Making Stream of Production-1
Making Stream of Production-1
Before going to the main theme I would respond to the questions regarding the
introduction of TPS which I have issued last time.
2) Supply or provide the necessary things to customer in the timing required and
the quantity required by the customer.
For example the case of buying a car.
The ideal situation of a customer buying a car is that visiting a car dealer and finding
his favourite type and colour and possible to buy.
1
But if there is no favourite car, he needs to choose one way in 2. One is to buy one in
the compromise. Another is to make order and wait the LT of delivery.
The case of Toyota the LT after the order to the dealer is very short days. (In Japan
and without the condition of new model car which very high demand at once,
producing out of the country and the remote place like as North Pole).
When getting the customer order, the car dealer deals with this with unique ordering
number in the same day and sending this on the direct line to Toyota. And the Toyota
factory plans the production in the production schedule of Heijunka of next day. And
the car production is made with the order number. Therefore if you visit the factory
and wish to chase and follow your car with the ordering number, you can see it next
day (from the order) in the assembly line even though very unique colour pink. Then
you can understand that Toyota starts the production after getting order.
Now here we have one doubt that does Toyota start the production after receiving
order in all processes (Manufacturing after receiving order)?
If it is possible to take the style of “Manufacturing start after receiving client’s order”
completely, it is ideal.
However the answer is No.
In the first place the Toyota production system also not the style of “manufacturing
after receiving order”, but one kind of “make to stock” system.
And it is possible to say that Toyota system uses “make to stock” with modifying the
production order (First order First production: first customer demand and first
production start.).
Let’s look the case by case.
-The case of export.
As you know the case of export is the complete “make to stock” production.
-The case of new product introduction.
The stock in the car dealer also is possible to be regarded as a stock.
When the new model introduction, it is necessary to manufacture the stock which
have no customer demand.
-The case of normal production.
As I wrote last time, TPS never deny MRP, but uses for
Informing the demand to each process (Press, Welding, Coating,
Plastic moulding, Forging, Casting, Machining, Suppliers and Assembly. For
Material preparation, Headcount preparation and
Kanban calculation and preparation.
Now here the important thing is that the MRP information is not the production
2
order to the processes and suppliers. The actual production order is made just by
Kanban and is given to just the final process (assembly). Then as you know begins
the “pull system”.
Normal production of Toyota also is not the complete “Make-to-order manufacturing”.
The example of car manufacturing process
The customer can chose (for instance) body colour, engine type, auto window, sunroof
etc. However the processes of common parts are progressed with no relation to the
actual order. (For instance press, welding, forging, casting and other common parts.)
And the order of production are arranged in order of the actual receiving order in
visual control and kanban as “First order First production”.
How about the supplier who implements TPS.
For instance Sumitomo who supplies the wiring harness to Toyota.
He needs to have the warehouse and minimum stock near the Toyota factory.
The Kanban system also is kept in having stock (but minimized). For instance Toyota
also has the process of large press and make the activity of SMED. However the large
press process is never the one by one production, but has stock in the Kanban system.
And the style of Make-to-order manufacturing is made in just one piece flow
production in the line (assembly line).
3
K. Suzumura in the Production Research Division in Toyota.
Kikuo Suzumura. My impression was that he was very scary person. He and his
group taught us TPS in my company. And one day when visiting the production line
with me he found excess work-in-progress which we call “subassembly” and should
be 5 but 7 beside of the line. Then he yelled me in anger “Connect these!!” and threw
these on the floor.
“Sub assembly” is the cables cut and terminated and assembled in connecters.
“Connect these cables cut in its original form” is of course impossible. After yelled at
me, he went to the executive room and yelled at my boss (director).
His point is quite right. When introducing the Kanban system which needs to have
minimum stock calculated and planned, 5S and 4R are seriously important for visual
control and controlling stock. And it was wrong that I had excess work-in-progress.
I love TPS.
However I hated and never like the manner of Mr. K. Suzumura and Toyota.
Demonstration in Shingijutsu style.
I heard the heroic story of Shingijutsu style that change the lay-out in not to say
whether or not for making one piece production flow (stream of production).
(I heard, but I haven’t seen. Therefore following comment is based on the reputation
and assumption.)
One piece flow production or small lot production and stream of production are very
useful to reduce LT, inventory and work-in-progress and also space dramatically.
4
On the other hand the general company is accustomed to the batch production with
high speed and multi-functional machine. Also he hasn’t the experience of the SMED
and 100% inspection & guarantee of quality in individual process. In this situation
it is impossible to make the style and is very high risk in following 2 reasons.
One is to give up or abandon the introduction of TPS on the way.
Another is more serious and that he has problems of production. In extreme cases, if
the machine which is used for the production of many kinds of parts is installed in a
cellular line as the exclusive use, he must have troubles for other necessary
production.
In fact the situation of most of the companies are in batch and job-shop style
production with high speed and automatic & multiple functions machine.
Also most of the companies has no sufficient base of the “Factory Management”. For
instance there are cases which they have no even Standard Time system. The
companies require us to introduce TPS, but they don’t have even policy control, TPM,
TQM. This is the actual situation of our clients. (Your clients may be much higher
level. But in general---). Of course if the client has no sufficient base, and even though
making brilliant demonstration, it is impossible to stabilize the system in the
company. I don’t know Shingijutu, but I think he teaches TPS for much higher level
company which has sufficient capacity of factory management and allowance of
machine only.
Now we need to understand that the particular techniques of TPS (for instance
Kanban with pull system) are not useful to everything.
TPS was/is not improved for everything cases, but for just the car manufacturing.
And TPS is never almighty.
As a consultant most important capacity and attitude is to identify the most useful
method and to recommend to meet to the client’s demand and manufacturing
condition.
Right now the circumstances of manufacturing industry is not “mass production”,
but “high-mix low volume”.
Car manufacturing? Of course this is “mass production”, even though there are many
variations in a car model.
5
MUDA.
Why making the stream of production is important? What is the purpose of making
flowing production?
In TPS, Taiichi Ohno taught us that if there is a stagnation, the courses of problem
lurk. Another words, a stagnation which are inventory and work-in-progress (from
the point of view of materials), waiting (from the point of view of the labour) and
information causes serious Muda and the flab in the management.
Also he taught us that “Make the flow of production and lower the water level then
it is possible to find more problems”.
For resolving this situation, one of useful method is to make the stream of production
with small lot. The visual effects in making the stream of production are
a) Reduce space, b) Quality improvement, c) LT (Lead Time,
d) Reduce WIP (Work-in-progress and e) Cash-flow improvement.
a) Reduce space (improve space efficiency).
When looking general factory, the space efficiency is quite low.
A factory uses the space for real production, passage and stockyard (excluding toilet,
rest area, compressor room, maintenance room, meeting room---).
Then the space efficiency which is the ratio of production space to total is less than
40% and the real production area is buried in materials and other unnecessary
things. We need to recognize that such phenomenon is unusual.
In the column of 5S, which I already shared to you, the first S (Seiri) requires the
treatment of unnecessary articles in making the “standard (what’s article and how
many should be in the location)”. And with the combination activity of 5S and making
flow of production, it is possible to reduce unnecessary things and (as a result) is
possible to reduce space dramatically.
The space cost is not the major problem in (for instance) USA in which the land cost
is very cheap. But the stagnation like as stock causes other serious problem which is
to obstruct the “visual control” and to paralyze the consciousness of risk and kaizen.
And it is possible to improve space efficiency in making flow of production
dramatically.
b) Quality improvement.
Batch production is easy to become the causes of high defect ratio because the
inspection and the feedback also is under batch style. And if we could establish the
flowing production system including the inspection with one by one or very small lot
production, it is possible to improve the quality because “The quality is in proportion
to the speed of the feedback” (QRQC; Quick Response Quality Control). By the way
6
it is possible to reduce space in just making flowing production (and 5S activity).
However the effect is never sufficient, but restrict.
Please look at following quality control graph (QC Cross Diagram).
And even though introduce the flowing production system in the line which is so low
process capability, the effect of reduction of space is restrictive because the process
needs to have the stock to cover the low process capability.
This situation is possible to say for the case of machine capability too.
c) LT (Lead Time)
Making stream of production effects the dramatic improvement of LT.
And when introducing TPS, it is essential to have the target which are (at least) LT,
Cash-flow and the (Labour, Machine and material) performance improvement.
As I wrote, I give the importance to the efficiency of LT. Now what is the LT efficiency
(LTE)?
LTE = (∑Standard LT of each process) x 100/Actual LT.
d) Reduce WIP
What is the meaning of “Making Stream of Production”? The meanings are to
eliminate the stagnation which is WIP and inventory (and to eliminate the waiting
the next job which is also one of the stagnation, but think in separate). And about
the “waiting” I already described in the LT.
e) Improve Cash-flow.
I would write any number of times that for the management of a company the
important factor is “cash-flow” rather than the figure of surplus in the income
7
statement.
Even though the surplus in income statement, if the shortages of cash, the company
bankruptcy occurs. I therefore when the introduction of TPS is intended, I
recommend to have the target figure which are the improvement of LT, Cash-flow
and Throughput at least.
8
waiting time, verification, collation.
Anyway as in the following example, LT is not long and summarized in 3 points
which are
receiving and processing order process,
production and final inspection and shipping.
When you start LTE calculation newly, I recommend to use the indicator LT standard
time which is the case of the benchmark products like as a principal product and the
result.
The condition of the LTE calculation is that having sufficient machines to the
production plan and is possible to produce necessary parts in parallel. But to be used
the LT of the critical path.
-2. Actual LT
Average LT of all products from receiving to shipping.
The standard LT is just one benchmarking product (when starting), but the result
LT is all products.
-3. Net time
A standard time is consisted of
Net time, Preparation time and Allowance time.
Then in LTE, just Net time should be used because the preparation time also the
target of reduction.
The case of a company.
When calculating LTE you can feel so bad managerial efficiency. I show one example
case as follow.
The company received an order. The product is constituted of 50 kinds of parts which
are produced internal processes of the large press, baking furnace and some
machines and of some commercially available parts and of the parts from suppliers
which are stocked in the warehouse. After the work in the processes of press and
machines, these parts are sub-assembled and assembled in the line. Again this
product has total 6 internal processes which are Press, Baking furnace, Machine
work, Sub-assembly, Assembly and the Final inspection. And this company has
sufficient machine and facility capacity for producing monthly orders.
First of all the sales department got the order of the product, which already has the
design, from a client and transferred the production order to the factory. The factory
processed the order and planned the production schedule and responded the delivery
date to the sales department. Then at this timing the LT has been spent 2 days
already.
9
The order was planned in the production schedule, but needed to wait the production
start 10 days because of the current production schedule. And the production was
started from the work of the parts in the machining process. And the total production
LT was spent one month (30 days) which the contents are Parts preparation in
machining process: 22 days, Sub-assembly: 2 days, assembly & final inspection: 2
days and Repair: 4 day. And again the production LT was one month because of the
waiting time of collecting all kinds of parts and waiting in each process and also the
time for repair after the final inspection. After the production, the products were put
in the warehouse temporarily 1 days for waiting the shipping order.
After the shipping order, the products were put in the shipping yard and shipped.
So many days and hours were spent for responding the clients. But when looking the
net time in following figure, the net time is only 36.5 hours.
10
by one production in machine work processes from the first.) and 100% inspection in
all processes including the inspection for the parts of the suppliers. This company
had a bad disease which is the chronic repair (and had the repair line). Then for
keeping the flowing production line I introduced the inspection system which is 100%
inspection and guarantee the quality in individual process. The watchword was
“Never make defects and never send defects”. The contents of the inspection system
are Self-Check inspection, Inspection by next process and Poka-Yoke in individual
process.
Self-check inspection and Inspection by next process: Giving the very simple and
easy inspection task to individual worker with simple visual aids, defect sample,
check jigs and recording sheet (just check mark). Sharing the inspection job to
individual.
100% guarantee? Of-course it is never possible, but was possible to reduce
WIP (work-in-progress) in each processes and also the “repair” drastically.
Jidoka
By the way TPS is constituted of 2 philosophies, which are JIT and this Jidoka.
The meaning of Jidoka (automatic) is that a machine has the automatic device which
is automatic stop when occurred the problem or defect. This concept was expanded
to the meaning of 100 % guarantee the quality in individual processes and not give
the defects to the next. Therefore in TPS, the inspection is 100% inspection by all
processes. Then for keeping this 100% inspection system, automatic stop device in
machine, self-check inspection, inspection by next process with simple inspection jigs
& tools, automatic inspection device and Poka-Yoke should be implemented.
11
machine work, switch off, takeout and haulage.
Preparation Time: Preparation of materials, die, jig & tools, cart & pallet,
container, drawings, workmanship standard. Set-up of jigs, die. Clean-up
of machine.
Allowance Time (total of 3 kinds):
-working allowance (put oil or lubricant, correction of defect, care of jigs &
tools, handling of remainder material and shaving & chips, change
of cutting device).
–work place allowance (power failure, machine trouble and down, waiting
materials and others, short meeting & information, Seiso after the
job, training).
–physiological allowance (drinking water, toilet, sweat, ---).
–fatigue allowance (rest in the case of handling heavy article, high heat).
And the Standard Time =
(Net Time + Preparation Time) x (1 + allowance ratio)
Allowance ratio is from 13% ~ 25% (depending upon the type of industry and process,
the individual allowance are different).
Then Net Time and Allowance Time are normally inevitable (without some case of
work place allowance like as power failure, machine trouble, waiting material), but
the Preparation Time should be targeted to reduce.
Therefore more than 80~87% is available to target. (in the condition of 100%
efficiency, allowance ratio 15%)
12