Chock Stress Calculation for Main Engine Installation Ship design

Engine weight (W) = 58257 kg = 571501 N


DIA. of holding down bolt = 27 mm
Area = 572.56 mm2
Quantity = 24
Tightening torque= 950 N-m = 96.8 kgf-m

Total hold down bolt tension force must be at least 2.5*Engine weight .
Tension force = Tightening torque*1000 /(0.2*DIA.)
= 950*1000/(0.2*27) = 175925.9 N
= 17933.3 kgf
Total tension force= 175926*24 2.5*(W) = 1428752.9
= 4222222 N > 1428753 N (OK)

2
Hold down bolt stress must be at least 4.73 kgf/mm
Bolt stress = Bolt tension force / Bolt Area
= 17933.3 / 572.56
= 31.3 kg/mm2 > 4.73 kgf/mm2 (OK)
= 307.3 N/mm2 < 640 N/mm2 (OK) grade 8.8

Stress on the chocks due to the machinery's weight should not exceed 7 kgf/cm 2
Min. total Chock area = W58257/7 = 8322.4 cm2
Chock: type A type B type C
length(cm) 48.0 48.0 48.0
broad(cm) 22.0 22.0 22.0
Area(cm2) 1056 1056 1056
Quantity 4 4 4
Hole: DIA. (mm) Area (mm2) Quantity
a) Holding down bolt 30 706.9 24
b) Adjusting screw 16 201.1 48

Total net chock area = (1056*4+1056*4+1056*4)-(706.9*24+201.1*48)/100


= 12405.8 cm2 > 8322.4 cm2 (OK)

Design chock loads should not exceed 4.5 N/mm 2


Chock loads =[ Total bolt tension force + Engine weight] / Net chock area
= (4222222+571501.17)/(12405.8*100)
= 3.9 N/mm2 < 4.5 N/mm2 (OK)

* The allowable stress for grade 8.8 is 640 N/mm2 (yield strength) Grade 8.8 yeild strength
*CHOCK: Loctite Fixmaster Marine Chocking (Green) 640 N/mm2

02/06
Chock Stress Calculation for Gearbox Installation Ship design
Gearbox weight (W) = 16414 kg = 161021.3 N
Holding down bolt= M 33
Bolt Area (AB)= 855.3 mm2
Quantity= 8 pcs.

2
Stress on the chocks due to the machinery's weight should not exceed 7 kgf/cm
Min. total Chock area = W / 7 = 16414/7 = 2344.9 cm2
Chock: typ D
length(cm) 100
broad(cm) 23.5
2
Area(cm ) 2350
Quantity 2
Hole: DIA. (mm) Area (mm2) Quantity
a) Fitted steel bush 0 0.0 0
b) Holding down bolt 36.5 1046.3 8
c) Adjusting screw 36 1017.9 4
Total effective area (Ae)= (2350*2)-(1046.3*8+1017.9*4)/100
= 4575.6 cm2 > 2344.9 cm2 (OK)
2
Design chock loads should not exceed 3.5 N/mm
Deadweight load(σc) = W/Ae = 161021.34/(4576*100)= 0.352 N/mm2
Total Allowable Static Load (σt) = 3.50 N/mm2
Max. Bolt Load (σ) = σt-σc= 3.15 N/mm2
Total Bolt Tension(Ft)=σ*Ae= 3.15*4575.6*100= 1440430.7 N
Tention Per Bolt (Fb)=Ft / Bolt No. = 1440430.7/8 = 180053.8 N
Max. Tightening Torque (Tp)= Fb*0.2*d/1000=
= 180053.8*0.2*33/1000= 1188.4 N-m Recommended Bolt Torque(Tp)

Recommended Bolt Torque(Tp)= 1180 N-m 1180 N-m

Total hold down bolt tension force must be at least 2.5*Engine weight.
Tention Per Bolt (Fb)=Tp*1000/(0.2*d) = 1180*1000/(0.2*33)
= 178787.9 N
= 18225.1 kgf
Total tension force= 178788*8
= 1430303.0 N > 2.5W = 402553.4 N (OK)
2
Hold down bolt stress must be at least 4.73 kgf/mm
Bolt stress = Tension force / Bolt Area
= 18225.1 / 855.3 = 21.31 kgf/mm^2 > 4.73 kgf/mm2 (OK)
2
= 209.04 N/mm^2 < 640 N/mm (OK) (grade 8.8)
2
* The allowable stress for grade 8.8 is 640 N/mm (yield strength) Grade 8.8 yeild strength
*CHOCK: Loctite Fixmaster Marine Chocking (Green) 640 N/mm2

03/06
GEARBOX CHOCK AREA CAL. CHOCK ARRANGEMENT ENGINE CHOCK AREA CAL.

Title

Scale Drawing Number Rev

1 / 30 JY110-M019 Sheet 04 of 06 --
MAIN ENGINE

GEARBOX

Title

Scale Drawing Number Rev

1/5 JY110-M019 Sheet 05 of 06 --


Title