323

Technical Specifications – Civil Works of DP2 Buildings

DP2 BUILDINGS

Sl. No. Name of Building No. of Units No. of Area (sqm)


Storeys
1. Boys Hostel-1 369 G+3 12262
2. Boys Hostel-2 376 G+3 12652
3. Girls Hostel-I 249 G+3 9051
4. Mess Block 1 G+1 5218
5. Married Student Housing 96 G+3 6097
The details given above are indicative; work has to be executed as per the Architectural,
Structural drawings and specification.

The Buildings are RCC framed structure with Column, Beam, Slab construction using
M25/35 Grade Design Mix Concrete. For shear wall, Self compacting Concrete (as per IS
10262-2019 ) of design Mix M35 grade Concrete.
CPWD specifications shall be followed as per latest specifications and up-to-date
correction slips for all works execution unless noted otherwise.

Wherever not mentioned Item should be as per DSR 2018 & Specification of CPWD
(Latest with up to date correction slips) should be followed.

In case of Non DSR Items details of specifications separately mentioned.

Contractor is liable to complete the building as per drawing & specification & make it
functional as per requirement & direction of Engineer-in-charge.

Shop drawings submitted by the contractor have to be approved for their design,
functionality and structural stability by concerned consultants appointed by IIT
Bhilai.So contractor should submit shop drawing well in advance so that work progress
doesn’t suffer.

Any minor changes (addition, omission and alteration) if required as per site condition
and as per IIT Bhilai requirement shall be done as per direction Engineer-in-charge;
nothing extra shall be paid against on this account.

Note: Floor height means from bottom of DPC to Top of slab in Level 1 and from top slab
to top of the slab above in upper Levels as per CPWD norms.

All necessary structural arrangements shall be provided at terrace to receive the solar
panels/ Fire Fighting/ water supply and other equipment’s as per requirement and as
per direction of Engineer-in-charge.

All material like Paints/ adhesives/ finishes, etc. shall be of low VOC meeting GRIHA
requirements.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


324

All Concrete (PCC, RCC etc.) works shall be done with OPC 43 grade cement and
for all other works, PPC cement shall be used.

Special measures to be taken at site to safeguard the edges/corners of the finished


exposed RCC works during construction works.

For all aluminium works, GRC works, dry stone cladding works, light-weight roofing
with MS sheeting or poly carbonate / multi-cell polycarbonate sheeting works, etc.,
wherever there are structural support system embedded within or exposed, the shop
drawings submitted by the contractor shall be duly vetted (structural) for their
structural stability and approved by concerned Consultant appointed by IIT Bhilai.

For all finishing works; especially - flooring, wall finishes (including exposed RCC, stone
cladding, etc.), fittings and fixtures, especially - hardware (for doors, windows, glazing,
aluminum works, all cupboards & cabinets), plumbing and sanitary CP fittings &
fixtures, lighting, etc. the contractor shall submit necessary sample board and prepare
necessary site mock-ups as per the direction of the Engineer-in-charge. Execution shall
be done only as per approved samples and mock-up approved by Engineer-in-charge.

For Mess Block all MEP work related to Kitchen and ancillary areas shall be done such
as to incorporate the functional requirements of the kitchen operations.

Detailed specifications:

A. Foundation:
Earthwork in excavation in foundation and trenches/ over areas for desired level as per
structural drawing for all kinds of soil and rock (if found) shall be as per CPWD
Specifications. Any deviation in earthwork in excavation as per site condition will be
ignored and nothing shall be paid extra. Top soil up to 300mm shall be preserved at site
premises (protected against erosion during rain) and reuse in future landscaping
development as per CPWD specifications and direction of Engineer-in-charge.

Filling with available excavated earth in sides of foundation & under floors shall be done
if soil found suitable. Otherwise filling shall be done by bringing Moorum of approved
quality and nothing extra shall be paid towards the same. Moorum of approved quality
shall be filled up to bottom of sand filling below flooring. Moorum filling may also be
done up to 3.00m from edge of building all-round the building up to proposed ground
level. Filling withavailable earthwork to be done as per CPWD specifications.

Excavation shall be undertaken to the width of the Basement / Retaining wall footing
including necessary margins for construction operation as per drawing or directed
otherwise. Where the nature of soil or the depth of the trench and season of the year, do
not permit vertical sides, the contractor at his own expense shall put up the necessary
shoring, strutting and planking or cut slopes with or without steps, to a safer angle or

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


325

both with due regard to the safety of personnel and works and to the satisfaction of the
Engineer. Nothing shall be paid extra

In order to avoid construction of underground structure or any basement portion of


building being getting uplifted/damaged due to water pressure, the contractor shall
make arrangement for lowering the ground water table below the proposed foundation
level . Sub soil water table shall be maintained at least 50 cm below the P.C.C. level
during laying of P.C.C., water proofing treatment, laying of basement raft and beams
including filling of earth/sand under the basement floor. The water table shall not be
allowed to rise above base of raft level until completion of outer retaining walls
including water proofing of vertical surface of walls and back filling along the walls up
to ground level and until the structure attains such height to counter balance the uplift
pressure. However, the contractor should inspect the site and make his own assessment
about sub-soil water level likely to be encountered at the time of execution and quote
his rates accordingly. Scope of work are inclusive of pumping out or bailing out water, if
required. Nothing extra on this account whatsoever shall be paid to him unless
otherwise specified. All the major excavation shall be carried out by mechanical
excavator. No extra payment shall be made for that.

The rates are inclusive for all depths & nothing extra shall be paid for additional lift etc.

Disposal and Shifting of Earth

Disposal of surplus excavated earth/cutting and shifting of earth to maintain required


finished levels as per landscaping drawing from one area to another within the campus
by mechanical transport including loading/unloading and stacking/spreading is
included in the scope of contractor and nothing will be paid extra even if contractor
have to double handling of earth.

Under Floor and Building Outerarea filling:-

Filling with available excavated earth in sides of foundations & under floors shall be
done only if earth found suitable, otherwise filling shall be done by bringing Moorum of
approved quality from outside and nothing extra shall be paid towards the same.

Moorum of approved quality and quantity shall be filled from Natural ground level to
Proposed Made up ground level as per GFC drawing outside allround the building along
the perimeter to an extent of 3 m from building outer face. Outer area murrom filling is
included in scope of contractor for every building.

Landscape area

All Cutting and Filling of Earth coming to maintain the required finished level of
complete Landscape area as mentioned in the landscaping/building drawing is in the
scope of contractor. All filling should be done with available excavated earth and as per
CPWD specifications and if the earth is not available, the same of approved quality to be

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


326

brought from outside as decided by Engineer in Charge and Contractor is strictly


advised to assess the required quantity beforehand and to quote his rate accordingly
and nothing extra will be paid later.

Sand filling:
150mm thick (compacted) sand filling shall be provided over well compacted earth
/moorum of approved quality above which compacted 100mm thick PCC of mix 1:4:8
shall be provided. PCC of mix 1:4:8 (1 cement: 4 coarse sand: 8 20mm nominal size
aggregate) shall be provided below foundations/ footings, rafts, grade beams, plinth
beams, floors, grade slab, etc. with a minimum thickness of 100mm.

Foundation shall be with RCC isolated/ stripped/ combined, Raft type footings as per
approved structural drawings using the grade of concrete M25 Design mix. Minimum
cement content shall be 330kg/ cumand work shall be executed as per approved design
mix, no extra payment to be made if excess cement to be used for design mix. The
minimum footing depth below natural ground level shall be followed as per approved
structural drawings. The depth of footing is variable as per site condition. Columns are
connected by grade beams (external) and / plinth beams (Internal) below ground level
as per structural drawing and shall be of grade M35 Design mix, wherever necessary
additional tie beams shall be provided in between grade beams/ plinth beams and top
of footing based on the depth of footing. 100mm thick Grade slab / floating slab of RCC
grade M25 Design mix shall be provided with nominal reinforcement steel 8mm dia @
200mm c/c both ways. To maintain the Cover to reinforcement in structural members,
approved manufacture’s factory made cover blocks of required size for footings,
columns, beams, slabs mentioned in structural drawings shall be provided and Cover
block concrete grade not lesser than the grade of concrete shall be provided in
structural members.

Anti-Termite Chemical Treatment:


The construction measures specified below should be adopted for protection against
subterranean termites originating both internally from within the plinth and externally
from the area surrounding the building.

Injecting chemical emulsion for anti-termite treatment of approved make (Imidacloprid


30.5% m/m SC, as per manufacturer's specification), as under

a) Along external wall where the apron is not provided using chemical emulsion @ 7.5
litres / sqm. of the vertical surface of the substructure to a depth of 300 mm including
excavation channel along the wall & rodding etc. complete with Bayer Premise.

b) Treatment of soil under floors above sand filling using chemical emulsion by flooding
@ 15 litres per sqm

c)Along the expansion joints, surrounding of pipes & fittings and conduits @ 20litre per
building.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


327

d) Anti-termite treatment shall be with chemical emulsion Imidacloprid 30.5% with 1%


concentration as per CPWD specifications .

This work is to be done by Specialized agency as approved by the Engineer-in-charge.

Damp Proof Course:


Damp proof course shall be with 50 mm thick cement concrete 1:2:4 (1cement: 2 coarse
sand: 4 graded stone aggregate 12.5mm nominal size) mixed with approved water
proofing compound painted at top with a coat of residual petroleum bitumen of grade
VG-10 at 1.7 kg/sqm.

Plinth Protection:
The Plinth protection and ramp should be executed as per related Landscape
drawings only. If the same has been shown in Architectural drawing then
Landscape drawings will supersede.

Brick work in foundation & plinth:


Non-Modular well burnt clay bricks in foundation with class designation 7.5 in cement
mortar 1:6 (1 cement: 6 coarse sand) Fly ash / Fly ash cement bricks of class
designation 7.5 in cement mortar 1:6 (1 cement: 6 coarse sand) for brickwork.

B. Superstructure:
Reinforced cement concrete/ PCC:
RCC Columns, Shear walls, Beams including plinth beams /tie beams slabs etc. shall be
as per structural drawing (duly checked with relevant architectural drawings) with
concrete grade of M35 Design mix shall be used. For shear wall, Self compacting
Concrete (as per IS 10262-2019 ) of design Mix M35 grade Concrete. Minimum cement
content shall be 350kg/ cum and work shall be executed as per approved design mix, no
extra payment to be made if excess cement to be used for design mix. All
superstructures RCC shall be Form finished/ Fair faced concrete. Superstructure form
work shall be with 12 mm thick BWP grade film faced plywood of CSFF designation
confirming to IS: 4990 for form finished/ fair faced concrete surface / Aluminium
formwork duly designed for the work and as per Structural and Architectural drawing
and as per acceptance criteria where ever required .Form work shall be designed for
structural stability and safety by the contractor and contractor will be sole responsible
for any mishap happens during execution of work. The shuttering shall be repeated
after due cleaning and inspection by the authorized representative of Engineer-in-
charge.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


328

SELF COMPACTING CONCRETE work to be done as per IS10262:2019 for Shear


walls.

Self compacting concrete (SCC) is highly flowable, non-segregating concrete that fills
uniformly and completely every corner of formwork by its own weight and encapsulate
reinforcement without any vibration whilst maintaining homogeneity.

a) Application Area

Self compacting concrete (SCC) may be used in precast concrete applications or for
concrete placed on site. SCC is used to cast sections with highly congested
reinforcement and in areas that present restricted access to placement and
consolidation and the casting of hybrid concrete- filled steel tubular columns. It may be
manufactured in a site batching plant or in a ready-mixed concrete plant and delivered
to site by truck mixer. It may be placed either by pumping or pouring into horizontal or
vertical forms.

b )Features of Fresh Self Compacting Concrete

A concrete mix can only be classified as self-compacting concrete, if the requirements


for all below mentioned characteristics are fulfilled:

a) Filling ability (Flowability),

b) Passing ability,

c) Segregation resistance, and

d) Viscosity

The above tests shall be carried out as per IS 1199 (Part 6).

1. Filling Ability (Flowability)

This is the ability of fresh concrete to flow into and fill all spaces within the formwork,
under its own weight. Slump-flow test is performed to test the flowability. Slump-flow
value describes the flowablity of a fresh mix in unconfined condition. Visual observation
during the test can provide additional information on the segregation resistance and
uniformity.

The following are typical slump-flow classes for a range of applications:

a) SF1 (slump flow 550 mm - 650 mm). This class of SCC is appropriate for:

1) Unreinforced or lightly reinforced concrete structures that are cast from the
top with free displacement from the delivery point (For example, housing slabs).

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


329

2) Casting by a pump injection system (for example, tunnel linings).

3) Sections that are small enough to prevent long horizontal flow (for
example,piles and some deep foundations).

b) SF2 (slump flow 660 mm - 750 mm) is suitable for normal applications (for
example, walls, columns).

c) SF3 (slump flow 760 mm-850 mm) is used for vertical applications in heavily
reinforced structures, structures with complex shapes, or for filling under
formwork. SF3 will often give better surface finish than SF2 for normal vertical
applications but segregation resistance is more difficult to control.

2 .Passing Ability (Free form Blocking at Reinforcement)

Passing ability describes the capacity of the fresh mix to flow through confined spaces
and narrow openings such as areas of congested reinforcement without segregation. If
there is little or no reinforcement, there may be no need to specify passing ability as a
requirement. L-box test is preformed to check the passing ability. The minimum ratio of
the depth of the concrete in the horizontal section relative to the depth of concrete
vertical section is considered to be 0.8. If the SCC flows as freely as water, it will be
completely horizontal, and the ratio will be equal to 1.0.

3 .Segregation Resistance (Stability)

This is the ability of fresh concrete to remain homogeneous in composition while in its
fresh state. Segregation resistance (Sieve) test is preformed to check this property of
fresh concrete.

After sampling, the fresh concrete is allowed to stand for 15 min and any separation of
bleed water is noted. The top part of the sample is then poured into a sieve with 4.75
mm square apertures. After 2 min, the weight of material which has passed through the
sieve is recorded. The segregation ratio (SR) is then calculated as the proportion of the
sample passing through the sieve.

There are two classes of segregation resistance, namely SR1 and SR2. SR1 is generally
applicable for thin slabs and for vertical applications with a flow distance of less than 5
m and a confinement gap greater than 80 mm. SR2 is preferred in vertical applications if
the flow distance is more than 5 m with a confinement gap greater than 80 mm in order
to take care of segregation during flow. For SR1 class segregation resistance shall be 15
to 20 percent and for SR2 it shall be less than 15 percent. SR2 may also be used for tall
vertical applications with a confinement gap of less than 80mm if the flow distance is
less than 5 m, but if the flow is more than 5 m, a target SR value of less than 10 percent
is recommended. Segregation resistance becomes an important parameter with higher
slump-flow classes and/or the lower viscosity classes, or if placing conditions promotes

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


330

segregation. If none of these apply, it is usually not necessary to specify a segregation


resistance class.

4 .Viscosity

Viscosity can be assessed by the V-funnel flow time as per IS 1199 (Part 6). Concrete
with a low viscosity will have a very quick initial flow and then stop. Concrete with a
high viscosity may continue to creep forward over an extended time.

A V-shaped funnel is filled with fresh concrete and the time taken for the concrete to
flow out of the funnel is measured and recorded as the V-funnel flow time. The viscosity
is divided into two classes, that is, V1 and V2. V1 has good filling ability even with
congested reinforcement. It is capable of self-leveling and generally has the best surface
finish. V2 class viscosity is more likely to exhibit thixotropic effects, which may be
helpful in limiting the formwork pressure or improving segregation resistance. But it
may cause negative effects on surface finish and sensitivity to stoppages or delays
between successive lifts.

For V1 class, the time taken to pass the concrete from V-funnel shall be ≤ 8 s and for V2
class the time taken to pass the concrete from V-funnel shall be between 8 s and 25 s.

Formwork for exposed concrete surfaces: -


Where it is specifically shown on the drawings to have original fair face finish of
concrete surface without any rendering of plastering, formwork shall be carried out by
using plywood of CSFF designation confirming to IS: 4990/ on steel plates with
rubberized joints / Aluminium Formwork.

The forms shall be constructed so as to produce a uniform and consistent texture and
pattern on the face of the concrete. The formwork shall be placed so that all horizontals
are constructed of lumber and are not panelled and the formwork joints shall be
staggered.

To achieve a finish which shall be free of board marks, the formwork shall be faced with
plywood or equivalent material in large sheets. Whenever possible, joints between
sheets shall be arranged to coincide with architectural feature, sills, window heads or
change in direction of surface. All joints between panels shall be vertical or horizontal
unless otherwise directed. Suitable joints shall be provided between sheets. The joints
shall be arranged and fitted so that no blemish or mark is imparted to the finished
surfaces.

Forms for exposed concrete surfaces shall be constructed with grade strips (the
underside of which indicate top of pour) at horizontal constructions joints, unless the
use of groove strips is specified on the drawings. The reset forms shall be tightened
against the concrete so that the forms will not be spread and permit abrupt

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


331

irregularities or loss of mortar. Supplementary form ties shall be used as necessary to


hold the reset forms tight against the concrete.

For fair faced concrete, the position of through bolts will be restricted and generally as
indicated on the drawings.

Plywood and steel plates/ Aluminium sheetsused in the formwork for obtaining
exposed surfaces shall be got inspected by his authorized representativeEngineer-in-
charge on each use. However no forms will be allowed for reuse if it is doubtful to
produce desired texture of exposed concrete.

Cement of only approved shade shall be used preferably of single lot to achieve integrity
of texture.

Class of surface Finish:-

For Beams & Slabs :

The finish shall be uniform, dense and smooth. No grout, no grain pattern, no crazing
and no major blemishes shall be permitted. Abrupt irregularities not exceeding 3mm
and gradual irregularities less than 5mm in 2m length only shall be permitted.

For Columns/Wall/Fins:

The finish shall be uniform and smooth levelling the surface of the compacted concrete
shall be done with a screed board with power floating the surface and over that steel
trowelling the surface under firm pressure characteristics of finish shall be brush marks
< 3mm gradual irregularities less than 5mm in 2m.

Tolerance in Finished Concrete:-

The formwork shall be so made as to produce a finished concrete true to shape, lines,
level, plumb and dimensions as shown in the drawings subject to the following
tolerance unless otherwise specified in this specification or drawings.

WALL/COLUMN/FINS:

Variation from the plum ± 6mm Upto 3m height

Variation from the plumb of ± 6mm Upto 6m height


conspicuous liner

Variation in the size of (+)15mm

wall openings (-) 6mm

Variation in parapet wall ± 6mm


thickness Upto 30cm thickness

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


332

SLAB, BEAM & GIRDER FORMS:

Variation from the level or from the specified grid for beam soffit before removal of
shores,

(a) In any 3m ± 6mm

(b) In any 6m ± 10mm

All the tolerances mentioned above shall apply to concrete dimensions only, and not to
positioning of vertical steel or dowels. The tolerances given above are specified for local
aberration in the finished concrete surface and should not be taken as tolerance for the
entire structure taken as whole for the setting and alignment of formwork. Any error,
within the above tolerance limits, or any other if noticed in any of the structure after
part or portion stripping of forms, shall be corrected in the subsequent work to bring
back the structure to its true line, level and alignment.

All shuttering brought at site should be new/fresh when used for the first time and
should not be allowed more than permissible repetition or quality of surface of
shuttering become uneven which ever is earlier

Dented, broken, cracked, twisted or rusted shuttering plates shall not be allowed to be
used on the work and Props of steel shall be provided with adequate horizontal
and cross - bracing. Steel props shall use steel pipes and steel couplers.

Form work including centering, shuttering, propping, staging shall be strong enough
to withstand the dead and live loads and forces caused by ramming and vibrations
of concrete and other incidental loads, imposed upon it during and after casting of
concrete. It shall be made sufficiently rigid by using adequate number of ties and
braces, screw jacks or hard board wedges where required shall be provided to make up
any settlement in the form work either before or during the placing of concrete.Form
work shall be properly designed for self- weight, weight of reinforcement, weight of
fresh concrete, and in addition, the various live loads likely to be imposed during the
construction process (such as workmen, materials and equipment). In case the height
of centering exceeds 3.50 meters, the prop may be provided in multi-stages.It is
important to note here that Designing of formwork/shuttering as per CPWD
specifications/relevant IS codes for RCC work i.e column/wall/beam/slab at all heights
and level as shown in GFC drawing is the responsibility of contractor and if any
mishap happens during execution of RCC work due to design/workmanship fault
etc, then it will be the sole responsibility of Contractor.

The shop drawing for centering and shuttering shall be prepared by the Contractor to
be submitted in advance (i.e., minimum 45 days) as per their work progress/ program
and same shall be submitted for approval by concerned Consultants appointed by IIT
Bhilai. (The ceiling of RCC slabs shall be shutter finished and plaster/ rendering shall
not be permitted). To maintain the Cover to reinforcement in structural member, only

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


333

factory made cover blocks of required size and grade not lesser than the M 35 deign mix
grade of concrete in RCC works shall be provided.

The parapet wall shall be in RCC/ Brick work as per structural / architectural drawing.

All external openings at unit and common areas and corridors shall have 600mm wide
projection (Sunshade/ Chajja) with both side minimum bearing of 230mm and drip
course of size 25x12mm in projections shall be provided in RCC.

Reinforcement:
Reinforcement bars shall be Thermo-Mechanically Treated (TMT) bars of grade Fe-
500D or more conforming to IS 1786of approved make (only primary producers of
steel). Workshop shall be installed at site for fabrication of steel. Couplers of approved
manufacturers/ brand of suitable length as per structural requirement to be provided
for columns reinforcement bars for more than 25mm dia.

Steel shall be fresh and new. It shall be free of defects and free of rust, oil, paints,
grease, loose mill scale or any other deleterious material undesirable for RCC or prevent
adhesion of concrete with reinforcement

Overlapping of bars should be as per mentioned in structural drawing. Overlapping


length should be closed tied with binding wire as per CPWD specification and where
there are two layers in beam reinforcement suitable dia. spacer bars/ spacer blocks not
less than 25mm of between two layers of reinforcement should be provided. In case of
slab/raft etc. chairs of minimum 12mm dia. (Diameter of chair should be such that they
do not buckle under weight of reinforcement and incidental loads during construction)
of required length and numbers not less than 30 times the diameter of supporting bars
using as chairs in double mesh portion should be provided.

Binding wires : Binding wire shall be 16 or 18 gauge annealed wire conforming to IS


280. It shall be free from rust, oil, paint, grease, loose mill scale or any other deleterious
material undesirable for the reinforcement and concrete or which may prevent
adhesion of concrete with reinforcement.

Workmanship

 Fabrication of reinforcement : Reinforcement shall be fabricated as per the


structural drawing and bar bending schedule. Bending of material shall be cold
bending only.Anchoring of bars and stirrups shall be provided exactly as detailed in
the GFC structural drawing

 Laps shall be strictly as per the GFC drawing or as per CPWD Specification. For
general guidance, the principles shall be followed as given in IS 456.

 Mechanical Reinforcement coupler of adequate strength, length and internal thread


and confirming to performance requirements as per IS code 16172:2014 can be

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


334

used by contractor for diameter 25mm and above in place of Lapping but nothing
extra will be paid for the same.

 The reinforcement shall be done as per CPWD Specifications - 2009 - Vol.I& Vol. II
with upto date correction slips.

 The item of reinforcement of RCC work includes all operations including


straightening, cutting, bending, binding and placing in position at all the floors with
all leads and lift complete as per CPWD Specification - 2009 - Vol.I& Vol. II with upto
date correction slips.

 To avoid displacement of bars in any direction and to ensure proper cover, only
factory made round type/rectangular cover blocks of same block of parent concrete
shall be used by the contractor. Nothing extra shall be payable on this account.

CURING

Curing of concrete is most important. it is for the contractor to arrange for everything
necessary to make sure that the concrete is cured to the complete satisfaction of the
Engineer-in-Charge or his authorized representative. Concrete shall be protected from
quick drying with moist or damped hessian cloth or any other material approved by
the Engineer-in-Charge or his authorized representative. After 24 hours of laying of the
concrete, the surface shall be cured by flooding with water or covering with damp
hessian cloth for a period of 7 days to keep it moist and for the next 7 days the surface
shall be kept wet all the time by sprinkling water continuously or as per CPWD
specifications.

Filling of sunken area:


The sunken area shall be filling with lightweight cement concrete as per the
specification for the cement concrete works given in CPWD Specifications except for the
material used as coarse aggregate. The coarse aggregate used for the lightweight
cement concrete works shall be lightweight aggregates made from “Autoclaved Aerated
cement blocks (AAC blocks) or equivalent as approved by the Engineer-in-charge. The
grading of the light-weight coarse aggregate shall be the same as that of the specified
size of the coarse aggregate. In case of non-availability of the specific or required sizes
of the light-weight aggregates, it shall be broken into required sizes by using mechanical
crushers. The oven dry density of the lightweight aggregate shall not be more than 650
kg/cum for Sunken portions for toilets, kitchen and similar locations above ground shall
be filled with Light weight cement concrete 1:5:10 (1 cement: 5 coarse sand: 10 broken
block of 20 mm nominal size specific gravity of light weight aggregate shall not be more
than 650 kg/ cum).

Expansion joint system:


For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 and Married Student housing-

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


335

All Expansion joint system shall be executed by Company authorized


/Trained/Recommended system integrator/installer or as decided by the Engineer-in-
charge.

The 50mm wide expansion joint system for floor, wall and roof shall be with extruded
aluminum base member’s pre-engineered self-aligning/ self-centering arrangement and
support plates etc. as per ASTM B221-02. Material shall conform to ASTM 6063.
Provision of Moisture Barrier Membrane in the Joint System shall have watertight joint.

C. Brick work in super-structure:


All external brick walls shall be with 230 mm thick fly ash / fly ash cement bricks of
class designation 7.5 in Cement mortar 1:6 (1 cement: 6 coarse sand) as shown in the
architectural drawing.

1.1. Internal walls shall be with 230/115 mm thick fly ash /fly ash Cement bricks
of class designation 7.5 and 200mm/150mm /100mm thick , Autoclaved
Aerated cement blocks (AAC blocks) of grade-1 & minimum compressive
strength 4.0 N/mm2 (IS 2185 Part3 ) in Cement mortar 1:4 (1 cement: 4
coarse sand) / Polymer modified cement mortar of approved company for
AAC block as per manufacturer’s specifications with RCC band (M 35) &duly
reinforced with GI flats of suitable section as per direction of Engineer-in-
charge ,properly anchored to the adjoining RCC columns & Masonary . RCC
band(M 35) shall contain 2no’s 8mm dia.reinforcement bar with 8mm dia.
single legged stirrup at spacing of 150 c/c as per IS 6041 to be provided at
the sill level/1metre and lintel level/2.1 metre.

1.2. Half brick masonry with cement mortar (1:4) including providing and placing
in position 2 Nos 8 mm dia reinforcement bars at every third course of Half
brick masonry work and RCC bands (M 35) of 100mm thick at the sill
level/1metre and lintel level/2.1 metre.RCC band (M 35) shall contain 2no’s
8mmdia.reinforcement bar with 8mm dia. single legged stirrup at spacing of
150 c/c .

1.3. 100mm AAC block of grade-1 & minimum compressive strength 4.0 N/mm2
(IS 2185 Part3 ) with approved block laying polymer modified adhesive
mortar all complete duly reinforced with GI flats of suitable section as per
direction of Engineer-in-charge ,properly anchored to the adjoining RCC
columns & Masonary , shall be provided with RCC bands(M 35) of 100mm
thick at the sill level/1metre and lintel level/2.1 metre .RCC band(M 35) shall
contain 2no’s 8mm dia. reinforcement bar with 8mm dia. single legged
stirrup at spacing of 150 c/c as per IS 6041to be provided at the sill
level/1metre and lintel level/2.1 metre.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


336

All opening shall be with M-35 RCC ,lintels and bands over top of parapet walls shall be
with RCC (Corridor/ Terrace/ Balconies, etc.) with both side bearing minimum 230mm.
RCC bands at the interval of 1mts. shall be provided in half brick masonry.

D. Aluminium work:
All aluminum works shall be executed throughspecialized agency to be approved by
Engineer-in-charge. The works shall be protected as per direction of Engineer-in-charge
in suitable manner till completion / handing over of the building whichever is later. If
any scratches and damages occurs shall be replaced or rectified at contractors own cost
and nothing extra shall be paid against the same.
The contractor shall submit the shop drawings of doors. Windows, louvers, cladding and
other aluminum work, based on architectural drawings well in advance preferably 45
days before procurement to the Engineer-in-Charge for approval. The drawings shall
show full size sections of doors, windows etc. thickness of metal (i.e wall thickness),
details of construction, sub frame/ rough ground profile, anchoring details, hardware as
well as connection of windows, doors and other metal work to adjacent work.

All aluminum works shall be factory fabricated extruded sections and polyster powder
coated (Minimum 60 micron) as per approved shade, unless otherwise mentioned in
drawings.

All common lobby/ Lift lobby glazing, Main Entrance Door & common lobby doors, Lift
lobby doors at all levels include double action hydraulic floor spring of approved brand
and manufacture conforming to IS: 6315 with 6mm thick Heat Strengthened glass with
EPDM rubber/ neoprene gasket and Aluminium Fittings as per Drawing and schedule of
hardware fittings and as per direction of Engineer-in-charge.

Aluminium Louvers (factory fabricated powder coated) shall be provided for all
Electrical shaft, FHC’s doors at all levels & Plumbing shaft access doors at Level 1 as per
direction of Engineer-in-charge.

Windows shall be factory fabricated (factory established at site) with pure polyester
powder coated (minimum thickness 60 micron) Aluminum sections. Openable shutters
shall be with 300mm long adjustable stainless-steel friction stays. Glazed panel shall be
4mm thick glass (weight not less than 10 kg/sqm.) frosted in ventilators/ 6mm thick
float glass (weight not less than 15 kg/sqm.) except DWs are with 6mm thick Heat
strengthened glass with EPDM rubber/ neoprene gasket, aluminum fittings etc. as per
drawing.

Providing and fixing 6 mm glass (Weight ≥ 15 Kg/sqm) with ‘Visible Light


Transmission’ is not less than 67%, maximum ‘Reflection’ (external and internal) is
19%, maximum ‘U-value’ is 5.6 W/Sqm.K, maximum ‘Solar Factor’ is 0.68, maximum
‘Shading Coefficient’ is 0.78 and minimum ‘UV Protection’ is 41%. The glass specs
conforming the requirement of BS EN 572 parts 1, 2 and 3 or ASTM C1036. Assessed for
optical and visual faults as described in BS EN 572-2. There will be no linear / extended

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


337

faults. Optical faults to be within the limits set in BS EN 572-2. The visual quality would
be in conformance with EN 1096- part 2 & 3. Visual quality will be established with EN
1096 & EN 12150. The glass shall be ‘Saint Gobain Glass (SGG) - ST 167’ or from
approved equivalent make.

Heat strengthening of glass conforming to the requirements of EN12150 or ASTM 1048


or EN 1863 -1 for heat treated Soda Lime Silicate Safety Glass. Maximum bow: 0.5%
length of side as per EN 1863 part 1. Compressive stress in the glass is below 52N/mm2
when measured by GASP in accordance with ASTM F218-95 (2000).

Light shelf with powder coated folded aluminum section to be integrated with room’s
windows. Toilet ventilators shall be with powder coated aluminum shutter (fixed/ top
hung/ louvers) as per drawing. All Windows and Corridor (common area) shall be
provided with MS Safety Grills as per design / drawing and direction of Engineer-in-
charge.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1, all common toilet main doors at all
levels shall be powder coated aluminum with 6mm thick Heat Strengthened glasswith
3M frosted film with EPDM rubber / neoprene gasket in upper half and louvers in below
half with Aluminium Fittings as per Drawing.

E. Stainless- Steel works


This work shall be executed by Company authorized /Trained/Recommended system
integrator/installer or as decided by the Engineer-in-charge.

The works shall be protected as per direction of Engineer in charge in suitable manner
till completion / handing over of the building whichever is later.

Stainless Steel 304 grade (18/8, Matt finish) railing for staircases, steps, at level 1, over
corridors and terrace parapet, etc. as per design and drawing. The section sizes and
thickness of handrail, main baluster and intermediate members of all railings shall be as
per requirement and as per direction of Engineer-in-charge. However, Balusters shall be
of wall thickness not less than 2.6mm and other members shall be of wall thickness not
less than 1.65mm.

F. Fire Resistant Doors:


Electrical rooms and Heat exchanger room at all levels shall have Fire Resistant doors
with shutters of required thickness as per manufacturer specification for two hours’ fire
rating as per standard design, attached detailed specification.

For Mess Block :-

1. Fire Rated Insulated Doors


Providing and fixing of Hollow Metal Insulated fire rated doors as per IS 3614 part-1,
for stability, integrity & insulation. Pressed galvanized steel confirming to IS 277 with

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


338

the following specification. Recommended fire door shall be tested to IS 3614 part 2 /
ISO 834-1 Part 1 / BS476 Part 20 & 22, CBRI / Cerifire or third party certified or
equivalent lab, for maximum rating of 120mins with 30minutes of insulation, in
latched /unlatched condition (if used with deadbolts and pull handles). Labeled
doors with certification shall be with vision glass as a part of complete assembly.
Manufacturer test certificate shall cover doors both single and double leaf and all
doors supplied shall be within the tested specimen, deviation in specification and
sheet thickness other than what is mentioned in the test certificates are not allowed.
Proper label confirming the type of door and the hourly rating is mandatory from
Approved manufacturer or equivalent.

Size of door fame and shutter shall be as per the manufactures specification with 2
Hrs fire rating. Door frame shall be single rebate grooved profile of size 125 x 60mm
made out of 1.60mm (16gauge) minimum thick galvanized steel sheet. Frames shall
be mitered and field assembled with self-tabs. Frames to have in build grooved
sealing system and shall be site fitted with fire rated EPDM gasket as standard. All
provision should be mortised, drilled and tapped for receiving appropriate hardware.
Frames should be provided with back plate bracket and anchor fasteners for
installation on a finished plastered masonry wall opening. Frames shall be filled with
fire rated puff.

Door leaf shall be 46mm thick fully flush double skin door, insulated with or without
vision lite. Door leaf shall be manufactured from 1.2mm (18guage) minimum thick
galvanized steel sheet. The internal construction of the door should be rigid
reinforcement pads for receiving appropriate hardware. The infill material shall be
high density insulation material. Intumescent seals 15x2mm to be provided all
around the door in addition to the grooved smoke seal. All doors shall be factory
prepped for receiving appropriate hardware and provided with necessary
reinforcement for hinges, locks, and door closers. The edges should be interlocked
with a bending radius of 1.4mm. For pair of doors integrated astragals has to be
provided on the meeting stile for both active and inactive leaf. Vision lite wherever
applicable should be provided as per manufacturer’s recommendation with a clip-on
arrangement. The glass should be 6mm clear borosilicate fire rated glass of relevant
rating of the door.

All doors and frames shall be finished Powder coated and shall have passed
minimum 500 hours of salt spray test.

Item shall include supply and installation of door and hardware as a complete
assembly as mentioned in the door and hardware schedule. Once frame installed
should be filled with PUF as recommended by the manufacturer .

120Mins Fire Rated Door Double leaf of size : 1200-1500x2100-2200 with vision
panel 200x300 with hardware set 6no ball baring butt hinges, panic bar with trim for
double leaf door, 2no door closer HDC 35 with slide arm, door coordinator, groove &

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


339

intumescent seal for smoke, all hardware are as per List of preferred makes &
inclusive of PUFF Grouting.

All hardware fittings should be minimum two hour fire rating.

2. Fire Rated Un-Insulated Doors

Providing and fixing of Hollow metal Un-Insulated fire rated doors as per IS 3614
part-1, for stability and integrity. Pressed galvanized steel confirming to IS 277 with
the following specification. Recommended fire door shall be tested to IS 3614 part 2
/ ISO 834-1 Part 1 / BS476 Part 20 & 22, CBRI / Cerifire or third party certified or
equivalent lab, for maximum rating of 120mins, in latched /unlatched condition (if
used with deadbolts and pull handles). Labeled doors with certification shall be
with vision glass as a part of complete assembly. Manufacturer test certificate shall
cover doors both single and double leaf and all doors supplied shall be within the
tested specimen, deviation in specification and sheet thickness other than what is
mentioned in the test certificates are not allowed. Proper label confirming the type
of door and the hourly rating is mandatory from Approved manufacturer or
equivalent.

Size of door fame and shutter shall be as per the manufactures specification with 2
Hrs fire rating. Door frame shall be single rebate grooved profile of size 125 x
60mm made out of 1.60mm (16gauge) minimum thick galvanized steel sheet.
Frames shall be mitered and field assembled with self-tabs. Frames to have in build
grooved sealing system and shall be site fitted with fire rated EPDM gasket as
standard. All provision should be mortised, drilled and tapped for receiving
appropriate hardware. Frames should be provided with back plate bracket and
anchor fasteners for installation on a finished plastered masonry wall opening.

Door leaf shall be 46mm thick fully flush double skin door, Un-insulated with or
without vision lite. Door leaf shall be manufactured from 1.2mm (18guage)
minimum thick galvanized steel sheet. The internal construction of the door should
be rigid reinforcement pads for receiving appropriate hardware. The infill material
shall be resin bonded honeycomb core. All doors shall be factory prepped for
receiving appropriate hardware and provided with necessary reinforcement for
hinges, locks, and door closers. The edges should be interlocked with a bending
radius of 1.4mm. For pair of doors integrated astragals has to be provided on the
meeting stile for both active and inactive leaf. Vision lite wherever applicable
should be provided as per manufacturer’s recommendation with a clip-on
arrangement. The glass should be 6mm clear borosilicate fire rated glass of relevant
rating of the door.

All doors and frames shall be finished Powder coated and shall have passed
minimum 500 hours of salt spray test.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


340

Item shall include supply and installation of door and hardware as a complete
assembly as mentioned in the door and hardware schedule. Once frame installed
should be filled with PUF as recommended by the manufacturer.

120Mins Fire Rated Door Single leaf of size: 1050-1200x2100-2400 with vision
panel 200x300mm with hardware set 3no ball baring butt hinges, D-type pull
handle of 300mm long on both side, mortise dead lock with both side cylinders, 1no
door closer HDC 35with slide arm, groove seal for smoke, all hardware are as per
List of preferred makes & inclusive of PUFF Grouting.
All hardware fittings should be minimum two hour fire rating.

G. MS Structural Steel work


This work shall be executed by Company authorized /Trained/Recommended
system integrator/installer or as decided by the Engineer-in-charge.

The works shall be protected as per direction of Engineer-in-charge in suitable


manner till completion / handing over of the building whichever is later.
Structural steel of grade E250 confirming to IS2062 shall be used for M.S. Steel
ladder, M.S. Hand rail, M.S. Insert Plates / Base / gusset / stiffener plates as per
Architectural / Structural drawings. M.S. Tube (Pipe / square / rectangular) sections
shall be of grade E310 for Pipes / E350 for RHS & SHS shall be used for Architectural
Pergolas, Façade members if any as per corresponding Architectural / Structural
drawings.

MS Door : For Mumty, Common shaft & Plumbing shaft and lift machine room shall
be of MS doors shutters made with MS Door of 1mm thick M.S. sheet with frame of
40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all
necessary fittings complete using flats 30x6mm for diagonal braces and central piece.
Door frame shall be of T-iron frames for doors, windows and ventilators of mild steel
Tee-sections, joints mitered and welded, including fixing of necessary butt hinges and
screws fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block
15x10x10 cm of C.C. 1:3:6, Finished with primer and synthetic enamel paint.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1, all staircases (as per drawing)
external side shall be provided with 3mm thick MS Rectangular Hollow Section or
Square Hollow Section as per IS:4923 up to beam/ slab bottom as per detail drawing
at all Levels. MS railing above terraces at all levels, MS works in Monkey ladder for
O.H.T.s and Stairs for Lift machine Room.

For Married Student Housing all balconies, corridors, staircases, etc. shall be
provided with MS grills up to beam/ slab bottom at Level 1. All balconies, corridors,
etc. shall be provided with MS railing at Levels 2, 3 & 4. Common shafts along
corridors, side grill of Staircase 1, etc. shall be provided with MS grills. MS works in
Monkey ladder for O.H.T.s and Stairs for Lift machine Room.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


341

For Mess Block staircases 3 & 4 shall be provided with MS railing at all Levels. MS
works in Monkey ladder for O.H.T.s and Stairs for Lift machine Room.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1, MS Pergola shall be provided at
front side of the block as per drawing with enamel paint as per specifications.

All window grills shall be powder coating (Minimum thickness 60mm) (All around
frame and vertical member is of flat 40x6mm @ 350 c/c and horizontal 12x12mm @
125mmc/c) shall be fixed with 100x8mm anchor fasteners in concrete / hold fast
with mix 1:2:4 concrete blocks in brick work in adequate no. (@500 c/c) of spacing.

MS Structural steel support/ base framing for stone cladding, GRC Screen, Concrete
jali, Polycarbonate roof sheeting, etc. works with priming coat of zinc primer and
painted with two or more coats of epoxy paint, all complete as per approved shop
drawing . All shafts shall be provided with MS ladder with chequered plate
(minimum 6mm thick) platform at floor levels with enamel paint with primer as per
specifications, all complete as per direction of engineer-in-charge.

MS support/ bracket (angle, tube, channel, plate, etc.) at wall/ ceiling for services line
(Plumbing, FF, Electrical, HVAC, etc.) shall be provided as per approved shop
drawing. The MS support to be fixed with 100x8mm anchor fasteners in concrete mix
of 1:1.5:3 / hold fast in brick work in adequate number at adequate spacing. The MS
works shall be finished with two or more coats of epoxy paint over a coat of zinc
primer.

Main/ Internal Doors of Unit:


All Main and Internal doors are 35mm thick factory made Pre-laminated Flush Door
shutters conforming to IS : 2202 (Phenol formaldehyde resin bonded & shall be a
green rated product) including 4 nos. SS butt hinges of size 125x64x2mm stainless
steel fixtures as per schedule of hardware fittings and as per direction of Engineer-in-
charge. For Mess Block vision panels of required size for service area doors (Kitchen,
Corridor, etc.) and as per direction of Engineer-in-charge. Toilet main doors shall be
lined with 1mm thick PVC sheet on the internal side of door with approved
adhesive/nailing at closed intervals by all complete as per architectural drawing and
design.

In Married Students Housing, Staircase doors shall be 35mm thick Pre-laminated


Flush Doors conforming to IS: 2202 (Phenol formaldehyde resin bonded & shall be a
green rated product) including 4 nos. SS butt hinges finished with polished teak
wood edge lipping (35x12mm) with vision panel and stainless steel fixtures as per
drawing and direction of Engineer-in-charge.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1- All door frames of size
125x65mm shall be factory made Phenol bonded Bamboo wood (Superior class,
interior use) of approved colour, texture and finish. The bamboo wood shall have

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


342

minimum density of 1000 Kg/cum, minimum hardness 1000 Kgf. The door frame
shall have tenon & mortise interlocking system, to be fixed to the wall with 100 mm
size. All complete as per directions of Engineer-in-charge.

For Married Student Housing- For All unit main entrance door frames of size
150x65mm (double rebate) and all internal door frames of size 125x65mm shall be
factory made Phenol bonded Bamboo wood (Superior class, interior use) of approved
colour, texture and finish. The bamboo wood shall have minimum density of 1000
Kg/cum, minimum hardness 1000 Kgf. The door frame shall have tenon & mortise
interlocking system, to be fixed to the wall with 100 mm size. All complete as per
directions of Engineer-in-charge.

For Mess Block-All door frames shall have factory made Pressed steel door frames
Profile section A/B/C conforming to IS: 4351, of approved manufacturers from
commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb,
bead, etc. including a coat of steel primer after pre-treatment and two or more coats
of approved brand and shade of painting and door frames profile inside should be
filled properly with CC 1:2:4( 1 cement: 2 coarse sand: 4 20mm graded stone
aggregate) and cured for seven days before fixing in position fixing shall be done as
per CPWD specification.

Toilet Cubicles and Doors: (Boys Hostel-1, Boys Hostel-2, Girls Hostel-1)

H. Common Toilet Cubicles:


This work shall be executed by Company authorized /Trained/Recommended
system integrator/installer or as decided by the Engineer-in-charge.

Providing and fixing Greenlam, Merino or equivalent, modular Box up toilet Toilet
cubicle(of following standard dimension which includes 600mm door size width)
made up of thermosetting resin treated high pressure ,self supporting decorative
compact laminates with permanently incorporate anti-bacterial agents during
manufacturing . The compact laminates should have the density >1.35kg/cm3 and
fulfilled the criteria of green guard gold certification and manufactured under
EN438-2&3:2005 standard. 12mm thick compact board should be heat resistant,
Chemical resistant, Moisture resistant, Impact resistant, termite resistant ,Scratch
resistant ,Weather and climatic shock resistant.

Finish of compact laminates should be Suede/Satin finish which includes door,


pilasters and intermediate panels finished with approved texture/shades as per
IS2046 and fulfilled the criteria of fire retardant under both BS-476/97 and
EN:BS1D0 standard. Pilaster to be supported with framing vertical posts with
circular adjustable foot and intermediate panels will attached to the wall with the
help of channels of stainless steel(grade316) and all required hardware, made up of

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


343

stainless steel(grade316) as per manufacturer’s specification and instruction of


Engineer-in-charge like Door knob, gravity hinges,Thumb turn locksets with
occupancy indicators ,coat hooks with door stopper , U channel, top rail with corner
connector of stainless steel(grade316), adjustable foot,Rubber noice deafening tape,
screw & wall plugs.

The top fitting should consist of SS round top rail of stainless steel(grade316) which
will get fixed with pilaster, with SS panel tube holder ,SS corner bend of stainless
steel(grade316) (connected with top rail ) will be use in corner of cubical in absence
of brick wall, SS wall fixing is used only on the wall which will hold the SS top rail.

All screw will of 304 grade in SS .All pilasters are supported by SS bottom cladding .
The base of the stainless steel bottom cladding will be anchored to the floor with a
clearance height upto 150 mm as per direction of Engineer-In-charge. Toilet Cubicle
with standard dimension of (Approx.) 2025mm Height, 1050 - 1250 mm Width and
1500mm Depth, which also includes 600mm door size width).

Married Student Housing & Mess Block:-

Toilet Doors and frames


Married Student Housing and for Mess Block - Toilet door frame shall be with factory
made PVC of size 50x47mm with wall thickness of 5mm made out of extruded 5mm
rigid PVC foam sheet, mitered at corners. The vertical door frame profile to be
reinforced with 19x19mm MS square tube of 19 gauge, EPDM rubber gasket weather
seal, etc. Frame to be fixed with MS screw/ fasteners. All complete as per
specifications and direction of Engineer-in-charge. (Item 9.119 / DSR 2018)

30mm thick pre-laminated factory-made PVC door shutter consisting of frame made
out of MS tube for style and for top & bottom rails. 30mm thick pre-laminated PVC
door shutters of approved design and colour. All complete as per specifications and
as directed by Engineer-in-charge. (9.120.2 / DSR 2018)

I. Cupboard and Cabinets:


For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 - Providing and fixing in all
cupboards in rooms shall have 25 mm thickfactory made / precast/ cast in situ RCC
shelves bottom side should be shutter finished cement concrete 1:1.5:3 (1cement:
1.5 coarse sand: 3 stone aggregate of 10mm to 6mm nominal size) and top surface
shall be finished with a neat cement floating coat including providing and fixing hard
drawn steel wire fabric of size 75x25 mm mesh of weight not less than 7.75 kg per
sqm and nominal reinforcement with 6mm bar all around periphery and center tied
along with wire mesh with binding wire as reinforcement including centering,
shuttering ,making chase in brickwork and fixing in position etc., as per the direction
of Engineer-in-Charge. Shutters shall be of 25mm thick flush door shutters as per IS:
2202 and finished with 1mm thick lamination (lamination shall be done at Factory)
with lipping 25x12mm including 2nd class teak wood frame with necessary fitting and

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


344

fixtures as per design and drawing. Loft shall be provided over cupboard as per
drawing. Heavy duty 25mm dia Stainless steel curtain rods with approved decorative
brackets shall be provided for all Windows.

All Doors, Windows, Cupboard, Cabinets, etc. shall be provided with all necessary
Stainless steel and Aluminium fitting and fixtures (such as hinges, Locks (Brass with
six levers), Mortice Lock, Safety Chain, Handles, sliding door bolt, Curtain rod, tower
bolt, night latch, cat eye, Twin rubber door stopper, door closer, drawer nob, vision
panel, double strip magnetic catcher, hanging rod, 300mm length stainless steel 304
friction stays at top and bottom, etc.) as per requirement & as per direction of
Engineer-in-charge.

For Married Student Housing: -


All cupboards and cabinets in typical unit shall have built in type using factory made
18mm thick BWR plywood conforming to IS 303 (lamination to be done at factory)
boxing provided with minimum 1mm thick lamination (total 20mm thick) on both
faces of required shade and colour. For all cupboards shutters and shelves lamination
shall be post formed including full length / height 4mm thick golden back mirror
cladded / pasted on one panel of shutter (1 for each unit), drawers and lockers in
cupboards with necessary fitting and fixtures including auto hinges as per design and
drawing. Loft over cupboard as per drawing. Bottom most area of cupboard shall be
finished with Granite stone.

All kitchens shall have built in type under-counter cabinets including drawers,
louvers door at gas cylinder and below sink as per drawing, over-head cabinets & loft
with necessary fitting and fixtures including auto hinges as per design and drawing.

All Doors, Windows, Cupboard, Cabinets, etc. shall be provided with all necessary
Stainless steel and Aluminium fitting and fixtures (such as hinges, Locks (Brass with
six levers), Mortice Lock, Safety Chain, Handles, sliding door bolt, Curtain rod, tower
bolt, night latch, cat eye, Twin rubber door stopper, door closer, drawer nob, vision
panel, double strip magnetic catcher, hanging rod for cupboard, 300mm length
stainless steel 304 friction stays at top and bottom, etc.) as per requirement and as
per direction of Engineer-in-charge.

Heavy duty 25mm dia Stainless steel curtain rods with approved decorative brackets
shall be provided for all Doors and Windows.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


345

Door and window hardware schedule :-


IITBH-DP2-BH1 (BOYS HOSTEL-1)- 369 Nos. Rooms
Inventory for 1 room and common area
Door and Window Hardware Schedule(ALUMINIUM FITTING/ M.S FITTING/S.S FITTING)
1 2 3 4 5 6 7 8 9 10
Door Door leaf/frame
Location Size (mm)
Code type

Mortice Lock -Rim


Friction Stay Hinges
Handle With Lock

Sliding Door Bolt

Tower Bolt 250

Door Stopper
lock 7 levers
Handle125

Handle300
Hinges

Buffer
DOOR
1800 x
D1a Main Entrance Glazed Door 8 4 1 1 1 2 2
2400
Indoor Sports & 1500 x
D1b Glazed Door 8 4 1 1 1 2 2
Washing 2400
HVAC Equipment
M.S Door with Including MS Door fittings and Fixtures, Handle,
D2 Room/ Mumty/ 1050x2400
M.S Frame Sliding door bolt, tower bolt, etc.
Machine Room
1200 X
FD-1 Electrical Room
2400
Fire Door As per fire Norms.
SD-1 Shaft Door 1200x2200 Louvered Door 6 2 1 1
SD-2 Shaft Door 600X2200 Louvered Door 3 1 1 1
DWG 1 Main Entry Door 5680x5800 Glazed Door 8 4 1 1 1 1 1
WINDOW
1500X190
W1 Room Aluminum 4 2 2
0
1500X190
W1a Guest Room Aluminum 4 2 2
0
W2 Guest Room 750X1900 Aluminum 2 1 1
1500X160
W3 Toilet Aluminum 4 2 2
0
1200X235
GL2 Warden Office Aluminum 4 2 2
0
1200X200
GL2a Warden Office Aluminum 4 2 2
0

STAINLESS STEEL FITTING


1050 X
D3 Toilet Main Entry Paneled Door 4 2 1 1 1 1
2400
Pre-laminated
D4 Main Room Entry 900X2100 4 2 1 1 1 1
Flush Door
Main Room Entry -
Differently Abled 1050X210 Pre-laminated
D4a 4 2 1 1 1 1
Student Room & 0 Flush Door
Toilet Door

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


Kitchen
cupboard
cupboard
Cupboard

Cupboards

Correction –Nil
&
Hardware Schedule

Under Counter Cabinet


Single Rooms 1200
Double Rooms 1050 wide

wide
Cabinetry

8
8
16
Self-Closing Hinge/ Auto Hinge (S.S. Matt finish)

Insertion –Nil
2
4
Handle 224mm (S.S. Matt finish)
Cupboard and Cabinetry Hardware Schedule

7
346

Handle 96mm (S.S. Matt finish)

1
Cupboard Lock

Drawer /Locker Lock

Drawer Recessed Handle (S.S. Matt finish)

Deletion –Nil
6
2 Drawer Channel for 30 kg load (Zinc plated)

1 Tower Bolt (200mm) (S.S. Matt finish)


2

Tower Bolt (100mm) (S.S. Matt finish)


2

Oval Hanger Rail (30x15x2mm) with zinc alloy


end support
4

Overwriting -Nil
Magnetic Catcher (load 4-5 kg)
347

IITBH-DP2-BH2 (BOYS HOSTEL-2)- 376 Nos. Rooms


Inventory for 1 room and common area

Door and Window Hardware Schedule(ALUMINIUM FITTING/ M.S FITTING/S.S FITTING)


1 2 3 4 5 6 7 8 9 10 11
Door leaf /
Door
Location Size Frame
Code
type

Stay

Mortice Lock -Rim


H Type Handle300
Handle With Lock

Sliding Door Bolt

Tower Bolt 250

Door Stopper
lock 7 levers
Handle125

Friction
Hinges

Hinges

Buffer
Lock
DOOR
1800 x
D1a Main Entrance Glazed Door 8 4 1 1 2 2
2400 1
Indoor Sports & 1500 x
D1b Glazed Door 8 4 1 1 2 2
Washing 2400 1
HVAC Equipment
1050x240 M.S Door with Including MS Door fittings and Fixtures. Handle, Sliding
D2 Room/ Mumty/
Machine Room
0 M.S Frame door bolt, tower bolt, etc.
1200 X
FD-1 Electrical Room
2400
Fire Door As per fire Norms.
1200x220 Louvered
SD-1 Shaft Door 3 2 1 1 1
0 Door
Louvered
SD-2 Shaft Door 600X2200 6 2 1 1 1
Door
5680x580
DWG 1 Main Entry Door Glazed Door 8 4 1 1 1 1 1
0
WINDOW
1500X190
W1 Room Aluminum 4 2 2
0
W2 Guest Room 750X1900 Aluminum 2 1 1
1500X160
W3 Toilet Aluminum 4 2 2
0
1200X235
GL2 Warden Office Aluminum 4 2 2
0
1200X200
GL2a Warden Office Aluminum 4 2 2
0
STAINLESS STEEL FITTING
1050 X
D3 Toilet Main Entry Paneled Door 4 2 1 1 1 1
2400
Pre-laminated
D4 Main Room Entry 900X2100 4 2 1 1 1 1
Flush Door
Main Room Entry -
Differently Abled 1050X210 Pre-laminated
D4a 4 2 1 1 1 1
Student Room & 0 Flush Door
Toilet Door

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


Single

Kitchen
cupboard
cupboard
Cupboard

Cupboards

Correction –Nil
Rooms
&
Hardware Schedule

Under Counter Cabinet


1200
Cabinetry

Double Rooms 1050 wide

wide
8

8
16

Insertion –Nil
Self-Closing Hinge/ Auto Hinge (S.S. Matt finish)

2
4
Handle 224mm (S.S. Matt finish)
Cupboard and Cabinetry Hardware Schedule

7
348

Handle 96mm (S.S. Matt finish)

1
2
Cupboard Lock

Drawer /Locker Lock

Drawer Recessed Handle (S.S. Matt finish)

Deletion –Nil
6 Drawer Channel for 30 kg load (Zinc plated)
1
2

Tower Bolt (200mm) (S.S. Matt finish)


1
2

Tower Bolt (100mm) (S.S. Matt finish)


1
2

Oval Hanger Rail (30x15x2mm) with zinc alloy end


support
2
4

Overwriting -Nil
Magnetic Catcher (load 4-5 kg)
349

IITBH-DP2-GH1 (GIRLS HOSTEL-1)- 249 Nos. Rooms


Inventory for 1 room and common area
Door and Window Hardware Schedule (ALUMINIUM FITTING / M.S FITTING/S.S. FITTING)
1 2 3 4 5 6 7 8 9 10 11
Door leaf /
Door
Location Size Frame
Code
type

Stay

Mortice Lock -Rim


H Type Handle300
Handle With Lock

Tower Bolt 250

Door Stopper
lock 7 levers
Handle125

Friction

L-Drop
Hinges

Hinges

Buffer
Lock
DOOR
1800 x
D1a Main Entrance Glazed Door 8 4 1 1 2 2
2400 1
Indoor Sports & 1500 x
D1b Glazed Door 8 4 1 1 2 2
Washing 2400 1
HVAC
Equipment M.S Door with Including MS Door fittings and Fixtures. Handle, Sliding
D2 1050x2400
Room/ Mumty/ M.S Frame door bolt, tower bolt, etc.
Machine Room
1200 X
FD-1 Electrical Room
2400
Fire Door As per fire Norms.
Louvered
SD-1 Shaft Door 1200x2200 6 2 1 1 1
Door
Louvered
SD-2 Shaft Door 600X2200 3 1 1 1 1
Door
DWG 1 Main Entry Door 5200x5625 Glazed Door 8 4 1 1 1 1 1
DWG 2 Main Entry Door 1500x2650 Glazed Door 8 2 1 1 2 2
WINDOW
W1 Room 1500X1900 Aluminum 4 2 2
W2 Guest Room 750X1900 Aluminum 2 1 1
W3 Toilet 1500X1600 Aluminum 4 2 2
GL2 Warden Office 1200X2350 Aluminum 4 2 2
Multipurpose
GL2a 1200X2000 Aluminum 4 2 2
Hall

STAINLESS STEEL FITTING


Toilet Main 1050 X
D3 Paneled Door 4 2 1 1 1 1
Entry 2400
Main Room Pre-laminated
D4 900X2100 4 2 1 1 1 1
Entry Flush Door
Main Room
Entry -
Pre-laminated
D4a Differently Abled 1050X2100 4 2 1 1 1 1
Flush Door
Student Room &
Toilet Door

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


Kitchen
cupboard
cupboard
Cupboard

Cupboards

Correction –Nil
&
Hardware Schedule

Under Counter Cabinet


Double Rooms 1050mm wide
Cabinetry

Single Rooms 1200 mm wide

8
8
16

Insertion –Nil
Self-Closing Hinge/ Auto Hinge (S.S. Matt finish)

2
4
Handle 224mm (S.S. Matt finish)
Cupboard and Cabinetry Hardware Schedule
350

7
Handle 96mm (S.S. Matt finish)

1
Cupboard Lock

Drawer /Locker Lock

Deletion –Nil
Drawer Recessed Handle (S.S. Matt finish)

6
2 Drawer Channel for 30 kg load (Zinc plated)

1
Tower Bolt (200mm) (S.S. Matt finish)
2

1
Tower Bolt (100mm) (S.S. Matt finish)
1
2

Oval Hanger Rail (30x15x2mm) with zinc alloy end


support
2
4

Overwriting -Nil
Magnetic Catcher (load 4-5 kg)
351

IITBH-DP2-MSH (Married Students Housing)- 96 Nos. Units


Inventory for 1 room and common area
DOOR AND WINDOW HARDWARE SCHEDULE

Mortice Lock - Rim lock 7


Door leaf / frame type

Friction Stay Hinges


Handle with Lock

Sliding Door Bolt


Tower Bolt 250
Tower Bolt 100
Door Stopper
Safety Chain
Night Latch
Handle125

Handle300
Door Code

Location

Channel

Cat eye
Hinges

Buffer
levers
Catch
Knob

Lock
Size

STAINLESS STEEL FITTING


35mm
1050x210
D1 Main Entry Thick Flush 4 2 1 1 1 1 1 1 1
0
Door 1
PVC Frame
D2 Toilet Door 750x2100 & Door 4 2 2 2 1 1
Shutter
35mm
Staircase 1400X210
D6 Thick Flush 8 4 1 1 1 2 1
Door 0
Door
ALUMINIUMFITTING
Lobby door 1500x210 Glazed
D3 8 4 1 1 2 1 1
at Level-1 0 Door
Mumty /
1000x210 Including MS Door fittings and Fixtures. Handle, Sliding
D4 Machine M.S Door
0 door bolt, tower bolt, etc.
Room
2700x265 Glazed
DW1 Balcony 12 2 2 4 1 2 1 1
0 Door
Staircase 1000X220
FD1 Fire Door As per fire Norms.
Fire Door 0
SD1 Shaft Door 600x2100 M.S. Door 4 2 1 1
Electrical
Shaft 1800x210
SD2 M.S. Door 8 2 2 1
Louvered 0
Door
Main 3600X265 Aluminum
CW1 8 4 1 4 2
Entrance 0 Glazing
Main Lobby 3600X235 Aluminum
GL1 4 2 1 2 1 1
at Level-2 0 Glazing
Main Lobby 3600X235 Aluminum
GL2
at Level-3,4 0 Glazing
2900x235 Aluminum
GL3 Main Lobby
0 Glazing
1440x235 Aluminum
GL4 Staircase 4 1 2
1 Glazing
WINDOW
1000X220 Aluminum
W1 Bed Room 4 1 4
0 Window

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


352

1050x160 Aluminum
W2 Kitchen 4 1 2
0 Window
Electrical Aluminum
W3 900X1200 4 1 4
Room Window
Aluminum
V1 Toilet 750x1000 2 1 1
Window

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


Cupboard & Cabinetry Hardware Schedule

Loft
+ Loft

Toilets
Kitchen
Cupboards

Correction –Nil
Overhead Cabinet
Under Counter Cabinet
Bedroom 1 Dress cupboard + Loft

Living area Wash basin Cabinet + Loft


Bedroom 1 1100 wide cupboard 1 & 2

Insertion –Nil
8
28

14
10
10
12
Self-Closing Hinge/ Auto Hinge (S.S. Matt finish)

4
2
CUPBOARD & CABINETRY HARDWARE SCHEDULE
353

Handle 224mm (S.S. Matt finish)

4
7
5
5
6
2
Handle 96mm (S.S. Matt finish)

5
2 Cupboard Lock

2
1

8 Drawer /Locker Lock


4

Drawer Recessed Handle (S.S. Matt finish)

Deletion –Nil
3
8
4

Drawer Channel for 30 kg load (Zinc plated)


2
1

Tower Bolt (200mm) (S.S. Matt finish)


3
1

1
7

Tower Bolt (100mm) (S.S. Matt finish)


2
1

Oval Hanger Rail (30x15x2mm) with zinc alloy end


support

Overwriting -Nil
6

14

Magnetic Catcher (load 4-5 kg)


354

MESS BLOCK
Door and Window Hardware Schedule
1 2 3 4 5 6 7 8 9 10 11
Door leaf/
Door
Location Size Frame
Code
type

Mortice Lock -Rim lock


Friction Stay Hinges
H Type Handle 300
Handle With Lock

Tower Bolt 250

Door Stopper
Handle125

7 levers
L-Drop
Hinges

Buffer
Lock
STAINLESS STEEL FITTING
Entry (Loading/
1500x210 35mm Thk.
D1 Unloading), 8 4 1 1 1 1 1
0 Flush Door
Staircase
Clean Dish,
1200x210 35mm Thk.
D2 Garbage, Dish 4 2 1 1 1 1
0 Flush Door
Wash
1200x210 35mm Thk.
D2A Storage 4 2 1 1 1 1
0 Flush Door
1050x210 35mm Thk.
D3 PH Toilet 4 2 1 1 1 1
0 Flush Door
35mm Thk.
D4 Toilet 900x2100 4 2 1 1 1 1
Flush Door
PVC Frame
D5 W.C 750x2100 & Door 4 2 1 1 1 1
Shutter
1200x210 35mm Thk.
D6 Cold Storage 4 2 1 1 1 1
0 Flush Door
Ladies Rest 1000x210 35mm Thk.
D7 4 2 1 1 1 1
Room 0 Flush Door
Mumty/ 1000x210 Including MS Door fittings and Fixtures. Handle, Sliding
D8 M.S Door
Machine Room 0 door bolt, tower bolt, etc.
Dormitory 35mm Thk.
D9 900x2100 4 2 1 1 1 1 1
Locker Flush Door
Dormitory 1000x210 35mm Thk.
D10 4 2 1 1 1 1
Room 0 Flush Door
Staircase Fire 1500X220 As per fire Norms.
FD1 Fire Door
Door 0
Electrical Room 1050X220
FD2
(Fire Door) 0
Fire Door As per fire Norms.
Patch
8600x845
GL1 Main Entrance Fittin 8
0
g

ALUMINIUM FITTING
3030X270 Glazed
DW1 Garbage Exit 12 4 2 2 1 1 1 1
0 Door 1
Loading/ UN 3330X270 Glazed
DW2 8 4 1 1
Loading Area 0 Door 1
3010X270 Glazed
DW3 Rear Entry 8 4 1 1
0 Door 1
3010X270 Glazed
DW4 Private Dining 8 4 1 1 1 1
0 Door 1
1800x270 Glazed
DW5 Mess In-charge 4 2 1 1 1 1
0 Door 1
2400x270 Glazed
DW6 Mess In-charge 4 2 1 1 1 1
0 Door 1
GL2 Dining Entry 6810X330 Aluminum 16 8 2 8 2 2

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


355

0
5470X380
GL4 Aluminum 8 4 1 4 1 1
0
5470X350
GL5 Aluminum 8 4 4
0

WINDOW
Loading/ 2600X180
W1 Aluminum 8 4 4
Unloading Area 0
Loading/ 2745X180
W2 Aluminum 8 4 4
Unloading Area 0
2100X180
W3 Dining Area Aluminum 8 4 4
0
1500X180
W4 Machine Room Aluminum 4 2 2
0
1500X105
W6 Kitchen Area Aluminum 4 2 2
0
Hand Wash,
1200X180
W7 Ladies Rest, Ele. Aluminum 2 1 1
0
Room
Electrical Room 1200X180
W7A Aluminum 2 1 1
0
3030X180
W8 Garbage Arae Aluminum 8 4 4
0
Private Dining 2800X280
W9 Aluminum 8 4 4
Area 0
W11 750X750 Aluminum 4 2 2
Solid Waste/ 2700X180
W12 Aluminum 8 4 4
Waste Disposal 0
2230X180
W13 Rear Elevation Aluminum 8 4 4
0
2815X180
W14 Rear Elevation Aluminum 8 4 4
0
2520X180
W15 Rear Elevation Aluminum 8 4 4
0
2310X180
W16 Rear Elevation Aluminum 8 4 4
0
2030X180
W17 Kitchen Hood Aluminum 8 4 4
0
V Toilet 900X900 Aluminum 2 1 1

Hardware schedules are for guidance only. The fittings shall be provided as per actual
site requirements and direction of Engineer-in-charge.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


356

J. FLOORING AND CLADDING:


Floor finishing margin varies from 50-60mm as per floor finishing / leveling
requirement shall be catered with 1:4 cement mortar up to desired level for which
nothing extra shall be paid.

The flooring works also protected by laying 2mm thick POP over the paper till
completion / handing over of the building whichever is later. If any scratches and
damages occur shall be replaced or rectified at their own cost and nothing shall be
paid against the same.

For Vitrified tiles, Rectified ceramic tiles and ceramic glazed tiles shall have not less
than 10% recycled material content to be used as per GRIHA norms for which
necessary certificate to be submitted by contractor.

Concrete Flooring in Floor:


52mm thick Hardcrete cement concrete flooring with concrete hardener topping
and making chequered pattern as per specifications. 18mm thick cement plaster
skirting of 100mm high with cement mortar 1:3 (1 cement: 3 coarse sand), finished
with a floating coat of neat cement shall be provided wherever required and as
directed by the Engineer in charge.

Polished Kota Stone flooring:


Kota stone flooring is with 25 mm thick (average) slab over 20mm (average) thick
base cement mortar of 1:4 (1 cement: 4 coarse sand)and Skirting shall be with 20
mm thick stones over 12mm (average) thick CM 1:3 (1 cement: 3 coarse sand) as
per CPWD specifications.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :- Flooring at Lobby & lift Lobby
area with combination of two colours of Kota stone and Tactile tile with 10mm wide
epoxy grout as per details in drawing shall be done as per CPWD specifications

Flooring in Corridors, passages etc. with combination of two colours of Kota stone
and Tactile tile with 10mm wide epoxy grout in a pattern as shown in drawing .
Flooring in connecting corridor/ wings (single loaded corridor at stilt) shall be
finished with combination of two colours of Kota stone and chisel dressed / rough
Kota stone with 10mm wide epoxy grout in a pattern as shown in drawing . Kota
stone flooring with 25 mm thick (average) slab over 20mm (average) thick base
mortar of 1:4 (1 cement : 4 coarse sand) and Skirting shall be with 20 mm thick kota
stones over 12mm (average) thick CM 1:3 (1 cement : 3 coarse sand).

Multipurpose hall flooring shall be provided with combination of two colours of


kota stone.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


357

Single piece Kota stone at staircase treads and risers up to 1500mm. Treads shall
have Kota stone with 15mm nosing projection as per approved design with 3 no’s
horizontal grooves for anti-skid purpose on treads as per CPWD specification.

Steps (Treads) shall be provided with Kota stone. Skirting and riser shall be
polished Kota stone as per per drawing and CPWD specifications.

Kota stone Flooring in Indoor sports area, Electrical room, Shop, Janitor, Security
room, Clothes washing, Lift machine room, all Staircases, Entrance steps, Stores,
Pump room, etc. as per drawing.

For Married Student Housing flooring at Common Lobby, lift Lobby, Corridors,
etc. with 10mm wide epoxy grout. Kota stone Flooring in Electrical room, Lift
machine room, all Staircases, Entrance steps, Stores, Pump room, etc. shall be done
as per CPWD specifications.

Steps, staircase treads and riser shall be finished with single piece Kota stone.
Treads shall have polished Kota stone with 15mm nosing projection as per design
and 3 no’s horizontal grooves for anti-skid purpose on treads as per CPWD
specification . Tread shall be single piece up to 1800mm.

For Mess Block: Flooring at Dining hall, corridors, passages, etc. shall be finished
with combination of Kota and Tactile tile with 10mm wide epoxy grout. Kota stone
flooring shall be provided in Garbage handling area, machine room, electrical room,
etc. as per drawing.

Staircases (2, 3, 4 & 5) shall be finished with Single piece Kota stone at treads and
risers up to 1700mm. Treads shall have Kota stone & 15mm nosing projection as
per design and 3 no’s horizontal grooves for anti-skid purpose on treads as per
CPWD specification.

For all staircases steps shall be provided with single piece of 25mm thick Kota stone
with 20mm thick base mortar 1:4 (1 cement: 4 coarse sand). Skirting and riser shall
be with 20mm thick Kota stone. Skirting shall be done with over 12mm (average)
thick base of CM 1:3 (1 cement: 3 coarse sand) as per CPWD specifications.

Flooring in Electrical room, Shop, Janitor, Security room, Clothes washing, Lift
machine room, all Staircases, Entrance steps, Stores, Pump room, etc. as per
drawing.

Tactile tile (for vision impaired persons as per standards) of required size with
9.8mm thickness having water absorption less than 0.5% and conforming to IS:
15622, of approved make in all colours and shades, laid on 20mm thick base of
cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns complete as
per drawing.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


358

Polished Kota stone coping shall be provided over low height walls at Level 1 area
near steps, planters & terrace parapet including nosing as per drawing and design
for all buildings.

Granite Flooring and Wall lining:


Gang-saw-cut 18mm thick Pre-Polished Granite (of approved shade) flooring
and wall lining:.

Granite flooring of Mirror polished, 18 mm thick gang saw cut pre-moulded and
pre-polished, machine cut of required size, approved shade, colour and texture laid
over 20 mm thick base cement mortar 1:4 (1 cement: 4 coarse sand), joints treated
with white cement, mixed with matching pigment, epoxy touch ups, including
rubbing, curing, moulding and polishing to edges to give high gloss finish etc.
complete at all levels.

Kitchen Counter, Toilet Counter, Window sills (single piece), etc. shall be laid with
18mm thick mirror polished, pre-moulded and pre-polished, Granite stone with
base of over cement mortar 20mm thick cm 1:4 (1 cement : 4 coarse sand)
moulding and nosing as per drawing. Window sill shall be provided with granite
stone over 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) over PCC
1:3:6 ( 1 cement: 3 coarse sand: 6 stone aggregate of graded 20mm nominal size)
as per drawing. Counters shall be finished in Jet black granite.

Granite Threshold shall be provided in flooring where finishes change.

18mm thick gang saw cut Granite Wall Cladding of full height shall be provided at
lift Facia in all floors as perarchitectural drawing and laid over 12mm thick cement
mortar 1:3 (1 cement : 3 coarse sand).

Granite stone divider for toilet and shower area shall be provided with nosing as
per drawing. The thickness of divider is 40mm thick (20+20mm).

For Mess Block :-

Staircase-1 shall be finished with 18mm thick gang-saw-cut Single Piece Granite
stone at treads and risers up to 2150mm. Treads shall have flamed finish granite
stone & 15mm nosing projection as per design and 3 no’s horizontal grooves for
anti-skid purpose on treads as per CPWD specification .

Main Lobbies, lift lobby, etc. shall be finished with 18mm thick gang-saw-cut pre-
polished granite stone with combination of Tactile tile as per drawing.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


359

NOTE: 18mm thick Gang saw Cut Granite slab while bringing to site minimum size
should be 2700mm X 1600mm and maximum size 3300mm X 2000mm. Less than
minimum size and thickness mentioned above shall not be allowed at site.

Common Area Wall Cladding (1050mm Height):


For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 and Married Student Housing
:- Common area (Lobby, Lift lobby, Corridor, Passage, All Staircases, etc.), Cloth
washing, etc. wall shall be cladded with 600mm height of full body vitrified tiles
(600x600mm) at center and a 200mm height band of Kota stone at top and bottom
of tiles laid on minimum 12 mm thick mortar of 1:3 (1 cement : 3 coarse sand) and
finished surfaces to be flushed with each other with 50mm stone mould on top as
per drawing, specifications.

For Mess Block :-

Dining hall, etc. wall shall be cladded with 600mm height of ceramic tiles at center
and a 200mm height band of Kota stone at top and bottom of tiles laid on minimum
12 mm thick mortar and finished surfaces to be flushed with each other with 50mm
polished Kota stone (25+25 with glue by araldite adhesive) stone mould on top as
per drawing, specifications .

Passages, etc. wall shall be cladded with 1000mm height of ceramic tiles as per
design with 50mm stone mould on top as per drawing, specifications.
Staircase-1 wall shall be cladded with 1000mm height full body vitrified tiles( High
traffic tiles) as per design, drawing, specifications.

Stainless steel Trough shall be provided for all 4 nos. hand wash areas as per profile
and requirement with base frame.

Stainless steel trough for the 2 nos. dish pre-wash areas shall be provided as per
profile and requirement with base frame.

Rectified Ceramic Floor Tiles (Satin Finish/ Matt Finish/ Anti-skid) and
Ceramic Wall Tiles:
For Married Student Housing :- Flooring for Living, Bedroom, etc. shall be with
600x600mm of thickness minimum 9mm Rectified Ceramic (Satin finish) laid on
20mm thick cement mortar with 3mm wide epoxy grout. Kitchen flooring shall be
with 300x300mm of thickness minimum 9mm Rectified Ceramic Tiles (Satin finish)
laid on 20mm thick cement mortar 1:4 (1 cement: 4 coarse sand). Balconies, Toilets,
etc. flooring shall be with 300x300mm of thickness minimum 9mm Rectified
Ceramic Tiles (Matt finish/anti-skid) laid on 20mm thick cement mortar 1:4 (1
cement: 4 coarse sand). Internal walls of Kitchen dado above counter and toilet
shall have 300x600mm ceramic wall tiles up to 2100mm laid over 12mm thick
cement mortar 1:3 (1 cement: 3 coarse sand) with PVC edge beading at corners.
Skirting shall be with same tiles laid over 12mm thick cement mortar.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


360

For Mess Block :- Flooring for all Toilets, Hand wash area, rinse area, soil drop area,
Ladies and gent’s toilets, Dormitory toilets, etc. shall be with 300x300mm of
thickness minimum 9mm Rectified Ceramic Tiles (Matt finish/anti-skid) laid on
20mm thick cement mortar 1:4 (1 cement: 4 coarse sand). Flooring for Physically
challenged toilet with combination of 300x300mm of thickness minimum 9mm
Rectified Ceramic Tiles (Matt finish/anti-skid) & Tactile tile laid on 20mm thick
cement mortar 1:4 (1 cement: 4 coarse sand). Internal walls of all Toilets, PH toilets,
Hand wash area, rinse area, soil drop area, Ladies and gent’s toilets, Dormitory
toilets, Kitchen, dish wash, clean dishes storage area, Garbage handling area, etc.
shall have 300x600mm ceramic wall tiles up to 2100mm, laid over 12mm thick
cement mortar1:4 (1 cement: 4 coarse sand) with PVC edge beading at corners.
Skirting shall be with same tiles laid over 12mm thick cement mortar 1:3 (1 cement:
3 coarse sand).

Kitchen, dish wash area, clean dishes storage area, dormitory, etc. flooring shall be
with 15mm thick anti-skid Industrial tile laid on 20mm thick cement mortar with
3mm wide epoxy grout.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :-


(1) Rectified Ceramic Floor Tiles (Satin Finish/ Matt Finish/ Anti-skid) and
Ceramic Wall Tiles:
Flooring for all Toilets, drying area, etc. shall be with 300x300mm of thickness
minimum 9mm Rectified Ceramic Tiles (Matt finish) laid on 20mm thick cement
mortar 1:4 (1 cement: 4 coarse sand). Flooring in front of passage for Physically
challenged toilet with combination of 300x300mm of thickness minimum 9mm
Rectified Ceramic Tiles (Matt finish) & Tactile tile laid on 20mm thick cement
mortar 1:4 (1 cement: 4 coarse sand). Internal walls of toilets and drying area dado
shall have 300x600mm ceramic wall tiles up to 2100mm, laid over 12mm thick
cement mortar 1:3 (1 cement: 3 coarse sand) providing PVC edge beading at
corners. Skirting shall be done with same tiles laid over 12mm thick cement mortar.
1:3 (1 cement : 3 coarse sand).

(2) Full body Vitrified tiles (Polished/Matt):


Full body Vitrified tiles of sizes 600 x 600 mm laid over 20 mm thick cement mortar
1:4 (1 cement: 4 coarse sand) for flooring in Student rooms, waiting room, Warden
office, Guest room, etc. as per drawing. Skirting shall be with same tiles laid over 12
mm thick cement mortar 1:3 (1cement: 3 coarse sand). Tile flooring shall be laid
with 3mm spacer and grouted with Epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg). For
Physically challenged rooms, flooring with combination of Vitrified tile and Tactile
tile laid on 20mm thick cement mortar with 3mm wide epoxy grout.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


361

(3) Vinyl Flooring:


Flooring at Music room and reading room shall be with Vinyl sports resilient
Vinyl flooring

Providing and installation of Vinyl Sports Sheet Flooring manufactured by


Armstrong Industries or equivalent Inc, 1.8m wide and 15 m long, having a
nominal total thickness of 6.5mm. The wear surface shall be 0.7 mm and PUR
coated with UV Treatment. Athleta shall conform to flammability Class Cfl as per EN
13501-1; Shock Absorption more than 37%; sliding coefficient of 0.45-0.65; energy
return of 0.40m/s; vertical deformation of 2.8 mm and sound insulation of 23-25
db. Impact Resistance of 8N/M (as per DIN18032); Abrasion Resistance of 7 mm,
Indentation Resistance of 0.6mm (as per EN1016), Friction Coefficient of 0.6 (as per
GB/T14833-1993) and Rebound Coefficient of 0.86 (as per GB/T14833-
1993)including skirting as per manufacturers specifications over a base of 40mm
thick cement concrete flooring with 1:2:4 (1 cement: 2 coarse sand: 4 graded
20mm stone aggregate) finished with a floating coat of neat cement. All complete
including surface preparation, leveling, as per drawing, design.

Internal floor and wall finish of Overhead Water Tanks shall be 300x300mm
Ceramic tiles (Glazed) over 12mm thick cement mortar 1:4 (1 cement: 4 coarse
sand) and laid over 12mm thick cement mortar 1:3 (1 cement: 3 coarse sand)
respectively.

All skirting shall be 100mm high with same material unless specified with base of
12mm cement mortar 1:3 (1 cement: 3 coarse sand). It should be flushed with wall
with groove 6x8mm.

Other balance areas if any left out shall be finished with Rectified Ceramic Floor
tiles Satin finish with 3mm epoxy grout and skirting with same tile with base of
12mm cement mortar 1:3 (1 cement: 3 coarse sand).

All tiles shall be of 1st quality as approved sample, brand, manufacture, colour and
shade.

Minimum base rate of Granite is Rs. 275 per sqft., Gwalior mint Stone is Rs. 150 per
sqft., Vitrified tile is Rs. 110 per sqft., Plain Ceramic tile is Rs. 45 per sqft., Rectified
Ceramic (Satin finish) tile is Rs. 75 per sqft., Rectified Ceramic (Matt/Anti-skid
finish) tile is Rs. 75 per sqft. (All above are approximate rates at Kutelabhata, Durg,
Chhattisgarh)

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


362

K. Roofing and Acoustic Treatment-


For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :- (Warden office, Waiting
room, Guest room, etc.)
Gypsum False ceiling:
Providing and fixing false ceiling at all height including providing and fixing of
frame work made of special sections, power pressed from M.S. sheets and
galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277
and consisting of angle cleats of size 25mm wide x 1.6 mm thick with flanges of
27mm and 37mm at 1200mm center to center, one flange fixed to the ceiling with
dash fastener 12.5mm dia x 50mm long with 6mm dia bolts, other flange of cleat
fixed to the angle hangers of 25x10x0.50mm of required length with nuts & bolts
of required size and other end of angle hanger fixed with intermediate G.I.
channels 45x15x0.9mm running at the spacing of 1200mm center to center, to
which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered
flanges of 26mm each having lips of 10.5mm, at 450mm center to center, shall be
fixed in a direction perpendicular to G.I. intermediate channel with connecting
clips made out of 2.64mm dia x 230mm long G.I. wire at every junction, including
fixing perimeter channels 0.5mm thick 27mm high having flanges of 20mm and
30mm long, the perimeter of ceiling fixed to wall/ partition with the help of rawl
plugs at 450 mm center, with 25mm long drywall screws @ 230mm interval,
including fixing of gypsum board to ceiling section and perimeter channel with the
help of drywall screws of size 3.5 x 25mm at 230mm c/c, including jointing and
finishing to a flush finish of tapered and square edges of the board with
recommended jointing compound, jointing tapes, finishing with jointing
compound in 3 layers covering upto 150mm on both sides of joint and two coats of
primer suitable for board, all as per manufacturer's specification and also
including the cost of making openings for light fittings, grills, diffusers, cutouts
made with frame of perimeter channels suitably fixed, all complete as per
drawings, specification but excluding the cost of painting with 12.5mm thick
tapered edge gypsum moisture resistant board conforming to IS: as per drawing.
(DSR 2018 12.45.3)

Tile false ceiling:


Providing and fixing mineral fibre false ceiling tiles at all heights of size
595x595mm of approved texture, design and pattern. The tiles should have
Humidity Resistance (RH) of 99%, Light Reflectance > 85%, Thermal Conductivity
k = 0.052 - 0.057 w/m K, Fire Performance as per (B476 pt - 6 &7) in true
horizontal level suspended on interlocking T-Grid of hot dipped all round
galvanized iron section of 0.33mm thick (galvanized @120 gsm) comprising of
main T runners of 15x32mm of length 3000mm, cross T of size 15x32mm of
length 1200mm and secondary intermediate cross T of size 15x32mm of length
600mm to form grid module of size 600x600mm suspended from ceiling using

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


363

galvanized mild steel item (galvanised@80gsm) 50mm long 8mm outer diameter
M-6 dash fasteners, 6mm diameter fully threaded hanger rod up to 1000mm
length and L-shape level adjuster of size 85x25x2mm, spaced at 1200mm center to
center along main ‘T’. The system should rest on periphery walls /partitions with
the help of GI perimeter wall angle of size24x24X3000mm made of 0.40mm thick
sheet, to be fixed to the wall with help of plastic rawl plug at 450mm center to
center & 40mm long dry wall S.S. screws. The exposed bottom portion of all T-
sections used in false ceiling support system shall be pre-painted with polyester
baked paint, for all heights. The work shall be carried out as per specifications,
drawings. With 16mm thick beveled tegular mineral fibre Anti-microbial false
ceiling tile confirming to ISO 5 (class 100) specifications (DSR 2018 26.27.3).
Tiled false Ceiling (grid false Ceiling) tiles of approved texture in the grid including
required cutting/ making, opening for services like diffusers, grills, light fittings,
fixtures, smoke detectors etc. as per drawing.
For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :- (Corridor areas, etc. First
floor, Second floor and Third floor and as per drawing)
Metal false ceiling:
Corridor areas as per drawing shall be finished with Providing and fixing Gl Clip in
Metal Ceiling System of 300x1200mm module which includes providing and fixing
'C' wall angle of size 20x30x20 mm made of 0.5mm thick pre painted steel along
the perimeter of the room with help of nylon sleeves and wooden screws at 300
mm center to center, suspending the main C carrier of size 10x38x10 mm made of
G.I steel 0.7 mm thick from the soffit with help of soffit cleat 37x27x25x1.6 mm,
rawl plugs of size 38x12 mm and C carrier suspension clip and main carrier
bracket at 1000 mm c/c. Inverted triangle shaped Spring Tee having height of 24
mm and width of 34 mm made of Gl steel 0.45 mm thick is then fixed to the main C
carrier and in direction perpendicular to it at 600 mm centers with help of
suspension brackets with 6mm dia GI fully threaded hanger rod upto 1000mm
length @1200 mm c/c spacing. Wherever the main C carrier and spring T have to
join, C carrier and spring T connectors have to be used. All sections to be
galvanized @ 120 gms/sqm (both side inclusive), fixing with clip in tiles into
spring T with :
GI Metal Ceiling Clip in plain Beveled edge global white color tiles of
size300x1200mmand 0.5 mm thick with 25 mm height, made of G I sheet having
galvanizing of 100 gms/ sqm (both sides inclusive) and 20% perforation area with
1.8 mm dia holes and having NRC of 0.5, electro statically polyester powder coated
of thickness 60 microns (minimum), including factory painted after bending and
perforation. (DSR item2018 12.54.2)

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :- (Corridor areas, etc. First
floor, Second floor and Third floor and as per drawing)
Side Wall Panelling ( Services covering)
Corridor areas as per drawing shall be finished with Providing and fixing Gl Clip in
Metal wall cladding System of 600x700 module which includes providing and

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


364

fixing 'C' wall angle of size 20x30x20 mm made of 0.5mm thick pre painted steel
with help of nylon sleeves and wooden screws at 300 mm center to center, main C
carrier of size 10x38x10 mm made of G.I steel 0.7 mm thick from the wall with
help of cleat 37x27x25x1.6 mm, rawl plugs of size 38x12 mm and C carrier
suspension clip and main carrier bracket at 1000 mm c/c. Inverted triangle
shaped Spring Tee having height of 24 mm and width of 34 mm made of Gl steel
0.45 mm thick is then fixed to the main C carrier and in direction perpendicular to
it at 600 mm centers with help of suspension brackets. Wherever the main C
carrier and spring T have to join, C carrier and spring T connectors have to be
used. All sections to be galvanized @ 120 gms/sqm (both side inclusive), fixing
with clip in tiles into spring T with :
GI Metal Clip in plain Beveled edge global white color tiles of size 600x700mm and
0.5 mm thick with 25 mm height, made of G I sheet having galvanizing of 100 gms/
sqm (both sides inclusive) and 20% perforation area with 1.8 mm dia holes and
having NRC of 0.5, electro statically polyester powder coated of thickness 60
microns (minimum), including factory painted after bending and perforation.

Calcium Silicate False Ceiling:


For Boys Hostel-I, Boy’s Hostel-II and Girls Hostel-I Ground floor corridors:
Providing and fixing tiled false ceiling of specified materials of size 595x595 mm in
true horizontal level, suspended on interlocking metal grid of hot dipped
galvanized steel sections (galvanized @ 120 grams/ sqm, both side inclusive)
consisting of main "T" runner with suitably spaced joints to get required length
and of size 24x38 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200
mm center to center and cross "T" of size 24x25 mm made of 0.30 mm thick
(minimum) sheet, 1200 mm long spaced between main "T" at 600 mm center to
center to form a grid of 1200x600 mm and secondary cross "T" of length 600 mm
and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at
middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of
size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid
including, required cutting/ making, opening for services like diffusers, grills, light
fittings, fixtures, smoke detectors etc. Main "T" runners to be suspended from
ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with
12.5 mm dia. and 50 mm long dash fasteners, 4 mm GI adjustable rods with
galvanized butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm center
to center along main T, bottom exposed width of 24 mm of all T-sections shall be
pre-painted with polyester paint.
8 mm thick fully perforated calcium silicate board made with Calcareous &
Siliceous materials reinforced with cellulose fiber manufactured through
autoclaving process to give stable crystalline structure with minimum
compressive strength 225 kg/ sq. cm, bending strength 100 kg/sqcm., of size
595x595 mm, having perforation of dia. 10 mm with minimum perforated area 18
% with non-woven tissue on the back side, having an NRC (Noise Reduction
Coefficient) of 0.85, with 50 mm thick rockwool of 48 kg /cum backing. All
complete for all heights as per specifications, drawings. (DSR item2018 12.58.1)

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


365

Acoustic False Ceiling and Wall Paneling:


All acoustics related works like Acoustic False Ceiling and Wall Paneling shall be
executed by specialized agency to be approved by the Engineer-in-Charge.
For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :-
Indoor sports area, Multipurpose hall, reading room, Music room etc. shall be
cladded with Acoustic False ceiling and wall paneling as per the drawing and
specifications.

ACOUSTIC FALSE CEILING


Supply and Installation of Strand color, square edge, magnesite-bonded pinewood
fibre ceiling tile of maximum size 600x2400x20mm, volume density 400Kgs/m3,
weight 8kg/m2 installed by using Anutone or equivalent Strut ceiling framework
without visible fasteners using Anutone or equivalentH-Spline.
The Strut ceiling framework system shall include Strut WC25 Wall channel, fully
knurled, sectional thickness 0.55mm, length 3600mm, unequal flanges of 20 &
30mm and web of 25mm, fixed along the perimeters of the wall with nylon sleeves
and suitable fasteners at every 300mm centers. Then suspend Strut MC45 Main
channels, fully knurled, sectional thickness 0.8mm, length 3600mm, equal flanges
of 15mm and web 45mm from the soffit at 1200mm centers with Strut SA25, fully
knurled, Suspender angle with sectional thickness 0.55mm, unequal flanges of 25
& 10mm. Strut CC25 Cross channel, fully knurled, sectional thickness 0.55mm,
length 3600mm, web 35mm, depth of 20mm and equal flanges 9.5mm is fastened
to the Strut MC45 perpendicularly at 300mm centers. PVC Vinyl core UV treated
H-Spline having sectional thickness 2mm and length 2400mm to be fixed
perpendicular to the Cross channel (CC25) at 600mm centers. The Kerfed edge
Strand panels shall be then inserted into the H-spline along their long edges of
2400mm against framework to perfect fit with staggered short edges.

The system is backlined with the acoustical infill SynthPF 10x25


Technical Parameters
• Fire (Class) – 1 & P
• Acoustics – NRC 0.9 (For 25mm E300* Mounting)
• Thermal conductivity (W/mk)– 0.07
• Climate (°C, RH) – 50, 95
• Light reflectance (%) – 80
• Green (VoC, RC %) – Low, 30

ACOUSTIC WALL PANELING


For Indoor sports area, Multipurpose hall, reading room, Music room etc. shall be
cladded with Acoustic wall paneling.

Supply and Installation of Strand color, Kerfed edge, magnesite-bonded superfine


filament pinewood fibre tile of maximum size 600x2400x30mm, density 400
kgs/m3, weight 12kg/m2 installed by using Strut framework system with non-
visible fasteners using Strut H-Spline.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


366

The Strut framework systems includes Strut CC50 Cross Channel having thickness
0.7mm, length 3600mm, knurled web 50, depth 50mm and equal flanges 15mm is
fastened to wall positioned horizontally in a regular manner at 600mm c/c. Strut
H-Spline having sectional thickness 2mm and length 2400mm to be fixed
perpendicular to the Strut CC50 Cross Channel at 600mm centers. The Kerfed edge
panels shall be then inserted into the Strut H-spline along their long edges of
2400mm against framework to perfect fit with staggered short edges.

The system is backlined with the acoustical infill Anutone SynthPF 10x50 or
equivalent

Technical Parameters
• Fire (Class) – 1 & P
• Acoustics – NRC 0.91 (For 50mm E250* Mounting)
• Thermal conductivity (W/mk)– 0.08
• Climate (°C, RH) – 50, 90
• Light reflectance (%) – 75
• Green (VoC, RC %) – Low, 30

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


367

Waterproofing:
Waterproofing compound material shall be mixed in concreting and plastering in
proportion recommended by manufactures.

All Waterproofing works shall be executed through specialized agency to be


approved by the Engineer-in-Charge.

All waterproofing works shall be commenced after completion of all RCC and
cementitious works like mumty rooms, water tanks, parapet walls and
supporting pillars of water supply line, firefighting lines and solar heater
supporting system and plastering of all works at terrace. Insulation system shall
start after initial surface cleaning, removal of debris, surface cleaning by wire
brush/ air blower and ready for the surface preparation and surface should be
dust free .

Making khurras 45cm x 45cm with average minimum thickness of 5cm cement
concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate of 20mm
nominal size) over PVC sheet 1mx1mx400 micron finished with 12mm cement
plaster 1:3 (1 cement: 3 fine sand) and a coat of neat cement rounding the edges
and making and finishing the outlet complete.

L. Terrace Water proofing treatment with Insulation:


1.1 Water proofing in roof including mumty area to be provided as follows:
a. Repairing cracks by cutting & making V groove in 25x25 mm, and groove
shall be made at all weaker sections of construction joints, in cracks and
hairline cracks etc. on mother slab and groove to be filled with using polymer
modified mortar CM (1:3) mixed with SBR Latex @10% by weight of cement.
After filling of joints, flood test for 7 days.
b. Base coat highly elastomeric, self-levelling two component polyurethane
based waterproofing coating, having elongation of 600% and tensile strength
of 6Mpa, crack bridging ability of 3mm, bonding strength to concrete
@1.5N/mm2 and tear strength of 30N/mm, applied at 1.5kg/Sqm, minimum
1.2mm thick, at the corners above the mother slab after making angle fillet of
50mm*50 mm for a length of 1000mm horizontally and 300mm vertically
after priming application.
c. Spray apply an average 65mm thick PU foam insulation (U Value= 0.346
W/m2°k) with a core density as per ASTM D1622 of 45-50 kg/m3, thermal
conductivity of 0.023 W/m.k at 25 degree mean temperature as per ASTM
C518/91, compressive strength with rise of 4.2kg/cm2 as per ASTM D-
1621/94, Tensile strength 5.1 Kg/cm2 as per ASTM 1623/78, Closed cell
content, apparent vol., % of 96-98, fire resistance property confirming to
class B2 as per DIN 4102.
d. Highly elastomeric, self-levelling two component polyurethane based
waterproofing coating, having elongation of 600% and tensile strength of
6Mpa, crack bridging ability of 3mm, bonding strength to concrete

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


368

@1.5N/mm2 and tear strength of 30N/mm, applied at 1.5kg/Sqm, minimum


1.2mm thick.
e. Spreading150 GSM Geotextile (non-woven polyester).
f. A bitumen filler board of 10mm thickness for construction joints shall be
placed vertically to form a rectangular bay 12 sqm
g. Average of 75 mm thick M-20 grade concrete screed including control joints
of 3m X 4m size, making angle fillet of 50mmX50mm using M20 grade
concrete at the corners. Exposed filler boards shall be cut by mechanical
means and filling the groove with Polysulphide Sealant. The width of sealant
fill shall not exceed 10mm, with all leads and heights complete . Khurras to be
provided at locations marked in drawings, 45x45 cm, finished with Heat
Resistant Terrace Tiles complete with core-cutting for rainwater pipe .
h. The entire system of supply of material and installation should be done
directly by the manufacturer through in-house team with a guarantee of 10
years against leakages.

Aluminium edge beading shall be provided / fixed to the parapet wall at the
end of PU coating and above that cement mortar 1:2 (1 cement: 2 Fine sand)
band of size 50mm height and 25mm width/ depth to be provided to prevent
entry of water as shown in terrace water proofing treatment drawing.

The terrace top finish with Heat Resistant tiles (300 mm x 300mm x 20 mm)
with SRI (solar refractive index) > 78, solar reflection > 0.70 and initial emittance
> 0.75 on water proof and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4 coarse sand) and grouting the joints
with mix of white cement & marble powder in ratio of 1:1, including providing
skirting up to 150 mm height along the parapet walls.

Water proofing forOverhead Water Tanks:


Overhead Water tank shall be treated with integral crystalline slurry of
hydrophilic in nature prepared by mixing in the ratio of 5:2 (5 parts integral
crystalline slurry: 2 parts water) for vertical surface sand 3:1 (3 parts integral
crystalline slurry: 1 part water) for horizontal surface sand applying the same
from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI- 212-3R-2010. The work shall be
carried out all complete as per specification. The product performance shall
carry guaranteed for 10 years against any leakage. For vertical surface two coats
@ 0.70 kg per sqm per coat. For horizontal surface one coat @1.10 kg per sqm.

PVC water stops conforming to IS:12200 for construction/ expansion joints


between two RCC members and fixed to the reinforcement with binding wire
before pouring concrete etc. complete Serrated with central bulb (225 mm wide,
8-11 mm thick).

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


369

Lift well Waterproofing:

(a) Horizontal surface:

Providing and laying integral cement based treatment for water proofing on
horizontal surface at all depth below ground level for underground structures
and consisting of:

1st layer of 22 mm to 25 mm thick approved and specified rough kota stone slab
over a 25 mm thick base of cement mortar 1:3 (1 cement: 3 coarse sand) mixed
with water proofing compound conforming to IS:2645 in the recommended
proportion over the leveling course Joints sealed and grouted with cement slurry
mixed with water proofing compound.

2nd layer of 25 mm thick cement mortar 1:3 (1 cement: 3 coarse sand) mixed
with water proofing compound in recommended proportions.

Finishing top with stone aggregate of 10 mm to 12 mm nominal size spreading @


10 cudm /sqm thoroughly embedded in the 2nd layer: Using rough Kota stone.

(b)Vertical surface:

Providing and laying integral cement based treatment for water proofing on the
vertical surface by fixing specified rough kota stone slab 22 mm to 25 mm thick
with cement slurry mixed with water proofing compound conforming to IS:2645
in recommended proportions with a gap of 20 mm (minimum) between stone
slabs and the receiving surfaces and filling the gaps with neat cement slurry
mixed with water proofing compound and finishing the exterior of stone slab
with cement mortar 1:3 (1 cement: 3 coarse sand) 20 mm thick with neat cement
punning mixed with water proofing compound in recommended proportion
complete at all levels as per CPWD specifications :Using rough Kota stone.

Water proofing for Sunken slab:


Water proofing treatment to vertical and horizontal surfaces of depressed
portions of toilets, Balcony, Utility, etc. consisting of:

Initially surface cleaning, removal of debris, surface cleaning by wire brush/ air
blower and ready for the surface preparation.

a) Highly elastomeric, polyurethane based self-levelling two component


waterproofing coating with 100% solids, having elongation of 600% and tensile
strength of 6Mpa, crack bridging ability of 3mm, bonding strength to concrete
@1.5N/mm2 and tear strength of 30N/mm, applied at 2kg/Sqm to achieve a
minimum thickness of 1.5mm. The system includes base preparation of cleaning,
brushing and removal of flaky materials, grouting the porous area with
cementitious grout, proper coving between slab and wall junctions and priming
the surface with epoxy resin-based primer applied @ 150gms/Sqm. The entire

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


370

system of supply of material and installation should be done directly by the


manufacturer through their in-house team or by specialized agency to be
approved by Engineer-in-Charge with a guarantee of 10 years against leakages
b) 120 GSM Geotextile over the entire horizontal area maintaining proper 100mm
overlaps including slope making and protection to the waterproofing treatment
with 40 mm avg. thick M20 grade screed for floors, complete .
c) Vertical protection in 15 mm thick with Cement Mortar 1:4 for wall plastering
admixed with integral waterproofing compound admixed @ 0.2litre/bag of
cement as per manufacturer's specifications including curing etc. The vertical
termination of waterproofing membrane shall be 300mm above the finish floor.

Any pipe / openings shall be taken up prior to surface preparation by packing of


full thickness of slab/wall all openings/ holes with effective leak-free packing.
After roughening the surface, apply a coat of Dr. Fixit Pidicrete URP or equivalent
and sprinkling sand to receive non-shrink grout. Gaps between pipes and core
shall be filled with Dr. Fixit Pidigrout 10M or equivalent Non-shrink cementitious
grout including filling the gap with backer rod.

Making ‘V’ groove shall be made at all construction joints. In cracks and hairline
cracks etc. on mother slab treated with Injection grouting (Cementitious
grouting) shall be done at all weaker sections in construction joints. In cracks
and hairline cracks filling the groove, the polymer mortar with cement and sand
mortar 1:4 admixed with SBR latex @ 1lt. per 50kg of cement. Angle fillets
(50x50mm) at junction of slab and vertical walls prepared with cement and sand
mortar 1:4 admixed with integral water proofing admixture (as per IS 450-
2000)” @ 200ml. per 50kg of cement.

After jointing flood test for 7 days for full depth of sunken portion. Leaking point
if any to be pressure grout after fixing PVC nipples and 40PSI grout pump using
cement slurry mixed with non-shrink admixture Dr. Fixit Pidicrete AM/cebex
100 or equivalent @ 225 gms per 50 kg of cement.

M. Finishing:
All paint finishing 1st quality material should have VOC (Volatile Organic
Compound) content less than 50 grams / litre of approved brand, manufacture,
colour and shade.

All internal brick wall /AAC wall shall be finished with 12mm thick cement
plaster of 1:6 (1 cement: 6 fine sand) and 15mm cement plaster 1:6 (1
cement: 6 fine sand) on rough side. The plastering shall be finished within line of
groove provided in door frame. No Plastering to be done at Ceiling.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


371

External walls shall be finished with 15mm thick cement plaster of 1:4 (1 cement
: 4 fine sand)

All junctions of concrete and masonry work and other locations shall be
provided with approved galvanized chicken wire mesh (24 gauge, 12mm size)
fixing in position with galvanized wire nails as per specifications. Groove of size
10x8mm shall be provided at the junctions wherever required. Wherever
chicken mesh provided there will not be any groove and grooves (if provided)
shall be finished with neat cement floating coat. External areas shall be provided
with grooves (Horizontal & Vertical) as per design.

For Boys Hostel-1, Boys Hostel-2, Girls Hostel-1 :-


All internal walls and ceiling of rooms, Indoor sports area, Music room, reading
room, Multipurpose hall, Store, Shop, Security room, guest room toilets etc. shall
be finished with premium acrylic emulsion paint of interior grade two or more
coats on new work including priming coat to achieve even colour and shade. All
Toilets, waiting room, warden office, guest room, etc. walls shall be finished with
Acrylic Distemper two or more coats on new work including priming coat to
achieve even colour and shade including applying additional coats wherever
required to achieve even shade and colour. The painting works shall be
commenced after base preparation by white cement based putty (1mm) of
approved brand and manufacture over plaster for even and smooth surface.

For Married Student Housing: -

All internal walls of units, Corridors, Lift lobby, Staircases, etc. shall be finished
with premium acrylic emulsion paint of interior grade two or more coats on new
work including priming coat to achieve even colour and shade, and All internal
Ceiling area of units shall be finished with Acrylic Distemper two or more coats
on new work including priming coat to achieve even colour and shade including
applying additional coats wherever required to achieve even shade and colour.
The painting works shall be commenced after base preparation by white cement
based putty (1mm) of approved brand and manufacture over plaster for even
and smooth surface.

All external sloping slabs above chajja projection in elevation shall be finished
with 15mm thick cement plaster 1:4 (1 cement: 4 fine sand) mixed with water
proofing compound in recommended proportion complete at all levels.

For Mess Block :-

All internal walls shall be finished with premium acrylic emulsion paint of
interior grade two or more coats on new work including priming coat to achieve

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


372

even colour and shade. All internal Ceiling area shall be finished with Acrylic
Distemper two or more coats on new work including priming coat to achieve
even colour and shade including applying additional coats wherever required to
achieve even shade and colour. The painting works shall be commenced after
base preparation by white cement based putty (1mm) of approved brand and
manufacture over plaster for even and smooth surface.

Ceiling area of Lobby(s), Corridors / passages, Lift area, Staircases, Main


Entrance steps, ramps, all Common toilets, cloth washing, lobby, etc. shall be
exposed RCC finish. Married student housing individual units, Mess block kitchen
and toilets shall be finished with Acrylic Distemper two or more coats on new
work including priming coat to achieve even colour and shade including applying
additional coats wherever required to achieve even shade and colour.

All shafts (Lift, Plumbing, electrical, etc.) internal areas shall be finished with
waterproofing cement paint over water thinnable cement primer as per
specifications.

Electrical room, Kitchen, Common Shafts, lift machine room, etc. wall and ceiling
shall be finished with Acrylic Distemper, including applying additional coats
wherever required, to achieve even shade and colour. The painting work
commencing after base preparation by white cement based putty (1mm) of
approved brand and manufacture over plaster for even and smooth surface.

Wood works (frame, Beading, lipping, etc.) shall be finished with French spirit
polish and coated with melamine as per specifications.

MS Steel works of window grills shall be finished in Powder coating (minimum


60 micron, pure polyester) and Railings works at all levels shall be finished with
epoxy paint (two or more coats) over the coat of approved zinc primer as per
drawing.

MS Steel work on other balance works shall be finished with two or more coats
on new work with synthetic enamel painting over the coat of approved red oxide
zinc chromatic steel primer having VOC content less than 250 grams/ litre.

External wall shall be painted with premium Acrylic smooth exterior paint with
silicone additives at locations specified in the Elevation drawings.

All paints shall be procured directly from company of 1st quality as approved
sample, brand, manufacture, colour and shade.

External walls shall be finished with non-pigmented stone based texture paint
with natural mineral, at locations specified in the Elevation drawings. It is a
mixture of Water based natural sand stone, granite and marble chips powder

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


373

providing natural colour and shade. The finish is water repellent, anti-fungal,
anti-bacterial, etc. has a unique property of flexibility.

Silicone based water repellent coating on Exposed RCC and


Stone cladding :-
This work shall be executed by Company authorized /Trained/Recommended
system integrator/installer or as decided by the Engineer-in-charge.

Providing and applying silicone based water repellent coating confirming to BS:
6477-1984 in 2 coats with a consumption of 6 sqm/litre per coat over the
exposed RCC surface including cleaning the surface making it free from dirt, oil
grease, wax and all other contamination using mechanical tool, wire brush,
compressed air followed by water washing and as per the manufacturer
specification .

The silicone-based water repellent coating should have the below mentioned
technical properties-

Property Typical Value

Appearance Clear free flowing liquid

Colour Water white to pale yellow

Nonvolatile matter % 3.5-5.0

Surface dry times in minutes 20-25

Water repellency as per IS 12027:1987 Repel water in bead form

Specific gravity@30-degree gms/ml 0.80+0.02

SURFACE PREPARATION
Surface should be dry and free from all debris, dirt, oil, grease, wax and all other
contamination, which could prevent penetration.
Clean the saturated dirt of surface by thorough wire brushing, cleaning with
compressed air followed by water washing.
De grease oil & grease by using appropriate solvents.
Allow the surface to dry completely before the application.
Thorough wire brushing followed by sanding with emery paper is recommended

APPLICATION
Apply one liberal coat of silicone coating confirming to BS: 6477-1984 simply by
brushing evenly on the prepared surface.
Allow the surface to dry for a minimum of 24 hrs for best results.
Allow it to dry for 24 hrs.
Apply second coat wet on wet, to improve the penetration rate & performance.
Allow it to dry for 24 hrs.
Do not dilute with water or by any other means.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


374

The coating should be applied in 2 coats with a consumption of 6


sq.mtr/litre/coat.

N. Dry stone cladding


External wall shall be finished with 35-40mm thick Gwalior Mint stone dry
cladding with machine cut edges fixed to structural steel frame work with the
help of cramps, pins, etc. and sealing the joints with approved weather sealant at
locations specified in the Elevation drawings . All complete as per CPWD
specifications . Stone cladding shall be treated with Anti-fungal (Wash
Treatment) transparent silicone based water repellent coating. This work shall
be executed by the specialized agency to be approved by the Engineer-in-charge.I

it will be responsibility of Contractor alone to ensure that each and every


Cladding stone and clamp is well installed as per CPWD Specifications or
relevant Code/practice and if any mishap/unfortunate incident happens during
execution of work or in future after completion of work/agreement due to falling
of Cladding stones etc, then Contractor will be solely responsible.

O. EXTERNAL FACE SHEAR WALL INSULATION-(Below Stone Cladding)


External wall insulation treatment below stone cladding shall be provided with
CFC, HCFC Free closed cell, high performance rigid water blown polyurethane
foam conforming to the requirements of IGBC & GRIHA Standards (PUF)
insulation 50mm thick having thermal conductivity (K-value) not more than
0.03W/mk measured at 20 Deg. C mean temperature, compressive strength of
320kpa and shall be classified as “not easily ignitable” with core density50-55
Kg/m3(conforming to IS: 12432 Part 3) over a coat of polyurethane primer spray
applied @ 6-8 Sqm/ltr. The insulation foam shall be spray applied with the help
of high pressure specially designed foaming machine like gusmer/ graco or
equivalent on the dry wall, applying water-based acrylic waterproof coating
@1.1Kg/sqm as protection coating including back-wrapping the coating up to
base wall a coat of polymerized cementitious primer. This work shall be executed
through specialized agency to be approved by the Engineer-in-Charge.

EXTERNAL FACE SHEAR WALL INSULATION-(Below Texture Paint over


shear wall)

This work shall be executed through specialized agency to be approved by the


Engineer-in-Charge.

External faces of RCC shear wall (below texture finish) shall be insulated with
50mm thick EPS insulation board having density 15-18 kg/sqm. And thermal
conductivity of 0.030-0.033W/mK fixed with fire rated polymer modified
adhesive layer @2.8kgs/sqm. conforming to standard BS8414 and mechanical

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


375

fasteners. PVC corner bead and Glass fiber mesh installed with the polymer
modified base coat. Primer applied at 0.2kgs/sqm. to reinforcement base coat
layer.

Step-1. Supply & application of fire rated Polymer Modified Adhesive layer
@2.8kgs/sqm confirming to standard BS8414 resulting in BR135, duly certified
by LPCB to LPS1581 and holds BBA certification.

Step-2. Supply and application of 50mm thick EPS Insulation board having the
density of 15-18kg/m3 and Thermal Conductivity of 0.030-0.033W/mK over the
adhesive layer.

Step-3. Supply & application of fire rated Polymer Modified Base coat layer
@2.0kgs/sqm over the EPS board confirming to standard BS8414 resulting in
BR135, duly certified by LPCB to LPS 1581 and holds BBA certification.

Step-4. Providing & application of Fibre Reinforcing Mesh, installed within the
polymer modified base coat including an additional layer of High grade Glass
Fibre Reinforcing Mesh for high impact areas at finishes.

Step-5. Supply and application of Color Primer applied at 0.2kgs/sqm to


reinforced base coat layer. Supply and application of sand pebble fine PMR
(Proven Mildew resistance) 1mm thick finish coat applied at 2.06kg/sqm to
primary layer.

Orother equivalent system as approved by Engineer-in-charge.

TEXTURE PAINT

This work shall be executed by Company authorized /Trained/Recommended


system integrator/installer or as decided by the Engineer-in-charge.

A Non-pigmented Stone based Texture paint with Natural Mineral comprising of


water based Natural Sand stone material derived by natural crushed stone added
with ceramic crushed added with salaxonic based resin, Aggregates combined
with Adhesives and resins applied with 1-2 coat with spray or trowel. The Finish
is water repellent, anti-fungal, breathes out trapped moisture and has a unique
property of flexibility of elasticity and Flexibility. Elasticity (due to temperature
variation there shall be no hairline cracks) providing Fine Decorative &
Protective wall Finishing formulated to with stand humidity, rain & hot climate,
containing anti-fungal & anti-bacterial additives.

It is a mixture of natural granite & marble chips powder providing natural stone
colours in approved shade. The finish shall be colourfast, water repellant,
resistant to condensate formation, cover hairline cracks/ crazing, UV & alkali
resistant & ensure good breathability `Protective and decorative coating for
exterior surfaces such as, concrete, plaster, masonry, brickwork, gypsum,

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


376

asbestos and wood Series of Ultratech/ Spectrum/ Asian/ Berger or Equivalent


as per Approved colour and pattern as per direction of engineer-in-charge.

COLOUR As per natural available shades of stone


FINISH Spray Texture
SOLIDS 82 ± 2%
SPECIFIC GRAVITY KG/L 2.0 ± 0.05
THEORETICAL SPREADING 5~7 Sq.ft / kg / in 2 Coats
RATE
RECOMMENDED (DFT) Approximately upto 2.00 mm
Temperature, humidity, air movement, film thickness
and number of coats all affect the drying time.
DRYING TIME @ 30 º C
Touch dry (hours) : 1/2
Dry to recoat (hours) : 16~18

The surface must be dry and mature, new plasters should have been left to
mature at least 30 days to allow complete carbonation. Clean the surfaces and
remove detaching and flaking parts. Surface should be free of water leaks and
humidity.

Protection top coat- one coat of primer and sealer mixed in equal ratio followed
by one coat of basecoat with steel trowel made of natural stone crushed powder.
2nd coat to be applied with steel trowel and finished by acrylic trowel or spray
gun of natural stone crushed powder added with granite chips. Final coat of
ultra-protect shall be applied with roller/ spray diluted with water, the above
procedure must be carried out following closely all application instructions
according to the desired finish.
Application recommendation-
-Apply on putty surface.
-Apply two coat of acrylic putty.
-Apply 1 coat of Primer/wall sealer
-Level the surface and sand until smooth.
-Apply 1 – coats -one coat of basecoat with steel trowel made of natural stone
crushed powder.
-Apply 2 – coats- 2nd coat to be applied with steel trowel and finished by acrylic
trowel or
Spray gun
-Final coat of ultra-protect shall be applied with roller/spray diluted with water.

P. GRC (Glass Reinforced Concrete) Screen /Jali:


This work shall be executed by specialized agency to be approved by the
Engineer-in-charge.

Providing and fixing Approved make Glass Reinforced Concrete (G.R.C)


ornamental Screens casted with 'Spray Mix' concrete design in approved size,
pattern, design, thickness and shade of approved make or equivalent. Border
thickness 50mm and Internal Members - 30-35mm, Weight 3.5-4.5 Kg per Sq. ft.
The Screens should be made from ‘53 grade’ White Portland Cement

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


377

manufactured by ‘JK Cement’ or equivalent, White Quartz graded fine Silica Sand,
Alkali Resistant Glass Fiber manufactured by 'NEG , Owen Corning ‘Saint Gobain’
or equivalent, Super Plasticizers manufactured by ‘Karochem’ or equivalent,
Polymers manufactured by ‘Nova Polychem’ or equivalent and U.V resistant
Synthetic inorganic pigments should be used for pigmentation manufactured by
‘Phenochem industries or equivalent.

The screens casting shall take place with layering methodology using- Direct
Power Spray machines. The GRC screens flexural strength average Limit Of
Proportionality (LOP) should be above or equivalent to 6 N/mm2 & M.O.R should
be above or equivalent to 15 N/mm2 for tests done on 28 days cured samples.
The fixing of screens should be done using ‘Dry fixing’ method onto structural
support members i.e. R.C.C, Brick work or epoxy primer and epoxy paint treated
mild steel frame works. The fixtures SS 304 grade CLAMPS & SS 304 grade PINS
to be used and Self drilling Screw, fasteners to be used for dry fixing should be
Hilti / Fischer or equivalent. The quantity of fasteners or self-drilling/ tapping
screws shall be calculated in accordance to weight of screen and actual site fixing
conditions. Welding Rod (grade 309) to be used ESAB or equivalent MS to SS.

The screens to be dry fixed with SS cramps, fasteners (Hilti/ fischer) or


equivalent and MS support to be provided wherever required as per drawing,
design and manufacturer’s specifications. The MS support should be epoxy paint
over zinc primer.

Cement Concrete Jali:


Precast cement concrete Jali (50mm thick) 1:2:4 (1 cement: 2 coarse sand (zone-
III): 4 graded stone aggregate 6mm nominal size), reinforced with 1.6 mm dia
mild steel wire, including centering and shuttering, roughening cleaning, fixing
and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete,
excluding plastering of the jambs, sills and soffits. MS frame work, cramps, pins,
connectors, etc. required to support and fixing the cement concrete jali as per
drawing and elevation. All complete as per elevation, drawing, specifications .

All Shafts shall provide orange colour safety foot rest 6mm thick plastic
encapsulated as per IS:10910, on 12mm dia steel bar conforming IS:1786, having
cross section as 23mmx25mm over all minimum length 263mm and width
163mm with minimum 112mm space between protruded legs. including fixing in
manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement: 3 coarse
sand: 6 graded stone aggregate 20 mm nominal size) complete as per design,
drawing and specifications.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


378

Q. ROOF SHEETING

Shafts as per drawing shall be provided with Extruded Multi-layered UV


protected polycarbonate sheet / panels of minimum 18mm thick. Sheeting
Panels shall be seven layers with opaque and translucent clear over MS support /
base frame as per drawing, design, detailed specifications .

Supply and Installation of polycarbonate multi-layered system, a complete


assembly of extruded multilayer UV protected polycarbonate panels
incorporated into a complete system. Co-extruded UV protected polycarbonate
panel system of min 18 mm thick panel of 1050-1200 mm (min.) width for bigger
spans to avoid number of junctions with angular day lighting concept in a
complete system. Panels shall have minimum seven layers with opaque and
translucent clear combination as per required lux level all fixing accessories to
ensure best performance for wind uplift, vibration, oil canning and visual
appearance. Panels shall be manufactured with vertical offset standing seam at
both sides of the panel. Panels shall be fixed on Purlin with snap on connectors
with grip-lock locking mechanism and will be secured on MS structure with 3
numbers self-drilling screws & trapezoid SS fasteners holding the base of the
standing seam offering best stability having a pull-out load of min. 7000N (7KN)
tested as per ISO 6892:1998 and IS 1608: 2005. Panels must satisfy Dart drop
impact test as per IS 14443- 97 shall show no sign of breakage on Polycarbonate
sheets which have been exposed to UV for a min. of 500 Hours as per ASTM G
155. Panels shall not have Yellowness Index as per ASTM D 1925 of 15 units
when tested on a sample exposed to UV for 500 Hours as per ASTM G 155. U
value shall not be more than 2.0 W/m2K as per EN ISO 10077- 2:2018. Panel
shall be with additional End cap/Aluminium U/F profile/ Glazing Bar for ends as
required. Panel shall be fixed over MS structural works conforming to the detail
technical specifications. This work shall be executed by Company authorized
/Trained/Recommended system integrator/installer or as decided by the
Engineer-in-charge and necessary mock-up provided at the site for approval .

Colour: As per Approval of the Engineer-in-charge

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


379

DP2 ( HOSTEL BUILDINGS) IIT Bhilai

List of Preferred Makes of Material (Civil)


S. NO MATERIALS PREFERRED MAKE

1. Ordinary Portland Cement 43


grade- OPC 43 ACC, Ultratech, Ambuja, Jaypee
Cement,J.K. Cement
2. Portland Pozzolana Cement -PPC

3. White Cement Birla, J.K. White , Lafarge

4. Reinforcement steel – (Primary RINL, SAIL, TATA Steel Ltd., JSW Steel
Producers)- (Fe500D or more) Ltd., Jindal Steel & Power Ltd.

5. Couplers for Reinforcement Dextra, G-Tech, Unitech or equivalent

6. Ready Mix Concrete (RMC) Plant Ultra Tech, ACC, RMC Ready Mix (India)

7. Pulverized Stone Sand/ Crushed Rank Enterprises, Robo Sand.


Stone Sand (Manufactured Sand)
(water washed)
8. Polymer based self-Curing FOSROC, SIKA, BASF, Pidilite, MC
Compounds Baucheme

9. Structural Steel Sections TATA, SAIL, RINL, Jindal Steel & Power
Ltd.,
JSW
10. M.S. Pipe (Railing) Jindal / Tata/ RINL/SAIL

11. Hollow Steel Sections TATA, Jindal, RINL, Jindal Steel & Power
Ltd.,
JSW, SAIL
12. Autoclaved Aerated Concrete M/s. Hyderabad Industries Ltd., M/s. Ultra
Blocks (AAC) Tech India Limited, M/s. Siporex India
Ltd., NCL, ECOREX, DLITE Block, ECOLITE
13. Binding Wire TATA, JSW or equivalent.

14. Factory Made Cement Concrete A.S.R. Cover Blocks, JK, Conbextra, KGM,
Cover Blocks grade M25 and M35 KK Manhole
15. Flush Door Shutters 1S:2202, ply Green ply, Archid Ply, Kitply (Swastic),
wood and block boards Century Ply, DURO

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


380

16. Fire Rated Doors (Metal) and Navair, Shakti Hormann, MPP Schrodder,
hardware fiitings.
17. Ply wood / Laminate Greenply, Merino, Archid ply, Centuryply,
Kitply, Greenlam
18. Veneers Greenlam, Merino, Centuryply,Archid

19. Compact laminate sheet Merino, Greenlam, Archid ply

20. Bamboo wood frame EPITOME, ECO GREEN, Floor India or


equivalent
21. Adhesive / Glue Pidilite, Sika, Fosroc

22. Steel Windows/ Pressed Steel Madhu Industries (Bengaluru), NCL or


Frames equivalent
23. Fire rated doors and Steel doors Shakti hormann, Navair, MPP Schrodder,
and windows
24. Cement Bonded Particle Board BISON Boards of NCL, GYPROC or
equivalent
25. PVC Doors shutters and frames Rajshri Plastiwood, Sintex, Duraplast

26. Rectified ceramic tiles, Ceramic Kajaria, Johnson, Somany


Floor and Dado Tiles, heat
resistant tiles
27. Vitrified Tiles Kajaria, Johnson, Somany

28. Precast Chequered Tiles Nitco, Eurocon ,Ultra

29. Metallic Floor Hardners/ Floor Fosroc, SIKA, Pidilite, ironite, Ferrok,
hardners Hardonate, BASF
30. Polyurethane floorings, wall Fosroc, Ardex endura, BASF, Pidilite.
coats, covings, sealant
31. Precast Cement Concrete Tiles NITCO, Eurocon, Ultra.

32. Factory made Cement Concrete Nitco, Ultra, Rigid tiles, Raj tiles
Interlocking Paver Blocks-
33. Grass Pavers Unistone, Ultra, NITCO

34. GRC (Glass Reinforced Concrete) Birla, Unistone, Shenisha


Jali
35. RCC Jali Alstone, Rajshri Plastiwood, Ecoste

36. PVC Vinyl Floors Armstrong, LG or equivalent.

37. High Density Fibre (HDF) Pre- Armstrong, GreenLam, Merino, Action-
laminated Flooring boards Tessa

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


381

38. Unglazed Heavy Duty Vitrified Somany (Dura Gres ), Johnson (Endura) or
Tiles equivalent
39. Unglazed Heavy Duty Paver/ Johnson (Endura), Somany ( Dura Stone )
Parking Tiles or equivalent
40. Tile Adhesives, Epoxy Grout, Laticrete, Roff, SIKA, Ardex, Endura,
Silicone Spray, Polysulphide Pidilite, Weber
Sealant
41. Ready Mix Plaster Ultratech/ Fomous Crete/ Saint Gobain

42. AAC Block Adhesive Ecorex/ Ultratech/ Ardex endura/


Ferrous Crete/ECOLITE
43. Grout Compound/ Epoxy Grouts Fosroc, Ardex Endura, Pidilite, SIKA,
Ferrous crete.
44. Epoxy mortar Fosroc, SIKA, BASF, Pidilite

45. Water Proofing Compound Fosroc, CICO, SIKA, Pidilite, BASF

46. Water proofing compound with FOSROC (Conplast 421)/ Dr. fixit: LW+/
cement (for plaster & mortar) Sika: sikacim/ BASF/ Ardex Endura/ CICO
47. Crystalline waterproofing Fosroc crystalline/ Pidilite Dr
compound. Fixitcrystalline/ Sika/ Crystalline/ BASF/
CICO/Ardex endura
48. Polymer Modified Cementitious Bal Endura/ Pidilite Kero Koal/
grout Ultratech/ Ardex/ Ferrous Crete
49. Damp proof material CICO, FOSROC, SIKA

50. Admixtures / Plasticizers Fosroc, CICO, SIKA, BASF, Bal Endura,


Dr.Fixit
51. Ethylene Propylene Diene Hanu, Anand, Lescuyer , supreme
Monomer (EPDM) Gasket.
52. Aluminium Extruded sections Jindal, Hindalco, Indalco

53. Polysulphide Sealant Pidilite (Pidiseal), Techseal, Choksey


chemicals, BASF, SIKA, FOSROC
54. Cement Based Wall putty / Birla Wall Care, J.K. Wall putty, Asian
Acrylic wall putty Paints.
55. Paints/ Primer (wood & steel) / ICI Dulux, Asian Paints, Berger
Polish/ Oil-bound acrylic
distemper, acrylic/ plastic
emulsion, synthetic enamel paint,
acrylic exterior paint, ‘Rustic’
texture paint

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


382

56. External Finish Texture paint Suzuka by Ultratech, Asian


paints,Spectrum,
57. Texture paint Ultratech, Spectrum, Asian paints,
Bakelite Coatings & paints limited
Heritage, Berger, Spectrum
58. Premium Acrylic Smooth Exterior Asian paint: Apex Ultima/ Berger:
Paint with Silicon Additive Weather coat all guard/ ICI dulux:
Weather Shield max
59. Premium Acrylic Emulsion Paint, Asian paints (Royale)/ ICI dulux (Velvet)/
Interior Berger (Luxol Silk)

60. Melamine polish Asian paints- Melamine Gold, wudfin of


Pidilite industries, Timbertone of ICI
dulux
61. Synthetic Enamel Paints Gloss Enamel paint of ICI (Dulux)/ Asian
paints (Apcolite Premium gloss)/ Berger
(Luxol Hi Gloss)
62. Water Proofing Cement Paint Snowcem India, ICI Dulux, Berger, Asian
paints
63. Roof insulation and PU Coating Pidilite, Fosroc, BASF

64. PU Enamel Metallic Paints on MS Asian paints, Berger, SKK


Structure.
65. Fire paint Asian paints/ Akzo Nobel Coatings India
ltd./ PROMAT/ Jotun
66. Calcium Silicate False Ceiling Aerolite Co., Hilux, Armstrong., Gyproc
Tiles
67. Gypsum Board False Ceiling Tiles Saint Gobain, Amstrong Co., Aerolite,
Boral
68. Gypsum Plaster Ferrouscrete, Ultratech, Elite (90) of
Gyproc
69. Mineral Fibre Board False Ceiling Armstrong, Decosonic, Rockfon, Nitbo,
Tiles Daiken, Hunter Duoglas, Ecophone
70. Metal False ceiling Armstrong, Saint Gobain, Daiken, Hunter
Duoglas
71. False ceiling system (POP board India Gypsum, / St. Gobain (Gyproc)/
& tiles) Armstrong / Hunter Duoglas/ Aerolite/
Gridsquare
72. Acoustic false ceiling and Armstrong, Anutone, Aerolite
Acoustic wall system
73. Glass Wool Dow Corning/ U.P. Twiga/ Isover

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


383

74. Wall insulation Pidilite, BASF, FOSROC

75. Anodised / Powder Coated Everite, Jyoti, Shakti, Classic.


Aluminium Fittings / Fixtures -
76. Stainless steel pipe (Railing) Jindal Stainless steel Ltd., Ozone, D line,
(18/8 SS 304 ) and its accessories Dorma, Kich, Geze, Godrej, Hardwyn,
Salem.
77. Stainless Steel Wire Mesh Champion, GKDor equivalent

78. Float/ Plain/ Tinted/ Tempered pilkington, Saint Gobain, TATA, AIS
Glass/ Annealed Float Glass/
Float Glass Profile Sheet
(transparent)
79. Mirror Glass. Modi Guard, Saint Gobain, AIS

80. Hydraulic Door Closers / Floor Ozone, Godrej, Hardwyn, Everite, Dorma,
Springs - Hafele, Dorset
81. Ball Bearing Hinges and Spring Dorma, Hafele, Dorset, ozone
Hinges
82. Clamping System Using Dash / Hilti (SS 316 grade ), Fischer, Bosch
Anchor Fastners, Expansion bolt,
stone cladding clamps
83. Locks in Cabinets, Furniture. Hettich, Dorset, Godrej, Harrison, Ozone,
Mortice locks, Multipurpose locks IPSA
84. Four Point / Multi Point Locking Hefele, Dorma, Godrej
Handle.
85. Stainless Steel Friction stay Hafele, Geze, Earl Bihari
hinges
86. Door closer lock/ Panic exit Ozone, Dorma, Monarch, Doortech, Geze,
device Kich, Hafele,Dorset
87. Door Coordinator UL Listed, Monarchor equivalent

88. Precoated galvalume Iron Profile TATA Blue scope, NCL, Lloyd Superdeck,
Sheets JSW, Jindal
89. Multi Walled Polycarbonate Lexan GE, Coxwell, DPI Day lighting
Roofing Sheets System, poly gal, DanPalon
90. Bitumen IOCL, HPCLor equivalent

91. Aluminium Composite Panels Alstrong, Alucobond, EURO bond


(ACP)
92. Glass for Structural Glazing pilkington, Saint Gobain, Asahi

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


384

93. Structural sealent and Weather Dow Corning, Wacker, GE


Sealants
94. Adhesive Tape Norton, 3Mor equivalent

95. Spider Fittings for Structural Dorma, Kich, Hafele, ozone


Glazing
96. Stainless steel Piano Hinges Supreme, Saswat, Deepak Enterprises
97. Toilet Cubicals Geenlam, Merino or equivalent
98. Anti-Termite Chemical ESSAR- CHLORO, DURSBAN, BASF, Bayer
premise
99. Dash fasteners Hilti, Fisher, Bosch
100. WATER PROOF COATINGS Like Pidilite, BASF, FOSROC
PU, PUF Spray
101. Welding rods Victor, Essar, Advani, L&T, Oerlikon

102. Stainless steel hardware fittings KICH, Ozone, Dorma, Haffle, Hettich
103. Exterior ready mix Plaster Ferrous Crete, Gyproc, Ultratech, saint
gobain
104. Rolling Shutters Shakti Hormann, Toshi Automation, Rama
Rolling Shutters, Jyoti Rolling Shutters
105. Reflective Glass Saint Gobain, AIS Asahi India Glass Ltd.,
pilkington

106. Hermetically-sealed double GSC Trutuf, AIS Asahi India Glass Ltd, ,
Saint Gobain, pilkington
insulated glass

107. Hardware (aluminum, stainless Hafele, Harrison, Nu Lite, IPSA


steel, brass)
(a) Handles, Tower Bolts, Hinges,
Aldrop, Floor stopper, casement
stay, safety chain, Magnetic door
Catcher, Magic eye, Drawer
Glides, floor stopper
(b) Sliding Door Mechanism Hafele, Dorma, Hettich, Ozone
113. Fire-Retardant paint Vipe, Nippon Paintor equivalent
114. Modular Kitchen Godrej or equivalent

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil


385

115. Laminated wooden flooring/ Armstrong,Pergo/ Arm strong, LG


Vinyl flooring
116. Thermal Insulation Twiga, Supreme, Pidilite
117. Acid/Alkali Resistant Tile Somany, Nitco, Kajaria,
118. Drapery Rod Vista levolor, Mac blirch or equivalent
119. Calcium Silicate Board Hilux, Aerolite or equivalent
120. Toughening, DGU land Wadhwa Glass Works (P) Ltd. Raipur, Mr.
lamination, heat strengthening, Glass (Raipur), Kocher (Bhopal) or
hermetically sealed equivalent
121. expansion joint Migua, Vexcolt, Megatec
Note :
1) Sample duly approved by Engineer-in-charge shall be kept in safe custody of
contractor and displayed in board properly till completion of the project.

2) Products not mentioned in the above list shall be brought by the contractor
after sample approval by the Engineer-in-charge. Equivalent material and
finishes of any other specialized make may be used provided brand specified
above are not available in the market. These equivalent material and finishes
may be used only after approval of Engineer-in-charge.

3) It is the duty of the contractor to get sample approved by the Engineer-in-


charge before procurement of the material.
The Contractor shall quote for the best of the materials as specified , the
contractor shall obtain prior approval from Engineer-In charge before
placing order for the specific material / agencies. In case of non-availability
of any of the preferred / specified materials / agency, during the execution of
the work, the Engineer-in Charge may approve suitable equivalent brand /
agency and his decision shall be final and binding on the contractor.

The Engineer in charge reserves the right to select any of the


makes/brands indicated in the list of approved brand/make. The tenderers
shall quote his rates on the basis of the price for the best quality product of
the brand/make stipulated for the item of work in the schedule of
quantity/specification/list of preferred brand/ make. No claim whatsoever
shall be entertained if the Engineer in Charge changes the brand/make of
any material within the preferred list, while giving approval for
procurement of a material.

Notwithstanding any interim or final approval the contractor remains


responsible for satisfactory performance of all fittings & fixtures. The
liability of the contractor is not limited by any approval of the maker of
materials.

Correction –Nil Insertion –Nil Deletion –Nil Overwriting -Nil