0% found this document useful (0 votes)
46 views1 page

7th Semester Evaluations-Final Evaluation Forms

This document outlines an evaluation form for final year project students, assigning marks across several deliverables and sections. The form evaluates students on their proposal document, software requirements specification, design document, prototype, supervision received, and project management. Marks are distributed across understanding the existing system, well-defined goals and objectives, conceptual architecture, and other criteria. Evaluators provide signatures and dates before the internal marks are calculated out of 80 total marks.

Uploaded by

Kamran Shahzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

7th Semester Evaluations-Final Evaluation Forms

This document outlines an evaluation form for final year project students, assigning marks across several deliverables and sections. The form evaluates students on their proposal document, software requirements specification, design document, prototype, supervision received, and project management. Marks are distributed across understanding the existing system, well-defined goals and objectives, conceptual architecture, and other criteria. Evaluators provide signatures and dates before the internal marks are calculated out of 80 total marks.

Uploaded by

Kamran Shahzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Final Year Project Evaluation Form (7th Semester)

Project Title: ________________________________________________________________________________

Roll No. __________________________ Student Name: _________________________________________

Project Deliverables Marks Marks Remarks


Distribution obtained

Proposal Document (Sub-Section Total: 20)


Understanding of existing system 5 o Accepted
Well defined goal & objective 5
Conceptual Application/Architecture (Modules)(Work o Revised
flow of system) 5
o Rejected
Presentation Skills 5

Evaluator 1 (Name, Signature & Date). ______________________________________________________

Evaluator 2 (Name, Signature & Date). ______________________________________________________

Software Requirements Specification (Sub-Section Total: 10)


Functional Requirements (Well defined requirement
2
according to proposal)
Interfaces (UI, External, H/W Interface requirements) 2
Use case descriptions 2
Use case diagrams 2
Non-Functional Attributes (Reliability, Availability,
Security, Maintainability, Portability, Performance) 2

Design Document (Sub-Section Total: 10)


OO Approach Structured Approach

Domain Model ERD 2


Class Diagram Data Flow Diagram 2
Sequence Diagram State Transition Diagram
2
State Chart Diagram Architectural Diagram 2
Collaboration Diagram Component Diagram 2
Prototype (Sub-Section Total: 10)
Partially Working System (30% implementation)
Supervisor (Sub-Section Total: 20)
(Meetings, project progress)

Project Management Office (Sub-Section Total: 10)


(Meeting Deadlines, Attending workshops)

Internal Marks
80

Evaluator 1 (Name, Signature & Date). ______________________________________________________

Evaluator 2 (Name, Signature & Date). ______________________________________________________


Project Management Office (PMO), Faculty of Computing & IT
Hafiz Hayat Campus, University of Gujrat.

You might also like