GETCO/E/TS – XMER 01/R5 Mar 09

GUJARAT ENERGY TRANSMISSION


CORPORATION LTD.
SARADAR PATEL VIDYUT BHAVAN,
RACE COURSE, BARODA – 390 007.

TECHNICAL SPECIFICATIONS
FOR

220/132 kV, 150 & 100 MVA;


132/66 kV, 50 MVA
AUTO TRANSFORMER

GETCO/E/TS – XMER 01/R5 Mar 09

Sign and Seal of Bidder Page 1 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SPECIAL INSTRUCTIONS TO BIDDER

Please read following instructions carefully before submitting your bid.

1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in
AutoCAD format and manuals in PDF format, for offered item shall be submitted.
Also the hard copies as per specification shall be submitted.

2. The bidder shall submit Quality Assurance Plan with the technical bid.

3. The bidder shall have to submit all the required type test reports for the offered
item. Bid without type tests will not be considered for evaluation.

4. The bidder must fill up all the points of GTP for offered item/s. Instead of
indicating “refer drawing, or as per IS/IEC”, the exact value/s must be filled in.

5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.

6. The bidder is required to impart training in view of manufacture, assembly,


erection, operation and maintenance for offered item, at his works, to the
person/s identified by GETCO, in the event of an order, free of cost. The cost of
logistics will be bear by GETCO.

7. Please note that the evaluation will be carried out on the strength of content of
bid only. No further correspondence will be made.

8. The bidder shall bring out all the technical deviation/s only at the specified
annexure.

Sign and Seal of Bidder Page 2 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

QUALIFYING REQUIREMENT DATA


(For Supply)

Bidder to satisfy all the following requirements.

1) The bidder shall be Original Equipment Manufacturer (OEM).


The offered equipment have to be designed, manufactured and
tested as per relevant IS/IEC with latest amendments.

2) The minimum requirement of manufacturing capacity of offered


type, size and rating of equipment shall be FIVE times tender/
bid quantity. The bidder should indicate manufacturing capacity
by submitting latest updated certificate of a Chartered Engineer
(CE).

3) Equipment proposed shall be of similar or higher rating and in


service for a minimum period of THREE (3) years and
satisfactory performance certificate in respect of this is to be
available and submitted.

4) The bidder should clearly indicate the quantity and Single


Value Contract executed during last FIVE (5) years, for the
offered equipment. Bidder should have executed one single
contract during last five years for the quantity equivalent to
tender / bid.
The details are to be submitted in following format,

Sr. ITEMS ORDER ITEMS QUANTI ORDER STATUS, IF REMAR


No SUPP REFEREN TY FULLY ORDER K
LIED CE No. & EXECUTED. UNDER
TO DATE YES/NO EXECUTION

e) Equipment offered shall have Type Test Certificates from


accredited laboratory (accredited based on ISO/IEC Guide 25 /
17025 or EN 45001 by the National accredition body of the
country where laboratory is located), as per IEC / IS / technical
specification. The type test reports shall not be older than FIVE
years and shall be valid up to expiry of validity of offer.

Sign and Seal of Bidder Page 3 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

INDEX
Sec. No. Particulars Page
no.
1.1 SCOPE : 6
1.1.3 GUARANTEE 6
1.2 TRANSPORT 6
1.3 STANDARDS 6
1.4 DRAWINGS 7
1.5 TYPE OF TRANSFORMER 8
1.6 DESIGN 8
1.7 TANK 9
1.8 UNDER CARRIAGE 10
1.9 CORE 11
1.10 WINDING 12
1.11 INSULATING OIL 14
1.12 INSULATION 14
1.13 TEMPERATURE RISE 14
1.14 FREQUENCY 15
1.15 PARALLEL OPERATION 15
1.16 IMPEDANCES 15
1.17 TAP CHANGING MECHANISM 15
1.18 OIL PRESERVING EQUIPMENT 18
1.19 BUSHINGS 18
1.20 COOLING 19
1.21 CENTRE OF GRAVITY 22
1.22 ACCESSORIES 22
1.23 TERMINALS 25
1.24 CURRENT TRANSFORMERS 25
1.25 TERMINAL MARKING 25
1.26 CLEANING AND PAINTING 25
1.27 PACKING AND TRANSPORT 26
1.28 LABLES 26
1.29 INSPECTION 26
1.30.1 INSTALLATION CHECKS 30
1.30.2 COMMISSIONING CHECKS 30
1.30.2 TESTING (Type, Spl & Routine) 30
1.30.3 TEST ON TRANSFORMER TANK 32
1.30.4 TEST AT SITE 33
1.31 TESTS ON OLTC 34
1.32 TEST REPORTS 34
1.34 LOSS/DAMAGES 34
1.35 TECHNICAL AND GUARANTEED PARTICULARS 34
1.36 INSRUCTION MANUALS 34
1.37 DEVIATION FROM SPECIFICATION 35
1.38 TRANSFORMER LOSSES AND EVALUATION OF BID 35
1.39 PENALTY FOR HIGHER LOSSES 35
1.40 REJECTION 36

Sign and Seal of Bidder Page 4 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.41 TRAINING TO ENGINEERS 36


1.42 TRANSFORMER OIL 37
SECTION – I I
2.1 SCOPE 38
2.2 CLIMATIC AND ISOCERANIC CONDITIONS 38
2.3 TYPE AND RATING: 38
2.4 EARTHQUAKE & WIND DESIGN LOADS 40
2.5 BUSHING CT 40
2.6 NEUTRAL CT 41
2.7 POWER SUPPLY FOR CONTROLS 41
2.8 OIL STORAGE TANK 41
2.9 OIL SAMPLE BOTTLE 43
SCH-A GTP for
Power TR 44
OLTC 54
Control Cabinet 56
Clamps & Connectors 58
SCH-C Standard verification of the equipment 60
Appendix - SPECIFICATION OF TRANSFORMER OIL 61
A
Appendix –
B
1.0 QUALIFICATION REQUIREMENTS FOR ERECTION 63
TESTING & COMMISSIONING
2.0 ERECTION OF POWER TRANSFORMER 63
3.0 TOOLS REQUIRD FOR ERECTION 64
Annexure-I AUTOMATIC VOLTAGE REGULATING RELAY 66
Annexure – List of documents to be attached 69
C
SCH-A GTP for Air cell 70
Annexure - Technical specification for On line moisture and multiple gas 73
II monitoring with Model analysis software and remote data
transfer/communication through internet.
Annexure - Nitrogen Injection System For Protection Against The Fire & 84
III Explosion as per specification no. GETCO/E/TS-FF/2902
DTD.JUNE 2008, attached with this specification

Sign and Seal of Bidder Page 5 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SECTION: I
DETAIL SPECIFICATION OF 150/100 MVA, 220/132 kV &
50 MVA, 132/66 KV AUTO TRANSFORMERS

GENERAL TECHNICAL REQUIREMENTS

1.1 SCOPE:

1.1.1 This section covers the design, manufacture, assembly, testing at


manufacturer’s works, supply and delivery include loading, transportation &
unloading on plinth at site, of the Auto transformers as detailed in the
Schedule of requirements, complete with all accessories required for
satisfactory and trouble free operation of the equipment.

1.1.2 The scope of work shall also include EITHER complete erection, testing and
commissioning of all the equipments/accessories furnished under this
specification OR only supervision of erection, testing and commissioning of
all the equipment furnished under this Specification, as indicated in Schedule
– A of the commercial bid.
Each transformer shall be supplied with (i) one number of Oil storage tank as
per cl. no. 2.8, (ii) 3 nos. of oil sampling bottles as per cl. no. 2.9, (iii) Fiber
optic sensors On Line Moisture and Gas In Oil Analyser as per Annexure II,
(iv) Nitrogen Injection System For Protection Against The Fire & Explosion as
per specification no. GETCO/E/TS-FF/2902 DTD.JUNE 2008, attached with
this specification as Annexure III.
However, Bidder has to quote for the accessories equipments/
Material, indicated in Schedule-A of commercial Bid.

1.1.3 GUARANTEE:

The bidder shall among other things guarantee the following:

i) Quality and strength of materials used.


ii) The bid shall give the guarantee as satisfactory working of the complete
transformer for 36 months from the date of commissioning of equipment
or 42 months from the date of receipt of transformer at site, whichever is
earlier.

It may be noted that the service guarantee would be applicable even


when the transformers are erected and operated through any other
agency appointed by the GETCO.

1.2 TRANSPORT:

1.2.1 The equipment to be furnished under this specification shall be packed for
transportation in such a manner as may facilitate easy handling and avoiding
any damage during transit.

Sign and Seal of Bidder Page 6 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.3 STANDARDS:

1.3.1 The Power Transformers covered under this specification shall comply with
the requirements of the latest edition of IS: 2026 (amended up to date)
except specified herein. However, in the event the offered equipment
conforms to any other standard, the salient points of difference between the
standard adopted and the specified standard shall be clearly brought out in
the bid.

1.4 DRAWINGS:

1.4.1 Drawings in AutoCAD format and in hard copy, incorporating the following
particulars shall be submitted by each bidder with the bid.

i) General outline drawing showing dimensions, wheel loading, net


weight of transformer, tap change gear, marshalling box etc.

ii) General arrangements of foundations and structural mounting.

iii) Sectional views showing the general constructional features and


disposition of various fittings and sectional view of Core Coil assembly
clearly indicating boltless construction and other necessary specific
details.
iv) Dimensions of the largest packages to be transported.

v) Drawing showing the complete details of all class condenser bushing


and other relevant data.

vi) Drawings showing details of Buchholtz relay, winding temperature


indicator, oil temperature indicator, air cell, cooling systems, tap changer
etc.

1.4.2 The successful bidder shall submit the following drawings in AutoCAD format
and in hard copy for the approval of the purchaser within commencement
period.

i) General out line drawing showing front, side elevation and plan of the
transformer and accessories with detailed dimensions. The clearances
between HV and LV terminals and ground should also to be shown.

ii) Detailed foundation drawings along with structural drawings showing


design criteria & loadings.

iii) Drawings of each type of bushings, lifting dimensions, clearance between


HT and LT terminals and ground, quantity of insulating oil, name plate
details etc. showing various weights and ratio of WT – CT, OT-CT, all
bushing CT and details of OLTC & RTCC.

Sign and Seal of Bidder Page 7 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

iv) Large scale drawings of high, medium and low-tension windings of the
transformers showing the nature and arrangement of insulators and
terminal connections.

v) Control and annunciation wiring diagram and drawings showing


temperature indicator, alarm circuits, Buchholz relay, oil surge relay, PRV,
MOG, WTI, OTI, AVR relay, OLTC, cooling control etc.
vi) Drawing showing construction and mounting details of marshalling boxes.

vii) Operation and maintenance guide for transformer and OLTC.

viii)Detailed drawing showing wheel loadings and its center of gravity.

1.4.3 The bidder may submit any other drawings found necessary in addition to the
drawings mentioned above or as asked during detailed engineering.

1.5 TYPE OF TRANSFORMER:

1.5.1 The transformers shall be of oil immersed type suitable for outdoor installation.
The type of working shall be as specified in specific Technical requirements
given in Section - II of this Specification.

1.6 DESIGN:

1.6.1 The autotransformer shall be used for bi-directional flow of rated power. The
transformer and accessories shall be designed to facilitate inspection,
cleaning and repairs and for operation where continuity of supply is the
primary consideration. All apparatus shall be designed to ensure satisfactory
operation under sudden variations of load and voltage as may be met with
under working conditions of the system including those due to short circuits.

1.6.2 All materials used shall be of the best quality and of the class most suitable for
working under the conditions specified and shall withstand the variations of
temperatures and atmospheric conditions arising under working conditions
without inner distortion or deterioration or setting up of undue stresses in any
part & also without affecting the strength and suitability of the various parts for
the work which they have to perform.

1.6.3 All outdoor apparatus, including bushing insulators with their mountings, shall be
so designed as to avoid pockets in which water can collect. All connections and
contacts shall be of ample cross-sections and surfaces for carrying continuously
the specified current without undue heating and fixed connections shall be
secured by bolts or set screws of ample size, adequately locked. Lock nuts shall
be used on stud connection carrying current.

1.6.4 Radio Interference and Noise level:

The transformer shall be designed with particular attention to the suppression


of maximum harmonic voltage, especially the third and fifth so as to minimize
interference with communication circuits.

Sign and Seal of Bidder Page 8 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

The noise level of transformer, when energized at normal voltage and


frequency with fans and pumps running shall not exceed, when measured
under standard conditions, the values specified in NEMA standard publication
TR-I.

1.6.5 The transformer shall be capable of being loading in accordance with IS:
6600/IEC-354. There shall be no limitation imposed by bushings, tap
changers etc. or any other associated equipments.

1.6.6 The transformer and all its accessories including CTs etc shall be designed to
withstand without any injury, the thermal and mechanical effects of any
external short circuit to earth and of short circuits at the terminals of any
winding for a period of 3 secs. The short circuit level of the HV and LV
system to which the subject transformer will be connected is 40 kA (sym,
rms, 3 phase fault on 400, 220 and 132 kV) & 25 kA (sym, rms, 3 phase fault
on 66, 22 and 11 kV).

1.6.7 Transformer shall be capable of withstanding thermal and mechanical


stresses caused by symmetrical or asymmetrical faults on any winding.

1.7 TANK:

1.7.1 The transformer tank and cover or bell type tank shall be fabricated from
good commercial grade low carbon steel suitable for welding and of adequate
thickness. The thickness of each side plate shall be indicated in GTP. The tank
and the cover shall be of welded construction. All seams shall be welded and
where practicable they shall be double welded. The tank wall shall be reinforced
by stiffener of structural steel for general rigidity. The tank shall have sufficient
strength to withstand without permanent distortion (i) filling by vacuum, (ii)
continuous internal gas pressure of 0.35 atmospheres with oil at operating level
and (iii) mechanical shock during transportation. The tank cover shall be bolted
to the tank and the transformer design shall be such that the tank will not be
split between the lower and upper cooler connection for untanking.

1.7.2 A man-hole with a welded flange and a bolted cover shall be provided on the
tank cover. The man-hole shall be of a sufficient size to ease access to the lower
ends of the bushings, terminals etc.

1.7.3 All bolted connections to tank shall be fitted with suitable oil-tight gasket, which
shall give satisfactory service under the operating conditions. Special attention
shall be given to the methods of making the hot oil-tight joints between the tank
and cover as also between the cover and the bushings and all other to ensure
that the joints can be remade satisfactorily and with ease, with the help of semi-
skilled labours. Where compressible gaskets are used, steps shall be provided to
prevent over compression. Bushings, turrets, cover of accessories, holes and
other devices shall be designed to prevent any leakage of water into or oil from
the tank. There should not be any leakage at least for three years and this
should be guaranteed. All the gaskets to be provided shall be of RC70C or RC80C
grade. Necessary tests certificates from manufacturer shall be submitted along

Sign and Seal of Bidder Page 9 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

with acceptance test report. The gasket to be used shall not be older than One
year.

1.7.4 Suitable guides shall be provided for positioning the various parts during
assembly or dismantling. Adequate space shall be provided between the covers
and windings and the bottom of the tank for collection of any sediment.

1.7.5 Lifting eyes or lugs shall be provided on all parts of the transformer requiring
independent handling during assembly or dismantling. In addition, the
transformer tank shall be provided with lifting lugs and bosses properly secured
to the sides of the tank for lifting the transformers either by crane or by jacks.

1.7.6 The design of the tank, the lifting lugs and bosses shall be such that the
complete transformer assembly filled with oil can be lifted with the use of those
lugs without any damage or distortions.

1.7.7 The tank shall be provided with two suitable copper alloy or any other suitable
material lugs for the purpose of grounding.

1.7.8 The tank shall be equipped with the following valves with standard screw
connection for external piping. All valves up to and including 100 mm shall be of
GM and larger valves shall be of Cast Iron bodies with GM fittings. They shall be
of full way type with internal screw and shall open when turned counter clock
wise when facing the hand wheel, along with suitable locking in open and close
positions.

i) One drain valve of adequate size with eccentric reducer and flange,
located on the low voltage side of the transformer. This valve shall be
equipped with a small sampling cock. The draining valve must be at
bottommost location of the tank.

ii) One filter valve of adequate size with eccentric reducer and flange,
located at the top of tank on the high voltage side. The opening of this
valve shall be baffled to prevent airation of oil.

iii) One filter valve of adequate size with eccentric reducer and flange,
located on the high voltage side of the transformer above the bottom
of the tank.
iv) Suitable valves shall be provided to take sample of oil from the OLTC
chamber during operation of transformer.
v) A valve of other suitable means shall be providing to fix the on line
dissolved Gas monitoring system to facilitate continuous dissolved gas
analysis. Location and size of the same shall be finalized during
detailed engineering.
vi) Pressure relief valve of adequate size & number/s shall be provided on
main tank as well as for OLTC.
vii) All hardware used shall be cadmium plated / electro galvanised.
viii) Necessary provision for installation of ‘HYDRAN – M2’ or equivalent On
Line monitoring system, shall be made for satisfactory performance
through out the life of transformer. Location and size of the same shall
be finalized during detailed engineering.

Sign and Seal of Bidder Page 10 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

ix) Necessary provision shall be made for installation of Nitrogen


Injection Fire Prevention cum Extinguishing System. Location and size
of the same shall be finalized during detailed engineering.

1.8 UNDER CARRIAGE:

1.8.1 The transformer tank shall be supported on a structural steel base equipped
with forged steel single flanged wheels suitable for moving the transformer
completely with oil.

1.8.2 Jacking pads shall be provided. It shall be possible to change the direction of the
wheels through 900 when the transformer is lifted on jacks to permit movement
of the transformer both in longitudinal and transverse direction. A standard track
gauge (preferably 1676 mm) in both longitudinal and transverse directional shall
be chosen.

1.8.3 Pulling eyes shall be provided to facilitate movement of transformer and they
shall be suitably brazed in a vertical direction so that bonding does not occur
when the pull has a vertical component.

1.9 CORE:

1.9.1 The transformer may be of core or shell type. The core shall be built up
with high-grade non-ageing cold rolled grain oriented silicon steel
laminations having high permeability and low hysterisis loss. The core
material shall be prime CRGO, which shall be procured directly from
manufacturer or through accredited marketing organization of reputation.

1.9.1 (a) The thickness of lamination shall be 0.27 mm or less. Surface insulation
of laminations shall be rust resistant and have high inter laminar
resistance. Insulation shall withstand annealing temperature as high as
8500 0C. Insulation shall be resistant to hot cooling medium. Laminations
are not to be punched.

1.9.1 (b) Bidder should have in house core cutting facility for proper monitoring &
control on quality & also to avoid any possibility of mixing of prime
material with defective/second grade material. This should be indicated
invariably in the QAP. The purchaser may witness the core-cutting
process. In case the in-house core cutting facility is not available, then
the same shall be carried out in the presence of the representative of
GETCO.

1.9.1(c) Bidder will offer the core for stage inspection and get approval from
purchaser during manufacturing stage. The bidder has to produce
following documents at the time of stage inspection for confirmation of use
of prime core materials.
i) Invoice of supplier
ii) Mills of approved test certificates
iii) Packing list
iv) Bill of lading
v) Bill of entry certificate by custom.

Sign and Seal of Bidder Page 11 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

To avoid any possibility of mixing of ‘Prime material’ with any other


second grade/ defective material, the imported packed slit coils of CRGO
materials shall be opened in the presence of the GETCO’s representative.
Only after the inspection and approval from purchaser, the core material
will be cut in-house OR sent to external agency for cutting individual
laminations. In case the core is sent to external agency for cutting, the
Board’s representative will have full access to visit such agency for the
inspection of the cutting of core.

1.9.2 After being sheared, the laminations shall be treated to remove all burrs and
shall be re-annealed to remove all residual stresses. The insulation of the
lamination shall be insert to the action of hot transformer oil. Paper and
varnish insulation will not be accepted. The nature of insulation should be
specified in the bid.

1.9.3 The core shall be rightly clamped to ensure adequate mechanical strength
and to prevent vibration during operation. The clamping structure shall be so
constructed that eddy currents will be minimum.

1.9.4 The core shall be provided with lugs suitable for lifting the complete core and
coil assembly of the transformer.

1.9.5 The core and the coil assembly shall be so fixed in the tank that shifting will
not occur when the transformer is moved or during a short circuit.

1.9.6 The transformer shall be designed in such a way that the flux density in the
steel core corresponding to the rated operating voltage and the rated
frequency shall be not exceeding 1.727 tesla.

1.9.7 Core and Frame terminals should be brought out on transformer top so as to enable
meggaring.

1.9.8 The core and the coil assembly shall be so fixed in the tank that shifting will not
occur and cause any damage when the transformer is moved shifted, or during a
short circuit. The maximum flux density in any part of core or yoke at 10%
continuous over voltage condition shall not exceed 1.9 tesla.

1.9.9 The complete core and core coil assembly of bolt less core type transformer shall be
so assembled that the axis and the plate of outer surface of the coil stack shall not
deviate from the vertical plane by more than 25 mm.

1.9.10 In case transformer with variable flux, the voltage variation which would affect
flux density at every tap shall be kept in view while designing the transformer.
Transformers shall be designed to withstand the following over fluxing conditions:

a) 110 % of maximum density corresponding to Continuous for all


rated voltage transformers
125 % & 140 % of max. flux density for 1 minute and 5 sec.

Sign and Seal of Bidder Page 12 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

b) corresponding to rated voltage respectively

1.10 WINDING:

1.10.1 The conductor for winding shall be of electrolytic grade copper. The winding
shall be so designed that all coil assemblies of identical voltage ratings shall
be interchangeable and field repairs can be readily done, without special
equipment. The coils shall be supported between adjacent sections by
insulating spacers and the barriers, bracings and other insulation used in the
assembly of the windings shall be arranged to ensure a free circulation of the
oil and to reduce hot spots in the windings. The insulation paper shall be of
high quality and the value of degree of polymerization shall not be less
than 1200 Pv and the necessary test certificate shall be submitted
along with the stage inspection report. Provision shall be made in the
tank, for taking sample, in future, of paper for testing purpose and
location shall be easily accessible and indicated on the transformer
tank by affixing special caution plate.

1.10.2 The insulation of the coils shall be such as to develop the full electrical
strength of the windings. All materials used in the insulation and assembly of
the windings shall be insoluble, non-catalytic and chemically inactive in the
hot transformer oil and shall not soften or otherwise be adversely affected
under the operating conditions.

1.10.3 All threaded connections shall be provided with locking facilities. All leads
from the winding to the terminal board and bushings shall be rigidly
supported to prevent injury from vibration. Guide tubes shall be used where
practicable.

1.10.4 The windings shall be clamped securely in place so that they will not be
displaced or deformed during short circuits. The assembled core and
windings shall be vacuum dried and suitably impregnated before removal
from the treating tank. The copper conductors used in the coil structure shall
be best suited to the requirements and all permanent current carrying joints in
the windings and the locks shall be welded or brazed.

1.10.5 Windings shall be subjected to a shrinkage treatment before final assembly, so that
no further shrinkage occurs during service. Adjustable device shall be provided for
taking up any possible shrinkage of coils in service if required.

1.10.6 The conductor shall be transposed at sufficient intervals in order to minimize eddy
currents and equalize the distribution of currents and temperature along the
windings.

1.10.7 The tapping winding shall be provided separately from main winding to minimize the
out of balance forces in the transformer at all voltage ratios.

Sign and Seal of Bidder Page 13 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.10.8 Transformer shall be designed and constructed to withstand, without damage, the
thermal effects on external short circuits (SC) for 3 seconds under conditions
specified in IS: 2026 (Part-I, amended up to date).

1.10.9 Bidder shall invariably indicate in the GTP, the cross sectional area of all windings
with respect to the current density adopted.

1.10.10 Bidder shall have to submit the calculations for thermal & dynamic ability to
withstand short circuits.

1.10.11 The cooling calculations will have to be submitted by successful bidder.

1.11 INSULATING OIL:

1.11.1 The oil for first filling together with 10% extra shall be supplied with each
transformer. The oil shall comply in all respects with the provisions of the
latest edition of IS: 335 (as amended upto date). Particular attention shall be
paid to deliver the oil free from moisture having uniform quality throughout in
non-returnable steel drums. The quantity of oil for first filling of each
transformer shall be stated in the bid.

The supplier of transformer shall furnish test certificates of the insulating


power oil supplied against their acceptance norms, prior to dispatch.
Subsequently oil samples shall be drawn
i) At manufacturer’s works before and after heat run test and shall be tested
for following:
a) BDV in kVrms
b) Moisture content
c) Dissolved Gas Analysis – samples for DGA shall be taken from
sampling device within 24 hrs prior to commencement of heat run test
and immediately after this test. The acceptance norms shall be as per
IS:10593 (based on IEC-599)
ii) prior to filling in main tank at site and shall be tested for BDV and moisture
content and Corrosive sulphur detection test as per ASTM D1275
subjecting oil for 150 0C for 48 hrs for acceptance norms as per
Appendix – A.
iii) prior to energisation at site and shall be tested for the following:
a) BDV in kVrms
b) Moisture content
c) Tan Delta at 90 deg cen.
d) Resistivity at 90 deg cen.
e) Interfacial Tension
1.11.2 On Line Moisture and multiple Gas In Oil Analyser, For New Transformer With
Model Analysis Software And Remote Data Transfer/Communications through
internet shall be provided as per Technical Specifications attached, if
indicated in Schedule – A of the commercial bid.

1.12 INSULATION:

Sign and Seal of Bidder Page 14 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.12.1 The dielectric strength of winding in insulation & of the bushings shall
conform to the values given in IS: 2026 (as amended up to date).
1.12.1.1 The partial discharges in the transformer at the time of dispatch shall
not be more than 500 pC.
1.12.1.2 The Maximum Limit of value of tan delta shall be 1% for windings,
0.5% for bushings and 0.2 % for oil other.

1.12.2 For rated system voltage of 66, 132 and 220 kV, the following impulse and
power freq. withstand test voltage may be offered.
System Voltage Impulse Test Voltage Power Freq. Voltage
66 kV 350 kVp 160 kV
132 kV 650 kVp 275 kV
220 kV 1050 kVp 460 kV

1.12.3 The HV winding of the transformer shall have graded insulation. The
insulation class of the neutral end of the windings shall be graded to 95 kV
(Impulse) and 38 kV (Power frequency) withstand.

1.13 TEMPERATURE RISE:

1.13.1 The transformer shall be installed out-door without any protection from sun
and rain. The maximum hot spot temperature rise shall be limited to 1050 C
with Class - A insulation. Each transformer shall be capable of operating
continuously at its normal rating without exceeding the temperature rise limits
specified as under:

Winding (measured by resistance) Temp. rise in 0 C


ONAN 55
ONAF / OFAF 60
Top oil (measured by thermometer). Temp. rise in 0 C
ONAN 45
ONAF / OFAF 55
Cores Not to exceed that
permitted for the adjacent
part of the winding.
NOTE: The reference subject temperature for the purpose of temp.
rise shall be 400 C.

1.13.2 The transformer shall be free from abnormal noise (other than humming) and
vibration.

1.14 FREQUENCY:

1.14.1 The transformer shall be suitable for continuous operation with a frequency
variation of + 3 % from normal of 50 Hz without exceeding the specified
temperature rise.

1.15 PARALLEL OPERATION:

Sign and Seal of Bidder Page 15 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.15.1 The similar ratio transformers shall operate satisfactorily in parallel with each
other if connected between high voltage and low voltage bus-bars. Also,
wherever specified, the transformers shall be suitable for parallel operation
with existing transformers. The details of existing transformers will be
provided.

1.16 IMPEDANCES:

1.16.1 Supplier shall indicate the guaranteed impedance and tolerances and also
the upper and lower limits of impedances, which can be offered without an
increase in the quoted price. Impedance shall include positive and zero
sequence and shall be expressed in terms of the branches of the star
connected equivalent diagrams, all on the same KVA base and the range
shall be for each branch of the equivalent circuit in turn. The transformer
impedances shall be as specified in Section - II of this Specification.

1.17 TAP CHANGING MECHANISM:

1.17.1 ON LOAD TAP CHANGER:

1.17.1.1 Each transformer shall be provided with on load tap changing mechanism.
This shall be designed for remote control operation from switchboard in the
control room. In addition the tap changer shall include the followings:

a) An oil immersed tap selector and arcing switch for arc suppressing tap
selector, provided with reactor of resistor for reduction of make & break
arcing voltage and short circuits.

b) Motor driven mechanism.

c) Control and protection devices.

d) Local tap changer position indicator.

e) Manual operating device.

f) Pressure relief device

1.17.1.2 The on load tap changer shall be so designed that the contacts do not
interrupt arc within the main tank of the transformer. The tap selector and
arcing switch or arc suppressing selector switch shall be located in one or
more oil filled compartments. The compartment shall be provided with a
means of releasing the gas produced by the arcing. It shall be designed so as
to prevent oil in the tap selector compartment from mixing with the oil in the
transformer tank. A Buchholtz relay shall be provided to indicate accumulation
of gas and alarm thereof.

1.17.1.3 The tap changer shall be capable of permitting parallel operation with other
transformer of the same type.

Sign and Seal of Bidder Page 16 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.17.1.4 The transformer shall give full load output on all taps. The manual operating
device shall be so located on the transformer that it can be operated by an
operator standing at the level of the transformer track. It shall be strong and
robust in construction.

1.17.1.5 The control scheme for the tap changer shall be provided for independent
control of the top changers when the transformers are in independent service.
In addition, provision shall be made to enable parallel control also at times so
that the tap changers will be operated simultaneously, when one unit is in
parallel with another so that under normal condition the tap charger will not
become out of step and this will eliminate circulating currents. Additional
features like master, followers and visual indication during the operation of
motor shall also be incorporated.

1.17.1.6 Necessary interlock blocking independent control when the units arc in parallel
shall be provided.

1.17.1.7 Under abnormal conditions such as may occur, if the contactor controlling one
tap changer sticks, the arrangement must be such as to switch off supply, to
the motor so that an out of step condition is limited to one tap difference
between the units. Details of out of step protection provided for the taps
should be furnished in the bid.

1.17.1.8 The contactors and associated gear for the tap change driving motors shall be
housed in a local kiosk mounted adjacent to or on the transformer. The motor
shall be suitable for operation with 3 ph, 415 Volts, 50 Cycles external power
supply.

1.17.1.9 In addition to the above equipment, the supplier shall supply a separate panel
for installation in purchaser’s control room for remote operation with the
following accessories.

- Raise and lower push Button switch.

- Remote tap position Indicator of digital type, device for indicating ‘ON’ &
‘OFF’ of Fan / Motor / Pump of cooler control.

- Microprocessor based Annunciation

- Out of step relay and indication.

- Name-plate for each component. An alarm indication lamps showing


tap changing in progress.
- RTCC panel shall be compatible to SCADA operation.

- Any other accessory required for satisfactory operation or required


during detail engineering.

1.17.1.10 Complete particulars of the tap changing gear including the capacity of the
motor shall be stated in the bid.

Sign and Seal of Bidder Page 17 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.17.1.11 Tap changer shall be suitable for bidirectional power flow. The tap changer
rating shall be more than maximum rated current of transformer.

1.17.1.12 Manual control

The cranking device for manual operation of the OLTC gear shall be
removable and suitable for operation by a man standing at ground level. The
mechanism shall be complete with following:
a) Mechanical tap position indicator which shall be clearly visible
b) A mechanical operation counter
c) Mechanical stops to prevent over-cranking of the mechanism beyond the
extreme tap position
d) The manual control considered as back up to the motor operated load tap
changer control shall be interlocked with the motor to block motor start-up
during manual operation. The manual operation mechanism shall be
labeled to show the direction of operation for raising the HV terminal
voltage and vice-versa

1.17.2 Automatic Voltage Regulating Relays :

1.17.2.1 The AVR relay shall be provided, if asked in particular bid, as per
specification indicted in Annexure – I, The scheme shall detect (i) failure of
auxiliary supply, (ii) failure of PT supply and (iii) failure of mechanism to
complete the tap changing operation. The relay shall have necessary
contacts to be connected to the alarm & / or to the Annunciator available in
the panel for visual and audible indication of the failure of trip circuit. The
AVR relay shall be compatible to SCADA operation of any make. However,
the RTCC panel shall be fully operatable even in case of non utilization of AVR
relay.
1.17.2.2 All the necessary wiring shall be carried out in RTCC panel and schematic
drawings shall be submitted with the technical bid and during detailed
engineering for approval in duplicate.

1.18 OIL PRESERVING EQUIPMENT:

1.18.1 Air cell type conservator tank is to be provided for oil conservator system.
1.18.2 Bidder shall offer diaphragm type oil sealing in the conservator to prevent
oxidation and contamination of oil due to contact with water. In this type of oil
preservation system, conservator shall be fitted with a dehydrating filter
breather.
1.18.3 In this system, using a flexible Diaphragm shall prohibit contact of oil with
atmosphere or nitryle rubber reinforced nylon cloth air cell.
(a) Diaphragm used shall be suitable for continuous operation in an
atmosphere of 100 0C to which transformer oil is likely to rise.
(b) The connection of the air cell to the top of the reservoir shall be by an
air proof seal permitting entrance of air into the cell only.
(c) The diaphragm of the conservator shall withstand the vacuum during
installation and maintenance. Otherwise provision shall be made to
isolate the conservator from main tank during vacuum by providing

Sign and Seal of Bidder Page 18 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

vacuum sealing valve in the pipe connecting the main tank with the
conservator.

1.19 BUSHINGS:

1.19.1 The bushings shall have high factor of safety against leakage to ground and shall
be so located as to provide adequate electrical clearances between bushings and
grounded parts. Bushings of identical voltage rating shall be interchangeable. All
bushings shall be equipped with suitable terminals of approved type and size and
shall be suitable for bimetallic connection. The insulation class of the high voltage
neutral bushing shall be properly coordinated with the insulation class of the
bushings of the high voltage winding.

1.19.2 Each bushing shall be so coordinated with the transformer insulation that all flash
over will occur outside the tank.

1.19.3 All main winding and neutral leads shall be brought out through out door type
bushings which shall be so located that the full flashover strength will be utilized
and the adequate phase clearance shall realized.

1.19.4 All porcelain used in bushings shall be of the wet process, homogeneous and
free from cavities or other flaws. The glazing shall be uniform in colour and free
from blisters, burrs and other defects.

1.19.5 The bushings for 66 kV and above shall be of the oil filled condenser type (hermetically
sealed) and shall conform to the latest edition of IS: 2099 & IS: 3347. 36 kV bushings for
neutral shall be solid porcelain or oil communicating type. Dimensions shall confirm to IS:
2099 & IS: 3347 (Part – V). The characteristics of the oil used in the bushings shall be
the same as that of the oil in the transformer. Oil filled condenser type bushing shall
be provided with fittings viz. oil level gauge, oil filling plug, Tap for capacitance
and delta test, etc.

1.19.6 All bushings shall have puncture strength greater than the dry flashover value.

1.19.7 Main terminals shall be solder-less terminals and shall be suitable for ACSR
”Moose” Conductor. The spacing between the bushings must be adequate to
prevent flashover between phases under all conditions of operation.

1.19.8 Special adjustable arcing horns may also be provided for the bushings as per IS:
3716 - 1966.

1.19.9 The bidder shall give the guaranteed withstand voltages for the above and also
furnish a calibration curve with different settings of the co-ordination gap to the
purchaser to decide the actual gap setting. Bidder’s recommendations are also
invited in this respect.

1.19.10 Bushing CTs should be provided for REF protection as specified in Section –
II Cl. 2.5. The bushing shall be removable without disturbing the CTs.
1.19.11 Bushings of identical rating shall be interchangeable.

Sign and Seal of Bidder Page 19 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.19.12 The STC rating shall be 40 kA for 3 sec for 132 kV & above class and 25 kA
for 3 sec for 66 kV and below class.
1.19.13 The height of live part shall be so arranged that minimum clearance up
to plinth shall be maintained as per safety clearances from latest CBIP
guide.

1.20 COOLING:

1.20.1 AIR BLAST, FORCED COOLED OIL TRANSFORMERS:

1.20.1.1 Each cooler unit shall consist of a totally enclosed, oil immersed motor
pump and a forced air-cooled heat exchanger/radiators. Motor and pump
shall be enclosed in an oil tight container with motor leads brought through
hermetically sealed bushings. Each cooler unit shall be detachable from the
transformers without disturbing the oil in the transformer tank. Moving parts of
motor and pump shall be readily removable without dismantling of cooler and
with minimum spillage of oil. Fans shall be located so that they are readily
accessible for inspection and repair. Heat exchangers, fans and oil pumps
shall be completely interchangeable.

1.20.1.2 All cooler shall be attached to and mounted on the transformer tank.

1.20.1.3 Coolers shall be so designed as to be accessible for cleaning and painting to


prevent accumulation of water on the outer surfaces to completely drain oil in
the tank and to ensure against formation of gas pockets when the tank is
being filled.

1.20.1.4 ONAF/OFAF cooled transformers shall be provided with requisite number of


radiator banks (Minimum 2 nos). Besides the requisite number of oil pumps
and fans required for normal operation, each radiator bank shall be provided
with one standby fan and oil pump as applicable.

1.20.1.5 Cooler units shall be connected to the tank by machined steel flanges welded
to cooler units and to the tank and provided with gaskets. Each cooler unit
shall be provided with an indicating shut-off valve, which can be fastened in
either open or closed position. A separate oil-tight black flange shall be
provided for each tank connection for use when the cooler unit is detached.
Each cooler unit shall have a lifting eye, an oil drain at the bottom and a vent
at the top.

1.20.1.6 An oil flow indicator with alarm contacts shall be furnished with each pumps
assembly to indicate normal pump operation and direction of oil flow.

1.20.1.7 Fans or blowers for air blast cooling shall be mounted so as to ensure that no
damage to the coolers can arise from vibration of the fans. Wire mesh
screens shall be fitted to prevent accidental contact with the blades, the mesh
being not greater than 2.5 cm.

Sign and Seal of Bidder Page 20 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.20.1.8 In cases of ONAN / ONAF / OFAF type cooling, the transformer shall be
capable of giving a continuous output of at least 50 % of rated full output with
all the artificial cooling out of service and without exceeding the temperature
rise. In case of ONAN / ONAF type of cooling the transformer shall be
capable of giving continuous output of at least 75 % of the rated full output
with all the artificial cooling out of service and without exceeding temperature
rise. In case of ONAN or ONAF type of cooling, the transformer shall have
two sets of radiators.

1.20.1.9 For OFAF cooled transformers with ONAN rating, piping system shall permit
bypassing of oil pump and operation of the transformer at the ONAN rating, in
case forced oil system develop any troubles.

1.20.1.10 ONAN / ONAF / OFAF cooled transformers shall be designed to operate at


no load for 4 hours without any cooler unit in service. ONAN / ONAF cooled
transformers shall also be capable of delivering its rated MVA for 20 minutes
with the loss of oil cooling equipment while the transformer is carrying full
load.
1.20.1.11 The cooling fan shall be operated at 2 sets of temperatures for fan GR I & II.
The oil pump shall be also operated by WTI.

1.20.2 NATURAL OIL COOLED TRANSFORMER :

1.20.2.1 The radiating section / tubes provided shall have sufficient cooling surface to
limit the temperature rise to the values specified under Clause 1.13 of this
specification. The radiating sections / tubes shall be connected to the tank
cooler assembly headers by machined steel flanges with adequate gaskets to
avoid oil leakage. Each radiator unit shall be provided with positive operated
gate type oil leak proof shut-off valve, which can be fastened in either closed
or open position and separate oil tight flange shall be provided for each tank
connections for use when the radiator unit or cooler assembly is detached. It
shall be possible to take out any of the radiating tubes without disturbing the
transformers. Each radiator unit shall have a lifting arrangement and oil drain
at the bottom and a vent at the top.

1.20.2.2 The radiators shall be so designed as to prevent any accumulation of water


on the outer surface or formation of gas pockets when the tank is being filled.

1.20.3 COOLER CONTROL:

1.20.3.1 Cooler units shall be suitable for operation with 415 Volts, 3 phase, 50 Hz
external power supply.

1.20.3.2 Control equipment for oil pump and for motors shall be mounted in a
marshalling cabinet adjacent to the transformer and it shall include the
necessary contactors with automatic control and annunciation equipment and
provision for manual control.

1.20.3.3 A single metal enclosed main isolating switch with Miniature Circuit Breakers
shall be provided for the cooling plant contactor group.

Sign and Seal of Bidder Page 21 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.20.3.4 The switching in or out of the cooling equipment shall be controlled by


winding temperature and there shall be provision for automatic switching in or
out at pre-determined temperature levels which should be capable of
adjustment and setting at will. Hunting of the cooling equipment should be
avoided by suitable auxiliary timer relay.

1.20.3.5 The bidder shall specify the loading of the transformers in case of failure of
one or more set of fans or pumps.

1.20.3.6 In case of ONAN / OFAF cooled transformers, provision of automatic


changeover from main supply to stand by auxiliary supply should be available
in case of failure of main supply. Necessary alarm etc. for this may also be
included.

1.20.3.7 The bidder shall provide for blower indicator in the cooling circuit in the remote
control panel.
Following lamp indications with annunciation shall be provided in cooler
control cabinet
a) Control supply failure
b) Cooling fan failure for each bank
c) Cooling pump failure for each pump
d) No oil flow or Reverse flow for pumps
e) Common thermal overload trip
One potential free initiation contact for all the above conditions shall be wired
independently to the terminal blocks of cooler control cabinet.

1.20.3.8 The fan circuit shall be operated at different Temperature for group I fans and
group II fan from WTI. The pump circuit shall be also operated from same
WTI contacts at diff. Temp.

1.20.3.9 The connection shall be bolted type having CB – 30 and CT connector shall
be of link type it can be shorted for testing or checking circuit.

1.21 CENTRE OF GRAVITY:

1.21.1 The center of gravity of the assembled transformer shall be low and as near the
vertical centerline as possible. The transformer shall be stable with or without oil.

1.22 ACCESSORIES:

1.22.1 Each transformer shall be provided with the following accessories.

I) Dial Image sensing type thermometers for oil:


a) For ONAN / ONAF and ONAN / OFAF Transformers:
The dial type indicating thermometers of robust baton mounted on
the side of the transformer at a convenient height to read
temperature in the hottest part of the oil and fitted with alarm and

Sign and Seal of Bidder Page 22 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

trip contacts and contacts for switching in and switching out the
cooling system at pre-determined temperatures.
b) For OFAF Transformers:
A dial Image sensing type thermometer for indicating oil
temperature fitted with maximum pointer and adjustable alarm and
trip contacts.

ii) On winding hot spot thermometer detector in one winding of each


phase as under:
a) For ONAN / ONAF & ONAF / ONAF Transformers:
It shall be indicating type, responsive to the combination of top
temperature and winding current, calibrated to follow the hottest
spot temperature of the transformer winding. The winding
temperature detector shall operate a remote alarm and trip at pre-
determined independent temperature in the event the hottest spot
temperature approaches a dangerous value.
b) FOR ONAN / ONAF & ONAN / OFAF type transformers:
In case of ONAN / ONAF or ONAN / OFAF type transformers, it
shall automatically actuate the fans / pump also.
c) Accuracy class of WTI shall be +/- 1.5% or better.
d) Any special cable required for shielding purpose, for connection
between cooler control cabinet and remote WTI control circuit, shall
be in the scope of supplier. Only one RWTI with a four point
selector switch shall be provided for all the windings.

iii) One magnetic type oil level gauge with low alarm contacts and dial
showing minimum, maximum and normal oil levels. The gauge shall
readable from the transformer base level. A low gas pressure electric
alarm device shall also be provided, if the transformer is equipped with
inert gas pressure equipment.

iv) One oil-filling valve (inlet).

v) One oil drain valve.

vi) One filter valve located at the top of tank on the HV side.

vii) One filter valve located near the bottom of tank of the HV side of the
transformer.

viii) Oil sampling devices.

ix) Pressure relief device:


A safety valve of the chimney type with an equalizer pipe inter-
connecting the top of the conservator and upper most part of the safety
valve should be provided to prevent rise of oil in the safety valve, pipe.
A stopcock should be provided in the inter-connecting pipe. An air
release cock shall also be fitted in convenient position. The safety valve
pipe shall preferably take off from the side of the transformer tank near
to the tank cover and not from top of tank cover.

Sign and Seal of Bidder Page 23 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

x) A Buchholz relay with alarm and tripping contacts to detect


accumulation of gas and sudden changes of oil pressures, complete
with two shut-off valves and flange coupling to permit easy removal
without lowering oil level in the main tank, a bleed valve for gas
venting and test valve. The relay shall be provided with a test cock
suitable for a flexible pipe connection for checking its operation &
taking gas sample. A copper or Stainless Steel tube shall be
connected from the gas collector to a valve located at 1200 mm above
ground level.

xi) Heat exchangers or radiators complete with pumps, motors, fans etc.,
described in Clause 1.20.

xii) a) An oil conservator or


b) Oil preserving equipments complete in all respect as described in
Clause 1.18.

xiii) Eye bolts and lugs on all parts for ease of handling.

xiv) Four grounding terminals.

xv) Diagram and rating plate.

xvi) One set of equipment for control, protection, indication and


annunciation for each transformer comprising motor contactors,
detecting elements or devices, indicating apparatus, instruments
relays, annunciations etc.

xvii) Suitable weatherproof cubicle for housing the control equipment,


terminals blocks etc, (one for each transformer) and one indoor cubicle
for each transformer for remote control of radiators, on load tap
changer alarm and indicating devices.

xviii) Dehydrating Filter Breather


Silica gel breather to be fitted with conservator shall be designed such
that:
a) It is of clear view type design so that moisture absorption indication
by change in colour of silica gel is visible from a distance
b) Passage of air is possible through silica gel only
c) Height of breather mounting shall not be less than 1200 mm from
rail top level
d) Size of breather shall be such that it content 5 kG of silica gel in it
e) The nos. of breathers shall be Three or more as required for main
conservator and shall be Two for OLTC conservator
f) Silica gel is isolated from atmosphere by an oil seal.

xix) Conservator and buchholtz relay for on load tap changer.

xx) Suitable terminal connectors for HV, LV & Neutral bushings.

Sign and Seal of Bidder Page 24 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

xxi) Suitable ladder or climbing devices.

xxii) Tap changer remote control panel complete with all accessories to be
installed in the Purchaser’s control room.

xxiii) A twin tinned copper strip grounding conductor of 50 x 6 mm size


shall be provided from the neutral terminal to transformer base for
connection to the sub-station grounding grid. Necessary pin insulator,
clamps, bolts etc. shall be supplied for this grounding purpose. Neutral
bushing to grounding conductor shall be made through twin copper
flexible strip of size 50 x 10 mm.
xxiv) Inspection opening and covers
xxv) Protected type mercury or alcohol in glass thermometer
xxvi) Bottom and top filter valves with threaded male adaptors, bottom
xxvii) Rating and diagram plates on transformer and auxiliary apparatus
xxviii)Flanged bi-directional wheel with anti earth quake clamps
xxix) Cooler control cabinet
xxx) Bushing CTs
xxxi) Oil flow Indicator
xxxii) On Load Tap Changing Gear
xxxiii)Drain valves/plugs shall be provided in order that each section pipe work can
be drained independently
xxxiv) Terminal Marking plates of Stainless Steel sheet having minimum thickness
of 2 MM
xxxv) Valves Schedule plates of Stainless Steel sheet having minimum thickness
of 2 MM
Any other fitting / accessories other than listed above, required for
satisfactory operation of the transformer are deemed to be included

1.22.2 The equipment and accessories furnished with the transformer shall be suitably
mounted on the transformer for satisfactory operation, Inspection and
maintenance and the mounting details shall be subject to the approval of the
purchaser. All valves shall be provided either with blind companion flanges or
with pipe plugs for protection.

1.22.3 Indication, alarm and relay equipment shall have contacts suitable for operation with
110 V/220 V D.C. Supply.
1.22.4 All cables from all equipment/device shall be arranged by manufacturer with proper
clamping arrangement
Any other accessories or appliances recommended by the manufacturer for the
satisfactory operation of the transformer, shall be given and indicated in the bid.

1.23 TERMINALS:

1.23.1 The bushing shall be equipped with terminals suitable for connection with
ACSR Zebra / Moose / Panther conductor. The short time current rating of
connector shall be of 40 kA /3 see for HV and 25 kA/3sec for LV & neutral.

1.24 CURRENT TRANSFORMERS:

Sign and Seal of Bidder Page 25 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.24.1 The bidder shall include in the scope of supply the multi ratio type turret
mounted current transformer on all phases of HV, LV & neutral leads of the
power transformers for restricted earth fault protection, as well as for standby
earth fault protection.

1.25 TERMINAL MARKING:

1.25.1 Each terminal including the neutral shall be clearly marked on both the primary
and secondary side in accordance with the diagram of connection supplied with
the transformers.

1.26 CLEANING AND PAINTING:

1.26.1 Before painting or filling with oil or compound oil, un-galvanized parts shall be
completely cleaned and free from dust, sealed and grosses and all external
rough surfaces on casting shall be filled by metal deposition. The interior of oil
transformer tanks and other filled chambers and internal structural steel work
shall be cleaned of all sealed and rust by send blasting or other approved
method. These surfaces shall be painted with an oil resisting varnish or paint.

1.26.2 Except for nuts, bolts and washers all external surfaces shall receive a minimum
of three coats of paint. The primary coat shall be applied immediately after
cleaning. The second coat shall be of oil paint of weather resisting nature. The
final coat shall be of a glossy, oil and weather resisting non-fading paint.

1.26.3 All internal surfaces of mechanism chambers and kiosk except those, which
have received anticorrosion treatment, shall receive three coats of paints
applied to the thoroughly cleaned metal surfaces. The final coat shall be of light
coloured anti-condensation mixture. Any damage to paint work incurred during
transport and erection shall be made good by thoroughly cleaning the damaged
portion and by applying full number of coats of paints.

1.27 PACKING AND TRANSPORT:


1.27.1 Transportation:

The bidder shall dispatch the transformer filled with oil or in an atmosphere of
Nitrogen or dry air. In the former case the bidder shall take care of the weight
limitation on transport and handling facility at site. In the latter case,
necessary arrangement shall be ensured by the bidder to take care of
pressure drop of Nitrogen or dry air during transit and storage till completion
of oil filling during erection. A gas pressure testing valve with necessary
pressure gauge and adaptor valve shall be provided. The transformer shall
be fitted with sufficient number of impact recorders during transportation to
measure the movement due to impact in all three directions.

1.27.2 All parts shall be adequately marked to facilitate field erection.

1.27.3 In case of synthetic resin bonded paper type bushing is offered; special
attention shall be paid in packing so as to avoid moisture ingress. The details
of the bushing and the method of packing shall be stated in the bid.

Sign and Seal of Bidder Page 26 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.28 LABLES:
labels shall be provided for all apparatus such as relays, switches, fuses contained in
cubicles or marshalling kiosk.

1.28.1 Labeling shall be clear, concise and adequate and shall be of standard size.

1.28.2 Descriptive labels for mounting indoor or inside cubicles and kiosk shall be of
material that will ensure permanence of the lettering. Danger notices shall have
red lettering on a white background. All plates shall be of material, which will not
be corroded.

1.28.3 Lables shall be attached to panels with brass screws or with steel screws, which
have received rust preventive treatment.

1.29 INSPECTION:
a) The bidder shall carry out a detailed inspection and testing program for
manufacturing activities of the various components. An indicative
program of inspection as envisaged by the Engineer is given below. This
is not, however, intended to form a comprehensive program, as it is
bidder’s responsibility to draw up and carry out such a program duly
approved by the Engineer.
b) Cost of Inspection / test is to be borne by the bidder.
c) Additional tests, if required, are to be deemed as included in scope of
work.
d) Stages of inspection and owners participation would be defined and tied
up at the time of award of contract.

TANK AND CONSERVATOR:


a) Certificates of chemical analysis and material tests of plates.
b) Welder’s and weld procedure qualification.
c) Testing of electrodes for quality of base materials.
d) Inspections of major weld preparation.
e) Crack detection of major strength weld seams by dye penetration test.
f) Measurement of film thickness.
i) Oil insoluble varnish.
ii) Zinc chromate paint.
iii) Light gray paint.
g) Check correct dimensions between wheels, demonstrate twining of
wheels through 900 and further dimensional check.
h) Check for physical properties of materials for lifting lugs jacking pad etc.
All load bearing welds including lifting lug welds shall be subjected to
NDT.
i) Leakage test of the conservator.
j) Certification of all test results.

CORE:

Sign and Seal of Bidder Page 27 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

a) Samples testing of core material for checking specific loss, bend


properties, magnetization characteristics and thickness.
b) Check on the quality of varnish if used on the stampings.
c) i) Measurement of thickness and hardness of varnish on stampings.
ii) Solvent resistance test to check that varnish does not react in hot
oil.
iii) Check over all quality of varnish on stamping to ensure uniform
shining, colour, and no bars spots; No over burnt varnish layer and
no bubbles on varnished surface.
d) Check on the amount of burrs.
e) Bow check on stampings.
f) Check for the overlapping stampings. Corners of the sheets are to be apart.
g) Visual and dimensional check during assembly stage.
h) Check for inter laminar insulation between core sections before and after
pressing.
i) Check on completed core for measurement of iron loss and check for any
hot spot by exciting the core so as to induce the designed value of flux
density in the core. The losses shall be actually measured on built up core
with dummy turns or can be demonstrated through suitable software to
GETCO representative and the report for the same shall be submitted.
However, during final inspection the losses shall be actually measured &
the same shall be within guaranteed losses.
j) Visual and dimensional checks for straightness and roundness of core,
thickness of limbs and suitability of clamps.
k) High voltage test (2 kV for one minute) between core and clamps.
l) Certification of all test results.

INSULATING MATERIAL:
a) Sample check for physical properties of material.
b) Check for dielectric strength.
c) Visual and dimensional checks.
d) Sample check on insulating paper for pH Value, electric strength
e) Check for the reaction of hot oil on insulating materials.
f) Certification of all tests results.

WINDING:
a) Sample check on winding conductor for mechanical properties and
electrical conductivity.
b) Visual dimensional checks on conductor for scratches, dent marks etc.
c) Sample check on insulating paper for PH value, electric strength.
d) Check for the reaction of hot oil on insulating paper.
e) Check for the bonding of the insulating paper on conductor.
f) Check for absence of short circuit between parallel strands.
g) Check and ensure that physical condition of all materials taken for
winding is satisfactory and free of dust.
h) Check for brazed joints wherever applicable.

Sign and Seal of Bidder Page 28 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

i) Measurement of voltage to be carried out when core / yoke is completely


restacked and all connections ready.
j) Conductor enamel test for checking of cracks, leakage and pin
holes
k) Conductor flexibility test
l) Heat Shrinkable test for enameled wire
m) Certification of all test results

CHECK BEFORE DRYING PROCESS:


a) Check conditions of insulation in the conductor and between the windings.
b) Check insulation resistance between high voltage connection cable and
earth other live parts.
c) Check insulation resistance between low voltage connection and earth &
other parts.
d) Insulation test of core earthing.
e) Check for proper cleanliness and absence of dust etc.
f) Certification of all test results.

CHECK DURING DRYING PROCESS:


a) Measurement and recording of temperature and drying time during
vacuum treatment.
b) Check for completeness of drying.
c) Certification of all test results.

ASSEMBLED TRANSFORMER:
a) Check completed transformer against approved outline drawing, provision
for all fitting, finish level etc.
b) Taking test on all the assembled transformers.
The contractor shall also prepare a comprehensive inspection and
testing program for all bought out / sub-contracted items and shall submit
the same to the Engineer for approval. Such program shall include in
following:
i) Buchholtz Relay.
ii) Sudden pressure rise relay.
iii) Axles and wheels.
iv) Winding temperature indicator for local and remote mounting.
v) Oil temperature indicators.
vi) Bushing.
vii) Bushing Current Transformer.
viii) Terminal connectors
ix) Radiators, cooler control and any other item, as desired by purchaser.
c) Test to check effective shielding of the tank
d) Jacking test with oil on all the assembled transformers
e) Dye penetration test shall be carried out after the jacking test

PRE-SHIPMENT CHECKS AT MANUFACTURER’S WORKS:

Sign and Seal of Bidder Page 29 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

a) Check for interchangeability of component of similar transformer for


mounting dimensions.
b) Check for proper packing and preservation of accessories like radiators,
bushings, PRV, dehydrating breather, rollers, buchholtz relay, control
cubicle, connecting pipes, conservator tank.
c) Check for proper provision of bracings to arrest the movement of core
and winding assembly inside the tank.
d) Gas tightness test to conform tightness.
e) Derivation of leakage rate and ensure adequate reserve gas capacity.

INSPECTION AND TESTING AT SITE:


The successful bidder shall carry out a detailed inspection and testing
program for field activities, namely, covering area right from the receipt of
materials stage upto commissioning stage. An indicative program of
inspection as envisaged by the Engineer is given below:

This is however not intended to form a comprehensive program, as it is


bidder’s responsibility to draw up and carry out such a program duly
approved by the Engineer.

RECEIPT AND STRORAGE CHECKS:


a) Check and record condition of each package, visible part of transformer
etc. for any damage.
b) Check and record the gas pressure in the transformer tank as well as in
the cylinder.
c) Visual check for welding of core and coils before filling up with oil and also
check condition of core and winding in general.

1.30.1 INSTALLATION CHECKS:

Test on oil samples taken from main tank top and bottom and cooling system
as per IS: 335. Sample shall be taken only after the oil has been allowed to
settle for 24 hours.
1.30.1.1 Check the whole assembly for tightness, general appearance etc.
1.30.1.2 Oil leakage tests.
1.30.1.3 The contractor shall warrant that oil furnished is in accordance with the
specifications given in this specification.
1.30.1.4 Capacitance and tan delta measurement of bushings before fixing / connecting to
the winding. Bidder shall furnish these values for site reference.
1.30.1.5 Sweep Frequency Response Analysis (SFRA) test

1.30.2 COMMISSIONING CHECKS:


a) Check the colour of silica gel breather.
b) Check the oil level in the breather housing, conservator tank, cooling
system, condenser bushing etc.
c) Check the bushings for conformity of connection to the line etc.

Sign and Seal of Bidder Page 30 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

d) Check for correct operation of oil protection and alarms.


i) Buchholtz relay.
ii) Excessive winding temperature.
iii) Low oil flow.
iv) Excessive oil temperature.
v) Low oil level indication.
e) Check for adequate protection on electric circuit supplying the
accessories.
f) Insulation resistance measurement for
i) Control wiring.
ii) Main winding.
g) Check for cleanliness of the transformer and the surrounding.

1.30.3 TESTING:
The transformer shall be tested in the presence of purchaser’s
representative. All tests (routine and type tests) shall be witnessed by him. All
the tests shall be performed in compliance of IS: 2026 - 1962 (as amended
up to date). All the instruments, meters, etc., used for testing shall be
duly calibrated at NABL laboratory and necessary calibration certificate
shall be made available during inspection. The following tests shall be
carried out on the transformer.

1.30.3.1(a) ROUTINE / ACCEPTANCE TESTS:


All the tests shall be performed in compliance of IS:2026 (as amended up to
date) with dielectric tests corresponding to Method 2 and losses with 3
phase 4 wire digital power meter shall be carried out on each transformer:
a) Resistance of each winding.
b) Turn ratio for all sets of windings on each tap, with percentage error
c) Polarity and phase relation ship.
d) Impedance between each pair of winding.
e) Excitation losses at 90, 100 and 110 % rated voltage measured by the
average voltmeter method.
f) Positive phase sequences impedance measurement on three phase
transformers.
g) Regulation at rated load and unity, 0.9, 0.8 lagging P.F.
h) Load losses, measured at rated frequency, by applying a primary
voltage sufficient to produce rated current in the windings with the
secondary windings short-circuited.
i) Separate source voltage with stand test.
j) Induced over voltage with stand test.
k) Auxiliary losses (fans. Pumps etc.)
l) SFRA test
m) Zero Sequence impedance test
n) Tests on tap-changer (IEC:214)
o) Tan delta & capacitance test for bushings and windings

Sign and Seal of Bidder Page 31 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

p) Tests on transformer oil including DGA on selected sample as per


IS:9434/IEC:567, before and after temp rise test and at final stage
before dispatch. Corrosive sulphur detection test as per ASTM D1275
subjecting oil for 150oC for 48 hrs.
q) Magnetic Circuit test: After assembly of each core shall be tested at 2 kV
between side plates, structural steel works etc. for 1 Minute
r) Tank leak test at 5 psi (35 kN/m2) for 12 hrs with oil & 1 hr with air.
s) Magnetic Balance & current test on all winding
t) HV withstand test on auxiliary equipments and wiring
u) Measurement of Insulation Resistance
v) Measurement of acoustic noise level
w) Measurement of harmonics of no load current
x) Measurement of Partial Discharges of transformer
y) Vacuum test for tank at 25 bar for 1 hr.
z) Measurement of no load current with 415 V AC supply on LV side.
aa) Tests on air cell.
bb) Temperature rise test as per cl. 1.30.3.1(b)(i) with DGA at initial, after
Temp rise test and at final stage before dispatch.
cc) Lightning impulse test
dd) ACLD test (For 220 kV class transformer)
All the routine/acceptance tests shall be carried out on transformer filled with
oil to be supplied and fitted with all accessories to be supplied with transformer.
1.30.3.1(b) TYPE TESTS:
Following type test reports as specified in IS: 2026 (amended up to date) shall
be submitted for the offered type rating of transformer, invariably with the
technical bid. Bid without type test reports will not be considered for
evaluation. The type test reports shall not be older than FIVE years and shall
be valid up to expiry of validity of offer.

i) Temperature rise test


The temperature rise test shall be conducted at a tap for the worst
combination of loading. Supplier before carrying out such test shall submit
detailed calculation showing alternative possible, on various taps and for
three types of ratings of the transformer and shall recommend that results in
highest temperature rise for the test.

Gas chromatographic analysis on oil shall also be conducted before and after
this test and the values shall be recorded in the test report. The sampling
shall be in accordance with IEC 567. For the evaluation of the gas analysis in
temperature rise test the procedure shall be as per IS:9434 (based on
IEC:567) and results will be interpreted as per IS:10593 (based on IEC:599).

ii) Impulse tests shall be made on three limbs of transformer. The test
sequence shall be with chopped wave.
iii) Vacuum and pressure test on tank
iv) Tests on OLTC

Sign and Seal of Bidder Page 32 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Important note for type tests: The type test report shall be submitted for the offered class
and rating of transformer. However, the type test report for higher class/rating can be accepted
for scrutiny of technical bid but the same test/s shall have to be carried out on the offered
class/rating transformer. Bidder shall invariably confirm to carry out the required type test/s,
special tests, before commencement of supply, without affecting delivery schedule, free of cost,
at NABL approved laboratory, or at suppliers works in presence of GETCO representative, in the
event of order.

1.30.3.1(c) SPECIAL TEST:


Following test reports shall be submitted for the offered type
rating of transformer & bought outs, invariably with the
technical bid.
i) Zero phase sequence impedance measurement.
ii) Degree of protection (IP55) for control cabinets & RTCC panel, OLTC
driving mechanism, terminal boxes of PRV, MOG, Buchholz Relay,
pump motors, fans, etc.
iii) Short Time Current withstand test on offered HV and LV terminal
connectors for 40 kA 3 sec for 220 kV and 132 kV class and 25 kA for 3
sec for 66 kV & below class.
iv) Measurement of acoustic noise level
v) Measurement of power taken by all auxiliaries
vi) Measurement of harmonic level in no load current
viii) Measurement of transferred surge in LV due to Lightning impulse on HV
& LV.
ix) ACLD test (for 132 kV class transformer)

1.30.3.1(d) CALCULATIONS:
a) Thermal and Dynamic ability to withstand terminal short circuits
b) Cooling calculations for ONAN, ONAF & OFAF.

If the above tests are carried out at bidder works then the bidder shall have to
repeat these tests again on any one unit without affecting delivery schedule
at no extra cost to GETCO. The necessary confirmation shall invariably be
submitted with the technical bid otherwise the offer shall be evaluated
accordingly.

1.30.3.2 Radiators, valves and other parts necessary for complete transformer shall
be tested for leaks and strength applying to the complete tank filled with oil
air pressure not less than 0.7 atmosphere for a period of 24 hours or not
less than 1.0 atmosphere for a period of 6 hours.

1.30.3 TEST ON TRANSFORMER TANK:


In addition to the routine tests on welds in the tank, the following type tests
shall be carried out on one of the transformer tanks in presence of GETCO
representative.

1.30.3.1 VACUUM TEST:

Sign and Seal of Bidder Page 33 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

The transformer tank without oil shall be subjected to a vacuum of 760 mm of


mercury. The permanent deflection of the flat plates after removal of vacuum
shall not exceed the values specified below.

Horizontal length of plate (mm) Permanent deflection(mm).


Below 760 5
760 to 1270 6
1300 to 1780 8
1800 to 2030 10
2050 to 2280 11
2300 to 2540 13
2560 to 3050 16
3075 and above 19

1.30.3.2 PRESSURE TEST:


The transformer tank along with radiators, conservator and other fittings shall
be subject to a pressure corresponding to twice the normal head of oil in the
transformer or normal pressure plus 0.36 Kg / Sq. cm, whichever is lower.
The permanent deflection of plates after release of excess pressure shall not
exceed the figures specified under vacuum test.

1.30.3.3 PRESSURE RELIEF TEST:

Pressure Relief Device with its diaphragm in position shall be subject to an


increasing oil pressure. This device shall operate before reaching the
pressure specified in the pressure test at above. Following routine tests shall
be performed on PRD
i) Air pressure test
ii) Liquid pressure test
iii) Contact test
iv) Leakage test
v) Dielectric test

1.30.4 TEST AT SITE:


After erection at site, the transformer shall be subject to the following tests:
i) Insulation resistance test.
ii) Ratio and polarity test.
iii) Dielectric test of oil.
(iv) Temperature rise test with maximum possible load.
(v) SFRA test

1.30.5 TYPE TESTS ON BOUGHT OUT ITEMS:

1. Bushing (Type test as per IS:2099/IEC:137)


2. OLTC (Temp Rise of contact, Short circuit current test, Mechanical test &
Dielectric test as per IEC:214 and IP:55 test on driving mechanism
box)
3. Buchholz relay (as per IS:3637) & IP-55 on terminal box

Sign and Seal of Bidder Page 34 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

4. Air cell (Flexible air separator) – Oil side coating, Air side under coating,
Air side outer coating and coated fabric as per
IS:3400/BS:903/IS:7016.
5. Oil pump – vacuum test, oil pressure test at 1 kg/cm2 for 24 hrs.,
Temperature rise test by resistance method, IP-55 for terminal box.
6. Cooling fan and motor assembly – Free air delivery, Temperature rise,
sound level, running at reduced voltage, IP-55 for terminal box.
7. MOG & terminal box for IP-55 degree of protection

1.31 TESTS ON OLTC:

1.31.1 The various test (routine and type) as stipulated in the IEC Publication No. 214 -
1966 (as amended upto date) shall be carried out.

1.32.2 Type test certificate copies of oscillogram as called for in IEC Publication No.
214 shall be furnished by the supplier.

1.32 TEST REPORTS:

1.32.1 After all the tests have been completed 4 copies of each test report shall be
furnished to the purchaser for this approval prior to the dispatch of equipment.
Soft copy of test reports for tests results obtained from software shall be
submitted for approval and record.

1.32.2 All the reports of inspections like stage, acceptance, routine & type tests
carried out on each transformer including test certificates for bought out
items, in bound volume, shall be submitted before dispatch. Also one copy
shall be sent along with transformer.

1.33 FURTHER TESTS:

The purchaser reserves the right of having any other reasonable test carried
out at his own expense to ensure that the transformer complied with the
requirements of this specification.

1.34 LOSS/DAMAGES:

1.34.1 The Purchaser shall not be responsible for any damage to the equipment during
commissioning if such damage results from faulty or inadequate action.

1.34.2 Seller shall not be liable for any loss, damage or injury to property or persons at
the installation site unless such damages or injuries are caused by any and or
negligence of the supervising erector.

1.35 TECHNICAL AND GUARANTEED PARTICULARS:

The bidder shall furnish all guaranteed technical particulars as called for in
Section - III, Schedule - A of this specification. Particulars, which are subject

Sign and Seal of Bidder Page 35 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

to guarantee, shall be clearly marked. Bids not containing this information are
likely to be rejected.

1.36 INSRUCTION MANUALS:

1.36.1 Six copies of operation, maintenance and erection manuals in English


language for each transformer shall be supplied with dispatch of the
equipment. The manuals shall be bound volumes and shall contain all the
drawings and information required for erection, operation and maintenance of
the transformer. The manuals shall include amongst other the following
particulars:

a) Marked erection prints identifying the component parts of the


transformer as dispatched with the assembly drawings.

b) Detailed dimensions, assembly and description of all the components.

1.37 DEVIATION FROM SPECIFICATION:

All deviations from this specification shall be separately listed in specified


Schedule, in the absence of which, it will be presumed that the provision of
the specification are complied with by the bidder.

1.38 TRANSFORMER LOSSES & EVALUATION OF BID:


The transformers are to be designed with minimum permissible losses.

1.38.1 The quoted losses shall be considered as maximum, without any positive
tolerance. The bidders are, however, at liberty to quote the guaranteed
losses. The evaluation of the offer shall be done on basis of maximum
guaranteed loss.

In case of any order, if the figure/s of losses during test are found, higher than
the figures guaranteed for maximum losses without any positive tolerance on
individual components of losses, the transformer will, at the option of the
purchaser / owner be rejected, or accepted with the reduction in prices as
under. The measurement of losses shall be carried out with 3 (Three) Watt
meter method only and CTs, PTs and meters used for these measurements
shall be of class of accuracy of 0.2.

However, no weight age shall be given for supply of transformer, with


losses (measured during routine tests) less than the guaranteed losses.

1.38.2 For the purpose of evaluation of bids, the quoted losses shall be compared for
all the bidders of particular tender.
The following formula adopted by the GETCO for working out comparable costs
with difference in prices and losses is:
Capitalized cost of transformer = IC + 1,60,000 Wi + 70,000 Wc + 60,000 Wp

Sign and Seal of Bidder Page 36 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Where, IC = Cost of Transformer; Wi = Iron losses in KW; Wc=


Copper losses in KW; Wp = Auxiliary loss in KW.

1.39 PENALTY FOR HIGHER LOSSES:

In case of order if the figures of losses measured during tests or in service


are found to be higher than the figures guaranteed, at the option of the
GETCO, will be rejected or accepted with the reduction in price as under.

For Iron loss = Rs. 1,60,000/- per kW


For Copper loss = Rs. 70,000/- per kW
For Auxiliary loss = Rs. 60,000/- per kW

1.40 REJECTION:

1.40.1 The Purchaser may reject transformer, if any of the following conditions
during or service arises:

i) No load losses or load losses exceed the guaranteed value.


ii) Impedance value exceeds the guaranteed value by + 10% or more.
iii) Oil or winding temperature rise exceeds the specified value by 5 deg. C.
iv) Transformer fails on impulse test.
v) Transformer fails on power frequency voltage withstand test.
vi) The difference is impedance values of any two phase during single
phase short circuit impedance test exceeds 2% of the average value
guaranteed by the manufacturer / contractor.
vii) Transformer is proved to have been manufactured not in accordance
with agreed specification.

1.40.2 The Purchaser reserves the right to retain the rejected transformer and use it
until the bidder replaces the defective transformer by a new transformer,
within a reasonable period, at no extra cost to the GETCO. In such case the
transportation, loading, unloading on plinth, inspection, erection, testing &
commissioning charges shall be bourn by the bidder.

1.41 TRAINING TO ENGINEERS:

1.41.1 The successful bidder will be required to grant facilities for training to
minimum two Engineers to be nominated by the GETCO, in his works and
more particularly in the manufacture, assembly, operation and maintenance
of transformer. The bidder should please state the general condition of
training and number of Engineers and duration of training for whom such
training will be arranged by him.

1.41.2 Bidder shall at his cost arrange for the above training facilities and in addition
shall bear all living expenses. The Purchaser shall only pay to and fro
passage of the trainees. Bidder shall indicate following in the prices schedule.

Sign and Seal of Bidder Page 37 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

a) The lump sum amount of training for the above training facilities.
b) Price reduction / addition for number of trainees specified herein.

1.42 Guarantee period will be reckoned from the date of receipt of 100 %
accessories and not from the date of receipt of main tank only.

1.43 If GETCO Engineer will return without inspection of offered equipments due
to non-readiness of materials at their works than financial loss to the GETCO
deputing their representative will be recovered from the concerned supplier.

1.44 TRANSFORMER OIL:

1.44.1 (1) Manufacturers / Suppliers will have to supply the transformer oil as per
GETCO’s Specification of Transformer oil attached herewith at Annexure
- A.

(2) At the time of inspection of transformer, bidder has to furnish the


certificate / test reports of transformer oil purchased. Same should be
meeting to GETCO’s transformer oil specification. At the time of
inspection of the each power transformer, the supplier of the transformer
shall arrange to take a sample of the transformer oil from the power
transformer under testing in presence of GETCO’s representative and
the supplier shall arrange at their cost the testing of the transformer oil
sample as per Cl. 5.3 of IS: 1866 - 1994 with latest amendments thereof
at M/s. ERDA or any other Govt. recognized laboratory to confirm the
quality of the transformer oil. The result of the same shall be submitted
for approval.

(3) After commissioning the transformer at site, in presence of


representative, commissioning Engineer of Supplier of transformer, 2
nos. of joint samples may be collected and sealed. One sample will be
sent for testing as per Cl. 5.3 of IS: 1866 - 1994 with latest amendments
thereof to M/s. ERDA, Baroda or Government approved Laboratory to
confirm the quality of transformer oil and second sample will be
preserved. In case of dispute for results of first sample, 2nd sample
should be got tested through any other approved test house by GETCO
and results shall be binding to suppliers.

1.45 QUALITY ASSURANCE PLAN:


The bidder shall invariably furnish following information's along with his offer,
failing which his offer shall be liable for rejection. Information shall be
separately given for individual type of equipments offered.
1. QAP for incoming material, in process and final checks and testing.
2. Statement giving list of important raw materials, names of sub suppliers for
the raw materials, list of standard according to which the raw materials are
tested. List of tests normally carried out on raw materials in presence of
bidder's representatives, copies of test certificates.
3. Information and copies of test certificates as in (i) above in respect of bought
out accessories.

Sign and Seal of Bidder Page 38 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

4. List of manufacturing facilities available.


5. Level of automation achieved and list of areas where manual processing
exists.
6. List of areas in manufacturing process, where stage inspections are
normally carried out for quality control and details of such tests and
inspections.
7. Special features provided in the equipment to make it maintenance free.
8. List of testing equipments available with the supplier for final testing of
transformer specified and test plant limitation, if any, for the special
acceptance and routine tests specified in the relevant standards. These
limitations shall be very clearly brought out in 'The schedule of divinations'
for specified test requirements.
9. Field Quality Plan shall be submitted with the technical bid.

Sign and Seal of Bidder Page 39 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SECTION – I I

TECHNICAL SPECIFICATION
FOR 220 & 132 KV CLASS POWER TRANSFORMERS.
SPECIFIC REQUIREMENTS

2.1 SCOPE:

2.1.1 This section covers the specific technical requirements, climatic and
isoceranic conditions and system particulars for which the power transformer
shall be offered as per the general technical requirements given in Section – I
of this specification and the Schedule of requirements specified herein for the
various sub-stations.

2.2 CLIMATIC AND ISOCERANIC CONDITIONS:

2.2.1 The climatic conditions under which the equipments shall operate
satisfactorily.
(a) Maximum ambient temperature of air in Shade (OC) 50
O
(b) Minimum ambient temperature of air in shade. ( C) 50
O
(c) Maximum daily average ambient temperature ( C) 40
(d) Maximum yearly average ambient temperature (OC) 30
(e) Maximum relative humidity (%) 95
(f) Average number of thunder storm (days/annum). 15
(g) Average number rain fail (cm) 150
2
(h) Maximum wind pressure (kg / m ) 150
(i) Height above monsoon level (mtr) Not exceeding

1000
2.2.2 All equipment offered shall be suitable for continuous satisfactory operation
at the full rated capacity under the above climatic conditions.

2.2.3 Since the sub-station may be near sea shore or industrial area, the equipment
offered shall be suitable for heavily polluted atmosphere.

2.3 TYPE AND RATING:

2.3.1 The transformers shall be either core or shell type construction, 3 phase, oil
immersed, ONAN / ONAF / OFAF with external heat exchanger and shall be
suitable for outdoor services. The rating and the electric characteristics of
the transformers shall be as under.

Sign and Seal of Bidder Page 40 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

150/100 MVA 50 MVA


220 / 132 kV 132 / 66 kV
a) Type 3 phase Auto 3 phase Auto
transformer with transformer
unloaded tertiary
winding.
b) Rated Capacity (MVA) 75 /105 / 150 37.5 / 50
50 / 70 / 100
c) Rated voltage (kV) 220 / 132 / 11 132 / 66
d) Highest system voltage (kV) 245 / 145 / 12 145 / 72.5
e) System frequency (Hz) 50 50
f) Type of cooling ONAN / ONAF / ONAN/ONAF
OFAF
g) Vector Group 150 MVA Yy0(HV-LV), Yy Nn 0
Yd1(HV-SV)
100 MVA Yy Nn D11
h) Tertiary Winding 11 kV (Unloaded) No Tertiary
i) System of grounding Solidly grounded Solidly grounded
j) Insulation Level
i) 1.2/50 micro sec Impulse 1050 / 650 / 75 650 / 350
withstand voltage (kVp)
ii) Power frequency withstand 460 / 275 / 28 275 / 160
voltage (kV)
k) Impedances ( % ) 150 MVA 10 8
100 MVA 10
l) Tapping range -5 to +15 % -5 to +15 %
16 equal steps 16 equal steps
each 1.25% each 1.25%
on LV side and on LV side and
for LV variation for LV variation
m) Type of tap changers ON LOAD TAP ON LOAD TAP
CHANGER CHANGER
(Resistance (Resistance
Transition type). Transition type).
n) Connection Yy0 Yd1 Yy Nn0
Yy Nn D11 (Auto star)
AUTOSTAR
O) Short circuit level for the MVA MVA
system 220 kV - 10000 N. A.
132 kV - 5000 5000
66 kV - N. A. 2500
11 kV - 500 N. A.
o) System Fault level HV: 40 kA 3 sec HV: 40 kA 3 sec
LV: 40 kA 3 sec LV: 25 kA 3 sec
p) Minimum Creepage distance
for bushing (mm) Total Total
220 KV - 6125 N. A.
132 kV - 3400 3400

Sign and Seal of Bidder Page 41 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

66 kV - N. A 1700
36 kV - 900 900
11 kV - 380 N. A

q) Service Outdoor Outdoor


r) Duty Continuous Continuous
s) Overload capacity As per IS:6600 – 1972 / IEC354
t) Partial Discharge level 500 pico-columb 500 pico-columb

2.3.2 The equipment offered shall be suitable for continuous operation under the
above conditions at the full rated capacity.

2.3.3 The autotransformers shall in general have constant ohmic impedance


between HV and LV on all taps. However, in case of parallel operation with
the existing transformer,
i) The impedance, vector group, OLTC connection & range etc. of the
transformer is to be matched with that of the existing transformer
ii) Necessary provision is to be kept in the transformer control scheme for
parallel operation with the existing Mater/Follower/Independent/Off type
OLTC control system.
iii) Matching of physical dimension, orientation etc. to facilitate
interchangeability with the existing transformer, if necessary.

2.3.4 External or internal reactors shall not be used to achieve the HV/LV
impedance specified

2.4 EARTHQUAKE & WIND DESIGN LOADS:

2.4.1 The equipment offered shall be designed to withstand repeated earthquake


acceleration of 0.08 x 2 g. and wind loads of 150 kg/m2 on the projected area
non-simultaneous without damage to component parts and without
impairment or operation.
2.5 BUSHING CT:
2.5.1 One multi ratio, turret mounted type, current transformer shall be provided on
All Line as well as common neutral lead in case of 2 winding transformer,
Line and neutral CT each for H.V. & L.V. Line as well as neutral shall be
provided with following technical details.

Voltage Class corresponding line voltage rating for line


bushing CT and corresponding neutral
voltage rating of neutral bushing
(A) HV side 150 MVA 100 MVA 50 MVA
(Line as well as neutral)

No. of cores ONE ONE ONE


Ratio 900-1200/1 900-1200/1 300-600/1

Sign and Seal of Bidder Page 42 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Accuracy class PS ( As per IS: 2705)


Burden 15 VA
Vk. ≥ 600 V- 300 V
I0 at Vk/2 ≤ 30 ma
Application Restricted earth fault protection

(B) LV side 150 MVA 100 MVA 50 MVA


(Line as well as neutral)
No. Of cores ONE ONE ONE
Ratio 900-1200/1 900-1200/1 600-900/1
Accuracy class PS ( As per IS: 2705)
Burden 15 VA
Vk ≥ 1200 V, 600 V, 300 V
I0 at Vk/2 ≤ 30 ma
Application Restricted earth fault protection

2.6 NEUTRAL CT:


2.6.1 One multi ratio bushing type / turret mounted current transformer shall be
provided on common neutral lead. In case of 2 winding transformer neutral
CT each for HV, LV and neutral comply in with the following requirements:

Voltage Class Corresponding to the voltage


rating of neutral bushing
. 150 MVA 100 MVA 50 MVA
No. Of cores ONE ONE ONE
Ratio 900-1200/1 900-1200/1 600-900/1
Accuracy class PS ( As per IS: 2705)
Application Restricted earth fault protection

2.6.2 Any change in the parameters of CT required at the time of detailed


engineering will have to be incorporated without any extra cost.

2.7 POWER SUPPLY FOR CONTROLS:


2.7.1 The AC power supply for auxiliaries will be available at 240 volts, 1 phase and
415 V, 3 phases, 50 Hz. The frequency can vary between ± 3% of normal
frequency of 50 Hz and voltage can vary from 85 % to 110 % of the normal
value.

2.7.2 The DC supply at 110 / 220 Volts will be available from station battery. The
DC supply is subject to variation of ± 10 %.

2.8 OIL STORAGE TANK:


2.8.1 General
This specification covers supply of oil storage tank of 15 cubic meter capacity
along with complete accessories.

Sign and Seal of Bidder Page 43 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

2.8.2 Standard
The oil storage tank shall be designed and fabricated as per relevant Indian
Standards e.g. IS: 803 or other internationally acceptable standards.

2.8.3 Specifications
Transformer oil storage tanks shall be tow able & rested on pneumatic types
of adequate quality & size. The tank shall be to cylindrical shape & mounted
horizontally and made of mild steel plate of adequate thickness. Size of the
storage tank shall be follows:

Diameter : 2.5 meter


Capacity : 15 cubic meters
The tank shall be designed for storage of oil at a temperature of 100ºC.

2.8.3.1 The Bidder may further note that maximum height of any part of the complete
assembly of the storage tank shall not exceed 4.0 meters above road top.

2.8.3.2 The tank shall have adequate number of jacking pad so that it can be kept on
jack while completely filled with oil. The tank shall be provided with suitable
saddles so that tank can be rested on ground after removing the pneumatic
tyres.

2.8.3.3 The tank shall be also fitted with manhole, outside & inside access ladder,
silica gel breather assembly, inlet & outlet valve, oil sampling valve with
suitable adopter, oil drainage valve, air vent etc. Pulling hook on both ends of
the tank shall be provided so that the tank can be pulled from either end while
completely filled with oil. Bidder shall indicate the engine capacity in horse
power to pull one tank completely fitted with oil. Oil level indicator shall be
provided with calibration in terms of litre so that at any time operator can
have an idea of oil in the tank. Four nos. suitable rubber hoses with couplers
and unions each not less than 10 meter long shall also be provided.

2.8.3.4 The internal & external surfaces to be painted shall be short or sand blasted
to remove all rust and scale of foreign adhering matter or grease. All steel
surfaces in contact with insulating oil shall have painted with two coats of
heat & oil resistant anti-corrosive paint after one coat of red oxide as per
IS:104 and one each coat of finishing coats of glossy white shade..
All steel surfaces exposed to weather shall be given primary coat zinc
chromate, second coat of oil & weather resistant paint of a colour distinct

Sign and Seal of Bidder Page 44 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

from primary and final two coats of glossy oil & weather resistant light grey
paint in accordance with shade no. 631 of IS: 5. All paint shall be carfully
selected to withstand heat & extremes of weather. The paint shall not scale
off or crinkle or be removed by abrasion due to normal handling. The
minimum thickness of outside painting of tank shall be 20 microns per coat
the total thickness shall be within 70 to 100 microns.

2.8.3.5 The tank shall contain a self mounted centrifugal oil pump with inlet and
outlet valves, with couplers suitable for rubber houses and necessary
switchgear for its control. There shall be no rigid connection to the pump. The
pump shall be electrical motor driven and shall have a discharge of not less
than 6 kLph with a discharge head of 8 Mtr. The pump motor and the control
cabinet shall be enclosed in cubicle with IP55 enclosure.

2.9 OIL SAMPLING BOTTLE:

2.9.1 Oil sampling bottle shall be suitable for collecting oil sample from transformer
and shunt reactors for dissolved gas analysis. Bottles shall be robust enough
so that no damage occurs during frequent transportation of samples.
2.9.2 Oil sampling bottle shall be made of Stainless Steel having capacity of ONE
litre.
2.9.3 Oil sampling bottle shall be capable of being sealed gas tight and shall be
fitted with cocks on both ends.
2.9.4 The design of bottle & seal shall be such that loss of hydrogen shall not
exceed 5% per week.
2.9.5 An impermeable oil proof transparent plastic or rubber tube of about 5 mm
diameter and of sufficient length shall also be provide with each bottle along
with suitable connectors to fit the tube on to the oil sampling valves of the
equipment and the oil collecting bottle respectively.

Sign and Seal of Bidder Page 45 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SECTION – III

BIDDING SCHEDULE
(To be filled in and signed by the Bidder)

SCHEDULE ‘A’

SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS


FOR AUTO TRANSFORMERS

1. Name of manufacturer :

2. Normal full load single phase/three phase output:


H.V. Winding (KVA):

L.V. Winding (KVA):


2.1 Temp. Rise as specified in the specification.

3. Continuous single phase/three phase output under:


Site conditions as specified in the specification

H.V. Winding (KVA):

L.V. Winding (KVA):

4. Type of cooling and corresponding normal:


Full load output

H.V. Winding (KVA):

L.V. Winding (KVA):

5. Over load capacity (as per IS:6600) starting from:


Full load and with Temp. as specified in the
Specification (KVA)

6. Normal ratio of transformation:


7. Connection (including vector group reference &:
Symbol)
H. V. Winding:

L.V. Winding:

Sign and Seal of Bidder Page 46 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

8. Type of tap changer:

9. Tapping a) Number :

b) Range :

c) Location :
9A Details of Automatic Voltage Regulator
(a) Make :

(b) Model etc. :

(c) Short description (other) :


10. Type of core construction :

11. i) Temp. rise by resistance of winding (oC) :

ii) Temp. rise in oil by thermometer (0C) :

iii) Hot spot temp. for which the transformer is :


designed (0C)

12. Limit for hot spot temp. for which the transformer :
is designed (oC)

13. Guaranteed no load loss at rated voltage & :


rated frequency and 75 0C average
winding temperature

14. Guaranteed load losses at rated current rated :


voltage, rated frequency and 75 0C average
winding temp. KW (excluding auxiliary losses)

15. a) Auxiliary losses at rated output :


b) Total losses at normal ratio, rated output, rated :
voltage, rated frequency and maximum attainable
temp. at site including auxiliary losses – KW
15(i) Stray eddy losses as % of total losses :
16. Exciting current power factor (Amp. %) :
i) At normal voltage & frequency :
ii) At maximum voltage and normal frequency :

Sign and Seal of Bidder Page 47 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

17. Efficiency at 750C Unity P.F. :


i) On 100% load (%) :

ii) On 75% load (%) :

iii) On 50% load (%) :

iv) On 25% load (%) :

18. Efficiency at 750 C, 0.8 P.F. (Lag) :


i) On 100% load (%) :

ii) On 75% load (%) :

iii) On 50% load (%) :

iv) On 25% load (%) :

19. Load at which maximum efficiency occurs :


(% of full load)

20. Maximum efficiency (%) :

21. a) Percentage reactance at rated current and :


frequency

b) Percentage impedance at rated current and


frequency at 75 0C

i) Positive sequence :

ii) Zero sequence :

c) Range of variation (+,-) offered in terms of :


clause 1.16

d) Tolerance applicable if any :

22. Impedance voltage drop at normal ratio at 75 0C :


expressed as a percentage of normal voltage on
full load (%)

Sign and Seal of Bidder Page 48 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

23. Regulation on full load at unity P.F. at 75 0C :


expressed as a percentage of normal voltage (%)

24. Regulation on full load 0.8 P.F. lagging at 75 0C :


expressed as a percentage in the winding.

25. Maximum current density & c/s area in the winding : Guaranteed As per SC calcu
i) H.V. (Amp./Sq. cm.) :
ii) Cross sectional area :
iii) L.V. (Amp/Sq. cm) :
iv) Cross sectional area :

26. Maximum flux density in the core :


26.a Core details
i) Material of core lamination :
ii) Thickness of core plates (mm) :
iii) Insulation of core lamination :
iv) Insulation of core clamping plates :
v) Press board material & thickness :
vi) Prime quality grade :

27. Core joints (butt or inter leave) :

28. Type of winding :

i) H.V. :

ii) L.V. :

29. Type of radial support :


i) High Voltage Winding :

ii) Lower Voltage Winding :

30. Insulation of higher voltage winding :

31. Insulation of lower voltage winding :

32. Thickness of transformer tank plates :


i) Sides (mm) :

Sign and Seal of Bidder Page 49 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

ii) Bottom (mm) :

iii) Cover (mm) :

iv) Radiator (mm) :

33 (A) POWER FREQUENCY WITHSTAND VOLT:

i) Test voltage for 1 min. P.F. withstand test on :


live end of high voltage winding (KV rms)

ii) Test voltage for 1 min. P.F. withstand test on :


neutral end of high voltage winding (KV rms)

iii) Test voltage for 1 min. P.F. withstand test on :


live end of low voltage winding (KV rms)

(B) IMPULSE TEST :


i) Test voltage for 1.2/50 micro sec. Full wave :
withstand test on high voltage winding
(KV crest) on.

ii) Test voltage for 1.2/50 micro sec. Full wave :


withstand test on low voltage winding
(KV crest) on

34 Inter-turn Insulation :
i) Extent of end turns reinforcement :
ii) Extent of reinforcement of turns adjustment :
to tap
iii) Test voltage for 1 min. 50 Hz. Inter-turn :
insulation test on (i) (KV rms)

iv) Test voltage for 1 min. 50 Hz. inter-turn :


insulation test on (ii) (KV rms)

v) Test voltage for 1 min. 50 Hz. inter-turn :


insulation test on main body of the winding
(KV rms)

35. Type of winding temperature indicator :

Sign and Seal of Bidder Page 50 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

36. Maxi continuous ratings :

i) At 50 oC ambient air temp. at site (KVA) :

ii) At 40 oC ambient air temp. at site (KVA) :

iii) At 30 oC ambient air temp. at site (KVA) :

iv) At 20 oC ambient air temp. at site (KVA) :

37. Details of Air cell :


Make
Type
Capacity
Size

38. Width of track gauge (Meters) :

39. Bushing Particulars :

(a) HV Bushing
i) Type of high voltage bushing and creepage :
distance in mm.

ii) Rated current :


iia) STC rating for 3 sec :
iii) Weight of high voltage bushing in Kg. :

iv) Quantity of oil in one high voltage bushing :


Insulator, in litre.

v) Dry 1 minute power frequency test voltage :


value of high voltage bushing in KV.

vi) Wet 10 second power frequency test voltage :


value of high voltage bushing in KV

vii) Impulse withstand test voltage value with :


1.2/50 microsecond full wave of
high voltage bushing in KV.

Sign and Seal of Bidder Page 51 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

(b) LV Bushing
i) Type of low voltage bushing and creepage :
distance in mm.

ii) Rated current


iia) STC rating for 3 sec :

iii) Weight of low voltage bushing insulator in kg:


iv) Quantity of oil in one low voltage bushing :
insulator in litres

v) Dry 1 minute power frequency withstand :


and test voltage value of low voltage
bushing in KV

vi) Wet 10 second power frequency withstand :


test voltage value of low voltage
bushing in KV

vii) Impulse withstand test voltage with :


1.2/50 microsecond fall wave of low voltage
bushing in KV
(c) NEUTRAL Bushing

i) Type of low voltage bushing and creepage :


distance in mm.

ii) Rated current :

iii) Weight of bushing insulator in kg:

iv) Quantity of oil in one bushing :


in litres

v) Dry 1 minute power frequency withstand :


and test voltage value of
bushing in KV

vi) Wet 10 second power frequency withstand :


test voltage value of bushing in KV

vii) Impulse withstand test voltage with :

Sign and Seal of Bidder Page 52 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.2/50 microsecond fall wave of bushing in KV

40. Clearance :
a) Minimum clearance between phase (Mtrs.) :
i) In oil :

ii) Out of oil :


b) Minimum clearance of high voltage to earth :
in oil (Mtrs)

c) Minimum clearance of high voltage to tank :


in oil (Mtrs)

41. Net weight of the core (Kgs.) :

42. Net weight of copper (Kgs.) :


a) H.V. (Kgs.) :

b) L.V. (Kgs.) :

c) Total (Kgs.) :

43 Weight of core and windings :

44. Weight of fittings :

45. Net untanking weight(Kgs.) :

46. Weight of tank and cover (Kgs.) :


46.1 Tank dimensions :
46.2 Guarantee against leakage for 3 years :

47. Weight of oil in transformer including bushings,


conservator and cooling system (Kgs.)/Quantity (Ltrs.)

48. Weight of oil in transformer (including bushings) (Kgs):

49. Weight of complete transformer with oil and all :


fittings (Kgs.)

50. Weight of transformer with all fittings but without:


oil (Kgs.)

Sign and Seal of Bidder Page 53 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

51. Weight of the package to be transported and :


dimensions

52. Dimensions of the transformers :


i) Maximum height upto top of bushings (Mtrs.) :

ii) Overall length (Mtrs.) :


iii) Overall width (Mtrs.) :

53. Minimum clear height for lifting core and windings :


from tank in meters

54. Details of on load tap changing gear :

a) Make :

b) Type :

c) Rating :
i) Rated Voltage :

ii) Rated current :

iii) Step Voltage :


iv) STC rating :

d) Time for complete tap change (Sec.) :

e) Diverter selector switch transition time (Cycles) :

f) Control :

g) Auxiliary supply details :

h) Voltage control :

i) Protection devices :

j) Value of Maxi. Short circuit current :

k) Maxi. Impulse withstand test voltage value with :

Sign and Seal of Bidder Page 54 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

1.2/50 microsecond full wave between switch


and ground

l) Maxi. Impulse withstand test voltage value with :


1.2/50 micro sec. Full wave between the remote
terminal and ground with the selector terminal at
one end of the range

m) Maxi. Power frequency test voltage between :


switch assembly and range

n) Maxi. Impulse withstand test voltage with :


1.2/50 micro sec. across the tapping range

o) Maxi. Temp. of the tap changer which must not :


be exceeded during operation

p) Approximate overall weight (kg) :

q) Approximate overall dimensions (Mtrs) :

r) Approximate overall quantity of oil (Kgs.) :

55 No. of operations (approx.) after which the :


change of oil is necessary

56. Any other particulars which need a mention :

57. Cooling calculation shall be submitted

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 55 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS

OIL LOAD TAPCHANGING GEAR


(To be filled by the Bidder)

Sr. No. Item

i) Make

ii) Type designation

iii) Suitable for auto/manual


operation
YES / NO

iv) Rated voltage (KV)

v) Rated current (Amps)

vi) Step voltage (Volts)

vii) Number of steps

viii) Rated voltage of drive motor (V)

ix) List of routine tests to be


carried out

x) Location of the taps with


respect to the terminals of the
tapped winding

xi) Drawing or pamphlet-number


of the technical and
descriptive particulars of the
OLTC, enclosed with the Bid.

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 56 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Sr. No. Item

xii) Drawing number of the


complete control schematic
drawing enclosed with the
Bid, along with a write-up of
the scheme provided.
YES / NO

xiii) Separate conservator and oil


surge relay provided
(YES / NO)

xiv) Local outdoor cabinet general


arrangement drawing number
(enclosed with the Bid).

xv) Remote indoor control cabinet


general arrangement drawing
number (enclosed with the
Bid.)

xvi) Quantity of oil in the OLTC


chamber (Ltrs)

xvii) Capacity of OLTC conservator


tank in Cu.mtr.

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 57 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS

CONTROL CABINET
(To be filled by the Bidder)

Sr. No. Item

Manufacturer's name and Country

2) Indoor/ outdoor application

3) Design ambient air temperature (C0)

4) Thickness of sheet steel for outdoor


& indoor panels (mm)

5) Degree of protection provided (as per


IS : 13947 or equivalent)

6) Bill of material for various equipment


giving make, type, ratings etc.
enclosed
(YES /NO)

7) Colour of finish paint


(i) Outside
(ii) Inside

8) Temperature rise at rated current over


specified ambient temp of 500C (C0)

a. Continuous current rating (Amp)

b. Three second current rating (KA)


(short time)

9) Control wiring

a. Material of conductor for various


circuits

b. Size of conductor For various circuits


mm2

c. Conductor – Solid / Stranded

Sign and Seal of Bidder Page 58 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SR. ITEM
NO.

10) Terminal Blocks


i) Make
ii) Current rating
2.1Power terminals (Amp)
2.2 Other terminals (Amp)

11) All tests as specified in Section-D (ii)


DATA SHEET A1 Specification for
the control panel will be carried out
Yes / No.

12) Space heater rating (Watts)

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 59 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS

CLAMPS & CONNECTORS


(To be filled by the Bidder)

SR. ITEM
NO.

1 BIDDER's name and address


1.1 Manufacturer's name and
address

2 Applicable standards

3 Application

4 Type

5 For connection to
5.1 Conductor size and arrangement
5.2 Equipment terminal size and
arrangement

6 Material
(state percentage composition of
constituents and impurities present)
6.1 Clamp body
6.2 Bolts and nuts
6.3 Spring washers
6.4 Liners if any

7 i) Rated current
ii) STC rating for 3 sec :

8 Maximum temperature rise over


Reference ambient temperature (C0)
(specified in project information
when carrying rated current)

9.0 Rated terminal load (Kg)


9.1 Factor of Safety

10.0 Minimum thickness of any part (mm)

11.0 Weight of connector complete with


Hardware (Kg)

1. Matching accuracy for matching


surfaces maintained or not

2. Service – Indoor / Outdoor

3. Manufacturer's drawing no.

Sign and Seal of Bidder Page 60 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

4. Type Tests
a. Whether type tests already
carried out (YES / NO)
b. If yes, test certificates
enclosed (YES / NO)
c. Details of type tests to be
carried out

5. List of routine tests to be carried


out by the BIDDER

6. Description of testing facilities for


carrying out
a. Mechanical test
b. Heat run test
c. Material composition test
d. Test for checking blow holes,
cracks etc.

7. For the above mentioned testing


facilities, please indicate name
and address

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 61 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

SECTION – III
SCHEDULE – “C”
The equipment offered confirm to other standard than specified standard as follow. The
salient points are as under.

SR.NO. NAME OF STANDARD ADDITIONAL/SALIENT FEATURES DIFF.


FROM IS 2026

Sign and Seal of Bidder Page 62 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

APPENDIX – ‘A’
SPECIFICATION OF TRANSFORMER OIL
Sr. Characteristics of Transformer Requirement Method of test
No. Oil
1 Appearance The oil shall be clear transparent A representative
sample of the oil
& free from suspended matter of
shall be
sediments. examined in a
100 mm thick
layer, at ambient
temperature.
2 Density, Max. 0.89 gm/Cm3 at 29.5 0C IS: 1448
3 Dynamitic Viscosity CST at 27 0C 27 cSt (Max.) IS: 1448
0
4 Flash point penskey-Marten 140 C Min. IS: 1448
(Closed)
0
5 Interfacial tension at 27 C 0.04 Min. IS: 6104
Newton/M
6 Pour point - 15 0C (Max.) IS: 1448
7 Neutralization value IS: 335
a) (Total acidity) mg. (Max) 0.03 mg KOH/gm Max. Appendix-A
b) Inorganic Acidity/alkalinity Nil
8 Corrosive Sulphur Non corrosive ASTM D1275
(In terms of classification of subjecting oil
copper strips) 48 Hrs. @ 150 0C 1500C for 48 hrs.

9 Electric Strength IS: 6792


(Break down voltage)
a) New Untreated Oil 30 KV Min. (rms)
b) After treatment 60 KV Min. (rms)
10 Dielectric Dissipation Factor IS: 6262
(Tan delta) at 90 0C 0.002 Max.
11 Specific Resistance ( Resistively) IS: 6103
0 12
a) @ 90 C 35 x10 Ohm-cm (Min.)
0
b) @ 27 C 1500 x1012 Ohm-cm (Min.)
12 Oxidation Stability IEC 61125
a) Neutralization value after
0.40 mg/ KOHp gm Max. (method C)
Oxidation for 164 Hrs. @ 100
0
C
b) Total sludge after oxidation for
0.10% by weight max.
164 Hrs. @ 100 0C

Sign and Seal of Bidder Page 63 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Sr. Characteristics of Transformer Requirement Method of test


No. Oil
13 Ageing Characteristics after 96 ASTM-/D
Hrs accelerated ageing (Open 1934/IS: 12177
beaker method with copper
catalyst)
a) Specific Resistance
(Resistivity)
1) @ 27 0C 2.5 X 1012 Ohm-cm-Min.
2) @ 90 0C 0.2 X 1012 Ohm-cm min.
b) Dielectric Dissipation Factor 0.2 Max.
(Tan delta) @ 90 0C
c) Total acidity 0.05 mg. KOH/gm Max.
d) Total sludge value 0.05 % by weight Max.
14 Presence of Oxidation inhibition Absent IS: 335
Appendix: D
15 Water content PPM (Max)
New untreated oil 50 PPM Max. IS: 2362
After treatment 05 PPM Max. IS: 1866
16 Poly Chlorinated Biphenyls NIL IEC 61619
(PCB) Content Doble spec
17 Gassing tendency at 50 hZ, after 5 mm3 per minute (Max.) Doble spec
120 minutes

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 64 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

APPENDIX – B

1.0 QUALIFICATION REQUIREMENTS FOR ERECTION, TESTING &


COMMISSIONING

1.1 The bidder should have carried out erection, testing, commissioning of
and test charging of at least two nos. of 220 kV or above class
transformers at 220 kV &/or 400 kV switch yard of sub stations
satisfactory during last five years before date of submission of the bid.

1.2 The bidder should arrange requisite tools and tackles including adequate
capacity hydraulic crane having suitable adjustable boom length for
erection of bushing, radiators, conservator, and other associated costly
equipments.

1.3 The bidder should have team of trained personnel and skilled
labour force and supervising engineers to carry out erection,
commissioning, testing and test charging work including laying of control
cables and wiring of OLTC gear scheme and inter connection of RTCC
panel with D.M., of OLTC., wiring of cooler control scheme and cooling
fans including automatic operation of cooler control etc.

2.0 ERECTION OF POWER TRANSFORMER

2.1 Erection includes entire vacuum by proper capacity of vacuum pump, for
not less than 48 hours, or more if required as per the instruction of
engineer in charge.

2.2 Filling the oil from tank/drums to the transformer through 6000 ltrs.
Capacity of high quality filter machine and filtration of the same to get
desired BDV &PPM as specified by engineer in charge and
transformer manual.
2.3 Contractor has to replace all the gaskets by new ones if required by
engineer –in –charge.
2.4 Erection shall include wiring of cooling fans, RTCC panels, terminations of
alarm and trip contacts from buchholz relay, WTI, OTI, PRD to M.K. box
and in turn to remote relay panel and RTCC panel in control room.
Required cabling on the transformer as well as from transformer to control
room shall also be included in scope of work. The testing and
commissioning of OLTC as well as cooler control scheme shall be carried
out as per instruction of engineer in charge.
2.5 The contractor shall arrange nitrogen cylinder required at site for above
work.
2.6 In case of any breakage of any item, contractor has to follow up with
insurance for the claims and amount for damage /breakage will be with
held from contractor’s bill till the time claim is finalized by insurance
company.

Sign and Seal of Bidder Page 65 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

2.7 Minimum 15 Nos. of good skilled fitters, with 2 Nos. qualified supervisors
and senior engineer having sufficient experience should be posted at site
during the above work.
2.8 Contractor has to repaint the transformer tank with two coat of anti rusting
good finish LTBS grey shade 632 of IS:5 by spray painting as per the
direction of engineer in charge.
2.9 Contractor is required to carry out all minor/major fabrication work of pipes
and hangers if required at site as per direction of engineer in charge.
2.10 All tools and tackles, testing equipments listed here under are to be
arranged by the contractor.
2.11 Contractor shall arrange required capacity of oil
tanker at site.
2.12 Any other items not mentioned above but required for successful
completion of erection shall have to be arranged by the contractor.

3.0 TOOLS REQUIRD FOR ERECTION

1. One or two mobile crane hydraulic of adequate capacity with long boom of 30 ft.
bearing free vertical lifts suitable for lifting HV bushing.
2. Steel/Manila/Nylon ropes and D shackle for lifting of 3-ton weight.
3. 4000 or 6000 liters. / hr. capacity filter machine in excellent working condition. It
must be capable of heating transformer oil up to 800 C and must be equipped with
built in high vacuum pump and chamber filter elements.
4. Following accessories should also be made available.
a) Non-collapsible hose piping of size 40 mm to 80 mm with nipple and flange.
b) Hosepipe should be of oil resistant 2” to 3” BSP suitably threaded for connecting
hose pipes & provided with holes for fastening.
c) 2 Nos. storage tanks for insulating oil of adequate capacity provided with 2 bottom
drain cum filter valve and another 2” top valve.
d) Two complete sets of ring and flat spanners of metric size up to 4 to 36.
e) One complete set of Allen keys.
f) One complete set of screw derivers.
g) 1/4 “ shackle 3-ply nylon rope of 15 mtr. Length.
h) 4 nos. of flange each of 1”, 2” to3” BSP suitably threaded for connecting hose pipe &
provided with holes for fastening.
i) Multi stage vacuum pumping system capacity 250-500 mm cu/hr. & should be able
to create absolute vacuum of 1 tor or 1.3 m bar or less having following
accessories.
j) Non return valve at inlet.
k) GI pipe/non-collapsible pipes with flange for connecting vacuum pump to
transformer main tank.
l) Vacuum gauge for reading 0 to 50 mm along with flange for fitting at top of
transformer of any suitable size 3/16 and 3/8 set in good quality.

Sign and Seal of Bidder Page 66 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

m) Oil testing kit in good working condition having 2.5mm and 4 mm guage for
adjusting the gap, 2.5/5 KV megger motor driven and capable of reading up to
50000 M-OHM.
n) 3 Ltrs. Of CTC.
o) Hot air blower for drying out of bushing.
p) Required nitrogen cylinder.
q) Stainless steel bottles for samples.
r) Gas cylinder with nozzle torch for gas cutting etc.
s) Any other item required for successful completion of work.

SEAL OF COMPANY SIGNATURE OF BIDDER


DATE:

Sign and Seal of Bidder Page 67 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

ANNEXURE - I

AUTOMATIC VOLTAGE REGULATING RELAY

1. Automatic voltage control shall be initiated by a voltage regulating relay of an approved


make and suitable for flush and/or wall mounting / DIN-rail mounting.
2. The relay shall operate from the nominal reference voltage derived form a circuit
mounted 1 phase / 3 phase Voltage transformer (VT).
3. The AVR relay shall be Microprocessor based Numerical relay having large LCD display
128x128.
4. The relay shall have 4 selectable set point voltages.
5. The AVR relay shall have the following methods as option for the compensation of
voltage.

 Apparent Current (Z-Comp.)


 Line drop compensation (LDC)
 Active Current
 Reactive current

6. The relay bandwidth shall be adjustable between –5 to +15 of set point voltage.
7. The relay shall have following options regarding time behavior with Time factor
selectable from 0.1 to 30.

 Linear
 Integral
 Fast integral

8. The relay shall incorporate an under voltage / over voltage blocking facility which shall
make the control inoperative if voltage falls / rises by percentage value of set point value
(as mentioned in Guaranteed technical particulars) with automatic restoration of control
when nominal voltage rises / falls to value as mentioned in the Guaranteed technical
particulars.
9. The AVR relay shall have integrated features for the display of following parameters

 Integrated tap changer position display


 Nominal Voltage
 Load current
 Bandwidth
 Measuring values V. I. Active power, Reactive power, Apparent power, phase
angle, Power factor, Reactive current and frequency
10. The AVR relay shall have facility to compensate the VT and CT-errors.
11. The AVR relay shall have facility to register the tap changer statistics. In the statistics
mode, the relay shall display the no. of tap changing operations occurred on each tap.
12. The AVR relay shall have facility to recode the voltage and current with respect to time.
Each of voltage value shall be measured for 100ms and averaged for 1 second. The
recorded values shall be presented in graphical format on the device.
13. The AVR relay shall have integrated feature to make the parallel operation of 10
transformers working in parallel. The relay shall be self sufficient and shall not require
any additional devices like parallel balancing module etc. The following principal shall be
available in the relay as standard.

 Master Follower
 Master Slave
 ∆I SinΦ (Circulating current)

Sign and Seal of Bidder Page 68 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

 ∆I SinΦ (S) (circulating current principal for different KVA/MVA ratings of


transformer)
 ∆Cos Φ

14. The AVR relay shall have facility to monitor or control the following parameters

 Monitoring of life time consumption of transformer


 Monitoring of operating hours of Tap changer, Fans and Pump
 Control of cooling levels of transformer
 Recording of Hot spot temperature

15. The AVR relay shall have facility to record specific events (Event-Recorder) like under
voltage, over voltage, Over current, Auto/Manual, local/remote etc. with date and time
stamping.
16. The AVR relay shall have facility to make selection of Auto/Manual and Local/Remote.
17. The AVR relay shall have different LEDs to indicate Service and Blocked condition.
18. It is preferred that 12 nos of freely programmable LEDs shall be available to indicate
different Operations / Alarm / Faults condition.
19. The AVR relay shall have freely programmable Binary Inputs, Binary outputs, Analog
Inputs and Analog Outputs.
20. The AVR relay shall have software to make the parameter settings of the device and it
shall also be possible to do the parameter setting through keyboard of relay.
21. The AVR relay shall have suitable interface to make communication with higher level
SCADA system. The following ports a minimum shall be available on the device.

a. Rs 232 port (COM 1) for doing the parameter setting and local
communication with device.
b. RS 232 port (COM 2) for communication with higher level SCADA with
optional protocols like MODBUS, SPABUS, PROFIBUS DP, LON, IEC
60870-5-101, -103 and –104, IEC 61850 in preparation.

22. It shall be possible to communicate via bus with all similar devices located at different
location by making communication link with any one device through its RS 485- port (E-
LAN) meant for local communication.
23. It shall have facility by which a customer specific software programme can be written
and incorporated as feature in the relay.

Sign and Seal of Bidder Page 69 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

ANNEXURE C

List of documents attached with technical bid:


Bidder shall invariably attach the following documents and clearly marked and duly
flagged in technical bid. In absence of these documents offer will be evaluated as a non
submission.

Sr. No. Particulars of document Whether attached


with tech bid
1 Drawings in AutoCAD format
2 Drawings hard copies as indicated in specification
3 Manual in PDF format
4 QAP for manufacturing process in SOFT format
5 QAP for manufacturing process in Hard format
6 FQP in SOFT format
7 FQP in Hard copy
8 Type test Reports in hard copies
a for transformer
b for OLTC
c for control cabinet
d for clamps & connectors
e for Air cell
9 Confirmation regarding type tests as per clause no. Cl.
1.30.3.1(b) page no. 32 – “IMPORTANT NOTE”
10 Calculation of Thermal stability to withstand short
circuits
11 Calculation of Dynamic ability to withstand short
circuits
12 Cooling calculation
13 Guaranteed Technical Particulars, completely filled in
a for transformer
b for OLTC
c for control cabinet
d for clamps & connectors
e for Air cell
14 Any other essential documents

SIGNATURE OF BIDDER COMPANY’S ROUND SEAL

DATE:
PLACE:

Sign and Seal of Bidder Page 70 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

GUARANTEED TECHNICAL PERTICULARS


Flexible Separator (Air cell)

Sr. No. Particulars

1 Item description :
2 Name of manufacturer :
3 Type & designation :
4 Shape :
5 Size of conservator Diameter :
Length :
6 Size of Flexible Separator (Air cell) :
a. Length (mm) Fully inflated :
b. Length (mm) Fully deflated:
c. Width (mm) Fully inflated:
d. Width (mm) Fully deflated
e. Distance between axes :
i.e. pitch distance of lugs (mm)
f. Expansion volume (litre) :
g. Occupation rate (%)
7 Material of Flexible Separator (Air cell) :
a. Basic fabric :
b. Coating compound :
c. Oil side coating :
8 Inside coating Material :
9 Outside coating Material :
10 Thickness :
11 Resistance to perforation :
12 Warp breaking strength :
13 Weft breaking strength :
14 Warp elongation breaking :
15 Weft elongation breaking :
16 Seam resistance :
17 Perforation :
18 Permeability to Oxygen :
19 Permeability to water vapor :
20 Resistance to Ozone gas for 96 hrs at 40oC:

Sign and Seal of Bidder Page 71 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

21 Attachment details :
22 Flange details :
23 Lugs :
24 vulcanizing process :
25 Reinforcement at bottom :
26 Suitable for maximum temperature :
27 Minimum width of over lap (mm) :
28 Material of adaptor and bolts :
29 Guarantee period :
30 Accessories and fittings
(Give list with details) :
31 Any other information :

Sign and Seal of Bidder Page 72 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Annexure - II
Technical Specification For On Line Moisture and Gas In Oil Analyser For New
Transformer With Model Analysis Software And Remote Data
Transfer/Communications through internet:

1.0 GENERAL:

The transformer shall be equipped with on line moisture and gas in oil analyzer system,
‘HYDRAN – M2’ or equivalent with model analysis software and remote data transfer /
communications. It is intended to continuously monitor the evolution of dissolved gases
from the oil of transformer with the help of a gas in oil sensor with no moving
parts or pump to detect and continuously monitor a composite value of gases
like H2 (Hydrogen), CO (Carbon monoxide), C2H2 (Acetylene), C2H4 (Ethylene), etc.
The system shall be installed on a single, open bore ball or gate valve. The
system shall also continuously monitor the moisture content in the transformer oil to
result a comprehensive incipient fault monitoring system.

Based on the type and configuration of the transformer and with 4, 4-20mA
input channels and appropriate non intrusive sensors, the system shall be
capable of utilizing the measured parameters of temperature, cooling bank
status and load currents to derive the following model calculations (based on
IEEE and/or IEC Standards). The original factory test report for the
transformer will be made available to properly configure these model
calculations.

• Apparent Power
• Load Current
• PPM value of composite combustible gas measurement
• Short term and long term rate of change of PPM value of composite
combustible gas measurement
• PPM water content in oil
• Water in oil condensation temperature
• Winding hotspot temperature
• Moisture content in winding insulating paper
• Moisture content in barrier insulation
• Relative ageing of the transformer insulation system taking into account
winding hotspot temperature and moisture content in winding insulating
paper.
• Bubble inception temperature
• Cooling system status
• OLTC Tap position tracking (when equipped with OLTC)
• OLTC temperature differential modeling (when equipped with external
type OLTC)

2.0 SCOPE of WORK:

This is as a part of transformer supply, the transformer manufacturer shall also include
in the scope of this tender, to supply, provision, mounting, erection, commissioning, etc;
but not limited to the following, for on line moisture and gas in oil analyzer system.

Sign and Seal of Bidder Page 73 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

2.1 Microprocessor based Intelligent Electronic Device (IED), as required, to be on a


single open bore ball or gate valve mounted on transformer along with all
required fittings and accessories.

2.2 One set of centralized monitoring system with suitable software for
communicating with IEDs simultaneously with a provision for communicating to
two or more IEDs if required in future. The required software shall be loaded in
GETCO system at desired location such that all the data/display associated with
the system can be visualized and all archiving / trending can be achieved.
Successful Bidder shall also be responsible for coordination with supplier of this
on line system & SAS /GETCO system and ensure for proper interfacing with all
required devices, cabling, software, hard ware, services, etc. It shall also give
printouts of all required data as desired.

2.3 All required interconnection, wiring, cabling with fiber optic cables/RS485
cables etc., including all required accessories for successful operation of the
system.

2.4 Required earthing & connection for the system at required location.

2.5 Necessary tools, tackles, calibration equipments, installation Material, required


for successful operation of the system.

2.6 To supply installation, commissioning and O&M manuals and procedures, etc., in
hard and soft form.

2.7 To supply standard HOST/User Interface Software in ENGLISH, one with each
unit on a CD – ROM.

2.8 The system interface shall also include required field cable, patch cable, patch
box, associated accessories & hardware’s to connect to the GETCO system.

2.9 Training to GETCO Engineers.

3.0 SPECIFIC TECHNICAL REQUIREMENT:

3.1 Intelligent Electronic Device (IED):

The IEDs shall be suitable for outdoor heavily polluted atmosphere, ambient
temperature of 50oC and relative humidity of 100 % and shall have minimum
degree of protection of IP-55. Necessary type test reports shall be submitted with
the bid. Each IED shall be provided with additional canopy.

The IED shall be suitable for mounting on offered transformer. The best single
point of mounting location to ensure optimum flow of oil in the IED without any
external / additional pump & piping shall be decided in co ordination with on line
moisture and gas in oil analyzer system manufacturer. The system shall operate
satisfactorily for oil temperature range of -5 to 100oC with heat fin adapter and
shall be suitable for oil pressure of 100 psi. Provision shall be made available for

Sign and Seal of Bidder Page 74 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

collection oil samples for DGA and moisture analysis, without disturbing IED or
its connections. It shall be possible to carry out the periodic maintenance easily.
The normal functioning of IED shall be guaranteed without necessity of any
additives / consumable. The IED shall include an automatic 'self-test'
feature which shall test the sensor and system twice per month. It shall
include a dedicated "Fail Alarm" relay, should the test result in detection
of a problem in the sensor and/or system.

Each IED shall be provided with multi line LCD with back light or red LED display
to indicate combined gas concentration level in ppm, moisture content in RH% &
ppm; hourly and daily trend readings, alarm etc. Key pad shall be built in for
menu driven easy operation. It shall be possible to down load all information
locally by a laptop computer. All the information shall also be continuously
transmitted to centralized monitoring GETCO system. Necessary serial
interfaces shall be provided. Minimum Four (4) nos. of potential free contacts
and 4-20 mA analog output shall also be provided. The IED shall be
electromagnetically screened and impervious to vibrations.

3.2 Centralised Monitoring System:

The centralised monitoring system shall be installed in GETCO server for


continuous display recording and archiving of information received from all IEDs
with a provision for receiving information from future IEDs also. The soft ware
shall have menu driven pass word protected real time operating system with self-
diagnostic feature. The soft ware shall be suitable for graphical display of gas
evolution and moisture level with daily and hourly trending as well as historical
data and event recording. It shall be required to obtain audio visual alarm with
suitable multiple thresholds for dissolved gas and moisture level ‘HIGH’, “HIGH -
HIGH”, ‘FAIL’. It shall also possible to configure the IEDs from the centralizing
system as well as local.

3.3 Interconnecting Cabling:

Glass Fiber Optic mono mode cables /RS485 cable shall be provided for
interconnection of all IEDs and the central monitoring system. The cable shall be
laid in HDPE conduits. All required terminations, splicing kits shall be arranged
by bidder. Provision shall be kept for installing and terminating cables from
future IEDs.

It is also intent to monitor moisture and gas in oil of transformer through internet.
There will not be any wire connection. It will be wireless communication. Any
suitable modem shall be provided. Data is to be seen and analyze at corporate
office or any other remote locations as desired by GETCO.

4.0 The on line moisture and gas in oil analyzer system shall be compatible to
SCADA. It shall use DNP3.0 or Modbus protocol, without the use of third
party protocol converters.

Sign and Seal of Bidder Page 75 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

5.0 List of routine & acceptance tests shall be submitted with the technical bid.
Successful bidder has to perform acceptance tests in presence of GETCO
representative, as per relevant standard.

6.0 Services of on line moisture and gas in oil analyzer system supplier during
supply, mounting, erection, testing, commissioning and after sales even beyond
guarantee period shall have to be arranged and provided by the bidder.

7.0 The on line moisture and gas in oil analyzer system shall also be operational
during temperature rise tests and demonstrated during these tests. The data
shall be recorded and reported in the test report. Data obtained from on line
moisture and gas in oil analyzer system and conventional DGA shall be
compared however, both values should satisfy the commitment.
NOTE: The clause no. 7.0 shall be applicable only when this item is purchased as
a part of transformer.

8.0 The bidder shall furnish all guaranteed technical particulars as called for in this
specification. Bid not containing this information are likely to be rejected.

9.0 Deviation from Specification:

All deviations from this specification shall be separately listed in specified


Schedule, in the absence of which, it will be presumed that the provision of the
specification are complied with by the bidder.

Sign and Seal of Bidder Page 76 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

ANNEXURE - III

GUJARAT ENERGY TRANSMISSION CORPORATION LTD.

TECHNICAL SPECIFICATIONS FOR THE WORK OF DESIGN, SUPPLY, ERECTION


AND COMMISSIONING INCLUDING CIVIL WORK OF NITROGEN INJECTION
SYSTEM FOR PROTECTION AGAINST THE FIRE & EXPLOSION FOR
TRANSFORMER.

TECHNICAL SPECIFICATION NO.


GETCO/E/TS-FF/2902 DTD.JUNE 2008.

Sign and Seal of Bidder Page 77 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

TECHNICAL SPECIFICATIONS

Name of work: Turnkey contract for the work of design, supply, erection and
commissioning of Nitrogen Injection system for protection against the
transformer explosion for 400 KV Transformers and Shunt Reactors as indicated
in Annexure-I.

Each oil filled transformer / reactor shall be provided with a dedicated Nitrogen
Injection system for prevention against the transformer explosion which shall
use nitrogen as quenching medium. The system shall prevent transformer /
Reactor oil tank explosion and possible fire in case of internal / external cause.
In the event of fire by external causes such as bushing fire.OLTC fires, fire from
surrounding equipment etc., it shall act as a fast and effective fire fighter. It
shall accomplish its role as fire preventer and extinguisher without employing
water or carbon dioxide. Fire shall be extinguished within reasonable with time
(not more than 3 minutes so as not to harm the transformer) of system
activation and within 30 seconds (maximum) of commencement of nitrogen
injection. The system shall have been in successful operation / commissioned in
Indian / Abroad installations for at least last five years for protection of
transformers of 220 KV and higher voltage class. The list of past supplies in
India / Abroad along with performance certificate from users of the system shall
be submitted for approval of purchaser.

Activation of the system

Mal-functioning of the Nitrogen injection system could lead to interruption in


power supply. The supplier shall ensure that the probabilities of chances of
malfunctioning of the Nitrogen injection system are practically zero. To achieve
this objective, the supplier shall plan out scheme of activating signals which
should not be too complicated to make the system inoperative in case of actual
need. The system shall be provided with automatic controls to prevent the
explosion of transformers. Besides automatic control, remote electrical push
button control at Control box and local manual control in the cubicle shall also
be provided. The following electrical-signals shall be used for activating the
system under prevention mode/fire extinguishing mode.

Auto Mode

For prevention:

• Differential relay operation.


• Buchholz relay paralleled with pressure relief valve or RPRR (Rapid
Pressure Rise Relay)

Sign and Seal of Bidder Page 78 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

• Tripping of all circuit breakers (on HV & LV/IV side) associated


transformer / reactor is the pre-requisite for activation of system.

For extinguishing

• Fire Detector
• Buchholz relay paralleled with pressure relief valve or RPRR (Rapid
Pressure Rise Relay).

Tripping of all circuit breakers (on HV & LV/IV side) associated with transformer
/ reactor is the pre-requisite for activation of system.

Manual Mode (Local / Remote)

Tripping of all circuit breakers (on HV & LV / IV side) associated with


transformer / reactor is the pre-requisite for activation of system.

Manual Mode (Mechanical)

• Tripping of all circuit breakers (on HV & LV / IV side) associated with


transformer / reactor is the pre-requisite for activation of system.

The system shall be designed to be operated manually in case of failure of


power supply to the system.

General description

Nitrogen Injection system should be a dedicated system for each oil filled
transformer / reactor. It should have a Fire Extinguishing Cubicle (FEC) placed
on a plinth at a distance of 5-10 m away from transformer / reactor or placed
next to the firewall (if fire fighting wall exists). The FEC shall be connected to
the top of transformer / reactor oil tank for depressurization of tank and to the
oil pit (capacity is approximately equal to 10% of total volume of oil in
transformer / reactor tank / or existing oil pit) from its bottom through oil pipes.
The FEC should house a pressurized nitrogen cylinder (s) which is connected to
the oil tank of transformer /reactor oil tank at bottom. The Transformer
Conservator Isolation Valve (TCIV) is fitted between the conservator tank and
Buchholz relay. Cable connections are to be provided from signal box to the
control box in the control room, from control box to FEC and from TCIV to signal
box. Detectors placed on the top of transformer / reactor tank are to be
connected in parallel to the signal box by Fire survival cables. Control box is
also to be connected to relay panel in control room for receiving system
activation signals.

Sign and Seal of Bidder Page 79 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Operation

On receipt of all activating signals, the system shall drain - pre-determined


volume of hot oil from the top of tank (i.e. top oil layer), through outlet valve, to
reduce tank pressure by removing top oil and simultaneously injecting nitrogen
gas at high pressure for stirring the oil at pre-fixed rate and thus bringing the
temperature of top oil layer down. Transformer conservator isolation valve
blocks the flow of oil from conservator tank in case of tank rupture / explosion
or bushing bursting. Nitrogen occupies the space created by oil drained out and
acts as an insulating layer over oil in the tank and thus preventing aggravation
of fire.

System components

Nitrogen Injection system shall broadly consist of the following components.


However, all other components which are necessary for fast reliable and
effective working of the system shall deemed to be included in the scope of
supply.

CUBICLE (FEC)

The Cubicle Frame shall be made of CRCA sheet of 3 mm (minimum) thick


complete with the base frame, painted inside and outside with post office red
colour (shade 538 of IS -5). It shall have hugged / hinged split doors fitted with
high quality tamper proof lock. The doors, removable covers and panels shall be
gasketted all round with neoprene gaskets. The degree of protection shall be
IP55. The following items shall be provided in the Cubicle.

• Nitrogen gas cylinder with regulator and falling pressure electrical contact
manometer.
• Oil drain pipe with mechanical quick drain valve.
• Electro mechanical control equipment for draining of oil of pre-determined
volume and injecting regulated volume of nitrogen gas.
• Pressure monitoring switch for back-up protection for nitrogen release.
• Limit switches for monitoring of the system.
• Butterfly valve with flanges on the top of panel for connecting oil drain
pipe and nitrogen injection pipes for transformer / reactors.
• Panel lighting (CFL Type)
• Oil drain pipe extension of suitable sizes for connecting pipes to oil pit.
• Space heater.

Sign and Seal of Bidder Page 80 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Control box

Control box is to be placed in the control room for monitoring system operation,
automatic control and remote operation. The following alarms, indications,
switches, push buttons, audio signal etc. shall be provided.

• System Oil.
• TCIV open.
• Oil drain valve closed.
• Gas inlet valve closed
• TCIV closed
• Detector trip
• Buchholz relay trip
• Oil drain valve open
• Extinction in progress
• Cylinder pressure low
• Differential relay trip
• PRV / RPRR trip
• Transformer / reactor trip
• System out of service
• Fault in cable connecting fault detector
• Fault in cable connecting differential relay
• Fault in cable connecting Buchholz relay
• Fault in cable connecting PRV / RPRR
• Fault in cable connecting transformer reactor trip
• Fault in cable connecting TCIV
• Auto / Manual / Off
• Extinction release on / off
• Lamp test
• Visual / Audio alarm for AC supply fail
• Visual / Audio alarm for DC supply fail

As far as possible the control box should be such devised that all the
transformers and reactors or group thereof should be controlled from single
spot.

Transformer Conservator Isolation Valve.

Transformer conservator isolation valve (TCIV) to be fitted in the conservator


pipe line, between conservator and buchholz relay which shall operate for
isolating the conservator during abnormal flow of oil due to rupture / explosion
of tank or bursting of bushing. The valve shall not isolate conservator during
normal flow of oil during filtration or filling or refilling, locking plates to be

Sign and Seal of Bidder Page 81 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

provided with handle for pad locking. It shall have proximity switch for remote
alarm, indication with visual position indicator.

The TCIV should be of the best quality as malfunctioning of TCIV could lead to
serious consequence. The closing of TCIV means stoppage of breathing of
transformer / reactor.

Locking plates shall be provided for pad locking.

Detectors

The system shall be complete with adequate number of detectors (quartz bulb)
fitted on the top cover of the transformer / reactor oil tank.

Signal box

It shall be mounted away from transformer / reactor main tank, preferably near
the transformer marshalling box, for terminating cable connections from TCIV &
detectors and for further connection to be control box. The degree of protection
shall be IP55.

Cables

Fire survival cables (capable to withstand 750º C.) of 4 core x 1.5 sq. mm size
for connection of detectors in parallel shall be used. The fire survival cable shall
conform to BS 7629-1, BS 8434-1, BS 7629-1 and BS 5839-1, BS EN 50267-2-1
or relevant Indian standards.

Fire Retardant Low Smoke(FRLS) cable of adequate size shall be used for
connection of signal box / marshalling box near transformer / reactor and FEC
mounted near transformer/ reactor with control box mounted in control room.

Fire Retardant Low Smoke (FRLS) cable of 4 core x 1.5 sq. mm size shall be
used for connection between control box to DC & AC supply source, FEC to AC
supply source, signal box / marshalling box to transformer conservator isolation
valve connection on transformer / reactor. Separate cables for AC supply & DC
supply shall be used.

Pipes

Pipes complete with connections, flanges, bends and tees etc. shall be supplied
along with the system.

Sign and Seal of Bidder Page 82 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Other items to be supplied.

(a) Oil drain and nitrogen injection openings with gate valves on transformer /
reactor tank at suitable locations.

(b) Flanges between Buchholz relay and conservator tank for fixing TCIV.

(c ) Detector brackets on transformer / reactor tank top cover.

(d) Spare potential free contacts activating the system i.e. in differential relay,
Bucholz relay. Pressure Relief Device / RPRR , Circuit breaker of
transformer / reactor.

(e) Pipe connections between transformer / reactor and FEC and between FEC
and oil pit required for collecting top oil.

(f) Cabling for detectors mounted on transformer / reactor top cover.

(g) Inter cabling between signal box, control box and FEC.

(h) Butterfly valves / Gate valves on oil drain pipe and nitrogen injection pipe
which should be able to withstand full vacuum.

(i) Supports, signal box etc. which are to be painted with enameled paint.

(j) Any other item required for satisfactory operation of system.

Power supply

For Control Box 220 V / 110 V DC

For FEC Auxiliary 230 V AC

Spares for three (3) years Operation & Maintenance

The bidder apart from the below mentioned spares shall submit a list of
recommendation spares for three years trouble free operation of the equipments
and also furnish unit rates. The owners will scrutinize the said list and decide on
the items on spares to be ordered and the quantities. These spares shall be
supplied by the contractor before end of guarantee period. The owner reserves
right to order the spares with twelve (12) months from the date of order for

Sign and Seal of Bidder Page 83 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

main equipments and the rate shall be kept valid till this date. The prices of
these spares shall not be considered for evaluation of the bid.

Mandatory Spares

Cylinder filled with Nitrogen of required 1 No.


Capacity per substation.

Detectors per transformer 3 No.

Regulator assembly per sub-station 1 No.

Modification on the transformer

No modification on the transformer shall be allowed which affects its


performance (i.e. efficiency, losses, heat dissipation ability etc.) safety, life etc.
or it’s any other useful parameter. This requirement shall be paramount
importance and shall form the essence of the contract.

However, in any case, performance of transformer should not be affected in any


manner by having Nitrogen Injection Fire Prevention Cum Extinguishing System
(NIFPES) and the Contractor / Sub-Contractor shall give an undertaking to this
effect. All pipes should be washed / rinsed with transformer oil. If any damage
is done to the transformer and / or any connected equipment during installation
& commissioning full recovery therefore shall be effected from the Contractor /
Sub-Contractor, of NIFPES system.

It shall be solely the responsibility of Contractor / Sub-Contractor to install, carry


out pre-commissioning tests & commission NIFPES at the mentioned Sub-Station
in this specification, to the entire satisfaction of the GETCO.

Interlocks

It shall be ensured that once the NIFPES gets activated manually or in auto
mode, all the connected breakers shall not close until the system is actually put
in OFF mode. Also PRV shall get closed only if all the connected breakers are
open.

Sign and Seal of Bidder Page 84 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

Tests

Contractor has to carry out the type test as per relevant IS/IEC. Specifically IP
55 on FEC or have to produce the report from NABL approved Lab.
Reports of all routine test conducted as per relevant IS/IEC standards in respect
of various bought out items including test reports for degree of protection for
FEC / control box / signal box shall be submitted by the supplier.

The supplier shall demonstrate all the functional test associated with the
following as Factory Acceptance Tests:

• FEC, Control Box


• Fire Detector
• Transformer Conservator Isolation Valve

The performance test of the complete system shall be carried out after erection
of the system with transformer at site.

Detailed layout drawings, equipment drawing along with 4 sets of Operation and
Maintenance manual along with soft copies (In CDs) shall be submitted by the
supplier along with the consignment.

The guaranteed and other technical particulars for the offered system are
indicated in Section - "Guaranteed and Other Technical Particulars". Any
other particulars considered necessary in addition to those listed in that Section
may be furnished by the Bidder.

Sign and Seal of Bidder Page 85 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

GUARANTEED TECHNICAL PARTICULARS


NITROGEN INJECSTION SYSTEM FOR PREVENTION OF FIRE/
EXPLOSION FOR TRANSFORMERS/REACTORS.

Sr. Description Guaranteed


No. Particulars
1 Name of Manufacture and country of origin
2 Reference standards
3 Details of system equipments
4 FEC (Fire Extinguishing Cubicle)
4.1 Dimensions (LXBXH) mm
4.2 Weight
4.3 Capacity of Nitrogen cylinder
4.4 Number of cylinders
4.5 Pressure of Nitrogen filing
4.6 Minimum distance of FE cubicle from the
transformer
4.7 Method of mounting
4.8 Whether the following items are provided in FE
cubicle. If so furnish make, type & other details
4.9 Contact Manometer
4.10 Pressure Regulator
4.11 Oil Release Unit
4.12 Gas release unit
4.13 Oil drain assembly
4.14 Pressure / limit switches
4.15 No. of contacts & spare contacts (NO & NC)
4.16 Oil drain Valve (ABOVE FEC)
4.17 Make
4.18 Type
4.19 Size
4.20 Type of metal
4.21 Nitrogen Injection Valve (Above FEC)
4.22 Make
4.23 Type
4.24 Size
4.25 Oil drain pipe
4.26 Size
4.27 Length
4.28 Number of openings in the transformer tank
4.29 Material
5 Control Box
5.1 Dimensions (LXBXH) mm

Sign and Seal of Bidder Page 86 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

5.2 mm
5.3 Type & Thickness of sheet steel
5.4 Details of components provided in the control box
5.5 Control voltage
5.6 Method of mounting
5.7 Whether audio and visual alarm provided?
6. Transformer Conservator Isolation Valve
6.1 Make
6.2 Type
6.3 Location
6.4 Whether suitable for pipe of size 80 mm dia
6.5 No. of contacts & spare contacts (NO & NC)
6.6 Padlocking provision
7 Detectors
7.1 Make
7.2 Type
7.3 Quantity required
7.4 Method of fixing
7.5 Effective heat sensing area
7.6 Temperature recommended for effective heat
sensing
7.7 Number of contacts NO / NC
7.8 Necessity and condition of Refilling
8 Whether approved by Tariff Advisory Committee of
India
9 TECHNICAL PARTICULARS FOR NITROGEN
INJECTION SYSTEM FOR PREVENTION OF
TRANSFORMER EXPLOSION
10 Power Supply
10.1 Control box
10.2 FEC (lighting)
10.3 Extinction period
10.4 On system activation
10.5 On commencement of Nitrogen injection
11 FEC Suitable for capacity
11.1 Dimensions (LXBXH) mm
11.2 Weight
11.3 Nitrogen cylinder capacity
12 Control Box
12.1 Dimensions (LXBXH) mm
12.2 Weight
13 Detectors
13.1 Heat sensing temperature

Sign and Seal of Bidder Page 87 of 88


GETCO/E/TS – XMER 01/R5 Mar 09

13.2 Time of Operation

Transformer Tank Fire Extinction


Explosion Prevention
a. For system activation

b. For reduction of pressure in


Tank by Nitrogen release.

13.3 Any other technical details not covered above.

Sign and Seal of Bidder Page 88 of 88