Lift plan QY100K-1 Prefab Method Statement Ref 1100001344/026 -BZL-HSE- DC Will update
Lift Team
Appointed Person Arifullah khan Crane Supervisor
Please refer to briefing sheet for Crane Operator, Slinger / Signaller, Lift Supervisor and Crane Co-ordinator.
Unloading and installation of prefab cabins for temporary ports buildings as per schedule of lifts contained within
LOAD DETAILS
Maximum weight of load (s) : Maximum Size of Load: Designed Lifting Yes No
Point’s x
11.06t Varies, see schedule of lifts See schedule of lifts
Maximum Lift Height: Others eg. Centre of Gravity:
Foreman/Supervisor and operator to identify before lift Utilities running beneath tarmac surface.
commences. Trailers to be positioned in front/rear of
crane
Ground Conditions Crane / Mat required
Compacted sand FDT tested to 95% compaction 2m x 3m 3cm thick spreader plates to be utilised
/Tarmac road beneath outriggers
Roads / Traffic Obstructions (e.g., structures, excavations, trees etc.)
As per BOC traffic management plan Lighting poles, fencing, steel structure and excavations
adjacent to crane setup area
Adjacent Activities Requirements for road closures, possessions, site
clearance etc.
Ongoing excavations, backfilling and utility works As per site requirements to be agreed at daily
activity briefing
Requirements for signage, barriers, fencing, lighting etc Other / additional control measures (please list) :
Exclusion zones around all lifting activities, to be Crane and lifting accessory 3rd party thorough
coordinated with all stakeholders and 3rd parties. Task examination inspection records to be provided by Bin
lighting to be provided as necessary during night hours Omairah and records kept onsite.
Keep noise to a minimum. Always work to the WMS. Any variation to this LP shall result in work being stopped
and reassessed to ensure continued safe operation. Crane Supervisor to ensure everyone is adequately briefed
before work commences; when lifting in the proximity of adjacent assets; loads may be picked up/ laid down
as close as is reasonably practicable without oversailing site/hoarding boundaries
Hazard Control
See Documents: Lifting management plan See same document: 07-1435-1100001344-Bz-
HSE-PLN-000006
This lift plan will run alongside a specific method Binzafrah CO. crane supervisor/Rigger I will be
statement and risk assessment for the works included. always supervising crane setup and movements.
Include crane position, lay-down / rigging area, position of delivery vehicles, landing points, banksman positions,
ground and overhead hazards and exclusion zones. If required use elevation drawings.
A
A
C2 C1
A = Pick Up Area/Trailer
B = Designated Laydown
C = 2no Crane setup areas East/West
= Slew Path
= Exclusion Zone
It is the slingers responsibility to ensure the path of the load is clear of personnel and obstructions before the lift
commences. All operatives to be aware of crane movements. Hook block is central to the load at all times
C
A
B B
A = Pick Up Area/Trailer
B = Designated Laydown
C = Crane setup area
= Slew Path
= Exclusion Zone
It is the slingers responsibility to ensure the path of the load is clear of personnel and obstructions before the lift
commences. All operatives to be aware of crane movements. Hook block is central to the load at all times
B B
A
C
A = Pick Up Area/Trailer
B = Designated Laydown
C = Crane setup area
= Slew Path
= Exclusion Zone
It is the slingers responsibility to ensure the path of the load is clear of personnel and obstructions before the lift
commences. All operatives to be aware of crane movements. Hook block is central to the load at all times
A A
C1 C2
B
A = Pick Up Area/Trailer
B = Designated Laydown
C = 2no. Crane setup areas East/West
= Slew Path
= Exclusion Zone
It is the slingers responsibility to ensure the path of the load is clear of personnel and obstructions before the lift
commences. All operatives to be aware of crane movements. Hook block is central to the load at all times
Schedule of Lifts
4no. Lifting points chocked on bottom frame. Offset CoG to be predetermined in trial lift and rigging adjusted
accordingly. Load to be level at all times.
Total 11,060kg
All operatives involved within the lifting activity addressed within this lift plan are briefed and listed below.
Lift Plan Briefed By AP / Crane Supervisor: Signed:
Location: Oxagon Community Date / Time of Briefing:
No Name Qualification Job Title Signature Employer Contract / Site Line Manager
1
10
11
12
Crane Supervisor/Rigger L1
Slinger Signaller/Rigger L3
110978 / ﺍﻟﺮﻗﻢ ﺍﻟﺘﺴﻠﺴﻠﻲ 1 : ﺍﻟﻔﺮﻉ :ﺍﻟﻤﺮﻛﺰ ﺍﻟﺮﺋﻴﺴﻲ Third Party Liability - ﺍﻟﺘﻐﻄﻴﺔ :
ﺭﻗﻢ ﺍﻟﻬﻮﻳﺔ 7014635341 : ﻣﺆﺳﺴﺔ ﺍﺑﺮﺍﻫﻴﻢ ﻣﺤﻤﺪ ﺟﻌﻔﺮﻱ ﻟﻠﻤﻘﺎﻭﻻﺕ ﺍﻟﻌﺎﻣﺔ : ﺍﺳﻢ ﺍﻟﻤﺎﻟﻚ
ﺍﻟﻤﺮﺟﻊ ﺳﻨﺔ ﺍﻟﺼﻨﻊ ﺭﻗﻢ ﺍﻟﻬﻴﻜﻞ ﺭﻗﻢ ﺍﻟﻠﻮﺣﺔ ﻧﻮﻉ ﺍﻟﺴﻴﺎﺭﺓ
236111410 2014 LXGCPA289EA003551 2880 TDA XUHO CRANE
ﺍ ﺩ ﻁ 2880
: ﺗﺸﻬﺪ ﺷﺮﻛﺔ ﺍﻻﺗﺤﺎﺩ ﺍﻟﺘﺠﺎﺭﻱ ﻟﻠﺘﺄﻣﻴﻦ ﺍﻟﺘﻌﺎﻭﻧﻲ ﺑﺄﻥ ﺍﻟﺴﻴﺎﺭﺓ ﺍﻟﻤﺒﻴﻨﺔ ﺃﻋﻼﻩ ﻣﺆﻣﻦ ﻋﻠﻴﻬﺎ ﺣﺴﺐ ﻭﺛﻴﻘﺔ ﺍﻟﺘﺎﻣﻴﻦ ﺭﻗﻢ
ﻧﻬﺎﻳﺔ ﺍﻟﺘﺄﻣﻴﻦ ﺑﺪﺍﻳﺔ ﺍﻟﺘﺄﻣﻴﻦ ﺭﻗﻢ ﺍﻟﻮﺛﻴﻘﺔ
ﺍﻟﻴﻮﻡ :
ﺍﻟﺠﻤﻌﺔ ﺍﻟﺨﻤﻴﺲ ﺍﻟﻴﻮﻡ : 1/82/1/29/6/23/110978
11/10/2024 : ﺍﻟﺘﺎﺭﻳﺦ 12/10/2023 : ﺍﻟﺘﺎﺭﻳﺦ
21:49 : ﺍﻟﻮﻗﺖ 21:49 : ﺍﻟﻮﻗﺖ
ﺗﻌﺘﺒﺮ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺍﻟﺼﺎﺩﺭﺓ ﺑﻤﺜﺎﺑﺔ ﻛﻔﺎﻟﺔ ﻏﺮﻡ ﻭﺃﺩﺍﺀ ﻟﻠﺤﻖ ﺍﻟﺨﺎﺹ ﺑﺎﻟﻄﺮﻑ ﺍﻟﺜﺎﻟﺚ ﻭﺫﻟﻚ ﻓﻴﻤﺎ ﻳﺘﻌﻠﻖ ﺑﺎﻟﻤﺴﺌﻮﻟﻴﺎﺕ ﺍﻟﻤﺒﻴﻨﺔ ﺃﺩﻧﺎﻩ ﻭﺍﻟﺘﻲ ﺗﻨﺘﺞ
ﻋﻦ ﺣﺎﺩﺙ ﺃﻭ ﺣﻮﺍﺩﺙ ﺗﺴﺒﺒﺖ ﻓﻴﻬﺎ ﺍﻟﻤﺮﻛﺒﺔ ﺍﻟﻤﺆﻣﻨﺔ ﻋﻠﻴﻬﺎ ،ﺷﺮﻳﻄﺔ ﺗﻄﺒﻴﻖ ﺷﺮﻭﻁ ﻭﺃﺣﻜﺎﻡ ﺍﻟﻮﺛﻴﻘﺔ ﻋﻠﻰ ﺃﻥ ﻻ ﻳﺘﺠﺎﻭﺯ ﻣﺠﻤﻮﻉ ﺍﻟﺘﻌﻮﻳﻀﺎﺕ
ﺍﻟﺤﺪ ﺍﻷﻗﺼﻰ ﺍﻟﻤﻮﺿﺢ ﺍﺩﻧﺎﻩ:
ﺍﻟﺤﺪ ﺍﻵﻗﺼﻰ ﻟﻤﺴﺆﻭﻟﻴﻪ ﺍﻟﺸﺮﻛﺔ ﻓﻲ ﺍﻟﻮﺍﻗﻌﺔ ﺍﻟﻮﺍﺣﺪﺓ ﻓﺈﻥ ﺍﻟﻮﺛﻴﻘﺔ ﻫﺬﻩ ﻷﺣﻜﺎﻡ ﻭﻓﻘﺎ ﺛﺎﻟﺚ ﻟﻄﺮﻑ ﺍﻟﺘﻌﻮﻳﺾ ﻋﻠﻴﻪ ﻓﻲ ﺣﺎﻝ ﻭﻗﻮﻉ ﺣﺎﺩﺙ ﻳﺘﺮﺗﺐ
ﻭ ﺍﻷﺿﺮﺍﺭ ﺍﻟﻤﺎﺩﻳﺔ ﻭﺍﻟﻤﺼﺎﺭﻳﻒ ﻣﻌﺎ ﻟﻦ ﻭﺧﻼﻝ ﻓﺘﺮﺓ ﺳﺮﻳﺎﻥ ﺍﻟﻮﺛﻴﻘﺔ ﺑﺎﻟﻨﺴﺒﺔ ﻟﻸﺿﺮﺍﺭ ﺍﻟﺠﺴﺪﻳﺔ ﺗﺘﺠﺎﻭﺯ ﻣﺒﻠﻐﺎ ﺍﺟﻤﺎﻟﻴﺎ ﻗﺪﺭﻩ 10,000,000ﺭﻳﺎﻝ
)ﻋﺸﺮﺓ ﻣﻼﻳﻴﻦ ﺭﻳﺎﻝ ﺳﻌﻮﺩﻯ ( ﻛﺤﺪ ﺍﻗﺼﻰ ﻟﻤﺴﺌﻮﻟﻴﺔ ﺍﻟﺸﺮﻛﺔ
ﺍﻟﺤﺎﻻﺕ ﺍﻟﺘﻰ ﺗﻠﺘﺰﻡ ﺍﻟﺸﺮﻛﺔ ﺑﺘﻌﻮﻳﺾ ﺍﻟﻄﺮﻑ ﺍﻟﺜﺎﻟﺚ ﻋﻨﻬﺎ ﻣﻊ ﺍﺣﺘﻔﺎﻇﻬﺎ ﺑﺤﻖ ﺍﻟﺮﺟﻮﻉ ﻋﻠﻰ ﺍﻟﻤﺆﻣﻥ ﻟﻪ ﺃﻭ ﺍﻟﺴﺎﺋﻖ ﺃﻭ ﺍﻟﻤﺴﺌﻮﻝ ﻋﻦ ﺍﻟﺤﺎﺩﺙ:
ﺃﻭﻻ :ﻟﻠﺸﺮﻛﺔ ﺣﻖ ﺍﻟﺮﺟﻮﻉ ﻋﻠﻰ ﺍﻟﻤﺆﻣﻥ ﻟﻪ ﺃﻭ ﺍﻟﺴﺎﺋﻖ ﻻﺳﺘﺮﺩﺍﺩ ﻣﺎ ﻗﺪﻡ ﻟﻠﻄﺮﻑ ﻟﺜﺎﻟﺚ ﻣﻦ ﺗﻌﻮﻳﻀﺎﺕ ﻓﻰ ﺃﻱ ﻣﻦ ﺍﻟﺤﺎﻻﺕ ﺍﻵﺗﻴﺔ
. -1ﺍﻟﺴﻴﺮ ﺑﺎﻟﻤﺮﻛﺒﺔ ﻋﻜﺲ ﺍﺗﺠﺎﻩ ﺍﻟﺴﻴﺮ
-2ﺗﺠﺎﻭﺯ ﺍﻹﺷﺎﺭﺓ ﺍﻟﺤﻤﺮﺍﺀ
-3ﺃﻱ ﻣﺴﺆﻭﻟﻴﺔ ﺃﻭ ﻣﺼﺎﺭﻳﻒ ﺗﻨﺸﺄ ﺃﻭ ﺗﺘﺮﺗﺐ ﻋﻨﺪﻣﺎ ﺗﻜﻮﻥ ﺍﻟﻤﺮﻛﺒﻪ
ﺃ -ﻣﺴﺘﻌﻤﻠﺔ ﻋﻠﻰ ﻭﺟﻪ ﻳﺨﺎﻟﻒ ﻗﻴﺪ ﺍﻻﺳﺘﻌﻤﺎﻝ ﺍﻟﻤﺒﻴﻦ ﻓﻲ ﺟﺪﻭﻝ ﺍﻟﻮﺛﻴﻘﺔ
ﺏ -ﺗﺤﻤﻞ ﻋﺪﺩﺍ ﻣﻦ ﺍﻟﺮﻛﺎﺏ ﻳﺘﺠﺎﻭﺯ ﺍﻟﺴﻌﺔ ﺍﻟﻤﺼﺮﺡ ﺑﻬﺎ ﻟﻠﻤﺮﻛﺒﺔ ،ﻭﺛﺒﺖ ﺃﻥ ﺣﺼﻮﻝ ﺍﻟﺤﺎﺩﺙ ﻛﺎﻥ ﺑﺴﺒﺐ ﻫﺬﺍ ﺍﻟﺘﺠﺎﻭﺯ
ﺝ -ﺇﺫﺍ ﺛﺒﺖ ﺃﻥ ﻗﻴﺎﺩﺓ ﺍﻟﻤﺮﻛﺒﺔ ﺗﻤﺖ ﺩﻭﻥ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻰ ﺭﺧﺼﺔ ﻗﻴﺎﺩﺓ ﻟﻨﻮﻉ ﺍﻟﻤﺮﻛﺒﺔ ﻃﺒﻘﺎ ﻟﻸﻧﻈﻤﺔ ﻭﺍﻟﻠﻮﺍﺋﺢ ﺫﺍﺕ ﺍﻟﻌﻼﻗﺔ ،ﺃﻭ ﺃﻥ ﺗﻜﻮﻥ ﺍﻟﺮﺧﺼﺔ
ﻗﺪ ﺻﺪﺭ ﺃﻣﺮ ﺑﺴﺤﺒﻬﺎ ﻣﻦ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ،ﺃﻭ ﻛﺎﻧﺖ ﻣﻨﺘﻬﻴﺔ ﻭﻗﺖ ﺍﻟﺤﺎﺩﺙ ﻣﺎﻟﻢ ﺗﺠﺪﺩ ﺍﻟﺮﺧﺼﺔ ﺍﻟﻤﻨﺘﻬﻴﺔ ﺧﻼﻝ ) ( 50ﻳﻮﻡ ﻋﻤﻞ ﻣﻦ ﺗﺎﺭﻳﺦ ﺍﻟﺤﺎﺩﺙ
ﺛﺎﻧﻴﺍ :ﺇﺫﺍ ﻛﺎﻧﺖ ﺍﻟﻤﺮﻛﺒﺔ ﻣﺴﺮﻭﻗﺔ ﺃﻭ ﻣﺄﺧﻮﺫﺓ ﻏﺼﺒﺍ ﻓﺈﻥ ﻟﻠﺸﺮﻛﺔ ﺣﻖ ﺍﻟﺮﺟﻮﻉ ﻋﻠﻰ ﺍﻟﻤﺘﺴﺒﺐ ﻓﻲ ﺍﻟﺤﺎﺩﺙ ،ﻭﻟﻬﺎ ﺍﻟﺮﺟﻮﻉ ﻋﻠﻰ ﺍﻟﻤﺆﻣﻦ ﻟﻪ
ﻓﻲ ﺣﺎﻝ ﻟﻢ ﻳﺨﻄﺮ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺩﻭﻥ ﻋﺬﺭ ﻣﻘﺒﻮﻝ
ﺛﺎﻟﺜﺎ :ﻋﻠﻰ ﺍﻟﺸﺮﻛﺔ ﺇﺧﻄﺎﺭ ﺍﻟﻤﺆﻣﻦ ﻟﻪ ﺃﻭ ﺍﻟﺴﺎﺋﻖ ﺧﻼﻝ ﻋﺸﺮﻳﻦ ﻳﻮﻡ ﻋﻤﻞ ﻣﻦ ﺗﺎﺭﻳﺦ ﺗﻘﺪﻳﻢ ﺍﻟﻤﻄﺎﻟﺒﺔ ﺍﻟﺘﻲ ﺗﻨﻄﺒﻖ ﻋﻠﻴﻬﺎ ﺇﺣﺪﻯ ﺣﺎﻻﺕ ﺍﻟﺮﺟﻮﻉ
ﻛﻤﺎ ﻋﻠﻰ ﺍﻟﺸﺮﻛﺔ ﻣﻤﺎﺭﺳﺔ ﺣﻖ ﺍﻟﺮﺟﻮﻉ ﺧﻼﻝ ﻣﺪﺓ ﺃﻗﺼﺎﻫﺎ ﺳﻨﺔ ﻣﻦ ﺗﺎﺭﻳﺦ ﺗﺴﻮﻳﺔ ﺍﻟﻤﻄﺎﻟﺒﺔ
ﺭﺍﺑﻌﺎ :ﻻ ﻳﺠﻮﺯ ﻟﻠﻄﺮﻑ ﺍﻟﺜﺎﻟﺚ ﻓﻲ ﺣﺎﻝ ﻛﺎﻥ ﺷﺨﺺ ﺍﻋﺘﺒﺎﺭﻱ ﻣﻄﺎﻟﺒﺔ ﺍﻟﺸﺮﻛﺔ ﻋﻦ ﺗﻜﺎﻟﻴﻒ ﻋﻼﺝ ﺍﻷﺿﺮﺍﺭ ﺍﻟﺠﺴﺪﻳﺔ ﺍﻟﺘﻲ ﺗﺤﻤﻠﻬﺎ ﻓﻲ
ﺣﺎﻝ ﺍﻧﻄﺒﻘﺖ ﺇﺣﺪﻯ ﺣﺎﻻﺕ ﺍﻟﺮﺟﻮﻉ ﻋﻠﻰ ﺫﺍﺕ ﺍﻟﻤﻄﺎﻟﺒﺔ
ﻻ ﻳﻌﺘﺪ ﺑﺄﻯ ﺷﻄﺐ ﺃﻭ ﺗﻌﺪﻳﻞ ﻋﻠﻰ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺍﻻ ﺑﺨﻄﺎﺏ ﺧﻄﻰ ﻣﻌﺘﻤﺪ ﻣﻦ ﺷﺮﻛﺔ ﺍﻟﺘﺄﻣﻴﻦ .
ﺗﺨﻀﻊ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻷﺣﻜﺎﻡ ﻭﺷﺮﻭﻁ ﻭﺍﺳﺘﺜﻨﺎﺀﺍﺕ ﻭﺛﻴﻘﺔ ﺍﻟﺘﺄﻣﻴﻦ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ،ﻛﻤﺎ ﺗﻌﺘﺒﺮ ﺟﺰﺀ ﻻ ﻳﺘﺠﺰﺃ ﻣﻦ ﻭﺛﻴﻘﺔ ﺍﻟﺘﺄﻣﻴﻦ ﺍﻻﺻﻠﻴﻪ
ﻻ ﺗﻘﺒﻞ ﺍﻻ ﺍﻟﺸﻬﺎﺩﺓ ﺍﻷﺻﻠﻴﺔ .