MEP Design Report

This document is an MEP design report for a client's temporary office extension. It includes 3 sections that summarize lighting, HVAC, and plumbing calculations and design considerations. The lighting section analyzes ground and first floor lux studies using software. The HVAC section covers codes, weather data, wall/roof constructions, space requirements, and air system sizing. The plumbing section addresses codes, floor plans, water demand, pump sizing, hot water storage, and storm drainage. The report contains calculations and technical details to support the MEP design of the temporary office extension.

Uploaded by

Mohamed Atef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
376 views2 pages

MEP Design Report

This document is an MEP design report for a client's temporary office extension. It includes 3 sections that summarize lighting, HVAC, and plumbing calculations and design considerations. The lighting section analyzes ground and first floor lux studies using software. The HVAC section covers codes, weather data, wall/roof constructions, space requirements, and air system sizing. The plumbing section addresses codes, floor plans, water demand, pump sizing, hot water storage, and storm drainage. The report contains calculations and technical details to support the MEP design of the temporary office extension.

Uploaded by

Mohamed Atef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Client’s Temporary Office Extension

(CTOE)

MEP Design Report - Rev 00

Table of Contents page

1. LIGHTING LUX STUDY BY DIALUX EVO 12

1.1 Introduction 12
1.2 Codes and Regulations 12
1.3 Ground Floor Lux Study 13
1.4 First Floor Lux Study 14

2. HVAC CALCULATION REPORT 30

2.1 Introduction 30
2.2 Codes and Regulations 30
2.3 Floor Plan Drawings 33
2.4 Design Weather Parameters & MSHGs 37
2.5 Wall Constructions 44
2.6 Roof Constructions 51
2.7 Space Input Data 56
2.8 Air System Sizing Summary for 01-GR-FCU 79
2.9 Air System Sizing Summary for 02-1ST-FCU 85

3. PLUMBING CALCULATION REPORT 111

3.1 Introduction 111


3.2 Codes and Regulations 111
3.3 Floor Plan Drawings 111
3.4 Potable Cold water daily demand 112
3.5 Pump flow and head calculations 112
3.6 Hot water storage calculations 112
3.7 Storm drainage calculations Space Input Data 112

27 December 2023 Page 1 of 200


Client’s Temporary Office Extension
(CTOE)

MEP Design Report - Rev 00