Awqaf Aae SD Hvac Mec 003 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35
X36
X37
X38
X39
X40
X41

FOR CONTINUATION REFER DWG NO:

FOR CONTINUATION REFER DWG NO:


FOR CONTINUATION REFER DWG NO:

FOR CONTINUATION REFER DWG NO:


AWQAF-AAE-SD-HVAC-MEC-003-1

AWQAF-AAE-SD-HVAC-MEC-003-2
AWQAF-AAE-SD-HVAC-MEC-003-2

AWQAF-AAE-SD-HVAC-MEC-003-3
+0.15 +0.15
FFL. FFL.

QND =14.45 QND =14.45


SAD SUPPLY AIR DUCT
EAD EXHAUST AIR DUCT
VCD VOLUME CONTROL DAMPER

CAR PARKING
DS DUCT SUPPORT
DSU SPLIT DUCTED UNIT
± 00.00 ± 00.00 ± 00.00
FFL. FFL. FFL. TH THERMOSTAT
QND =14.30 QND =14.30 QND =14.30
SCD SUPPLY CEILING DIFFUSER
RCD RETURN CEILING DIFFUSER
F/A FROM ABOVE
T/A TO ABOVE
T/B TO BELOW
+0.15
+0.15
FFL.
FFL FINISH FLOOR LEVEL
FFL.
QND =14.45
QND =14.45 CFM CUBIC FEET PER MINUTE

COORDINATION

ARCHITECTURAL
STRUCTURAL
OFFICE
MEP
OFFICE G-13 OFFICE G-12 OFFICE G-11 OFFICE G-10 OFFICE G-09 OFFICE G-08 G-07 OFFICE

AREA=
OFFICE G-07 G-06
OFFICE
INFRA
RECEPTION OFFICE G-06
G-05 OFFICE

+0.30 OFFICE G-05 G-04 SUB-CONTRACTOR


OFFICE G-04
FFL. +0.30
+0.30 REFERENCE DRAWINGS
FFL.
ELEC. FFL.
MAIN
+0.30
ENT.LOBBY PANTRY TOILET PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY
3.2m² 3.2m² FFL.
PANTRY TOILET
TOILET PANTRY
ELEC. ELEC. ELEC. PANTRY TOILET
TOILET PANTRY

+0.30 +0.30 +0.30 +0.30


FFL. ELEC.
FFL. FFL. FFL.
+0.30

ELEC.
FFL.
ELEC.

PANTRY TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET TOILET PANTRY PANTRY TOILET PANTRY TOILET
2.6m² TOILET PANTRY PANTRY TOILET
TOILET PANTRY PANTRY TOILET
TOILET PANTRY PANTRY TOILET
TOILET PANTRY

ISSUES \ REVISIONS

SHOP G-29 SHOP G-28 SHOP G-27 SHOP G-26 SHOP G-25 SHOP G-24 SHOP G-23 SHOP G-22 SHOP G-21 SHOP G-20 SHOP G-19 SHOP G-18 SHOP G-17 SHOP G-16
SHOP G-15
SHOP G-14
SHOP G-13
SHOP G-12
SHOP G-11
SHOP G-10
SHOP G-09
SHOP G-08 ISSUES \ REVISIONS

+0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30
+0.30 +0.30
FFL. FFL. FFL. FFL. FFL. FFL. FFL. FFL. +0.30
FFL. FFL. FFL. FFL. FFL. FFL. FFL.
FFL. +0.30 APPROVED A
FFL. +0.30 +0.30
FFL. +0.30
FFL. FFL. +0.30 APPROVED AS NOTED B
FFL.
FFL.
REVISED AND RE-SUBMIT C
+0.30
FFL. REJECTED D
+0.30 ENGINEER SIGNATURE
FFL.
CLIENT

MAIN ENTRANCE
MAIN ENTRANCE
01
+0.15
GENERAL DIRECTORATE OF ENDOWMENTS
FFL. INVESTMENT DEPARTMENT / PROJECTS SECTION

+0.15 CONSULTANT
QND =14.45
FFL.
QND =14.45

ARAB CONSULTING ENGINEERS


MOHARRAM-BAKHOUM

QND =14.30
± 00.00 P.O.Box : 7124 Doha - Qatar P.O.Box : 62 Dokki - Egypt
FFL. CAR PARKING Tel.(974)44355409 - Fax (974)44419867 Tel.(202) 3377120- Fax (202)7498254
± 00.00
FFL. MAIN CONTRACTOR
QND =14.30

MAIN ROAD WALKWAY PAVING (OUTSIDE PLOT)

SUB CONTRACTOR

LIGHTNING
ELECTROMECHANICAL
P.O. BOX: 47100, DOHA-QATAR

PROJECT TITLE

FOR CONTINUATION REFER DWG NO:

FOR CONTINUATION REFER DWG NO:


FOR CONTINUATION REFER DWG NO:

FOR CONTINUATION REFER DWG NO:

X17 X34 COMMERCIAL AND OFFICES BUILDING

AWQAF-AAE-SD-HVAC-MEC-003-2

AWQAF-AAE-SD-HVAC-MEC-003-3
AWQAF-AAE-SD-HVAC-MEC-003-1

AWQAF-AAE-SD-HVAC-MEC-003-2

X16 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X35 X36 X37
AT ABU HAMOUR (B+G+M+1st)
X38 X39
X40
X41
X42
DRAWING TITLE

GROUND FLOOR PLAN

PART-2 SCALE : 1:150 @A1


HVAC SYSTEM LAYOUT
(PART-2)
DATE : 25-12-2023
PROJECT NUMBER : REV.
GROUND FLOOR HVAC SYSTEMS LAYOUT (PART-2) DRAWING NUMBER :
00
AWQAF-AAE-SD-HVAC-MEC-003-2

You might also like