Creating The Layout From Your Schematic
Creating The Layout From Your Schematic
electronic circuit or system. It allows the designer to plan out and test the
etc must all be precisely defined. This is known as board layout or PCB layout.
it into an initial board layout that is ready for further refinement and
Exporting netlists
Placing components
Routing connections
Implementing layout best practices
Performing design rule checks
Properly creating the layout ensures your design intent is maintained and the
After completing the schematic design, the first step is to export an electronic
netlist file. This netlist contains a listing of all the electronic connections in a
textual file format which will serve as the guide for layout.
EDIF
Protel
OrCad
PADS
Cadence Allegro
The netlist can be exported directly from within the schematic CAD program.
If your schematic tool does not support exporting all required data, manual
Place Components
With the netlist file imported, the basic parts placement process can begin.
There are a few methods and order of operations to follow for initial
placement:
1. Identify circuit sections - Break the design into functional blocks like microcontroller,
power supply, connectors, etc
2. Define section outlines - Create board outlines for each section for initial component
grouping
3. Place section components - Within each section, place related components near each
other
are needing sufficient board space upfront and potential difficulty routing
between sections.
1. Place sheet components - Follow the same schematic sheet order placing components
2. Route sheet connections - Route connections for each sheet before moving to the next
3. Complete overall routing - Finish routing between sheets
This mirrors the schematic hierarchy for intuitive component findability. It can
Start with special placement requirements - First place components with fixed locations
like connectors that interface with external hardware
Observe clearance rules - Ensure sufficient spacing between part footprints and
enclosure walls based on voltage separation design rules
Group associated parts - Place interacting components with short connections near each
other
Plan for routing channels - Leave sufficient routing channels between sections at 50-100
mil widths
Following these basic rules sets the foundation for part placement
optimization later.
between parts is the next priority. This is known as routing and includes tracing
Logical Organization
Layout Practices
Via Usage
Properly organizing and routing the connections transforms the logical netlist
Beyond just routing the basic connectivity, additional best practices ensure
Specify Stackup
Choose a fabrication stackup that provides the right number of routing layers
Common options:
4-layer FR4
4-layer high frequency material
6-layer with power and ground planes
8-layer or more for advanced designs
Power Distribution
Minimize parasitics for high speed signals like memory buses with:
Thermal Management
Ensure power devices and ICs can dissipate heat efficiently through:
Connectivity
Spacing
Routing
Tools analyze the full layout and generate detailed reports listing any design
optimization and design rule validation are key leading up to final tape out.
Next Steps
Upon passing design validation, the layout can then be released for board
With attention to the guidance provided throughout this article during layout,
FQA
What are the key differences when laying out a double sided vs
multilayer board?
The most significant differences are around routing capabilities and best
practices. For double sided, all routing must be completed on the two external
layers. This limits routing capability and often requires wider traced to carry
more current flow. Also without internal planes acting as shields, care must be
flexibility plus integrated power and ground planes shield signals while serving
as heat sinks. Components can be placed closer together and trace widths
trace?
termination of high speed signals. This prevents reflection and parasitics which
off a route that are left unterminated. At high frequencies they can become
1. Design validation testing - run design rule checks that model manufacturing capabilities
looking for violations
2. DFM analysis - sophisticated tools can run simulations based on proposed stackup, layer
materials, trace specs, etc to predict manufacturability
3. Prototype testing - submit prototypes to the intended fabricator to confirm capabilities
firsthand and uncover process limitations
manufacturing constraints.
modeling tools like Ansys Icepak. The material properties, layer construction,
Analysis is critical for high power boards. External changes like adding a heat
Summary
in the field.
Leveraging the guidance provided throughout this 3500+ word article equips
you with the methodology to tackle PCB layout for a robust design. Let the
completion of routing be the start of the next exciting stage of testing and