0% found this document useful (0 votes)
49 views8 pages

Contoh Progress

The document is a monthly progress report for the construction of a coal fired power plant in Lampung, Indonesia. It summarizes that as of November 19, 2008, the overall progress of the civil foundation and concrete structure work was 39.267%. Specifically, it provides details on the progress of 21 line items, including excavation at 23.3% complete, backfill at 82.0% complete, and rebar installation at 20.1% complete. The report was prepared by the contractor, PT. Samtra Tridaya, for the project owner, PT. Manunggal Engineering.

Uploaded by

oktavia pribowo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views8 pages

Contoh Progress

The document is a monthly progress report for the construction of a coal fired power plant in Lampung, Indonesia. It summarizes that as of November 19, 2008, the overall progress of the civil foundation and concrete structure work was 39.267%. Specifically, it provides details on the progress of 21 line items, including excavation at 23.3% complete, backfill at 82.0% complete, and rebar installation at 20.1% complete. The report was prepared by the contractor, PT. Samtra Tridaya, for the project owner, PT. Manunggal Engineering.

Uploaded by

oktavia pribowo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

PT.

MANUNGGAL ENGINEERING

CP. BAHARI 4 x 30 MW
COAL FIRED STEAM POWER PLANT PROJECT
LAMPUNG

MONTHLY CERTIFICATE OF COMPLETION

We undersigned :

I. Name : Marojahan Samosir


Position : Site Manager
Company : PT. Manunggal Enggineering

Act for and behalf PT. Manunggal Engineering, further more as Party I

II. Name : Farid Wajdi


Position : QC Inspector
Company : PT. Manunggal Engineering

Act for and behalf PT. Manunggal Engineering, further more as Party II

According to Monthly Progress Report 8 th, hereby we acknowledge and accept the contrction -
work for Civil Foundation & Concrete Structure for CP. Bahari 4 x 30 MW Coal Fired Power Plant -
Project with contract number ME-C006/CPB-0108 dated January 29, 2008 has been finished : 39.267%
by PT. SAMTRA TRIDAYA as contractor from PT. Manunggal Engineering.

Our signature attests to approval of the work and acceptance of this complaetion .

Lampung , 19 November 2008

Party I Party II

Marojahan Samosir Farid Wajdi


Site Manager QC Inspector
Gedung A KA Lt. 8
Jl. Bangka Raya No. 2
Keb. Baru - Jakarta Selatan

Nomor Kontrak : ME-C006/CPB-0108


Tanggal Kontrak : 29 Januari 2008
Nomor LOI : ME-LI006-CPB-0108
Tanggal LOI : 16 Januari 2008
Proyek : Civil Foundation & Concrete Structure
CP Bahari power plant 2 x 30 MW, Lampung
Kontraktor : PT. Samtra Tridaya

Berita Acara Progress Pekerjaan


No. 28433 / ST / XI / 2008

Berita acara ini menerangkan bahwa :

Pekerjaan untuk proyek Civil Foundation & Concrete Structure, CP Bahari power plant 2 x 30 MW, dilokasi -

PT. Manunggal Engineering - Lampung, telah mencapai kemajuan (progress) sebesar : 39.267% (sesuai -

dengan progress report 8 th -


terlampir). Pekerjaan ini juga dilaksanakan dengan memenuhi kondisi-kondisi -

yang dipersyaratkan dalam kontrak .

Lampung , 19 November 2008


Dibuat oleh,
PT. SAMTRA TRIDAYA

( S. Wardoyo )
Site Manager

Diperiksa / Disetujui oleh,


PT. MANUNGGAL ENGINEERING

( Xiao Ben ) ( Marojahan Samosir ) ( )


Civil Construction Site Manager .....................

Lampiran : Progress Report


MONTHLY REPORT 8th
19 September - 18 November 2008

CP BAHARI 2 X 30 MW COAL FIRED POWER PLANT


CONTRACT NO. ME-C006/CPB-0108

DENTE TELADAS, TULANG BAWANG, LAMPUNG

Owner :
PT. MANUNGGAL ENGINEERING

Contractor :
PT. SAMTRA TRIDAYA
Ged u n g A K A L t . 8
J l . B an g k a Ray a No . 2
MONTHLY PRORESS
K eb . B ar u - J ak ar t a Sel at an

PROJECT TITLE : CP BAHARI 2 X 30 MW CAPTIVE - COAL FIRED POWER PLANT


OWNER : PT. MANUNGGAL ENGINEERING
LOCATION : DENTE, TELADAS - TULANG BAWANG - LAMPUNG
WORK TITLE : CIVIL FOUNDATION & CONCRETE STRUCTURE
Period : 19 September - 18 November 2008
Realization Work
Percentage
No DESCRIPTION QTY Unit Up to Last Month This Month Up to This Month
of weight QTY % Site % QTY % Site % QTY % Site %

A Preparation Work
1 Survey 13,500.00 m2 0.077% 10,395.00 77.0% 0.059% - 0.0% 0.000% 10,395.00 77.0% 0.059%
2 Mobilization & Demobilization 1.00 ls 0.738% 0.69 69.0% 0.509% - 0.0% 0.000% 0.69 69.0% 0.509%
3 Direction Keet 1.00 ls 1.230% 1.00 100.0% 1.230% - 0.0% 0.000% 1.00 100.0% 1.230%
Total - A : 2.045% 1.799% 0.000% 1.799%

B Boiler Pilecap until Floor


4 Excavation 12,564.00 m3 0.922% 2,922.69 23.3% 0.214% - 0.0% 0.000% 2,922.69 23.3% 0.214%
5 Back Fill 2,432.00 m3 0.152% 1,916.61 78.8% 0.120% 77.18 3.2% 0.005% 1,993.79 82.0% 0.125%
6 Disposal 10,618.00 m3 0.596% 717.10 6.8% 0.040% 19.15 0.2% 0.001% 736.24 6.9% 0.041%
7 Cutting Pile 504.00 point 0.091% 222.00 44.0% 0.040% - 0.0% 0.000% 222.00 44.0% 0.040%
8 Concrete K-125 74.00 m3 0.018% 45.27 61.2% 0.011% - 0.0% 0.000% 45.27 61.2% 0.011%
9 Concrete K-225 1,806.00 m3 0.641% 474.66 26.3% 0.168% 32.21 1.8% 0.011% 506.87 28.1% 0.180%
10 Rebar 251,680.00 kg 10.129% 50,583.63 20.1% 2.036% - 0.0% 0.000% 50,583.63 20.1% 2.036%
11 Formwork Unexposed 2,924.00 m2 0.729% 806.24 27.6% 0.201% - 0.0% 0.000% 806.24 27.6% 0.201%
12 Formwork Exposed 250.00 m2 0.112% - 0.0% 0.000% 154.88 62.0% 0.069% 154.88 62.0% 0.069%
13 NSG Grouting 3.00 m3 0.159% 2.09 69.5% 0.111% 0.39 13.0% 0.021% 2.48 82.5% 0.131%
Total - B : 13.548% 2.942% 0.107% 3.049%

C Boiler Concrete floor and Drainage


14 Compaction by Stamper 5,600.00 m2 0.192% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
15 Plastic layer 5,600.00 m2 0.059% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
16 Wiremesh M6 17,192.00 kg 0.904% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
17 Wiremesh M8 30,632.00 kg 1.532% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
18 Rebar 12,500.00 kg 0.503% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
19 Concrete K-225 1,220.00 m3 0.507% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
20 Steel trowel finish floor 5,600.00 m2 0.547% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - C : 4.243% 0.000% 0.000% 0.000%

D. Boiler Equipment and Accessories Foundation


21 Concrete K-125 25.80 m3 0.006% 18.47 71.6% 0.004% 3.29 12.8% 0.001% 21.76 84.3% 0.005%
22 Concrete K-225 1,717.40 m3 0.609% 181.34 10.6% 0.064% - 0.0% 0.000% 181.34 10.6% 0.064%
23 Rebar 218,109.80 kg 8.778% 41,239.42 18.9% 1.660% - 0.0% 0.000% 41,239.42 18.9% 1.660%
24 Formwork Unexposed 1,768.80 m2 0.441% 256.33 14.5% 0.064% - 0.0% 0.000% 256.33 14.5% 0.064%
25 Formwork Exposed 1,622.40 m2 0.724% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
26 Anchor Bolt Hole 428.00 hole 0.030% 120.00 28.0% 0.008% - 0.0% 0.000% 120.00 28.0% 0.008%
Period : 19 September - 18 November 2008
Realization Work
Percentage
No DESCRIPTION QTY Unit Up to Last Month This Month Up to This Month
of weight QTY % Site % QTY % Site % QTY % Site %

27 NSG Grouting 37.40 m3 1.982% - 0.0% 0.000% 8.84 23.6% 0.469% 8.84 23.6% 0.469%
28 Water Stop 157.60 m' 0.095% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - D : 12.666% 1.801% 0.469% 2.270%

E. Coal Conveyor Foundation


29 Excavation 1,788.00 m3 0.131% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
30 Back Fill 1,895.00 m3 0.119% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
31 Disposal 186.20 m3 0.010% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
32 Concrete K-125 14.10 m3 0.003% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
33 Concrete K-225 136.90 m3 0.049% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
34 Rebar 17,088.00 kg 0.688% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
35 Formwork Unexposed 219.50 m2 0.055% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
36 Formwork Exposed 101.80 m2 0.045% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
37 Grouting (non shrink grout) 1.00 m3 0.053% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
38 Compaction 137.30 m2 0.005% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
39 Plastic layer 177.10 m2 0.002% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
40 Steel trowel finish floor 44.30 m2 0.004% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - E : 1.164% 0.000% 0.000% 0.000%
Total A - E : 33.666% 6.541% 0.577% 7.117%

F. ESP Foundation and Concrete Structure


41 Excavation 160.00 m3 0.012% 729.07 455.7% 0.053% - 0.0% 0.000% 729.07 455.7% 0.053%
42 Back Fill 140.00 m3 0.009% 503.81 359.9% 0.032% 100.76 72.0% 0.006% 604.57 431.8% 0.038%
43 Disposal 19.00 m3 0.001% 59.97 315.7% 0.003% 11.99 63.1% 0.001% 71.97 378.8% 0.004%
44 Concrete K-125 11.35 m3 0.003% 14.25 125.5% 0.003% - 0.0% 0.000% 14.25 125.5% 0.003%
45 Concrete K-225 235.50 m3 0.084% 118.86 50.5% 0.042% - 0.0% 0.000% 118.86 50.5% 0.042%
46 Grouting (non shrink grout) 1.20 m3 0.064% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
47 Formwork Unexposed 168.70 m2 0.042% 406.40 240.9% 0.101% - 0.0% 0.000% 406.40 240.9% 0.101%
48 Formwork Exposed 457.00 m2 0.204% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
49 Rebar 32,997.10 kg 1.328% 20,534.97 62.2% 0.826% - 0.0% 0.000% 20,534.97 62.2% 0.826%
50 Embedded Plate 14,155.00 kg 0.905% - 0.0% 0.000% 6,401.02 45.2% 0.409% 6,401.02 45.2% 0.409%
51 Steel Profile 8,870.40 kg 0.671% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - F : 3.322% 1.062% 0.416% 1.478%

G MCC and Control Building


52 Excavation 802.80 m3 0.059% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
53 Back Fill 267.30 m3 0.017% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
54 Disposal 535.40 m3 0.030% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
55 Compaction 267.30 m2 0.009% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
56 Fill Good Soil 196.00 m2 0.038% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
57 Cutting Pile 109.00 point 0.018% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
58 Formwork Unexposed 3,875.30 m2 0.967% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Period : 19 September - 18 November 2008
Realization Work
Percentage
No DESCRIPTION QTY Unit Up to Last Month This Month Up to This Month
of weight QTY % Site % QTY % Site % QTY % Site %

59 Formwork Exposed 448.20 m2 0.200% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
60 Rebar 133,339.80 kg 5.366% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
61 Wiremesh M6 2,849.00 kg 0.150% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
62 Wiremesh M8 5,076.20 kg 0.254% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
63 Concrete K-125 16.60 m3 0.004% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
64 Concrete K-225 1,065.70 m3 0.378% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
65 Vertical Down Pipe 4,766.40 Kg 0.416% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
66 Handrail 1,389.60 Kg 0.126% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
67 Embedded Plate 513.50 kg 0.027% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
68 Steel ladder 1.00 ls 0.121% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
69 Sand Blasting 185.60 m2 0.019% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
70 Painting 185.60 m2 0.058% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - G : 8.256% 0.000% 0.000% 0.000%

H Turbine Building and Foundation


71 Survey 2,994.60 m2 0.017% 1,946.49 65.0% 0.011% 299.46 10.0% 0.002% 2,245.95 75.0% 0.013%
72 Excavation 3,633.00 m3 0.266% 6,099.94 167.9% 0.447% - 0.0% 0.000% 6,099.94 167.9% 0.447%
73 Back Fill 3,193.00 m3 0.200% 3,229.84 101.2% 0.202% - 0.0% 0.000% 3,229.84 101.2% 0.202%
74 Disposal 439.00 m3 0.025% 896.72 204.3% 0.050% - 0.0% 0.000% 896.72 204.3% 0.050%
75 Cutting Pile 235.00 point 0.043% 305.00 129.8% 0.055% - 0.0% 0.000% 305.00 129.8% 0.055%
76 Formwork Unexposed 4,420.00 m2 1.103% 3,390.07 76.7% 0.846% 22.67 0.5% 0.006% 3,412.74 77.2% 0.851%
77 Formwork Exposed 767.00 m2 0.342% 257.26 33.5% 0.115% 868.27 113.2% 0.388% 1,125.53 146.7% 0.502%
78 Rebar 698,870.00 kg 28.126% 291,985.43 41.8% 11.751% 8,078.43 1.2% 0.325% 300,063.86 42.9% 12.076%
79 Wiremesh M6 12,659.00 kg 0.666% 11,724.26 92.6% 0.617% - 0.0% 0.000% 11,724.26 92.6% 0.617%
80 Wiremesh M8 22,555.00 kg 1.128% 19,531.37 86.6% 0.977% - 0.0% 0.000% 19,531.37 86.6% 0.977%
81 Concrete K-125 407.00 m3 0.098% 234.23 57.6% 0.057% - 0.0% 0.000% 234.23 57.6% 0.057%
82 Concrete K-225 749.70 m3 0.266% 1,014.27 135.3% 0.360% - 0.0% 0.000% 1,014.27 135.3% 0.360%
83 Concrete K-300 5,480.90 m3 1.944% 867.32 15.8% 0.308% 93.90 1.7% 0.033% 961.21 17.5% 0.341%
84 Vertical Down Pipe 5,243.00 Kg 0.457% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
85 Handrail 992.60 Kg 0.090% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
86 Embedded Plate 513.50 kg 0.027% 8,061.73 1570.0% 0.431% 496.15 96.6% 0.026% 8,557.88 1666.6% 0.457%
87 Steel ladder 1.00 ls 0.121% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
88 Sand Blasting 185.60 m2 0.019% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
89 Painting 185.60 m2 0.058% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
90 Grouting (non shrink grout) 3.00 m3 0.159% 1.94 64.7% 0.103% 2.84 94.7% 0.151% 4.78 159.4% 0.253%
Total - H : 35.155% 16.329% 0.930% 17.259%
Total F - H : 46.733% 17.391% 1.347% 18.737%

I Coal Storage Stockyard


91 Excavation 1,449.00 m3 0.106% 3,069.26 211.8% 0.225% - 0.0% 0.000% 3,069.26 211.8% 0.225%
92 Back Fill 1,185.00 m3 0.074% 1,993.11 168.2% 0.125% - 0.0% 0.000% 1,993.11 168.2% 0.125%
93 Disposal 264.30 m3 0.015% 1,056.75 399.8% 0.059% - 0.0% 0.000% 1,056.75 399.8% 0.059%
Period : 19 September - 18 November 2008
Realization Work
Percentage
No DESCRIPTION QTY Unit Up to Last Month This Month Up to This Month
of weight QTY % Site % QTY % Site % QTY % Site %

94 Concrete K-125 302.50 m3 0.073% 71.52 23.6% 0.017% - 0.0% 0.000% 71.52 23.6% 0.017%
95 Formwork Unexposed 836.00 m2 0.209% 1,147.56 137.3% 0.286% - 0.0% 0.000% 1,147.56 137.3% 0.286%
96 Formwork Exposed 2,464.00 m2 1.100% 2,024.86 82.2% 0.904% - 0.0% 0.000% 2,024.86 82.2% 0.904%
97 Concrete K-250 1,216.00 m3 0.431% 1,257.41 103.4% 0.446% - 0.0% 0.000% 1,257.41 103.4% 0.446%
98 Rebar 150,785.00 kg 6.068% 127,711.06 84.7% 5.140% - 0.0% 0.000% 127,711.06 84.7% 5.140%
Total - I : 8.076% 7.202% 0.000% 7.202%

J Coal Chute, Crusher & Handling Trestle


99 Excavation 1,303.00 m3 0.096% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
100 Back Fill 1,015.00 m3 0.064% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
101 Disposal 286.00 m3 0.016% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
102 Cutting Pile 156.00 point 0.028% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
103 Concrete K-125 12.40 m3 0.003% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
104 Concrete K-225 351.00 m3 0.124% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
105 Grouting (non shrink grout) 2.90 m3 0.154% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
106 Formwork Unexposed 210.00 m2 0.052% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
107 Formwork Exposed 818.00 m2 0.365% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
108 Rebar 43,495.00 kg 1.750% - 0.0% 0.000% - 0.0% 0.000% - 0.0% 0.000%
Total - J : 2.653% 0.000% 0.000% 0.000%

K Miscellaneous
109 Indirect cost 1.00 ls 4.110% 0.40 40.2% 1.652% 0.30 29.8% 1.225% 0.70 70.0% 2.877%
110 Over Head + Profit 1.00 ls 4.762% 0.40 40.2% 1.914% 0.30 29.8% 1.420% 0.70 70.0% 3.333%
Total - K : 8.872% 3.566% 2.645% 6.210%
Total I - K : 19.601% 10.768% 2.645% 13.413%

Grand Total : 100.00% 34.699% 4.568% 39.267%

Lampung , 19 November 2008


Checked / Aproved by Prepared By, ###
PT MANUNGGAL ENGINEERING PT. SAMTRA TRIDAYA
###
###

(Marojahan Samosir) ( S. Wardoyo )


Gedung A KA Lt. 8
Jl. Bangka Raya No. 2
Keb. Bar u - Jakar ta Selatan

REKAPITULATION
PROJECT TITLE : CP BAHARI 2 X 30 MW CAPTIVE - COAL FIRED POWER PLANT
OWNER : PT. MANUNGGAL ENGINEERING
LOCATION : DENTE, TELADAS - TULANG BAWANG - LAMPUNG
WORK TITLE : CIVIL FOUNDATION & CONCRETE STRUCTURE

Period : 19 September - 18 November 2008

Procentase Progress Progress Progress


No DESCRIPTION Last Month This Month Up to This Month
(%) (%) (%) (%)

A Preparation Work 2.045% 1.799% 0.000% 1.799%

B Boiler Pilecap until Floor 13.548% 2.942% 0.107% 3.049%

C Boiler Concrete floor and Drainage 4.243% 0.000% 0.000% 0.000%

D. Boiler Equipment and Accessories Foundation 12.666% 1.801% 0.469% 2.270%

E. Coal Conveyor Foundation 1.164% 0.000% 0.000% 0.000%

F. ESP Foundation and Concrete Structure 3.322% 1.062% 0.416% 1.478%

G MCC and Control Building 8.256% 0.000% 0.000% 0.000%

H Turbine Building and Foundation 35.155% 16.329% 0.930% 17.259%

I Coal Storage Stockyard 8.076% 7.202% 0.000% 7.202%

J Coal Chute, Crusher & Handling Trestle 2.653% 0.000% 0.000% 0.000%

K Miscellaneous 8.872% 3.566% 2.645% 6.210%

Grand Total : 100.00% 34.699% 4.568% 39.267%

Lampung , 19 November 2008


Checked / Aproved by Prepared By,
PT MANUNGGAL ENGINEERING PT. SAMTRA TRIDAYA

( Xiao Ben ) (Marojahan Samosir) (S. Wardoyo)


Civil Construction Site Manager Site Manager