1.26.1 Before painting or filling with oil or compound oil, un-galvanized parts shall be
completely cleaned and free from dust, sealed and grosses and all external
rough surfaces on casting shall be filled by metal deposition. The interior of oil
transformer tanks and other filled chambers and internal structural steel work
shall be cleaned of all sealed and rust by send blasting or other approved
method. These surfaces shall be painted with an oil resisting varnish or paint.
1.26.2 Except for nuts, bolts and washers all external surfaces shall receive a minimum
of three coats of paint. The primary coat shall be applied immediately after
cleaning. The second coat shall be of oil paint of weather resisting nature. The
final coat shall be of a glossy, oil and weather resisting non-fading paint.
1.26.3 All internal surfaces of mechanism chambers and kiosk except those, which
have received anticorrosion treatment, shall receive three coats of paints
applied to the thoroughly cleaned metal surfaces. The final coat shall be of light
coloured anti-condensation mixture. Any damage to paint work incurred during
transport and erection shall be made good by thoroughly cleaning the damaged
portion and by applying full number of coats of paints.
The bidder shall dispatch the transformer filled with oil or in an atmosphere of
Nitrogen or dry air. In the former case the bidder shall take care of the weight
limitation on transport and handling facility at site. In the latter case,
necessary arrangement shall be ensured by the bidder to take care of
pressure drop of Nitrogen or dry air during transit and storage till completion
of oil filling during erection. A gas pressure testing valve with necessary
pressure gauge and adaptor valve shall be provided. The transformer shall
be fitted with sufficient number of impact recorders during transportation to
measure the movement due to impact in all three directions.
1.27.3 In case of synthetic resin bonded paper type bushing is offered; special
attention shall be paid in packing so as to avoid moisture ingress. The details
of the bushing and the method of packing shall be stated in the bid.
1.28 LABLES:
labels shall be provided for all apparatus such as relays, switches, fuses contained in
cubicles or marshalling kiosk.
1.28.1 Labeling shall be clear, concise and adequate and shall be of standard size.
1.28.2 Descriptive labels for mounting indoor or inside cubicles and kiosk shall be of
material that will ensure permanence of the lettering. Danger notices shall have
red lettering on a white background. All plates shall be of material, which will not
be corroded.
1.28.3 Lables shall be attached to panels with brass screws or with steel screws, which
have received rust preventive treatment.
1.29 INSPECTION:
a) The bidder shall carry out a detailed inspection and testing program for
manufacturing activities of the various components. An indicative
program of inspection as envisaged by the Engineer is given below. This
is not, however, intended to form a comprehensive program, as it is
bidder’s responsibility to draw up and carry out such a program duly
approved by the Engineer.
b) Cost of Inspection / test is to be borne by the bidder.
c) Additional tests, if required, are to be deemed as included in scope of
work.
d) Stages of inspection and owners participation would be defined and tied
up at the time of award of contract.
CORE:
INSULATING MATERIAL:
a) Sample check for physical properties of material.
b) Check for dielectric strength.
c) Visual and dimensional checks.
d) Sample check on insulating paper for pH Value, electric strength
e) Check for the reaction of hot oil on insulating materials.
f) Certification of all tests results.
WINDING:
a) Sample check on winding conductor for mechanical properties and
electrical conductivity.
b) Visual dimensional checks on conductor for scratches, dent marks etc.
c) Sample check on insulating paper for PH value, electric strength.
d) Check for the reaction of hot oil on insulating paper.
e) Check for the bonding of the insulating paper on conductor.
f) Check for absence of short circuit between parallel strands.
g) Check and ensure that physical condition of all materials taken for
winding is satisfactory and free of dust.
h) Check for brazed joints wherever applicable.
ASSEMBLED TRANSFORMER:
a) Check completed transformer against approved outline drawing, provision
for all fitting, finish level etc.
b) Taking test on all the assembled transformers.
The contractor shall also prepare a comprehensive inspection and
testing program for all bought out / sub-contracted items and shall submit
the same to the Engineer for approval. Such program shall include in
following:
i) Buchholtz Relay.
ii) Sudden pressure rise relay.
iii) Axles and wheels.
iv) Winding temperature indicator for local and remote mounting.
v) Oil temperature indicators.
vi) Bushing.
vii) Bushing Current Transformer.
viii) Terminal connectors
ix) Radiators, cooler control and any other item, as desired by purchaser.
c) Test to check effective shielding of the tank
d) Jacking test with oil on all the assembled transformers
e) Dye penetration test shall be carried out after the jacking test
Test on oil samples taken from main tank top and bottom and cooling system
as per IS: 335. Sample shall be taken only after the oil has been allowed to
settle for 24 hours.
1.30.1.1 Check the whole assembly for tightness, general appearance etc.
1.30.1.2 Oil leakage tests.
1.30.1.3 The contractor shall warrant that oil furnished is in accordance with the
specifications given in this specification.
1.30.1.4 Capacitance and tan delta measurement of bushings before fixing / connecting to
the winding. Bidder shall furnish these values for site reference.
1.30.1.5 Sweep Frequency Response Analysis (SFRA) test
1.30.3 TESTING:
The transformer shall be tested in the presence of purchaser’s
representative. All tests (routine and type tests) shall be witnessed by him. All
the tests shall be performed in compliance of IS: 2026 - 1962 (as amended
up to date). All the instruments, meters, etc., used for testing shall be
duly calibrated at NABL laboratory and necessary calibration certificate
shall be made available during inspection. The following tests shall be
carried out on the transformer.
Gas chromatographic analysis on oil shall also be conducted before and after
this test and the values shall be recorded in the test report. The sampling
shall be in accordance with IEC 567. For the evaluation of the gas analysis in
temperature rise test the procedure shall be as per IS:9434 (based on
IEC:567) and results will be interpreted as per IS:10593 (based on IEC:599).
ii) Impulse tests shall be made on three limbs of transformer. The test
sequence shall be with chopped wave.
iii) Vacuum and pressure test on tank
iv) Tests on OLTC
Important note for type tests: The type test report shall be submitted for the offered class
and rating of transformer. However, the type test report for higher class/rating can be accepted
for scrutiny of technical bid but the same test/s shall have to be carried out on the offered
class/rating transformer. Bidder shall invariably confirm to carry out the required type test/s,
special tests, before commencement of supply, without affecting delivery schedule, free of cost,
at NABL approved laboratory, or at suppliers works in presence of GETCO representative, in the
event of order.
1.30.3.1(d) CALCULATIONS:
a) Thermal and Dynamic ability to withstand terminal short circuits
b) Cooling calculations for ONAN, ONAF & OFAF.
If the above tests are carried out at bidder works then the bidder shall have to
repeat these tests again on any one unit without affecting delivery schedule
at no extra cost to GETCO. The necessary confirmation shall invariably be
submitted with the technical bid otherwise the offer shall be evaluated
accordingly.
1.30.3.2 Radiators, valves and other parts necessary for complete transformer shall
be tested for leaks and strength applying to the complete tank filled with oil
air pressure not less than 0.7 atmosphere for a period of 24 hours or not
less than 1.0 atmosphere for a period of 6 hours.
4. Air cell (Flexible air separator) – Oil side coating, Air side under coating,
Air side outer coating and coated fabric as per
IS:3400/BS:903/IS:7016.
5. Oil pump – vacuum test, oil pressure test at 1 kg/cm2 for 24 hrs.,
Temperature rise test by resistance method, IP-55 for terminal box.
6. Cooling fan and motor assembly – Free air delivery, Temperature rise,
sound level, running at reduced voltage, IP-55 for terminal box.
7. MOG & terminal box for IP-55 degree of protection
1.31.1 The various test (routine and type) as stipulated in the IEC Publication No. 214 -
1966 (as amended upto date) shall be carried out.
1.32.2 Type test certificate copies of oscillogram as called for in IEC Publication No.
214 shall be furnished by the supplier.
1.32.1 After all the tests have been completed 4 copies of each test report shall be
furnished to the purchaser for this approval prior to the dispatch of equipment.
Soft copy of test reports for tests results obtained from software shall be
submitted for approval and record.
1.32.2 All the reports of inspections like stage, acceptance, routine & type tests
carried out on each transformer including test certificates for bought out
items, in bound volume, shall be submitted before dispatch. Also one copy
shall be sent along with transformer.
The purchaser reserves the right of having any other reasonable test carried
out at his own expense to ensure that the transformer complied with the
requirements of this specification.
1.34 LOSS/DAMAGES:
1.34.1 The Purchaser shall not be responsible for any damage to the equipment during
commissioning if such damage results from faulty or inadequate action.
1.34.2 Seller shall not be liable for any loss, damage or injury to property or persons at
the installation site unless such damages or injuries are caused by any and or
negligence of the supervising erector.
The bidder shall furnish all guaranteed technical particulars as called for in
Section - III, Schedule - A of this specification. Particulars, which are subject
to guarantee, shall be clearly marked. Bids not containing this information are
likely to be rejected.
1.38.1 The quoted losses shall be considered as maximum, without any positive
tolerance. The bidders are, however, at liberty to quote the guaranteed
losses. The evaluation of the offer shall be done on basis of maximum
guaranteed loss.
In case of any order, if the figure/s of losses during test are found, higher than
the figures guaranteed for maximum losses without any positive tolerance on
individual components of losses, the transformer will, at the option of the
purchaser / owner be rejected, or accepted with the reduction in prices as
under. The measurement of losses shall be carried out with 3 (Three) Watt
meter method only and CTs, PTs and meters used for these measurements
shall be of class of accuracy of 0.2.
1.38.2 For the purpose of evaluation of bids, the quoted losses shall be compared for
all the bidders of particular tender.
The following formula adopted by the GETCO for working out comparable costs
with difference in prices and losses is:
Capitalized cost of transformer = IC + 1,60,000 Wi + 70,000 Wc + 60,000 Wp
1.40 REJECTION:
1.40.1 The Purchaser may reject transformer, if any of the following conditions
during or service arises:
1.40.2 The Purchaser reserves the right to retain the rejected transformer and use it
until the bidder replaces the defective transformer by a new transformer,
within a reasonable period, at no extra cost to the GETCO. In such case the
transportation, loading, unloading on plinth, inspection, erection, testing &
commissioning charges shall be bourn by the bidder.
1.41.1 The successful bidder will be required to grant facilities for training to
minimum two Engineers to be nominated by the GETCO, in his works and
more particularly in the manufacture, assembly, operation and maintenance
of transformer. The bidder should please state the general condition of
training and number of Engineers and duration of training for whom such
training will be arranged by him.
1.41.2 Bidder shall at his cost arrange for the above training facilities and in addition
shall bear all living expenses. The Purchaser shall only pay to and fro
passage of the trainees. Bidder shall indicate following in the prices schedule.
a) The lump sum amount of training for the above training facilities.
b) Price reduction / addition for number of trainees specified herein.
1.42 Guarantee period will be reckoned from the date of receipt of 100 %
accessories and not from the date of receipt of main tank only.
1.43 If GETCO Engineer will return without inspection of offered equipments due
to non-readiness of materials at their works than financial loss to the GETCO
deputing their representative will be recovered from the concerned supplier.
1.44.1 (1) Manufacturers / Suppliers will have to supply the transformer oil as per
GETCO’s Specification of Transformer oil attached herewith at Annexure
- A.
SECTION – I I
TECHNICAL SPECIFICATION
FOR 220 & 132 KV CLASS POWER TRANSFORMERS.
SPECIFIC REQUIREMENTS
2.1 SCOPE:
2.1.1 This section covers the specific technical requirements, climatic and
isoceranic conditions and system particulars for which the power transformer
shall be offered as per the general technical requirements given in Section – I
of this specification and the Schedule of requirements specified herein for the
various sub-stations.
2.2.1 The climatic conditions under which the equipments shall operate
satisfactorily.
(a) Maximum ambient temperature of air in Shade (OC) 50
O
(b) Minimum ambient temperature of air in shade. ( C) 50
O
(c) Maximum daily average ambient temperature ( C) 40
(d) Maximum yearly average ambient temperature (OC) 30
(e) Maximum relative humidity (%) 95
(f) Average number of thunder storm (days/annum). 15
(g) Average number rain fail (cm) 150
2
(h) Maximum wind pressure (kg / m ) 150
(i) Height above monsoon level (mtr) Not exceeding
1000
2.2.2 All equipment offered shall be suitable for continuous satisfactory operation
at the full rated capacity under the above climatic conditions.
2.2.3 Since the sub-station may be near sea shore or industrial area, the equipment
offered shall be suitable for heavily polluted atmosphere.
2.3.1 The transformers shall be either core or shell type construction, 3 phase, oil
immersed, ONAN / ONAF / OFAF with external heat exchanger and shall be
suitable for outdoor services. The rating and the electric characteristics of
the transformers shall be as under.
66 kV - N. A 1700
36 kV - 900 900
11 kV - 380 N. A
2.3.2 The equipment offered shall be suitable for continuous operation under the
above conditions at the full rated capacity.
2.3.4 External or internal reactors shall not be used to achieve the HV/LV
impedance specified
2.7.2 The DC supply at 110 / 220 Volts will be available from station battery. The
DC supply is subject to variation of ± 10 %.
2.8.2 Standard
The oil storage tank shall be designed and fabricated as per relevant Indian
Standards e.g. IS: 803 or other internationally acceptable standards.
2.8.3 Specifications
Transformer oil storage tanks shall be tow able & rested on pneumatic types
of adequate quality & size. The tank shall be to cylindrical shape & mounted
horizontally and made of mild steel plate of adequate thickness. Size of the
storage tank shall be follows:
2.8.3.1 The Bidder may further note that maximum height of any part of the complete
assembly of the storage tank shall not exceed 4.0 meters above road top.
2.8.3.2 The tank shall have adequate number of jacking pad so that it can be kept on
jack while completely filled with oil. The tank shall be provided with suitable
saddles so that tank can be rested on ground after removing the pneumatic
tyres.
2.8.3.3 The tank shall be also fitted with manhole, outside & inside access ladder,
silica gel breather assembly, inlet & outlet valve, oil sampling valve with
suitable adopter, oil drainage valve, air vent etc. Pulling hook on both ends of
the tank shall be provided so that the tank can be pulled from either end while
completely filled with oil. Bidder shall indicate the engine capacity in horse
power to pull one tank completely fitted with oil. Oil level indicator shall be
provided with calibration in terms of litre so that at any time operator can
have an idea of oil in the tank. Four nos. suitable rubber hoses with couplers
and unions each not less than 10 meter long shall also be provided.
2.8.3.4 The internal & external surfaces to be painted shall be short or sand blasted
to remove all rust and scale of foreign adhering matter or grease. All steel
surfaces in contact with insulating oil shall have painted with two coats of
heat & oil resistant anti-corrosive paint after one coat of red oxide as per
IS:104 and one each coat of finishing coats of glossy white shade..
All steel surfaces exposed to weather shall be given primary coat zinc
chromate, second coat of oil & weather resistant paint of a colour distinct
from primary and final two coats of glossy oil & weather resistant light grey
paint in accordance with shade no. 631 of IS: 5. All paint shall be carfully
selected to withstand heat & extremes of weather. The paint shall not scale
off or crinkle or be removed by abrasion due to normal handling. The
minimum thickness of outside painting of tank shall be 20 microns per coat
the total thickness shall be within 70 to 100 microns.
2.8.3.5 The tank shall contain a self mounted centrifugal oil pump with inlet and
outlet valves, with couplers suitable for rubber houses and necessary
switchgear for its control. There shall be no rigid connection to the pump. The
pump shall be electrical motor driven and shall have a discharge of not less
than 6 kLph with a discharge head of 8 Mtr. The pump motor and the control
cabinet shall be enclosed in cubicle with IP55 enclosure.
2.9.1 Oil sampling bottle shall be suitable for collecting oil sample from transformer
and shunt reactors for dissolved gas analysis. Bottles shall be robust enough
so that no damage occurs during frequent transportation of samples.
2.9.2 Oil sampling bottle shall be made of Stainless Steel having capacity of ONE
litre.
2.9.3 Oil sampling bottle shall be capable of being sealed gas tight and shall be
fitted with cocks on both ends.
2.9.4 The design of bottle & seal shall be such that loss of hydrogen shall not
exceed 5% per week.
2.9.5 An impermeable oil proof transparent plastic or rubber tube of about 5 mm
diameter and of sufficient length shall also be provide with each bottle along
with suitable connectors to fit the tube on to the oil sampling valves of the
equipment and the oil collecting bottle respectively.
SECTION – III
BIDDING SCHEDULE
(To be filled in and signed by the Bidder)
SCHEDULE ‘A’
1. Name of manufacturer :
L.V. Winding:
9. Tapping a) Number :
b) Range :
c) Location :
9A Details of Automatic Voltage Regulator
(a) Make :
12. Limit for hot spot temp. for which the transformer :
is designed (oC)
i) Positive sequence :
25. Maximum current density & c/s area in the winding : Guaranteed As per SC calcu
i) H.V. (Amp./Sq. cm.) :
ii) Cross sectional area :
iii) L.V. (Amp/Sq. cm) :
iv) Cross sectional area :
i) H.V. :
ii) L.V. :
34 Inter-turn Insulation :
i) Extent of end turns reinforcement :
ii) Extent of reinforcement of turns adjustment :
to tap
iii) Test voltage for 1 min. 50 Hz. Inter-turn :
insulation test on (i) (KV rms)
(a) HV Bushing
i) Type of high voltage bushing and creepage :
distance in mm.
(b) LV Bushing
i) Type of low voltage bushing and creepage :
distance in mm.
40. Clearance :
a) Minimum clearance between phase (Mtrs.) :
i) In oil :
b) L.V. (Kgs.) :
c) Total (Kgs.) :
a) Make :
b) Type :
c) Rating :
i) Rated Voltage :
f) Control :
h) Voltage control :
i) Protection devices :
i) Make
CONTROL CABINET
(To be filled by the Bidder)
9) Control wiring
SR. ITEM
NO.
SR. ITEM
NO.
2 Applicable standards
3 Application
4 Type
5 For connection to
5.1 Conductor size and arrangement
5.2 Equipment terminal size and
arrangement
6 Material
(state percentage composition of
constituents and impurities present)
6.1 Clamp body
6.2 Bolts and nuts
6.3 Spring washers
6.4 Liners if any
7 i) Rated current
ii) STC rating for 3 sec :
4. Type Tests
a. Whether type tests already
carried out (YES / NO)
b. If yes, test certificates
enclosed (YES / NO)
c. Details of type tests to be
carried out
SECTION – III
SCHEDULE – “C”
The equipment offered confirm to other standard than specified standard as follow. The
salient points are as under.
APPENDIX – ‘A’
SPECIFICATION OF TRANSFORMER OIL
Sr. Characteristics of Transformer Requirement Method of test
No. Oil
1 Appearance The oil shall be clear transparent A representative
sample of the oil
& free from suspended matter of
shall be
sediments. examined in a
100 mm thick
layer, at ambient
temperature.
2 Density, Max. 0.89 gm/Cm3 at 29.5 0C IS: 1448
3 Dynamitic Viscosity CST at 27 0C 27 cSt (Max.) IS: 1448
0
4 Flash point penskey-Marten 140 C Min. IS: 1448
(Closed)
0
5 Interfacial tension at 27 C 0.04 Min. IS: 6104
Newton/M
6 Pour point - 15 0C (Max.) IS: 1448
7 Neutralization value IS: 335
a) (Total acidity) mg. (Max) 0.03 mg KOH/gm Max. Appendix-A
b) Inorganic Acidity/alkalinity Nil
8 Corrosive Sulphur Non corrosive ASTM D1275
(In terms of classification of subjecting oil
copper strips) 48 Hrs. @ 150 0C 1500C for 48 hrs.
APPENDIX – B
1.1 The bidder should have carried out erection, testing, commissioning of
and test charging of at least two nos. of 220 kV or above class
transformers at 220 kV &/or 400 kV switch yard of sub stations
satisfactory during last five years before date of submission of the bid.
1.2 The bidder should arrange requisite tools and tackles including adequate
capacity hydraulic crane having suitable adjustable boom length for
erection of bushing, radiators, conservator, and other associated costly
equipments.
1.3 The bidder should have team of trained personnel and skilled
labour force and supervising engineers to carry out erection,
commissioning, testing and test charging work including laying of control
cables and wiring of OLTC gear scheme and inter connection of RTCC
panel with D.M., of OLTC., wiring of cooler control scheme and cooling
fans including automatic operation of cooler control etc.
2.1 Erection includes entire vacuum by proper capacity of vacuum pump, for
not less than 48 hours, or more if required as per the instruction of
engineer in charge.
2.2 Filling the oil from tank/drums to the transformer through 6000 ltrs.
Capacity of high quality filter machine and filtration of the same to get
desired BDV &PPM as specified by engineer in charge and
transformer manual.
2.3 Contractor has to replace all the gaskets by new ones if required by
engineer –in –charge.
2.4 Erection shall include wiring of cooling fans, RTCC panels, terminations of
alarm and trip contacts from buchholz relay, WTI, OTI, PRD to M.K. box
and in turn to remote relay panel and RTCC panel in control room.
Required cabling on the transformer as well as from transformer to control
room shall also be included in scope of work. The testing and
commissioning of OLTC as well as cooler control scheme shall be carried
out as per instruction of engineer in charge.
2.5 The contractor shall arrange nitrogen cylinder required at site for above
work.
2.6 In case of any breakage of any item, contractor has to follow up with
insurance for the claims and amount for damage /breakage will be with
held from contractor’s bill till the time claim is finalized by insurance
company.
2.7 Minimum 15 Nos. of good skilled fitters, with 2 Nos. qualified supervisors
and senior engineer having sufficient experience should be posted at site
during the above work.
2.8 Contractor has to repaint the transformer tank with two coat of anti rusting
good finish LTBS grey shade 632 of IS:5 by spray painting as per the
direction of engineer in charge.
2.9 Contractor is required to carry out all minor/major fabrication work of pipes
and hangers if required at site as per direction of engineer in charge.
2.10 All tools and tackles, testing equipments listed here under are to be
arranged by the contractor.
2.11 Contractor shall arrange required capacity of oil
tanker at site.
2.12 Any other items not mentioned above but required for successful
completion of erection shall have to be arranged by the contractor.
1. One or two mobile crane hydraulic of adequate capacity with long boom of 30 ft.
bearing free vertical lifts suitable for lifting HV bushing.
2. Steel/Manila/Nylon ropes and D shackle for lifting of 3-ton weight.
3. 4000 or 6000 liters. / hr. capacity filter machine in excellent working condition. It
must be capable of heating transformer oil up to 800 C and must be equipped with
built in high vacuum pump and chamber filter elements.
4. Following accessories should also be made available.
a) Non-collapsible hose piping of size 40 mm to 80 mm with nipple and flange.
b) Hosepipe should be of oil resistant 2” to 3” BSP suitably threaded for connecting
hose pipes & provided with holes for fastening.
c) 2 Nos. storage tanks for insulating oil of adequate capacity provided with 2 bottom
drain cum filter valve and another 2” top valve.
d) Two complete sets of ring and flat spanners of metric size up to 4 to 36.
e) One complete set of Allen keys.
f) One complete set of screw derivers.
g) 1/4 “ shackle 3-ply nylon rope of 15 mtr. Length.
h) 4 nos. of flange each of 1”, 2” to3” BSP suitably threaded for connecting hose pipe &
provided with holes for fastening.
i) Multi stage vacuum pumping system capacity 250-500 mm cu/hr. & should be able
to create absolute vacuum of 1 tor or 1.3 m bar or less having following
accessories.
j) Non return valve at inlet.
k) GI pipe/non-collapsible pipes with flange for connecting vacuum pump to
transformer main tank.
l) Vacuum gauge for reading 0 to 50 mm along with flange for fitting at top of
transformer of any suitable size 3/16 and 3/8 set in good quality.
m) Oil testing kit in good working condition having 2.5mm and 4 mm guage for
adjusting the gap, 2.5/5 KV megger motor driven and capable of reading up to
50000 M-OHM.
n) 3 Ltrs. Of CTC.
o) Hot air blower for drying out of bushing.
p) Required nitrogen cylinder.
q) Stainless steel bottles for samples.
r) Gas cylinder with nozzle torch for gas cutting etc.
s) Any other item required for successful completion of work.
ANNEXURE - I
6. The relay bandwidth shall be adjustable between –5 to +15 of set point voltage.
7. The relay shall have following options regarding time behavior with Time factor
selectable from 0.1 to 30.
Linear
Integral
Fast integral
8. The relay shall incorporate an under voltage / over voltage blocking facility which shall
make the control inoperative if voltage falls / rises by percentage value of set point value
(as mentioned in Guaranteed technical particulars) with automatic restoration of control
when nominal voltage rises / falls to value as mentioned in the Guaranteed technical
particulars.
9. The AVR relay shall have integrated features for the display of following parameters
Master Follower
Master Slave
∆I SinΦ (Circulating current)
14. The AVR relay shall have facility to monitor or control the following parameters
15. The AVR relay shall have facility to record specific events (Event-Recorder) like under
voltage, over voltage, Over current, Auto/Manual, local/remote etc. with date and time
stamping.
16. The AVR relay shall have facility to make selection of Auto/Manual and Local/Remote.
17. The AVR relay shall have different LEDs to indicate Service and Blocked condition.
18. It is preferred that 12 nos of freely programmable LEDs shall be available to indicate
different Operations / Alarm / Faults condition.
19. The AVR relay shall have freely programmable Binary Inputs, Binary outputs, Analog
Inputs and Analog Outputs.
20. The AVR relay shall have software to make the parameter settings of the device and it
shall also be possible to do the parameter setting through keyboard of relay.
21. The AVR relay shall have suitable interface to make communication with higher level
SCADA system. The following ports a minimum shall be available on the device.
a. Rs 232 port (COM 1) for doing the parameter setting and local
communication with device.
b. RS 232 port (COM 2) for communication with higher level SCADA with
optional protocols like MODBUS, SPABUS, PROFIBUS DP, LON, IEC
60870-5-101, -103 and –104, IEC 61850 in preparation.
22. It shall be possible to communicate via bus with all similar devices located at different
location by making communication link with any one device through its RS 485- port (E-
LAN) meant for local communication.
23. It shall have facility by which a customer specific software programme can be written
and incorporated as feature in the relay.
ANNEXURE C
DATE:
PLACE:
1 Item description :
2 Name of manufacturer :
3 Type & designation :
4 Shape :
5 Size of conservator Diameter :
Length :
6 Size of Flexible Separator (Air cell) :
a. Length (mm) Fully inflated :
b. Length (mm) Fully deflated:
c. Width (mm) Fully inflated:
d. Width (mm) Fully deflated
e. Distance between axes :
i.e. pitch distance of lugs (mm)
f. Expansion volume (litre) :
g. Occupation rate (%)
7 Material of Flexible Separator (Air cell) :
a. Basic fabric :
b. Coating compound :
c. Oil side coating :
8 Inside coating Material :
9 Outside coating Material :
10 Thickness :
11 Resistance to perforation :
12 Warp breaking strength :
13 Weft breaking strength :
14 Warp elongation breaking :
15 Weft elongation breaking :
16 Seam resistance :
17 Perforation :
18 Permeability to Oxygen :
19 Permeability to water vapor :
20 Resistance to Ozone gas for 96 hrs at 40oC:
21 Attachment details :
22 Flange details :
23 Lugs :
24 vulcanizing process :
25 Reinforcement at bottom :
26 Suitable for maximum temperature :
27 Minimum width of over lap (mm) :
28 Material of adaptor and bolts :
29 Guarantee period :
30 Accessories and fittings
(Give list with details) :
31 Any other information :
Annexure - II
Technical Specification For On Line Moisture and Gas In Oil Analyser For New
Transformer With Model Analysis Software And Remote Data
Transfer/Communications through internet:
1.0 GENERAL:
The transformer shall be equipped with on line moisture and gas in oil analyzer system,
‘HYDRAN – M2’ or equivalent with model analysis software and remote data transfer /
communications. It is intended to continuously monitor the evolution of dissolved gases
from the oil of transformer with the help of a gas in oil sensor with no moving
parts or pump to detect and continuously monitor a composite value of gases
like H2 (Hydrogen), CO (Carbon monoxide), C2H2 (Acetylene), C2H4 (Ethylene), etc.
The system shall be installed on a single, open bore ball or gate valve. The
system shall also continuously monitor the moisture content in the transformer oil to
result a comprehensive incipient fault monitoring system.
Based on the type and configuration of the transformer and with 4, 4-20mA
input channels and appropriate non intrusive sensors, the system shall be
capable of utilizing the measured parameters of temperature, cooling bank
status and load currents to derive the following model calculations (based on
IEEE and/or IEC Standards). The original factory test report for the
transformer will be made available to properly configure these model
calculations.
• Apparent Power
• Load Current
• PPM value of composite combustible gas measurement
• Short term and long term rate of change of PPM value of composite
combustible gas measurement
• PPM water content in oil
• Water in oil condensation temperature
• Winding hotspot temperature
• Moisture content in winding insulating paper
• Moisture content in barrier insulation
• Relative ageing of the transformer insulation system taking into account
winding hotspot temperature and moisture content in winding insulating
paper.
• Bubble inception temperature
• Cooling system status
• OLTC Tap position tracking (when equipped with OLTC)
• OLTC temperature differential modeling (when equipped with external
type OLTC)
This is as a part of transformer supply, the transformer manufacturer shall also include
in the scope of this tender, to supply, provision, mounting, erection, commissioning, etc;
but not limited to the following, for on line moisture and gas in oil analyzer system.
2.2 One set of centralized monitoring system with suitable software for
communicating with IEDs simultaneously with a provision for communicating to
two or more IEDs if required in future. The required software shall be loaded in
GETCO system at desired location such that all the data/display associated with
the system can be visualized and all archiving / trending can be achieved.
Successful Bidder shall also be responsible for coordination with supplier of this
on line system & SAS /GETCO system and ensure for proper interfacing with all
required devices, cabling, software, hard ware, services, etc. It shall also give
printouts of all required data as desired.
2.3 All required interconnection, wiring, cabling with fiber optic cables/RS485
cables etc., including all required accessories for successful operation of the
system.
2.4 Required earthing & connection for the system at required location.
2.6 To supply installation, commissioning and O&M manuals and procedures, etc., in
hard and soft form.
2.7 To supply standard HOST/User Interface Software in ENGLISH, one with each
unit on a CD – ROM.
2.8 The system interface shall also include required field cable, patch cable, patch
box, associated accessories & hardware’s to connect to the GETCO system.
The IEDs shall be suitable for outdoor heavily polluted atmosphere, ambient
temperature of 50oC and relative humidity of 100 % and shall have minimum
degree of protection of IP-55. Necessary type test reports shall be submitted with
the bid. Each IED shall be provided with additional canopy.
The IED shall be suitable for mounting on offered transformer. The best single
point of mounting location to ensure optimum flow of oil in the IED without any
external / additional pump & piping shall be decided in co ordination with on line
moisture and gas in oil analyzer system manufacturer. The system shall operate
satisfactorily for oil temperature range of -5 to 100oC with heat fin adapter and
shall be suitable for oil pressure of 100 psi. Provision shall be made available for
collection oil samples for DGA and moisture analysis, without disturbing IED or
its connections. It shall be possible to carry out the periodic maintenance easily.
The normal functioning of IED shall be guaranteed without necessity of any
additives / consumable. The IED shall include an automatic 'self-test'
feature which shall test the sensor and system twice per month. It shall
include a dedicated "Fail Alarm" relay, should the test result in detection
of a problem in the sensor and/or system.
Each IED shall be provided with multi line LCD with back light or red LED display
to indicate combined gas concentration level in ppm, moisture content in RH% &
ppm; hourly and daily trend readings, alarm etc. Key pad shall be built in for
menu driven easy operation. It shall be possible to down load all information
locally by a laptop computer. All the information shall also be continuously
transmitted to centralized monitoring GETCO system. Necessary serial
interfaces shall be provided. Minimum Four (4) nos. of potential free contacts
and 4-20 mA analog output shall also be provided. The IED shall be
electromagnetically screened and impervious to vibrations.
Glass Fiber Optic mono mode cables /RS485 cable shall be provided for
interconnection of all IEDs and the central monitoring system. The cable shall be
laid in HDPE conduits. All required terminations, splicing kits shall be arranged
by bidder. Provision shall be kept for installing and terminating cables from
future IEDs.
It is also intent to monitor moisture and gas in oil of transformer through internet.
There will not be any wire connection. It will be wireless communication. Any
suitable modem shall be provided. Data is to be seen and analyze at corporate
office or any other remote locations as desired by GETCO.
4.0 The on line moisture and gas in oil analyzer system shall be compatible to
SCADA. It shall use DNP3.0 or Modbus protocol, without the use of third
party protocol converters.
5.0 List of routine & acceptance tests shall be submitted with the technical bid.
Successful bidder has to perform acceptance tests in presence of GETCO
representative, as per relevant standard.
6.0 Services of on line moisture and gas in oil analyzer system supplier during
supply, mounting, erection, testing, commissioning and after sales even beyond
guarantee period shall have to be arranged and provided by the bidder.
7.0 The on line moisture and gas in oil analyzer system shall also be operational
during temperature rise tests and demonstrated during these tests. The data
shall be recorded and reported in the test report. Data obtained from on line
moisture and gas in oil analyzer system and conventional DGA shall be
compared however, both values should satisfy the commitment.
NOTE: The clause no. 7.0 shall be applicable only when this item is purchased as
a part of transformer.
8.0 The bidder shall furnish all guaranteed technical particulars as called for in this
specification. Bid not containing this information are likely to be rejected.
ANNEXURE - III
TECHNICAL SPECIFICATIONS
Name of work: Turnkey contract for the work of design, supply, erection and
commissioning of Nitrogen Injection system for protection against the
transformer explosion for 400 KV Transformers and Shunt Reactors as indicated
in Annexure-I.
Each oil filled transformer / reactor shall be provided with a dedicated Nitrogen
Injection system for prevention against the transformer explosion which shall
use nitrogen as quenching medium. The system shall prevent transformer /
Reactor oil tank explosion and possible fire in case of internal / external cause.
In the event of fire by external causes such as bushing fire.OLTC fires, fire from
surrounding equipment etc., it shall act as a fast and effective fire fighter. It
shall accomplish its role as fire preventer and extinguisher without employing
water or carbon dioxide. Fire shall be extinguished within reasonable with time
(not more than 3 minutes so as not to harm the transformer) of system
activation and within 30 seconds (maximum) of commencement of nitrogen
injection. The system shall have been in successful operation / commissioned in
Indian / Abroad installations for at least last five years for protection of
transformers of 220 KV and higher voltage class. The list of past supplies in
India / Abroad along with performance certificate from users of the system shall
be submitted for approval of purchaser.
Auto Mode
For prevention:
For extinguishing
• Fire Detector
• Buchholz relay paralleled with pressure relief valve or RPRR (Rapid
Pressure Rise Relay).
Tripping of all circuit breakers (on HV & LV/IV side) associated with transformer
/ reactor is the pre-requisite for activation of system.
General description
Nitrogen Injection system should be a dedicated system for each oil filled
transformer / reactor. It should have a Fire Extinguishing Cubicle (FEC) placed
on a plinth at a distance of 5-10 m away from transformer / reactor or placed
next to the firewall (if fire fighting wall exists). The FEC shall be connected to
the top of transformer / reactor oil tank for depressurization of tank and to the
oil pit (capacity is approximately equal to 10% of total volume of oil in
transformer / reactor tank / or existing oil pit) from its bottom through oil pipes.
The FEC should house a pressurized nitrogen cylinder (s) which is connected to
the oil tank of transformer /reactor oil tank at bottom. The Transformer
Conservator Isolation Valve (TCIV) is fitted between the conservator tank and
Buchholz relay. Cable connections are to be provided from signal box to the
control box in the control room, from control box to FEC and from TCIV to signal
box. Detectors placed on the top of transformer / reactor tank are to be
connected in parallel to the signal box by Fire survival cables. Control box is
also to be connected to relay panel in control room for receiving system
activation signals.
Operation
System components
CUBICLE (FEC)
• Nitrogen gas cylinder with regulator and falling pressure electrical contact
manometer.
• Oil drain pipe with mechanical quick drain valve.
• Electro mechanical control equipment for draining of oil of pre-determined
volume and injecting regulated volume of nitrogen gas.
• Pressure monitoring switch for back-up protection for nitrogen release.
• Limit switches for monitoring of the system.
• Butterfly valve with flanges on the top of panel for connecting oil drain
pipe and nitrogen injection pipes for transformer / reactors.
• Panel lighting (CFL Type)
• Oil drain pipe extension of suitable sizes for connecting pipes to oil pit.
• Space heater.
Control box
Control box is to be placed in the control room for monitoring system operation,
automatic control and remote operation. The following alarms, indications,
switches, push buttons, audio signal etc. shall be provided.
• System Oil.
• TCIV open.
• Oil drain valve closed.
• Gas inlet valve closed
• TCIV closed
• Detector trip
• Buchholz relay trip
• Oil drain valve open
• Extinction in progress
• Cylinder pressure low
• Differential relay trip
• PRV / RPRR trip
• Transformer / reactor trip
• System out of service
• Fault in cable connecting fault detector
• Fault in cable connecting differential relay
• Fault in cable connecting Buchholz relay
• Fault in cable connecting PRV / RPRR
• Fault in cable connecting transformer reactor trip
• Fault in cable connecting TCIV
• Auto / Manual / Off
• Extinction release on / off
• Lamp test
• Visual / Audio alarm for AC supply fail
• Visual / Audio alarm for DC supply fail
As far as possible the control box should be such devised that all the
transformers and reactors or group thereof should be controlled from single
spot.
provided with handle for pad locking. It shall have proximity switch for remote
alarm, indication with visual position indicator.
The TCIV should be of the best quality as malfunctioning of TCIV could lead to
serious consequence. The closing of TCIV means stoppage of breathing of
transformer / reactor.
Detectors
The system shall be complete with adequate number of detectors (quartz bulb)
fitted on the top cover of the transformer / reactor oil tank.
Signal box
It shall be mounted away from transformer / reactor main tank, preferably near
the transformer marshalling box, for terminating cable connections from TCIV &
detectors and for further connection to be control box. The degree of protection
shall be IP55.
Cables
Fire survival cables (capable to withstand 750º C.) of 4 core x 1.5 sq. mm size
for connection of detectors in parallel shall be used. The fire survival cable shall
conform to BS 7629-1, BS 8434-1, BS 7629-1 and BS 5839-1, BS EN 50267-2-1
or relevant Indian standards.
Fire Retardant Low Smoke(FRLS) cable of adequate size shall be used for
connection of signal box / marshalling box near transformer / reactor and FEC
mounted near transformer/ reactor with control box mounted in control room.
Fire Retardant Low Smoke (FRLS) cable of 4 core x 1.5 sq. mm size shall be
used for connection between control box to DC & AC supply source, FEC to AC
supply source, signal box / marshalling box to transformer conservator isolation
valve connection on transformer / reactor. Separate cables for AC supply & DC
supply shall be used.
Pipes
Pipes complete with connections, flanges, bends and tees etc. shall be supplied
along with the system.
(a) Oil drain and nitrogen injection openings with gate valves on transformer /
reactor tank at suitable locations.
(b) Flanges between Buchholz relay and conservator tank for fixing TCIV.
(d) Spare potential free contacts activating the system i.e. in differential relay,
Bucholz relay. Pressure Relief Device / RPRR , Circuit breaker of
transformer / reactor.
(e) Pipe connections between transformer / reactor and FEC and between FEC
and oil pit required for collecting top oil.
(g) Inter cabling between signal box, control box and FEC.
(h) Butterfly valves / Gate valves on oil drain pipe and nitrogen injection pipe
which should be able to withstand full vacuum.
(i) Supports, signal box etc. which are to be painted with enameled paint.
Power supply
The bidder apart from the below mentioned spares shall submit a list of
recommendation spares for three years trouble free operation of the equipments
and also furnish unit rates. The owners will scrutinize the said list and decide on
the items on spares to be ordered and the quantities. These spares shall be
supplied by the contractor before end of guarantee period. The owner reserves
right to order the spares with twelve (12) months from the date of order for
main equipments and the rate shall be kept valid till this date. The prices of
these spares shall not be considered for evaluation of the bid.
Mandatory Spares
Interlocks
It shall be ensured that once the NIFPES gets activated manually or in auto
mode, all the connected breakers shall not close until the system is actually put
in OFF mode. Also PRV shall get closed only if all the connected breakers are
open.
Tests
Contractor has to carry out the type test as per relevant IS/IEC. Specifically IP
55 on FEC or have to produce the report from NABL approved Lab.
Reports of all routine test conducted as per relevant IS/IEC standards in respect
of various bought out items including test reports for degree of protection for
FEC / control box / signal box shall be submitted by the supplier.
The supplier shall demonstrate all the functional test associated with the
following as Factory Acceptance Tests:
The performance test of the complete system shall be carried out after erection
of the system with transformer at site.
Detailed layout drawings, equipment drawing along with 4 sets of Operation and
Maintenance manual along with soft copies (In CDs) shall be submitted by the
supplier along with the consignment.
The guaranteed and other technical particulars for the offered system are
indicated in Section - "Guaranteed and Other Technical Particulars". Any
other particulars considered necessary in addition to those listed in that Section
may be furnished by the Bidder.
5.2 mm
5.3 Type & Thickness of sheet steel
5.4 Details of components provided in the control box
5.5 Control voltage
5.6 Method of mounting
5.7 Whether audio and visual alarm provided?
6. Transformer Conservator Isolation Valve
6.1 Make
6.2 Type
6.3 Location
6.4 Whether suitable for pipe of size 80 mm dia
6.5 No. of contacts & spare contacts (NO & NC)
6.6 Padlocking provision
7 Detectors
7.1 Make
7.2 Type
7.3 Quantity required
7.4 Method of fixing
7.5 Effective heat sensing area
7.6 Temperature recommended for effective heat
sensing
7.7 Number of contacts NO / NC
7.8 Necessity and condition of Refilling
8 Whether approved by Tariff Advisory Committee of
India
9 TECHNICAL PARTICULARS FOR NITROGEN
INJECTION SYSTEM FOR PREVENTION OF
TRANSFORMER EXPLOSION
10 Power Supply
10.1 Control box
10.2 FEC (lighting)
10.3 Extinction period
10.4 On system activation
10.5 On commencement of Nitrogen injection
11 FEC Suitable for capacity
11.1 Dimensions (LXBXH) mm
11.2 Weight
11.3 Nitrogen cylinder capacity
12 Control Box
12.1 Dimensions (LXBXH) mm
12.2 Weight
13 Detectors