BAHRIA TOWN KARACHI

E&P Department
22-Jul-23
Under Repair Water Bowser Detail
Sr. # BT. # Description Department Date IN Ex.Date Out Status
1 20-178 Water Bowser Water Mang. 16-Mar-23 25-Jul-23 Under Repair
2 20-176 Water Bowser E&P Crush Plant 22-Jul-23 21-Aug-23 Under Repair
3 20-193 Foton Water Bowser Bahria Paradise 12-Jul-23 30-Jul-23 Under Repair

Overhauled Water Bowser Detail


Sr.# Department Complete Under Repaired Remaining Bowser Total Bowser
1 Infra-I 13 0 0 13
2 Infra-II 10 0 0 10
3 Infra-III 8 0 0 8
4 Infra-IV 21 0 0 21
5 Paradise 5 1 0 6
6 Horticulture 4 0 0 4
7 Asphalt 1 0 0 1
8 Golf City 3 0 0 3
9 M&S 3 0 0 3
10 BTK-II 7 0 0 7
11 E&P 2 1 1 4
12 W&S 2 1 1 4
Grand Total 79 3 2 84

Remaining Water Bowser for Fabrication


Sr. # BT. # Description Department Ex. Completion Date
1 20-134 Water Bowser E&P August-23
2 20-183 Water Bowser Water Mang. September-23