Project:
AVIDA TOWERS MAKATI SOUTH POINT
REQUEST FOR APPROVAL Location:
Brgy. Bangkal Chino Roces Ave. Makati City
To: Date:
NBF 6/9/2022
Attention: Date Required:
ALDRIEN DULAY/MARK FLORA/WILBERT VALDEZ 6/21/2022
Copy To:
Ritz Bernal (ADD) Philip Gregor Ramos (CMG) Reynard Maranan (CMG)
ARMY GUIRIBA/ VINCENT GARCIA NOT as per contract scope GARETH GALANG site is NOT ready
MEPFS ENGINEER PROJECT MANAGER
Remarks: Remarks:
For Design/Drawings/Specifications:
Reviewed & Checked By: Date Received Date Returned Date required "+/- (Days)"
by Consultant by Consultant by MDC
RECIL FAYE ORIBELLO
BIMD SUPERVISOR BIMD OFFICER BIMD MANAGER
Remarks:
Approver's Response:
NBFCI NOTE:
-20mm SHOULD BE INSIDE DIAMETER (NOMINAL) AS PER OUR PLANS.
15/06/2022
➢ CWL stub-out should be 20mm inside diameter. Actual onsite is 20mm outside diameter
➢ WC stub-out conflict with pipe chase enclosure, should be 170mm from wall as per plan. Actual site is 130mm
For approval of 20mm outside diameter CWL which was originally 20mm inside diameter as per IFC
NBFCI NOTE:
-20mm SHOULD BE INSIDE DIAMETER (NOMINAL) AS PER OUR PLANS.
15/06/2022