Non-
Project Delay in
Default by performance or
Manageme execution of
1 subcontractor/s breach of Threat Low
nt the works
and suppliers contract by
subcontractors
High
Involving the
Local labour
Community Delay in
Project dispute and
Liaison Officer execution of
2 Manageme stoppage of all Threat Threat
(CLO) sourcing the works
nt activities on
Threat
the local labour
site
Non agreement
Community
with local Project
3 External strikes Threat Medium
community delayed
Very High
requirements
Project
Moderate
Delay in
Manageme Unstable soil
4 Dolomitic area execution of Threat Low
nt condition
the works
Delay in the
execution of
Theft of the
Project Non- the works due
plant and /or
High
5 Manageme performance to Threat High
materials from
nt security staff requirements
the site
to repeat
work
Damage to
Limited
Project existing Limited
availability of
High
6 Manageme services at the availability of as- Threat Medium
as-built
nt sites built drawings
drawings
Delay in
Interface of Inefficient/incorr completion of
Project
Civil, ect the project
High
7 manageme Thread Medium
Mechanical and Sequencing of and possible
nt Electrical works switch over environmental
damage
High
8 Management surfaces and and Threat High
y
and prevention infected persons transmissions
High
9 Quality Threat Medium
workmanship not adhering to some areas
the quality continue to
control plans. leak
Cashflow
management,
non-
performance Delays in
debt gearing, construction
Financial insolvency, or and
high
10 Liquidity Threat High
Health poor financial completion of
management by the project
the contractor/s intime.
during of the
contract
obligation
High
11 construction payment to Threat Medium
Contracting overrun
activities subcontractors
Loss of life,
injury to
High
12 Safety Drowning Threat Medium
personnel,
site closed
Construction
Moving Loss of life,
Machinery
Equipment injury to
High
13 Safety moving Threat High
injuring personnel,
Not adhering to
personnel site closed
the traffic plan
Floods/
Employees
Insufficient PPE/ Work
High
14 Safety falling into Threat Medium
Unsafe Work disruption
trenches
area
Delay in
Lack of
obtaining
Implementat adequate Extended
Construction
High
15 ion information construction Threat Medium
Permits from
Phase required by the period
Dept of
Dept
Labour
Name of Bidder:
Signed by or on Official
behalf of Bidder: Capacity:
Date: