This technical submittal log summarizes civil works submissions for a plot upgrade and construction project. It lists 5 submissions including work method statements, design consultant prequalification, machinery and staffing documents. The log notes the planned and actual submission and response dates, and status of each submittal.
This technical submittal log summarizes civil works submissions for a plot upgrade and construction project. It lists 5 submissions including work method statements, design consultant prequalification, machinery and staffing documents. The log notes the planned and actual submission and response dates, and status of each submittal.
This technical submittal log summarizes civil works submissions for a plot upgrade and construction project. It lists 5 submissions including work method statements, design consultant prequalification, machinery and staffing documents. The log notes the planned and actual submission and response dates, and status of each submittal.
This technical submittal log summarizes civil works submissions for a plot upgrade and construction project. It lists 5 submissions including work method statements, design consultant prequalification, machinery and staffing documents. The log notes the planned and actual submission and response dates, and status of each submittal.
CLIENT ITHRA CONTRACTOR ON ROADING COMMENCEMENT DATE
CONTRACTING LLC CONSULTANT ALTURATH ENGINEERING PROJECT Plot X floor upgrade design COMPLETION DATE CONSULTANT and construction - Waterfront Market LLC
Submission date Response date Day
Sr. Submission App. Days Rev. Technical submittal Description s Remarks No. Ref. planned Actual planned Actual Status o/s o/d TEC/CIV/MS/0 Work Method statement for Trial 11/12/202 11/12/20 13/12/20 13/12/20 1 01 00 AAN Pit works 3 23 23 23 TEC/CIV/PQ/0 Design Consultant 14/12/202 14/12/20 18/12/20 18/12/20 2 01 00 AAN PreQualification 3 23 23 23 MACHINERY LIST WORKMEN 19/12/202 19/12/20 TEC-CIV- 3 GEN-001 00 COMPENSATION,THIRD PARTY IN PROCESS LIABILITY INSURANCE, THIRD PARTY 3 23 GEN/CIV/CV/0 01- 18/12/202 18/12/20 4 GEN/CIV/CV/0 00 CV FOR COMPANY STAFF 3 23 07 REVISE TEC/CIV/PRG/ 19/12/202 19/12/20 19/12/20 19/12/20 AND 5 001 01 SCHEDULE OF WORK RESUBM 3 23 23 23 IT 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25