A 3 4 12 ➢ 1 4 4*
Serious Operator L Consider the stability of the
Speeding injury or s and forklift under braking, its
death other stopping distances and
people environmental factors.
around ➢ *
Reduce speed to walking pace
223
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 224
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
A 3 3 9 1 3 3 Superviso
Sprains and Short term Operator L ➢ Consider forklifts with swivel r
strains or long-term s seats and/or closed-circuit
health video systems to reduce neck
effects due ‘craning’ and twisting.
to
➢ Fit mirrors if practicable.
continuous
looking up, ➢ Ensure road surfaces and floor
behind, surfaces are even and in good
uneven condition.
surface. ➢ Ensure the forklift seat is in
good condition and has
sufficient cushioning so that it
supports the back and
minimize vibration and jolting.
224
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 225
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
225
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 226
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
226
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 227
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
227
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 228
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
229
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 230
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
230
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 231
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
➢ T
Battery Serious Operator E The use and maintenance of
Charging injury or s, the vehicles, associated
death due to business, battery chargers, and
electrocutio equipmen equipment should be
n, fire and t and restricted to designated
explosion stock personnel trained in their
operation.
o D
Do not locate battery
chargers within storage racks.
o W
Within facilities equipped with
automatic sprinklers provide
automatic sprinklers to
protect battery charging
areas.
o B
Battery chargers should be
installed on a concrete floor,
or securely wall mounted
against a noncombustible
structure.
o P
Provide barriers to protect
231
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 232
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
232
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 233
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
Name: Name:
233
RISK ASSESSMENT Risk Assessment No: 04
Name of the Aspect: Fork Lift Operation Revision No 00
Company Name: Issue date
Assessed By: Risk/Impact Assessment Team (Logistic) Page No Page 234
of 12
Activity Hazard How might Who might N/ AL L S R1 Control measures L S R2 Action by Action
people be be A/ monitore
harmed? harmed? E/ d by
when?
Legend:
N: Normal A: Abnormal E: Emergency
AL: Applicability of legal requirements
L: Likelihood R1: Initial Risk Rate
S: Severity R2: Residual Risk Rate
234