Coating & Painting Works
Coating & Painting Works
Coating & Painting Works
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 1 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
WORK SUPERVISOR : I CERTIFIED THAT I HAVE EXPLAIN THIS HIRARC TO ALL WORKERS
No. Name Position IC No Signature Witness By EME - HSE Signature Date
En. Syammir SITE MANAGER AMIR NAQIUDDIN B. ABD JALIL
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/005
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 2 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
MOST LIKELY The most likely result of the hazard / event being realized 5 CATASTROPHIC Numerous fatalities, irrecoverable property damage and productivity 5
Approximately one single fatality major or major property damage if hazard is
POSSIBLE Has a good chance of occurring and is not unusual 4 FATAL 4
realized
CONCEIVABLE Might be occur at some time in future 3 SERIOUS Non-fatal injury, permanent disability or minor property damage 3
REMOTE Has not been known to occur after many years 2 MINOR Disabling but not permanent injury 2
INCONCEIVABLE Is practically impossible and has never occurred 1 NEGLIGIBLE Minor abrasions, bruises, cuts, first aid type injury 1
PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)
Concrete Works
Prepare work tools / a. Obstruction a. Body injury Identify proper inspection area 1 2 2 a. Good Housekeeping Site Supervisor /
1 materials b. Slip Trip & Fall at (LOW) b. Identify proper inspection area Engineer
same level c. Clear any obstruction
d. Maintain good housekeeping at all
time
b. Floor opening a. Serious body 3 3 9 a. Installation barricade for floor opening Site Supervisor /
injury (MEDIUM) b. Install safety signage Engineer
c. Sharp edges a. Cut and abrasion 1 2 2 a. Always practice correct & safe method Site Supervisor /
(LOW) of works Engineer
b. Wearing proper work attire (PPE)
c. Covered sharp edges (if possible)
d. Defective equipment a. Property damage 1 2 2 a. Inspection on equipment before Site Supervisor /
(LOW) start work. Engineer
b. Ensure the tools and equipment’s
were checked and recorded
e. Untrained worker a. Property damage 1 2 2 a. Follow work method statement. Site Supervisor /
b. Body injury (LOW) b. Wear proper work attire (PPE) Engineer /
Conduct training/awareness Safety
f. Ergonomic issue a. Back pain 1 2 2 a. Practice correct body posture and Site Supervisor /
b. Muscle strain (LOW) movement Engineer /
b. Provide in-house training to all related Safety
workers
Working At Height a. Falling from height due a. Resulting into All worker must be briefed before 4 4 16 Site Supervisor /
2 (WAH) to work above personel injury start work especially on safety aspect (HIGH) a.Workers must wear full body harness Engineer /
ground/floor level more through briefing toolbox talk and with double lanyard, chin strap and Safety
than 2meter HIRARC to be explained to all ensure the hook 100% tie off to the firm
workers. structure properly.
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 4 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)
a.
e. Bad Weather a. Thunderstorm 1 3 3 a. Stop works when heavy rain or Site Supervisor /
b. Flooding (LOW) thunderstorm Engineer /
b. To have weather forecast before Safety
starting work (if necessary)
c. Provide shelter resting area for resting
time
d. Ensure all drain clear from obstruction
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 5 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)
Apply coating and a. Exposed to paint and a. Personnel Injury 2 3 6 a. SDS (Safety Data Sheet) display at Site Supervisor /
3 painting solvents flammable (MEDIUM) storage area Engineer /
- Manual Touch Up b. Wear PPE as per stated in SDS (Dust Safety
- Powered Tools mask, Rubber glove, etc)
c. Avoid exposing hand and parts of
body from any chemical
d. Identify nearest location of safety
shower and safety eye wash
b. Spillage of paint/thinner a. Environment 2 2 4 a. Use proper container for mixing Site Supervisor /
/ ceramic alloy Issue (LOW) purposes Engineer /
materials b. Cover underneath mixing area Safety
container with canvas
c. Cleanup the spillage immediately
d. To dispose contaminated PPE as
scheduled waste
e. Wear appropriate PPE.
a. Chemical a. Eye injury 3 4 12 a. Obtain and read the manufacturer's Site Supervisor /
Handling/Exposure b. Skin Irritation (MEDIUM) SDS for health hazard information Engineer /
c. May cause b. Avoid exposing hand and parts of Safety
cancer body from any chemical
d. Cause damage c. Wear proper PPE as per PTW & SDS
to organs requirements
d. To follow SDS (Safety Data Sheet)
requirements for handling
e. Identify nearest location of safety
shower and safety eye wash
f. Make sure all workers know about the
task of work
b. Ergonomics - Manual a. Muscular strain 1 3 3 a. Conduct Manual Handling Awareness Site Supervisor /
handling, repetitive and back pain (LOW) Training. Engineer /
work etc. from work b. Working with assistant Safety
position & Use machinery for lifting heavy
manual lifting of material
materials
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 6 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)
Housekeeping a. Manual Handling a. Back pain / 2 2 4 a. Wear proper PPE as per PTW Site Supervisor /
4 ergonomic (LOW) requirement Engineer /
b. Body Injury b. Correct body posture & do not over Safety
stretch body
c. Working with buddy system when
handling a heavy load
d. Use correct / proper tools and proper
manual lifting method
b. Slip, Trip and Fall a. Personnel Injury 2 3 6 a. To ensure proper housekeeping of Site Supervisor /
(MEDIUM) tools, cables, equipments and Engineer
materials
b. To ensure all loose tools are tied off/
in tool bags
c. To wear proper PPE as per PTW
requirements and in good condition
c. Waste Disposal a. Environment 3 3 9 a. To segregate domestic and scheduled Site Supervisor /
(Scheduled waste) (MEDIUM) waste Engineer
b. To properly allocate the scheduled
waste in drum and labelling
c. To seal the drum once the scheduled
waste full
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 7 of 8
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
COATING & PAINTING WORKS HIRARC No HIRARC R0 (Rev: 0) Date 20.11.2023
Description
PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)