0% found this document useful (0 votes)
508 views1 page

FM NPD 10 (Apqp Matrix)

Uploaded by

akash.vd.1603
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
508 views1 page

FM NPD 10 (Apqp Matrix)

Uploaded by

akash.vd.1603
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ATOP PRODUCTS PVT LTD

APQP MATRIX
Purpose : To define the rank of new development activities & responsibilities
Scope : This Matrix is applicable for development of new tool , customer provided tool and Engg. Change
Method : Description,Rank of Development and responsibility is defined as below
Development Type
Type Details
Development of new family part by Tool Design ,manufacturing &
A
Process
B Any Engineering Change ( Process or Product )
C Out of family part
For Development Rank For Responsibility

Legend Definition Legend Definition


O Point to be Implemented Prime Responsibility
Blank Point which are not to be implemented O Co-Responsibility

Development Responsibility
S.No Description Remarks
A B C Mktg QA Prod. PUR.

1 Reciept of Customer enquiry log register/Drawing O


2 List of NPD parts O
3 Drawing issue to Feasibility Team O
4 Formulation of APQP matrix
5 Technical Feasibility&Management Approval O O O
6 Quote to customer. O
7 Control the Drawing O
8 Proposal For Additional Requirement O O O
9 Reciept of LOI/Purchase Order from customer O
10 Customer Specific requirement /Mannual if Any O O O
11 Time Plan Preparation & Team formation O O O O
12 Formulation of PFD,PFMEA and Control Plan O O
13 Arrange of Raw Material(BOM) O
14 Packaging Specifications & Development O O
15 Sample Submission O O O
16 Customer Feed Back O O
17 Process/Tool Correction if needed O O
18 Sample Trial Run(T1) if needed O O
19 Customer Feed Back O O
20 Pilot Lot Submission with MSA & SPC study O O
21 Updation of TGR/TGW O O
22 PPAP Approval & PSW Signoff (Pre-launch) O
Rev.No. Change Description Date

PREPARED BY : APPROVED BY:


FM-NPD-10 REV NO.00 EFFECTIVE DATE 25-11-2016