100% found this document useful (1 vote)
418 views3 pages

Public Address System Estimation

This document provides an estimation for a public address system for the Tosiba Factory at Thang Long IP. It includes a breakdown of areas and rooms in the factory with their dimensions, the proposed audio equipment for each area including speakers, racks and cables, and estimates of materials needed like cable, conduit and trunking. The estimate also provides unit rates and calculations to determine the total estimated cost for purchasing and installation of the public address system.

Uploaded by

tien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
418 views3 pages

Public Address System Estimation

This document provides an estimation for a public address system for the Tosiba Factory at Thang Long IP. It includes a breakdown of areas and rooms in the factory with their dimensions, the proposed audio equipment for each area including speakers, racks and cables, and estimates of materials needed like cable, conduit and trunking. The estimate also provides unit rates and calculations to determine the total estimated cost for purchasing and installation of the public address system.

Uploaded by

tien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Name:Tosiba Factory at Thang Long IP REVISION 00

PUBLIC ADDRESS SYSTEM - ESTIMATION

Sta
Page For Quotation

ge
System/work item: Area/Floor: Date of Estimation: 04.June.08 Date of Check:

Dwg for Estimation: E- Issued date: Estimated by: Hang Checked by: Total For Purchasing

ROOM DIMENSION PUBLIC ADDRESS EQUIPMENT UNIT DATA Box/P.Box Cable/Wire Pipe/conduit Trunking/CR/Others

Area/Room Name X Y S Install Averag. Zone Speaker Volume/Remote Mic PA Rack/TB Box/P.Box Cable/wire Pipe/ Conduit PVC PVC Steel Pull Nozzle 3C 5C 10C UTP PVC PVC PVC FEP FEP TK CR DB

Excavation
Manhole
Up/D Recess CAT
20 25 32 30 50

0,H=1
W=10

W=30
(m) (m) (m2) Level of No. PA TB PVC PVC Steel straigh straigh Up/Dn Box Box Box Plate 1.25 1.25 1.25
coverag. RM 5

W=
n ed

50
0
Recess w/Co w/Co w/Cove w/Co
PA 3W/6W 3W/6W 10W 3W 6W 30W Rack Box
(m2) ed ver ver r ver

I COMMON ITEMS 30

T-01 to AMP 20 10 30

II OFFICE AREA 1FL & CANTEEN 1 10 3 1 1 1 13 156 12

w/Ceiling CH=3.0

SP to SP(Ceiling Type) 10 1 110

SP to Volume 8 3 3 33 9

Zone to TB (AMP) 10 3 3 13 3

m
II OFFICE AREA 2FL 1 4 1 1 1 1 5 68 6

co
w/Ceiling CH=3.0

SP to SP(Ceiling Type) 10 1 44

SP to Volume 8 3 3 11 3

.
Zone to TB (AMP) 10 3 3 13 3

ep
III FACTORY 1 2 1 2 2 75 9

w/Ceiling CH=3.0

um
SP to SP(Box Type) 20 5 3 50 6

Zone to TB (AMP) 20 5 3 25 3

GRAND TOTAL 3 14 2 4 1 1 20 2 299 30 47 45

Adjust Factor 1.05 1.00 1.00


ilie
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05

For Quotation 3 14 2 4 1 1 20 2 314 32 50 48

Notes/Conditions: Q'ty PA Rack (Cheap Type) Q'ty Scope


Ta
● Cabinet rack (VN) w/Blower 13 units,…
SELECTION OF SPEAKER
● Program timer (……....output)
II Labour,Testing, Comissioning Fee ROOM/ AREA SP TYPE/ VOLUME Q'ty ● Power amplifier: 120W, 240W
1 Labour cost for installation 1 lot OFFICE & CANTEEN AREA SP VC SET m2 m (W/5 zones seletor/1AMP)
2 Testing and commissioning 1 lot ● Office Ceiling 3W/6W O 1 150 ● Voice announcement unit
● Director Ceiling 3W/6W O 1 ● Compact flash card
● Meeting/ Conference Ceiling 3W/6W O 1 ● Paging Microphone
● Corridor Ceiling 3W/6W 1 20 Remote microphone (option)
● Canteen/ Kitchen Ceiling 3W/6W 1 150 ● CD/DVD Players (option)
FACTORY AREA (Operation by hand only)
● Factory w/o ceiling Horn SP 10W/15W 1 600 ● Interface w/TEL, FA…(option)
● Factory w/ceiling Box 3W/6W 1 300
(CH≤ 5m) Horn SP 10W/15W 1 600 ● EMG PS & Batteries (option)
● Factory Office Ceiling 3W/6W 1 150 ● Selection PA configuration:
● Factory w/ceiling >5m Horn SP 10W/15W 1 600 - If owner's request→Follow
● Long corr, high ceiling Box SP 3W/6W 1 20 - If nothing→Proposal by VNKD
● Locker Ceiling 3W/6W 1 300 (Small project→choose cheap one,
● Max speaker No/1zone: Not limited, up to AMP capacity big project→check w/supplier)
● Volume controller (VC): Office, meeting, corridor,….
● Amplifier capacity ≥ Total speaker's capacity (W)
● Piping/Wiring: Trunking→Sharing w/FA, TEL system

05.June.08 Tosiba Factory


REV-00 PUBLIC ADDRESS SYSTEM

Page 1 of 3
Project Name:HARAJYUKU - PROJECT
DETAIL OF PA EQUIPMENTS
REVISION - 00

2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19 20 21 22

Auto (Refer to other sheet) Auto (This sheet) Input manually

ROOM DIMENSION PUBLIC ADDRESS EQUIPMENT

Area/Room Name X Y S Ceilling Averag. Speaker Volume/Remote Mic PA Rack/TB

(m) (m) (m2) (CH=) PA TB


coverag. RM
or LTG Level
(m2)
3W/6W 3W/6W 10W 3W 6W 30W Rack
H=
I OFFICE AREA 1FL & CANTEEN ### #REF! 613 #REF! 61 10 3 1
1FL Waiting area 8.5 5.5 47 CH=3 47 1
1FL Corridor-1 27.0 2.0 54 CH=3 54 1
1FL Driver Rm 6.0 2.5 15 CH=3
1FL Locker (M.F) 6.0 5.0 30 CH=3 2
1FL Document 6.0 2.5 15 CH=3
1FL Delivery inspection 8.5 5.0 43 CH=3 43 1
1FL Corridor-2 22.0 2.0 44 CH=3 44 1
1FL Reception 8.0 3.0 24 CH=3 1 1
1FL Corridor-3 3.5 15.0 53 CH=3
1FL Reception for Toilet 4.5 11.0 50 CH=2.8
1FL Stair #REF! #REF! CH=3 #DIV/0!
1FL Present RM 8.0 5.0 40 CH=3 1 1
1FL Multi purpose RM 8.0 12.0 96 CH=3 96 1 1 1
1FL Canteen 8.0 11.0 88 CH=3 88 1
1FL Smoking area 8.0 2.0 16 CH=3
1FL #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
II OFFICE AREA 2FL ### #REF! 197 #REF! 4 1 1

om
2FL Corridor 12.5 2.0 25 CH=3 25 1
2FL Reception for toilet 2Fl 4.5 5.5 25 CH=2.8 #DIV/0!
2FL Stair #REF! #REF! CH=3 #DIV/0!
2FL Pantry 2.5 3.0 8 CH=3 #DIV/0!
2FL Office RM 8.0 13.5 108 CH=3 108 1 1 1
2FL Meeting RM 5.5 4.0 22 CH=3 22 1

.c
2FL Server RM 2.5 4.0 10 CH=3 10 1
2FL #REF! #REF! #REF! #REF! #REF! #REF!
2FL #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
ep
### #REF! #REF! #REF! #REF! #REF! #REF!
III FACTORY AREA #REF! #REF! 492 #REF! 2
1FL Production area 22.0 22.0 484 CH=3 2
1FL Small RM 2.5 3.0 8 CH=3
1FL #REF! #REF! #REF! #REF!
um

1FL #REF! #REF! #REF! #REF!


### #REF! #REF! #REF! #REF! #REF!
IV EXTERNAL & Utility #REF! #REF! #REF!

1FL Electrical RM #REF! #REF! #REF! #DIV/0!


1FL Transformer RM #REF! #REF! #REF! #DIV/0!
1FL Guard house #REF! #REF! #REF! #DIV/0!
lie

1FL Pump Rm #REF! #REF! #REF! #DIV/0!


1FL Bycicle area
1FL Parking area
1FL #REF! #REF! #REF! #REF! #DIV/0!
i

### #REF! #REF! #REF! #REF! #REF! #REF!


Ta

A GRAND TOTAL #REF! #REF! 1302 #REF! 14 2 4 1 1


B Adjust Quantity #REF! #REF! #REF! #REF! #REF!

C GRAND TOTAL (A+B) ### #REF! #REF! #REF!

FOR CHECKING ONLY


Q'ty L 3C 5C 10C
CEILLING SP 0 15 0
HORN SP 0 45 0
BOX SP 0 75 0
VOLUME 0 17 0
ZONE 5 25 125
TB 90 20
TOTAL 125 90 20

Page 2 of 3
Project Name: JTEC FACTORY AT THANG LONG IP, HANOI REVISION-02

PUBLIC ADDRESS SYSTEM


USD/VND 16,000
UNIT PRICE TOTAL (USD)
No. NAME UNIT Q'Ty
VND USD VND USD
I REMOTE MICROPHONE set 1 9,875,000 617.19 9,875,000 617.19

II AMP RACK 30,927,000 1,932.94

m
1 Cabinet rack set 1 3,500,000 218.75 3,500,000 218.75
2 Program Timer set 1 6,776,000 423.50 6,776,000 423.50

co
3 Management Amplifier 120W set 1 11,200,000 700.00 11,200,000 700.00
4 Voice announcement board set 1 5,150,000 321.88 5,150,000 321.88

.
5 Compact flash card set 1 1,515,000 94.69 1,515,000 94.69

ep
6 Paging Micro phone set 1 586,000 36.63 586,000 36.63
7 DVD Player set 1 2,200,000 137.50 2,200,000 137.50

um
III SPEAKERS
1 Ceiling speaker - 3W/6W set 10 277,000 17.31 2,770,000 173.13
2 Horn speaker - 10W set 7 720,000 45.00 5,040,000 315.00
ilie
3 Box speaker - 3W set 2 275,000 17.19 550,000 34.38
4 Attenuator - 6W set 5 252,000 15.75 1,260,000 78.75
Ta

IV Assemble, Testing, Commissioning & Transportation LOT 1 2,500,000 156.25

V GRAND TOTAL 3,307.63