RIYADH GEOTECHNIQUE & FOUNDATIONS CO.

Contract No. 4800000121

Contract Title Neom Desalination Plant to Gayal Transmission System

Work/Service Order No. SO-003

Work Order Title Topographic Survey, Geotechnical and Geophysical Investigations

FACTUAL GEOTECHNICAL INVESTIGATION REPORT

Document No. 11-180000-4800000121-RGF-GEO-RPT-000001


Document Revision History:
Prepared by Checked by Approved by
Rev. Revision Description Status Date (Geotechnical (Sr. Geotechnical (Manager, Western
(Reason for Issue)
Engineer) Engineer) Region)

Mohammed
01 Original For Review 01.02.2022 Shahzad Shafiq Hamid Ismail
Aboueishe

Signatures:

Document Review Status Date: Name/Signature:

1 - Work May Proceed


2 - Incorporate Comments – Proceed
3 - Revise & Re-submit. Do NOT proceed
4 - Review Not Required – Proceed

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION C ODE : 0 1 PAGE 1 OF 27


FACTUAL GEOTECHNICAL INVESTIGATION REPORT

11-180000-4800000121-RGF-GEO-RPT-000001 R e v 0 1 , F E B R U A R Y 2 0 2 2

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 OF 27


Document history

Revision code Description of changes Purpose of issue Date

01 Original For Review 01.02.2022

Document approval

Prepared by Reviewed by Approved by


Name Shahzad Shafiq Mohammed Aboueishe Hamid Ismail

Job Title Geotechnical Engineer Sr. Geotechnical Engineer Manager, Western Region

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 3 OF 27


SO-003 NEOM DESALINATION PLANT TO GAYAL

TABLE OF CONTENTS

DESCRIPTION Page No.


-------------------------------------------------------------------------------------------------------------------------
1. INTRODUCTION 7

2. PURPOSE AND SCOPE OF WORK 9

3. FIELD INVESTIGATION 11
3.1 Drilling of Boreholes 11
3.2 Groundwater Conditions 12
3.3 Insitu Permeability Test 13
3.3.1 Falling Head Method 13
3.3.2 Constant Head Test 14
3.4 Pressuremeter Tests 14
3.5 Excavation of Trial Pits 17
3.6 Percolation Test 17
3.7 Insitu CBR Test 18
3.7.1 Procedure 18
3.8 Plate Load Tests 19

4. LABORATORY TESTING 21
4.1 General 21
4.2 Soil Classification Tests 22
4.3 Unconfined Compression Tests 22
4.4 Determination of Point Load Strength Index 22
4.5 Direct Shear Box 22
4.6 Proctor Test and CBR Tests 23
4.7 Chemical Tests 23

5. REGIONAL AND SITE GEOLOGY 24


5.1 Regional Geology 24
5.1.1 Cambrian Deposits 24
5.1.2 Paleozoic Sedimentary Rocks 24
5.1.3 Tertiary Deposits 25
5.1.4 Quaternary Deposits 25
5.2 Site Geology 26
5.2.1 The Subsurface Soil Stratigraphy 26

FIGURE

TABLES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 4 OF 27


TABLE OF CONTENTS

DESCRIPTION
-------------------------------------------------------------------------------------------------------------------------

APPENDIX-A FIELD DATA


- Borehole Logs
- Trial Pit Logs
- Falling Head Permeability Tests
- Constant Head Permeability Tests
- Pressuremeter Tests
- Dobule Cycle Plate Load Tests
- Percolation Test
- Insitu CBR Tests
- Electrical Resistivity Tests
- Thermal Resistivity Tests

APPENDIX-B LABORATORY TESTING RESULTS


Boreholes
- Particle Size Distribution
- Atterberg Limits
- Hydrometer Analysis
- Specific Gravity Test
- Point Load Test
- Direct Shear Test
- Unit Weight
- Unconfined Compression Test
- Chemical Tests of Soil
- Chemical Tests of Water

Trial Pits
- Particle Size Distribution
- Atterberg Limits
- Modified Proctor Tests
- California Bearing Ratio Tests

APPENDIX-C PHOTOGRAPHS
- Borehole Samples
- Trial Pits

APPENDIX-D APPROVED LABORATORY TESTING SCHEDULES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 5 OF 27


MAIN REPORT

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 6 OF 27


1. INTRODUCTION

Neom has embarked on the construction of Water Transmission system


(pipeline), Pump Stations and Laydown area between Neom Desalination
Plant to Gayal. The sites are situated in the northern part of Saudi Arabia.
Riyadh Geotechnique & Foundations Co. (RGF) has been awarded a
Contract under Service Order No. 3 to carry out the subsurface geotechnical
investigation and laboratory testing services at the above mentioned project.
The scope of services includes drilling of boreholes, in-situ testing &
sampling, excavation of trial pits, logging & sampling, groundwater level
observations and laboratory testing of the selected soil and rock samples
retrieved during the field works and preparation of factual and interpretive
reports.

This factual report that relates to Neom Desalination Plant to Gayal Water
Transmission system. The scope of work along the pipeline route includes
drilling of one hundred forty-six (146) boreholes & fifteen (15) trial pits as well
as relevant insitu & laboratory testing. All field and laboratory works were
performed according to the stipulated scope and specifications.

Upon receipt of the Service Order from Neom and getting permissions from
concerned authorities, Riyadh Geotechnique and Foundations (RGF)
mobilized necessary equipment and personnel on October 23, 2021 on the
project site and the field investigation was completed on December 27, 2021.

This geotechnical report presents a general description of the site, details of


investigation performed for remaining work, a general assessment of the
project area and an appreciation of the subsurface conditions encountered at
site as well as groundwater. The report also presents the assessments of the

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 7 OF 27


subsurface soil data obtained from the boreholes and trial pits incorporating
the laboratory test results from the selected soil/rock samples.

The field test results are presented in APPENDIX-A, whereas the laboratory
test results are presented in APPENDIX-B of this report. The as-built
coordinates and elevations of the borehole and trial pits ground investigation
are shown on TABLE-A. Photographs of borehole & samples and trial pits
are presented as a separate APPENDIX-C to this report. Laboratory testing
schedules for boreholes were prepared by RGF and forwarded to EPM for
necessary approval. The approved laboratory testing schedules are
presented in APPENDIX-D of this report.

The borehole logs and other field tests are presented in APPENDIX-A while
the laboratory test results are presented in APPENDIX-B of this report.
Photographs of borehole samples and trial pits are presented in
APPENDIX-C.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 8 OF 27


2. PURPOSE AND SCOPE OF WORK

The purpose of the present investigation was to assess the prevailing


subsurface geotechnical conditions at the site and to verify the geo-
engineering properties of the various subsurface soil/rock layers that will
significantly affect the behaviour of the proposed construction at site. The
scope of work for Road-17 comprised of the following tasks:

1. Manual excavation at each borehole (146) location to rule out presence


of underground utility.

2. Drilling and sampling of one hundred forty-six (146) boreholes (N2G-BH-


01 to N2G-BH146) down to a depth ranging from 15.0 meters to 30.0
meters below the existing ground surface. The borehole depth and
locations were designated by EPM. The borehole location are shown on
FIGURE-1.

3. In-situ testing and sampling of subsurface soil by performing Standard


Penetration Tests (SPTs) at each 1.0 meter depth interval down to 5.0
meters depth and 1.5 meters interval thereafter down to maximum depth
of each borehole. Core drilling in rock formation using double-tube core
barrel and measurement of drill core parameters such as Total Recovery
and Rock Quality Designation (RQD).

4. Performance of one hundred forty-six (146) Constant Head Permeability


test at 5.0 meters depth in each borehole.

5. Performance of one hundred forty-six (146) Falling Head Permeability


test at 6.0 meters depth in each borehole.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 9 OF 27


6. Performance of thirty-eight (38) Pressuremeter Test in selected
boreholes at 8.0 & 11.0 meters depth.

7. Excavation of fifteen (15) trial pits down to 3.0 meters depth or refusal,
whichever comes first and collection of bulk samples for classification &
CBR testing.

8. Performance of fifteen (15) double cycle Plate Load tests at 0.5 meter
depth.

9. Performance of fifteen (15) Percolation test in trial pits using BRE-365


Method.

10. Performance of fifteen (15) insitu CBR test at 0.5 meter depth in trial
pits.

11. Performance of one hundred and thirty-eight (138) Electrical Resistivity


tests using Wenner configuration in x-y direction.

12. Performance of one hundred and thirty-eight (138) Thermal Resistivity


tests at designated locations along the pipeline.

13. Conducting laboratory tests on representative soil samples, retrieved


from the boreholes and trial pits.

14. The preparation of a factual geotechnical report presenting the


investigation procedures and the results of the in-situ and laboratory
tests.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 0 OF 27


3. FIELD INVESTIGATION

The actual field investigation program comprised of drilling of total of one


hundred and forty-six (146) boreholes, drilled down to depth ranging from
15.0 to 20.0 meters below the existing ground surface level. In addition,
excavation of fifteen (15) trial pits was also included in scope of work. The
borehole and trial pit logs are presented in APPENDIX-A and locations
shown on FIGURE-1. Considerable difference was observed between the
ground elevation of the boreholes. Survey coordinates of all investigation
points are presented on individual borehole hole logs, trial pit logs and
summarized in TABLE-A. Borehole and trial pits locations are shown in
FIGURE-1.

3.1 DRILLING OF BOREHOLES

The drilling was carried out using Acker AD-II drilling rigs. Drilling was
carried out using 5” dia. steel starter casing. The Standard Penetration Tests
(SPTs) were performed at 1.0 meter depth interval down to 5.0 meters depth
and 1.50 meters interval thereafter down to maximum depth of borehole in
accordance with BS-5930. The drive assembly of SPT consisted of a
hammer of 63.5 kgs. weight, a driving head and a guide permitting free fall
of 76 cms. The assembly was equipped with a split spoon sampler to collect
the disturbed samples for necessary identifications and testing. The samples
retrieved from the split spoon sampler were examined for their visual
identification, packed in airtight polyethylene bags and sent to our laboratory
in Jeddah for further evaluation and testing.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 1 OF 27


Upon reaching rock drilling was advanced by coring using a T2-101 double
tube core barrel equipped with diamond bits. The cores recovered from the
core barrel were of 83 mm nominal diameter. The coring was carried out in
successive “core runs” of 1.5 meters. All the samples recovered from the
core barrel were identified and carefully preserved and labelled in wooden
core boxes. The percentage of core recovery and Rock Quality Designation
(RQD) for each “core run” was noted and recorded on borehole logs.
Photographs of all core samples are presented in APPENDIX-C according to
the project specifications.

A record of field observation was maintained in the form of field logs


describing the visual identifications (ASTM D2488) of the sub-surface
materials encountered at different depths, the sampling details and
recording the blow count observed in the SPT. These logs were later refined
by incorporating the laboratory test results and are presented in
APPENDIX-A.

3.2 GROUNDWATER CONDITIONS

Each borehole was checked for presence of groundwater after completion of


drilling.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 2 OF 27


3.3 INSITU PERMEABILITY TEST

3.3.1 Falling Head Method

Seepage tests in boreholes constitute one means of determining the in-situ


permeability of soils such tests are particularly valuable in the case of
materials such as sand or gravels.

The in-situ permeability tests was carried out using falling head method. In
this test the casing was filled with water and allowed to seep into the soil.
The rate of drop of the water surface below the top of casing was recorded
at regular time intervals. The observations were made until the rate of drop
became negligible or until sufficient reading were obtained to satisfactorily
determine the permeability.

The in-situ permeability was estimated using the following formula:

A H
k log e 1
F t 2  t1  H2

(for case G and L/D > 4)

Where K = permeability (m/sec)


F = lntake Factor
D = Intake Diameter (cm)
d = Standpipe Casing Diameter (cm)
H1 = piezometer head at time = t1 sec
H2 = piezometer head at time = t2 sec

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 3 OF 27


Results of Falling Head Permeability Tests are presented in APPENDIX-A of
this report.

3.3.2 Constant Head Test

The constant head tests were performed according to ASTM D6931. This
test is considered suitable for permeability testing at various depths during
progress of the borehole where the test section will stand unsupported. The
test procedure is as follows:

 Drill-hole to desired depth with casing


 Clean hole and retrieve the casing slowly to form a cavity of suitable
length (1 or 2 meters)
 Connect water reservoir to top of the casing maintaining a constant
head of water in the reservoir
 Monitor water flow (q) into the casing while maintaining a constant head
in the reservoir.

Estimate insitu permeability using following relation:

K = q/FHc (m/s)

Where; q = Rate of flow to the test section


Hc = Constant Head of Water
F = Shape Factor

Results of Constant Head Permeability Tests are presented in APPENDIX-A


of this report.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 4 OF 27


3.4 PRESSUREMETER TESTS

A total of thirty-eight (38) pressuremeter tests were performed to determine


insitu pressure-deformation behaviour of the sub-soil layers, Pressure Meter
tests were performed at various depth horizons in selected boreholes from
ground surface level.

Pressure Meter tests were executed using a Prebored, G-type Menard


Pressuremeter manufactured by APAGEO, France. It consists of three (3)
main parts that are:

 A monitoring box.
 A radially expandable cylindrical probe, having a BX size nominal
diameter (60 mm).
 A hose connecting the monitoring box to the probe.

Following were the step by step procedure for conducting of pressuremeter


test in the field:

1. The borehole was drilled using a 100 mm diameter steel casing to reach
the test depth.

2. The bottom of the borehole was cleaned.

3. Test pocket was drilled at the test depth in the borehole with a BX size
(60mm), side discharge tricone bit and was ensured that the test pocket
be free of debris and drilling cuttings.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 5 OF 27


4. Both volume and pressure calibrations were carried out before the start
of test. Volume calibration was done by pressurizing the probe in a
heavy duty steel casing whereas pressure calibration was conducted at
the level of monitoring box with probe completely exposed to the
atmosphere.

5. The probe was then connected with drill rods and lowered to the test
location.

6. Pressuremeter test was then carried out by applying and maintaining the
pressure in steps for a period of one minute for each step to the limiting
pressure or equipment’s capacity whichever arrives first. Nitrogen gas
was used to inflate the probe membrane.

7. At each applied pressure value, corresponding change in volume at 60


sec after the pressure application were recorded.

8. From these field observations, graph between applied pressure and


volume change was developed after applying of necessary corrections.
This graph was later used for the calculation of pressuremeter Modulus
Ep that has been used for elastic / immediate settlements computations.

Individual pressure-meter test results are presented in APPENDIX-A of the


report.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 6 OF 27


3.5 EXCAVATION OF TRIAL PITS

The field investigation program also included excavation of fifteen (15) trial
pits and field density tests (FDT) at designated locations as shown in
FIGURE-1. The pits were excavated mechanically down to 3.0 meters depth
or to hard pan, whichever came first. All test pits were logged, photographed
and representative bulk soil samples were collected from various depths in
the trial pits and later transported to RGF laboratory for further evaluation
and testing. The test pit logs are presented in APPENDIX-A. Photographs of
trial pits are presented in APPENDIX-C.

3.6 PERCOLATION TEST

The percolation tests were performed in pre-excavated trial pits, in


accordance with BRE Digest 365. The test procedure is described below:

1. Excavate a trial pit of the appropriate size and depth.


2. Record the area of the base of the trial pit.
3. Record the area of the pit at the depth, upto which water will be filled
during the test.
4. Record the area of the pit at 50% depth.
5. Fix graduated scale in the test pit to record the water depth.
6. Fill the pit with water to the desired level.
7. Record the elapsed time between 75% and 25% of the water depth.

Following relationship was used to estimate the percolation/infiltration


coefficient at site.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 7 OF 27


q=

Vp= Storage volume of the pit between 75% and 25% of the water depth
ap= Area of the base and sides of the pit at 50% of the water depth
tp= Elapsed time to empty between 75% and 25% of the water depth

Results of percolation test are presented in APPENDIX-A.

3.7 IN-SITU CBR TEST

In-situ field California Bearing Ratio tests were performed at 0.5 meters
depth in trial pits to determine in situ CBR value in accordance with ASTM
D4429 at designated locations.

A loaded truck was used for applying the load by means of a mechanical
screw jack. The other equipment used are 5 cm diameter loading plunger,
extension rods, jacks, proving ring assembly, dial gauge, datum frame,
annular surcharge plate 25 cm in diameter and 5 kg. in weight, with a central
hole and slot width of 5.32 cm.

3.7.1 PROCEDURE

A circular area of about 30 cm in diameter is trimmed and leveled. Care was


taken at the center where the plunger is to be seated. The surcharge load of
15 kg is placed on this surface and the plunger is seated properly. The dial

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 8 OF 27


gauge to measure the penetration is attached to the plunger from an
independent datum frame. A seating load of 4 kg is applied, and the load
and penetration dials are set to zero.

The load is applied to the plunger by means of the jack such that the rate of
penetration is approximately 1.3mm/minute. The load readings are noted for
penetrations 0.0, 0.6, 1.27, 1.91, 2.54, 3.81, 5.08, 6.35, 7.62, 8.89 and
10.16mm. The load is released, and moisture content specimen is taken
from underneath the plunger.

The load-penetration curve is plotted and the CBR value is calculated.


Results of field CBR are presented in APPENDIX-A

3.8 PLATE LOAD TESTS

Fifteen (15) Plate Load tests were performed at designated locations to


evaluate the load settlement behavior of the upper soil layers. The applied
pressure on a rigid steel plate was measured by the Bourdon gauge
connected to the pressure line of the hydraulic jack and the settlement of the
plate was recorded by observing readings on three dial gauges clamped to
independently supported reference beams. The procedure for Plate Load
test consists of the following steps:

1. A 600 mm diameter rigid steel plate was firmly seated on the leveled
ground at each test location.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 1 9 OF 27


2. The loading jack, the reference beams and the gauges for observing
settlements were installed.

3. The test plate was loaded in equal load increments to the maximum plate
pressure. Plate settlements were noted against each load increment.

4. After reaching the maximum plate pressure the plate was unloaded in
three decrements and rebound for each decrement was recorded.

5. All pressure versus settlement data was recorded in tabular form and
presented as pressure versus settlement curves for each plate load test.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 0 OF 27


4. LABORATORY TESTING

4.1 GENERAL

The samples retrieved from the boreholes and trial pits were logged,
examined in the field, preserved and transported to RGF testing laboratory
in Jeddah for relevant laboratory testing. Laboratory test schedules were
prepared for each exploratory borehole and presented to EPM for approval.
The laboratory test results are presented in APPENDIX-B of this report.

Soil samples collected from the boreholes were subjected to the following
tests as per latest ASTM / BS or equivalent Standards.

● Grain size Analysis (ASTM D 421, 422) including hydrometer


● Atterberg Limits (ASTM D 4318)
● Natural Moisture Content (ASTM D 2216)
● Laboratory Compaction of Soil using Modified Effort (ASTM D 1557)
● 3 Point Soaked CBR (ASTM D 1883)
● Direct Shear Test (BS-1377)
● Unconfined Compression Test (ASTM D 7012)
● Point Load Test (ASTM D 5731)
● Water Soluble Sulphates Content (BS 1377 Part 3)
● Water Soluble Chloride Content (BS 1377 Part 3)
● pH (BS 1377 Part 3)

Brief description of the laboratory tests performed are outlined in the


following sections:

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 1 OF 27


4.2 SOIL CLASSIFICATION TESTS

The classification test performed on selected representative samples of


subsurface materials consisted of determination of natural moisture content
(ASTM D2216), Liquid Limit and Plastic Limits (ASTM D4318), Grain Size
Analysis (ASTM D422) and sedimentation by Hydrometer (ASTM D422).

4.3 UNCONFINED COMPRESSION TESTS

Unconfined compression tests were performed on intact rock core samples


in accordance with ASTM D3148.

4.4 DETERMINATION OF POINT LOAD STRENGTH INDEX

Point Load strength Index tests were performed on intact rock core samples
in accordance with ASTM D5731.

4.5 DIRECT SHEAR BOX

Drained Direct Shear Tests were performed on selected soil samples to


determine the shear strength characteristics of soil. The tests were
performed on samples from passing No.10 sieve according to BS-1377.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 2 OF 27


4.6 PROCTOR TEST AND CBR TESTS

Proctor tests and CBR tests were performed on the bulk soil samples
according to testing schedule. The tests were performed according to the
ASTM D1557 and ASTM D1883, respectively.

4.7 CHEMICAL TESTS

Chemical tests were performed on the selected soil samples. The testing
program included determination of pH (BS-1377), Acid Soluble Chloride
(BS-1377), Acid Soluble Sulphate (BS-1377) and Carbonate Contents
(ASTM D4737) of soil samples.

Groundwater samples was subjected to pH (ASTM D-1293), total chlorides


(ASTM D-512), total sulphate (ASTM D-516) & total dissolved solid (ASTM
D-5907) test.

All laboratory test results are presented in APPENDIX-B.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 3 OF 27


5. REGIONAL & SITE GEOLOGY

5.1 REGIONAL GEOLOGY

The Bad Quadrangle (Sheet 28A) & Al-Muwaylih (Sheet 27A) lies in the
north province of Arabian Shield, on the eastern edge of Red Sea rift
(between latitude 28o 00’ and 29o 00’ N and longitude 34o30’ and 36o30’.
FIGURE-2 (a & b) shows the location of the Al- Bad & Al-Muwaylih
Quadrangle (sheet 28A & 27A). The quadrangle is in the northern part of the
Hijaz region. A flat low-laying coastal plain is succeeded eastwards by the
rock mountains. The regional geology applicable to NEOM site is presented
as follows:

5.1.1 CAMBRIAN DEPOSITS

Oldest deposits in this site area are numerous small granitic plugs and
irregular bodies that are intruded into other formations and the oldest granitic
plutons. The small intrusions are diffucklt to recognise. They are variable in
mineralogy, composition and appearance. Most consists of medium grained
leucocratic monzogranite, some of syenogranite and micrograinte, there
intrusions are of various ages and some shows resemblances to Aliya or
Lawz units.

5.1.2 PALEOZOIC SEDIMENTARY ROCKS

Paleozoic sedimentary rocks crop-out in the western area of the site. The
Cambrian Siq Sandstone unconformably overlies the Proterozoic basement.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 4 OF 27


It is composed of coarse grained quartz sandstone that is well bedded and
locally cross-bedded. It is dark red to reddish brown. Quartz pebble
scattered throughout the sequence and there is thin quartz pebble
conglomerate at the base. North of Wadi Abu Khurma, it is cut-out by
Quweira sandstone which is mainly light reddish brown, massive, medium to
coarse grained arkosic sandstone. Ram and Umm Sahm sandstone
conformably overlie the Queweira sandstone. It mainly consists of light
brown to white massive quartz sandstone and of subordinate brown, sandy
shale or siltstone.

5.1.3 TERTIARY DEPOSITS

The thin sequence of Predominantly Miocene sedimentary rocks exposed in


the Aynunah area was named the Khuraybah formation named after the
village of Al-Khuraybah, it is mainly shallow water limestone sequence
marked by many facies changes but it contains interbedded sandstone and
minor pebbly conglomerate. An isolated are of gypsum-anhydrite limestone
beds.

The lower part of the Khuraybah formation consists of reefal limestone that
flanks the edge of the proterozoic basement rocks along the al-Khurabah
coastal section.

5.1.4 QUATERNARY DEPOSITS

Quaternary deposits in the area are of continental and marine origin. Along
the Al-Khurabah coastal section, alluvial gravel sheets and terraces slope

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 5 OF 27


gently toward the Red Sea, each level reflecting a relative uplift of the land
during the early Quaternary. It consists mainly of poorly sorted and crudely
layered. Pebble and cobble gravels having a sandy, silty or clayey matrix.
Other undifferentiated sand and gravel deposits consists of Wadi alluvium
and minor Wadi terrace deposits found throughout the area. Immediately
adjacent to the coast, alluvial out was that forms much of the surficial cover
are windblown sand and shell bearing beach sand.

5.2 SITE GEOLOGY

The description of the subsurface soil strata is based on the inspection of


soil samples retrieved from the boreholes and later refinements done after
obtaining laboratory test results. Based on the above procedure the
subsurface soil for Neom to Gayal Water Transmission Systemsite is
described in the following paras. The project covers a large area with
considerable elevation difference between the boreholes. The borehole top
elevation ranged from 7.46 to 90.76 amsl. The subsurface strata
encountered at site is described below:

5.2.1 THE SUBSURFACE SOIL STRATIGRAPHY

It is established from the investigation carried out for the Water


Transmission system between Neom Desalination plant to Gayal that the
alluvial/overburden soil strata consisted of a brownish grey well graded to
poorly graded SAND/GRAVEL with silt and silty SAND with or without
gravel. Thickness of the overburden soil ranged from 0.5 to 30.0 meters
below existing ground level. Standard penetration tests recorded in the

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 6 OF 27


overburden soil as well as in subsequent layers ranged between 12-blows to
more than 50 blows for 30 cms penetration of the split spoon sampler.
Localized loose layers were encountered between surface to 1.50 meter
depth across the site.

Rock was encountered in encountered in fourteen (14) boreholes (BH-7, 9,


29, 50, 53, 54, 56, 85, 89, 101, 102, 138, 141 & 142) at the depth ranging
from 0.5 to 5.0 meters and continued down to the maximum termination
depth of each boreholes below surface. The rock is described as grey to
dark grey, moderately to severely weathered, close to extremely close
spaced fractured SANDSTONE/ MUDSTONE/ ANHYDRITE & GRANITE.

The above description of the sub-strata is based on results of boreholes.


Variability in the sub surface soil formation can be expected even within few
meters of the borehole points. Such variations depend upon the state of
weathering of the rock and thickness of overburden soil layers.

GROUNDWATER CONDITIONS
Groundwater was encountered only in eight (8) boreholes (BH-7, 11, 18, 19,
22, 24, 27 & 28) drilled in low lying area along the pipeline. Groundwater
was encountered at a depth ranging from 8.0 to 13.0 meters depth below
existing ground level. This corresponds to a groundwater elevation ranging
from +0.051 to +0.67 meters w.r.t mean sea level. Seasonal & tidal
variations shall be taken as +50 cm or more.

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01 PAG E 2 7 OF 27


FIGURE

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


TABLES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


TABLE-A
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System
Project No. 21J4037
BOREHOLES
Sr. No. BH ID Depth (m) Northing Easting Elevation
1 N2G-BH-001 15.00 3041142.855 757461.021 45.848
2 N2G-BH-002 18.00 3051951.937 752865.348 34.668
3 N2G-BH-003 26.00 3052451.376 752864.574 45.713
4 N2G-BH-004 15.00 3052946.181 752798.055 40.438
5 N2G-BH-005 27.00 3053425.227 752656.507 44.346
6 N2G-BH-006 15.00 3053881.830 752453.982 32.439
7 N2G-BH-007 17.00 3054299.208 752180.041 12.156
8 N2G-BH-008 19.00 3054678.577 751855.853 25.735
9 N2G-BH-009 15.00 3055006.985 751480.304 20.926
10 N2G-BH-010 16.00 3057801.976 750491.981 27.500
11 N2G-BH-011 16.00 3058253.596 750278.258 10.235
12 N2G-BH-012 26.00 3060393.381 749029.072 50.613
13 N2G-BH-013 15.00 3060697.709 748632.597 19.000
14 N2G-BH-014 23.00 3061012.098 748244.060 49.718
15 N2G-BH-015 15.00 3062568.352 746351.000 23.765
16 N2G-BH-016 15.00 3062960.317 746040.547 18.565
17 N2G-BH-017 15.00 3063352.235 745730.159 22.132
18 N2G-BH-018 18.00 3063744.267 745419.761 26.844
19 N2G-BH-019 18.00 3067450.874 744282.923 13.311
20 N2G-BH-020 15.00 3067899.182 744065.820 8.057
21 N2G-BH-021 15.00 3068322.272 743799.363 19.285
22 N2G-BH-022 15.00 3068741.767 743527.308 10.673
23 N2G-BH-023 15.00 3069160.359 743253.777 18.769
24 N2G-BH-024 15.00 3069618.501 743057.699 12.259
25 N2G-BH-025 15.00 3070086.675 742882.321 17.985
26 N2G-BH-026 15.00 3070555.274 742707.791 8.251
27 N2G-BH-027 16.45 3071023.637 742532.930 7.465
28 N2G-BH-028 20.00 3071492.113 742358.055 24.449
29 N2G-BH-029 25.00 3073839.211 741565.518 35.922
30 N2G-BH-030 25.00 3074290.470 741350.193 33.113
31 N2G-BH-031 24.00 3074742.443 741136.432 29.182
32 N2G-BH-032 15.00 3075195.272 740924.385 17.825
33 N2G-BH-033 27.00 3075648.058 740712.338 41.589
34 N2G-BH-034 23.21 3076099.267 740496.824 29.021
35 N2G-BH-035 15.00 3076550.243 740280.891 28.974
TABLE-A
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System
Project No. 21J4037
BOREHOLES
Sr. No. BH ID Depth (m) Northing Easting Elevation
36 N2G-BH-036 15.00 3077001.387 740065.328 31.148
37 N2G-BH-037 15.45 3077452.503 739849.669 36.838
38 N2G-BH-038 15.00 3077903.699 739634.361 39.073
39 N2G-BH-039 15.00 3078356.955 739423.351 43.670
40 N2G-BH-040 15.00 3078820.626 739238.773 49.290
41 N2G-BH-041 15.00 3079300.256 739097.194 54.645
42 N2G-BH-042 15.00 3079780.825 738959.822 62.951
43 N2G-BH-043 15.00 3080267.170 738843.713 67.964
44 N2G-BH-044 16.00 3080736.642 738720.734 73.234
45 N2G-BH-045 19.00 3081158.787 738454.552 75.549
46 N2G-BH-046 15.00 3081591.640 738207.989 70.277
47 N2G-BH-047 15.00 3082048.955 738005.839 70.986
48 N2G-BH-048 17.00 3082460.148 737723.241 71.454
49 N2G-BH-049 16.00 3082844.154 737403.275 63.823
50 N2G-BH-050 30.00 3083238.199 737095.580 84.279
51 N2G-BH-051 25.00 3083691.690 736894.883 68.214
52 N2G-BH-052 21.00 3084168.682 736745.116 67.054
53 N2G-BH-053 15.00 3084647.530 736601.731 64.821
54 N2G-BH-054 17.00 3085130.716 736473.037 74.893
55 N2G-BH-055 20.00 3085567.207 736233.875 81.260
56 N2G-BH-056 15.00 3085956.068 735919.576 69.103
57 N2G-BH-057 24.00 3086346.255 735606.919 72.892
58 N2G-BH-058 22.00 3086741.444 735300.612 70.085
59 N2G-BH-059 15.00 3087196.487 735287.907 58.396
60 N2G-BH-060 17.00 3087677.759 735270.881 61.081
61 N2G-BH-061 18.00 3088146.067 734963.339 64.323
62 N2G-BH-062 15.50 3088503.141 734667.801 60.385
63 N2G-BH-063 15.00 3088903.231 734387.836 65.249
64 N2G-BH-064 15.00 3089281.686 734062.375 65.622
65 N2G-BH-065 17.00 3089622.946 733698.556 67.090
66 N2G-BH-066 16.00 3090040.199 733423.512 69.064
67 N2G-BH-067 16.00 3090458.703 733149.864 74.682
68 N2G-BH-068 15.00 3090877.195 732876.269 77.871
69 N2G-BH-069 15.00 3091211.716 732511.612 74.692
70 N2G-BH-070 15.00 3091518.354 732116.701 67.529
TABLE-A
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System
Project No. 21J4037
BOREHOLES
Sr. No. BH ID Depth (m) Northing Easting Elevation
71 N2G-BH-071 15.00 3091825.116 731721.830 65.027
72 N2G-BH-072 15.00 3092131.775 731326.918 59.875
73 N2G-BH-073 16.00 3092438.376 730931.961 56.017
74 N2G-BH-074 16.00 3092753.796 730544.180 55.370
75 N2G-BH-075 15.00 3093077.348 730163.001 61.507
76 N2G-BH-076 15.00 3093400.944 729781.770 60.753
77 N2G-BH-077 15.00 3093724.534 729400.574 57.266
78 N2G-BH-078 16.00 3094048.065 729019.374 56.125
79 N2G-BH-079 16.00 3094371.665 728638.233 55.666
80 N2G-BH-080 15.00 3094695.218 728257.034 53.974
81 N2G-BH-081 15.00 3095018.752 727875.838 59.599
82 N2G-BH-082 15.00 3095342.363 727494.618 61.399
83 N2G-BH-083 17.00 3095636.601 727090.586 50.988
84 N2G-BH-084 15.00 3095929.013 726684.933 58.896
85 N2G-BH-085 21.00 3096221.259 726279.281 68.115
86 N2G-BH-086 19.00 3096513.561 725873.602 67.405
87 N2G-BH-087 19.00 3096805.897 725467.931 67.579
88 N2G-BH-088 19.00 3097098.205 725062.285 67.600
89 N2G-BH-089 19.00 3097476.491 724759.515 66.428
90 N2G-BH-090 18.00 3097927.590 724543.993 44.502
91 N2G-BH-091 18.00 3098378.761 724328.439 38.022
92 N2G-BH-092 20.00 3098829.931 724112.891 35.466
93 N2G-BH-093 20.00 3099281.061 723897.309 31.722
94 N2G-BH-094 15.00 3099739.588 723699.888 33.531
95 N2G-BH-095 15.00 3100212.855 723538.427 35.605
96 N2G-BH-096 16.00 3100686.050 723377.014 40.980
97 N2G-BH-097 17.00 3101154.051 723206.536 55.998
98 N2G-BH-098 15.00 3101577.392 722959.608 44.119
99 N2G-BH-099 15.00 3102053.024 722738.245 38.507
100 N2G-BH-100 30.00 3102509.282 722582.611 61.390
101 N2G-BH-101 30.00 3102931.358 722331.104 84.772
102 N2G-BH-102 30.00 3103342.457 722046.164 89.975
103 N2G-BH-103 30.00 3103753.300 721761.203 90.768
104 N2G-BH-104 30.00 3104080.965 721406.356 64.938
105 N2G-BH-105 16.00 3104301.046 720957.464 56.572
TABLE-A
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System
Project No. 21J4037
BOREHOLES
Sr. No. BH ID Depth (m) Northing Easting Elevation
106 N2G-BH-106 20.00 3104515.607 720506.017 36.338
107 N2G-BH-107 15.00 3104713.041 720046.651 45.781
108 N2G-BH-108 15.00 3104910.491 719587.303 30.635
109 N2G-BH-109 17.00 3105107.952 719127.921 34.196
110 N2G-BH-110 15.00 3105305.359 718668.553 33.532
111 N2G-BH-111 17.00 3105502.854 718209.203 24.499
112 N2G-BH-112 19.00 3105700.280 717749.814 25.290
113 N2G-BH-113 16.00 3105911.679 717297.466 19.212
114 N2G-BH-114 17.00 3106160.814 716863.956 18.732
115 N2G-BH-115 20.00 3106409.974 716430.437 23.301
116 N2G-BH-116 15.00 3106659.085 715996.911 14.680
117 N2G-BH-117 15.00 3106908.204 715563.382 25.540
118 N2G-BH-118 15.00 3107068.302 715090.670 28.419
119 N2G-BH-119 15.00 3107219.953 714614.227 28.783
120 N2G-BH-120 30.00 3107192.951 714083.900 27.348
121 N2G-BH-121 30.00 3107398.745 713534.954 16.607
122 N2G-BH-122 15.00 3107704.489 713148.790 15.812
123 N2G-BH-123 15.00 3108010.249 712762.694 26.127
124 N2G-BH-124 15.00 3108310.787 712373.646 28.682
125 N2G-BH-125 15.00 3108435.057 711889.338 26.974
126 N2G-BH-126 20.00 3108559.291 711405.080 29.987
127 N2G-BH-127 15.00 3108683.597 710920.739 27.262
128 N2G-BH-128 15.00 3108807.821 710436.438 33.776
129 N2G-BH-129 17.00 3108932.092 709952.101 36.410
130 N2G-BH-130 16.00 3109057.460 709468.097 33.007
131 N2G-BH-131 15.00 3109221.343 708995.746 29.171
132 N2G-BH-132 15.00 3109385.215 708523.380 32.012
133 N2G-BH-133 18.00 3109549.117 708051.001 33.331
134 N2G-BH-134 15.00 3109712.992 707578.633 28.009
135 N2G-BH-135 15.00 3109876.834 707106.266 37.224
136 N2G-BH-136 30.00 3110095.283 706658.412 43.082
137 N2G-BH-137 15.00 3110340.327 706222.551 28.913
138 N2G-BH-138 15.00 3110585.378 705786.659 35.455
139 N2G-BH-139 15.00 3110830.359 705350.854 33.661
140 N2G-BH-140 15.00 3111075.381 704914.981 33.604
TABLE-A
Client : NEOM
Project : NEOM Desalination Plant to Gayal Transmission System
Project No. 21J4037
BOREHOLES
Sr. No. BH ID Depth (m) Northing Easting Elevation
141 N2G-BH-141 15.00 3111320.381 704479.148 29.605
142 N2G-BH-142 15.00 3111565.429 704043.322 31.268
143 N2G-BH-143 15.00 3111832.457 703609.701 33.080
144 N2G-BH-144 15.00 3112044.671 703167.317 22.256
145 N2G-BH-145 20.00 3112168.531 702682.844 29.785
146 N2G-BH-146 15.00 3112541.121 702482.717 29.378
TRIAL PITS
Sr. No. TP ID Depth (m) Northing Easting Elevation
1 1 1.2 3110459.546 706010.451 34.131
2 2 3 3109443.791 708354.436 47.406
3 3 3 3107161.532 714188.028 26.436
4 4 3 3102390.361 722623.159 57.762
5 5 0.8 3097809.682 724600.318 59.183
6 6 3 3099047.427 728047.499 112.208
7 7 3 3096637.1 728301.364 73.455
8 8 3 3093191.738 730028.195 61.081
9 9 3 3088021.469 735099.96 65.181
10 10 3 3078408.659 739400.377 44.426
11 11 3.00 3069049.384 743326.31 17.02
12 12 3.00 3060604.533 748747.89 51.907
13 13 3.00 3054277.573 752196.75 25.224
14 14 3.00 3048043.101 754022.28 36.715
15 15 3.00 3043990.569 755588.94 24.99
APPENDIX-A

FIELD TEST DATA

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


BOREHOLE LOGS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-001

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3041142.855


NEOM Desalination Plant to Gayal Transmission System 45.848 E: 757461.021
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 26-Dec-21 27-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Grey, poorly-graded GRAVEL of dolerite with R-1 50/0 91 Coring from


sand. 0.00~0.50 meters

--Ditto-- R-2 93 Coring from


0.50~1.50 meters

1 44.848

--Ditto-- R-3 98 Coring from


1.50~3.00 meters

2 43.848

3 42.848
Dark grey, poorly-graded angular coarse to R-4 95 Coring from
medium GRAVEL/COBBLE of dolorite origin 3.00~4.50 meters
qith gravel.

4 41.848

Dark grey, angular poorly-graded coarse to R-5 96 Coring from


medium GRAVELS of dolorite origin. 4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 40.848

6 39.848
Dark grey, poorly-graded to medium R-6 50/0 93 SPT at 6.00 meters
Coring from
GRAVELS of dolorite origin with cobbles. 6.00~7.50 meters

7 38.848

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-001

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark grey, sandy, angualr coarse to medium R-7 92 Coring from


GRAVELS of dolorite origin. 7.50~9.00 meters

8 37.848

9 36.848
Grey, well-graded GRAVEL of dolerite with R-8 90 Coring from
sand. 9.00~10.50 meters

10 35.848

--Ditto-- R-9 93 Coring from


10.50~12.00 meters

11 34.848

12 33.848
Dark grey, poorly-graded angular coarse R-10 94 Coring from
GRAVELS of dolorite origin. 12.00~13.50 meters

13 32.848
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-11 93 Coring from


13.50~15.00 meters

14 31.848

15 30.848
----End of borehole at 15.00 meters----

16 29.848

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-002

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3051951.937


NEOM Desalination Plant to Gayal Transmission System 34.668 E: 752865.348
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Dec-21 27-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, light brown, fine SAND with silt and D-1 15 38 SPT at 0.00 meters
sub-angular to sub-rounded medium to fine 17
gravels of igneous origin. 21

1 33.668
Medium dense, light brown, poorly-graded D-2 14 16 SPT at 1.00 meters
sub-angular fine to coarse GRAVEL of 8
igneous origin with silt and sand. 8

2 32.668
Medium dense, light brown, poorly-graded D-3 12 18 SPT at 2.00 meters
medium to fine SAND with silt and 8
sub-angular coarse to medium gravels of 10
igneous origin.

3 31.668
--Ditto-- D-4 9 26 SPT at 3.00 meters
13
13

4 30.668
Medium dense, light brown, silty coarse D-5 7 17 SPT at 4.00 meters
SAND with fine gravels of igneous origin. 8
9
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 29.668
--Ditto-- D-6 10 28 SPT at 5.00 meters
12
16

6 28.668

Very dense, light brown, silty SAND with D-7 10 55 SPT at 6.50 meters
gravel of igneous origin. 25
30
7 27.668

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-002

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, light brown, silty SAND with


gravel of igneous origin. (continued)
8 26.668
Dense, light brown, coarse SAND with silt D-8 13 45 SPT at 8.00 meters
and sub-angular to sub-rounded gravels of 18
igneous origin. 27

9 25.668

Very dense, light brown, medium to coarse D-9 17 52 SPT at 9.50 meters
SAND with silt and tarces of sub-angular 23
coarse gravels of igneous origin. 29
10 24.668

11 23.668
Very dense, light brown, poorly-graded D-10 19 57 SPT at 11.00 meters
medium to coarse SAND with silt and 26
sub-angular medium to coarse gravels of 31
igneous origin.

12 22.668

Dense, light brown, poorly-graded medium D-11 15 48 SPT at 12.50 meters


to caorse SAND with silt and sub-rounded 20
medium to fine gravels of igneous origin. 28
13 21.668
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 20.668
Very dense, light brown, sub-angular to D-12 17 57 SPT at 14.00 meters
sub-rounded medium to fine GRAVELS of 24
igneous origin with silt and sand. 33

15 19.668

Very dense, brown, clayey SAND with D-13 20 61 SPT at 15.50 meters
gravel. 27
34
16 18.668

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-002

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, clayey SAND with


gravel. (continued)

17 17.668
Hard, brown, sandy Lean CLAY. D-14 19 65 SPT at 17.00 meters
29
36

18 16.668
Very dense, light brown, sub-angular to D-15 21 100 SPT at 18.00 meters
sub-rounded coarse to fine GRAVEL gravels 34
of igneous origin with silty medium to fine 50/5
sand.
----End of borehole at 18.00 meters----
19 15.668

20 14.668

21 13.668
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 12.668

23 11.668

24 10.668

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-003

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3052451.376


NEOM Desalination Plant to Gayal Transmission System 45.713 E: 752864.574
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Dec-21 27-Dec-21
DRILLING EQUIPMENT: Acker Soil Max (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-12-21 8:00 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Faisal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, light brown, silty fine SAND D-1 6 15 SPT at 0.00 meters
with sub-angular fine to medium gravels of 7
igneous origin. 8

1 44.713
Medium dense, light brown, silty medium to D-2 8 17 SPT at 1.00 meters
fine SAND. 8
9

2 43.713
Medium dense, light brown, silty SAND. D-3 10 21 SPT at 2.00 meters
9
12

3 42.713
Dense, light brown, poorly-graded fine to D-4 16 42 SPT at 3.00 meters
medium SAND with silt. 21
21

4 41.713
Changing to very dense. D-5 21 59 SPT at 4.00 meters
27
32
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 40.713
Very dense, light brown, medium to fine D-6 22 71 SPT at 5.00 meters
SAND with silt. 31
40

6 39.713

Very dense, brown, medium to fine SAND D-7 50/6 100


90
SPT at 6.50 meters
with silt. R-1 Coring from
6.56~7.50 meters
7 38.713 Light brown, poorly-graded angular medium
to coarse GRAVELS of siltstone origin.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-003

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty clayey fine SAND D-8 23 100 SPT at 7.50 meters
with sub-rounded fine gravels of sedimentary 50/10
origin. R-2 95 Coring from
8 37.713 7.75~9.00 meters
Light brown, hard sandy Lean CLAY
(Decomposed siltstone).

9 36.713
Very dense, brown, clayey silty fine SAND D-9 22 100 SPT at 9.00 meters
with sub-angular to sub-rounded coarse to 40
medium gravels of sedimentary origin. 50/10
Light brown, poorly-graded angular to R-3 86 Coring from
9.50~10.50 meters
sub-angular medium to coarse GRAVELS of
10 35.713
siltstone.

Very dense, brown, silty clayey fine SAND D-10 23 100 SPT at 10.50 meters
with sub-angular fine gravels of sedimentary 50/10
origin. R-4 65 Coring from
11 34.713 10.75~12.00 meters
--Ditto--

12 33.713
Very dense, brown, silty fine SAND. D-11 21 83 SPT at 12.00 meters
37
45

13 32.713
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Very dense, brown, silty fine SAND with D-12 20 80 SPT at 13.50 meters
traces of sub-rounded fine gravels of 36
sedimentary origin. 44
14 31.713

15 30.713
Hard, brown, sandy SILT. D-13 20 62 SPT at 15.00 meters
30
32
--Ditto-- U-1 UDS sample from
15.45~15.65 meters

16 29.713

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-003

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Hard, brown, sandy SILT. (continued)

Very dense, brown, silty clayey fine SAND D-14 23 67 SPT at 16.50 meters
with sub-rounded to sub-angular medium to 27
fine gravels of sedimentary origin. 40
17 28.713

18 27.713
Very desne, brown, clayey silty medium to D-15 23 79 SPT at 18.00 meters
fine SAND with sub-rounded coarse to 34
medium gravels of sedimentary origin. 45

19 26.713

Very dense, brown, clayey coarse to fine D-16 22 68 SPT at 19.50 meters
SAND. 31
37
20 25.713

21 24.713
--Ditto-- D-17 22 56 SPT at 21.00 meters
24
32
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 23.713

Changing to dense. D-18 20 47 SPT at 22.50 meters


23
34
23 22.713

24 21.713
with sub-rounded to sub-angular fine to D-19 18 50 SPT at 24.00 meters
medium gravels of sedimentary origin. 24
26

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-003

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, clayey coarse to fine


SAND. (continued)
25 20.713

Very dense, brown, silty medium to fine D-20 19 58 SPT at 25.50 meters
SAND with silt and clay. 27
31
26 19.713
--Ditto-- D-21 22 56 SPT at 26.00 meters
with sub-angular medium to fine gravels of 22
sedimentary origin. 34
----End of borehole at 26.00 meters----

27 18.713

28 17.713

29 16.713

30 15.713
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 14.713

32 13.713

33 12.713

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-004

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3052946.181


NEOM Desalination Plant to Gayal Transmission System 40.438 E: 752798.055
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 26-Dec-21 26-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 29-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, light brown, poorly-graded medium D-1 12 36 SPT at 0.00 meters


to fine SAND with silt and sub-angular to 16
sub-rounded medium to fine gravels of 20
igneous origin.

1 39.438
Medium dense, brown, silty sub-rounded to D-2 12 22 SPT at 1.00 meters
sub-angular coarse to medium GRAVEL of 9
of igneous origin with sand. 13

2 38.438
Medium dense, brown, poorly-graded coarse D-3 13 28 SPT at 2.00 meters
to medium SAND with sub-angular coarse to 15
medium gravels of igneous origin. 13

3 37.438
--Ditto-- D-4 11 26 SPT at 3.00 meters
12
14

4 36.438
Medium dense, brown, silty coarse SAND D-5 10 27 SPT at 4.00 meters
with sub-rounded medium to fine gravels of 13
igneous origin. 14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 35.438
Medium dense, brown, silty medium to fine D-6 11 30 SPT at 5.00 meters
SAND with sub-rounded medium to fine 14
gravels of igneous origin. 16

6 34.438

Very dense, light brown, silty SAND with D-7 11 61 SPT at 6.50 meters
gravel of igneous origin. 28
33
7 33.438

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-004

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, light brown, silty SAND with


gravel of igneous origin. (continued)
8 32.438
Very dense, brown, poorly-graded medium D-8 15 58 SPT at 8.00 meters
to fine SAND with silt and sub-angular to 27
sub-rounded medium to fine gravels of 31
igneous origin.

9 31.438

--Ditto-- D-9 14 60 SPT at 9.50 meters


26
34
10 30.438

11 29.438
Very dense, brown, silty, clayey SAND with D-10 20 53 SPT at 11.00 meters
gravel of igneous origin. 27
26

12 28.438

Very dense, light brown, sandy sub-rounded D-11 19 56 SPT at 12.50 meters
medium to fine GRAVELS of igneous origin 25
with silt. 31
13 27.438
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 26.438
Dense, light brown, silty SAND with gravel of D-12 11 33 SPT at 14.00 meters
igneous origin. 15
18

15 25.438
Very dense, light brown, poorly-graded D-13 18 59 SPT at 15.00 meters
coarse to fine SAND with silt and angular 25
coarse to medium gravels of igneous origin. 34
----End of borehole at 15.00 meters----

16 24.438

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-005

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3053425.227


NEOM Desalination Plant to Gayal Transmission System 44.346 E: 752656.507
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Dec-21 27-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, clayey GRAVEL of D-1 4 11 SPT at 0.00 meters


igneous origin with sand. 5
6

1 43.346
--Ditto-- D-2 5 16 SPT at 1.00 meters
7
9

2 42.346
Medium dense, brown, poorly-graded coarse D-3 6 18 SPT at 2.00 meters
to fine SAND with silt and sub-angular to 8
sub-rounded medium to fine gravels of 10
igneous origin.

3 41.346
--Ditto-- D-4 11 25 SPT at 3.00 meters
12
13

4 40.346
Medium dense, brown, medium to fine D-5 9 28 SPT at 4.00 meters
SAND with silt and sub-angular medium to 13
fine gravels of igneous origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 39.346
Dense, brown, clayey SAND with gravel of D-6 12 33 SPT at 5.00 meters
igneous origin. 15
18

6 38.346

Dense, dark brown, poorly-graded medium D-7 14 35 SPT at 6.50 meters


to coarse SAND with silt. 16
19
7 37.346

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-005

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, dark brown, poorly-graded medium


to coarse SAND with silt. (continued)
8 36.346
--Ditto-- D-8 17 40 SPT at 8.00 meters
19
21

9 35.346

Dense, brown, poorly-graded SAND with silt D-9 18 42 SPT at 9.50 meters
and sub-angular fine to medium gravels of 20
igneous origin. 22
10 34.346

11 33.346
Dense, dark brown, silty coarse to medium D-10 20 44 SPT at 11.00 meters
SAND. 21
23

12 32.346

Very dense, dark brown, silty fine to medium D-11 23 54 SPT at 12.50 meters
SAND. 25
29
13 31.346
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 30.346
--Ditto-- D-12 23 56 SPT at 14.00 meters
27
29

15 29.346

--Ditto-- D-13 22 61 SPT at 15.50 meters


29
32
16 28.346

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-005

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, silty fine to medium


SAND. (continued)

17 27.346
Very dense, dark brown, poorly-graded fine D-14 21 63 SPT at 17.00 meters
to medium SAND with silt. 30
33

18 26.346

--Ditto-- D-15 20 67 SPT at 18.50 meters


32
35
19 25.346

20 24.346
Very dense, brown, silty medium to fine D-16 22 70 SPT at 20.00 meters
SAND. 34
36

21 23.346

Very dense, dark brown, well-graded SAND D-17 23 70 SPT at 21.50 meters
with silt. 33
37
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 22.346

23 21.346
Very dense, dark brown, poorly-graded D-18 22 67 SPT at 23.00 meters
coarse to medium SAND with silt. 32
35

24 20.346

--Ditto-- D-19 20 72 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-005

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, poorly-graded 34


coarse to medium SAND with silt. 38
25 19.346
(continued)

26 18.346
Very dense, dark brown, poorly-graded D-20 23 73 SPT at 26.00 meters
coarse to medium SAND with silt. 36
37

27 17.346
Very dense, dark brown, poorly-graded D-21 21 77 SPT at 27.00 meters
coarse to medium SAND with silt and traces 37
of sub-angular medium to fine gravels of 40
igneous origin.
----End of borehole at 27.00 meters----
28 16.346

29 15.346

30 14.346
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 13.346

32 12.346

33 11.346

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-006

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3053881.830


NEOM Desalination Plant to Gayal Transmission System 32.439 E: 752453.982
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Dec-21 25-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


gravels and cobbles. 0.00~1.20meters

1 31.439

Medium dense, brown, poorly-graded D-1 17 28 SPT at 1.20 meters


medium to fine SAND with silt and 14
sub-angular to rounded fine to medium 14
gravels of igneous origin.
2 30.439
Medium, greyish brown, well-graded D-2 9 26 SPT at 2.00 meters
sub-angular to subrounded medium to fine 11
GRAVEL of igneous origin with silt and sand. 15

3 29.439
Medium dense, greyish brown, silty medium D-3 7 28 SPT at 3.00 meters
to fine SAND. 12
16

4 28.439
--Ditto-- D-4 11 27 SPT at 4.00 meters
15
12
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 27.439
Medium dense, greyish brown, silty coarse D-5 12 26 SPT at 5.00 meters
SAND with sub-rounded fine gravels of 14
igneous origin. 12

6 26.439

Dense, greyish brown, well-graded coarse to D-6 13 35 SPT at 6.50 meters


medium SAND with silt and sub-angular fine 16
to medium gravels of igneous origin. 19
7 25.439

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-006

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 24.439
Medium dense, greyish brown, silty medium D-7 14 30 SPT at 8.00 meters
to fine SAND. 13
17

9 23.439

Changing to dense. D-8 14 38 SPT at 9.50 meters


17
21
10 22.439

11 21.439
Dense, greyish brown, silty medium to fine D-9 10 35 SPT at 11.00 meters
SAND with traces of sub-rounded medium to 15
fine gravels of igneous origin. 20

12 20.439

Dense, greyish brown, silty fine SAND. D-10 16 47 SPT at 12.50 meters
21
26
13 19.439
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 18.439
--Ditto-- D-11 18 50 SPT at 14.00 meters
23
27

15 17.439
Changing to very dense. D-12 20 59 SPT at 15.00 meters
26
----End of borehole at 15.00 meters----
33

16 16.439

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-007

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3054299.208


NEOM Desalination Plant to Gayal Transmission System 12.156 E: 752180.041
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Dec-21 25-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-12-21 8:30 12.10 4.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


angular gravels of various lithologies. 0.00~1.20meters

1 11.156

Medium dense, brown, silty fine SAND. D-1 7 24 SPT at 1.20 meters
10
14

2 10.156
--Ditto-- D-2 8 28 SPT at 2.00 meters
12
16

3 9.156
Dense, dark brown, silty fine SAND. D-3 12 32 SPT at 3.00 meters
15
17

4 8.156
--Ditto-- D-4 14 36 SPT at 4.00 meters
16
20
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 7.156
Dense, dark brown, silty fine SAND with D-5 13 43 SPT at 5.00 meters
angular medium gravels of SANDSTONE. 19
(Decomposed SANDSTONE) 24

6 6.156

Recovered as dense, brown, silty SAND. D-6 16 47 SPT at 6.50 meters


20
27
7 5.156

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-007

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Recovered as dense, brown, silty SAND.


(continued)
8 4.156
Very dense, light brownish grey, silty fine D-7 31 100 SPT at 8.00 meters
SAND with angular gravels of sandstone 43
(Decomposed SANDSTONE). 50/12
8.50m~9.20m R-1 97 13 20 37.5 Coring from
--Ditto-- 8.50~9.50 meters
9.20m~12.50m
9 3.156
Weak, brown, clastic thinly bedded, friable
SANDSTONE. Moderately weathered, close
spaced bedding fractured.
R-2 100 37 57 21.0 Coring from
9.50~11.00 meters

10 2.156

11 1.156
Changing to medium strong. R-3 100 33 43 22.2 Coring from
11.00~12.50 meters

12 0.156

Very weak, light grey and brown, clastic R-4 40 0 7 NI Coring from
fraible SANDSTONE. Highly weathered to 12.50~14.00 meters
decomposed.
13 -0.844
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -1.844
Changing to medium dense. D-8 9 25 SPT at 14.00 meters
12
13
Medium dense, brown, clayey fine to R-5 50 Coring from
medium SAND. 14.50~15.50 meters

15 -2.844

--Ditto-- D-9 11 30 SPT at 15.50 meters


14
16
16 -3.844

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-007

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, clayey fine to


medium SAND. (continued)

17 -4.844
Dense, light greenish gey, silty medium D-10 16 49 SPT at 17.00 meters
SAND. 22
27
----End of borehole at 17.00 meters----

18 -5.844

19 -6.844

20 -7.844

21 -8.844
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -9.844

23 -10.844

24 -11.844

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-008

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3054678.577


NEOM Desalination Plant to Gayal Transmission System 25.735 E: 751855.853
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Dec-21 25-Dec-21
DRILLING EQUIPMENT: Acker Soil Max (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-12-2021 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Faisal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, light brown, silty fine SAND D-1 10 26 SPT at 0.00 meters
with traces of subangular fine gravels of 13
igneous origin. 13

1 24.735
Very desne, brown, silty SAND. D-2 18 59 SPT at 1.00 meters
27
32

2 23.735
Very desne, light brown, poorly-graded D-3 21 62 SPT at 2.00 meters
coarse SAND with silt and traces of 26
subrounded medium to fine gravels of 36
igneous origin.

3 22.735
Very dense, light brown, clayey coarse to D-4 24 67 SPT at 3.00 meters
medium SAND. 27
40

4 21.735
Very dense, light brown, clayey medium to D-5 20 71 SPT at 4.00 meters
fine SAND with subrounded coarse to 31
medium gravels of sedimentary origin. 40
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 20.735
Very dense, light brown, clayey silty medium D-6 22 59 SPT at 5.00 meters
to fine SAND. 23
36

6 19.735

Very dense, brown, clayey SAND. D-7 23 89 SPT at 6.50 meters


42
47
7 18.735

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-008

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, clayey SAND.


(continued)
8 17.735
Very dense, light brown, well-graded D-8 24 100 SPT at 8.00 meters
subrounded coarse to medium GRAVELS of 50/10
sedimentary origin with silt and sand. R-1 100 30 40 23.5 Coring from
8.25~9.00 meters
Very weak, brown, thinly laminated
MUDSTONE, moderately weathered,
9 16.735
bedding fractures are tight sub-horizontal to
horizontal. R-2 30 Coring from
9.00~10.50 meters
Very dense, brown, weakly cemented clayey
SAND (Residual Soil).

10 15.735

--Ditto-- D-9 24 100 SPT at 10.50 meters


36
50/13
11 14.735
11.00m~11.40m R-3 100 33 35 22.2 Coring from
Weak, brown, thinly laminated, MUDSTONE, 11.00~12.00 meters
moderately weathered bedding fractures are
induced, tight, sub-horizontal to horizontal.
11.40m~12.00m
Decomposed MUDSTONE.
12 13.735
Very dense, brown, subangualr to D-10 21 61 SPT at 12.00 meters
subrounded coarse GRAVEL of 24
MUDSTONE with silt and sand. 37

13 12.735
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Very dense, light brown, weakly cemented D-11 23 100 SPT at 13.50 meters
clayey silty fine SAND. 40
50/10
14 11.735
Very weak, light brown, fine grained R-4 80 0 4 NI Coring from
SILTSTONE, moderately to highly 14.00~15.00 meters
weathered, highly fractured (residual
SILTSTONE).

15 10.735
Very dense, light brown, clayey SAND D-12 22 78 SPT at 15.00 meters
(Decomposed SILTSTONE). 36
42

16 9.735

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-008

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, light brown, clayey SAND


(Decomposed SILTSTONE). (continued)
Very desne, brown, poorly-graded fine D-13 21 68 SPT at 16.50 meters
SAND with silt and subrounded fine to 31
medium gravels of SILTSTONE. 37
17 8.735

18 7.735
Very dense, light brown, poorly-graded D-14 23 68 SPT at 18.00 meters
coarse to fine SAND with silt and subangular 28
fine gravels of sedimentary origin. 40

19 6.735
--Ditto-- D-15 23 72 SPT at 19.00 meters
32
----End of borehole at 15.00 meters----
40

20 5.735

21 4.735
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 3.735

23 2.735

24 1.735

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-009

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3055006.985


NEOM Desalination Plant to Gayal Transmission System 20.926 E: 751480.304
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Dec-21 23-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 26-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


subangular gravels of igneous origin. 0.00~1.20m

1 19.926

Very desne, greyish brown, silty fine SAND D-1 12 100 SPT at 1.20 meters
with angular gravels of igneous origin. 50/8
Medium strong, brownsih grey, clastic R-1 60 16 30 35.5 Coring from
1.50~2.50 meters
SANDSTONE. Moderately weathered close
2 18.926 spaced bedding fractures.

2.50m~3.50m R-2 98 0 0 NI Coring from


Extremely weak, brown, thinly bedded clastic 2.50~3.00 meters
friable, SANDSTONE. Highly weathered to
3 17.926
decomposed. R-3 100 36 40 21.2 Coring from
3.00~4.50 meters

3.50m~4.50m
very weak, greyish brown, medium bedded
clastic arenaccous SANDSTONE.
4 16.926
Moderately weathered, bedding fractures
are horizontal to sub-horizontal.

Very weak, greensih grey and brown, clastic R-4 100 0 27 NI Coring from
friable SANDSTONE. Highly weathered 4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

close spaced bedding fractures.


5 15.926

6 14.926
Changing to very dense. D-2 14 100 SPT at 6.00 meters
12
50/9
Very weak, greensih grey and brown, clastic R-5 100 13 43 37.5 Coring from
friable SANDSTONE. Highly weathered 6.50~7.50 meters
close spaced bedding fractures.
7 13.926

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-009

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very weak, greensih grey and brown, clastic R-6 75 0 0 NI Coring from
friable SANDSTONE. Highly weathered 7.50~9.00 meters
close spaced bedding fractures. (continued)
8 12.926
7.50m~8.00m
--Ditto--
8.00m~9.00m
Extremly weak, light greenish grey,
SANDSTONE. Highly weathered to
decomposed.
9 11.926
--Ditto-- R-7 80 0 0 NI Coring from
9.00~9.50 meters

Very dense, ligth greenish grey, silty fine to D-3 24 61 SPT at 9.50 meters
medium SAND (Decomposed 30
SANDSTONE). 31
10 10.926

Very dense, greenish grey, silty SAND with D-4 16 56 SPT at 10.50 meters
gravel of sandstone. 25
31
11 9.926

12 8.926
Dense, light greensih grey, silty fine gravels D-5 14 48 SPT at 12.00 meters
of SANDSTONE (Decomosed sandstone). 19
29

13 7.926
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Very dense, greenish grey, silty SAND with D-6 17 54 SPT at 13.50 meters
gravel of sandstone. 24
30
14 6.926

15 5.926
--Ditto-- D-7 16 73 SPT at 15.00 meters
26
----End of borehole at 15.00 meters----
53

16 4.926

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-010

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3057801.976


NEOM Desalination Plant to Gayal Transmission System 27.500 E: 750491.981
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Dec-21 22-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-Dec-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Yellowish brown, poorly-graded medium B-1 Inspection Pit


SAND with silt and subangular to 0.00~1.20meters
subrounded gravels and cobbles on surface.

1 26.500

Medium dense, yellowish brown, silty D-1 8 20 SPT at 1.20 meters


medium to fine SAND with subangular 9
medium gravels of igneous origin. 11

2 25.500
Medium dense, yellowish brown, silty D-2 8 28 SPT at 2.00 meters
medium to fine SAND. 11
17

3 24.500
--Ditto-- D-3 10 29 SPT at 3.00 meters
13
19

4 23.500
Dense, brown, poorly-graded coarse to fine D-4 14 40 SPT at 4.00 meters
SAND with silt and traces of subrounded fine 18
gravels of igneous origin. 22
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 22.500
Dense, brown, silty medium to fine SAND. D-5 13 37 SPT at 5.00 meters
17
20

6 21.500

Dense, greyish brown, well-graded SAND D-6 18 48 SPT at 6.50 meters


with silt. 22
26
7 20.500

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-010

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, greyish brown, well-graded SAND


with silt. (continued)
8 19.500
Very dense, brown, silty medium to fine D-7 23 65 SPT at 8.00 meters
SAND with traces of subangular medium 29
gravels of igneous origin. 36

9 18.500

Very dense, brown, poorly-graded SAND D-8 24 53 SPT at 9.50 meters


with silt and sub-rounded fine gravels of 45
igneous origin. 48
10 17.500

11 16.500
Very dense, brown, silty medium to fine D-9 24 100 SPT at 11.00 meters
SAND and subrounded fine gravels of 45
sediments origin (Decomposed 50/9
R-1 100 0 10 NI Coring from
SANDSTONE). 11.39~12.00 meters
Medium strong, thinly laminated brownish
12 15.500
grey, medium to fine grain SANDSTONE,
moderately weathered fractures are incipient R-2 100 32 45 22.7 Coring from
horizontal to subhorizontal highly fractured. 12.00~13.00 meters

Medium strong, brownish grey, thinly


laminated, medium to fine grained
SANDSTONE, moderately weathered,
fractures are incipient subhorizontal to
13 14.500
horizontal, open, clean, very close to R-3 93 12 20 38.0 Coring from
medium spaced. 13.00~14.50 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto--

14 13.500

Medium strong, grey to brownish grey, thinly R-4 100 41 56 19.8 Coring from
laminated medium to fine grained 14.50~16.00 meters
SANDSTONE, inter bedded by
15 12.500
conglomerate, moderately to highly
weathered, fractures are incipient
subhorizontal close to medium spaced open
clean.

16 11.500

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-010

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

----End of borehole at 16.00 meters----

17 10.500

18 9.500

19 8.500

20 7.500

21 6.500
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 5.500

23 4.500

24 3.500

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-011

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3058253.596


NEOM Desalination Plant to Gayal Transmission System 10.235 E: 750278.258
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Dec-21 22-Dec-21
DRILLING EQUIPMENT: Acker Soil Max (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-12-21 08:30 10.00 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Fiasal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty fine to medium SAND with B-1 Inspection Pit


medium gravels. 0.00~1.20meters

1 9.235

Medium dense, brown, poorly-graded D-1 7 17 SPT at 1.20 meters


medium SAND wiith silt. 7
10

2 8.235
Medium dense, brown, poorly-graded SAND D-2 10 21 SPT at 2.00 meters
with silt and sub-rounded fine angular of 9
igneous origin. 12

3 7.235
Changing to very dense. D-3 19 59 SPT at 3.00 meters
27
32

4 6.235
Very dense, brown, silty fine SAND with D-4 22 51 SPT at 4.00 meters
traces of subangular fine gravels of igneous 24
origin. 27
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 5.235
Very dense, brown, well-graded SAND with D-5 21 56 SPT at 5.00 meters
silt. 29
27

6 4.235

Very dense, brown, silty medium to fine D-6 18 62 SPT at 6.50 meters
SAND with traces of sub-angular medium 28
gravels of igneous origin. 34
7 3.235

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-011

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 2.235
Very dense, brown, silty fine SAND with D-7 24 61 SPT at 8.00 meters
sub-angular to sub-rounded medium to fine 27
gravels of igneous origin. 34

9 1.235

Very dense, brown, well-graded SAND with D-8 23 60 SPT at 9.50 meters
silt. 28
32
10 0.235

11 -0.765
--Ditto-- D-9 23 70 SPT at 11.00 meters
30
40

12 -1.765

--Ditto-- D-10 19 58 SPT at 12.50 meters


26
32
13 -2.765
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -3.765
Very dense, brown, silty fine SAND with D-11 21 63 SPT at 14.00 meters
sub-rounded fine gravels of igneous origin. 29
34

15 -4.765
--Ditto-- D-12 22 51 SPT at 15.00 meters
23
28

16 -5.765

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-011

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very desne, silty medium to fine SAND with D-13 21 70 SPT at 16.00 meters
traces of sub-angular fine gravels of igneous 30
origin. 40
----End of borehole at 16.00 meters----

17 -6.765

18 -7.765

19 -8.765

20 -9.765

21 -10.765
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -11.765

23 -12.765

24 -13.765

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-012

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3060393.381


NEOM Desalination Plant to Gayal Transmission System 50.613 E: 749029.072
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Dec-21 25-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-12-2021 08:00 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium SAND with gravels of B-1 Inspection Pit


igneous origin. 0.00~1.20meters

1 49.613

Dense, brown, silty fine to medium SAND D-1 12 35 SPT at 1.20 meters
with angular fine to medium gravels of 15
igneous origin. 20

2 48.613
Dense, brown, poorly-graded GRAVEL with D-2 13 38 SPT at 2.00 meters
silt and sand. 17
21

3 47.613
Dense, brown, poorly-graded medium to fine D-3 9 37 SPT at 3.00 meters
SAND with silt and sub-angular fine to 14
medium gravels of igneous origin. 23

4 46.613
--Ditto-- D-4 13 46 SPT at 4.00 meters
18
28
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 45.613
Very dense, brown, silty fine to medium D-5 23 89 SPT at 5.00 meters
SAND with sub-angular coarse gravels of 40
igneous origin. 49

6 44.613

Very dense, brown, silty coarse SAND with D-6 18 76 SPT at 6.50 meters
sub-angular medium to coarse gravels of 33
igneous origin. 43
7 43.613

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-012

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 42.613
Dense, brown, poorly-graded SAND with silt. D-7 9 37 SPT at 8.00 meters
15
22

9 41.613

Dense, greyish brown, poorly-graded fine to D-8 18 48 SPT at 9.50 meters


medium SAND with silt and sub-angular to 21
sub-rounded medium to coarse gravels of 27
10 40.613
igneous origin.

11 39.613
Very dense, brown, silty fine to medium D-9 20 67 SPT at 11.00 meters
SAND with sub-angular coarse to medium 29
gravels of igneous origin. 38

12 38.613

--Ditto-- D-10 18 73 SPT at 12.50 meters


33
40
13 37.613
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 36.613
Very dense, poorly-graded medium to fine D-11 21 82 SPT at 14.00 meters
SAND with silt and sub-angular medium to 37
coarse gravels of igneous origin. 45

15 35.613

--Ditto-- D-12 18 79 SPT at 15.50 meters


34
45
16 34.613

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-012

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, poorly-graded medium to fine


SAND with silt and sub-angular medium to
coarse gravels of igneous origin. (continued)

17 33.613
Very dense, brown, fine SAND with silt and D-13 22 79 SPT at 17.00 meters
sub-angular to sub-rounded medium to 35
coarse gravels of igneous origin. 44

18 32.613

Very dense, brown, silty fine SAND with D-14 17 73 SPT at 18.50 meters
sub-angular fine to medium gravels of 33
igneous origin. 40
19 31.613

20 30.613
Very dense, brown, silty fine SAND with D-15 23 82 SPT at 20.00 meters
sub-angular to sub-rounded medium to fine 36
gravels of igneous origin. 46

21 29.613

--Ditto-- D-16 21 75 SPT at 21.50 meters


28
47
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 28.613

23 27.613
--Ditto-- D-17 20 76 SPT at 23.00 meters
31
45

24 26.613

D-18 19 84 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-012

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, reddish brown, poorly-graded 37


medium to fine SAND with silt and 47
25 25.613
sub-rounded medium to fine gravels of
sedimentary origin. (continued)

26 24.613
--Ditto-- D-19 24 100 SPT at 26.00 meters
40
----End of borehole at 26.00 meters----
50/6

27 23.613

28 22.613

29 21.613

30 20.613
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 19.613

32 18.613

33 17.613

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-013

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3060697.709


NEOM Desalination Plant to Gayal Transmission System 19.000 E: 748632.597
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Dec-21 23-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 26-12-2021 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, poorly-graded coarse to fine B-1 Inspection Pit


SAND with silt and sub-angular fine to 0.00~1.20meters
medium gravel of igneous origin.

1 18.000

Dense, light brown, silty medium to fine D-1 12 34 SPT at 1.20 meters
SAND with sub-angular fine to medium 15
gravels of igneous origin. 19

2 17.000
Dense, brown, poorly-graded SAND with D-2 15 37 SPT at 2.00 meters
sub-angular coarse to medium gravels of 17
igneous origin. 20

3 16.000
--Ditto-- D-3 13 39 SPT at 3.00 meters
17
22

4 15.000
--Ditto-- D-4 16 43 SPT at 4.00 meters
19
24
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 14.000
Dense, brown, poorly-graded medium to fine D-5 14 45 SPT at 5.00 meters
SAND with silt and angular medium to fine 19
gravels of igneous origin. 26

6 13.000

Dense, brown, poorly-graded GRAVEL of D-6 17 46 SPT at 6.50 meters


igneous origin with sand. 21
25
7 12.000

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-013

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, poorly-graded GRAVEL of


igneous origin with sand. (continued)
8 11.000
Very dense, brown, silty medium to fine D-7 15 51 SPT at 8.00 meters
SAND with sub-angular to sub-rounded 23
medium to fine gravels of igneous origin. 28

9 10.000

--Ditto-- D-8 19 54 SPT at 9.50 meters


25
29
10 9.000

11 8.000
--Ditto-- D-9 23 58 SPT at 11.00 meters
27
31

12 7.000

Very dense, brown, poorly-graded medium D-10 21 63 SPT at 12.50 meters


to fine SAND with silt and sub-rounded 29
medium to fine gravels of igneous origin. 34
13 6.000
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 5.000
--Ditto-- D-11 23 67 SPT at 14.00 meters
33
34

15 4.000
--Ditto-- D-12 21 79 SPT at 15.00 meters
37
----End of borehole at 15.00 meters----
42

16 3.000

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-014

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3061012.098


NEOM Desalination Plant to Gayal Transmission System 49.718 E: 748244.060
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Dec-21 27-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, medium to fine SAND with silt B-1 Inspection Pit
and gravel, cobble, boulder. 0.00~1.20meters

1 48.718

Dense, reddish brown, silty SAND with D-1 13 38 SPT at 1.20 meters
sub-angular fine to medium gravels of 17
igneous origin. 21

2 47.718
--Ditto-- D-2 8 33 SPT at 2.00 meters
14
19

3 46.718
Dense, reddish brown, medium to fine SAND D-3 13 42 SPT at 3.00 meters
with silt and sab-angular medium to fine 18
gravels of igneous origin. 23

4 45.718
--Ditto-- D-4 10 42 SPT at 4.00 meters
16
26
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 44.718
Changing to very dense. D-5 21 57 SPT at 5.00 meters
26
31

6 43.718

Very dense, reddish brown, weakly D-6 19 60 SPT at 6.50 meters


cemented, clayey medium to fine SAND with 27
sub-angular to sub-rounded medium to fine 33
7 42.718
gravels of igneous and sedimentary origin.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-014

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, reddish brown, weakly


cemented, clayey medium to fine SAND with
sub-angular to sub-rounded medium to fine
8 41.718
gravels of igneous and sedimentary origin. D-7 23 67 SPT at 8.00 meters
(continued) 31
--Ditto-- 36

9 40.718

Very dense, brown, fine SAND with silt and D-8 23 100 SPT at 9.50 meters
sub-angular to sub-rounded medium to fine 40
gravels of sedimentary origin. (Decomposed 50/10
10 39.718 R-1 80 Coring from
Sandstone) 9.90~11.00 meters
--Ditto--

11 38.718
Recovered as hard sandy SILT. R-2 100 Coring from
11.00~12.00 meters

12 37.718
Very dense, brown, weakly cemented, silty D-9 23 100 SPT at 12.00 meters
fine to medium SAND with gravel (Residual R-3 50/5 90 Coring from
soil). 12.20~13.50 meters
--Ditto--

13 36.718
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- D-10 22 100 SPT at 13.50 meters


50/7
Recovered as hard gravelly Lean LCAY with R-4 86 Coring from
sand. 13.72~15.00 meters
14 35.718

15 34.718
--Ditto-- D-11 21 100 SPT at 15.00 meters
50/12
--Ditto-- R-5 85 Coring from
15.27~16.50 meters

16 33.718

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-014

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, weakly cemented silty D-12 23 100 SPT at 16.50 meters
medium to fine SAND with gravel 50/13
(Decomposed Sandstone). R-6 89 Coring from
17 32.718
--Ditto--
16.78~18.00 meters

18 31.718
--Ditto-- D-13 23 100 SPT at 18.00 meters
50/12
Recovered as silty SAND. R-7 86 Coring from
18.27~19.50 meters

19 30.718

--Ditto-- D-14 21 100 SPT at 19.50 meters


50/10
--Ditto-- R-8 92 Coring from
20 29.718 19.75~21.00 meters

21 28.718
--Ditto-- D-15 23 100 SPT at 21.00 meters
45
50/14
--Ditto-- R-9 80 Coring from
21.44~23.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 27.718

23 26.718
--Ditto-- D-16 23 100 SPT at 23.00 meters
45
----End of borehole at 23.00 meters----
50/3

24 25.718

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-015

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3062568.352


NEOM Desalination Plant to Gayal Transmission System 23.765 E: 746351.000
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Dec-21 22-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-12-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded medium SAND with B-1 Inspection Pit


silt and trace medium gravels of igneous 0.00~1.20meters
origin.

1 22.765

Dense, brownish grey, poorly-graded fine to D-1 26 43 SPT at 1.20 meters


medium SAND with silt. 23
20

2 21.765
Dense, greyish brown, silty medium to fine D-2 17 46 SPT at 2.00 meters
SAND with angular fine to medium gravels of 25
igneous origin. 21

3 20.765
Dense, reddish brown, clayey SAND. D-3 13 38 SPT at 3.00 meters
17
21

4 19.765
--Ditto-- D-4 14 38 SPT at 4.00 meters
18
20
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 18.765
Very dense, brown, silty SAND. D-5 15 61 SPT at 5.00 meters
26
35

6 17.765

--Ditto-- D-6 18 64 SPT at 6.50 meters


27
37
7 16.765

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-015

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty SAND. (continued)

8 15.765
Very dense, greyish brown, silty medium to D-7 13 66 SPT at 8.00 meters
fine SAND with trace sub-angular fine 27
gravels of igneous origin. 39

9 14.765

Hard, light brown to greyish brown, Lean D-8 16 59 SPT at 9.50 meters
CLAY with fine sand. 19
40
10 13.765
Brown, Lean CLAY with sand. U-1 UDS from 9.95~10.20
meters

11 12.765
Very dense, brown, silty fine to medium D-9 17 64 SPT at 11.00 meters
SAND with trace sub-angular fine gravels of 26
igneous origin. 38

12 11.765

--Ditto-- D-10 19 63 SPT at 12.50 meters


25
38
13 10.765
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 9.765
--Ditto-- D-11 21 71 SPT at 14.00 meters
30
41

15 8.765
--Ditto-- D-12 20 81 SPT at 15.00 meters
39
----End of borehole at 15.00 meters----
42

16 7.765

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-016

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3062960.317


NEOM Desalination Plant to Gayal Transmission System 18.565 E: 746040.547
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Dec-21 22-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javeed
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with B-1 Inspection Pit


sub-rounded gravels. 0.00~1.20meters

1 17.565

Loose, brown, silty medium to fine SAND D-1 4 10 SPT at 1.20 meters
with traces of sub-angular coarse to fine 4
gravels of igneous origin. 6

2 16.565
Medium dense, brown, silty medium to fine D-2 5 20 SPT at 2.00 meters
SAND with coarse gravels of igneous origin. 9
11

3 15.565
Medium dense, brown, silty fine SAND. D-3 7 15 SPT at 3.00 meters
7
8

4 14.565
--Ditto-- D-4 8 20 SPT at 4.00 meters
9
11
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 13.565
Medium dense, brown, poorly-graded D-5 7 23 SPT at 5.00 meters
medium to fine SAND with silt and 10
sub-angular to sub-rounded coarse to fine 13
gravels of igneous origin.

6 12.565

Medium dense, brown, silty SAND with D-6 9 26 SPT at 6.50 meters
gravel of igneous origin. 12
14
7 11.565

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-016

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, silty SAND with


gravel of igneous origin. (continued)
8 10.565
Dense, brown, silty medium SAND with D-7 13 33 SPT at 8.00 meters
sub-angular medium gravels of igneous 16
origin. 17

9 9.565

Dense, brown, silty medium to fine SAND D-8 12 33 SPT at 9.50 meters
with sub-angular coarse to fine gravels of 15
igneous origin. 18
10 8.565

11 7.565
Dense, brown, poorly-graded SAND with silt D-9 14 34 SPT at 11.00 meters
and gravel of igneous origin. 15
19

12 6.565

--Ditto-- D-10 15 42 SPT at 12.50 meters


18
24
13 5.565
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 4.565
Very dense, brown, silty fine SAND with D-11 19 57 SPT at 14.00 meters
traces of sub-angular to sub-rounded fine 23
gravels of igneous origin. 34

15 3.565
--Ditto-- D-12 17 66 SPT at 15.00 meters
28
----End of borehole at 15.00 meters----
38

16 2.565

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-017

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3063352.235


NEOM Desalination Plant to Gayal Transmission System 22.132 E: 745730.159
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Dec-21 22-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-12-21 8:00 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, silty fine to medium SAND with B-1 Inspection Pit
sub-angular to sub-rounded gravels. 0.00~1.20meters

1 21.132

Medium dense, greyish brown, silty fine D-1 4 13 SPT at 1.20 meters
SAND with sub-angular to sub-rounded 6
medium to fine gravels of igneous origin. 7

2 20.132
Medium dense, greyish brown, D-2 6 14 SPT at 2.00 meters
poorly-graded SAND. 6
8

3 19.132
Medium dense, greyish brown, silty medium D-3 8 18 SPT at 3.00 meters
to fine SAND with traces of sub-angular 7
coarse gravels of igneous origin. 11

4 18.132
Medium dense, greyish brown, silty medium D-4 8 18 SPT at 4.00 meters
to fine SAND with medium to fine gravels of 8
igneous origin. 10
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 17.132
--Ditto-- D-5 9 24 SPT at 5.00 meters
11
13

6 16.132

Medium dense, brown, poorly-graded SAND D-6 8 23 SPT at 6.50 meters


with silt and sub-angular coarse to medium 10
gravels of igneous origin. 13
7 15.132

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-017

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, poorly-graded SAND


with silt and sub-angular coarse to medium
gravels of igneous origin. (continued)
8 14.132
--Ditto-- D-7 9 28 SPT at 8.00 meters
13
15

9 13.132

Changing to dense. D-8 10 32 SPT at 9.50 meters


14
18
10 12.132

11 11.132
Dense, brown, silty fine SAND with D-9 13 40 SPT at 11.00 meters
sub-angular to sub-rounded fine gravels of 18
igneous origin. 22

12 10.132

Changing to very dense. D-10 16 57 SPT at 12.50 meters


23
34
13 9.132
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 8.132
--Ditto-- D-11 19 63 SPT at 14.00 meters
25
38

15 7.132
Very dense, brown, silty fine SAND with D-12 18 68 SPT at 15.00 meters
traces of sub-angular fine gravels of igneous 26
origin. 42
----End of borehole at 15.00 meters----

16 6.132

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-018

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3063744.267


NEOM Desalination Plant to Gayal Transmission System 26.844 E: 745419.761
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 26-Dec-21 26-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 29-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded coarse to medium B-1 Inspection Pit


SAND with silt and gravels. 0.00~1.20meters

1 25.844

Loose, brown, silty SAND with sub-angular D-1 4 10 SPT at 1.20 meters
medium to fine gravels of igneous origin. 4
6

2 24.844
Changing to medium dense. D-2 5 14 SPT at 2.00 meters
6
8

3 23.844
--Ditto-- D-3 6 17 SPT at 3.00 meters
8
9

4 22.844
Medium dense, brown, poorly-graded fine to D-4 5 21 SPT at 4.00 meters
medium SAND with silt and sub-rounded to 9
sub-angular medium to fine gravels of 12
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 21.844
--Ditto-- D-5 8 24 SPT at 5.00 meters
10
14

6 20.844

Dense, brown, poorly-graded coarse to fine D-6 14 38 SPT at 6.50 meters


SAND with silt and sub-angular to 17
sub-rounded medium to fine gravels of 21
7 19.844
igneous origin.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-018

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 18.844
Dense, brown, well-graded GRAVEL with silt D-7 15 44 SPT at 8.00 meters
and sand. 19
25

9 17.844

Very dense, brown, poorly-graded coarse to D-8 17 51 SPT at 9.50 meters


medium SAND with silt and sub-angular to 22
sub-rounded coarse to fine gravels of 29
10 16.844
igneous origin.

11 15.844
Very dense, brown, fine to medium SAND D-9 18 64 SPT at 11.00 meters
with silt and traces of sub-angular medium to 25
fine gravels of igneous origin. 39

12 14.844

--Ditto-- D-10 22 71 SPT at 12.50 meters


30
41
13 13.844
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 12.844
Very dense, brown, clayey SAND with D-11 21 77 SPT at 14.00 meters
sub-angular medium to fine gravels of 33
igneous origin. 44

15 11.844

--Ditto-- D-12 22 82 SPT at 15.50 meters


36
46
16 10.844

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-018

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, clayey SAND with


sub-angular medium to fine gravels of
igneous origin. (continued)

17 9.844
Very dense, brown, poorly-graded coarse to D-13 23 83 SPT at 17.00 meters
fine SAND with silt and sub-angular fine 38
gravels of igneous origin. 45

18 8.844
--Ditto-- D-14 23 88 SPT at 18.00 meters
40
----End of borehole at 18.00 meters----
48

19 7.844

20 6.844

21 5.844
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 4.844

23 3.844

24 2.844

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-019

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3067450.874


NEOM Desalination Plant to Gayal Transmission System 13.311 E: 744282.923
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Dec-21 21-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-12-21 8:30 13.00 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, silty medium to coarse SAND B-1 Inspection Pit


with gravels and cobble. 0.00~1.20meters

1 12.311

Medium dense, light brown, poorly-graded D-1 11 30 SPT at 1.20 meters


coarse to fine SAND with sub-angular to 13
sub-rounded medium to fine gravels of 17
igneous origin.
2 11.311
Medium dense, greyish brown, D-2 9 30 SPT at 2.00 meters
poorly-graded fine to coarse SAND with silt 15
and sub-angular to sub-rounded fine to 15
medium gravels of igneous origin.

3 10.311
Dense, brown, silty fine to medium SAND D-3 15 38 SPT at 3.00 meters
with sub-angular fine gravels of igneous 17
origin. 21

4 9.311
--Ditto-- D-4 16 43 SPT at 4.00 meters
19
24
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 8.311
Dense, brown, poorly-graded SAND with D-5 13 40 SPT at 5.00 meters
gravel of igneous origin. 18
22

6 7.311

Dense, brown, silty fine to medium SAND D-6 17 45 SPT at 6.50 meters
with sub-angular to sub-rounded medium to 20
fine gravels of igneous origin. 25
7 6.311

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-019

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, silty fine to medium SAND


with sub-angular to sub-rounded medium to
fine gravels of igneous origin. (continued)
8 5.311
--Ditto-- D-7 14 44 SPT at 8.00 meters
21
23

9 4.311

--Ditto-- D-8 17 49 SPT at 9.50 meters


22
27
10 3.311

11 2.311
Dense, brown, poorly-graded fine to medium D-9 14 50 SPT at 11.00 meters
SAND with sub-angular medium to fine 24
gravels of igneous origin. 26

12 1.311

Changing to very dense. D-10 18 55 SPT at 12.50 meters


26
29
13 0.311
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -0.689
Very dense, brown, poorly-graded fine to D-11 21 60 SPT at 14.00 meters
medium SAND with silt and traces of 28
sub-angular to sub-rounded fine gravels of 32
igneous origin.

15 -1.689

D-12 24 65 SPT at 15.50 meters


30
35
16 -2.689

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-019

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, poorly-graded


coarse to fine SAND with silt and
sub-angular medium to fine gravels of
igneous origin. (continued)

17 -3.689
Very dense, greyish brown, poorly-graded D-13 24 75 SPT at 17.00 meters
GRAVEL of igneous origin with sand. 33
42

18 -4.689
--Ditto-- D-14 22 81 SPT at 18.00 meters
37
----End of borehole at 18.00 meters----
44

19 -5.689

20 -6.689

21 -7.689
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -8.689

23 -9.689

24 -10.689

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-020

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3067899.182


NEOM Desalination Plant to Gayal Transmission System 8.057 E: 744065.820
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Dec-21 23-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 26-12-21 08:30 8.00 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark brown, silty coarse to medium SAND B-1 Inspection Pit


with gravels and cobble of igneous origin. 0.00~1.20meters

1 7.057

Medium dense, brown, silty medium to fine D-1 9 22 SPT at 1.20 meters
SAND with sub-angular to sub-rounded 10
medium to fine gravels of igneous origin. 12

2 6.057
Medium dense, brown, poorly-graded SAND D-2 12 29 SPT at 2.00 meters
with silt and gravel of igneous origin. 14
15

3 5.057
Dense, dark brown, silty fine SAND with D-3 14 36 SPT at 3.00 meters
traces of sub-rounded fine gravels of 17
igneous origin. 19

4 4.057
Dense, dark brown, poorly-graded medium D-4 15 33 SPT at 4.00 meters
to fine SAND with silt and sub-angular 15
medium to fine gravels of igneous origin. 18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 3.057
Dense, greyish brown, silty coarse to D-5 17 37 SPT at 5.00 meters
medium SAND with sub-rounded medium to 18
fine gravels of igneous origin. 19

6 2.057

Dense, grey, well-graded SAND with silt and D-6 16 41 SPT at 6.50 meters
gravel of igneous origin. 19
22
7 1.057

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-020

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, grey, well-graded SAND with silt and


gravel of igneous origin. (continued)
8 0.057
Dense, brown, poorly-graded medium to fine D-7 19 44 SPT at 8.00 meters
SAND with silt and sub-angular fine gravels 21
of igneous origin. 23

9 -0.943

--Ditto-- D-8 20 46 SPT at 9.50 meters


22
24
10 -1.943

11 -2.943
Dense, grey, poorly-graded SAND with silt. D-9 17 46 SPT at 11.00 meters
21
25

12 -3.943

--Ditto-- D-10 18 49 SPT at 12.50 meters


23
26
13 -4.943
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -5.943
Very dense, greyish brown, medium to fine D-11 21 51 SPT at 14.00 meters
SAND with silt. 24
27

15 -6.943
Very dense, brown, poorly-graded medium D-12 23 58 SPT at 15.00 meters
to fine SAND with sub-rounded medium to 27
fine gravels of igneous origin. 31
----End of borehole at 15.00 meters----

16 -7.943

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-021

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3068322.272


NEOM Desalination Plant to Gayal Transmission System 19.285 E: 743799.363
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Dec-21 21-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, coarse to medium SAND with silt and B-1 Inspection Pit
gravels of igneous origin. 0.00~1.20meters

1 18.285

Medium dense, dark brown, poorly-graded D-1 7 20 SPT at 1.20 meters


coarse to fine SAND with silt and 8
sub-angular medium to fine gravels of 12
igneous origin.
2 17.285
Medium dense, dark brown, silty SAND. D-2 10 25 SPT at 2.00 meters
12
13

3 16.285
--Ditto-- D-3 9 25 SPT at 3.00 meters
11
14

4 15.285
Medium dense, dark brown, coarse SAND D-4 9 30 SPT at 4.00 meters
with silt and sub-angular to rounded medium 15
to fine gravels of igneous origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 14.285
Dense, greyish brown, poorly-graded D-5 11 31 SPT at 5.00 meters
medium to coarse SAND with sub-angular 14
course to fine gravels of igneous origin. 17

6 13.285

Dense, greyish brown, well-graded D-6 8 34 SPT at 6.50 meters


sub-angular to sub-rounded medium to fine 13
GRAVEL of igneous origin with sand. 21
7 12.285

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-021

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 11.285
Dense, brown, silty coarse to medium SAND D-7 12 34 SPT at 8.00 meters
with sub-angular to sub-rounded medium to 15
fine gravels of igneous origin. 19

9 10.285

Dense, greyish brown, silty coarse SAND D-8 14 38 SPT at 9.50 meters
with sub-angular to sub-rounded medium to 16
fine gravels of igneous origin. 22
10 9.285

11 8.285
Dense, brown, well-graded SAND with silt D-9 10 33 SPT at 11.00 meters
and gravel of igneous origin. 14
19

12 7.285

Dense, dark brown, silty medium to coarse D-10 13 37 SPT at 12.50 meters
SAND with traces of sub-angular to 16
sub-rounded medium to fine gravels of 21
13 6.285
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 5.285
--Ditto-- D-11 17 45 SPT at 14.00 meters
20
25

15 4.285
Changing to very dense. D-12 19 51 SPT at 15.00 meters
23
----End of borehole at 15.00 meters----
28

16 3.285

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-022

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3068741.767


NEOM Desalination Plant to Gayal Transmission System 10.673 E: 743527.308
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Dec-21 21-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 08:30 10.00 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, well-graded SAND with silt. B-1 Inspection Pit


0.00~1.20meters

1 9.673

Medium dense, brown, poorly-graded D-1 10 21 SPT at 1.20 meters


medium to fine SAND with silt an 11
sub-angular medium to fine gravels of 10
igneous origin.
2 8.673
--Ditto-- D-2 11 22 SPT at 2.00 meters
9
13

3 7.673
Medium dense, brown, poorly-graded D-3 12 30 SPT at 3.00 meters
medium to fine SAND with silt. 15
15

4 6.673
--Ditto-- D-4 14 27 SPT at 4.00 meters
12
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 5.673
Dense, greyish brown, poorly-graded coarse D-5 13 35 SPT at 5.00 meters
to medium SAND with silt and traces of 16
sub-angular to sub-rounded medium to fine 19
gravels of igneous origin.

6 4.673

Medium dense brown, poorly-graded SAND. D-6 9 28 SPT at 6.50 meters


12
16
7 3.673

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-022

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown, poorly-graded SAND.


(continued)
8 2.673
Changing to dense. D-7 14 42 SPT at 8.00 meters
19
23

9 1.673

Dense, brown, silty medium to fine SAND D-8 16 45 SPT at 9.50 meters
with sub-angular medium to fine gravels of 20
igneous origin. 25
10 0.673

11 -0.327
Very dense, brown, poorly-graded SAND D-9 18 56 SPT at 11.00 meters
with gravel of igneous origin. 26
30

12 -1.327

--Ditto-- D-10 17 57 SPT at 12.50 meters


24
33
13 -2.327
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -3.327
Very dense, brown, silty medium to fine D-11 21 59 SPT at 14.00 meters
SAND with traces of sub-angular medium to 22
fine gravels of igneous origin. 37

15 -4.327
--Ditto-- D-12 20 70 SPT at 15.00 meters
29
----End of borehole at 15.00 meters----
41

16 -5.327

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-023

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3069160.359


NEOM Desalination Plant to Gayal Transmission System 18.769 E: 743253.777
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Dec-21 20-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:30 N.E 3.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, silty gravelly fine to coarse B-1 Inspection Pit


SAND. Gravels are sub-rounded medium of 0.00~1.20meters
igneous origin.

1 17.769

Medium dense, greyish brown, clayey SAND D-1 7 20 SPT at 1.20 meters
with gravel of igneous origin. 9
11

2 16.769
--Ditto- D-2 7 16 SPT at 2.00 meters
7
9

3 15.769
--Ditto- D-3 10 26 SPT at 3.00 meters
12
14

4 14.769
--Ditto- D-4 8 24 SPT at 4.00 meters
11
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 13.769
Medium dense, greyish brown, medium to D-5 9 27 SPT at 5.00 meters
coarse SAND with silt and traces of 12
sub-angular fine gravels of igneous origin. 15

6 12.769

Medium dense, brown, silty SAND. D-6 11 29 SPT at 6.50 meters


13
16
7 11.769

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-023

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, silty SAND.


(continued)
8 10.769
Changing to dense. D-7 13 35 SPT at 8.00 meters
16
19

9 9.769

--Ditto- D-8 15 41 SPT at 9.50 meters


18
23
10 8.769

11 7.769
Dense, greyish brown, gravelly medium D-9 17 44 SPT at 11.00 meters
SAND with silt. Gravels are rounded, 20
medium of igneous origin. 24

12 6.769

Dense, greyish brown, poorly-graded SAND D-10 15 42 SPT at 12.50 meters


with silt. 19
23
13 5.769
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 4.769
--Ditto- D-11 18 48 SPT at 14.00 meters
22
26

15 3.769
Changing to very dense. D-12 20 56 SPT at 15.00 meters
25
----End of borehole at 15.00 meters----
31

16 2.769

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-024

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3069618.501


NEOM Desalination Plant to Gayal Transmission System 12.259 E: 743057.699
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Dec-21 20-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:00 12.00 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


angular gravels and cobbles of igneous 0.00~1.20meters
origin.

1 11.259

Medium dense, light brown, poorly-graded D-1 9 28 SPT at 1.20 meters


medium to fine SAND. 13
15

2 10.259
Medium dense, brown, poorly-graded coarse D-2 10 27 SPT at 2.00 meters
to medium SAND with silt and traces of 14
sub-angular to sub-rounded medium to fine 13
gravels of igneous origin.

3 9.259
Dense, greyish brown, silty coarse SAND D-3 12 32 SPT at 3.00 meters
with sub-angular to sub-rounded medium to 16
fine gravels of igneous origin. 16

4 8.259
Dense, brown, poorly-graded coarse to fine D-4 9 32 SPT at 4.00 meters
SAND with sub-angular medium to coarse 14
gravels of igneous origin. 18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 7.259
Dense, greyish brown, well-graded SAND D-5 13 35 SPT at 5.00 meters
with silt and sub-rounded to sub-angular 14
coarse to fine gravels of igneous origin. 21

6 6.259

Dense, brown, silty medium to fine SAND D-6 15 45 SPT at 6.50 meters
with traces of sub-rounded medium to fine 21
gravels of igneous origin. 24
7 5.259

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-024

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, silty medium to fine SAND


with traces of sub-rounded medium to fine
gravels of igneous origin. (continued)
8 4.259
--Ditto-- D-7 13 40 SPT at 8.00 meters
18
22

9 3.259

Very dense, brown, poorly-graded SAND D-8 17 51 SPT at 9.50 meters


with sub-angular medium to coarse gravels 24
of igneous origin. 27
10 2.259

11 1.259
--Ditto-- D-9 23 59 SPT at 11.00 meters
28
31

12 0.259

--Ditto-- D-10 23 64 SPT at 12.50 meters


30
34
13 -0.741
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -1.741
Very dense, brown, poorly-graded fine to D-11 21 70 SPT at 14.00 meters
medium SAND with silt and sub-angular to 33
sub-rounded coarse to fine gravels of 37
igneous origin.

15 -2.741
--Ditto-- D-12 22 82 SPT at 15.00 meters
39
----End of borehole at 15.00 meters----
43

16 -3.741

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-025

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3070086.675


NEOM Desalination Plant to Gayal Transmission System 17.985 E: 742882.321
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 19-Dec-21 20-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:10 N.E 3.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty gravelly fine to medium SAND. B-1 Inspection Pit


Gravels are sub-angular coarse of igneous 0.00~1.20meters
origin.

1 16.985

Medium dense, reddish brown, silty fine D-1 6 17 SPT at 1.20 meters
SAND with traces of sub-rounded medium 7
gravels of igneous origin. 10

2 15.985
Medium dense, brown, silty SAND with D-2 7 20 SPT at 2.00 meters
gravel of igneous origin. 9
11

3 14.985
Dense, brown, silty fine to medium SAND D-3 10 31 SPT at 3.00 meters
with sub-angular gravels of igneous origin. 12
19

4 13.985
--Ditto-- D-4 13 31 SPT at 4.00 meters
15
16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 12.985
Medium dense, greyish brown, D-5 8 23 SPT at 5.00 meters
poorly-graded fine to medium SAND with silt 10
and sub-rounded medium gravels of igneous 13
origin.

6 11.985

Medium dense, greyish brown, D-6 11 27 SPT at 6.50 meters


poorly-graded SAND with silt and gravel of 13
igneous origin. 14
7 10.985

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-025

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 9.985
Dense, greyish brown, poorly-graded fine to D-7 14 36 SPT at 8.00 meters
medium SAND with silt. 17
19

9 8.985

--Ditto-- D-8 15 40 SPT at 9.50 meters


19
21
10 7.985

11 6.985
Dense, light grey, silty fine to medium SAND. D-9 17 41 SPT at 11.00 meters
20
21

12 5.985

--Ditto-- D-10 20 46 SPT at 12.50 meters


22
26
13 4.985
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 3.985
--Ditto-- D-11 19 48 SPT at 14.00 meters
23
25

15 2.985
Changing to very dense. D-12 20 53 SPT at 15.00 meters
25
----End of borehole at 15.00 meters----
28

16 1.985

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-026

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3070555.274


NEOM Desalination Plant to Gayal Transmission System 8.251 E: 742707.791
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 18-Dec-21 19-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:30 8.20 6.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, well-graded SAND with silt and B-1 Inspection Pit


sub-angular gravel of igneous origin. 0.00~1.20meters

1 7.251

Medium dense, brownish grey, D-1 8 24 SPT at 1.20 meters


poorly-graded medium to coarse SAND with 11
silt and sub-rounded medium gravel of 13
igneous origin.
2 6.251
--Ditto- D-2 9 29 SPT at 2.00 meters
14
15

3 5.251
Changing to dense. D-3 11 31 SPT at 3.00 meters
15
16

4 4.251
--Ditto- D-4 13 36 SPT at 4.00 meters
17
19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 3.251
Dense, brownish grey, poorly-graded D-5 12 35 SPT at 5.00 meters
medium SAND with sub-rounded medium 15
gravel of igneous origin. 20

6 2.251

--Ditto- D-6 13 39 SPT at 6.50 meters


18
21
7 1.251

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-026

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 0.251
Dense, brownish grey, silty fine to medium D-7 15 42 SPT at 8.00 meters
SAND with traces of sub-rounded fine gravel 19
of igneous origin. 23

9 -0.749

Dense, grey, poorly-graded SAND with silt D-8 18 45 SPT at 9.50 meters
and gravel of igneous origin. 20
25
10 -1.749

11 -2.749
--Ditto- D-9 20 46 SPT at 11.00 meters
22
24

12 -3.749

Very dense, brownish grey, silty medium D-10 23 52 SPT at 12.50 meters
SAND with sub-rounded fine gravel of 25
igneous origin. 27
13 -4.749
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -5.749
--Ditto- D-11 25 56 SPT at 14.00 meters
27
29

15 -6.749
--Ditto- D-12 26 62 SPT at 15.00 meters
30
----End of borehole at 15.00 meters----
32

16 -7.749

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-027

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3071023.637


NEOM Desalination Plant to Gayal Transmission System 7.465 E: 742532.930
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 18-Dec-21 18-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-12-21 8:00 6.00 6.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with silt and B-1 Inspection Pit


subrounded gravel of various lithologies. 0.00~1.20meters

1 6.465

Medium dense, brown, poorly-graded coarse D-1 9 25 SPT at 1.20 meters


to medium SAND with silt and subrounded 10
gravels of various lithologies. 15

2 5.465
--Ditto-- D-2 9 22 SPT at 2.00 meters
12
10

3 4.465
Changing to very dense, D-3 11 34 SPT at 3.00 meters
16
18

4 3.465
Dense, greyish brown, silty coarse to D-4 13 36 SPT at 4.00 meters
medium SAND with subrounded gravels of 13
various lithogies. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 2.465
--Ditto-- D-5 15 38 SPT at 5.00 meters
18
20

6 1.465

Very stiff, brown, Lean CLAY. D-6 8 19 SPT at 6.50 meters


9
10
7 0.465
Brown, sandy SILT. U-1 UDS from
6.95~7.40meters.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-027

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, sandy SILT. (continued)

8 -0.535
Medium dense, white silty medium to fine D-7 10 24 SPT at 8.00 meters
SAND with angualr fine to medium gravels of 11
LIMESTONE (Decomposed limestone) 13

9 -1.535

Medium dense, silty, clayey SAND with D-8 13 30 SPT at 9.50 meters
gravel of igneous origin. 14
16
10 -2.535

11 -3.535
Dense, brown, medium to coarse SAND with D-9 15 38 SPT at 11.00 meters
silt and subrounded gravels of igneous 18
origin. 20

12 -4.535

Dense, brown, silty fine to medium SAND D-10 13 42 SPT at 12.50 meters
with traces of subrounded medium to fine 20
gravels of igneous origin. 22
13 -5.535
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 -6.535
--Ditto-- D-11 17 42 SPT at 14.00 meters
19
23

15 -7.535

--Ditto-- D-12 18 48 SPT at 15.50 meters


22
26
16 -8.535

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-027

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Changing to very dense. D-13 20 54 SPT at 16.00 meters


25
29
----End of borehole at 16.45 meters----

17 -9.535

18 -10.535

19 -11.535

20 -12.535

21 -13.535
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -14.535

23 -15.535

24 -16.535

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-028

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3071492.113


NEOM Desalination Plant to Gayal Transmission System 24.449 E: 742358.055
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Dec-21 21-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-12-21 8:30 N.E 1.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Javed
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


gravels of igneous origin. 0.00~1.20m

1 23.449

Dense, brown, poorly-graded fine to coarse D-1 13 50 SPT at 1.20 meters


SAND wtih silt and subrounded to 23
subangular coarse to fine gravels of igneous 27
origin.
2 22.449
--Ditto-- D-2 20 100 SPT at 2.00 meters
27
50/6
2.36m~2.72m R-1 67 12 20 38.0 Coring from
Brown, silty medium to fine SAND with silt 2.36~3.00 meters
and subangular to subrounded coarse to
3 21.449
medium gravels of igneous origin
(Decomposed) R-2 70 Coring from
2.72m~3.00m 3.00~4.00 meters
Weak, greyish brown, clastic
COGLOMERATE, slightly weathered
(Boulder).
4 20.449
Brown, subangular to subrounded coarse to
medium gravels of igneous origin with sand D-3 23 100 SPT at 4.00 meters
and silt (Decomposed Conglomerate). 36
50/10
Very dense, brown, subangular to R-3 90 Coring from
subrounded fine to medium gravels of 4.40~5.50 meters
igneous origin with silt and fine SAND
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 19.449
(Decomposed coglomerate).
Brown to greyish brown, subangular to
subrounded caorse to fine gravels of
igneous origin with silt and SAND.
Very dense, brown, well-graded SAND with D-4 22 85 SPT at 5.50 meters
37
silt and angular to subrounded medium to 48
6 18.449 fine gravels of igneous origin. (Decomposed
conglomerate).

7 17.449
Dense, brown, silty fine SAND with traces of D-5 12 40 SPT at 7.00 meters
subrounded fine gravel of igneous origin. 17
23
Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-028

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, silty fine SAND with traces of


subrounded fine gravel of igneous origin.
(continued)
8 16.449

Very dense, brown, silty fine SAND weakly D-6 16 57 SPT at 8.50 meters
cemented. 24
33
9 15.449

10 14.449
Very dense, brown, clayey fine SAND. D-7 20 67 SPT at 10.00 meters
28
39

11 13.449

--Ditto-- D-8 24 74 SPT at 11.50 meters


33
41
12 12.449

13 11.449
--Ditto-- D-9 19 65 SPT at 13.00 meters
27
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

38

14 10.449

--Ditto-- D-10 22 68 SPT at 14.50 meters


with subangular to subrounded coarse to 28
medium gravels of igneous origin. 40
15 9.449

16 8.449

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-028

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty medium to fine D-11 23 76 SPT at 16.00 meters
SAND. (continued) 31
45

17 7.449

--Ditto-- D-12 18 80 SPT at 17.50 meters


34
46
18 6.449

19 5.449
--Ditto-- D-13 22 80 SPT at 19.00 meters
with subrounded medium to fine gravels of 36
igneous origin. 44

20 4.449
--Ditto-- D-14 19 83 SPT at 20.00 meters
35
----End of borehole at 20.00 meters----
48

21 3.449
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 2.449

23 1.449

24 0.449

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-029

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3073839.211


NEOM Desalination Plant to Gayal Transmission System 35.922 E: 741565.518
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 19-Dec-21 20-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:30 N.E 1.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Javed
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, poorly-graded coarse to fine B-1 Inspection Pit


SAND with silt and gravels. 0.00~0.60meters

Very denes, light brown, poorly-graded D-1 23 100 SPT at 0.60 meters
medium to fine SAND with silt and R-1 50/6 83 Coring from
1 34.922 subrounded to subangular coarse to fine 0.80~1.50 meters
gravels of sedimentary origin. (Decomposed
limestone)
Extremely weak, light brown, clastic R-2 100 Coring from
LIMESTONE, completely weathered with 1.50~3.00 meters
traces of subangular to subrounded coarse
2 33.922 gravels of igneous origin.
--Ditto--

3 32.922
--Ditto-- R-3 10/0 100 SPT at 3.00 meters
Coring from
3.00~4.50 meters

4 31.922

--Ditto-- R-4 100 Coring from


4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 30.922

6 29.922
6.00m7.00m R-5 10/0 100 SPT at 6.00 meters
--Ditto-- Coring from
6.00~7.50 meters
7.00m~7.70m
Ver weak, greyish brown, sandy rounded to
sub-rounded GRAVEL of igneous origin
(Completely weathered Conglomerate).
7 28.922

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-029

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

6.00m7.00m R-6 100 70 69 12.0 Coring from


--Ditto-- 7.50~9.00 meters
7.00m~7.70m
8 27.922
Ver weak, greyish brown, sandy rounded to
sub-rounded GRAVEL of igneous origin
(Completely weathered Conglomerate).
(continued)
7.70m~9.20m
Strong, greyish brown, clastic
9 26.922
CONGLOMERATE, slighty weathered R-7 53 23 28 28.5 Coring from
horizontal, close to medium spaced 9.00~10.50 meters
fractured.
9.20m~10.50m
Weak, brown, thiny laminated, clastic
SANDSTONE, slightly to moderately
10 25.922
weathered, close spaced horizontal
fractured.

Very dense, brown, silty medium to fine D-2 13 100 SPT at 10.50 meters
SAND with subangular coarse to medium 24
gravels of igneous origin. 50/9
11 24.922 R-8 96 Coring from
Brown to reddish brown, poorly-graded 10.89~10.50 meters
coarse to medium SAND with silt and
subrounded coarse to medium
(Decomposed sandstone).

12 23.922
Very dense, brown, silty fine to medium D-3 17 100 SPT at 12.00 meters
SAND with traces of subangular fine gravels 26
of igneous origin. (Decomposed sandstone). 50/10
R-9 80 Coring from
Changing to reddish brown. 12.40~13.50 meters

13 22.922
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Reddish brown, poorly-graded fine to D-4 21 100 SPT at 13.50 meters


medium SAND with silt and traces of 33
subangular fine to medium gravels of 50/8
14 21.922 R-10 98 Coring from
igneous origin. (Decomposed sandstone). 13.88~15.00 meters
Light greyish brown, silty medium to fine
SAND and subrounded to subangular coarse
to fine gravels of igneous origin
(Decomposed sandstone).
15 20.922
Very dense, brown, poorly-graded medium D-5 18 SPT at 15.00 meters
to fine SAND with silt and traces of 29
subrounded fine gravels of igneous origin. 50/11
--Ditto-- R-11 90 Coring from
15.41~16.50 meters

16 19.922

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-029

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty medium to fine D-6 22 99 SPT at 16.50 meters
SAND with traces of subrounded fine gravels 36
of igneous origin. 43
17 18.922

18 17.922
Very dense, brown, silty coarse to medium D-7 15 67 SPT at 18.00 meters
SAND with subrounded fine to medium 28
gravels of igneous origin. 39

19 16.922

--Ditto-- D-8 17 78 SPT at 19.50 meters


35
43
20 15.922

21 14.922
Very dense, light brown, poorly-graded D-9 15 64 SPT at 21.00 meters
coarse to fine SAND with silt and 28
subrounded to subangular coarse to medium 45
gravels of igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 13.922

Very dense, brown, silty SAND. D-10 22 81 SPT at 22.50 meters


34
47
23 12.922

24 11.922
Very dense, light brown, silty coarse to D-11 18 79 SPT at 24.00 meters
medium SAND with subrounded medium to 33
fine gravels of igneous origin. 46

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-029

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

25 10.922
--Ditto-- D-12 19 75 SPT at 25.00 meters
31
----End of borehole at 25.00 meters----
44

26 9.922

27 8.922

28 7.922

29 6.922

30 5.922
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 4.922

32 3.922

33 2.922

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-030

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3074290.470


NEOM Desalination Plant to Gayal Transmission System 33.113 E: 741350.193
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 18-Dec-21 19-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-11-21 8:00 N.E 1.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded coarse to medium B-1 Inspection Pit


SAND with subangular gravels. 0.00~1.00meters

1 32.113
Very dense, brown, silty coarse to medium D-1 20 70 SPT at 1.00 meters
SAND with subangular fine gravels of 31
igneous origin. 39

2 31.113
--Ditto-- D-2 23 71 SPT at 2.00 meters
32
39

3 30.113
Changing to dense. D-3 15 42 SPT at 3.00 meters
18
24

4 29.113
Dense, brown, poorly-graded coarse to fine D-4 13 41 SPT at 4.00 meters
SAND with silt and traces of subangular 18
coarse to fine gravels of igneous origin. 23
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.113
Dense, brown, poorly-graded medium to fine D-5 16 46 SPT at 5.00 meters
SAND with silt. 20
26

6 27.113

Very dense, brown, poorly-graded medium D-6 22 60 SPT at 6.50 meters


to fine SAND with silt and traces of 26
subangular fine gravels of igneous origin. 34
7 26.113

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-030

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 25.113
Very dense, brown, poorly-graded medium D-7 27 71 SPT at 8.00 meters
to fine SAND wtih silt and subangular 32
medium to fine gravels of igneous origin. 39

9 24.113

Very dense, brown, subangular to D-8 24/5 100


90 11 8 39.0 SPT at 9.50 meters
subrounded coarse to fine gravels of R-1 Coring from
9.55m~10.50m
igneous origin with silty fine SAND.
10 23.113
Medium strong, light greyish brown, clastic
CONGLOMERATE highly weathered highly
fractured incipient and subangular to
subrounded coarse to fine gravles medium R-2 96 26 38 25.5 Coring from
cobbles of igneous origin. 10.50m~12.00m

11 22.113 Changing to very weak

12 21.113
Medium strong, light greyish brown, thinly R-3 100 65 59 13.0 Coring from
laminated clastic SANDSTONE. slightly 12.00m~13.50m
weathered vertical to subvertical fractures
open spaced incipient.

13 20.113
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

13.50m~14.00m R-4 100 11 30 39.0 Coring from


Brown, clastic SANDSTONE. Highly 13.50m~15.00m
weathered to residual soil.
14 19.113
14.00m~15.50m
Very weak, greyish brown, thinly bedded
SANDSTONE. Moderately weathered close
to very close spaced bedding fractures.

15 18.113
15.50m~16.50m R-5 100 30 12 23.5 Coring from
Very weak, brown, clastic SANDSTONE 15.00m~16.50m
residual soil.

16 17.113

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-030

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

16.50m~16.94m R-6 100 Coring from


Weak weak, brown, clastic SANDSTONE 16.50m~18.00m
highly weathered, highly fractured.
17 16.113
16.94m~18.00m
Extremely weak, brown, clastic
SANDSTONE, highly weathered to residual
soil highly fractured.

18 15.113
Extremely weak, Decomposed R-7 93 Coring from
SANDSTONE recovered as very dense 18.00m~19.50m
SAND and GRAVEL.

19 14.113

--Ditto-- D-9 28 70 SPT at 19.50 meters


30
40
20 13.113
Recovered as very dense, silty SAND. R-8 100 Coring from
20.00m~21.00m

21 12.113
--Ditto-- R-10 93 Coring from
21.00m~22.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 11.113
--Ditto-- D-10 35 100 SPT at 22.00 meters
50/7

--Ditto-- R-9 92 Coring from


22.50m~24.00m

23 10.113

24 9.113
--Ditto-- R-10 96 Coring from
24.00m~25.00m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-030

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Recovered as very dense, silty SAND.


(continued)
25 8.113
----End of borehole at 25.00 meters----

26 7.113

27 6.113

28 5.113

29 4.113

30 3.113
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 2.113

32 1.113

33 0.113

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-031

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3074742.443


NEOM Desalination Plant to Gayal Transmission System 29.182 E: 741136.432
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 19-Dec-21 20-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-12-21 8:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


gravels of igneous origin. 0.00~1.20meters

1 28.182

Very dense, brown, weakly cemented, silty D-1 20 76 SPT at 1.20 meters
fine SAND with sub-angular fine gravels of 36
igneous origin. 40

2 27.182
Dense, brown, silty clayey SAND. D-2 17 40 SPT at 2.00 meters
22
18

3 26.182
Dense, brown, silty fine SAND. D-3 14 45 SPT at 3.00 meters
19
26

4 25.182
Medium dense, brown, silty medium to fine D-4 8 29 SPT at 4.00 meters
SAND. 13
16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.182
Very dense, dark brown, silty coarse SAND D-5 8 62 SPT at 5.00 meters
with sub-rounded fine gravel of igneous 20
origin. 42

6 23.182

Very dense, brown, silty medium to fine D-6 14 70 SPT at 6.50 meters
SAND with sub-angular coarse to fine 30
gravels of igneous origin. 40
7 22.182

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-031

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 21.182
Very dense, brown, well-graded GRAVEL D-7 23 71 SPT at 8.00 meters
with clay and sand. 31
40

9 20.182

--Ditto-- D-8 21 73 SPT at 9.50 meters


31
42
10 19.182

11 18.182
Very dense, brown, silty medium to fine D-9 20 60 SPT at 11.00 meters
SAND with traces of sub-angular to fine 27
gravels of igneous origin. 33

12 17.182

Very dense, brown, poorly-graded coarse to D-10 14 63 SPT at 12.50 meters


fine SAND with silt and sub-angular medium 28
to fine gravels of igneous origin. 35
13 16.182
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 15.182
Very dense, brown, poorly-graded GRAVEL D-11 24 63 SPT at 14.00 meters
with silt and sand. 27
36

15 14.182

--Ditto-- D-12 23 63 SPT at 15.50 meters


28
35
16 13.182

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-031

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, poorly-graded GRAVEL


with silt and sand. (continued)

17 12.182
Very dense, brown, silty fine SAND. D-13 19 79 SPT at 17.00 meters
47
32

18 11.182

Very dense, dark brown, poorly-graded D-14 18 60 SPT at 18.50 meters


SAND. 26
34
19 10.182

20 9.182
--Ditto-- D-15 22 68 SPT at 20.00 meters
31
37

21 8.182

Very dense, dark brown, silty coarse to D-16 20 62 SPT at 21.50 meters
medium SAND. 28
34
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 7.182

23 6.182
--Ditto-- D-17 24 70 SPT at 23.00 meters
29
41

24 5.182
Very dense, dark brown, silty medium SAND D-18 17 63 SPT at 24.00 meters
with sub-angular coarse to medium gravels 27
of igneous origin. 36

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-031

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

----End of borehole at 24.00 meters----


25 4.182

26 3.182

27 2.182

28 1.182

29 0.182

30 -0.818
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 -1.818

32 -2.818

33 -3.818

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-032

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3075195.272


NEOM Desalination Plant to Gayal Transmission System 17.825 E: 740924.385
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 18-Dec-21 18-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-12-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, silty fine to coarse SAND B-1 Inspection Pit


with angular medium to coarse gravels and 0.00~1.20meters
cobble of igneous origin.

1 16.825

Medium dense, brownish grey, D-1 11 24 SPT at 1.20 meters


poorly-graded fine to medium SAND with silt 13
and subrounded medium gravels of igneous 11
origin.
2 15.825
Changing to dense. D-2 10 31 SPT at 2.00 meters
13
18

3 14.825
Changing to medium dense. D-3 14 28 SPT at 3.00 meters
12
16

4 13.825
Dense, brownish grey, medium to caorse D-4 15 38 SPT at 4.00 meters
SAND with silt and traces of subrounded 17
gravels of igneous origin. 21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 12.825
Dense, grey, poorly-graded SAND with silt. D-5 13 34 SPT at 5.00 meters
15
19

6 11.825

--Ditto-- D-6 15 39 SPT at 6.50 meters


20
19
7 10.825

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-032

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, grey, poorly-graded SAND with silt.


(continued)
8 9.825
Dense, grey, poorly-graded SAND with silt D-7 9 45 SPT at 8.00 meters
and gravel of igneous origin. 13
22

9 8.825

Dense, dark grey, fine to medium SAND with D-8 12 39 SPT at 9.50 meters
silt and traces of subrounded gravels of 15
igneous origin. 24
10 7.825

11 6.825
Changing to medium dense. D-9 10 23 SPT at 11.00 meters
9
14

12 5.825

Dense, brownish grey, gravelly fine to D-10 16 42 SPT at 12.50 meters


coarse SAND with silt, Gravels are 19
subangular medium of igneous origin. 23
13 4.825
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 3.825
Very dense, grey, medium to coarse SAND D-11 19 64 SPT at 14.00 meters
with silt and and traces of subangluar 27
gravels of igneous origin. 37

15 2.825
--Ditto-- D-12 21 69 SPT at 15.00 meters
29
----End of borehole at 15.00 meters----
40

16 1.825

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-033

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3075648.058


NEOM Desalination Plant to Gayal Transmission System 41.589 E: 740712.338
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 18-Dec-21 19-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 22-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, silty coarse to medium SAND B-1 Inspection Pit


with gravels and cobbles. 0.00~1.20meters

1 40.589

Dense, light brown, silty coarse to fine SAND D-1 11 36 SPT at 1.20 meters
with subrounded to subangular coarse to 15
fine gravels of igneous origin. 21

2 39.589
Dense, brown, silty SAND. D-2 13 40 SPT at 2.00 meters
18
22

3 38.589
Very dense, subangular to subrounded D-3 24 100 SPT at 3.00 meters
coarse to medium gravels of SANDSTONE 36
with silt and sand. 50/10
R-1 95 0 0 NI Coring from
Weak, greyish brown, clastic highly to 3.40m~4.50m
moderatrely weathered, highly fractured
4 37.589
SANDSTONE.

Weak, greyish brown, clastic thinly bedded R-2 93 0 0 NI Coring from


close to very close spaced fractured 4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

SANDSTONE.
5 36.589

6 35.589
Medium strong, greysih brown, thinly R-3 95 46 70 18.2 Coring from
laminated, clastic SANDSTONE silghtly 6.00m~7.50m
weathered, vertical to subvertical fractures,
clean closed spaced.

7 34.589

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-033

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

7.50m~8.50m R-4 98 47 48 18.0 Coring from


--Ditto- 7.50m~9.00m

8 33.589

8.50m~10.50m
Subangular to subrounded coarse to
medium gravels of igneous origin,
9 32.589
Decomposed CONGLOMERATE. R-5 98 7 14 40.0 Coring from
--Ditto-- 9.00m~10.50m

10 31.589

Exteremly weak, brown, clastic residual soil R-6 100 0 0 NI Coring from
of SANDSTONE. 10.50m~12.00m

11 30.589

12 29.589
--Ditto-- R-7 100 0 0 NI Coring from
12.50m~13.00m

13 28.589
Very dense, brown, silty fine SAND, weakly D-4 24 100 SPT at 13.00 meters
cemented. 50/6
R-8 100 Coring from
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- 13.21m~14.50m

14 27.589

--Ditto-- D-5 24 100 SPT at 14.50 meters


Very weak, decomosed SANDSTONE R-9 50/5 92 Coring from
recovered as very dense SAND and 14.70m~16.00m
15 26.589
GRAVEL.

16 25.589

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-033

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, weakly cemented D-6 24 100 SPT at 16.00 meters
silty fine SAND. (continued) R-10 50/8 90 Coring from
16.23m~17.50m

17 24.589

--Ditto-- D7 24 79 SPT at 17.50 meters


36
43
18 23.589

19 22.589
Very dense, dark brown, silty fine SAND. D-8 24 100 SPT at 19.00 meters
31
50/7
Residual soil of Decomposed SANDSTONE, R-11 88 Coring from
recovered as very dense well-graded SAND 19.37m~21.00m
with silt and gravel.
20 21.589

21 20.589
--Ditto-- D-9 24 73 SPT at 21.00 meters
34
39
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 19.589

Very dense, dark brown, silty fine SAND with D-10 23 76 SPT at 22.50 meters
trace of rounded fine gravels of igneous 35
origin. 41
23 18.589

24 17.589
Very dense, dark brown, weakly cemented D-11 22 70 SPT at 24.00 meters
silty fine SAND. 34
36

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-033

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, weakly cemented


silty fine SAND. (continued)
25 16.589

--Ditto-- D-12 21 82 SPT at 25.50 meters


39
43
26 15.589

27 14.589
--Ditto-- D-13 23 85 SPT at 27.00 meters
40
----End of borehole at 27.00 meters----
45

28 13.589

29 12.589

30 11.589
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 10.589

32 9.589

33 8.589

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-034

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3076099.267


NEOM Desalination Plant to Gayal Transmission System 29.021 E: 740496.824
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 16-Dec-21 18-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-12-21 8:45 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded coarse to medium B-1 Inspection Pit


SAND with silt, gravels and cobbles. 0.00~1.20meters

1 28.021

Dense, dark brown, well-graded coarse to D-1 14 46 SPT at 1.20 meters


medium SAND with silt and subangular 20
medium gravels of igneous origin. 26

2 27.021
Dense, brown, silty fine to medium SAND D-2 12 45 SPT at 2.00 meters
with traces of subangular to subrounded 17
gravels of igneous origin. 28

3 26.021
Dense, brown, silty medium to fine SAND D-3 11 33 SPT at 3.00 meters
with traces of subangular to subrounded 15
gravels of igneous origin. 19

4 25.021
Dense, dark brown, poorly-graded coarse to D-4 14 42 SPT at 4.00 meters
fine SAND with silt and traces of subangular 18
medium to fine gravels of igneous origin. 23
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.021
--Ditto-- D-5 15 44 SPT at 5.00 meters
19
25

6 23.021

Very dense, light brown, silty fine SAND. D-6 14 65 SPT at 6.50 meters
25
40
7 22.021

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-034

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, light brown, silty fine SAND.


(continued)
8 21.021
Very dense, light brown, silty fine SAND with D-7 23 100 SPT at 8.00 meters
subangular medium to fine gravels of R-1 50/5 80 Coring from
igneous origin. 8.20m~9.00m
Weak, light brown, clastic
SANDSTONE/CONGLOMERSTE highly
9 20.021
weathered, highly fractured with subrounded
to subangular coarse to medium pebbles of D-8 23 100 SPT at 9.00 meters
igneous origin. R-2 50/5 60 Coring from
Very dense, light brown, silty fine SAND and 9.20m~10.00m
subrounded coarse to medium gravels of
igneous origin.
10 19.021 Dark grey, subrounded to subangular
medium to coarse gravels of igneous origin. D-9 16 81 SPT at 10.00 meters
33
Very dense, brown, silty fine SAND with 48
subrounded medium to coarse gravels of
igneous origin.

11 18.021

--Ditto-- D-10 20 88 SPT at 11.50 meters


35
43
12 17.021

13 16.021
Very dense, brown, silty fine SAND with D-11 19 75 SPT at 13.00 meters
subrounded to subangular medium to fine 28
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

gravels of igneous origin. 47

14 15.021

Very dense, brown, clayey fine SAND with D-12 15 78 SPT at 14.50 meters
subangular fine gravels of igneous origin. 30
48
15 14.021

16 13.021

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-034

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, poorly-graded medium D-13 23 79 SPT at 16.00 meters


to fine SAND with silt and traces of 39
subangular medium to fine gravels of 45
igneous origin. (continued)

17 12.021

--Ditto-- D-14 22 80 SPT at 17.50 meters


38
42
18 11.021

19 10.021
Very dense, brown, poorly-graded GRAVEL D-15 20 78 SPT at 19.00 meters
of igneous origin with silt and sand. 37
41

20 9.021

--Ditto-- D-16 17 81 SPT at 20.50 meters


37
44
21 8.021
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 7.021
Very dense, brown, poorly-graded coarse to D-17 24 76 SPT at 22.00 meters
fine SAND with traces of subrounded 30
medium gravels of igneous origin. 46

23 6.021
--Ditto-- D-18 21 100 SPT at 23.00 meters
50/6
----End of borehole at 23.21 meters----

24 5.021

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-035

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3076550.243


NEOM Desalination Plant to Gayal Transmission System 28.974 E: 740280.891
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 16-Dec-21 16-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 20-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded GRAVEL of igneous B-1 Inspection Pit


origin and sand. 0.00~1.20m

1 27.974

Dense, dark brown, poorly-graded medium D-1 20 38 SPT at 1.20 meters


to fine SAND with silt and subrounded 20
gravels of igneous origin. 18

2 26.974
Dense, dark brown, poorly-graded coarse to D-2 18 42 SPT at 2.00 meters
fine SAND with subangular to subrounded 22
coarse to fine gravels of igneous origin. 20

3 25.974
Very dense, dark brown, poorly-graded D-3 19 54 SPT at 3.00 meters
medium to fine SAND with silt and traces of 24
subrounded fine gravels of igneous origin. 30

4 24.974
Dense, dark brown, poorly-graded coarse to D-4 14 34 SPT at 4.00 meters
fine SAND with silt and subrounded medium 13
to fine gravels of igneous origin. 21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.974
Dense, dark brown, poorly-graded medium D-5 9 36 SPT at 5.00 meters
to fine SAND with silt. 14
22

6 22.974

Dense, dark brown, poorly-graded medium D-6 16 43 SPT at 6.50 meters


to fine SAND with silt and sub angular 19
medium to fine gravels of igneous origin. 24
7 21.974

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-035

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, dark brown, poorly-graded medium


to fine SAND with silt and sub angular
medium to fine gravels of igneous origin.
8 20.974
(continued) D-7 21 58 SPT at 8.00 meters
Changing to very dense. 27
31

9 19.974

Very dense, brown, well-graded SAND with D-8 17 51 SPT at 9.50 meters
silt and and gravel of igneous origin. 21
30
10 18.974

11 17.974
--Ditto-- D-9 20 64 SPT at 11.00 meters
28
36

12 16.974

Very dense, brown, silty medium to fine D-10 18 62 SPT at 12.50 meters
SAND with traces of subangular to 27
subrounded medium to fine gravels of 35
13 15.974
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.974
Very dense, brown, silty fine to medium D-11 22 77 SPT at 14.00 meters
SAND with subangular to subrounded fine to 31
medium gravels of igneous origin. 46

15 13.974
--Ditto-- D-12 19 53 SPT at 15.00 meters
23
----End of borehole at 15.00 meters----
30

16 12.974

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-036

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3077001.387


NEOM Desalination Plant to Gayal Transmission System 31.148 E: 740065.328
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 16-Dec-21 16-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 20-12-21 8:00 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark brown, silty coarse to fine SAND with B-1 Inspection Pit
angular and cobbles on surface. 0.00~1.20m

1 30.148

Medium dense, dark brown, poorly-graded D-1 9 24 SPT at 1.20 meters


coarse to fine SAND with silt and subangular 10
to subrounded medium to fine gravels of 14
igneous orign.
2 29.148
--Ditto-- D-2 10 28 SPT at 2.00 meters
13
15

3 28.148
--Ditto-- D-3 11 30 SPT at 3.00 meters
14
16

4 27.148
Dense, brown, well-graded fine to coarse D-4 13 36 SPT at 4.00 meters
SAND with clay and sub angular to 17
subrounded coarse to fine gravels of 19
igneous orign.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 26.148
Changing to medium dense. D-5 12 30 SPT at 5.00 meters
13
17

6 25.148

Dense, brown, well-graded coarse to fine D-6 14 38 SPT at 6.50 meters


SAND with silt and traces of subrounded fine 18
gravels of igneous orign. 20
7 24.148

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-036

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, well-graded coarse to fine


SAND with silt and traces of subrounded fine
gravels of igneous orign. (continued)
8 23.148
--Ditto-- D-7 15 41 SPT at 8.00 meters
20
21

9 22.148

--Ditto-- D-8 11 39 SPT at 9.50 meters


17
22
10 21.148

11 20.148
Dense, reddish brown, clayey coarse to fine D-9 16 36 SPT at 11.00 meters
SAND. 14
22

12 19.148

Dense, brown, poorly-graded, medium to D-10 18 44 SPT at 12.50 meters


fine SAND with silt and subrounded to sub 20
angular medium to fine gravels of igneous 24
13 18.148
orign.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 17.148
Dense, brown, poorly-graded, medium to D-11 20 47 SPT at 14.00 meters
fine SAND with clay and sub angular to 22
subrounded medium to fine gravels of 25
igneous orign.

15 16.148
Changing to very dense. D-12 21 51 SPT at 15.00 meters
25
----End of borehole at 15.00 meters----
26

16 15.148

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-037

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3077452.503


NEOM Desalination Plant to Gayal Transmission System 36.838 E: 739849.669
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 16-Dec-21 16-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 19-12-21 9:00 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, well-graded SAND with silt. B-1 Inspection Pit


0.00~1.20m

1 35.838

Medium dense, silty gravelly fine to medium D-1 7 20 SPT at 1.20 meters
SAND, Gravels are subrounded medium of 9
igneous origin. 11

2 34.838
--Ditto-- D-2 6 20 SPT at 2.00 meters
10
10

3 33.838
Medium dense, brown, silty gravelly, medium D-3 9 30 SPT at 3.00 meters
to coarse SAND. Gravels are subrounded 13
fine to medium of igneous origin. 17

4 32.838
--Ditto-- D-4 8 25 SPT at 4.00 meters
11
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 31.838
Medium dense, brown, poorly-graded SAND D-5 10 30 SPT at 5.00 meters
with silt. 13
17

6 30.838

Dense, brown, gravelly coarse to medium D-6 13 36 SPT at 6.50 meters


SAND with silt. Gravels are subrounded 16
medium of igneous origin. 20
7 29.838

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-037

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 28.838
Dense, brownish grey, poorly-graded D-7 12 39 SPT at 8.00 meters
subrounded medium GRAVELS of igneous 17
origin with sand. Sand is medium to fine. 22

9 27.838

Dense, greyish brown, medium to coarse D-8 14 42 SPT at 9.50 meters


SAND with silt and subrounded gravels of 19
igneous origin. 24
10 26.838

11 25.838
--Ditto-- D-9 13 42 SPT at 11.00 meters
18
23

12 24.838

--Ditto-- D-10 16 47 SPT at 12.50 meters


20
27
13 23.838
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 22.838
Very dense, greyish brown, coarse to D-11 19 54 SPT at 14.00 meters
medium SAND with silt and subrounded 23
medium gravels of igneous origin. 31

15 21.838
--Ditto-- D-12 22 65 SPT at 15.00 meters
29
36
----End of borehole at 15.45 meters----

16 20.838

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-038

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3077903.699


NEOM Desalination Plant to Gayal Transmission System 39.073 E: 739634.361
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 15-Dec-21 15-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 19-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium coarse SAND with B-1 Inspection Pit


sub-rounded to sub-angular medium gravel 0.00~1.20m
of igneous origin.

1 38.073

Dense, brown, poorly-graded fine to coarse D-1 13 38 SPT at 1.20 meters


SAND with silt and subrounded to 18
subangular fine to coarse gravel of igneous 20
origin.
2 37.073
--Ditto-- D-2 9 31 SPT at 2.00 meters
with subangular fine gravel of igneous origin. 14
17

3 36.073
Dense, brown, silty coarse SAND. D-3 12 37 SPT at 3.00 meters
16
21

4 35.073
Dense, brown, well-graded SAND . D-4 13 38 SPT at 4.00 meters
15
23
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 34.073
--Ditto-- D-5 9 45 SPT at 5.00 meters
17
28

6 33.073

Very dense, brown, poorly-graded coarse D-6 14 51 SPT at 6.50 meters


SAND with silt. 20
31
7 32.073

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-038

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, poorly-graded coarse


SAND with silt. (continued)
8 31.073
Very dense, brown, poorly-graded medium D-7 13 60 SPT at 8.00 meters
to coarse SAND with silt and subangular fine 23
gravel of igneous origin. 37

9 30.073

--Ditto-- D-8 15 54 SPT at 9.50 meters


21
33
10 29.073

11 28.073
Very dense, brown, silty coarse to medium D-9 17 60 SPT at 11.00 meters
SAND. 22
38

12 27.073

--Ditto-- D-10 16 59 SPT at 12.50 meters


26
33
13 26.073
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 25.073
Very dense, brown, well-graded SAND with D-11 17 74 SPT at 14.00 meters
silt. 32
42

15 24.073
--Ditto-- D-12 19 77 SPT at 15.00 meters
33
----End of borehole at 15.00 meters----
44

16 23.073

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-039

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3078356.955


NEOM Desalination Plant to Gayal Transmission System 43.670 E: 739423.351
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 15-Dec-21 15-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, well-graded SAND with silt. B-1 Inspection Pit


0.00~1.20meters

1 42.670

Dense, brown, silty fine to medium SAND D-1 10 37 SPT at 1.20 meters
with subrounded to sub-angular medium to 17
coarse gravels of igneous origin. 20

2 41.670
Dense, dark brown, poorly-graded medium D-2 9 36 SPT at 2.00 meters
SAND with silt and traces of coarse to 15
medium gravels of igneous origin. 21

3 40.670
--Ditto-- D-3 11 38 SPT at 3.00 meters
16
22

4 39.670
--Ditto-- D-4 11 33 SPT at 4.00 meters
14
19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 38.670
Dense, brown, poorly-graded SAND with silt. D-5 15 42 SPT at 5.00 meters
17
25

6 37.670

Dense, dark brown, silty medium to fine D-6 14 37 SPT at 6.50 meters
SAND with traces of subangular fine gravels 19
of igneous origin. 18
7 36.670

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-039

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 35.670
Dense, dark brown, silty fine to medium D-7 17 45 SPT at 8.00 meters
SAND with subangular medium gravels of 21
igneous origin. 24

9 34.670

--Ditto-- D-8 16 50 SPT at 9.50 meters


22
28
10 33.670

11 32.670
Very dense, greyish brown, silty medium to D-9 18 56 SPT at 11.00 meters
fine SAND with traces of subangular fine 25
gravels of igneous origin. 31

12 31.670

Very dense, greyish brown, silty medium to D-10 20 62 SPT at 12.50 meters
fine SAND with sub-angular medium to fine 28
gravels of igneous origin. 34
13 30.670
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 29.670
Very dense, greyish brown, silty medium to D-11 20 63 SPT at 14.00 meters
fine SAND with trace of sub-angular gravels 24
of igneous origin. 34

15 28.670
--Ditto-- D-12 21 73 SPT at 15.00 meters
31
----End of borehole at 15.00 meters----
24

16 27.670

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-040

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3078820.626


NEOM Desalination Plant to Gayal Transmission System 49.290 E: 739238.773
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 15-Dec-21 15-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 8:45 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, poorly-graded coarse to B-1 Inspection Pit


medium SAND with silt and subangular 0.00~1.20meters
medium gravels of igneous origin.

1 48.290

Dense, brown, poorly-graded GRAVEL with D-1 12 34 SPT at 1.20 meters


silt and sand. 15
19

2 47.290
--Ditto-- D-2 14 33 SPT at 2.00 meters
16
17

3 46.290
Dense, brown, silty coarse SAND with D-3 13 35 SPT at 3.00 meters
subangular to subrounded coarse to fine 17
gravels of igneous origin. 18

4 45.290
Dense, brown, well-graded coarse to fine D-4 10 37 SPT at 4.00 meters
SAND with silt and subangular to 18
subrounded medium to fine gravels of 19
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 44.290
--Ditto-- D-5 15 37 SPT at 5.00 meters
17
20

6 43.290

Dense, reddish brown, silty fine SAND with D-6 13 36 SPT at 6.50 meters
subrounded medium to fine gravels of 15
igneous origin. 21
7 42.290

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-040

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 41.290
Dense, brown, well-graded SAND with silt D-7 17 44 SPT at 8.00 meters
and gravel. 21
23

9 40.290

Dense, reddish brown, silty fine SAND with D-8 19 47 SPT at 9.50 meters
traces of subangular fine gravels of igneous 22
origin. 25
10 39.290

11 38.290
Dense, reddish brown, silty clayey medium D-9 20 49 SPT at 11.00 meters
to fine SAND with traces of subrounded 23
gravels of igneous origin. 26

12 37.290

Very dense, reddish brown, silty SAND. D-10 22 53 SPT at 12.50 meters
25
28
13 36.290
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 35.290
--Ditto-- D-11 24 55 SPT at 14.00 meters
26
29

15 34.290
--Ditto-- D-12 27 62 SPT at 15.00 meters
29
----End of borehole at 15.00 meters----
33

16 33.290

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-041

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3079300.256


NEOM Desalination Plant to Gayal Transmission System 54.645 E: 739097.194
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 15-Dec-21 15-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 9:00 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded coarse to medium B-1 Inspection Pit


SAND with silt and subangular fine gravels 0.00~1.20meters
of igneous origin.

1 53.645

Medium dense, brown, silty medium to fine D-1 8 28 SPT at 1.20 meters
SAND with subangular fine to coarse gravels 12
of igneous origin. 16

2 52.645
Dense, dark brown, poorly-graded SAND. D-2 10 32 SPT at 2.00 meters
13
18

3 51.645
Dense, brown, silty medium to coarse SAND D-3 11 34 SPT at 3.00 meters
with sub-angular to angular fine to medium 15
gravels of igneous origin. 19

4 50.645
Dense, brown, well-graded coarse SAND D-4 13 38 SPT at 4.00 meters
with subangular fine to medium gravels of 17
igneous origin. 21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 49.645
Dense, dark brown, silty medium to coarse D-5 15 42 SPT at 5.00 meters
SAND with subangular medium to fine 18
gravels of igneous origin. 23

6 48.645

Dense, dark brown, silty coarse to medium D-6 14 47 SPT at 6.50 meters
SAND with traces of subangular coarse to 22
medium gravels of igneous origin. 25
7 47.645

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-041

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, dark brown, silty coarse to medium


SAND with traces of subangular coarse to
medium gravels of igneous origin.
8 46.645
(continued) D-7 16 46 SPT at 8.00 meters
--Ditto-- 20
26

9 45.645

Dense, brown, poorly-graded SAND with D-8 18 49 SPT at 9.50 meters


gravel of igneous origin. 22
27
10 44.645

11 43.645
Very dense, light brown, poorly-graded D-9 20 53 SPT at 11.00 meters
medium to fine SAND with silt and 24
subangular medium to fine gravels of 29
igneous origin.

12 42.645

--Ditto-- D-10 22 62 SPT at 12.50 meters


27
33
13 41.645
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 40.645
Very dense, brown, silty medium to fine D-11 18 65 SPT at 14.00 meters
SAND. 26
39

15 39.645
--Ditto-- D-12 21 73 SPT at 15.00 meters
31
----End of borehole at 15.00 meters----
42

16 38.645

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-042

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3079780.825


NEOM Desalination Plant to Gayal Transmission System 62.951 E: 738959.822
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 14-Dec-21 14-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to coarse SAND with B-1 Inspection Pit


gravels and cobbles. 0.00~1.20m

1 61.951

Hard, dark brown, SILT with sand. D-1 11 32 SPT at 1.20 meters
15
17

2 60.951
--Ditto-- D-2 14 34 SPT at 2.00 meters
16
18

3 59.951
Medium dense, dark brown, silty coarse to D-3 10 30 SPT at 3.00 meters
medium SAND. 14
16

4 58.951
Changing to dense. D-4 13 35 SPT at 4.00 meters
17
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 57.951
Medium dense, dark brown, silty SAND. D-5 11 30 SPT at 5.00 meters
14
16

6 56.951

Dense, greyish brown, poorly-graded coarse D-6 12 35 SPT at 6.50 meters


to medium SAND with clay. 16
19
7 55.951

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-042

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, greyish brown, poorly-graded coarse


to medium SAND with clay. (continued)
8 54.951
Dense, reddish brown, silty coarse to D-7 16 41 SPT at 8.00 meters
medium SAND. 20
21

9 53.951

Very dense, brown, silty coarse to medium D-8 24 63 SPT at 9.50 meters
SAND with traces of subrounded fine gravels 30
of igneous origin. 33
10 52.951

11 51.951
Very dense, reddish brown, silty coarse to D-9 24 SPT at 11.00 meters
medium SAND (residual soil of decomposed 29
SANDSTONE) . 50/5
R-1 100 Coring from
Very dense, reddish brown, well-graded 11.35m~12.00m
SAND with silt (Residual soil of decomposed
12 50.951
SANDSTONE).
--Ditto-- D-10 21 SPT at 12.00 meters
30
50/9
--Ditto-- R-2 90 Coring from
12.50m~14.00m

13 49.951
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 48.951
--Ditto-- D-11 20 SPT at 14.00 meters
34
50/3
--Ditto-- R-3 100 Coring from
14.37m~15.00m

15 47.951
Very dense, reddish brown, silty coarse to R-12 22 SPT at 15.00 meters
medium SAND with silt and trace of 50/5
subangular fine gravels of igneous origin.
----End of borehole at 15.00 meters----

16 46.951

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-043

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3080267.170


NEOM Desalination Plant to Gayal Transmission System 67.964 E: 738843.713
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 14-Dec-21 14-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, gravelly medium to coarse SAND B-1 Inspection Pit


with silt. Gravels are angular coarse of 0.00~1.20m
igneous origin.

1 66.964

Medium dense brown silty SAND with D-1 7 25 SPT at 1.20 meters
subrounded, medium gravels of igneous 11
origin. 14

2 65.964
Changing to dense. D-2 14 40 SPT at 2.00 meters
17
23

3 64.964
--Ditto-- D-3 17 50 SPT at 3.00 meters
23
27

4 63.964
Very dense, brown, silty fine SAND. D-4 19 61 SPT at 4.00 meters
28
33
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.964
--Ditto-- D-5 25 73 SPT at 5.00 meters
34
39

6 61.964

Very dense, brown, silty SAND. D-6 27 78 SPT at 6.50 meters


30
42
7 60.964

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-043

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty SAND. (continued)

8 59.964
Very dense, brown, fine to medium SAND D-7 23 72 SPT at 8.00 meters
with silt. 32
40

9 58.964

--Ditto-- D-8 28 100 SPT at 9.50 meters


39
50/10
10 57.964
Very dense, brown, weakly cemented silty R-1 100 Coring from
fine to medium SAND. 10.00m~11.00m

11 56.964
--Ditto-- D-9 36 100 SPT at 11.00 meters
47
50/13
--Ditto-- R-2 100 Coring from
11.50m~12.50m

12 55.964

--Ditto-- D-10 39 100 SPT at 12.50 meters


41
50/10
13 54.964
--Ditto-- R-3 93 Coring from
13.00m~14.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 53.964
Very dense, brown, weakly cemented fine to D-11 41 100 SPT at 14.00 meters
medium SAND with silt. R-4 50/6 100 Coring from
--Ditto-- 14.21m~15.00m

15 52.964
----End of borehole at 15.00 meters----

16 51.964

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-044

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3080736.642


NEOM Desalination Plant to Gayal Transmission System 73.234 E: 738720.734
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 14-Dec-21 14-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-21-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, silty fine SAND with traces of B-1 Inspection Pit
subrounded gravels of igneous origin. 0.00~1.20m

1 72.234

Medium dense, greenish brown, silty fine D-1 10 16 SPT at 1.20 meters
SAND. 5
11

2 71.234
--Ditto-- D-2 8 15 SPT at 2.00 meters
8
7

3 70.234
Medium dense, greyish brown, angular D-3 9 16 SPT at 3.00 meters
GRAVEL of SILSTONE with clay and sand. 7
9

4 69.234
Changing to dense. D-4 13 39 SPT at 4.00 meters
17
22
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 68.234
--Ditto-- D-5 50/4 100
100 0 0 NI SPT at 5.00 meters
R-1 Coring from
Weak, light brown, non-clastic SILTSTONE, 5.04m~6.00m
Moderately weathered extremely close
spaced, fractured.

6 67.234
--Ditto-- R-2 100 7 13 40.0 Coring from
6.00m~7.50m

7 66.234

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-044

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

7.50~8.50m R-3 100 9 9 40.0 Coring from


--Ditto-- 7.50m~9.00m
8.50~9.00m
8 65.234
Weak, light greyish brown, medium bedded,
SANDSTONE. Moderately weathered close
spaced, subvertical to subhorizontal incipient
fractured.

9 64.234
Changing to very weak R-4 100 18 31 34.0 Coring from
9.00m~10.50m

10 63.234

Medium strong, greyish brown, thinly R-5 98 60 71 14.0 Coring from


bedded, SANDSTONE. Slightly weathered 10.50m~12.00m
medium spaced subhorizontally incipient
11 62.234
fractued.

12 61.234
Changing to very weak. R-6 97 74 81 11.2 Coring from
12.00m~13.50m

13 60.234
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-7 99 89 89 6.3 Coring from


13.50m~15.00m

14 59.234

15 58.234
Moderately weathered, close spaced, R-8 100 34 52 21.8 Coring from
vertical to subhoizontal incipient fractured. 15.00m~16.00m

16 57.234

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-044

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

----End of borehole at 16.00 meters----

17 56.234

18 55.234

19 54.234

20 53.234

21 52.234
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 51.234

23 50.234

24 49.234

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-045

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3081158.787


NEOM Desalination Plant to Gayal Transmission System 75.549 E: 738454.552
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 15-Dec-21 16-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 19-12-21 08:30 N.E 4.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ahsan
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty fine SAND with gravel and B-1 Inspection Pit
cobble at the surface. 0.00~1.20m

1 74.549

Medium dense, brown, silty fine SAND with D-1 8 27 SPT at 1.20 meters
angular fine gravels of SANDSTONE 11
(Decomposed SANDSTONE). 16

2 73.549
Changing to dense. D-2 10 31 SPT at 2.00 meters
13
18

3 72.549
--Ditto-- D-3 15 48 SPT at 3.00 meters
21
27

4 71.549
--Ditto-- D-4 13 44 SPT at 4.00 meters
19
25
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 70.549
Changing to very dense. D-5 50/8 SPT at 5.00 meters
91 0 0 NI Coring from
Extremely weak, brown, clastic friable R-1 5.08m~6.00m
SANDSTONE (Decomposed).

6 69.549
Extremely weak, light greenish brown, clastic R-2 96 0 0 NI Coring from
friable SANDSTONE (Decomposed). 6.00m~7.50m

7 68.549

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-045

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Changing to very dense. D-6 30 SPT at 7.50 meters


50/14
Weak, brown, non-clastic SILTSTONE, R-3 95 0 0 NI Coring from
8 67.549
Highly weathered, fractured. 7.80m~9.00m

9 66.549
Changing to very dense. D-7 50/12 SPT at 9.00 meters
9.12m~9.40m R-4 100 38 38 20.7 Coring from
9.12m~10.50m
--Ditto--
9.40m~9.90m
Very weak, light creamish brown, clastic
10 65.549
friable SANDSTONE (Decomposed).
9.90m~13.50m
Weak, light creamish brown, clastic friable,
SANDSTONE. Moderately weathered, close
to medium spaced horizontal bedding R-5 100 65 65 13.0 Coring from
fractured. 10.50m~12.00m

11 64.549

12 63.549
R-6 95 32 36 22.7 Coring from
12.00m~13.50m

13 62.549
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

13.50m~15.90m R-7 90 0 0 NI Coring from


Weak, light greenish to greyish brown, 13.50m~15.00m
non-clastic SILTSTONE. Highly weathered,
14 61.549
very close spaced, fractured.
15.90m~16.50m
Very weak, light brown to light grey, clastic
friable SANDSTONE. Moderately to highly
weathered close spaced horizontaly bedding
fractured.
15 60.549
R-8 92 20 35 33.0 Coring from
15.00m~16.50m

16 59.549

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-045

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light greenish grey, fine to medium SAND R-9 97 Coring from


with silt. (Decomposed SANDSTONE). 16.50m~18.00m

17 58.549

18 57.549
Changing to very dense. D-8 30 SPT at 18.00 meters
50/12
18.30m~18.70m R-10 91 10 13 40.0 Coring from
--Ditto-- 18.30m~19.00m
18.70m~19.00m
Very weak, light greenish grey, clastic friable
19 56.549
SANDSTONE. Highly weathered, close
spaced horizontal bedding fractured.
----End of borehole at 19.00 meters----

20 55.549

21 54.549
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 53.549

23 52.549

24 51.549

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-046

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3081591.640


NEOM Desalination Plant to Gayal Transmission System 70.277 E: 738207.989
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 13-Dec-21 13-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark brown, silty medium to fine SAND with B-1 Inspection Pit
subangular medium to coarse gravels of 0.00~1.20m
SANSTONE.

1 69.277

Medium dense, brown, weakly cemented D-1 13 29 SPT at 1.20 meters


silty fine SAND. 15
14

2 68.277
Dense, dark brown, silty fine SAND. D-2 14 40 SPT at 2.00 meters
19
21

3 67.277
--Ditto-- D-3 18 42 SPT at 3.00 meters
20
22

4 66.277
Dense, reddish brown, weakly cemented D-4 15 37 SPT at 4.00 meters
clayey fine SAND. 17
20
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 65.277
--Ditto-- D-5 20 46 SPT at 5.00 meters
21
25
5.50m~6.50m R-1 100 0 0 NI Coring from
Weak, light brown, clastic arenaceous 5.50m~6.50m
SANDSTONE. Highly weathered, highly
6 64.277
fractured.

Hard, brown, Lean CLAY. D-6 19 57 SPT at 6.50 meters


21
36
7 63.277
Weak, light brown, clastic arenaceous R-2 90 0 0 NI Coring from
SANDSTONE. Highly weathered, highly 7.00m~8.50m
fractured.
Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-046

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Weak, light brown, clastic arenaceous


SANDSTONE. Highly weathered, highly
fractured. (continued)
8 62.277

Dense, brown, silty medium to fine SAND D-7 16 38 SPT at 8.50 meters
with gravel of sandstone. 17
21
9 61.277
Weak, yellowish brown, clastic arenaceous, R-3 100 0 0 NI Coring from
MUDSTONE. Highly weathered, highly 9.00m~9.50m
fractured.
Dense, reddish brown, clayey fine SAND, D-7 14 31 SPT at 9.50 meters
weakly cemented. 12
19
10 60.277

11 59.277
Hard, brown, Lean CLAY. D-8 18 43 SPT at 11.00 meters
21
23
Greyish brown, SILT with sand. U-1 UDS from
11.50m~11.75m

12 58.277

Dense, brown, clayey fine SAND, weakly D-9 19 43 SPT at 12.50 meters
cemented. 20
23
13 57.277
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 56.277
Dense, brown, clayey fine SAND. D-10 22 49 SPT at 14.00 meters
24
25

15 55.277
Very dense, light brown, silty fine SAND. D-11 20 50 SPT at 15.00 meters
26
----End of borehole at 15.00 meters----
24

16 54.277

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-047

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3082048.955


NEOM Desalination Plant to Gayal Transmission System 70.986 E: 738005.839
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 13-Dec-21 13-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Reddish brown, poorly-graded medium to B-1 Inspection Pit


fine SAND with subangular to subrounded 0.00~1.20m
medium to fine gravels of igneous origin.

1 69.986

Dense, brown, well-graded medium SAND D-1 15 39 SPT at 1.20 meters


with clay and subangular medium to fine 18
gravels of igneous origin. 21

2 68.986
Dense, brown, weakly cemented, D-2 11 31 SPT at 2.00 meters
poorly-graded medium coarse SAND with silt 14
and subangular medium to fine gravels of 17
igneous origin.

3 67.986
Dense, brown, silty fine SAND with traces of D-3 10 33 SPT at 3.00 meters
subrounded coarse gravels of igneous 14
origin. 19

4 66.986
Medium dense, silty medium to fine SAND. D-4 9 30 SPT at 4.00 meters
13
17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 65.986
Changing to dense. D-5 15 38 SPT at 5.00 meters
10
28

6 64.986

Very dense, reddish, cemented silty fine D-6 17 56 SPT at 6.50 meters
SAND. 25
31
7 63.986

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-047

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, reddish, cemented silty fine


SAND. (continued)
8 62.986
--Ditto-- D-7 19 60 SPT at 8.00 meters
27
33

9 61.986

--Ditto-- D-8 16 60 SPT at 9.50 meters


26
34
10 60.986
Very weak, reddish brown, clastic R-1 100 0 0 NI Coring from
SANDSTONE. Highly weathered highly 10.00m~11.00m
fractured.

11 59.986
Changing to very dense D-9 22 100 SPT at 11.00 meters
50/7

Very weak, reddish brown, clastic R-2 100 0 0 NI Coring from


SANDSTONE. Highly weathered highly 11.50m~12.00m
fractured.
12 58.986
Medium strong, reddish brown, clastic R-3 100 12 27 38.0 Coring from
12.00m~13.50m
SANDSTONE. Highly weathered highly
fractured.

13 57.986
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-4 90 28 28 24.5 Coring from


13.50m~15.00m

14 56.986

15 55.986
----End of borehole at 15.00 meters----

16 54.986

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-048

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3082460.148


NEOM Desalination Plant to Gayal Transmission System 71.454 E: 737723.241
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 13-Dec-21 13-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-Dec-21 08:30 N.E 12.0
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, well-graded SAND with silt B-1 Inspection Pit


and gravel, cobbles of igneous origin. 0.00~1.20m

1 70.454

Very dense, dark brown, silty fine to medium D-1 27 68 SPT at 1.20 meters
SAND with rounded gravels of igneous 30
origin. 38

2 69.454
Very dense, greyish brown, silty medium to D-2 19 68 SPT at 2.00 meters
coarse SAND with subangular medium 32
gavels of igneous origin. 36

3 68.454
Dense, brownish grey, silty sandy D-3 15 47 SPT at 3.00 meters
subangular fine to medium GRAVEL of 21
igneous origin. 26

4 67.454
--Ditto-- D-4 17 49 SPT at 4.00 meters
21
28
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 66.454
Colour is changing to brown. D-5 16 42 SPT at 5.00 meters
19
23

6 65.454

Very dense, brown, silty gravelly fine to D-6 17 54 SPT at 6.50 meters
medium SAND. Gravels are subrounded 23
medium of igneous origin. 31
7 64.454

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-048

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 63.454
Very dense, brown, well-graded GRAVEL of D-7 11 59 SPT at 8.00 meters
igneous origin with silt and sand. 25
34

9 62.454

--Ditto-- D-8 17 57 SPT at 9.50 meters


23
34
10 61.454

11 60.454
--Ditto-- D-9 19 61 SPT at 11.00 meters
26
35

12 59.454

Very dense, brownish grey, silty SAND. D-10 20 67 SPT at 12.50 meters
29
38
13 58.454
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 57.454
--Ditto-- D-11 18 63 SPT at 14.00 meters
27
36

15 56.454

--Ditto-- D-12 22 74 SPT at 15.50 meters


30
44
16 55.454

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-048

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brownish grey, silty SAND.


(continued)

17 54.454
--Ditto-- D-13 24 82 SPT at 17.00 meters
35
----End of borehole at 17.00 meters----
47

18 53.454

19 52.454

20 51.454

21 50.454
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 49.454

23 48.454

24 47.454

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-049

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3082844.154


NEOM Desalination Plant to Gayal Transmission System 63.823 E: 737403.275
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 12-Dec-21 12-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 15-Dec-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty fine to medium SAND with B-1 Inspection Pit


subangular to subrounded medium to fine 0.00~1.20m
gravels of igneous origin.

1 62.823

Medium dense, dark brown, poorly-graded D-1 7 20 SPT at 1.20 meters


GRAVEL with silt and sand. 8
12

2 61.823
--Ditto-- D-2 9 26 SPT at 2.00 meters
12
14

3 60.823
Medium dense, dark brown, poorly-graded D-3 10 28 SPT at 3.00 meters
fine to coarse SAND with silt and 13
subrounded to subangular coarse to fine 15
gravels of igneous origin.

4 59.823
changing to dense. D-4 11 33 SPT at 4.00 meters
15
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 58.823
Dense, grey, poorly-graded GRAVEL with D-5 12 37 SPT at 5.00 meters
sand. 16
21

6 57.823

Dense, dark brown, poorly-graded coarse to D-6 14 42 SPT at 6.50 meters


medium SAND with subangular to 17
subrounded medium to fine gravels of 25
7 56.823
igneous origin.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-049

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 55.823
Dense, dark brown, silty medium to fine D-7 13 40 SPT at 8.00 meters
SAND with traces of subangular medium 18
gravels of igneous origin. 22

9 54.823

--Ditto-- D-8 16 50 SPT at 9.50 meters


21
29
10 53.823

11 52.823
Dense, grey, well-graded SAND with silt. D-9 18 50 SPT at 11.00 meters
20
30

12 51.823

Very dense, dark brown, silty medium to fine D-10 15 57 SPT at 12.50 meters
SAND. 23
34
13 50.823
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 49.823
Very dense, dark brown, silty medium to fine D-11 18 59 SPT at 14.00 meters
SAND with traces of subrounded medium 26
gravels of igneous origin. 33

15 48.823

Very dense, dark brown, silty medium to fine D-12 17 67 SPT at 15.50 meters
SAND. 29
38
16 47.823

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-049

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, dark brown, silty fine SAND. D-13 22 75 SPT at 16.00 meters
30
----End of borehole at 16.00 meters----
45

17 46.823

18 45.823

19 44.823

20 43.823

21 42.823
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 41.823

23 40.823

24 39.823

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-050

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3083238.199


NEOM Desalination Plant to Gayal Transmission System 84.279 E: 737095.580
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 12-Dec-21 14-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-12-21 8:30 N.E 12.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty clayey fine SAND with B-1 Inspection Pit


sub-rounded fine to coarse gravels of 0.00~1.20meters
igneous origin.

1 83.279

Dense, brown, clayey fine SAND with gravel. D-1 16 40 SPT at 1.20 meters
19
21

2 82.279
--Ditto-- D-2 14 40 SPT at 2.00 meters
18
22

3 81.279
Very dense, reddish brown, clayey fine D-3 21 60 SPT at 3.00 meters
SAND with angular medium gravels of 23
igneous origin. 37

4 80.279
--Ditto-- D-4 20 56 SPT at 4.00 meters
25
31
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 79.279
--Ditto-- D-5 24 68 SPT at 5.00 meters
30
38

6 78.279

Very dense, brown, angular coarse GRAVEL D-6 50/6 100 SPT at 6.50 meters
of igneous origin.
7 77.279
Very dense, brown to greyish brown, R-1 100 Coring from
sub-angular coarse GRAVEL and cobble of 7.00m~8.00m
igneous origin.
Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-050

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown to greyish brown,


sub-angular coarse GRAVEL and cobble of
igneous origin. (continued)
8 76.279
--Ditto-- R-2 100 Coring from
8.00m~9.50m

9 75.279

9.95m~9.90m R-3 96 0 0 NI Coring from


--Ditto-- 9.50m~10.50m
9.90m~10.50m
10 74.279
Very weak, brown, non-clastic MUDSTONE.
Highly weathered to decomposed, highly
fractured.
Very dense, brown, non-clastic MUDSTONE, D-7 44 100 SPT at 10.50 meters
Highly weathered to decomosed, highly 50/5
fractured.
11 73.279
--Ditto-- R-4 97 0 0 NI Coring from
11.00m~12.00m

12 72.279
Recovered as very dense, clayey SAND with D-8 29 69 SPT at 12.00 meters
gravel. 33
36
--Ditto-- R-5 96 0 0 NI Coring from
12.50m~13.50m

13 71.279
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- D-9 35 100 SPT at 13.50 meters


41
50/4
14 70.279
--Ditto-- R-6 97 0 0 NI Coring from
14.00m~15.00m

15 69.279
--Ditto-- D-10 36 100 SPT at 15.00 meters
40
50/12
--Ditto-- R-7 98 0 0 NI Coring from
15.50m~16.50m

16 68.279

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-050

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, non-clastic MUDSTONE,


Highly weathered to decomosed, highly
fractured. (continued)
--Ditto-- D-11 31 100 SPT at 16.50 meters
40
50/10
17 67.279
Weak to very weak, brown, non-clastic, R-8 95 0 0 NI Coring from
thinly bedded MUDSTONE. Highly 17.00m~18.00m
weathered to decomposed highly fractured.

18 66.279
Recovered as silty SAND. D-12 24 100 SPT at 18.00 meters
40
50/9
--Ditto-- R-9 94 0 0 NI Coring from
18.50m~19.50m

19 65.279

--Ditto-- D-13 39 100 SPT at 19.50 meters


50/4

20 64.279
--Ditto-- R-10 97 0 0 NI Coring from
20.00m~21.00m

21 63.279
--Ditto-- D-14 47 100 SPT at 21.00 meters
50/4

Very weak, brown, non-clastic MUDSTONE. R-11 98 0 0 NI Coring from


Highly weathered to decomposed, highly 21.50m~22.50m
fractured.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 62.279

Changing to very dense. D-15 34 100 SPT at 22.50 meters


36
50/5
23 61.279
--Ditto-- R-12 95 0 0 NI Coring from
23.00m~24.00m

24 60.279
--Ditto-- D-16 46 100 SPT at 24.00 meters
50/07

--Ditto-- R-13 94 0 0 NI Coring from


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-050

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very weak, brown, non-clastic MUDSTONE. 24.50m~25.50m


Highly weathered to decomposed, highly
25 59.279
fractured. (continued)

--Ditto-- D-17 40 100 SPT at 25.50 meters


39
50/4
26 58.279
Weak to very weak, brown, non-clastic R-14 100 0 7 NI Coring from
MUDSTONE. Highly weathered to 26.00m~27.00m
decomposed. highly fractured.

27 57.279
Changing to very dense. D-18 43 100 SPT at 27.00 meters
40
50/6
--Ditto-- R-15 100 0 0 NI Coring from
27.50m~28.50m

28 56.279

Recovered as very dense, silty SAND with D-19 37 100 SPT at 28.50 meters
gravel. 39
50/6
29 55.279
--Ditto-- R-16 100 10 10 40.0 Coring from
29.00m~30.00m

30 54.279
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 53.279

32 52.279

33 51.279

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-051

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3083691.690


NEOM Desalination Plant to Gayal Transmission System 68.214 E: 736894.883
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 13-Dec-21 14-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 18-12-21 08:30 N.E 3.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown to reddish brown, sandy angular fine B-1 Inspection Pit


to coarse GRAVEL of SILTSTONE. 0.00~1.20meters

1 67.214

Dense, reddish brown, clayey SAND. D-1 13 48 SPT at 1.20 meters


22
26

2 66.214
Changing to very dense. D-2 15 52 SPT at 2.00 meters
23
29

3 65.214
Very dense, brown, silty fine to coarse D-3 21 79 SPT at 3.00 meters
SAND with subangular coarse gravel of 32
igneous origin. 47

4 64.214
--Ditto-- D-4 23 SPT at 4.00 meters
38
50/6
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 63.214
--Ditto-- D-5 25 SPT at 5.00 meters
Very dense, reddish brown, clayey coarse to R-1 50/5 100 Coring from
medium SAND with sub angular gravel of 5.20m~6.00m
igneous and SILTSTONE.

6 62.214
--Ditto-- D-6 27 SPT at 6.00 meters
--Ditto-- R-2 50/5 92 Coring from
6.20m~7.20m

7 61.214

--Ditto-- D-7 23 SPT at 7.20 meters


50/4
Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-051

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, reddish brown, silty fine to R-3 100 Coring from
medium SAND with angualr fine to coarse 7.40m~8.70m
gravel of SILTSTONE, SANDSTONE.
8 60.214
(continued)

--Ditto-- D-8 22 SPT at 8.70 meters


9 59.214 --Ditto-- R-4 50/5 98 Coring from
8.90m~10.40m

10 58.214

--Ditto-- D-9 21 SPT at 10.40 meters


Very dense, reddish brown, sandy angular R-5 50/4 97 Coring from
fine to coarse GRAVEL of SILTSTONE, 10.60m~12.00m
11 57.214 SANDSTONE and igneous origin.

12 56.214
--Ditto-- D-10 25 SPT at 12.00 meters
50/4

--Ditto-- R-6 92 Coring from


12.50m~14.00m

13 55.214
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 54.214
--Ditto-- D-1150/06 93
SPT at 14.00 meters
R-7 Coring from
Very dense, brown, well-graded GRAVEL 14.06m~15.50m
with silt and sand.

15 53.214

Refusal (No Sample Recovered) D-1250/02 100 SPT at 15.50 meters


R-8 Coring from
15.52m~16.50m
16 52.214

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-051

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, reddish brown, sandy angular


medium to coarse GRAVEL of SILTSTONE,
SANDSTONE and igneous origin.
(continued) R-9 90 Coring from
16.50m~18.00m
Very dense, creamish to greyish brown,
17 51.214 sandy angular coarse GRAVEL and pebbles
of various lithologies.

18 50.214
--Ditto-- R-10 95 Coring from
18.00m~19.50m

19 49.214

Refusal (No Sample Recovered) D-13 50/2 93 SPT at 19.50 meters


R-11 Coring from
Very dense, greyish to greenish brown, 19.52m~21.00m
20 48.214 well-graded angular fine to coarse GRAVEL
of various lithologies with sand.

21 47.214
--Ditto-- R-12 95 Coring from
21.00m~22.50m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 46.214

--Ditto-- R-13 75 Coring from


22.50m~24.00m

23 45.214

24 44.214
Very dense, brown, sandy angular coarse D-14 27 78 SPT at 24.00 meters
GRAVEL of various lithologies. 38
40

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-051

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, sandy angular coarse


GRAVEL of various lithologies. (continued)
25 43.214
--Ditto-- D-15 29 SPT at 25.00 meters
50/14
----End of borehole at 25.00 meters----

26 42.214

27 41.214

28 40.214

29 39.214

30 38.214
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 37.214

32 36.214

33 35.214

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-052

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3084168.682


NEOM Desalination Plant to Gayal Transmission System 67.054 E: 736745.116
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 12-Dec-21 13-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-12-21 08:30 N.E 4.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty sandy angular medium to coarse B-1 Inspection Pit


GRAVEL of igneous origin. 0.00~1.20meters

1 66.054

Dense, reddish brown, silty angular medium D-1 15 34 SPT at 1.20 meters
GRAVEL of igneous origin with sand. 16
18

2 65.054
--Ditto-- D-2 11 34 SPT at 2.00 meters
15
19

3 64.054
Very dense, brown, sandy subrounded D-3 16 56 SPT at 3.00 meters
medium GRAVEL of igneous origin with silt. 20
36

4 63.054
--Ditto-- D-4 16 55 SPT at 4.00 meters
25
30
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.054
--Ditto-- D-5 22 SPT at 5.00 meters
50/6
Very dense, brown, weakly cemented, R-1 100 Coring from
poorly-graded sandy, subangular medium to 5.21m~6.00m
coarse GRAVEL of siltstone, sandstone and
igneous origin with sand.
6 61.054
--Ditto-- R-2 100 Coring from
6.00m~7.50m

7 60.054

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-052

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-6 50/2 100 100 SPT at 7.50 meters


R-3 Coring from
Very dense, brown, weakly cemented 7.52m~9.00m
8 59.054 angular coarse to medium GRAVEL of
various lithologies.

9 58.054
--Ditto-- D-7 50/3 100 97 SPT at 9.00 meters
--Ditto-- R-4 Coring from
9.03m~10.50m

10 57.054

--Ditto-- D-8 37 100 SPT at 10.50 meters


--Ditto-- R-5 50/5 98 Coring from
10.70m~12.00m
11 56.054

12 55.054
--Ditto-- D-9 41 100 SPT at 12.00 meters
Vey dense, brown, poorly-graded R-6 50/2 97 Coring from
12.17m~13.50m
subrounded to subangular fine to coarse
GRAVEL of various lithologies with silt and
sand.
13 54.054
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- D-1050/14 100 SPT at 13.50 meters


--Ditto-- R-7 98 Coring from
13.64m~15.00m
14 53.054

15 52.054
--Ditto-- D-11 39 100 SPT at 15.00 meters
50/6
Very dense, greyish brown, angular medium R-8 99 Coring from
to coarse GRAVEL of igneous origin with silt 15.21m~16.50m
and sand.

16 51.054

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-052

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, greyish brown, angular medium


to coarse GRAVEL of igneous origin with silt
and sand. (continued)
--Ditto-- D-12 50/6 100
97
SPT at 16.50 meters
R-9 Coring from
--Ditto-- 16.56m~18.00m
17 50.054

18 49.054
--Ditto-- D-1350/14 100 SPT at 18.00 meters
--Ditto-- R-10 90 Coring from
18.14m~19.50m

19 48.054

--Ditto-- D-14 37 100 SPT at 19.50 meters


--Ditto-- R-11 50/5 94 Coring from
19.70m~21.00m
20 47.054

21 46.054
----End of borehole at 21.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 45.054

23 44.054

24 43.054

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-053

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3084647.530


NEOM Desalination Plant to Gayal Transmission System 64.821 E: 736601.731
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 11-Dec-21 12-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 15-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yassir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown, silty medium to fine SAND with Inspection Pit


gravels and cobble on surface. 0.00~1.20meters

1 63.821

Dense, brown, poorly-graded medium to fine D-1 14 40 SPT at 1.20 meters


SAND with traces of sub-angular coarse 19
gravels of igneous origin. 21

2 62.821
Medium dense, brown, well-graded SAND D-2 10 29 SPT at 2.00 meters
with silt. 12
17

3 61.821
Dense, brown, poorly-graded medium to D-3 9 33 SPT at 3.00 meters
coarse SAND with sub-rounded fine gravels 13
of igneous origin. 20

4 60.821
--Ditto-- D-4 15 48 SPT at 4.00 meters
21
27
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 59.821
Changing to very dense. D-5 18 54 SPT at 5.00 meters
24
30

6 58.821

Very dense, brown, silty medium to coarse D-6 17 100 SPT at 6.50 meters
SAND. 25
50/5
7 57.821 R-1 96 83 83 8.0 Coring from
6.85m~7.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-053

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Weak, grey, fine to medium grain, R-2 95 9 9 40.0 Coring from


LIMESTONE, moderately weathered 7.50m~9.00m
horizontal to sub-horizontal fractured closed
8 56.821
spaced clean open vugs of size 2 to 4mm
noted. (continued)
7.50m~7.95m
--Ditto--
7.95m~9.00m
Brown, poorly-graded cemented coarse to
9 55.821
medium GRAVEL of conglomerate origin. R-3 98 28 40 24.5 Coring from
9.00m~11.00m 9.00m~10.50m
Very weak, pinkish grey
CONGLOMERERATE, moderately to highly
weathered, incipient fractures, sub-horizontal
to sub-vertical very close to close spaced.
10 54.821
11.00m~12.00m
Medium strong, thinly, bedded brownish
grey, fine to medium grained SANDSTONE,
slightly weathered close to medium spaced R-4 99 50 58 17.0 Coring from
horizontal fractured. 10.50m~12.00m

11 53.821

12 52.821
--Ditto-- R-5 95 76 82 10.7 Coring from
12.00m~13.50m

13 51.821
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-6 100 90 92 6.0 Coring from


13.50m~15.00m

14 50.821

15 49.821
----End of borehole at 15.00 meters----

16 48.821

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-054

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3085130.716


NEOM Desalination Plant to Gayal Transmission System 74.893 E: 736473.037
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 11-Dec-21 12-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 15-Dec-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with silt, gravel B-1 Inspection Pit


and cobbles of igneous origin. 0.00~1.20meters

1 73.893

Medium dense, brown, silty sandy sub D-1 12 29 SPT at 1.20 meters
angular medium GRAVEL of igneous origin. 14
15

2 72.893
Dense, brown, silty clayey fine SAND with D-2 13 31 SPT at 2.00 meters
trace gravels of igneous origin. 15
16

3 71.893
Dense, greyish brown, silty sandy sub D-3 15 39 SPT at 3.00 meters
angular fine to medium GRAVEL of igneous 19
origin. 20

4 70.893
--Ditto-- D-4 14 38 SPT at 4.00 meters
17
21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 69.893
--Ditto-- D-5 16 38 SPT at 5.00 meters
18
20

6 68.893

Dense, grey, well-graded GRAVEL of D-6 19 43 SPT at 6.50 meters


igneous origin with silt and sand. 20
23
7 67.893

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-054

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, grey, well-graded GRAVEL of


igneous origin with silt and sand. (continued)
8 66.893
Dense, creamish brown, angular coarse D-7 20 50 SPT at 8.00 meters
GRAVEL of limestone. 24
26
Weak brownish to light brownish cream, R-1 90 55 60 15.8 Coring from
non-clastic fossiliferous CORALLINE 8.50m~9.50m
LIMESTONE. Moderately weathered, close
9 65.893
spaced horizontal fractures, solutioned
forming vugs. (2~10mm)

--Ditto-- R-2 100 73 78 11.4 Coring from


9.50m~11.00m

10 64.893

11 63.893
--Ditto-- R-3 100 87 87 6.7 Coring from
11.00m~12.50m

12 62.893

--Ditto-- R-4 100 73 80 11.4 Coring from


12.50m~14.00m

13 61.893
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 60.893
--Ditto-- R-5 100 67 70 12.6 Coring from
14.00m~15.50m

15 59.893

R-6 100 21 25 30.5 Coring from


15.50m~17.00m

16 58.893

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-054

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very weak, creamsih brown, non-clastic


fossiliferous, CORALLINE LIMESTONE.
Highly weathered, very close spaced
fractured solutioned, forming vugs.
(2~10mm) (continued)
17 57.893
----End of borehole at 17.00 meters----

18 56.893

19 55.893

20 54.893

21 53.893
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 52.893

23 51.893

24 50.893

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-055

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3085567.207


NEOM Desalination Plant to Gayal Transmission System 81.260 E: 736233.875
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 09-Dec-21 11-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 14-12-21 8:30 N.E 3.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty clayey sub-rounded GRAVLES B-1 Inspection Pit


and cobble of igneous origin. 0.00~1.20meters

1 80.260

Medium dense, brown, silty angular coarse D-1 8 26 SPT at 1.20 meters
GRAVELS of igneous origin with sand. 12
14

2 79.260
Changing to very dense. D-2 15 58 SPT at 2.00 meters
22
36

3 78.260
Dense, reddish brown, clayey fine SAND D-3 14 48 SPT at 3.00 meters
with angular medium gravel of igneous 18
origin. 30

4 77.260
Changing to very dense. D-4 15 59 SPT at 4.00 meters
21
38
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 76.260
Very dense, brown, sandy sub-rounded D-5 19 59 SPT at 5.00 meters
medium GRAVEL of igneous origin with silt. 23
Sand is medium grained. 36

6 75.260

Very dense, reddish brown, clayey fine D-6 18 61 SPT at 6.50 meters
SAND with angular fine gravel of igneous 26
origin. 35
7 74.260

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-055

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 73.260
Dense, greyish brown, medium to coarse D-7 16 47 SPT at 8.00 meters
SAND with silt and sub-rounded medium 19
gravel of igneous origin. 28

9 72.260

Very dense, brown, well-graded SAND with D-8 15 54 SPT at 9.50 meters
silt. 21
33
10 71.260

11 70.260
--Ditto-- D-9 18 64 SPT at 11.00 meters
26
38

12 69.260

Very dense, greyish brown, SANDSTONE. D-10 50/8 100 SPT at 12.50 meters
100 54 85 16.0 Coring from
Medium strong, greyish to creamish brown, R-1 12.58m~14.00m
13 68.260 clastic arenaceous SANDSTONE.
Moderately weathered medium spaced,
bedding fractured.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 67.260
Medium strong, brown, clastic medium R-2 100 60 76 14.0 Coring from
bedded argillacious SANDSTONE. 14.00m~15.50m
Moderately weathered close spaced bedding
fractured.

15 66.260

Changing to very weak R-3 100 71 71 11.8 Coring from


15.50m~17.00m

16 65.260

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-055

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brown, clastic medium


bedded argillacious SANDSTONE.
Moderately weathered close spaced bedding
fractured. (continued)

17 64.260
Very weak, brown, thickly bedded clastic R-4 100 89 89 6.3 Coring from
argillacious SANDSTONE. Moderately 17.00m~18.50m
weathered medium to widely spaced
bedding fractured.

18 63.260

--Ditto-- R-5 100 85 89 7.3 Coring from


18.50m~20.00m

19 62.260

20 61.260
----End of borehole at 20.00 meters----

21 60.260
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 59.260

23 58.260

24 57.260

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-056

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3085956.068


NEOM Desalination Plant to Gayal Transmission System 69.103 E: 735919.576
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 09-Dec-21 09-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 12-12-21 08:30 N.E 4.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, silty medium to coarse B-1 Inspection Pit


SAND with angular gravels of igneous origin. 0.00~1.20meters

1 68.103

Dense, brownish grey, poorly-graded, D-1 12 31 SPT at 1.20 meters


medium to coarse SAND with silt and trace 14
sub-angular gravels of igneous origin. 17

2 67.103
Medium dense, brownish grey, D-2 9 28 SPT at 2.00 meters
poorly-graded SAND. 13
15

3 66.103
Changing to dense. D-3 12 36 SPT at 3.00 meters
16
20

4 65.103
Dense, grey, well-graded fine to coarse D-4 15 42 SPT at 4.00 meters
SAND with silt and sub-angular medium 19
gravels of igneous origin. 23
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 64.103
--Ditto-- D-5 17 45 SPT at 5.00 meters
20
25

6 63.103

Dense, brown, poorly-graded SAND with D-6 14 39 SPT at 6.50 meters


gravel. 17
22
7 62.103
Very weak, brown, clastic MUDSTONE, R-1 100 0 0 NI Coring from
Highly weathered highly fractured. 7.00m~7.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-056

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very weak, brown, clastic MUDSTONE, R-2 100 0 20 NI Coring from


Highly weathered highly fractured. 7.50m~8.00m
(continued)
8 61.103
--Ditto-- R-3 100 0 0 NI Coring from
8.00m~9.00m
Very weak, brown, clastic MUDSTONE.
Highly weathered, extremely close spaced
highly fractured.

9 60.103
Changing to weak R-4 98 13 20 37.5 Coring from
9.00m~10.50m

10 59.103

--Ditto-- R-5 98 0 10 NI Coring from


10.50m~12.00m

11 58.103

12 57.103
--Ditto-- R-6 100 0 0 NI Coring from
12.00m~13.50m

13 56.103
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

13.50m~14.00m R-7 100 0 10 NI Coring from


--Ditto-- 13.50m~15.00m
14.00m~15.00m
14 55.103
Brown, weakly cemented fine to medium
SAND with silt.

15 54.103
----End of borehole at 15.00 meters----

16 53.103

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-057

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3086346.255


NEOM Desalination Plant to Gayal Transmission System 72.892 E: 735606.919
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 11-Dec-21 12-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 15-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND with B-1 Inspection Pit


subangular to subrounded fine gravels of 0.00~1.20m
igneous origin.

1 71.892

Dense light brown, silty medium to fine D-1 11 31 SPT at 1.20 meters
SAND and subangular to subrounded 14
medium to fine gravels of igneous origin. 17

2 70.892
Dense, brown, weakly cemented, silty clayey D-2 10 33 SPT at 2.00 meters
medium to fine SAND with traces of 15
subangular medium to fine gravels of 18
igneous origin.

3 69.892
Dense, dark brown, silty medium to coarse D-3 12 38 SPT at 3.00 meters
SAND with subangular to subrounded 17
medium to fine gravels of igneous origin. 21

4 68.892
--Ditto-- D-4 11 39 SPT at 4.00 meters
16
23
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 67.892
Dense, brown, weakly cemented silty fine D-5 18 42 SPT at 5.00 meters
SAND with subangular medium to fine 18
gravels of igneous origin. 24

6 66.892

--Ditto-- D-6 18 44 SPT at 6.50 meters


21
23
7 65.892

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-057

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 64.892
Very dense, reddish brown, weakly D-7 23 62 SPT at 8.00 meters
cemented silty SAND. 29
33

9 63.892

--Ditto-- D-8 20 58 SPT at 9.50 meters


27
31
10 62.892

11 61.892
Very dense, reddish brown, weakly D-9 18 62 SPT at 11.00 meters
cemented clayey silty fine SAND. 26
36

12 60.892

Changing to dense. D-10 15 42 SPT at 12.50 meters


18
24
13 59.892
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 58.892
Dense, reddish brown, weakly cemented D-11 19 48 SPT at 14.00 meters
silty fine SAND. 22
26

15 57.892

--Ditto-- D-12 17 46 SPT at 15.50 meters


23
23
16 56.892

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-057

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, reddish brown, weakly cemented


silty fine SAND. (continued)

17 55.892
Very dense, reddish brown, weakly D-13 20 53 SPT at 17.00 meters
cemented, silty fine SAND. 25
28

18 54.892

Dense, brown, silty fine SAND. D-14 19 50 SPT at 18.50 meters


23
37
19 53.892

20 52.892
Very dense, brown, silty medium to fine D-15 21 53 SPT at 20.00 meters
SAND with traces of subangular fine gravels 25
of igneous origin. 28

21 51.892

Very dense, brown, silty medium to fine D-16 23 61 SPT at 21.50 meters
SAND with subangular to subrounded fine 28
gravels of igneous origin. 33
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 50.892

23 49.892
Very dense, brown, silty fine SAND with D-17 19 56 SPT at 23.00 meters
subrounded medium to fine gravels of 26
igneous origin. 30

24 48.892
Very dense, brown, silty fine SAND with fine D-18 23 62 SPT at 24.00 meters
gravels of igneous origin. 28
34
----End of borehole at 24.00 meters----

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-058

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3086741.444


NEOM Desalination Plant to Gayal Transmission System 70.085 E: 735300.612
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 09-Dec-21 11-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 16-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to coarse SAND with B-1 Inspection Pit


subangular medium gravels of igneous 0.00~1.20m
origin.

1 69.085

Dense, brown, clayey GRAVEL of igneous D-1 13 39 SPT at 1.20 meters


origin with sand. 18
21

2 68.085
Chaning to medium dense. D-2 8 27 SPT at 2.00 meters
11
16

3 67.085
Dense, brown, silty medium to fine SAND D-3 12 52 SPT at 3.00 meters
and subangular coarse to fine gravels of 19
igneous origin. 33

4 66.085
Very dense, brown, silty medium to fine D-4 14 51 SPT at 4.00 meters
SAND with traces of subangular fine gravels 21
of igneous origin. 30
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 65.085
Very dense, brown, poorly-graded coarse to D-5 10 58 SPT at 5.00 meters
medium SAND with silt of subangular to 23
subrounded medium gravels of igneous 35
origin.

6 64.085

Dense, brown, silty SAND with gravel. D-6 15 47 SPT at 6.50 meters
18
29
7 63.085

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-058

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, silty SAND with gravel.


(continued)
8 62.085
Changing to very dense. D-7 13 54 SPT at 8.00 meters
20
34

9 61.085

Very dense, greyish brown, silty medium to D-8 16 55 SPT at 9.50 meters
coarse SAND. 22
33
10 60.085

11 59.085
Very dense, greyish brown, silty medium to D-9 15 63 SPT at 11.00 meters
coarse SAND with subangular medium 27
gravels of igneous origin. 36

12 58.085

Very dense, brown, well-graded SAND with D-10 19 55 SPT at 12.50 meters
silt. 25
30
13 57.085
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 56.085
Dense, brown, weakly cemented, clayey fine D-11 13 33 SPT at 14.00 meters
SAND with traces of subangular fine gravels 15
of igneous origin. 18

15 55.085

Dense, brown, weakly cemented clayey fine D-12 12 40 SPT at 15.50 meters
SAND. 17
23
16 54.085

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-058

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, weakly cemented clayey fine


SAND. (continued)

17 53.085
Dense, brown, silty medium to fine SAND D-13 16 43 SPT at 17.00 meters
with subrounded fine gravels of igneous 19
origin. 24

18 52.085

Dense, brown, sandy Lean CLAY. D-14 9 42 SPT at 18.50 meters


19
23
19 51.085

20 50.085
Dense, brown, clayey fine SAND with silt. D-15 14 40 SPT at 20.00 meters
18
22

21 49.085

Dense, brown, weakly cemented silty fine D-16 15 44 SPT at 21.50 meters
SAND. 20
24
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 48.085
Dense, brown, weakly cemented clayey silty D-17 14 41 SPT at 22.00 meters
fine SAND. 18
23
----End of borehole at 22.00 meters----

23 47.085

24 46.085

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-059

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3087196.487


NEOM Desalination Plant to Gayal Transmission System 58.396 E: 735287.907
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 09-Dec-21 09-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 12-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with subangular B-1 Inspection Pit


medium to fine gravels of igneous origin. 0.00~1.20m

1 57.396

Medium dense, brown, poorly-graded D-1 5 18 SPT at 1.20 meters


medium to fine SAND with silt and 8
subangular to subrounded medium to coarse 10
gravels of igneous origin.
2 56.396
Medium dense, brown, silty coarse to D-2 11 29 SPT at 2.00 meters
medium SAND with subagular to 13
subrounded fine to medium gravels of 16
igneous origin.

3 55.396
Medium dense, brown, silty coarse SAND D-3 8 22 SPT at 3.00 meters
with subangular medium to coarse gravels 10
of igneous origin. 12

4 54.396
--Ditto-- D-4 7 24 SPT at 4.00 meters
11
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 53.396
Medium dense, brown, poorly-graded SAND D-5 10 26 SPT at 5.00 meters
with silt and subangular coarse to medium 12
gravels of igneous origin. 14

6 52.396

Medium dense, brown, poorly-grade D-6 9 30 SPT at 6.50 meters


GRAVEL of igneous origin with sand. 13
17
7 51.396

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-059

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, poorly-grade


GRAVEL of igneous origin with sand.
(continued)
8 50.396
Very dense, brown, weakly cemented clayey D-7 16 57 SPT at 8.00 meters
fine SAND. 25
32

9 49.396

--Ditto-- D-8 18 61 SPT at 9.50 meters


26
35
10 48.396

11 47.396
Very dense, brown, weakly cemented clayey D-9 19 57 SPT at 11.00 meters
medium to fine SAND with subrounded to 24
subangular fine gravels of igneous origin. 33

12 46.396

Very dense, brown, weakly cemented fine D-10 22 79 SPT at 12.50 meters
SAND with subangular to subrounded 38
medium to fine gravels of igneous origin. 41
13 45.396
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 44.396
Very dense, brown, silty medium to fine D-11 23 79 SPT at 14.00 meters
SAND with subangular to subrounded fine to 35
medium gravels of igneous origin. 44

15 43.396
--Ditto-- D-12 25 77 SPT at 15.00 meters
31
----End of borehole at 15.00 meters----
46

16 42.396

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-060

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3087677.759


NEOM Desalination Plant to Gayal Transmission System 61.081 E: 735270.881
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 08-Dec-21 08-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium SAND with sub angular B-1 Inspection Pit
medium to coarse angular gravel of igneous 0.00~1.20m
origin.

1 60.081

Medium dense, light brown, poorly-graded D-1 5 15 SPT at 1.20 meters


coarse to fine SAND with silt and sub 7
angular medium gravel of igneous origin. 8

2 59.081
Medium dense, dark brown, poorly-graded D-2 6 18 SPT at 2.00 meters
medium to coarse SAND with silt and 7
subangular to subrounded medium to fine 11
gravel of igneous origin.

3 58.081
Medium dense, brown, poorly-graded coarse D-3 8 26 SPT at 3.00 meters
GRAVEL of igneous origin with sand. 12
14

4 57.081
Medium dense, light brown, silty medium to D-4 11 30 SPT at 4.00 meters
fine SAND with subrounded medium to fine 13
gravel of igneous origin. 17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 56.081
Dense, light brown, silty medium to fine D-5 13 35 SPT at 5.00 meters
SAND with subangular to subrounded 16
medium to fine gravel of igneous origin. 19

6 55.081

Dense, brown, silty medium to fine SAND D-6 16 39 SPT at 6.50 meters
with subangular to subounded medium to 18
fine gravels of ignous origin. 21
7 54.081

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-060

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 53.081
Dense, brown, silty coarse SAND with D-7 15 41 SPT at 8.00 meters
subangular to subrounded coarse to fine 17
gravels of igneous origin. 24

9 52.081

Dense, brown, silty medium to fine SAND D-8 14 43 SPT at 9.50 meters
with traces of subangular medium to fine 18
gravels of igneous origin. 25
10 51.081

11 50.081
Changing to very dense. D-9 16 51 SPT at 11.00 meters
21
30

12 49.081

Very dense, brown, weakly cemented, silty D-10 15 52 SPT at 12.50 meters
medium to fine SAND with subangular fine 22
gravels of ignous origin. 30
13 48.081
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 47.081
Very dense, brown, weakly cemented, silty D-11 18 67 SPT at 14.00 meters
medium to fine SAND. 29
38

15 46.081

Very dense, brown, silty fine SAND with D-12 17 68 SPT at 15.50 meters
subangular fine gravels of igneous origin. 28
40
16 45.081

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-060

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty fine SAND with


subangular fine gravels of igneous origin.
(continued)

17 44.081
Very dense, brown, silty fine SAND with D-13 18 77 SPT at 17.00 meters
traces of subangular fine gravels of ignous 32
origin. 45
----End of borehole at 17.00 meters----

18 43.081

19 42.081

20 41.081

21 40.081
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 39.081

23 38.081

24 37.081

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-061

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3088146.067


NEOM Desalination Plant to Gayal Transmission System 64.323 E: 734963.339
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 09-Dec-21 09-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 12-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND. B-1 Inspection Pit


0.00~1.20m

1 63.323

Medium dense brown weakly cemented silty D-1 7 21 SPT at 1.20 meters
fine SAND. 9
12

2 62.323
Medium dense brown poorly-graded fine to D-2 11 28 SPT at 2.00 meters
medium SAND with silt and sub-angular to 14
sub-rounded fine to medium gravels of 14
igneous origin.

3 61.323
Dense brown poorly-graded fine to medium D-3 14 33 SPT at 3.00 meters
SAND with silt and traces of sub-rounded 16
fine to medium gravels of igneous origin. 17

4 60.323
Dense brown poorly-graded medium to D-4 15 33 SPT at 4.00 meters
coarse SAND with silt and sub-angular fine 15
gravels of igneous origin. 18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 59.323
--Ditto-- D-5 14 36 SPT at 5.00 meters
17
19

6 58.323

Dense brown well-graded medium to coarse D-6 16 41 SPT at 6.50 meters


SAND with silt and sub-rounded coarse to 19
medium gravels of igneous origin. 22
7 57.323

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-061

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 56.323
Dense brown poorly-graded medium to fine D-7 18 41 SPT at 8.00 meters
SAND with silt and sub-angular fine gravels 18
of igneous origin. 23

9 55.323

--Ditto-- D-8 19 43 SPT at 9.50 meters


19
24
10 54.323

11 53.323
--Ditto-- D-9 16 45 SPT at 11.00 meters
21
24

12 52.323

Dense brown poorly-graded medium to D-10 21 46 SPT at 12.50 meters


coarse SAND with sub-angular fine gravels 21
of igneous origin. 25
13 51.323
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 50.323
Dense brown poorly-graded medium to D-11 17 49 SPT at 14.00 meters
coarse SAND with silt and traces of 24
sub-angular to sub-rounded medium to fine 25
gravels of igneous origin.

15 49.323

Changing to very dense. D-12 20 52 SPT at 15.50 meters


25
27
16 48.323

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-061

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded medium to


coarse SAND with silt and traces of
sub-angular to sub-rounded medium to fine
gravels of igneous origin. (continued)

17 47.323
Very dense brown poorly-graded fine to D-13 22 55 SPT at 17.00 meters
coarse SAND with silt and sub-angular 26
medium to fine gravels of igneous origin. 29

18 46.323
--Ditto-- D-14 19 54 SPT at 18.00 meters
26
----End of borehole at 18.00 meters----
28

19 45.323

20 44.323

21 43.323
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 42.323

23 41.323

24 40.323

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-062

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3088503.141


NEOM Desalination Plant to Gayal Transmission System 60.385 E: 734667.801
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 08-Dec-21 08-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yassir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty medium to fine SAND. B-1 Inspection Pit


0.00m~1.20m

1 59.385

Medium dense, greyish brown, D-1 5 16 SPT at 1.20 meters


poorly-graded medium to fine SAND. 7
9

2 58.385
--Ditto-- D-2 7 17 SPT at 2.00 meters
7
10

3 57.385
--Ditto-- D-3 9 23 SPT at 3.00 meters
10
13

4 56.385
Dense, greyish brown, poorly-graded D-4 12 31 SPT at 4.00 meters
medium to fine SAND with sub rounded fine 14
gravels of igneous origin. 17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 55.385
Medium dense, greyish brown, D-5 11 28 SPT at 5.00 meters
poorly-graded medium to fine SAND. 13
15

6 54.385

Changing to dense. D-6 15 37 SPT at 6.50 meters


17
20
7 53.385

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-062

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, greyish brown,


poorly-graded medium to fine SAND.
(continued)
8 52.385
Very dene, light brown, silty fine SAND and D-7 50/13 SPT at 8.00 meters
sub angular fine to medium gravel of R-1 90 70 85 12.0 Coring from
8.15m~9.50m
sedimentary and igneous origin.
Very weak, yellowish light brown, clastic
thinly, laminated, SANDSTONE, interbedded
9 51.385 with CONGLOMERATE. Moderately
weathered, subvertical incipient fractured.

--Ditto-- R-2 98 95 80 4.0 Coring from


9.50m~11.00m

10 50.385

11 49.385
Weak, greyish brown, slightly to moderately R-3 95 95 98 4.0 Coring from
weathered close to medium spaced 11.00m~12.50m
fractured SANDSTONE interdedded with
CONGLOMERATE.

12 48.385

--Ditto-- R-4 99 92 96 5.3 Coring from


12.50m~14.00m

13 47.385
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 46.385
--Ditto-- R-5 98 96 97 3.0 Coring from
14.00m~15.50m

15 45.385

----End of borehole at 15.50 meters----

16 44.385

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-063

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3088903.231


NEOM Desalination Plant to Gayal Transmission System 65.249 E: 734387.836
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 08-Dec-21 09-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 12-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark brown, silty coarse to medium SAND B-1 Inspection Pit


with sub angular medium to fine gravel. 0.00m~0.80m

Medium dense, dark brown, well-graded D-1 9 23 SPT at 0.80 meters


1 64.249
SAND with silt and sub angular to 11
subrounded medium to fine gravels of 12
igneous origin.

2 63.249
Medium dense, dark brown, silty medium to D-2 11 27 SPT at 2.00 meters
fine SAND. 13
14

3 62.249
--Ditto-- D-3 10 27 SPT at 3.00 meters
13
14

4 61.249
Medium dense, dark brown, well-graded D-4 11 29 SPT at 4.00 meters
SAND with silt. 14
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 60.249
Dense, brown, silty fine to medium SAND D-5 13 31 SPT at 5.00 meters
with traces of subrounded fine gravels of 15
sedimentary origin. 16

6 59.249

Very dense, brown, silty fine to medium D-6 20 55 SPT at 6.50 meters
SAND with subrounded fine to medium 25
gravels of sedimentary origin. 30
7 58.249

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-063

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 57.249
Very dense, silty SAND with gravels of D-7 18 57 SPT at 8.00 meters
igneous origin. 26
31

9 56.249

--Ditto-- D-8 19 53 SPT at 9.50 meters


24
29
10 55.249

11 54.249
Very dense, brown, poorly-graded medium D-9 21 60 SPT at 11.00 meters
to fine SAND with silt and traces of sub 28
angular to subrounded gravels of igneous 32
and sedimentary origin. R-1 100 Coring from
11.50m~12.50m
11.50m~12.00m
12 53.249
Very dense, dark brown, poorly-graded
SAND with angular gravel of sedimentary
origin.

Very dense, dark brown, poorly-graded D-10 20 51 SPT at 12.50 meters


medium to coarse SAND with silt. 24
27
13 52.249
13.00m~14.00m R-2 100 Coring from
Very dense, dark brown, poorly-graded 13.00m~14.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

SAND with silt and angular gravel of


sedimentary origin.

14 51.249
Very dense, dark brown, poorly-graded D-11 22 56 SPT at 14.00 meters
medium to coarse SAND with subrounded to 25
sub angular gravels of sedimentary origin. 31

15 50.249
Very dense, brown, poorly-graded medium D-12 23 55 SPT at 15.00 meters
to coarse SAND with silt and traces of sub 26
angular to subrounded fine to gravels of 29
igneous and sedimentary orgin.
----End of borehole at 15.00 meters----
16 49.249

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-064

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3089281.686


NEOM Desalination Plant to Gayal Transmission System 65.622 E: 734062.375
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 08-Dec-21 08-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with silt and B-1 Inspection Pit


sub-rounded to sub-angular fine to medium 0.00~1.20m
gravels of igneous origin.

1 64.622

Medium dense brown poorly-graded medium D-1 10 24 SPT at 1.20 meters


to coarse SAND with silt. 12
13

2 63.622
Medium dense brown silty medium to coarse D-2 9 27 SPT at 2.00 meters
SAND with sub-angular to sub-rounded fine 13
gravels of igneous origin. 14

3 62.622
Medium dense brown well-graded SAND D-3 11 29 SPT at 3.00 meters
with silt and sub-angualr medium to fine 14
gravels of igneous origin. 15

4 61.622
Medium dense brown poorly-graded fine to D-4 12 29 SPT at 4.00 meters
coarse SAND with sub-angular to 13
sub-rounded medium to fine gravels of 16
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 60.622
Dense light brown silty medium to coarse D-5 13 31 SPT at 5.00 meters
SAND. 14
17

6 59.622

Medium dense brown silty medium to fine D-6 12 27 SPT at 6.50 meters
SAND. 12
15
7 58.622

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-064

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown silty medium to fine


SAND. (continued)
8 57.622
Dense brown poorly-graded SAND with silt. D-7 14 33 SPT at 8.00 meters
15
18

9 56.622

Dense light brown silty fine to medium D-8 14 36 SPT at 9.50 meters
SAND. 16
20
10 55.622

11 54.622
--Ditto-- D-9 16 43 SPT at 11.00 meters
21
22

12 53.622

--Ditto-- D-10 18 45 SPT at 12.50 meters


21
24
13 52.622
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 51.622
Dense light brown silty SAND. D-11 14 48 SPT at 14.00 meters
23
25

15 50.622
Changing to very dense. D-12 20 51 SPT at 15.00 meters
24
----End of borehole at 15.00 meters----
27

16 49.622

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-065

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3089622.946


NEOM Desalination Plant to Gayal Transmission System 67.090 E: 733698.556
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 08-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty coarse to medium SAND with B-1 Inspection Pit


traces of sub-rounded to sub-angular gravels 0.00~1.20m
of igneous origin.

1 66.090

Medium dense light brown silty fine to D-1 7 17 SPT at 1.20 meters
coarse SAND with sub-rounded to 9
sub-angular medium to fine gravels of 8
igneous origin.
2 65.090
Medium dense greyish brown poorly-graded D-2 9 20 SPT at 2.00 meters
coarse to medium SAND and sub-angular to 9
sub-rounded fine to coarse gravels of 11
igneous origin.

3 64.090
Medium dense brown well-graded SAND D-3 9 18 SPT at 3.00 meters
with silt and gravel. 8
10

4 63.090
Medium dense greyish brown poorly-graded D-4 9 26 SPT at 4.00 meters
coarse to medium SAND with silt and 12
sub-angular to sub-rounded medium to fine 14
gravels of igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.090
--Ditto-- D-5 10 28 SPT at 5.00 meters
13
15

6 61.090

Changing to dense. D-6 11 32 SPT at 6.50 meters


16
16
7 60.090

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-065

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 59.090
Dense brown poorly-graded coarse to fine D-7 11 37 SPT at 8.00 meters
SAND with silt and sub-rounded to 16
sub-angular medium to fine gravels of 21
igneous origin.

9 58.090

Dense brown poorly-graded medium to D-8 13 42 SPT at 9.50 meters


coarse SAND with silt and sub-angular 18
medium to coarse gravels of igneous origin. 24
10 57.090

11 56.090
Dense brown well-graded medium to fine D-9 16 45 SPT at 11.00 meters
SAND with silt and traces of sub-angular fine 19
to medium gravels of igeous origin. 26

12 55.090

Dense brown well-graded medium to fine D-10 14 45 SPT at 12.50 meters


SAND with silt. 20
25
13 54.090
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 53.090
Very dense brown poorly-graded fine to D-11 16 55 SPT at 14.00 meters
medium SAND with silt and traces of 21
sub-rounded fine gravels of igneous origin. 34

15 52.090

Very dense brown poorly-graded fine to D-12 19 67 SPT at 15.50 meters


medium SAND with silt and sub-angular 29
medium to coarse gravels of igneous origin. 38
16 51.090

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-065

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown poorly-graded fine to


medium SAND with silt and sub-angular
medium to coarse gravels of igneous origin.
(continued)

17 50.090
Very dense greyish brown poorly-graded B-13 18 66 SPT at 17.00 meters
coarse to medium SAND with sub-angular 25
coarse to medium gravels of igneous origin. 41
----End of borehole at 17.00 meters----

18 49.090

19 48.090

20 47.090

21 46.090
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 45.090

23 44.090

24 43.090

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-066

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3090040.199


NEOM Desalination Plant to Gayal Transmission System 69.064 E: 733423.512
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 08-Dec-21 08-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown well-graded SAND with silt and B-1 Inspection Pit


sub-angular fine gravels of igneous origin. 0.00~1.20m

1 68.064

Medium dense brown silty medium to fine D-1 7 20 SPT at 1.20 meters
SAND with sub-angular medium to fine 9
gravels of igneous origin. 11

2 67.064
Medium dense, brown, poorly-graded SAND D-2 9 24 SPT at 2.00 meters
with gravel of igneous origin. 11
13

3 66.064
--Ditto-- D-3 11 30 SPT at 3.00 meters
13
17

4 65.064
Medium dense brown poorly-graded medium D-4 11 24 SPT at 4.00 meters
to fine SAND with silt and sub-angular fine to 12
medium gravels of igneous origin. 12
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 64.064
Changing to dense. D-5 13 32 SPT at 5.00 meters
15
17

6 63.064

--Ditto-- D-6 14 36 SPT at 6.50 meters


17
19
7 62.064

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-066

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 61.064
Dense brown silty medium to fine SAND with D-7 11 36 SPT at 8.00 meters
traces of sub-angular fine gravels of igneos 18
origin. 18

9 60.064

--Ditto-- D-8 17 40 SPT at 9.50 meters


18
22
10 59.064

11 58.064
Dense brown poorly-graded fine to medium D-9 16 45 SPT at 11.00 meters
SAND with silt. 21
24

12 57.064

Dense brown poorly-graded fine to medium D-10 19 45 SPT at 12.50 meters


SAND with silt and traces of sub-rounded 19
fine gravels of igneous origin. 26
13 56.064
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 55.064
Dense brown silty fine to medium SAND with D-11 16 49 SPT at 14.00 meters
sub-angular fine to medium gravels of 21
igneous origin. 28

15 54.064

Very dense brown poorly-graded medium to D-12 15 51 SPT at 15.50 meters


coarse SAND with silt and traces of 24
sub-angular fine to medium gravels of 27
16 53.064

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-066

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

igneous origin. B-13 23 48 SPT at 16.00 meters


24
Dense brown silty medium to fine SAND with
24
traces of sub-rounded fine gravels of
igneous origin.
----End of borehole at 16.00 meters----
17 52.064

18 51.064

19 50.064

20 49.064

21 48.064
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 47.064

23 46.064

24 45.064

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-067

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3090458.703


NEOM Desalination Plant to Gayal Transmission System 74.682 E: 733149.864
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 8:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded medium to coarse B-1 Inspection Pit


SAND. 0.00~1.20m

1 73.682

Medium dense, brown, silty medium to fine D-1 11 29 SPT at 1.20 meters
SAND with traces of subangular fine to 13
medium gravels of igneous origin. 16

2 72.682
Medium dense, brown, silty SAND. D-2 9 24 SPT at 2.00 meters
10
14

3 71.682
Changing into dense D-3 12 32 SPT at 3.00 meters
15
17

4 70.682
Medium dense, brown, poorly-graded D-4 10 29 SPT at 4.00 meters
medium to fine SAND with silt and traces of 13
subrounded fine gravels of igneous origin. 16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 69.682
Changing into dense D-5 13 33 SPT at 5.00 meters
15
18

6 68.682

Dense, brown, silty medium to fine SAND D-6 15 38 SPT at 6.50 meters
17
21
7 67.682

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-067

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, silty medium to fine SAND


(continued)
8 66.682
Dense, reddish brown, silty fine to medium D-7 16 42 SPT at 8.00 meters
SAND with traces of subangular medium to 19
coarse gravels of igneous origin. 23

9 65.682

Dense, reddish brown, silty SAND. D-8 14 45 SPT at 9.50 meters


20
25
10 64.682

11 63.682
Dense, reddish brown, silty fine to medium D-9 10 44 SPT at 11.00 meters
SAND with subrounded to subangular, 21
medium to coarse gravels of igneous origin. 23

12 62.682

Very dense, brown, poorly-graded medium D-10 17 46 SPT at 12.50 meters


to fine SAND with silt and traces of 22
subangular to subrounded medium to fine 24
13 61.682
gravels of igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 60.682
Very dense, brown, silty SAND with gravel of D-11 21 55 SPT at 14.00 meters
igneous origin. 24
31

15 59.682
--Ditto-- D-12 19 53 SPT at 15.00 meters
23
30

16 58.682

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-067

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-13 17 52 SPT at 16.00 meters


20
----End of borehole at 16.00 meters----
32

17 57.682

18 56.682

19 55.682

20 54.682

21 53.682
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 52.682

23 51.682

24 50.682

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-068

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3090877.195


NEOM Desalination Plant to Gayal Transmission System 77.871 E: 732876.269
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 10-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown clayey medium to coarse SAND with B-1 Inspection Pit


sub-angular medium to coarse gravels of 0.00~1.20m
igneous origin.

1 76.871

Medium dense brown silty SAND with D-1 7 21 SPT at 1.20 meters
sub-angular to sub-rounded medium to 10
coarse gravels of igneous origin. 11

2 75.871
--Ditto-- D-2 9 24 SPT at 2.00 meters
11
13

3 74.871
Medium dense brown silty SAND. D-3 10 26 SPT at 3.00 meters
12
14

4 73.871
Medium dense brown poorly-graded medium D-4 12 28 SPT at 4.00 meters
to coarse SAND. 13
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 72.871
Medium dense brown silty fine to medium D-5 9 30 SPT at 5.00 meters
SAND with traces of sub-angular fine gravels 14
of igneous origin. 16

6 71.871

Changing to dense. D-6 13 31 SPT at 6.50 meters


14
17
7 70.871

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-068

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown silty fine to medium


SAND with traces of sub-angular fine gravels
of igneous origin. (continued)
8 69.871
--Ditto-- D-7 15 38 SPT at 8.00 meters
18
20

9 68.871

--Ditto-- D-8 16 40 SPT at 9.50 meters


19
21
10 67.871

11 66.871
Dense brown poorly-graded medium to fine D-9 19 42 SPT at 11.00 meters
SAND with silt and traces of sub-rounded to 20
sub-angular fine to medium gravels of 22
igneous origin.

12 65.871

Dense brown silty medium to fine SAND. D-10 20 44 SPT at 12.50 meters
20
24
13 64.871
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 63.871
Dense brown silty medium to coarse SAND, D-11 21 48 SPT at 14.00 meters
23
25

15 62.871
Very dense brown silty medium to coarse D-12 22 51 SPT at 15.00 meters
SAND with traces of sub-angular medium to 25
fine gravels of igneous origin. 26
----End of borehole at 15.00 meters----

16 61.871

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-069

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3091211.716


NEOM Desalination Plant to Gayal Transmission System 74.692 E: 732511.612
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 09-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded medium to coarse B-1 Inspection Pit


SAND with silt and sub-angular fine to 0.00~1.20m
medium gravels of igneous origin.

1 73.692

Medium dense light brown poorly-graded D-1 5 14 SPT at 1.20 meters


medium to coarse SAND with silt and 5
sub-angular coarse gravels of igneous 9
origin.
2 72.692
Medium dense brown poorly-graded medium D-2 7 24 SPT at 2.00 meters
to coarse SAND with silt and sub-angular to 12
sub-rounded medium to fine gravels of 12
igneous origin.

3 71.692
--Ditto-- D-3 10 24 SPT at 3.00 meters
11
13

4 70.692
Medium dense brown silty coarse SAND with D-4 9 26 SPT at 4.00 meters
sub-angular medium to coarse gravels of 11
igneous origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 69.692
Medium dense brown well-graded medium to D-5 11 26 SPT at 5.00 meters
coarse SAND with silt. 12
14

6 68.692

Medium dense brown poorly-graded medium D-6 8 28 SPT at 6.50 meters


to coarse SAND with sub-rounded fine 12
gravels of igneous origin. 16
7 67.692

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-069

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 66.692
Dense brown silty medium to fine SAND with D-7 11 34 SPT at 8.00 meters
sub-rounded to sub-angular medium to fine 14
gravels of igneous origin. 20

9 65.692

Changing to medium dense. D-8 12 27 SPT at 9.50 meters


12
15
10 64.692

11 63.692
Dense brown poorly-graded medium to D-9 12 35 SPT at 11.00 meters
coarse SAND with silt and sub-angular 16
medium to coarse gravels of igneous origin. 19

12 62.692

Dense, brown, well-graded SAND with silt D-10 14 33 SPT at 12.50 meters
and gravel of igneous origin. 12
21
13 61.692
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 60.692
Dense light brown silty medium to fine SAND D-11 15 45 SPT at 14.00 meters
with traces of sub-angular medium gravels of 19
igneous origin. 26

15 59.692
Very dense light brown silty fine to medium D-12 16 60 SPT at 15.00 meters
SAND with sub-rounded fine gravels of 24
igneous origin. 36
----End of borehole at 15.00 meters----

16 58.692

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-070

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3091518.354


NEOM Desalination Plant to Gayal Transmission System 67.529 E: 732116.701
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 10-12-21 8:00 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with silt and B-1 Inspection Pit


gravels of igneous origin. 0.00~1.20m

1 66.529

Medium dense, brown, poorly-graded D-1 9 22 SPT at 1.20 meters


medium to fine SAND with silt and 10
subangular to subrounded coarse to fine 12
gravels of igneous origin.
2 65.529
--Ditto-- D-2 8 24 SPT at 2.00 meters
11
13

3 64.529
Medium dense, brown, silty medium to fine D-3 11 29 SPT at 3.00 meters
SAND. 14
15

4 63.529
Changing to dense. D-4 11 31 SPT at 4.00 meters
14
17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.529
Dense, light brown, silty medium to fine D-5 13 32 SPT at 5.00 meters
SAND. 16
16

6 61.529

Medium dense, greyish brown, clayey D-6 8 17 SPT at 6.50 meters


medium to fine SAND with subrounded 8
coarse to medium gravels of sedimentary 9
7 60.529
origin.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-070

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, greyish brown, clayey


medium to fine SAND with subrounded
coarse to medium gravels of sedimentary
8 59.529
origin. (continued) D-7 7 20 SPT at 8.00 meters
--Ditto-- 9
11

9 58.529

--Ditto-- D-8 14 36 SPT at 9.50 meters


17
19
10 57.529

11 56.529
Dense, brown, well-graded medium to fine D-9 16 32 SPT at 11.00 meters
SAND with silt. 18
23

12 55.529

Dense, brown, silty medium to coarse SAND D-10 17 46 SPT at 12.50 meters
with traces of subangular coarse gravels of 21
igneous origin. 25
13 54.529
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 53.529
Changing into very dense. D-11 20 53 SPT at 14.00 meters
24
29

15 52.529
--Ditto-- D-12 23 57 SPT at 15.00 meters
26
----End of borehole at 15.00 meters----
31

16 51.529

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-071

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3091825.116


NEOM Desalination Plant to Gayal Transmission System 65.027 E: 731721.830
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 09-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with silt and B-1 Inspection Pit


sub-angular fine to medium gravels of 0.00~1.20m
igneous origin.

1 64.027

Medium dense brown poorly-graded medium D-1 6 20 SPT at 1.20 meters


to coarse SAND with silt and sub-rounded to 9
sub-angular fine to coarse gravels of 11
igneous origin.
2 63.027
Medium dense brown well-graded SAND D-2 10 23 SPT at 2.00 meters
with silt. 11
12

3 62.027
Medium dense brown poorly-graded medium D-3 7 24 SPT at 3.00 meters
to coarse SAND with silt and sub-angular to 10
sub-rounded fine to medium gravels of 14
igneous origin.

4 61.027
Medium dense brown, silty medium to fine D-4 12 27 SPT at 4.00 meters
SAND with sub-rounded fine to medium 13
gravels of igneous origin. 14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 60.027
Dense, brown, poorly-graded SAND with silt. D-5 10 31 SPT at 5.00 meters
15
16

6 59.027

Dense brown poorly-graded medium to fine D-6 12 33 SPT at 6.50 meters


SAND with silt. 16
17
7 58.027

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-071

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded medium to fine


SAND with silt. (continued)
8 57.027
Medium dense brown poorly-graded coarse D-7 10 29 SPT at 8.00 meters
to medium SAND with silt and sub-angular to 13
sub-rounded medium to coarse gravels of 16
igneous origin.

9 56.027

Dense brown poorly-graded medium to D-8 13 31 SPT at 9.50 meters


coarse SAND with silt and sub-rounded 14
medium gravels of igneous origin. 17
10 55.027

11 54.027
--Ditto-- D-9 10 35 SPT at 11.00 meters
15
20

12 53.027

Dense brown silty SAND with sub-rounded D-10 15 40 SPT at 12.50 meters
medium to fine gravels of igneous origin. 18
22
13 52.027
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 51.027
Dense brown silty medium to fine SAND. D-11 15 40 SPT at 14.00 meters
19
21

15 50.027
Dense greyish brown poorly-graded coarse D-12 17 45 SPT at 15.00 meters
to medium SAND with silt. 20
25
----End of borehole at 15.00 meters----

16 49.027

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-072

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3092131.775


NEOM Desalination Plant to Gayal Transmission System 59.875 E: 731326.918
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 06-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 09-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded medium to coarse B-1 Inspection Pit


SAND with silt sub-rounded fine gravels of 0.00~1.20m
igneous origin.

1 58.875

Medium dense greyish brown poorly-graded D-1 4 14 SPT at 1.20 meters


coarse to medium SAND with silt and 6
sub-rounded to sub-angular medium to fine 8
gravels of igneous origin.
2 57.875
Medium dense light brown poorly-graded D-2 6 17 SPT at 2.00 meters
medium to fine SAND with silt and traces of 7
sub-angular to sub-rounded medium to fine 10
gravels of igneous origin.

3 56.875
Dense brown well-graded coarse to medium D-3 9 34 SPT at 3.00 meters
SAND with silt . 14
20

4 55.875
Dense brown silty fine SAND. D-4 11 38 SPT at 4.00 meters
16
22
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 54.875
Dense brown silty medium to coarse SAND. D-5 9 32 SPT at 5.00 meters
14
18

6 53.875

Dense brown poorly-graded medium to fine D-6 11 38 SPT at 6.50 meters


SAND with silt and sub-angular coarse 16
gravels of igneous origin. 22
7 52.875

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-072

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 51.875
Dense brown poorly-graded fine to medium D-7 13 44 SPT at 8.00 meters
SAND with silt. 18
26

9 50.875

Medium dense reddish brown well-graded D-8 8 28 SPT at 9.50 meters


medium to fine SAND with silt. 12
16
10 49.875

11 48.875
Dense, reddish brown, poorly-graded SAND D-9 13 34 SPT at 11.00 meters
with silt. 13
21

12 47.875

Changing to very dense. D-10 13 57 SPT at 12.50 meters


19
38
13 46.875
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 45.875
Very dense reddish brown poorly-graded D-11 16 61 SPT at 14.00 meters
medium to fine SAND with silt and 25
sub-angular medium gravels of igneous 36
origin.

15 44.875
Very dense reddish brown poolry-graded D-12 18 66 SPT at 15.00 meters
SAND. 27
39
----End of borehole at 15.00 meters----

16 43.875

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-073

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3092438.376


NEOM Desalination Plant to Gayal Transmission System 56.017 E: 730931.961
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 06-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with B-1 Inspection Pit


sub-rounded fine gravels of igneous origin. 0.00~1.20m

1 55.017

Medium dense brown poorl-graded medium D-1 7 20 SPT at 1.20 meters


to coarse SAND with silt and traces of 9
sub-angular to sub-rounded fine to medium 11
gravels of igneous origin.
2 54.017
--Ditto-- D-2 8 24 SPT at 2.00 meters
10
14

3 53.017
Dense brown silty medium to coarse SAND D-3 12 34 SPT at 3.00 meters
and sub-rounded to sub-angular fine to 15
medium gravels of igneous origin. 19

4 52.017
Dense brown poorly-graded medium to fine D-4 11 31 SPT at 4.00 meters
SAND with silt and sub-rounded to 13
sub-angular medium to fine gravels of 18
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 51.017
--Ditto-- D-5 15 39 SPT at 5.00 meters
18
21

6 50.017

Dense brown well-graded medium to coarse D-6 17 44 SPT at 6.50 meters


SAND with silt and sub-angular medium to 20
fine gravels of igneous origin. 24
7 49.017

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-073

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 48.017
Dense, brown, well-graded SAND with silt D-7 15 42 SPT at 8.00 meters
and gravel of igneous origin. 19
23

9 47.017

Dense brown well-graded medium to fine D-8 17 45 SPT at 9.50 meters


SAND with silt. 20
25
10 46.017

11 45.017
Very dense brown silty fine to medium D-9 19 53 SPT at 11.00 meters
SAND. 24
29

12 44.017

--Ditto-- D-10 21 57 SPT at 12.50 meters


25
32
13 43.017
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 42.017
Very dense brown silty SAND. D-11 20 61 SPT at 14.00 meters
27
34

15 41.017
Very dense brown poorly-graded fine to D-12 24 70 SPT at 15.00 meters
medium SAND with silt and sub-rounded fine 31
to medium gravels of igneous origin. 39

16 40.017

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-073

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown silty medium to coarse B-13 22 59 SPT at 16.00 meters
SAND sub-angular to sub-rounded fine to 26
medium gravels of igneous origin. 33
----End of borehole at 16.00 meters-----

17 39.017

18 38.017

19 37.017

20 36.017

21 35.017
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 34.017

23 33.017

24 32.017

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-074

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3092753.796


NEOM Desalination Plant to Gayal Transmission System 55.370 E: 730544.180
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 06-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 09-12-21 08:30 N.E 9.00
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with angular to B-1 Inspection Pit


sub-rounded gravels of igneous origin. 0.00~1.20m

1 54.370

Medium dense brown poorly-graded SAND D-1 7 17 SPT at 1.20 meters


with sub-rounded gravels of igneous origin. 8
9

2 53.370
Medium dense, brown, poorly-graded SAND. D-2 7 19 SPT at 2.00 meters
9
10

3 52.370
--Ditto-- D-3 8 22 SPT at 3.00 meters
10
12

4 51.370
Medium dense brown poorly-graded fine to D-4 6 24 SPT at 4.00 meters
medium SAND with silt and sub-rounded 11
medium gravels of igneous origin. 13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 50.370
--Ditto-- D-5 7 25 SPT at 5.00 meters
11
14

6 49.370

Medium dense, brown, well-graded SAND D-6 10 30 SPT at 6.50 meters


with silt. 14
16
7 48.370

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-074

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, well-graded SAND


with silt. (continued)
8 47.370
Medium dense grey medium to coarse D-7 9 27 SPT at 8.00 meters
SAND with silt and sub-rounded medium 12
gravels of igneous origin. 15

9 46.370

Changing to dense. D-8 12 32 SPT at 9.50 meters


15
17
10 45.370

11 44.370
Dense, grey, silty SAND. D-9 14 35 SPT at 11.00 meters
16
19

12 43.370

Dense grey fine to medium SAND with silt D-10 13 39 SPT at 12.50 meters
and trace sub-rounded gravels of igneous 18
origin. 21
13 42.370
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 41.370
--Ditto-- D-11 14 41 SPT at 14.00 meters
19
22

15 40.370
Dense grey poorly-graded medium to coarse D-12 17 46 SPT at 15.00 meters
SAND with silt and rounded gravels of 21
igneous origin. 25

16 39.370

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-074

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-13 17 49 SPT at 16.00 meters


22
----End of borehole at 16.00 meters----
27

17 38.370

18 37.370

19 36.370

20 35.370

21 34.370
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 33.370

23 32.370

24 31.370

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-074

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

25 30.370

26 29.370

27 28.370

28 27.370

29 26.370

30 25.370
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 24.370

32 23.370

33 22.370

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-075

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3093077.348


NEOM Desalination Plant to Gayal Transmission System 61.507 E: 730163.001
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 05-Dec-21 06-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-2021 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


gravel. 0.00~1.20m

1 60.507

Medium dense brown well-graded medium to D-1 9 24 SPT at 1.20 meters


coarse SAND with silt and traces of 11
sub-rounded fine gravels of igneous origin. 13

2 59.507
Medium dense, brown, poorly-graded SAND. D-2 11 30 SPT at 2.00 meters
14
16

3 58.507
Dense brown silty fine to medium SAND. D-3 13 35 SPT at 3.00 meters
16
19

4 57.507
--Ditto-- D-4 12 33 SPT at 4.00 meters
15
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 56.507
Dense brown poorly-graded SAND with silt. D-5 14 38 SPT at 5.00 meters
17
21

6 55.507

Dense brown well-graded fine to medium D-6 15 42 SPT at 6.50 meters


SAND with silt and traces of sub-angular fine 19
gravels of igneous origin. 23
7 54.507

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-075

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 53.507
Very dense brown silty fine to medium D-7 18 51 SPT at 8.00 meters
SAND. 24
27

9 52.507

Changing to dense. D-8 16 45 SPT at 9.50 meters


20
25
10 51.507

11 50.507
Very dense reddish brown silty GRAVEL of D-9 19 56 SPT at 11.00 meters
igneous origin with sand. 25
31

12 49.507

--Ditto-- D-10 21 63 SPT at 12.50 meters


29
34
13 48.507
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 47.507
Very dense brown silty medium to fine SAND D-11 24 65 SPT at 14.00 meters
with sub-angular fine to medium gravels of 29
igneous origin. 36

15 46.507
--Ditto-- D-12 22 65 SPT at 15.00 meters
29
----End of borehole at 15.00 meters----
34

16 45.507

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-076

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3093400.944


NEOM Desalination Plant to Gayal Transmission System 60.753 E: 729781.770
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 05-Dec-21 06-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with silt and B-1 Inspection Pit


sub-rounded medium to coarse gravels of 0.00~1.20m
igneous origin.

1 59.753

Changing to medium dense. D-1 5 16 SPT at 1.20 meters


7
9

2 58.753
Medium dense brown silty fine to medium D-2 7 23 SPT at 2.00 meters
SAND with sub-rounded fine to medium 10
gravels of igneous origin. 13

3 57.753
Medium dense grey poorly-graded SAND D-3 9 28 SPT at 3.00 meters
with gravel. 14
14

4 56.753
--Ditto-- D-4 14 29 SPT at 4.00 meters
13
16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 55.753
Medium dense brown poorly-graded SAND D-5 10 28 SPT at 5.00 meters
with silt and fine to medium gravels of 13
igneous origin. 15

6 54.753

Changing to dense. D-6 11 32 SPT at 6.50 meters


14
18
7 53.753

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-076

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 52.753
Dense brown silty fine to medium SAND with D-7 11 35 SPT at 8.00 meters
gravel. Gravels are angular fine to medium 16
of igneous origin. 19

9 51.753

Dense, brown, silty SAND. D-8 14 42 SPT at 9.50 meters


18
24
10 50.753

11 49.753
Very dense light greenish grey silty weakly D-9 18 53 SPT at 11.00 meters
cemented fine to medium SAND. 22
31

12 48.753

Dense, light grey, poorly-graded SAND with D-10 16 60 SPT at 12.50 meters
silt. 25
35
13 47.753
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 46.753
Very dense brown to greenish grey silty D-11 21 74 SPT at 14.00 meters
weakly cemented fine to medium SAND. 33
41

15 45.753
--Ditto-- D-12 20 83 SPT at 15.00 meters
36
----End of borehole at 15.00 meters----
47

16 44.753

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-077

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3093724.534


NEOM Desalination Plant to Gayal Transmission System 57.266 E: 729400.574
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 05-Dec-21 05-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with silt and B-1 Inspection Pit


sub-angular fine to medium gravels of 0.00~1.20m
igneous origin.

1 56.266

Changing to medium dense. D-1 6 18 SPT at 1.20 meters


8
10

2 55.266
Medium dense, brown, poorly-graded SAND D-2 8 20 SPT at 2.00 meters
with silt and gravel. 9
11

3 54.266
Medium dense brown silty fine to medium D-3 7 22 SPT at 3.00 meters
SAND with trace sub-angular to sub-rounded 10
fine to medium gravels of igneous origin. 12

4 53.266
--Ditto-- D-4 9 26 SPT at 4.00 meters
12
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 52.266
Medium dense brown poorly-graded SAND D-5 10 29 SPT at 5.00 meters
with silt and gravel of igneous origin. 14
15

6 51.266

--Ditto-- D-6 13 30 SPT at 6.50 meters


15
15
7 50.266

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-077

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown poorly-graded SAND


with silt and gravel of igneous origin.
(continued)
8 49.266
Dense greyish brown silty clayey medium to D-7 16 37 SPT at 8.00 meters
fine SAND with sub-angular medium to fine 18
19
gravels of igneous origin.

9 48.266

--Ditto-- D-8 17 39 SPT at 9.50 meters


19
20
10 47.266

11 46.266
Dense, brown, clayey SAND with gravel of D-9 18 41 SPT at 11.00 meters
igneous origin. 20
21

12 45.266

Dense reddish brown silty weakly cemented D-10 20 43 SPT at 12.50 meters
fine to medium SAND with sub-angular fine 21
gravels of igneous origin. 22
13 44.266
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 43.266
Dense reddish brown silty weakly cemented D-11 19 44 SPT at 14.00 meters
fine to medium SAND with sub-angular fine 21
gravels of sandstone origin. 23

15 42.266
--Ditto-- D-12 20 48 SPT at 15.00 meters
23
-----End of borehole at 15.00 meters----
25

16 41.266

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-078

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3094048.065


NEOM Desalination Plant to Gayal Transmission System 56.125 E: 729019.374
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 05-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greysih brown poorly-graded SAND with silt B-1 Inspection Pit


and sub-angular medium to coarse gravels 0.00~1.20m
of igneous origin.

1 55.125

Medium dense light brown fine SAND with D-1 4 12 SPT at 1.20 meters
silt and sub-angular coarse to medium 6
gravels of igneous origin. 6

2 54.125
Medium dense brown poorly-graded fine to D-2 6 19 SPT at 2.00 meters
medium SAND with silt and sub-angular 8
medium to fine gravels of igneous origin. 11

3 53.125
Medium dense brown poorly-graded fine to D-3 9 22 SPT at 3.00 meters
medium SAND with silt and traces of 9
sub-angular medium to fine gravels of 13
igneous origin.

4 52.125
Medium dense brown poorly-graded medium D-4 9 24 SPT at 4.00 meters
to coarse SAND with silt and sub-rounded 11
medium to fine gravels of igneous origin. 13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 51.125
--Ditto-- D-5 8 24 SPT at 5.00 meters
12
12

6 50.125

Medium dense brown poorly-graded coarse D-6 10 27 SPT at 6.50 meters


to medium SAND with silt. 11
16
7 49.125

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-078

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown poorly-graded coarse


to medium SAND with silt. (continued)
8 48.125
Very dense greyish brown well-graded D-7 18 61 SPT at 8.00 meters
medium to fine SAND with silt. 29
32

9 47.125

Very dense, greyish brown, poorly-graded D-8 16 58 SPT at 9.50 meters


SAND with silt. 25
33
10 46.125

11 45.125
Very dense greyish brown silty SAND. D-8 30 100 SPT at 11.00 meters
35
50/10
From 11.50~13.00m R-1 100 Coring from
Very dense brownish grey weakly cemented 11.50~12.50 meters
silty SAND.
12 44.125

R-2 98 Coring from


12.50~14.00 meters

13 43.125
From 13.00~16.00m
Extremely weak brownish to greenish grey
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

clastic friable SANDSTONE. Highly


weathered to decomposed.

14 42.125
R-3 97 0 6 NI Coring from
14.00~15.50 meters

15 41.125

From 15.50~16.00m R-4 100 24 24 27.0 Coring from


Very weak brownish yellow weakly 15.50~16.00 meters
cemented coarse to medium SANDSTONE
16 40.125

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-078

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

moderately weathered.
----End of borehole at 16.00 meters----

17 39.125

18 38.125

19 37.125

20 36.125

21 35.125
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 34.125

23 33.125

24 32.125

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-079

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3094371.665


NEOM Desalination Plant to Gayal Transmission System 55.666 E: 728638.233
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 05-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to coarse SAND. B-1 Inspection Pit


0.00~1.20m

1 54.666

Medium dense brown silty medium to fine D-1 8 24 SPT at 1.20 meters
SAND with traces of sub-angular medium to 11
fine gravels of igneous origin. 13

2 53.666
Medium dense brown coarse to medium D-2 10 28 SPT at 2.00 meters
SAND with sub-rounded medium to fine 12
gravels of igneous origin. 16

3 52.666
--Ditto-- D-3 8 26 SPT at 3.00 meters
12
14

4 51.666
Dense brown silty fine to medium SAND with D-4 14 34 SPT at 4.00 meters
sub-rounded medium gravel of igneous 15
origin. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 50.666
Changing to medium dense. D-5 10 30 SPT at 5.00 meters
13
17

6 49.666

Dense light brownish grey clayey fine SAND. D-6 16 45 SPT at 6.50 meters
20
25
7 48.666

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-079

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense light brownish grey clayey fine SAND.


(continued)
8 47.666
--Ditto-- D-7 37 100 SPT at 8.00 meters
50/7
Extremely weak light brownish to grey clastic R-1 100 12 20 38.0 Coring from
SANDSTONE. Highly weathered to 8.25~9.00 meters
decomposed.

9 46.666
--Ditto-- R-2 100 0 0 NI Coring from
9.00~10.00 meters

10 45.666
Very weak light greyish brown clastic R-3 100 45 80 18.4 Coring from
SANDSTONE. Highly weathered medium 10.00~11.00 meters
bedded.

11 44.666
Weak greyish brown to brown weakly R-4 100 Coring from
cemented fine to medium SAND. 11.00~12.00 meters

12 43.666
Greyish brown to brown, clayey SAND. R-5 75 Coring from
12.00~13.50 meters

13 42.666
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Very dense silty medium to fine SAND with D-8 39 100 SPT at 13.50 meters
sub-rounded fine to medium gravels of 50/9
igneous origin. R-6 100 Coring from
14 41.666 13.75~14.00 meters
Very dense brown weakly cemented medium R-7 90 20 26 33.0 Coring from
14.00~15.00 meters
SAND with silt.
Weak brown highly weathered clastic
SANDSTONE medium bedded.

15 40.666
Very dense greyish brown poorly-graded D-9 33 81 SPT at 15.00 meters
medium to coarse SAND with silt and 38
sub-angular medium to coarse gravels of 43
igneous origin.

16 39.666

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-079

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-10 36 86 SPT at 16.00 meters


40
----End of borehole at 16.00 meters----
46

17 38.666

18 37.666

19 36.666

20 35.666

21 34.666
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 33.666

23 32.666

24 31.666

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-080

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3094695.218


NEOM Desalination Plant to Gayal Transmission System 53.974 E: 728257.034
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 04-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 06-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with silt and B-1 Inspection Pit


traces of sub-rounded medium to fine gravel 0.00~1.20m
of igneous origin.

1 52.974

Medium dense greyish brown poorly-graded D-1 4 12 SPT at 1.20 meters


SAND with silt and sub-angular to 5
sub-rounded medium to fine gravels of 7
igneous origin.
2 51.974
Medium dnese greyish brown silty fine to D-2 7 23 SPT at 2.00 meters
medium SAND with sub-angular medium to 12
fine gravels of igneous origin. 11

3 50.974
--Ditto-- D-3 9 25 SPT at 3.00 meters
11
14

4 49.974
Medium dense, greyish brown, D-4 8 19 SPT at 4.00 meters
poorly-graded SAND with silt and gravel of 10
igneous origin. 9
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 48.974
Medium dense brown poorly-graded coarse D-5 10 19 SPT at 5.00 meters
to medium SAND with sub-rounded to 8
sub-angular fine to medium gravels of 11
igneous origin.

6 47.974

Medium dense brown poorly-graded fine to D-6 11 28 SPT at 6.50 meters


medium SAND with silt sub-rounded gravels 13
of igneous origin. 15
7 46.974

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-080

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 45.974
Medium dense brown silty coarse to medium D-7 10 28 SPT at 8.00 meters
SAND with fine sub-rounded to sub-angular 12
gravels of igneous origin. 16

9 44.974

Dense brown poorly-graded medium to fine D-8 13 33 SPT at 9.50 meters


SAND with sub-rounded fine to medium 15
gravels of igneous origin. 18
10 43.974

11 42.974
--Ditto-- D-9 14 44 SPT at 11.00 meters
20
24

12 41.974

Dense brown silty fine to medium SAND with D-10 16 50 SPT at 12.50 meters
traces of sub-rounded fine gravel of igneous 22
origin. 28
13 40.974
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 39.974
Very dense brown silty SAND with traces D-11 15 56 SPT at 14.00 meters
sub-angular fine to medium gravels of 25
igneous origin. 31

15 38.974
--Ditto-- D-12 18 62 SPT at 15.00 meters
28
----End of borehole at 15.00 meters----
34

16 37.974

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-081

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3095018.752


NEOM Desalination Plant to Gayal Transmission System 59.599 E: 727875.838
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 04-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 06-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded SAND with silt and B-1 Inspection Pit


sub-angular medium to fine gravels of 0.00~1.20m
igneous origin.

1 58.599

Medium dense brown poorly-graded D-1 4 17 SPT at 1.20 meters


GRAVEL of igneous origin with silt and sand. 8
9

2 57.599
--Ditto-- D-2 8 19 SPT at 2.00 meters
9
10

3 56.599
Medium dense brown silty medium to coarse D-3 10 25 SPT at 3.00 meters
SAND with sub-rounded to sub-angular 12
medium to fine gravels of igneous origin. 13

4 55.599
--Ditto-- D-4 12 29 SPT at 4.00 meters
14
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 54.599
Medium dense brown silty medium to coarse D-5 10 27 SPT at 5.00 meters
SAND with sub-rounded to sub-angular fine 12
to medium gravels of igneous origin. 15

6 53.599

Changing to dense. D-6 11 31 SPT at 6.50 meters


15
16
7 52.599

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-081

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 51.599
Dense greyish brown poorly-graded medium D-7 15 41 SPT at 8.00 meters
to coarse SAND with silt. 19
22

9 50.599

Dense greyish brown poorly-graded medium D-8 14 39 SPT at 9.50 meters


to coarse SAND with silt and traces of 18
sub-rounded fine to medium gravels of 21
10 49.599
igneous origin.

11 48.599
Dense greyish brown silty medium to coarse D-9 17 43 SPT at 11.00 meters
SAND. 20
23

12 47.599

Hard greyish brown SILT with sand. D-10 14 40 SPT at 12.50 meters
19
21
13 46.599
U-1 UDS from
13.00~13.20 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 45.599
--Ditto-- D-11 19 45 SPT at 14.00 meters
21
24

15 44.599
--Ditto-- D-12 20 49 SPT at 15.00 meters
23
----End of borehole at 15.00 meters----
26

16 43.599

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-082

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3095342.363


NEOM Desalination Plant to Gayal Transmission System 61.399 E: 727494.618
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 04-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 07-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dark brown poorly-graded SAND. B-1 Inspection Pit


0.00~1.20m

1 60.399

Medium dense poorly-graded medium to fine D-1 9 29 SPT at 1.20 meters


SAND with silt and sub-angular medium to 12
fine gravels of igneous origin. 17

2 59.399
--Ditto-- D-2 11 28 SPT at 2.00 meters
13
15

3 58.399
--Ditto-- D-3 9 28 SPT at 3.00 meters
12
16

4 57.399
Dense brown poorly-graded SAND with D-4 11 33 SPT at 4.00 meters
sub-angular medium to fine gravels of 14
igneous origin. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 56.399
Dense brown poorly-graded fine to medium D-5 18 35 SPT at 5.00 meters
SAND with silt and sub-rounded fine gravels 16
of igneous origin. 19

6 55.399

Dense brown silty medium to fine SAND with D-6 11 31 SPT at 6.50 meters
silt and traces of sub-rounded to sub-angular 14
fine gravels of igneous origin. 17
7 54.399

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-082

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown silty medium to fine SAND with


silt and traces of sub-rounded to sub-angular
fine gravels of igneous origin. (continued)
8 53.399
--Ditto-- D-7 14 38 SPT at 8.00 meters
17
21

9 52.399

--Ditto-- D-8 16 43 SPT at 9.50 meters


20
23
10 51.399

11 50.399
Dense brown poorly-graded fine to medium D-9 15 43 SPT at 11.00 meters
SAND with silt. 19
24

12 49.399

Dense brown poroly-graded fine to medium D-10 15 43 SPT at 12.50 meters


SAND with silt and traces of sub-rounded to 19
sub-angular medium to fine gravel of 24
13 48.399
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 47.399
--Ditto-- D-11 17 48 SPT at 14.00 meters
21
27

15 46.399
--Ditto-- D-12 14 43 SPT at 15.00 meters
18
----End of borehole at 15.00 meters----
25

16 45.399

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-083

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3095636.601


NEOM Desalination Plant to Gayal Transmission System 50.988 E: 727090.586
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 02-Dec-21 02-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 05-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, well-graded SAND with silt. B-1 Inspection Pit


0.00~1.20m

1 49.988

Medium dense greyish brown silty fine to D-1 7 18 SPT at 1.20 meters
medium SAND with traces of sub-rounded 9
fine gravels of igneous origin. 9

2 48.988
Medium dense greyish brown poorly-graded D-2 9 23 SPT at 2.00 meters
fine to medium SAND with silt and 11
sub-angular coarse gravels of igneous 12
origin.

3 47.988
Dense greyish brown poorly-graded fine to D-3 12 31 SPT at 3.00 meters
medium SAND with silt and traces of 14
sub-angular medium to fine gravel of 17
igneous origin.

4 46.988
--Ditto-- D-4 15 36 SPT at 4.00 meters
16
20
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 45.988
Dense greyish brown silty fine to medium D-5 14 36 SPT at 5.00 meters
SAND with traces of fine to medium gravels 17
of igneous origin. 19

6 44.988

Dense greyish brown, poorly-graded SAND D-6 17 46 SPT at 6.50 meters


with silt and sub-angular medium to coarse 21
gravels of igneous origin. 25
7 43.988

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-083

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown, poorly-graded SAND


with silt and sub-angular medium to coarse
gravels of igneous origin. (continued)
8 42.988
Changing to very dense. D-7 19 51 SPT at 8.00 meters
24
27

9 41.988

Very dense greyish brown silty coarse to D-8 21 56 SPT at 9.50 meters
medium SAND with sub-angular medium to 26
coarse gravels of igneous origin. 30
10 40.988

11 39.988
Very dense greyish brown silty medium to D-9 22 59 SPT at 11.00 meters
fine SAND with sub-angular medium to 26
coarse gravels of igneous origin. 33

12 38.988

Very dense greyish brown silty fine to D-10 27 68 SPT at 12.50 meters
medium SAND with sub-angular to 31
sub-rounded medium to coarse gravels of 37
13 37.988
igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 36.988
--Ditto-- D-11 24 63 SPT at 14.00 meters
29
34

15 35.988

Very dense greyish brown silty medium to D-12 23 63 SPT at 15.50 meters
fine SAND with sub-angular medium to 28
coarse gravels of igneous origin. 35
16 34.988

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-083

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown silty medium to


fine SAND with sub-angular medium to
coarse gravels of igneous origin. (continued)

17 33.988
--Ditto-- D-13 25 68 SPT at 17.00 meters
31
----End of borehole at 17.00 meters----
37

18 32.988

19 31.988

20 30.988

21 29.988
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 28.988

23 27.988

24 26.988

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-084

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3095929.013


NEOM Desalination Plant to Gayal Transmission System 58.896 E: 726684.933
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 02-Dec-21 02-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 05-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with silt and B-1 Inspection Pit


gravel of igneous origin. 0.00~1.20m

1 57.896

Medium dense greyish brown poorly-graded D-1 6 18 SPT at 1.20 meters


medium to coarse SAND with silt and traces 8
of sub-angular medium to fine gravels of 10
igneous origin.
2 56.896
Medium dense greyish brown poorly-graded D-2 8 22 SPT at 2.00 meters
medium to coarse SAND with silt and traces 10
of sun-angular medium to coarse gravels of 12
igneous origin.

3 55.896
Medium dense greyish brown poorly-graded D-3 10 28 SPT at 3.00 meters
medium to coarse SAND with silt. 13
15

4 54.896
Medium dense greyish brown poorly-graded D-4 8 24 SPT at 4.00 meters
medium to fine SAND with silt. 11
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 53.896
--Ditto-- D-5 10 26 SPT at 5.00 meters
12
14

6 52.896

--Ditto-- D-6 12 30 SPT at 6.50 meters


14
16
7 51.896

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-084

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense greyish brown poorly-graded


medium to fine SAND with silt. (continued)
8 50.896
Dense greyish brown fine to medium D-7 15 39 SPT at 8.00 meters
poorl-graded SAND with silt. 18
21

9 49.896

Dense greyish brown silty medium to coarse D-8 19 42 SPT at 9.50 meters
SAND. 20
22
10 48.896

11 47.896
Dense greyish brown poorly-graded medium D-9 20 45 SPT at 11.00 meters
to coarse SAND with silt and sub-angular 21
medium to coarse gravels of igneous origin. 24

12 46.896

Dense greyish brown poorly-graded fine to D-10 13 48 SPT at 12.50 meters


medium SAND with silt and traces of angular 23
to medium gravels of igneous origin. 25
13 45.896
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 44.896
Dense greyish brown silty medium to fine D-11 15 43 SPT at 14.00 meters
SAND. 19
24

15 43.896
--Ditto-- D-12 18 46 SPT at 15.00 meters
20
----End of borehole at 15.00 meters----
26

16 42.896

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-085

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3096221.259


NEOM Desalination Plant to Gayal Transmission System 68.115 E: 726279.281
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 07-Dec-21 08-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, well-graded GRAVEL with sand. B-1 Inspection Pit


0.00~0.60meters

Medium strong, brownish grey, phaneritic R-1 100 10 10 40.0 Coring from
texture, GRANITE. decomposed to highly 0.60m~1.50m
1 67.115 weathered.

--Ditto-- R-2 90 8 8 40.0 Coring from


1.50m~3.00m

2 66.115

3 65.115
3.00m~6.00m R-3 93 0 5 NI Coring from
Medium strong, pinkish grey, phaneritic 3.00m~4.50m
texture, GRANITE. Moderately weathered,
close to extremely close spaced incipient
fractured. Undulated rough, brown surface
staining at 5.00m, 5.80m
4 64.115

--Ditto-- R-4 93 11 17 39.0 Coring from


4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 63.115

6 62.115
6.00m~8.00m R-5 96 60 67 14.0 Coring from
Medium strong, pink, phaneritic texture, 6.00m~7.50m
GRANITE. Moderately weathered, close to
medium spaced, vertical and subvertical
incipient fractured, undulated smooth
surface, brown to reddish brown, staining.
7 61.115
joints are vertical, partly open to tight.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-085

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8.00m~9.00m R-6 96 31 31 23.0 Coring from


Moderately weathered, extremely close 7.50m~9.00m
spaced fractured
8 60.115

9 59.115
9.00m~9.70m R-7 93 15 20 36.0 Coring from
Moderately weathered, close spaced, 9.00m~10.50m
subvertical incipient fractured, joints are
vertical tight.
9.70m~12.40m
Medium strong, pink, phaneritic texture
10 58.115
GRANITE. Highly weathered extremely close
spaced fractured.

--Ditto-- R-8 93 0 0 NI Coring from


10.50m~12.00m

11 57.115

12 56.115
12.40m~14.60m R-9 92 0 11 NI Coring from
Medium strong, pink, phaneritic GRANITE, 12.00m~13.50m
MOderately weathered, close spaced,
subhorizontal to subvertical fractured,
planer, smooth surface having brown
staining. joints are vertical to subhorizontal
13 55.115
tight to partly open.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

R-10 96 31 47 23.0 Coring from


13.50m~15.00m

14 54.115

14.60m~19.50m
Highly weathered, extremely close spaced
fractured.
15 53.115
R-11 95 0 0 NI Coring from
15.00m~16.50m

16 52.115

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-085

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- R-12 96 0 0 NI Coring from


16.50m~18.00m

17 51.115

18 50.115
--Ditto-- R-13 93 0 0 NI Coring from
18.00m~19.50m

19 49.115

19.50m~21.00m R-14 97 29 32 24.0 Coring from


Medium strong to strong, pink, phaneritic 19.50m~21.00m
texture flow banded GRANITE. Moderately
20 48.115
weathered very close to close spaced,
subhorizontal incipient fractured having
brown staining from 19.50m~20.00m, @
20.70 and 21.00m. joints are vertical partly
to tight.
21 47.115
----End of borehole at 21.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 46.115

23 45.115

24 44.115

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-086

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3096513.561


NEOM Desalination Plant to Gayal Transmission System 67.405 E: 725873.602
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 06-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 09-12-21 08:30 N.E 3.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brownish grey, poorly-graded GRAVEL of B-1 Inspection Pit


granite with silt and sand (Residual Soil). 0.00~0.80meters

Very dense, greyish brown, medium to D-1 23 100 SPT at 0.80 meters
1 66.405
coarse SAND with silt and angular coarse 50/7
gravels of granite (residual soil).

--Ditto-- D-2 25 100 SPT at 1.50 meters


Very dense, greyish brown, well-graded R-1 50/4 97 Coring from
SAND (residual soil). 1.70m~2.70m
2 65.405

--Ditto-- D-3 25 100 SPT at 2.70 meters


50/7
3 64.405
--Ditto-- R-2 95 Coring from
3.00m~4.00m

4 63.405
--Ditto-- D-4 24 100 SPT at 4.00 meters
--Ditto-- R-3 50/5 94 Coring from
4.20m~5.20m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.405

Very dense, pinkish to greyish brown, D-5 25 100 SPT at 5.20 meters
poorly-graded SAND with gravel of granite 50/6
R-4 98 Coring from
(residual soil). 5.41m~6.40m

6 61.405

--Ditto-- D-6 23 100 SPT at 6.40 meters


--Ditto-- R-5 50/4 96 Coring from
6.60m~7.60m
7 60.405

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-086

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, greyish brown, angular fine to D-7 20 100 SPT at 7.60 meters
medium GRAVEL with sand. 50/7
R-6 92 Coring from
8 59.405 7.82m~8.80m

Very dense, greyish brown, medium to D-8 23 100 SPT at 8.80 meters
9 58.405
coarse SAND with angular coarse to R-7 50/5 90 Coring from
medium gravels of granite (residual soil) 9.00m~10.00m
Very dense, brown, poorly-graded SAND
with gravel of granite (residual soil).

10 57.405
--Ditto-- D-9 24 100 SPT at 10.00 meters
--Ditto-- R-8 50/4 95 Coring from
10.20m~11.20m

11 56.405

--Ditto-- D-10 22 100 SPT at 11.20 meters


50/6
11.41m~ 11.61m R-9 73 0 0 NI Coring from
--Ditto-- 11.41m~12.90m
11.61m~12.90m
12 55.405 Medium strong, pinkish brown, phaneritic
texture GRANITE. Decomposed to highly
weathered extremely close spaced fractured.

13 54.405 R-10 95 0 0 NI Coring from


12.90m~13.50m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-11 94 0 0 NI Coring from


13.50m~14.50m

14 53.405

--Ditto-- R-12 94 0 0 NI Coring from


14.50m~16.00m

15 52.405

16 51.405

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-086

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- R-13 96 0 0 NI Coring from


11.41m~ 11.61m 16.00m~17.50m
--Ditto--
11.61m~12.90m
Medium strong, pinkish brown, phaneritic
17 50.405 texture GRANITE. Decomposed to highly
weathered extremely close spaced fractured.
(continued)

--Ditto-- R-14 95 0 0 NI Coring from


17.50m~19.00m

18 49.405

19 48.405
----End of borehole at 19.00 meters----

20 47.405

21 46.405
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 45.405

23 44.405

24 43.405

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-087

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3096805.897


NEOM Desalination Plant to Gayal Transmission System 67.579 E: 725467.931
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 01-Dec-21 02-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 05-12-21 08:30 N.E 1.5
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish grey, phaneritic R-1 87 0 0 NI Coring from


texture, GRANITE. Highly to moderately 0.00m~1.00m
weathered, extremely close spaced, highly
fractured.

1 66.579
--Ditto-- R-2 100 0 0 NI Coring from
1.00m~1.50m

--Ditto-- R-3 97 0 0 NI Coring from


1.50m~3.00m

2 65.579

3 64.579
--Ditto-- R-4 96 0 0 NI Coring from
3.00m~4.50m

4 63.579

4.50m~5.20m R-5 93 0 0 NI Coring from


--Ditto-- 4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5.20m~6.00m
5 62.579
Medium strong, brownish grey, phaneritic
texture, GRANITE. Moderately weathered,
extremely close spaced, highly fractured.

6 61.579
--Ditto-- R-6 98 0 0 NI Coring from
6.00m~7.50m

7 60.579

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-087

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish to pinkish grey, R-7 92 0 0 NI Coring from


Phaneritic texture, GRANITE. Highly to 7.50m~9.00m
moderately weathered highly fractured.
8 59.579

9 58.579
--Ditto-- R-8 93 0 0 NI Coring from
9.00m~10.50m

10 57.579

--Ditto-- R-9 91 0 0 NI Coring from


10.50m~12.00m

11 56.579

12 55.579
Moderately weathered, extremely close R-10 91 0 0 NI Coring from
spaced, highly fractured. 12.00m~13.50m

13 54.579
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-11 90 0 0 NI Coring from


13.50m~15.00m

14 53.579

15 52.579
--Ditto-- R-12 92 0 0 NI Coring from
15.00m~16.50m

16 51.579

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-087

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish to pinkish grey,


Phaneritic texture, GRANITE. Highly to
moderately weathered highly fractured.
(continued) R-13 90 0 0 NI Coring from
16.50m~18.00m
--Ditto--
17 50.579

18 49.579
--Ditto-- R-14 80 0 0 NI Coring from
18.00m~19.00m

19 48.579
----End of borehole at 19.00 meters----

20 47.579

21 46.579
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 45.579

23 44.579

24 43.579

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-088

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3097098.205


NEOM Desalination Plant to Gayal Transmission System 67.600 E: 725062.285
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 06-Dec-21 07-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 11-12-21 8:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown, silty fine to medium SAND. B-1 Inspection Pit


0.00m~0.90m

1 66.600 Medium dense, greyish brown, D-1 9 33 SPT at 0.90 meters


poorly-graded, medium SAND. 14
19

2 65.600
Very dense, greyish brown, silty medium to D-2 25 65 SPT at 2.00 meters
coarse SAND. 30
35
--Ditto-- R-1 100 0 0 Coring from
2.45m~3.00m

3 64.600
Medium strong, greyish brown, phaneritic R-2 93 0 0 Coring from
texture GRANITE. Decomposed to highly 3.00m~4.50m
weathered.

4 63.600

--Ditto-- R-3 92 0 0 Coring from


4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 62.600

6 61.600
--Ditto-- R-4 96 0 0 Coring from
6.00m~7.50m

7 60.600

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-088

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish grey, phaneritic R-5 96 0 0 Coring from


texture, GRANITE, Highly weathered to 7.50m~9.00m
decomposed.
8 59.600

9 58.600
Medium strong, pinkish brown, phanitic R-6 98 0 0 Coring from
texture, GRANITE, Highly weathered and 9.00m~10.50m
extremely close spaced fractured.

10 57.600

--Ditto-- R-7 97 0 0 Coring from


10.50m~12.00m

11 56.600

12 55.600
Greyish brown, medium to coarse SAND R-8 98 0 0 Coring from
with angular coarse gravels (decomposed 12.00m~13.50m
granite).

13 54.600
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Medium strong, pinkish brown to light grey, R-9 93 0 0 Coring from


phaneritic texture GRANITE, Highly 13.50m~15.00m
weathered extremely close spaced fractured.
14 53.600

15 52.600
--Ditto-- R-10 100 0 0 Coring from
15.00m~16.50m

16 51.600

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-088

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, pinkish brown to light grey,


phaneritic texture GRANITE, Highly
weathered extremely close spaced fractured.
(continued) R-11 100 0 0 Coring from
16.50m~18.00m
--Ditto--
17 50.600

18 49.600
--Ditto-- R-12 100 0 0 Coring from
18.00m~19.00m

19 48.600
----End of borehole at 19.00 meters----

20 47.600

21 46.600
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 45.600

23 44.600

24 43.600

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-089

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3097476.491


NEOM Desalination Plant to Gayal Transmission System 66.428 E: 724759.515
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 04-Dec-21 05-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 8:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty coarse to medium SAND. Inspection Pit


0.00m~0.90m

1 65.428 Changing into very dense. D-1 24 100 SPT at 0.90 meters
40
50/7
Medium strong, brownish grey, phaneritic R-1 100 0 0 Coring from
texture GRANITE, decomposed to highly 1.27m~2.00m
weathered.

2 64.428
2.00~2.70m R-2 85 0 5 Coring from
--Ditto-- 2.00m~3.50m
2.70~3.50m
Very dense, brown, sandy subangular
GRAVEL of granite (Decomposed
GRANITE).
3 63.428

R-3 53 0 0 Coring from


3.50m~4.00m

4 62.428
--Ditto-- R-4 90 0 0 Coring from
4.00m~5.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 61.428
--Ditto-- R-5 67 0 0 Coring from
5.00m~6.50m

6 60.428

--Ditto-- R-6 100 0 0 Coring from


6.50m~7.00m

7 59.428
Weak, brown, phaneritic texture, GRANITE. R-7 93 0 0 Coring from
Highly weathered to decomposed. 7.00m~8.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-089

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Weak, brown, phaneritic texture, GRANITE.


Highly weathered to decomposed.
(continued)
8 58.428

Weak, brown, phaneritic texture GRANITE. R-8 80 0 0 Coring from


Highly weathered to decomposed. 8.50m~9.50m

9 57.428

--Ditto-- R-9 100 0 0 Coring from


9.50m~10.00m

10 56.428
--Ditto-- R-10 93 0 0 Coring from
10.00m~11.50m

11 55.428

--Ditto-- R-11 80 0 0 Coring from


11.50m~12.50m

12 54.428

--Ditto-- R-12 100 0 0 Coring from


12.50m~13.00m

13 53.428
Medium strong, brown, phaneritic texture, R-13 93 0 0 Coring from
GRANITE. Highly weathered, extremely 13.00m~14.50m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

close spaced fractured.

14 52.428

Medium strong, brownish grey, phaneritic R-14 67 0 0 Coring from


texture GRANITE. Highly to moderately 14.50m~16.00m
weathered close spaced fractured.
15 51.428

16 50.428

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-089

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- R-15 100 0 0 Coring from


Medium strong, brownish grey, phaneritic 16.00m~16.50m
texture GRANITE. Highly to moderately
weathered close spaced fractured. R-16 93 0 0 Coring from
16.50m~18.00m
(continued)
17 49.428 --Ditto--

18 48.428
Medium strong, brownish grey, phaneritic R-17 100 23 23 28.5 Coring from
texture GRANITE. Highly to moderately 18.00m~19.00m
weathered very close spaced fractured,
brown, surface staining from 18.50~19.00m
subvertical partly open to tight joints are
visible.
19 47.428
----End of borehole at 19.00 meters----

20 46.428

21 45.428
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 44.428

23 43.428

24 42.428

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-090

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3097927.590


NEOM Desalination Plant to Gayal Transmission System 44.502 E: 724543.993
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 02-Dec-21 03-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 06-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brownish yellow poorly-graded meidum to B-1 Inspection Pit


fine SAND with silt and traces of sub-angular 0.00~1.20m
gravels of igneous origin.

1 43.502

Loose brown poorly-graded fine to medium D-1 3 10 SPT at 1.20 meters


SAND with silt. 4
6

2 42.502
Changing to medium dense. D-2 4 13 SPT at 2.00 meters
6
7

3 41.502
Medium dense brown poorly-graded fine to D-3 5 14 SPT at 3.00 meters
medium SAND with silt. 7
7

4 40.502
--Ditto-- D-4 7 20 SPT at 4.00 meters
9
11
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 39.502
--Ditto-- D-5 11 26 SPT at 5.00 meters
12
14

6 38.502

Medium dense brown poorly-graded SAND D-6 11 28 SPT at 6.50 meters


with silt. 13
15
7 37.502

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-090

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown poorly-graded SAND


with silt. (continued)
8 36.502
Dense brown silty medium to fine SAND. D-7 13 35 SPT at 8.00 meters
16
19

9 35.502

--Ditto-- D-8 14 36 SPT at 9.50 meters


18
18
10 34.502

11 33.502
Dense brown poorly-graded SAND with silt. D-9 16 42 SPT at 11.00 meters
20
22

12 32.502

--Ditto-- D-10 15 45 SPT at 12.50 meters


22
23
13 31.502
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 30.502
Dense brown silty fine SAND with traces of D-11 16 48 SPT at 14.00 meters
sub-rounded fine gravels of igneous origin. 24
24

15 29.502

Very dense greyish brown silty fine to D-12 18 57 SPT at 15.50 meters
medium SAND. 24
33
16 28.502

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-090

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown silty fine to


medium SAND. (continued)

17 27.502
Very dense greyish brown poorly-graded D-13 22 64 SPT at 17.00 meters
coarse to medium SAND with silt. 28
36

18 26.502
--Ditto-- D-14 24 67 SPT at 18.00 meters
33
----End of borehole at 18.00 meters----
34

19 25.502

20 24.502

21 23.502
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 22.502

23 21.502

24 20.502

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-091

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3098378.761


NEOM Desalination Plant to Gayal Transmission System 38.022 E: 724328.439
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 01-Dec-21 01-Dec-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to fine SAND with silt and B-1 Inspection Pit
sub-rounded medium to fine gravel of 0.00~1.20m
igneous origin.

1 37.022

Medium dense brown medium to fine SAND D-1 4 14 SPT at 1.20 meters
with silt and traces of sub-rounded fine 6
gavels of igneous origin. 8

2 36.022
Medium dense brown poorly-graded medium D-2 8 20 SPT at 2.00 meters
to fine SAND with silt and traces of 9
sub-angular medium to fine gravel of 11
igneous origin.

3 35.022
Dense brown silty medium to coarse SAND. D-3 12 37 SPT at 3.00 meters
18
19

4 34.022
Dense brown poorly-graded coarse to D-4 11 39 SPT at 4.00 meters
medium SAND with silt and traces of 19
sub-angular medium gravels of igneous 20
origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 33.022
Dense greyish brown silty medium to fine D-5 10 31 SPT at 5.00 meters
SAND. 13
18

6 32.022

Dense greyish brown fine to medium SAND D-6 11 34 SPT at 6.50 meters
with silt and traces of sub-rounded fine of 14
igneous origin. 20
7 31.022

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-091

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 30.022
Dense greyish brown medium to coarse D-7 16 40 SPT at 8.00 meters
SAND with silt and traces of sub-angular 18
medium to fine gravels of igneous origin. 22

9 29.022

Dense greyish brownsilty medium to coarse D-8 18 46 SPT at 9.50 meters


SAND. 21
25
10 28.022

11 27.022
Dense brown fine to medium silty SAND with D-9 19 47 SPT at 11.00 meters
traces of sub-angular medium to fine gravels 22
of igneous origin. 25

12 26.022

Dense greyish brown poorly-graded medium D-10 17 47 SPT at 12.50 meters


to fine SAND with silt and traces of 21
sub-rounded fine gravels of igneous origin. 26
13 25.022
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 24.022
Dense greyish brown fine to medium SAND D-11 20 47 SPT at 14.00 meters
with silt and traces of sub-angular medium to 20
fine gravels of igneous origin. 27

15 23.022

Very dense brown fine to medium SAND D-12 19 50 SPT at 15.50 meters
with silt and traces of medium to fine 24
sub-angular gravels of igneous origin. 28
16 22.022

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-091

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown fine to medium SAND


with silt and traces of medium to fine
sub-angular gravels of igneous origin.
(continued)

17 21.022
Dense brown clayey SAND. D-13 15 39 SPT at 17.00 meters
18
21

18 20.022
--Ditto-- D-14 21 44 SPT at 18.00 meters
21
----End of borehole at 18.00 meters----
23

19 19.022

20 18.022

21 17.022
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 16.022

23 15.022

24 14.022

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-092

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3098829.931


NEOM Desalination Plant to Gayal Transmission System 35.466 E: 724112.891
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 01-Dec-21 01-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 04-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to fine silty SAND. B-1 Inspection Pit


0.00~1.20m

1 34.466

Medium dense brown poorly-graded medium D-1 5 13 SPT at 1.20 meters


to coarse SAND with silt and sub-angular 7
medium to coarse gravels of igneous origin. 6

2 33.466
Medium dense brown fine to medium silty D-2 8 23 SPT at 2.00 meters
SAND. 10
13

3 32.466
--Ditto-- D-3 9 27 SPT at 3.00 meters
12
15

4 31.466
Dense brown fine to medium silty SAND with D-4 13 35 SPT at 4.00 meters
sub-angular fine to medium gravels of 16
igneous origin. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 30.466
Dense brown fine to medium silty SAND. D-5 12 38 SPT at 5.00 meters
17
21

6 29.466

Dense brown fine to medium silty SAND with D-6 15 43 SPT at 6.50 meters
sub-angular medium to fine gravels of 19
igneous origin. 24
7 28.466

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-092

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown fine to medium silty SAND with


sub-angular medium to fine gravels of
igneous origin. (continued)
8 27.466
--Ditto-- D-7 17 45 SPT at 8.00 meters
20
25

9 26.466

Very dense brown fine to medium silty SAND D-8 20 53 SPT at 9.50 meters
with traces of sub-angular fine to medium 24
gravels of igneous origin. 29
10 25.466

11 24.466
Very desne, brown, poorly-graded SAND D-9 22 57 SPT at 11.00 meters
with silt and gravel of igneous origin. 26
31

12 23.466

Very dense brown medium to fine SAND D-10 19 51 SPT at 12.50 meters
with silt and sub-rounded fine gravels of 23
igneous origin. 28
13 22.466
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 21.466
Very dense brown poorly-graded SAND with D-11 22 61 SPT at 14.00 meters
silt and sub-angular medium to fine gravels 27
of igneous origin. 34

15 20.466

--Ditto-- D-12 18 56 SPT at 15.50 meters


25
31
16 19.466

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-092

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown poorly-graded SAND with


silt and sub-angular medium to fine gravels
of igneous origin. (continued)

17 18.466
Very dense brown fine to medium silty SAND D-13 23 59 SPT at 17.00 meters
with sub-angular medium to coarse gravels 27
of igneous origin. 32

18 17.466

Very dense brown fine to medium silty SAND D-14 20 53 SPT at 18.50 meters
with sub-angular medium to fine gravels of 23
igneous origin. 30
19 16.466

20 15.466
--Ditto-- D-15 24 63 SPT at 20.00 meters
28
----End of borehole at 20.00 meters----
35

21 14.466
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 13.466

23 12.466

24 11.466

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-093

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3099281.061


NEOM Desalination Plant to Gayal Transmission System 31.722 E: 723897.309
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 01-Dec-21 01-Dec-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded fine to medium SAND B-1 Inspection Pit


with silt. 0.00~1.20m

1 30.722

Medium dense brown poorly-graded fine to D-1 4 13 SPT at 1.20 meters


medium SAND with silt. 6
7

2 29.722
--Ditto-- D-2 7 15 SPT at 2.00 meters
6
9

3 28.722
--Ditto-- D-3 9 20 SPT at 3.00 meters
9
11

4 27.722
Medium dense brown to light brown silty fine D-4 10 27 SPT at 4.00 meters
to medium SAND with trace fine gravels of 12
igneous origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 26.722
--Ditto-- D-5 12 30 SPT at 5.00 meters
14
16

6 25.722

Changing to dense. D-6 13 32 SPT at 6.50 meters


15
17
7 24.722

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-093

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 23.722
Dense brown poorly-graded fine to medium D-7 14 34 SPT at 8.00 meters
SAND with silt. 16
18

9 22.722

--Ditto-- D-8 13 40 SPT at 9.50 meters


19
21
10 21.722

11 20.722
--Ditto-- D-9 15 43 SPT at 11.00 meters
20
23

12 19.722

Dense brown to greyish brown D-10 19 45 SPT at 12.50 meters


poorly-graded fine to medium SAND with silt. 21
24
13 18.722
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 17.722
--Ditto-- D-11 20 47 SPT at 14.00 meters
22
25

15 16.722

--Ditto-- D-12 21 50 SPT at 15.50 meters


24
26
16 15.722

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-093

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown to greyish brown


poorly-graded fine to medium SAND with silt.
(continued)

17 14.722
Dense greyish brown poorly-graded fine to D-13 23 50 SPT at 17.00 meters
medium SAND with silt. 25
25

18 13.722

Changing to very dense. D-14 24 53 SPT at 18.50 meters


26
27
19 12.722

20 11.722
--Ditto-- D-15 21 59 SPT at 20.00 meters
29
----End of borehole at 20.00 meters----
30

21 10.722
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 9.722

23 8.722

24 7.722

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-094

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3099739.588


NEOM Desalination Plant to Gayal Transmission System 33.531 E: 723699.888
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 30-Nov-21 30-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to fine SAND with silt and B-1 Inspection Pit
traces of sub-angular medium to fine gravel 0.00~1.20m
of igneous origin.

1 32.531

Medium dense brown silty fine to medium D-1 7 18 SPT at 1.20 meters
SAND with traces of sub-angular gravel of 9
igneous origin. 9

2 31.531
Medium dense brown silty fine to medium D-2 6 19 SPT at 2.00 meters
SAND with traces of sub-angular medium to 8
fine gravels of igneous origin. 11

3 30.531
Medium dense brown silty fine to medium D-3 10 28 SPT at 3.00 meters
SAND. 13
15

4 29.531
Changing to dense. D-4 13 31 SPT at 4.00 meters
14
17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.531
Dense brown poorly-graded SAND. D-5 11 34 SPT at 5.00 meters
15
19

6 27.531

--Ditto-- D-6 14 37 SPT at 6.50 meters


16
21
7 26.531

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-094

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded SAND.


(continued)
8 25.531
Dense brown silty medium to fine SAND with D-7 17 49 SPT at 8.00 meters
traces of sub-runded medium to fine gravels 20
of igneous origin. 29

9 24.531

Dense brown silty medium to fine SAND with D-8 15 48 SPT at 9.50 meters
traces of sub-angular fine gravel of igneous 22
origin. 26
10 23.531

11 22.531
Changing to very dense. D-9 19 53 SPT at 11.00 meters
24
29

12 21.531

Dense brown poorly-graded SAND with D-10 18 48 SPT at 12.50 meters


sub-angular medium to fine gravels of 21
igneous origin. 27
13 20.531
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.531
Very dense brown silty fine to medium D-11 20 54 SPT at 14.00 meters
SAND. 25
29

15 18.531
--Ditto-- D-12 19 50 SPT at 15.00 meters
23
----End of borehole at 15.00 meters----
27

16 17.531

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-095

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3100212.855


NEOM Desalination Plant to Gayal Transmission System 35.605 E: 723538.427
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 30-Nov-21 30-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with traces B-1 Inspection Pit
of sub-rounded fine gravel. 0.00~1.20m

1 34.605

Medium dense brown silty fine to medium D-1 3 12 SPT at 1.20 meters
SAND. 5
7

2 33.605
Medium dense brown silty medium to fine D-2 5 17 SPT at 2.00 meters
SAND. 7
10

3 32.605
Medium dense brown silty medium to coarse D-3 7 20 SPT at 3.00 meters
SAND. 9
11

4 31.605
Medium dense brown poorly-graded medium D-4 9 26 SPT at 4.00 meters
to coarse SAND. 12
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 30.605

Medium dense brown silty fine to medium D-5 11 28 SPT at 5.50 meters
SAND. 13
15
6 29.605

Dense brown silty fine to medium SAND with D-6 14 32 SPT at 6.50 meters
traces of sub-angular medium gravel of 15
igneous origin. 17
7 28.605

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-095

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 27.605
Dense, brown, well-graded SAND with silt. D-7 8 34 SPT at 8.00 meters
16
18

9 26.605

Dense brown poorly-graded medium to fine D-8 15 38 SPT at 9.50 meters


SAND with silt and traces of sub-rounded 18
fine gravel of igneous origin. 20
10 25.605

11 24.605
Dense brown poorly-graded fine to medium D-9 14 41 SPT at 11.00 meters
SAND with silt and traces of sub-rounded 19
medium to fine gravels of igneous origin. 22

12 23.605

--Ditto-- D-10 16 42 SPT at 12.50 meters


21
21
13 22.605
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 21.605
Dense brown poorly-graded fine to medium D-11 18 42 SPT at 14.00 meters
SAND with silt. 19
23

15 20.605
Dense brown silty fine to medium SAND with D-12 16 46 SPT at 15.00 meters
traces of sub-angular medium gravel. 22
24
----End of borehole at 15.00 meters----

16 19.605

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-096

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3100686.050


NEOM Desalination Plant to Gayal Transmission System 40.980 E: 723377.014
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 30-Nov-21 30-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown well-graded SAND with silt and B-1 Inspection Pit


sub-angular gravels of igneous origin. 0.00~1.20m

1 39.980

Medium dense brown poorly-graded medium D-1 4 14 SPT at 1.20 meters


to coarse SAND with silt and sub-rounded, 6
fine gravel of igneous origin. 8

2 38.980
Medium dense brown poorly-graded medium D-2 5 15 SPT at 2.00 meters
to coarse SAND with silt and traces of 7
sub-rounded medium gravel of igneous 8
origin.

3 37.980
Medium dense brown medium to coarse D-3 7 18 SPT at 3.00 meters
SAND with silt and sub-rounded fine gravel 8
of igneous origin. 10

4 36.980
--Ditto-- D-4 9 22 SPT at 4.00 meters
10
12
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 35.980
Medium dense brown poorly-graded medium D-5 12 30 SPT at 5.00 meters
to fine SAND. 13
17

6 34.980

Dense brown silty SAND with sub-angular D-6 14 33 SPT at 6.50 meters
medium to coarse gravels of igneous origin. 15
18
7 33.980

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-096

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown silty SAND with sub-angular


medium to coarse gravels of igneous origin.
(continued)
8 32.980
Dense brown silty SAND. D-7 15 36 SPT at 8.00 meters
17
19

9 31.980

Dense greyish brown coarse to medium D-8 16 41 SPT at 9.50 meters


SAND. 19
22
10 30.980

11 29.980
Dense brown fine to medium SAND with silt. D-9 18 43 SPT at 11.00 meters
20
23

12 28.980

--Ditto-- D-10 15 45 SPT at 12.50 meters


20
25
13 27.980
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 26.980
Dense, brown, silty SAND. D-11 15 41 SPT at 14.00 meters
18
23

15 25.980

Dense brown poorly-graded medium to fine D-12 19 46 SPT at 15.50 meters


SAND with silt. 22
24
16 24.980

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-096

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium D-13 20 50 SPT at 16.00 meters


SAND with sub-rounded fine gravel of 24
igneous origin. 26
----End of borehole at 16.00 meters----

17 23.980

18 22.980

19 21.980

20 20.980

21 19.980
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 18.980

23 17.980

24 16.980

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-097

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3101154.051


NEOM Desalination Plant to Gayal Transmission System 55.998 E: 723206.536
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 29-Nov-21 30-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to fine SAND with fine to B-1 Inspection Pit


medium sub-rounded gravel of igneous 0.00~1.20m
origin.

1 54.998

Loose brown poorly-graded medium to D-1 6 10 SPT at 1.20 meters


coarse SAND with medium to fine 5
sub-angular gravels of igneous origin. 5

2 53.998
Medium dense greyish brown coarse to D-2 7 19 SPT at 2.00 meters
medium SAND. 9
10

3 52.998
Medium dense greyish brown coarse to D-3 5 15 SPT at 3.00 meters
medium SAND. 6
9

4 51.998
Medium dense greyish brown poorly-graded D-4 8 23 SPT at 4.00 meters
medium to fine SAND with silt. 10
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 50.998
Medium dense greyish brown fine to medium D-5 10 28 SPT at 5.00 meters
SAND with silt. 12
16

6 49.998

Dense greyish brown medium to coarse D-6 13 40 SPT at 6.50 meters


SAND with sub-angular fine to medium 18
gravel of igneous origin. 22
7 48.998

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-097

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 47.998
Dense, brown, poorly-graded SAND with D-7 16 44 SPT at 8.00 meters
gravel of igneous origin. 20
24

9 46.998

Dense brown poorly-graded SAND with silt. D-8 14 42 SPT at 9.50 meters
19
23
10 45.998

11 44.998
Dense greyish brown fine to medium SAND D-9 18 50 SPT at 11.00 meters
with sub-angular medium to coarse gravels 22
of igneous and sedimentary origin. 28

12 43.998

Changing to very dense. D-10 21 57 SPT at 12.50 meters


25
32
13 42.998
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 41.998
Very dense, brown, poorly-graded SAND D-11 23 63 SPT at 14.00 meters
with gravel of igneous and sedimentary 29
origin. 34

15 40.998

D-12 21 57 SPT at 15.50 meters


25
32
16 39.998

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-097

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown medium to fine


SAND with sub-rounded to sub-angular
gravel of igneous origin medium to coarse
insize. (continued)

17 38.998
--Ditto-- D-13 25 66 SPT at 17.00 meters
30
----End of borehole at 17.00 meters----
36

18 37.998

19 36.998

20 35.998

21 34.998
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 33.998

23 32.998

24 31.998

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-098

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3101577.392


NEOM Desalination Plant to Gayal Transmission System 44.119 E: 722959.608
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 29-Nov-21 29-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, medium to fine SAND with B-1 Inspection Pit


sub-angular fine to medium gravels of 0.00~1.20m
igneous origin.

1 43.119

Medium dense brown poorly-graded fine to D-1 4 12 SPT at 1.20 meters


medium silty SAND. 5
7

2 42.119
Medium dense, brown, silty SAND. D-2 5 16 SPT at 2.00 meters
7
9

3 41.119
Medium dense brown poorly-graded fine to D-3 5 15 SPT at 3.00 meters
medium silty SAND with sub-rounded fine 6
gravels of igneous origin. 9

4 40.119
Medium dense brown poorly-graded fine to D-4 6 19 SPT at 4.00 meters
medium silty SAND with sub-angular 8
medium gravels of igneous origin. 11
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 39.119
--Ditto-- D-5 8 21 SPT at 5.00 meters
9
12

6 38.119

Medium dense brown silty SAND. D-6 11 24 SPT at 6.50 meters


11
13
7 37.119

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-098

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown silty SAND.


(continued)
8 36.119
Medium dense brown poorly-graded fine to D-7 12 30 SPT at 8.00 meters
medium SAND with silt and sub-angular fine 14
to medium gravels of igneous origin. 16

9 35.119

Changing to dense. D-8 11 36 SPT at 9.50 meters


17
19
10 34.119

11 33.119
Dense, brown, poorly-graded SAND with silt. D-9 13 39 SPT at 11.00 meters
18
21

12 32.119

Dense brown fine to medium SAND with silt D-10 14 40 SPT at 12.50 meters
and sub-rounded fine gravels of igneous 18
origin. 22
13 31.119
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 30.119
Dense brown fine to medium SAND with silt D-11 14 41 SPT at 14.00 meters
and traces of sub-angular to sub-rounded 18
fine to medium gravels of igneous origin. 23

15 29.119
--Ditto-- D-12 16 41 SPT at 15.00 meters
19
----End of borehole at 15.00 meters----
22

16 28.119

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-099

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3102053.024


NEOM Desalination Plant to Gayal Transmission System 38.507 E: 722738.245
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 29-Nov-21 29-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 01-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


medium to fine sub-angular gravel of 0.00~1.20m
igneous origin.

1 37.507

Medium dense brown poorly-graded medium D-1 6 16 SPT at 1.20 meters


to fine SAND with sub-angular medium to 7
coarse gravels of igneous origin. 9

2 36.507
Medium dense brown poorly-graded medium D-2 9 25 SPT at 2.00 meters
to coarse SAND. 11
14

3 35.507
--Ditto-- D-3 8 28 SPT at 3.00 meters
12
16

4 34.507
Medium dense brown medium to coarse D-4 10 28 SPT at 4.00 meters
SAND with traces of sub-angular gravels of 13
fine of igneous origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 33.507
Dense brown poorly-graded fine to medium D-5 13 35 SPT at 5.00 meters
SAND with silt. 16
19

6 32.507

--Ditto-- D-6 15 40 SPT at 6.50 meters


18
22
7 31.507

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-099

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium


SAND with silt. (continued)
8 30.507
Dense brown silty fine to medium SAND. D-7 17 46 SPT at 8.00 meters
21
25

9 29.507

Dense, brown, poorly-graded SAND with silt. D-8 19 43 SPT at 9.50 meters
20
23
10 28.507

11 27.507
--Ditto-- D-9 16 45 SPT at 11.00 meters
20
25

12 26.507

Very dense brown well-graded medium to D-10 21 53 SPT at 12.50 meters


fine SAND with silt. 24
29
13 25.507
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 24.507
Changing to dense. D-11 19 49 SPT at 14.00 meters
22
27

15 23.507
Very dense brown poorly-graded medium to D-12 24 61 SPT at 15.00 meters
coarse SAND with silt. 28
33
----End of borehole at 15.00 meters----

16 22.507

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-100

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3102509.282


NEOM Desalination Plant to Gayal Transmission System 61.390 E: 722582.611
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 28-Nov-21 30-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 04-12-21 8:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, silty, medium to fine SAND with Inspection Pit


subangular coarse gravels and cobbles of 0.00~1.20m
limestone.

1 60.390

Medium dense, brown, well-graded SAND D-1 9 28 SPT at 1.20 meters


with silt and subrounded medium gravel of 13
limestone and igneous origin. 15

2 59.390
--Ditto-- D-2 5 11 SPT at 2.00 meters
4
7

3 58.390
Medium dense, brown, poorly-graded , D-3 6 21 SPT at 3.00 meters
coarse to medium SAND with silt and traces 8
of subrounded fine gravels of igneous origin. 11

4 57.390
--Ditto-- D-4 4 13 SPT at 4.00 meters
6
7
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 56.390
--Ditto-- D-5 6 15 SPT at 5.00 meters
6
9

6 55.390

Dense, light grey, weakly cemented, clayey D-6 13 39 SPT at 6.50 meters
fine SAND. 18
21
7 54.390

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-100

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, light grey, weakly cemented, clayey


fine SAND. (continued)
8 53.390
Dense, light greenish grey, clayey fine D-7 14 34 SPT at 8.00 meters
SAND. 19
23

9 52.390

Dense, brown, silty medium to fine SAND. D-8 16 44 SPT at 9.50 meters
20
24
10 51.390

11 50.390
--Ditto-- D-9 18 42 SPT at 11.00 meters
22
20

12 49.390

Dense, brown, clayey fine SAND. D-10 15 50 SPT at 12.50 meters


22
28
13 48.390
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 47.390
Hard, brown, Lean CLAY with sand. D-11 17 52 SPT at 14.00 meters
25
27

15 46.390

Dense, brown, weakly cemented fine to D-12 14 47 SPT at 15.50 meters


mdium SAND with silt. 21
26
16 45.390

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-100

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, weakly cemented fine to


mdium SAND with silt. (continued)

17 44.390
Very dense, brown, weakly cemented fine to D-13 38 100 SPT at 17.00 meters
medium SAND with silt. 30/8
R-1 90 25 35 26.5 Coring from
Weak, brown, close to medium grain, 17.25m~18.00m
SANDSTONE. Moderately weathered, close
to medium spaced, subhorizontally fractured.
18 43.390
17.55~19.50m
Medium strong to strong, whitish cream R-2 97 87 87 6.7 Coring from
non-clastic micritic LIMESTONE, Moderately 18.00m~19.50m
weathered close to medium subhorizontal
fractured occasionally solutioned forming
vugs.
--Ditto--
19 42.390

--Ditto-- R-3 100 92 92 5.3 Coring from


19.50m~21.00m

20 41.390

21 40.390
Medium strong, brownish cream, non-clastic, R-4 100 90 90 6.0 Coring from
micritic LIMESTONE. Modrately weathered, 21.00m~22.50m
medium spaced, horizontaly fractured,
occasionaly solutioned forming small vugs.
(1-3cm).
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 39.390

--Ditto-- R-5 100 68 72 12.4 Coring from


22.50m~24.00m

23 38.390

24 37.390
close spaced subhorizontal to horizontally R-6 90 53 57 16.5 Coring from
fractured. 24.00m~25.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-100

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish cream, non-clastic,


micritic LIMESTONE. Modrately weathered,
25 36.390
medium spaced, horizontaly fractured,
occasionaly solutioned forming small vugs.
(1-3cm). (continued)
25.50~30.00m R-7 100 41 53 19.8 Coring from
Medium strong, brownish cream to brownish 25.50m~27.00m
grey, non-clastic fossiferous, micritic
26 35.390
LIMESTONE.
Moderately weathered, close spaced,
horizontally fractured, rusty brown, fracture
surfaces at 28.25m, 29.05m, 29.75m,

27 34.390
R-8 90 50 50 17.0 Coring from
27.00m~28.50m

28 33.390

--Ditto-- R-9 97 50 54 17.0 Coring from


28.50m~30.00m

29 32.390

30 31.390
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 30.390

32 29.390

33 28.390

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-101

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3102931.358


NEOM Desalination Plant to Gayal Transmission System 84.772 E: 722331.104
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 29-Nov-21 01-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 04-12-21 8:30 N.E 8.55
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very weak, brown, GRANITE, Highly R-1 98 0 0 NI Coring from


weathered to decomposd. 0.00m~1.00m

1 83.772
--Ditto-- R-2 95 0 0 NI Coring from
1.00m~1.50m

1.50~2.40m R-3 98 0 5 NI Coring from


--Ditto-- 1.50m~3.00m

2 82.772

2.40~4.50m
Medium strong, pinkish grey, phaneritic
texture, flow banded, GRANITE. Highly to
moderately weathered, very close to
3 81.772
extremely close spaced fractured, brown, R-4 98 0 5 NI Coring from
surface staining fractures. 3.00m~4.50m

4 80.772

4.50~5.00m R-5 95 27 27 25.0 Coring from


Medium strong, moderately weathered, 4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

close spaced, subhorizontal to subvertically


5 79.772
fractured, udulated planer surface, brown
surface staining.
5.20~7.10m
Highly weathered, very close spaced,
fractured.
6 78.772
R-6 96 19 30 33.5 Coring from
6.00m~7.50m

7 77.772

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-101

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

7.20~10.90m R-7 99 69 69 12.2 Coring from


Strong, light grey, phaneritic texture, flow 7.50m~9.00m
banded, GRANITE. Moderately to slightly
8 76.772
weathered, medium spaced, subvertical
induced and incipient fractures. joints are
vertical to subhorizontal, brown, surface
staining.

9 75.772
R-8 93 70 73 12.0 Coring from
9.00m~10.50m

10 74.772

10.90~12.00m R-9 94 17 17 35.0 Coring from


Moderately weathered, very close spaced, 10.00m~12.00m
incipient fractures, brown surface staining.
11 73.772

12 72.772
12.00~18.00m R-10 105 69 69 12.2 Coring from
Strong, light grey, phaneritic, texture, flow 12.00m~13.50m
banded, GRANITE.
Slightly weathered, close to medium spaced,
subhoizontal incipient fractures, joints are
subhorizontal and vertical tight to partly
13 71.772
open, clean, bown surface staining.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

Changing to strong. R-11 96 64 64 13.2 Coring from


13.50m~15.00m

14 70.772

15 69.772
R-12 96 61 61 13.8 Coring from
15.00m~16.50m

16 68.772

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-101

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

12.00~18.00m
Strong, light grey, phaneritic, texture, flow
banded, GRANITE.
Slightly weathered, close to medium spaced, R-13 96 77 77 10.3 Coring from
16.50m~18.00m
subhoizontal incipient fractures, joints are
17 67.772 subhorizontal and vertical tight to partly
open, clean, bown surface staining.
(continued)

18 66.772
Medium strong, pinkish to light grey, R-14 96 67 70 12.6 Coring from
phaneritic texture, flow banded, GRANITE. 18.00m~19.50m
Slightly weathered, close to medium spaced,
subvertical to subhorizontal incipient and
induced fractures. joints are tight to partly
open, brown surface statining.
19 65.772

--Ditto-- R-15 100 73 78 11.4 Coring from


19.50m~21.00m

20 64.772

21 63.772
--Ditto-- R-16 100 77 77 10.3 Coring from
21.00m~22.50m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 62.772

Medium strong, slightly weathered, very R-17 96 37 37 21.0 Coring from


close to close spacd, subhorizontal to 22.50m~24.00m
subvertical incipient and induced fractures,
23 61.772
joints are tight, brown surface staining at
22.80m, 23.40m, 24.00m, 24.60~24.90m,
25.30m, 25.50m

24 60.772
R-18 98 40 40 20.0 Coring from
24.00m~25.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-101

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

25 59.772

Medium strong, pinkish light grey, phaneritic R-19 97 37 40 21.0 Coring from
texture, flow, banded, GRANITE. wide 25.50m~27.00m
occassional quartz veins. Moderately
26 58.772
weathered, very close to close spaced
subvertical and subhorizontal incipient and
induced fractures, joint are vertical to
subvertical, tight to partly open. brown,
surface statining, at 25.80m, 26.00m,
26.40m, 27.15m, 27.50m, 27.40m,
27 57.772
27.90~30.00m R-20 96 16 19 35.5 Coring from
Highly to moderately weathered, very close, 27.00m~28.50m
spaced subvertical incipient fractures, brown
stainging.

28 56.772

R-21 97 13 17 37.5 Coring from


28.50m~30.00m

29 55.772

30 54.772
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 53.772

32 52.772

33 51.772

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-102

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3103342.457


NEOM Desalination Plant to Gayal Transmission System 89.975 E: 722046.164
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 02-Dec-21 05-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 08-12-21 8:00 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, gravelly medium to coarse SAND R-1 100 0 0 NI Inspection Pit


gravel, are angular medium to coarse of 0.00m~0.50m
granite (decomposd GRANITE).
--Ditto-- R-2 100 0 8 NI Coring from
0.50m~1.50m

1 88.975

1.35~3.00m R-3 97 38 41 20.7 Coring from


Medium strong, pinkish grey, phaneritic 1.50m~3.00m
texture, flow banded GRANITE. Moderately
2 87.975
weathered close spaced subvertical to
subhorizontal incipient fractures joints are
tight, vertical, brown, suface staining.

3 86.975
3.00~6.00m R-4 95 37 54 21.0 Coring from
Medium strong, pinkish grey, phaneritic 3.00m~4.50m
texture, flow banded, GRANITE
Moderately to slightly weathered, close to
medium spaced, subhorizontal incipient
fractures undulated, rough sufaces, reddish
4 85.975
brown, surface staining.

R-5 93 60 63 14.0 Coring from


4.50m~6.00m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 84.975

6 83.975
Moderately weathered, close spaced to R-6 97 40 47 20.0 Coring from
subhorizontal incipient fractures, undulated, 6.00m~7.50m
rough, sufaces, reddish brown, staining,
joints are tight, subvertical.

7 82.975

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-102

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Moderately weathered, close spaced to R-7 93 37 37 21.0 Coring from


subhorizontal incipient fractures, undulated, 7.50m~9.00m
rough, sufaces, reddish brown, staining,
8 81.975
joints are tight, subvertical. (continued)
--Ditto--

9 80.975
Strong, brown and light grey, phaneritic, R-8 91 8 17 40.0 Coring from
texture, flow banded GRANITE. Highly to 9.00m~10.50m
moderately weathered close to vey close
spaced, brown to reddish brown, surfaces
staining, joints are partly open.
10 79.975

--Ditto-- R-9 96 20 23 33.0 Coring from


10.50m~12.00m

11 78.975

12 77.975
--Ditto-- R-10 100 7 7 40.0 Coring from
12.00m~13.50m

13 76.975
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

13.50~14.20m R-11 100 18 27 34.0 Coring from


--Ditto-- 13.50m~15.00m
14.20~14.60m
14 75.975
Moderately weathered, medium spaced,
subhorizontal incipient fractures, brown
surface staining, joints are partly open to
tight.
14.60~1500m
Highly weathered, extremely, close spaced,
15 74.975
incipient fractured R-12 97 71 71 11.8 Coring from
Strong, moderately weathered, close to 15.00m~16.50m
medium spaced, horizontal incipient
fractured, brown surface staining. joints are
subvertical partly open to tight.
16 73.975

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-102

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

16.50~17.80m R-13 100 43 47 19.0 Coring from


Highly to moderately weathered, very close 16.50m~18.00m
spaced, incipient fractured, brown surface
17 72.975
staining.
17.80~18.50m
Joints are subvertical partly open to tight.

18 71.975
Strong, pinkish grey, phanitic texture, flow R-14 100 77 77 10.3 Coring from
banded, GRANITE. 18.00m~19.50m
Medium spaced, subhorizontal incipient and
few induced fractures, light brown, surrface
staining, joints ar vetical partly open to tight,
clean.
19 70.975

--Ditto-- R-15 100 80 85 9.0 Coring from


19.5m0~21.00m

20 69.975

21 68.975
Changing to medium strong. R-16 100 71 76 11.8 Coring from
21.00m~22.50m
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 67.975

Moderately weathered, very close to close R-17 95 16 23 35.5 Coring from


spaced, subvertical incipient fractured, light 22.50m~24.00m
brown, surface staining at fractured suface,
23 66.975
joints are subvertical, tight to partly open.

24 65.975
--Ditto-- R-18 96 41 41 19.8 Coring from
24.00m~25.50m

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-102

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Moderately weathered, very close to close


spaced, subvertical incipient fractured, light
25 64.975
brown, surface staining at fractured suface,
joints are subvertical, tight to partly open.
(continued)
--Ditto-- R-19 96 30 39 23.5 Coring from
25.50m~27.00m

26 63.975

27 62.975
27.00~27.85m R-20 93 20 23 33.0 Coring from
--Ditto-- 27.00m~28.50m
27.85~30.00m
Medium strong, moderately to highly
weathered, incipient fractures, joints are
vertical open, partly filled with silt.
28 61.975

--Ditto-- R-21 93 7 13 40.0 Coring from


28.50m~30.00m

29 60.975

30 59.975
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 58.975

32 57.975

33 56.975

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-103

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3103753.300


NEOM Desalination Plant to Gayal Transmission System 90.768 E: 721761.203
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Dec-21 30-Dec-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 31-12-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firaz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Grey, angular coarse to medium GRAVELS D-1 50/0 100 0 0 NI Coring from
of CORALLINE LIMESTONE. R-1 0.00~0.50 meters

--Ditto-- R-2 95 0 0 NI Coring from


0.50~1.50 meters

1 89.768

Weak, brownish grey, fine to medium grain R-3 96 25 40 25.6 Coring from
LIMESTONE, moderately to highly 1.50~3.00 meters
weathered, fractures are incipient
2 88.768
sub-horizontal to horizontal, clean, very
close to close spaced open.

3 87.768
Weak, grey, medium to fine grain, R-4 100 88 72 6.5 Coring from
LIMESTONE, moderatley, weathered, 3.00~4.50 meters
fractures are incipient, sub-horizontal to
sub-vertical close to medium spaced, clean,
open.
4 86.768

--Ditto-- R-5 80 8 13 40.0 Coring from


highly fractured 3.5mm vugus are noted. 4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 85.768

6 84.768
--Ditto-- R-6 95 0 0 NI Coring from
Completely weathered residual soil. 6.00~6.50 meters

Medium strong, brownish grey to grey, fine R-7 100 10 60 40.0 Coring from
to medium grains, vuggy LIMESTONE, 6.50~7.50 meters
moderately weathered, slightly solutioned
7 83.768
with vugs of 7~10mm.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-103

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish grey to grey, fine R-8 96 80 80 9.0 Coring from
to medium grains, vuggy LIMESTONE, 7.50~9.00 meters
moderately weathered, slightly solutioned
8 82.768
with vugs of 7~10mm. (continued)
--Ditto--

9 81.768
--Ditto-- R-9 100 78 81 9.7 Coring from
9.00~10.50 meters

10 80.768

Medium strong, grey, fine to medium R-10 98 72 72 11.6 Coring from


LIMESTONE, moderately weathered 10.50~12.00 meters
fissured solutioned, vugs 3~7mm are noted.
11 79.768

12 78.768
Medium strong, greyish brown, fine grained, R-11 100 57 64 15.0 Coring from
vuggy LIMESTONE, moderately weathered 12.00~13.50 meters
solutioned and fissured.

13 77.768
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-12 100 42 50 19.4 Coring from


13.50~15.00 meters

14 76.768

15 75.768
Strong, thinly, laminated, brownish grey, fine R-13 100 44 60 18.8 Coring from
to medium grain, vuggy LIMESTONE, 15.00~16.50 meters
moderately weathered Solutioned and
fissured.

16 74.768

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-103

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Strong, thinly, laminated, brownish grey, fine


to medium grain, vuggy LIMESTONE,
moderately weathered Solutioned and
fissured. (continued) R-14 100 90 90 6.0 Coring from
16.50~18.00 meters
--Ditto--
17 73.768

18 72.768
--Ditto-- R-15 80 16 23 35.5 Coring from
Fractures are very close to close sapced. 18.00~19.50 meters

19 71.768

Medium strong, brownish grey, R-16 100 96 96 3.0 Coring from


LIMESTONE, moderately, weathered, 19.50~20.00 meters
fissured, vuggs of 5~7mm are noted.
20 70.768
--Ditto-- R-17 96 58 58 14.7 Coring from
20.00~21.00 meters

21 69.768
--Ditto-- R-18 98 73 78 11.4 Coring from
21.00~22.50 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 68.768

--Ditto-- moderately to highly weathered and R-19 90 10 12 40.0 Coring from


residual soil. 22.50~24.00 meters

23 67.768

24 66.768
--Ditto-- R-20 90 0 0 NI Coring from
24.00~25.50 meters

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-103

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium strong, brownish grey,


LIMESTONE, moderately, weathered,
25 65.768
fissured, vuggs of 5~7mm are noted.
(continued)

Medium strong, grey, fine to medium R-21 90 10 20 40.0 Coring from


grained, vuggy LIMESTONE, moderately to 25.50~27.00 meters
highly weathered, fissured, vuggs are
26 64.768
5~7mm are noted.

27 63.768
--Ditto-- R-22 90 40 40 20.0 Coring from
27.00~28.50 meters

28 62.768

--Ditto-- R-23 90 25 28 26.5 Coring from


28.50~30.00 meters

29 61.768

30 60.768
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 59.768

32 58.768

33 57.768

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-104

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3104080.965


NEOM Desalination Plant to Gayal Transmission System 64.938 E: 721406.356
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 28-Nov-21 29-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 01-11-21 08:30 N.E 18.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to coarse SAND with B-1 Inspection Pit


angular gravels and cobbles of limestone. 0.00~1.20m

1 63.938

Medium dense brown well-graded medium to D-1 9 22 SPT at 1.20 meters


corase SAND with angular fine gravels of 10
igneous origin. 12

2 62.938
--Ditto-- D-2 10 24 SPT at 2.00 meters
11
13

3 61.938
--Ditto-- D-3 8 27 SPT at 3.00 meters
12
15

4 60.938
Medium dense, brown, poorly-graded SAND D-4 11 30 SPT at 4.00 meters
with silt. 14
16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 59.938
Medium dense brown silty medium SAND D-5 10 22 SPT at 5.00 meters
with sub-angular fine to medium gravels of 10
igneous origin. 12

6 58.938

Medium dense, brown, silty SAND. D-6 14 29 SPT at 6.50 meters


14
15
7 57.938

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-104

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, silty SAND.


(continued)
8 56.938
Dense brown silty medium to coarse SAND D-7 15 32 SPT at 8.00 meters
with sub-angular fine gravels of igneous 14
origin. 18

9 55.938

--Ditto-- D-8 19 41 SPT at 9.50 meters


20
21
10 54.938

11 53.938
Dense brown poorly-graded fine to medium D-9 20 45 SPT at 11.00 meters
SAND with silt and trace sub-angular fine 22
gravels of igneous origin. 23

12 52.938

--Ditto-- D-10 18 41 SPT at 12.50 meters


20
21
13 51.938
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 50.938
--Ditto-- D-11 21 49 SPT at 14.00 meters
24
25

15 49.938

--Ditto-- D-12 22 46 SPT at 15.50 meters


22
24
16 48.938

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-104

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium


SAND with silt and trace sub-angular fine
gravels of igneous origin. (continued)

17 47.938
Dense brown well-graded SAND with silt. D-13 20 46 SPT at 17.00 meters
22
24

18 46.938

--Ditto-- D-14 17 44 SPT at 18.50 meters


21
23
19 45.938

20 44.938
Very dense brown poorly-graded fine to D-15 22 53 SPT at 20.00 meters
medium SAND with silt. 24
29

21 43.938

--Ditto-- D-16 19 52 SPT at 21.50 meters


25
27
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 42.938

23 41.938
--Ditto-- D-17 22 53 SPT at 23.00 meters
26
27

24 40.938

--Ditto-- D-18 23 53 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-104

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown poorly-graded fine to 25


medium SAND with silt. (continued) 29
25 39.938

26 38.938
Dense brown poorly-graded coarse to D-19 18 44 SPT at 26.00 meters
medium SAND with silt. 20
24

27 37.938

Changing to very dense. D-20 20 53 SPT at 27.50 meters


25
28
28 36.938

--Ditto-- D-21 23 55 SPT at 28.50 meters


25
30
29 35.938

30 34.938
Very dense brown well-graded fine to coarse D-22 25 58 SPT at 30.00 meters
SAND with silt and fine gravels of igneous 27
origin. 31
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

----End of borehole at 30.00 meters----

31 33.938

32 32.938

33 31.938

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-105

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3104301.046


NEOM Desalination Plant to Gayal Transmission System 56.572 E: 720957.464
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 28-Nov-21 28-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, medium to fine SAND with B-1 Inspection Pit


sub-rounded gravels of igneous origin. 0.00~1.20m

1 55.572

Medium dense brown poorly-graded medium D-1 6 20 SPT at 1.20 meters


to coarse SAND with silt and sub-rounded 9
fine gravel of igneous origin. 11

2 54.572
Medium dense brown well-graded SAND D-2 10 26 SPT at 2.00 meters
with silt. 12
14

3 53.572
Medium dense brown poorly-graded medium D-3 9 29 SPT at 3.00 meters
to coarse SAND with silt. 13
16

4 52.572
Changing to dense. D-4 11 32 SPT at 4.00 meters
14
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 51.572
Dense brown well-graded medium to coarse D-5 13 37 SPT at 5.00 meters
SAND. 16
21

6 50.572

Very dense brown poorly-graded medium to D-6 18 61 SPT at 6.50 meters


coarse SAND with silt. 27
34
7 49.572

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-105

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown poorly-graded medium to


coarse SAND with silt. (continued)
8 48.572
Very dense, brown, poorly-graded SAND D-7 21 56 SPT at 8.00 meters
with silt. 25
31

9 47.572

Very dense brown well-graded medium to D-8 17 63 SPT at 9.50 meters


coarse SAND with silt and sub-angular fine 28
to medium gravels of igneous origin. 35
10 46.572

11 45.572
Very dense brown poorly-graded fine to D-9 20 53 SPT at 11.00 meters
medium SAND. 24
29

12 44.572

--Ditto-- D-10 22 59 SPT at 12.50 meters


27
32
13 43.572
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 42.572
--Ditto-- D-11 20 56 SPT at 14.00 meters
25
31

15 41.572

Very dense brown silty medium to fine D-12 23 65 SPT at 15.50 meters
SAND. 30
35
16 40.572

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-105

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-13 25 62 SPT at 16.00 meters


29
----End of borehole at 16.00 meters----
33

17 39.572

18 38.572

19 37.572

20 36.572

21 35.572
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 34.572

23 33.572

24 32.572

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-106

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3104515.607


NEOM Desalination Plant to Gayal Transmission System 36.338 E: 720506.017
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 28-Nov-21 28-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 02-12-21 08:30 N.E 12.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with B-1 Inspection Pit


sub-rounded fine to coarse gravels of 0.00~1.20m
igneous origin.

1 35.338

Medium dense brown silty fine to medium D-1 7 26 SPT at 1.20 meters
SAND with trace sub-rounded medium 12
gravel of igneous origin. 14

2 34.338
--Ditto-- D-2 6 21 SPT at 2.00 meters
9
12

3 33.338
Medium dense brown poorly-graded fine to D-3 8 27 SPT at 3.00 meters
coarse SAND with silt and sub-angular 12
gravels of igneous origin. 15

4 32.338
Dense brown poorly-graded coarse to D-4 10 34 SPT at 4.00 meters
medium SAND with silt and fine to medium 15
gravels of igneous origin. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 31.338
Dense, brown, well-graded SAND with silt. D-5 12 33 SPT at 5.00 meters
16
17

6 30.338

--Ditto-- D-6 9 35 SPT at 6.50 meters


14
21
7 29.338

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-106

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 28.338
Dense brown poorly-graded coarse to D-7 11 49 SPT at 8.00 meters
medium SAND with silt and traces of 23
sub-rounded medium gravels of igneous 26
origin.

9 27.338

--Ditto-- D-8 14 44 SPT at 9.50 meters


21
23
10 26.338

11 25.338
--Ditto-- D-9 12 44 SPT at 11.00 meters
19
25

12 24.338

Very dense brown well-graded fine to coarse D-10 16 61 SPT at 12.50 meters
SAND with silt. 24
37
13 23.338
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 22.338
--Ditto-- D-11 14 63 SPT at 14.00 meters
29
34

15 21.338

--Ditto-- D-12 18 68 SPT at 15.50 meters


30
38
16 20.338

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-106

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown well-graded fine to coarse


SAND with silt. (continued)

17 19.338
Very dense brown poorly-graded medium to D-13 13 63 SPT at 17.00 meters
coarse SAND with silt and trace 29
sub-rounded fine gravels of igneous origin. 34

18 18.338

--Ditto-- D-14 15 66 SPT at 18.50 meters


27
39
19 17.338

20 16.338
--Ditto-- D-15 16 66 SPT at 20.00 meters
28
----End of borheole at 20.00 meters----
38

21 15.338
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 14.338

23 13.338

24 12.338

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-107

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3104713.041


NEOM Desalination Plant to Gayal Transmission System 45.781 E: 720046.651
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-21 28-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown sandy coarse sub-rounded B-1 Inspection Pit


GRAVEL with silt. 0.00~1.20m

1 44.781

Medium dense greyish brown well-graded D-1 9 26 SPT at 1.20 meters


SAND with sub-angular to sub-rounded 11
coarse to medium gravel of igneous origin. 15

2 43.781
--Ditto-- D-2 16 26 SPT at 2.00 meters
13
13

3 42.781
Medium dense greyish brown poorly-graded D-3 8 30 SPT at 3.00 meters
medium SAND with silt and rounded fine to 13
medium gravels of igneous origin. 17

4 41.781
Dense brownish grey poorly-graded SAND D-4 11 35 SPT at 4.00 meters
with silt and gravel of igneous origin. 16
19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 40.781
Medium dense greyish brown to brown silty D-5 8 30 SPT at 5.00 meters
medium to fine SAND with rounded medium 13
gravels of igneous origin. 17

6 39.781

Changing to dense. D-6 12 37 SPT at 6.50 meters


16
21
7 38.781

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-107

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 37.781
Dense brown sandy rounded fine to medium D-7 11 36 SPT at 8.00 meters
GRAVEL of igneous origin with silt. Sand is 16
medium grain. 20

9 36.781

Dense brown silty fine to medium SAND with D-8 15 42 SPT at 9.50 meters
sub-rounded medium gravels of igneous 18
origin. 24
10 35.781

11 34.781
Dense greyish brown poorly-graded SAND D-9 14 40 SPT at 11.00 meters
of igneous origin. 17
23

12 33.781

Dense greyish brown gravelly fine to D-10 11 43 SPT at 12.50 meters


medium SAND with silt. Gravels are fine to 18
medium of igneous origin. 25
13 32.781
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 31.781
Changing to very dense. D-11 16 51 SPT at 14.00 meters
21
30

15 30.781
--Ditto-- D-12 17 60 SPT at 15.00 meters
26
----End of borehole at 15.00 meters----
34

16 29.781

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-108

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3104910.491


NEOM Desalination Plant to Gayal Transmission System 30.635 E: 719587.303
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-21 28-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, well-graded GRAVEL with sand. B-1 Inspection Pit


0.00~1.20m

1 29.635

Medium dense brown fine to medium SAND D-1 5 16 SPT at 1.20 meters
with silt and fine sub-angular gravels of 7
igneous origin. 9

2 28.635
Medium dense brown fine to medium silty D-2 8 24 SPT at 2.00 meters
SAND. 11
13

3 27.635
Dense brown poorly-graded medium to D-3 12 33 SPT at 3.00 meters
coarse SAND with silt. 15
18

4 26.635
Dense brown poorly-graded medium to fine D-4 11 38 SPT at 4.00 meters
SAND with silt. 17
21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 25.635
Dense brown poorly-graded coarse to D-5 13 34 SPT at 5.00 meters
medium SAND with silt. 15
19

6 24.635

Dense greyish brown poorly-graded SAND D-6 12 36 SPT at 6.50 meters


with silt. 16
20
7 23.635

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-108

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded SAND


with silt. (continued)
8 22.635
--Ditto-- D-7 14 39 SPT at 8.00 meters
17
22

9 21.635

Dense greyish brown poorly-graded medium D-8 16 41 SPT at 9.50 meters


to coarse SAND with silt and sub-rounded 18
fine gravels of igneous origin. 23
10 20.635

11 19.635
Dense greyish brown coarse to medium D-9 15 41 SPT at 11.00 meters
SAND with sub-angular fine gravels of 17
igneous origin. 24

12 18.635

Dense greyish brown well-graded SAND with D-10 17 38 SPT at 12.50 meters
silt. 14
24
13 17.635
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 16.635
Dense greyish brown medium to coarse D-11 14 39 SPT at 14.00 meters
SAND. 18
21

15 15.635
Dense greyish brown medium to fine SAND D-12 18 47 SPT at 15.00 meters
with traces of sub-angular fine gravels of 21
igneous origin. 26
----End of borehole at 15.00 meters----

16 14.635

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-109

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3105107.952


NEOM Desalination Plant to Gayal Transmission System 34.196 E: 719127.921
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 01-Dec-21 28-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 29-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to fine SAND with silt and B-1 Inspection Pit
sub-angular medium to fine gravels of 0.00~1.20m
igneous origin.

1 33.196

Medium dense brown fine to medium silty D-1 9 26 SPT at 1.20 meters
SAND. 12
14

2 32.196
Dense brown fine to medium silty SAND with D-2 12 35 SPT at 2.00 meters
sub-rounded fine gravels of igneous origin. 16
19

3 31.196
Dense brown medium to coarse D-3 15 42 SPT at 3.00 meters
poorly-graded SAND with silt and 18
sub-angular fine gravels of igneous origin. 24

4 30.196
Dense greyish brown coarse to medium D-4 13 37 SPT at 4.00 meters
SAND with silt. 16
21
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 29.196
Dense brown well-graded SAND with silt. D-5 17 45 SPT at 5.00 meters
20
25

6 28.196

Very dense greyish brown medium to coarse D-6 4 52 SPT at 6.50 meters
SAND with silt. 23
29
7 27.196

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-109

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown medium to coarse


SAND with silt. (continued)
8 26.196
Dense brown poorly-graded medium to fine D-7 16 45 SPT at 8.00 meters
SAND with silt. 19
26

9 25.196

Very dense brown poorly-graded fine to D-8 20 53 SPT at 9.50 meters


medium SAND with silt and sub-angular 23
medium to fine gravels of igneous origin. 30
10 24.196

11 23.196
--Ditto-- D-9 18 52 SPT at 11.00 meters
24
28

12 22.196

Very dense brown poorly-graded medium to D-10 21 57 SPT at 12.50 meters


coarse silty SAND with traces of sub-angular 25
medium to fine gravels of igneous origin. 32
13 21.196
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 20.196
Very dense greyish brown well-graded D-11 19 51 SPT at 14.00 meters
medium to coarse SAND with silt. 23
28

15 19.196

Very dense brown fine to medium silty SAND D-12 21 54 SPT at 15.50 meters
with sub-rounded gravels of igneous origin. 25
29
16 18.196

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-109

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown fine to medium silty SAND


with sub-rounded gravels of igneous origin.
(continued)

17 17.196
Very dense brown poorly-graded medium to D-13 23 60 SPT at 17.00 meters
fine silty SAND with sub-angular fine gravels 28
of igneous origin. 32
----End of borehole at 17.00 meters----

18 16.196

19 15.196

20 14.196

21 13.196
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 12.196

23 11.196

24 10.196

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-110

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3105305.359


NEOM Desalination Plant to Gayal Transmission System 33.532 E: 718668.553
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-21 27-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 29-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


sub-rounded medium gravels of igneous 0.00~1.20m
origin.

1 32.532

Dense reddish brown silty medium to fine D-1 11 36 SPT at 1.20 meters
SAND. 16
20

2 31.532
--Ditto-- D-2 14 33 SPT at 2.00 meters
14
19

3 30.532
Dense reddish brown silty fine to medium D-3 12 39 SPT at 3.00 meters
SAND with sub-angular fine gravels of 18
igneous origin. 21

4 29.532
Dense, brown, silty SAND. D-4 13 38 SPT at 4.00 meters
16
22
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.532
--Ditto-- D-5 15 49 SPT at 5.00 meters
22
27

6 27.532

Very dense reddish brown silty fine to D-6 18 51 SPT at 6.50 meters
medium SAND. 22
29
7 26.532

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-110

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense reddish brown silty fine to


medium SAND. (continued)
8 25.532
Dense reddish brown silty fine to medium D-7 22 34 SPT at 8.00 meters
SAND with sub-rounded fine gravels of 19
igneous origin. 15

9 24.532

--Ditto-- D-8 14 36 SPT at 9.50 meters


17
19
10 23.532

11 22.532
Dense reddish brown poorly-graded fine to D-9 13 38 SPT at 11.00 meters
medium SAND with silt. 18
20

12 21.532

Very dense brown well-graded SAND with D-10 19 52 SPT at 12.50 meters
silt. 26
26
13 20.532
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.532
--Ditto-- D-11 10 51 SPT at 14.00 meters
23
28

15 18.532
--Ditto-- D-12 18 49 SPT at 15.00 meters
23
----End of borehole at 15.00 meters----
26

16 17.532

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-111

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3105502.854


NEOM Desalination Plant to Gayal Transmission System 24.499 E: 718209.203
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-11 27-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown silty SAND with sub-angular B-1 Inspection Pit


coarse to medium gravels. 0.00~1.20m

1 23.499

Dense greyish brown poorly-graded medium D-1 11 34 SPT at 1.20 meters


to coarse SAND with traces of sub-angular 15
medium to fine gavels of igneous origin. 19

2 22.499
Dense greyish brown poorly-graded medium D-2 9 31 SPT at 2.00 meters
to coarse SAND with silt and sub-rounded 14
fine gravels of igneous origin. 17

3 21.499
Medium dense greyish brown medium to fine D-3 17 27 SPT at 3.00 meters
SAND. 12
15

4 20.499
Changing to dense. D-4 10 32 SPT at 4.00 meters
14
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 19.499
Dense brown medium to coarse SAND with D-5 15 40 SPT at 5.00 meters
silt and traces of sub-angular gravel of 18
igneous origin. 22

6 18.499

Dense brown well-graded SAND with silt and D-6 12 49 SPT at 6.50 meters
sub-angular gravels of igneous and 22
sedimentary origin. 27
7 17.499

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-111

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 16.499
Dense greyish brown poorly-graded fine to D-7 16 44 SPT at 8.00 meters
medium SAND with angular fine gravels of 20
igneous origin. 24

9 15.499

Very dense, greyish brown, silty SAND. D-8 18 52 SPT at 9.50 meters
23
29
10 14.499

11 13.499
Dense greyish brown medium to fine SAND D-9 14 43 SPT at 11.00 meters
with sub-rounded of fine gravels of igneous 18
origin. 25

12 12.499

Very dense greyish brown fine to medium D-10 19 52 SPT at 12.50 meters
SAND. 23
29
13 11.499
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 10.499
Changing to dense. D-11 16 45 SPT at 14.00 meters
19
26

15 9.499

Very dense greyish brown poorly-graded fine D-12 21 58 SPT at 15.50 meters
to medium SAND. 26
32
16 8.499

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-111

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown poorly-graded fine


to medium SAND. (continued)

17 7.499
Very dense greyish brown poorly-graded D-13 18 54 SPT at 17.00 meters
SAND with silt and sub-rounded fine gravels 24
of igneous origin. 30
----End of borehole at 17.00 meters----

18 6.499

19 5.499

20 4.499

21 3.499
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 2.499

23 1.499

24 0.499

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-112

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3105700.280


NEOM Desalination Plant to Gayal Transmission System 25.290 E: 717749.814
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-21 27-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 12.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with B-1 Inspection Pit


sub-rounded to sub-angular fine to coarse 0.00~1.20m
gravels of igneous origin.

1 24.290

Medium dense brown silty fine SAND with D-1 9 27 SPT at 1.20 meters
gravel of igneous origin. 11
16

2 23.290
--Ditto-- D-2 5 24 SPT at 2.00 meters
10
14

3 22.290
Medium dense greyish brown silty medium D-3 6 30 SPT at 3.00 meters
to fine SAND with sub-angular medium 13
gravels of igneous origin. 17

4 21.290
--Ditto-- D-4 7 23 SPT at 4.00 meters
13
10
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 20.290
--Ditto-- D-5 10 26 SPT at 5.00 meters
10
16

6 19.290

Dense greyish brown poorly-graded SAND. D-6 11 33 SPT at 6.50 meters


14
19
7 18.290

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-112

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded SAND.


(continued)
8 17.290
Dense greyish brown silty fine to medium D-7 14 44 SPT at 8.00 meters
SAND with trace sub-rounded fine to 21
medium gravels of igneous origin. 23

9 16.290

Dense greyish brown well-graded fine to D-8 12 40 SPT at 9.50 meters


coarse SAND with silt and sub-rounded 18
medium to coarse gravels of igneous origin. 22
10 15.290

11 14.290
Dense, brown, poorly-graded SAND with D-9 15 46 SPT at 11.00 meters
gravel of igneous origin. 20
26

12 13.290

Changing to very dense. D-10 17 51 SPT at 12.50 meters


22
29
13 12.290
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 11.290
Dense greyish brown poorly-graded fine to D-11 19 43 SPT at 14.00 meters
medium SAND with silt and trace 19
sub-rounded fine to medium gravels of 24
igneous origin.

15 10.290

Very dense brown poorly-graded fine to D-12 17 51 SPT at 15.50 meters


medium SAND with silt and sub-rounded 23
medium gravels of igneous origin. 28
16 9.290

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-112

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown poorly-graded fine to


medium SAND with silt and sub-rounded
medium gravels of igneous origin.
(continued)

17 8.290
Very dense greyish brown poorly-graded fine D-13 21 62 SPT at 17.00 meters
to medium SAND with silt and sub-rounded 29
fine to medium gravels of igneous origin. 33

18 7.290

--Ditto-- D-14 23 62 SPT at 18.50 meters


27
35
19 6.290
Very dense brown to greyish brown sandy D-15 25 72 SPT at 19.00 meters
rounded coarse to medium GRAVELS of 33
igneous origin with silt. Sand is medium 39
grain.
----End of borehole at 20.00 meters----
20 5.290

21 4.290
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 3.290

23 2.290

24 1.290

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-113

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3105911.679


NEOM Desalination Plant to Gayal Transmission System 19.212 E: 717297.466
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 27-Nov-21 27-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


sub-rounded medium to coarse SAND. 0.00~1.20m

1 18.212

Medium dense brown to light brown silty fine D-1 4 13 SPT at 1.20 meters
to medium SAND with sub-angular fine 6
gravels of igneous origin. 7

2 17.212
--Ditto-- D-2 6 15 SPT at 2.00 meters
7
8

3 16.212
--Ditto-- D-3 8 17 SPT at 3.00 meters
8
9

4 15.212
Medium dense brown poorly-graded fine to D-4 10 24 SPT at 4.00 meters
medium SAND with silt and trace 11
sub-rounded fine gravel of igneous origin. 13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 14.212
--Ditto-- D-5 12 28 SPT at 5.00 meters
13
15

6 13.212

Dense, brown, poorly-graded SAND. D-6 13 32 SPT at 6.50 meters


15
17
7 12.212

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-113

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, brown, poorly-graded SAND.


(continued)
8 11.212
Dense brown poorly-graded coarse to D-7 17 31 SPT at 8.00 meters
medium SAND with silt. 10
21

9 10.212

--Ditto-- D-8 20 41 SPT at 9.50 meters


20
21
10 9.212

11 8.212
Dense brown poorly-graded fine to medium D-9 13 37 SPT at 11.00 meters
SAND with silt. 17
20

12 7.212

--Ditto-- D-10 18 46 SPT at 12.50 meters


21
25
13 6.212
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 5.212
Dense, brown, silty SAND. D-11 22 50 SPT at 14.00 meters
24
26

15 4.212
Very dense brown silty medium to coarse D-12 24 52 SPT at 15.00 meters
SAND with sub-rounded fine to medium 25
gravels of igneous origin. 27

16 3.212

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-113

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-13 25 56 SPT at 16.00 meters


27
----End of borehole at 16.00 meters----
29

17 2.212

18 1.212

19 0.212

20 -0.788

21 -1.788
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -2.788

23 -3.788

24 -4.788

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-114

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3106160.814


NEOM Desalination Plant to Gayal Transmission System 18.732 E: 716863.956
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown fine to medium SAND with traces of B-1 Inspection Pit


silt. 0.00~1.20m

1 17.732

Medium dense brown poorly-graded fine to D-1 9 22 SPT at 1.20 meters


medium SAND with silt. 10
12

2 16.732
Medium dense brown medium to fine D-2 7 23 SPT at 2.00 meters
poorly-graded SAND with silt and angular 9
medium to fine gravels of igneous origin. 14

3 15.732
Dense greyish brown poorly-graded fine to D-3 11 31 SPT at 3.00 meters
medium SAND with silt and sub-angular 14
medium to fine gravels of igneous origin. 17

4 14.732
Dense greyish brown poorly-graded fine to D-4 13 34 SPT at 4.00 meters
medium SAND with traces of sub-rounded 15
fine to medium gravels of igneous origin. 19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 13.732
Dense greyish brown poorly-graded fine to D-5 12 33 SPT at 5.00 meters
medium SAND with angular to sub-angular 16
medium to fine gravels of igneous origin. 17

6 12.732

--Ditto-- D-6 16 42 SPT at 6.50 meters


19
23
7 11.732

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-114

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 10.732
Dense greyish brown fine to medium SAND D-7 16 45 SPT at 8.00 meters
with sub-angular to angular medium to fine 20
gravel of igneous origin. 25

9 9.732

Dense greyish brown fine to medium D-8 14 42 SPT at 9.50 meters


poorly-graded SAND with sub-angular gravel 19
of igneous origin. 23
10 8.732

11 7.732
Dense greyish brown poorly-graded fine to D-9 18 49 SPT at 11.00 meters
medium SAND with sub-angular medium 22
gravels of igneous origin. 27

12 6.732

Dense greyish brown poorly-graded fine to D-10 16 49 SPT at 12.50 meters


medium SAND with sub-rounded medium to 20
fine gravel of igneous origin. 29
13 5.732
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 4.732
Very dense greyish brown poorly-graded fine D-11 18 64 SPT at 14.00 meters
to medium SAND with silt and sub-angular 24
medium to fine gravel of igneous origin. 30

15 3.732

Very dense greyish brown poorly-graded fine D-12 21 54 SPT at 15.50 meters
to medium SAND with coarse to medium 25
sub-angular gravel. 29
16 2.732

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-114

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown poorly-graded fine


to medium SAND with coarse to medium
sub-angular gravel. (continued)

17 1.732
--Ditto-- D-13 17 50 SPT at 17.00 meters
22
----End of borehole at 17.00 meters----
28

18 0.732

19 -0.268

20 -1.268

21 -2.268
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -3.268

23 -4.268

24 -5.268

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-115

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3106409.974


NEOM Desalination Plant to Gayal Transmission System 23.301 E: 716430.437
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 18.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND. B-1 Inspection Pit


0.00~1.20m

1 22.301

Loose brown silty medium to fine SAND. D-1 4 9 SPT at 1.20 meters
5
4

2 21.301
Medium dense brown poorly-graded fine to D-2 5 12 SPT at 2.00 meters
medium SAND with silt and gravels. Gravels 5
are sub-rounded medium of igneous origin. 7

3 20.301
--Ditto-- D-3 8 19 SPT at 3.00 meters
8
11

4 19.301
Medium dense brown silty medium to coarse D-4 11 28 SPT at 4.00 meters
SAND with gravels. Gravels are sub-angular 12
to rounded fine to coarse of igneous origin. 16
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 18.301
--Ditto-- D-5 7 25 SPT at 5.00 meters
11
14

6 17.301

Medium dense brown poorly-graded fine to D-6 9 25 SPT at 6.50 meters


medium SAND with silt and gravels. Gravels 10
are sub-rounded medium of igneous origin. 15
7 16.301

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-115

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 15.301
Dense greyish brown sandy sub-rounded D-7 12 32 SPT at 8.00 meters
fine to medium GRAVEL of igneous origin. 14
Sand is fine. 18

9 14.301

Dense greyish brown poorly-graded medium D-8 12 34 SPT at 9.50 meters


SAND. 15
19
10 13.301

11 12.301
--Ditto-- D-9 14 39 SPT at 11.00 meters
17
22

12 11.301

Dense greyish brown well-graded fine to D-10 13 41 SPT at 12.50 meters


coarse SAND with silt. 19
22
13 10.301
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 9.301
Dense greyish brown poorly-graded medium D-11 15 48 SPT at 14.00 meters
to coarse SAND with silt. 18
30

15 8.301

--Ditto-- D-12 16 43 SPT at 15.50 meters


16
27
16 7.301

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-115

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded medium


to coarse SAND with silt. (continued)

17 6.301
Very dense greyish brown silty fine to D-13 17 54 SPT at 17.00 meters
medium SAND. 21
33

18 5.301

--Ditto-- D-14 14 60 SPT at 18.50 meters


24
36
19 4.301

20 3.301
--Ditto-- D-15 19 69 SPT at 20.00 meters
26
----End of borehole at 20.00 meters----
43

21 2.301
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 1.301

23 0.301

24 -0.699

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-116

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3106659.085


NEOM Desalination Plant to Gayal Transmission System 14.680 E: 715996.911
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Nov-21 27-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown, poorly-graded SAND with medium to B-1 Inspection Pit


fine gravels of igneous origin. 0.00~1.20m

1 13.680

Medium dense greyish brown poorly-graded D-1 6 19 SPT at 1.20 meters


SAND with sub-angular medium to fine 9
gravels of igneous origin. 10

2 12.680
Medium dense greyish brown medium to D-2 8 24 SPT at 2.00 meters
coarse well-graded SAND with sub-angular 11
gravels of fine to medium of igneous origin. 13

3 11.680
Medium dense greyish brown poorly-graded D-3 11 26 SPT at 3.00 meters
medium to coarse SAND. 13
13

4 10.680
Medium dense greyish brown medium to fine D-4 12 28 SPT at 4.00 meters
SAND with sub-angular gravels of igneous 13
origin. 15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 9.680
Dense brown poorly-graded fine to medium D-5 9 34 SPT at 5.00 meters
SAND. 15
19

6 8.680

Dense greyish brown porly-graded SAND D-6 14 39 SPT at 6.50 meters


with silt and sub-angular medium to fine 17
gravels of igneous origin. 22
7 7.680

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-116

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 6.680
Dense greyish brown medium to coarse D-7 15 42 SPT at 8.00 meters
poorly-graded SAND. 17
25

9 5.680

Dense greyish brown medium to coarse D-8 14 41 SPT at 9.50 meters


poorly-graded SAND with sub-angular 18
gravels of igneous origin. 23
10 4.680

11 3.680
--Ditto-- D-9 12 37 SPT at 11.00 meters
16
21

12 2.680

Dense greyish brown medium to fine SAND D-10 16 46 SPT at 12.50 meters
with sub-rounded medium to fine gravels of 20
igneous origin. 26
13 1.680
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 0.680
Dense greyish brown medium to fine SAND D-11 18 47 SPT at 14.00 meters
with traces of sub-angular gravels of igneous 22
origin. 25

15 -0.320
Dense greyish brown poorly-graded medium D-12 16 48 SPT at 15.00 meters
to fine SAND with sub-angular medium to 24
fine gravels of igneous origin. 24
----End of borehole at 15.00 meters----

16 -1.320

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-117

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3106908.204


NEOM Desalination Plant to Gayal Transmission System 25.540 E: 715563.382
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 12.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


gravels. Gravels are rounded fine to medium 0.00~1.20m
of igneous origin.

1 24.540

Changing to loose. D-1 3 7 SPT at 1.20 meters


3
4

2 23.540
Changing to medium dense. D-2 5 12 SPT at 2.00 meters
6
6

3 22.540
Medium dense brown clayey fine SAND. D-3 6 17 SPT at 3.00 meters
8
9

4 21.540
--Ditto-- D-4 7 24 SPT at 4.00 meters
11
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 20.540
Medium dense brown poorly-graded fine to D-5 10 25 SPT at 5.00 meters
medium SAND. 11
14

6 19.540

Medium dense, brown, silty SAND. D-6 9 29 SPT at 6.50 meters


13
16
7 18.540

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-117

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, silty SAND.


(continued)
8 17.540
Medium dense greyish brown medium to D-7 10 29 SPT at 8.00 meters
coarse SAND with gravels. Gravels are 13
sub-rounded coarse of igneous origin. 16

9 16.540

Dense brown to greyish brown sandy D-8 11 33 SPT at 9.50 meters


sub-rounded fine to medium GRAVELS of 14
igneous origin. Sand is fine to medium. 19
10 15.540

11 14.540
Dense greyish brown poorly-graded SAND D-9 14 40 SPT at 11.00 meters
with gravels. Gravels are coarse to medium 18
of igneous origin. 22

12 13.540

--Ditto-- D-10 12 34 SPT at 12.50 meters


16
18
13 12.540
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 11.540
--Ditto-- D-11 14 43 SPT at 14.00 meters
17
26

15 10.540
--Ditto-- D-12 13 50 SPT at 15.00 meters
19
----End of borehole at 15.00 meters----
31

16 9.540

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-118

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3107068.302


NEOM Desalination Plant to Gayal Transmission System 28.419 E: 715090.670
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded fine to medium SAND B-1 Inspection Pit


with silt and sub-rounded coarse to medium 0.00~1.20m
gravels of igneous origin.

1 27.419

Medium dense brown poorly-graded medium D-1 8 23 SPT at 1.20 meters


to coarse SAND with traces of gravels of 10
igneous origin. 13

2 26.419
Medium dense brown silty fine to medium D-2 6 21 SPT at 2.00 meters
SAND with gravels of igneous origin. 9
12

3 25.419
Dense brown medium to fine SAND with D-3 11 32 SPT at 3.00 meters
angular fine gravels of igneous origin. 15
17

4 24.419
--Ditto-- D-4 13 34 SPT at 4.00 meters
16
18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.419
--Ditto-- D-5 12 35 SPT at 5.00 meters
15
20

6 22.419

Dense brown poorly-graded SAND with silt D-6 14 40 SPT at 6.50 meters
and angular medium to fine gravels of 18
igneous origin. 22
7 21.419

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-118

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded SAND with silt


and angular medium to fine gravels of
igneous origin. (continued)
8 20.419
--Ditto-- D-7 16 44 SPT at 8.00 meters
20
24

9 19.419

Dense brown poorly-graded SAND with silt D-8 15 41 SPT at 9.50 meters
and angular medium to coarse gravels of 18
igneous origin. 23
10 18.419

11 17.419
--Ditto-- D-9 14 45 SPT at 11.00 meters
19
26

12 16.419

Dense brown poorly-graded medium to fine D-10 16 45 SPT at 12.50 meters


SAND with sub-angular gravels of igneous 21
origin. 24
13 15.419
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.419
Dense brown poorly-graded fine to medium D-11 19 41 SPT at 14.00 meters
SAND with silt and sub-angular medium to 12
coarse gravels of igneous origin. 29

15 13.419
--Ditto-- D-12 16 45 SPT at 15.00 meters
20
----End of borehole at 15.00 meters----
25

16 12.419

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-119

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3107219.953


NEOM Desalination Plant to Gayal Transmission System 28.783 E: 714614.227
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown poorly-graded medium to B-1 Inspection Pit


coarse SAND. 0.00~1.20m

1 27.783

Medium dense greyish brown poorly-graded D-1 7 20 SPT at 1.20 meters


medium to coarse SAND with sub-angular 9
medium to fine gravels. 11

2 26.783
--Ditto-- D-2 9 24 SPT at 2.00 meters
11
13

3 25.783
Medium dense greyish brown poorly-graded D-3 10 27 SPT at 3.00 meters
medium to fine SAND with traces of 12
sub-angular medium to fine gravels of 15
igneous origin.

4 24.783
Dense brown poorly-graded coarse to D-4 12 32 SPT at 4.00 meters
medium SAND with angular medium to 15
coarse gravel of igneous origin. 17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.783
--Ditto-- D-5 9 33 SPT at 5.00 meters
14
19

6 22.783

Dense brown poorly-graded fine to medium D-6 7 31 SPT at 6.50 meters


SAND with trace of gravels of igneous origin. 13
18
7 21.783

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-119

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium


SAND with trace of gravels of igneous origin.
(continued)
8 20.783
Dense brown medium to coarse SAND with D-7 15 36 SPT at 8.00 meters
angular to sub-angular fine gravel of igneous 16
20
origin.

9 19.783

--Ditto-- D-8 14 40 SPT at 9.50 meters


18
22
10 18.783

11 17.783
Dense brown poorly-graded coarse to D-9 15 41 SPT at 11.00 meters
medium SAND with angular fine to medium 17
gravels. 24

12 16.783

Dense brown poorly-graded coarse to D-10 16 48 SPT at 12.50 meters


medium SAND with sub-angular medium to 21
fine gravels of igneous origin. 27
13 15.783
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.783
Dense brown poorly-graded medium to fine D-11 19 47 SPT at 14.00 meters
SAND. 22
25

15 13.783
Very dense brown poorly-graded fine to D-12 18 51 SPT at 15.00 meters
medium SAND. 23
28
----End of borehole at 15.00 meters----

16 12.783

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-120

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3107192.951


NEOM Desalination Plant to Gayal Transmission System 27.348 E: 714083.900
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 25-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 28-11-21 08:30 N.E 16.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded medium to coarse B-1 Inspection Pit


SAND with silt and angular fine to coarse 0.00~1.20m
gravel and cobble of limestone.

1 26.348

Medium dense brown silty fine to medium D-1 5 14 SPT at 1.20 meters
SAND. 6
8

2 25.348
Medium dense, brown, poorly-graded SAND D-2 7 17 SPT at 2.00 meters
with silt. 8
9

3 24.348
--Ditto-- D-3 9 20 SPT at 3.00 meters
9
11

4 23.348
Medium dense brown poorly-graded fine to D-4 10 23 SPT at 4.00 meters
medium SAND with silt and trace 11
sub-angular medium gravel of igneous 12
origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 22.348
--Ditto-- D-5 13 29 SPT at 5.00 meters
15
14

6 21.348

Changing to dense. D-6 15 34 SPT at 6.50 meters


16
18
7 20.348

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-120

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 19.348
Dense brown well-gradedSAND with silt and D-7 17 38 SPT at 8.00 meters
sub-angular medium gravels of igneous 18
origin. 20

9 18.348

--Ditto-- D-8 19 42 SPT at 9.50 meters


20
22
10 17.348

11 16.348
Dense brown silty fine to medium SAND with D-9 21 45 SPT at 11.00 meters
sub-rounded fine gravels of igneous origin. 21
24

12 15.348

Desne, brown, well-graded SAND with silt D-10 17 41 SPT at 12.50 meters
and gravel of igneous origin. 20
21
13 14.348
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 13.348
Dense brown silty fine to medium SAND. D-11 13 39 SPT at 14.00 meters
18
21

15 12.348

--Ditto-- D-12 16 44 SPT at 15.50 meters


20
24
16 11.348

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-120

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown silty fine to medium SAND.


(continued)

17 10.348
Dense greyish brown poorly-graded fine to D-13 19 46 SPT at 17.00 meters
medium SAND. 21
25

18 9.348

--Ditto-- D-14 20 49 SPT at 18.50 meters


23
26
19 8.348

20 7.348
Very dense greyish brown silty SAND with D-15 21 52 SPT at 20.00 meters
sub-rounded medium gravel of igneous 25
origin. 27

21 6.348

--Ditto-- D-16 25 54 SPT at 21.50 meters


25
29
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 5.348

23 4.348
Very dense greyish brown poorly-graded fine D-17 26 57 SPT at 23.00 meters
to medium SAND with silt and sub-angular 27
gravels of igneous origin. 30

24 3.348

--Ditto-- D-18 28 61 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-120

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown poorly-graded fine 29


to medium SAND with silt and sub-angular 32
25 2.348
gravels of igneous origin. (continued)

26 1.348
Very dense brown silty fine to medium SAND D-19 24 60 SPT at 26.00 meters
with rounded medium gravel of igneous 29
origin. 31

27 0.348

--Ditto-- D-20 24 62 SPT at 27.50 meters


27
35
28 -0.652

29 -1.652
--Ditto-- D-21 32 68 SPT at 29.00 meters
34
34

30 -2.652
--Ditto-- D-22 23 63 SPT at 30.00 meters
30
----End of borehole at 30.00 meters----
33
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 -3.652

32 -4.652

33 -5.652

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-121

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3107398.745


NEOM Desalination Plant to Gayal Transmission System 16.607 E: 713534.954
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 25-Nov-21 27-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 30-11-21 08:30 18.43 3.0
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown fine to medium SAND with silt B-1 Inspection Pit
and sub-rounded fine to medium gravel of 0.00~1.20m
igneous origin.

1 15.607

Loose greyish brown poorly-graded fine to D-1 2 9 SPT at 1.20 meters


medium SAND with silt. 4
5

2 14.607
Loose greyish brown medium to fine SAND D-2 3 9 SPT at 2.00 meters
with silt. 3
6

3 13.607
Changing to medium dense. D-3 4 12 SPT at 3.00 meters
5
7

4 12.607
Medium dense greyish brown poorly-graded D-4 7 23 SPT at 4.00 meters
fine to medium SAND with silt and 9
sub-rounded to sub-angular coarse to 14
medium gravels of igneous origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 11.607
Medium dense, greyish brown, D-5 8 29 SPT at 5.00 meters
poorly-graded SAND with gravel of igneous 13
origin. 16

6 10.607

Changing to dense. D-6 10 31 SPT at 6.50 meters


14
17
7 9.607

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-121

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 8.607
Dense greyish brown medium to fine SAND D-7 12 34 SPT at 8.00 meters
with silt and sub-angular medium to fine 15
gravels of igneous origin. 19

9 7.607

Dense greyish brown poorly-graded medium D-8 17 42 SPT at 9.50 meters


to fine SAND with traces of sub-angular and 19
sub-rounded fine gravels of igneous origin. 23
10 6.607

11 5.607
Dense, greyish brown, poorly-graded D-9 14 40 SPT at 11.00 meters
GRAVEL with sand. 18
22

12 4.607

--Ditto-- D-10 18 47 SPT at 12.50 meters


21
26
13 3.607
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 2.607
Dense greyish brown poorly-graded D-11 15 48 SPT at 14.00 meters
GRAVEL of igneous origin with sand. 23
25

15 1.607

--Ditto-- D-12 13 43 SPT at 15.50 meters


19
24
16 0.607

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-121

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded


GRAVEL of igneous origin with sand.
(continued)

17 -0.393
Dense greyish brown, silty medium to fine D-13 18 49 SPT at 17.00 meters
SAND. 24
25

18 -1.393

Changing to very dense. D-14 21 66 SPT at 18.50 meters


29
37
19 -2.393

20 -3.393
Very dense, greyish brown, poorly-graded D-15 17 61 SPT at 20.00 meters
SAND with silt. 28
33

21 -4.393

Very dense greyish brown poorly-graded D-16 16 65 SPT at 21.50 meters


medium to fine SAND with sub-angular and 30
sub-rounded medium to fine gravel of 35
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 -5.393
igneous origin.

23 -6.393
--Ditto-- D-17 20 55 SPT at 23.00 meters
24
31

24 -7.393

--Ditto-- D-18 23 65 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-121

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense greyish brown poorly-graded 27


medium to fine SAND with sub-angular and 38
25 -8.393
sub-rounded medium to fine gravel of
igneous origin. (continued)

26 -9.393
Very dense greyish brown medium to fine D-19 19 57 SPT at 26.00 meters
SAND with sub-angular fine gravels of 25
igneous origin. 32

27 -10.393

--Ditto-- D-20 22 62 SPT at 27.50 meters


27
35
28 -11.393

29 -12.393
Very dense, greyish brown, poorly-graded D-21 24 72 SPT at 29.00 meters
SAND with gravel of igneous origin. 30
42

30 -13.393
Very dense greyish brown silty fine to D-22 23 69 SPT at 30.00 meters
medium SAND . 28
41
----End of borehole at 30.00 meters----
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 -14.393

32 -15.393

33 -16.393

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-122

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3107704.489


NEOM Desalination Plant to Gayal Transmission System 15.812 E: 713148.790
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 24-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 27-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown poorly-graded fine to medium B-1 Inspection Pit


SAND with silt and sub-rounded coarse 0.00~1.20m
gravels of igneous origin.

1 14.812

Loose greyish brown silty poorly-graded fine D-1 2 6 SPT at 1.20 meters
to medium SAND with sub-angular fine 3
gravel of igneous origin. 3

2 13.812
Loose, brown, poorly-graded SAND with silt. D-2 3 7 SPT at 2.00 meters
2
5

3 12.812
Loose greyish brown silty fine to medium D-3 2 8 SPT at 3.00 meters
SAND. 4
4

4 11.812
Medium dense brown to greyish brown D-4 9 24 SPT at 4.00 meters
poorly-graded coarse to medium SAND with 11
sub-angular fine gravels of igneous origin. 13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 10.812
Changing to dense. D-5 8 32 SPT at 5.00 meters
15
17

6 9.812

--Ditto-- D-6 10 32 SPT at 6.50 meters


14
18
7 8.812

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-122

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 7.812
Dense greyish brown silty medium to coarse D-7 13 35 SPT at 8.00 meters
SAND. 15
20

9 6.812

Dense greyish brown poorly-graded coarse D-8 16 43 SPT at 9.50 meters


to medium SAND with angular fine to 20
medium gravels of igneous origin. 23
10 5.812

11 4.812
--Ditto-- D-9 18 40 SPT at 11.00 meters
19
21

12 3.812

Dense greyish brown poorly-graded fine to D-10 15 43 SPT at 12.50 meters


medium SAND with angular medium to 17
coarse gravels of igneous origin. 26
13 2.812
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 1.812
--Ditto-- D-11 16 47 SPT at 14.00 meters
22
25

15 0.812
--Ditto-- D-12 17 45 SPT at 15.00 meters
19
----End of borehole at 15.00 meters----
26

16 -0.188

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-123

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3108010.249


NEOM Desalination Plant to Gayal Transmission System 26.127 E: 712762.694
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 24-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 27-11-21 08:30 N.E 12.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown silty fine to medium SAND B-1 Inspection Pit


with gravel and cobbles. Gravels are 0.00~1.20m
rounded fine to coarse of igneous origin.

1 25.127

Medium dense greyish brown poorly-graded D-1 4 11 SPT at 1.20 meters


SAND with gravels. Gravels are rounded 5
medium of igneous origin. 6

2 24.127
--Ditto-- D-2 5 16 SPT at 2.00 meters
7
9

3 23.127
--Ditto-- D-3 6 17 SPT at 3.00 meters
7
10

4 22.127
--Ditto-- D-4 11 29 SPT at 4.00 meters
14
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 21.127
Dense greyish brown poorly-graded medium D-5 15 34 SPT at 5.00 meters
to coarse SAND with gravels. Gravels are 16
sub-rounded medium of igneous origin. 18

6 20.127

--Ditto-- D-6 13 34 SPT at 6.50 meters


15
19
7 19.127

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-123

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 18.127
Dense light brownish grey poorly-graded D-7 15 40 SPT at 8.00 meters
medium to fine SAND with silt. 19
21

9 17.127

Dense light brownish grey poorly-graded fine D-8 18 42 SPT at 9.50 meters
to medium SAND with silt and gravels. 20
Gravels are sub-rounded fine to medium of 22
10 16.127
igneous origin.

11 15.127
Dense, brown, poorly-graded SAND with D-9 21 48 SPT at 11.00 meters
gravel of igneous origin. 23
25

12 14.127

--Ditto-- D-10 18 43 SPT at 12.50 meters


20
23
13 13.127
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 12.127
Very dense brownish grey silty fine to D-11 23 52 SPT at 14.00 meters
medium SAND with gravels. Gravels are 25
sub-rounded medium of igneous origin. 27

15 11.127
Changing to dense. D-12 22 48 SPT at 15.00 meters
24
----End of borehole at 15.00 meters----
24

16 10.127

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-124

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3108310.787


NEOM Desalination Plant to Gayal Transmission System 28.682 E: 712373.646
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 24-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 27-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded fine to medium SAND B-1 Inspection Pit


with silt and sub-angular medium to coarse 0.00~1.20m
gravels.

1 27.682

Medium dense brown fine to medium SAND D-1 5 15 SPT at 1.20 meters
with silt. 6
9

2 26.682
Medium dense poorly-graded SAND with silt. D-2 7 20 SPT at 2.00 meters
9
11

3 25.682
Medium dense brown fine to medium SAND D-3 8 22 SPT at 3.00 meters
with silt. 9
13

4 24.682
--Ditto-- D-4 7 26 SPT at 4.00 meters
11
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.682
Medium dense brown poorly-graded SAND D-5 9 25 SPT at 5.00 meters
with silt. 11
14

6 22.682

Dense brown fine to medium SAND with silt. D-6 10 31 SPT at 6.50 meters
14
17
7 21.682

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-124

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown fine to medium SAND with silt.


(continued)
8 20.682
--Ditto-- D-7 12 34 SPT at 8.00 meters
15
19

9 19.682

Dense brown poorly-graded SAND. D-8 11 34 SPT at 9.50 meters


16
18
10 18.682

11 17.682
--Ditto-- D-9 13 35 SPT at 11.00 meters
15
20

12 16.682

Dense brown poorly-graded fine to medium D-10 16 39 SPT at 12.50 meters


SAND with silt. 18
21
13 15.682
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.682
--Ditto-- D-11 14 43 SPT at 14.00 meters
19
24

15 13.682
--Ditto-- D-12 17 42 SPT at 15.00 meters
20
----End of borehole at 15.00 meters----
22

16 12.682

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-125

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3108435.057


NEOM Desalination Plant to Gayal Transmission System 26.974 E: 711889.338
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 24-Nov-21 24-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 27-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with B-1 Inspection Pit


rounded fine to medium gravels of igneous 0.00~1.20m
origin.

1 25.974

Medium dense brown silty fine to medium D-1 10 14 SPT at 1.20 meters
SAND with gravels. Gravels are 6
sub-rounded fine of igneous origin. 8

2 24.974
--Ditto-- D-2 6 19 SPT at 2.00 meters
8
11

3 23.974
Medium dense brown silty fine to coarse D-3 7 23 SPT at 3.00 meters
SAND with gravels. Gravels are sub-angular 10
fine of igneous origin. 13

4 22.974
Medium dense brown silty fine to medium D-4 7 24 SPT at 4.00 meters
SAND with gravels. Gravels are rounded fine 10
to medium of igneous origin. 14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 21.974
--Ditto-- D-5 10 25 SPT at 5.00 meters
14
11

6 20.974

Medium dense greyish brown well-graded D-6 11 25 SPT at 6.50 meters


SAND with gravels. Gravels are sub-angular 13
medium of igneous origin. 12
7 19.974

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-125

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense greyish brown well-graded


SAND with gravels. Gravels are sub-angular
medium of igneous origin. (continued)
8 18.974
--Ditto-- D-7 9 29 SPT at 8.00 meters
13
16

9 17.974

--Ditto-- D-8 12 30 SPT at 9.50 meters


15
15
10 16.974

11 15.974
Dense greyish brown silty medium to fine D-9 14 35 SPT at 11.00 meters
SAND with gravels. Gravels are sub-angular 16
medium of igneous origin. 19

12 14.974

--Ditto-- D-10 15 44 SPT at 12.50 meters


18
26
13 13.974
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 12.974
Very dense greyish brown poorly-graded D-11 16 58 SPT at 14.00 meters
SAND with sub-rounded medium to coarse 22
gravels of igneous origin. 36

15 11.974
Very dense greyish brown poorly-graded fine D-12 14 58 SPT at 15.00 meters
to medium SAND. 25
33
----End of borehole at 15.00 meters----

16 10.974

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-126

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3108559.291


NEOM Desalination Plant to Gayal Transmission System 29.987 E: 711405.080
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 10.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Yasir
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Firas
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown poorly-graded fine to medium B-1 Inspection Pit


SAND with angular medium to coarse 0.00~1.20m
gravels of igneous origin.

1 28.987

Loose greyish brown poorly-graded SAND. D-1 4 9 SPT at 1.20 meters


4
5

2 27.987
Changing to medium dense. D-2 5 13 SPT at 2.00 meters
6
7

3 26.987
Medium dense greyish brown poorly-graded D-3 6 18 SPT at 3.00 meters
fine to medium SAND with silt. 8
10

4 25.987
--Ditto-- D-4 9 22 SPT at 4.00 meters
10
12
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.987
--Ditto-- D-5 11 30 SPT at 5.00 meters
14
16

6 23.987

Dense greyish brown fine to medium SAND D-6 13 33 SPT at 6.50 meters
with silt and angular medium to coarse 15
gravel of igneous origin. 18
7 22.987

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-126

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 21.987
Dense greyish brown silty fine to medium D-7 13 35 SPT at 8.00 meters
SAND. 16
19

9 20.987

Dense, brown, poorly-graded SAND D-8 12 35 SPT at 9.50 meters


15
20
10 19.987

11 18.987
--Ditto-- D-9 16 39 SPT at 11.00 meters
17
22

12 17.987

Dense brown poorly-graded fine to medium D-10 17 43 SPT at 12.50 meters


SAND. 20
23
13 16.987
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 15.987
--Ditto-- D-11 19 46 SPT at 14.00 meters
22
24

15 14.987

Dense brown poorly-graded fine to medium D-12 21 48 SPT at 15.50 meters


SAND with silt. 23
25
16 13.987

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-126

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium


SAND with silt. (continued)

17 12.987
--Ditto-- D-13 18 41 SPT at 17.00 meters
19
22

18 11.987

Dense greyish brown medium to fine SAND D-14 17 39 SPT at 18.50 meters
with silt. 18
21
19 10.987

20 9.987
Changing to very dense. D-15 21 42 SPT at 20.00 meters
25
----End of borehole at 20.00 meters----
27

21 8.987
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 7.987

23 6.987

24 5.987

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-127

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3108683.597


NEOM Desalination Plant to Gayal Transmission System 27.262 E: 710920.739
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Light brown well-graded SAND with silt and B-1 Inspection Pit
gravels. Gravels are sub-rounded fine to 0.00~1.20m
coarse of igneous origin.

1 26.262

Medium dense greyish brown silty fine to D-1 5 23 SPT at 1.20 meters
coarse SAND with sub-rounded fine to 12
medium gravels of igneous origin. 11

2 25.262
--Ditto-- D-2 8 24 SPT at 2.00 meters
10
14

3 24.262
--Ditto-- D-3 8 25 SPT at 3.00 meters
11
14

4 23.262
Dense brown silty fine to medium SAND with D-4 10 33 SPT at 4.00 meters
gravels. Gravels are sub-rounded fine of 15
igneous origin. 18
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 22.262
--Ditto-- D-5 13 36 SPT at 5.00 meters
15
21

6 21.262

Dense brown silty medium to fine SAND with D-6 14 33 SPT at 6.50 meters
gravels. Gravels are sub-rounded fine of 14
igneous origin. 19
7 20.262

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-127

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 19.262
Dense, brown, silty SAND. D-7 13 35 SPT at 8.00 meters
16
19

9 18.262

Dense light brown poorly-graded fine to D-8 14 37 SPT at 9.50 meters


medium SAND with silt and gravels. Gravels 15
are sub-angular to sub-rounded fine of 22
10 17.262
sandstone and igneous origin.

11 16.262
Dense brown silty fine to medium SAND. D-9 13 44 SPT at 11.00 meters
19
25

12 15.262

Very dense brown to light brown D-10 16 56 SPT at 12.50 meters


poorly-graded coarse to medium SAND. 24
32
13 14.262
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 13.262
--Ditto-- D-11 18 63 SPT at 14.00 meters
25
38

15 12.262
--Ditto-- D-12 20 71 SPT at 15.00 meters
30
----End of borehole at 15.00 meters----
41

16 11.262

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-128

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3108807.821


NEOM Desalination Plant to Gayal Transmission System 33.776 E: 710436.438
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with B-1 Inspection Pit


gravels. Gravels are sub-rounded medium to 0.00~1.20m
coarse of igneous origin.

1 32.776

Medium dense greyish brown poorly-graded D-1 5 12 SPT at 1.20 meters


SAND. 6
6

2 31.776
--Ditto-- D-2 4 16 SPT at 2.00 meters
7
9

3 30.776
Medium dense greyish brown poorly-graded D-3 8 23 SPT at 3.00 meters
fine to medium SAND with silt and gravels. 10
Gravels are sub-angular medium of igneous 13
origin.

4 29.776
Changing to dense. D-4 12 32 SPT at 4.00 meters
15
17
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.776
--Ditto-- D-5 15 37 SPT at 5.00 meters
17
20

6 27.776

Dense greyish brown poorly-graded coarse D-6 12 40 SPT at 6.50 meters


to medium SAND. 18
22
7 26.776

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-128

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded coarse


to medium SAND. (continued)
8 25.776
Dense greyish brown poorly-graded coarse D-7 15 37 SPT at 8.00 meters
to medium SAND with silt and trace gravels. 17
Gravels are sub-angular medium of igneous 20
origin.

9 24.776

Dense, greyish brown, poorly-graded SAND. D-8 18 46 SPT at 9.50 meters


21
25
10 23.776

11 22.776
Very dense greyish brown silty medium to D-9 15 52 SPT at 11.00 meters
fine SAND with gravels. Gravels are rounded 29
to sub-angular medium of igneous origin. 23

12 21.776

Changing to dense. D-10 17 47 SPT at 12.50 meters


21
26
13 20.776
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.776
Dense brownish grey poorly-graded coarse D-11 19 46 SPT at 14.00 meters
to medium SAND with silt. 22
24

15 18.776
--Ditto-- D-12 17 46 SPT at 15.00 meters
20
----End of borehole at 15.00 meters----
26

16 17.776

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-129

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3108932.092


NEOM Desalination Plant to Gayal Transmission System 36.410 E: 709952.101
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 7.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with B-1 Inspection Pit


gravels and cobbles. Gravels are rounded 0.00~1.20m
fine to coarse of igneous origin.

1 35.410

Medium dense brown poorly-graded SAND D-1 6 18 SPT at 1.20 meters


with silt and gravel. 8
10

2 34.410
Medium dense brown silty medium to fine D-2 5 18 SPT at 2.00 meters
SAND with trace gravels. Gravels are 7
sub-rounded fine of igneous origin. 11

3 33.410
--Ditto-- D-3 7 22 SPT at 3.00 meters
9
13

4 32.410
--Ditto-- D-4 9 26 SPT at 4.00 meters
12
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 31.410
Dense greyish brown silty fine to medium D-5 12 36 SPT at 5.00 meters
SAND with trace gravels. Gravels are 17
sub-rounded fine of igneous origin. 19

6 30.410

--Ditto-- D-6 14 36 SPT at 6.50 meters


16
20
7 29.410

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-129

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 28.410
Dense greyish brown poorly-graded fine to D-7 11 33 SPT at 8.00 meters
medium SAND with silt and trace gravels. 15
Gravels are sub-rounded fine of igneous 18
origin.

9 27.410

Dense, brown, well-graded SAND with silt. D-8 13 31 SPT at 9.50 meters
14
17
10 26.410

11 25.410
Dense greyish brown poorly-graded fine to D-9 15 38 SPT at 11.00 meters
medium SAND with silt and gravels. Gravels 17
are rounded medium of igneous origin. 21

12 24.410

--Ditto-- D-10 13 36 SPT at 12.50 meters


16
20
13 23.410
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 22.410
Dense greyish brown poorly-graded fine to D-11 16 41 SPT at 14.00 meters
medium SAND with silt and gravels. Gravels 19
are sub-rounded and sub-angular fine to 22
medium of igneous origin.

15 21.410

--Ditto-- D-12 15 39 SPT at 15.50 meters


18
21
16 20.410

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-129

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense greyish brown poorly-graded fine to


medium SAND with silt and gravels. Gravels
are sub-rounded and sub-angular fine to
medium of igneous origin. (continued)

17 19.410
--Ditto-- D-13 18 46 SPT at 17.00 meters
21
----End of borehole at 17.00 meters----
25

18 18.410

19 17.410

20 16.410

21 15.410
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 14.410

23 13.410

24 12.410

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-130

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3109057.460


NEOM Desalination Plant to Gayal Transmission System 33.007 E: 709468.097
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 23-Nov-21 23-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded medium to coarse B-1 Inspection Pit


SAND with silt and angular to sub-angular 0.00~1.20m
medium to coarse gravels of igneous origin.

1 32.007

Medium dense brown poorly-graded coarse D-1 6 14 SPT at 1.20 meters


to medium SAND. 6
8

2 31.007
--Ditto-- D-2 7 20 SPT at 2.00 meters
9
11

3 30.007
Medium dense brown poorly-graded coarse D-3 8 22 SPT at 3.00 meters
to medium SAND with sub-rounded fine to 9
medium gravels of igneous origin. 13

4 29.007
--Ditto-- D-4 6 24 SPT at 4.00 meters
10
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.007
--Ditto-- D-5 11 27 SPT at 5.00 meters
14
13

6 27.007

Medium dense brown poorly-graded medium D-6 9 26 SPT at 6.50 meters


to coarse SAND with silt. 12
14
7 26.007

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-130

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense brown poorly-graded medium


to coarse SAND with silt. (continued)
8 25.007
--Ditto-- D-7 8 27 SPT at 8.00 meters
10
17

9 24.007

Changing to dense. D-8 11 31 SPT at 9.50 meters


13
18
10 23.007

11 22.007
Dense brown poorly-graded SAND with D-9 9 31 SPT at 11.00 meters
sub-angular medium to coarse gravels of 14
igneous origin. 17

12 21.007

Medium dense brown poorly-graded medium D-10 13 29 SPT at 12.50 meters


to coarse SAND with angular medium 13
gravels of igneous origin. 16
13 20.007
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.007
--Ditto-- D-11 8 27 SPT at 14.00 meters
12
15

15 18.007

Dense brown poorly-graded medium to D-12 10 33 SPT at 15.50 meters


coarse SAND. 15
18
16 17.007

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-130

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown silty fine to medium SAND with D-13 9 32 SPT at 16.00 meters
angular medium gravels of igneous origin. 13
19
----End of borehole at 16.00 meters----

17 16.007

18 15.007

19 14.007

20 13.007

21 12.007
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 11.007

23 10.007

24 9.007

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-131

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3109221.343


NEOM Desalination Plant to Gayal Transmission System 29.171 E: 708995.746
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown well-graded SAND with silt. B-1 Inspection Pit


0.00~1.20m

1 28.171

Medium dense brown silty fine to medium D-1 8 21 SPT at 1.20 meters
SAND with trace fine gravels. Gravels are 10
sub-rounded fine of igneous origin. 11

2 27.171
--Ditto-- D-2 9 28 SPT at 2.00 meters
12
16

3 26.171
Dense greyish brown poorly-graded fine to D-3 11 32 SPT at 3.00 meters
medium SAND with silt. 15
17

4 25.171
--Ditto-- D-4 14 42 SPT at 4.00 meters
18
24
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.171
Hard, brown, sandy Lean CLAY. D-5 13 40 SPT at 5.00 meters
13
27

6 23.171

Hard, brown, sandy Lean CLAY. D-6 16 50 SPT at 6.50 meters


21
29
7 22.171

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-131

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Hard, brown, sandy Lean CLAY. (continued)

8 21.171
Very dense light brown poorly-graded D-7 18 56 SPT at 8.00 meters
medium to coarse SAND with trace gravels. 24
Gravels are sub-rounded fine igneous origin. 32

9 20.171

--Ditto-- D-8 16 57 SPT at 9.50 meters


23
34
10 19.171

11 18.171
Very dense light greyish brown D-9 13 53 SPT at 11.00 meters
poorly-graded fine to medium SAND with silt. 18
35

12 17.171

Changing to dense. D-10 14 48 SPT at 12.50 meters


16
32
13 16.171
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 15.171
Changing to very dense. D-11 18 60 SPT at 14.00 meters
25
35

15 14.171
--Ditto-- D-12 20 66 SPT at 15.00 meters
27
----End of borehole at 15.00 meters----
39

16 13.171

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-132

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3109385.215


NEOM Desalination Plant to Gayal Transmission System 32.012 E: 708523.380
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 22-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with trace B-1 Inspection Pit
gravels. Gravels are sub-rounded fine to 0.00~1.20m
medium of igneous origin.

1 31.012

Loose brown to greyish brown poorly-graded D-1 4 9 SPT at 1.20 meters


SAND with silt. 4
5

2 30.012
Changing to medium dense. D-2 5 16 SPT at 2.00 meters
7
9

3 29.012
--Ditto-- D-3 6 18 SPT at 3.00 meters
8
10

4 28.012
--Ditto-- D-4 9 26 SPT at 4.00 meters
11
15
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 27.012
Medium dense greyish brown poorly-graded D-5 12 29 SPT at 5.00 meters
medium to fine SAND. 13
16

6 26.012

--Ditto-- D-6 12 29 SPT at 6.50 meters


14
15
7 25.012

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-132

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense greyish brown poorly-graded


medium to fine SAND. (continued)
8 24.012
Dense greyish brown silty medium to fine D-7 15 34 SPT at 8.00 meters
SAND with trace gravels. Gravels are 16
sub-rounded fine of igneous origin. 18

9 23.012

Dense, greyish brown, silty SAND. D-8 15 38 SPT at 9.50 meters


18
20
10 22.012

11 21.012
--Ditto-- D-9 17 42 SPT at 11.00 meters
19
23

12 20.012

Dense greyish brown weakly cemented D-10 19 40 SPT at 12.50 meters


medium to fine SAND with silt. 20
20
13 19.012
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 18.012
--Ditto-- D-11 13 34 SPT at 14.00 meters
16
18

15 17.012
--Ditto-- D-12 12 35 SPT at 15.00 meters
16
----End of borehole at 15.00 meters----
19

16 16.012

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-133

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3109549.117


NEOM Desalination Plant to Gayal Transmission System 33.331 E: 708051.001
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 22-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 10.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded fine to medium SAND B-1 Inspection Pit


with silt and gravels. Gravels are 0.00~1.20m
sub-rounded medium to coarse of igneous
origin.

1 32.331

Medium dense brown poorly-graded SAND D-1 4 14 SPT at 1.20 meters


with silt and gravels. Gravels are 5
sub-angular medium to coarse of igneous 9
origin.
2 31.331
--Ditto-- D-2 5 17 SPT at 2.00 meters
7
10

3 30.331
Medium dense brown silty fine to medium D-3 12 28 SPT at 3.00 meters
SAND with gravels. Gravels are 12
sub-rounded fine of igneous origin. 16

4 29.331
Changing to very dense. D-4 50/6 100
90
SPT at 4.00 meters
R-1 Coring from
Brown weakly cemented silty fine to medium 4.06~5.00 meters
SAND.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.331
Very dense brown silty fine to medium SAND D-5 20 58 SPT at 5.00 meters
with traces of gravels. Gravels are angular 22
fine of sandstone. 36

6 27.331

--Ditto-- D-6 18 54 SPT at 6.50 meters


21
33
7 26.331

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-133

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 25.331
Dense brown poorly-graded fine to medium D-7 12 39 SPT at 8.00 meters
SAND with silt. 17
22

9 24.331

--Ditto-- D-8 13 43 SPT at 9.50 meters


18
25
10 23.331

11 22.331
Very dense brown poorly-graded fine to D-9 18 51 SPT at 11.00 meters
medium SAND with silt and trace gravels. 20
Gravels are sub-rounded fine to medium of 31
igneous origin.

12 21.331

Changing to dense. D-10 15 48 SPT at 12.50 meters


19
29
13 20.331
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.331
Very dense light brown medium to coarse D-11 16 56 SPT at 14.00 meters
SAND with silt and gravels. Gravels are 21
angular fine of igneous origin. 35

15 18.331

Very dense, brown, poorly-graded SAND D-12 19 56 SPT at 15.50 meters


with silt. 26
30
16 17.331

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-133

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, poorly-graded SAND


with silt. (continued)

17 16.331
Dense light brown silty fine to medium D-13 17 48 SPT at 17.00 meters
SAND. 21
27

18 15.331
Changing to very dense. D-14 19 59 SPT at 18.00 meters
21
----End of borehole at 18.00 meters----
38

19 14.331

20 13.331

21 12.331
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 11.331

23 10.331

24 9.331

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-134

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3109712.992


NEOM Desalination Plant to Gayal Transmission System 28.009 E: 707578.633
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 22-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown poorly-graded medium to coarse B-1 Inspection Pit


SAND with gravel. Gravels are sub-rounded 0.00~1.20m
fine to medium of igneous origin.

1 27.009

Loose brown well-graded fine to coarse D-1 3 9 SPT at 1.20 meters


SAND with silt and gravels. Gravels are 4
sub-angular fine of igneous origin. 5

2 26.009
Changing to medium dense. D-2 4 11 SPT at 2.00 meters
5
6

3 25.009
Medium dense brown poorly-graded medium D-3 10 28 SPT at 3.00 meters
to coarse SAND with silt and gravels. 13
Gravels are angular fine of igneous origin. 15

4 24.009
Medium dense, brown, well-graded SAND D-4 10 26 SPT at 4.00 meters
with silt and gravel of igneous origin. 12
14
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.009
Changing to dense. D-5 8 32 SPT at 5.00 meters
15
17

6 22.009

Dense brown poorly-graded fine to medium D-6 10 34 SPT at 6.50 meters


SAND with silt and gravels. Gravels are 16
sub-angular medium of igneous origin. 18
7 21.009

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-134

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 20.009
Medium dense brown silty fine to medium D-7 9 28 SPT at 8.00 meters
SAND with trace gravels. Gravels are 13
sub-angular fine of igneous origin. 15

9 19.009

Changing to dense. D-8 12 32 SPT at 9.50 meters


15
17
10 18.009

11 17.009
--Ditto-- D-9 15 36 SPT at 11.00 meters
17
19

12 16.009

Dense brown, poorly-graded SAND with silt. D-10 16 38 SPT at 12.50 meters
18
20
13 15.009
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.009
--Ditto-- D-11 19 40 SPT at 14.00 meters
20
20

15 13.009
--Ditto-- D-12 16 40 SPT at 15.00 meters
18
----End of borehole at 15.00 meters----
22

16 12.009

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-135

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3109876.834


NEOM Desalination Plant to Gayal Transmission System 37.224 E: 707106.266
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Nov-21 21-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with trace B-1 Inspection Pit
gravels. Gravels are sub-rounded medium to 0.00~1.20m
fine of igneous origin.

1 36.224

Loose brown poorly-graded fine to medium D-1 4 9 SPT at 1.20 meters


SAND with silt. 4
5

2 35.224
Changing to medium dense. D-2 5 13 SPT at 2.00 meters
6
7

3 34.224
--Ditto-- D-3 6 14 SPT at 3.00 meters
6
8

4 33.224
Medium dense light greyish brown silty D-4 8 22 SPT at 4.00 meters
medium to fine SAND with gravels. Gravels 9
are sub-angular fine of igneous origin. 13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 32.224
Medium dense, brown, well-graded SAND D-5 9 22 SPT at 5.00 meters
with silt and gravel of igneous origin. 10
12

6 31.224

--Ditto-- D-6 12 29 SPT at 6.50 meters


14
15
7 30.224

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-135

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, well-graded SAND


with silt and gravel of igneous origin.
(continued)
8 29.224
Medium dense reddish brown poorly-graded D-7 9 21 SPT at 8.00 meters
fine to medium SAND with silt. 10
11

9 28.224

--Ditto-- D-8 11 26 SPT at 9.50 meters


12
14
10 27.224

11 26.224
Dense greyish brown silty fine to medium D-9 13 33 SPT at 11.00 meters
SAND. 15
18

12 25.224

--Ditto-- D-10 15 36 SPT at 12.50 meters


17
19
13 24.224
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 23.224
--Ditto-- D-11 16 38 SPT at 14.00 meters
18
20

15 22.224
--Ditto-- D-12 18 42 SPT at 15.00 meters
20
----End of borehole at 15.00 meters----
22

16 21.224

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-136

Test Boring Log SHEET 1 OF 4

PROJECT: ELEVATION (m.a.s.l): N: 3110095.283


NEOM Desalination Plant to Gayal Transmission System 43.082 E: 706658.412
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 23-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 NE 3.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown fine to medium SAND with silt and B-1 Inspection Pit
sub-angular medium to coarse gravels of 0.00~1.20m
igneous origin.

1 42.082

Medium dense brown poorly-graded medium D-1 8 22 SPT at 1.20 meters


to coarse SAND with silt and sub-angular 10
gravels of igneous origin. 12

2 41.082
--Ditto-- D-2 9 25 SPT at 2.00 meters
11
14

3 40.082
Changing to dense. D-3 13 32 SPT at 3.00 meters
15
17

4 39.082
Dense brown poorly-graded fine to medium D-4 14 41 SPT at 4.00 meters
SAND with silt and angular fine gravels of 19
igneous origin. 22
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 38.082
Dense brown poorly-graded silty fine to D-5 16 41 SPT at 5.00 meters
medium SAND. 20
21

6 37.082

Dense, reddish brown, clayey SAND. D-6 13 40 SPT at 6.50 meters


21
19
7 36.082

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-136

Test Boring Log SHEET 2 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense, reddish brown, clayey SAND.


(continued)
8 35.082
Dense brown fine to medium SAND with silt. D-7 15 47 SPT at 8.00 meters
22
25

9 34.082

Very dense reddish brown poorly-graded D-8 50/7 100


33
SPT at 9.50 meters
fine SAND with silt. R-1 Coring from
9.57~10.60 meters
10 33.082 Reddish brown well-graded fine to medium
SAND with silt.

Dense reddish brown silty poorly-graded D-9 18 49 SPT at 10.60 meters


medium to coarse SAND. 23
11 32.082 26

12 31.082

Dense brown silty poorly-graded medium to D-10 16 46 SPT at 12.50 meters


coarse SAND with angular fine to medium 19
gravels of igneous origin. 27
13 30.082
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 29.082
Dense brown silty well-graded medium to D-11 13 44 SPT at 14.00 meters
coarse SAND. 20
24

15 28.082

--Ditto-- D-12 15 48 SPT at 15.50 meters


21
27
16 27.082

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-136

Test Boring Log SHEET 3 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown silty well-graded medium to


coarse SAND. (continued)

17 26.082
--Ditto-- D-13 17 100 SPT at 17.00 meters
35
50/10
Brown silty SAND. R-2 92 Coring from
17.40~18.50 meters

18 25.082

Very dense brown poorly-graded medium to D-14 24 100 SPT at 18.50 meters
coarse SAND with silt and angular medium 50/9
to coarse gravels of igneous origin. R-3 100 Coring from
19 24.082 18.75~19.80 meters
Brown well-graded medium to coarse SAND
with silt and sub-angular medium to coarse
gravels of igneous origin.

Very dense brown medium to fine SAND D-15 24 100 SPT at 19.80 meters
20 23.082
with silt and sub-angular fine gravels of 37
igneous origin. 50/10
R-4 80 Coring from
Brown poorly-graded fine to medium SAND 20.20~21.20 meters
with silt and sub-angular fine gravels of
igneous origin.
21 22.082

Very dense brown fine to medium SAND D-16 20 84 SPT at 21.20 meters
with silt. 39
45
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 21.082

23 20.082
--Ditto-- D-17 22 84 SPT at 23.00 meters
39
45

24 19.082

D-18 23 83 SPT at 24.50 meters


Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-136

Test Boring Log SHEET 4 OF 4

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense brown fine to medium SAND 38


with silt. (continued) 45
25 18.082

26 17.082
Very dense, brown, poorly-graded SAND D-19 22 87 SPT at 26.00 meters
with silt. 39
48

27 16.082

Very dense brown fine to medium SAND D-20 21 79 SPT at 27.50 meters
with silt and angular medium to coarse 38
gravels of igneous origin. 41
28 15.082

29 14.082
Very dense brown poorly-graded fine SAND D-21 20 83 SPT at 29.00 meters
with silt. 38
45

30 13.082
--Ditto-- D-22 23 89 SPT at 30.00 meters
40
----End of borehole at 30.00 meters----
49
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

31 12.082

32 11.082

33 10.082

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-137

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3110340.327


NEOM Desalination Plant to Gayal Transmission System 28.913 E: 706222.551
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 22-Nov-21 22-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 25-11-21 08:30 N.E 1.50
CORE BAR.: - LENGTH: - BIT: - DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown medium to coarse SAND with silt and B-1 Inspection Pit
sub-angular to sub-rounded medium to 0.00~1.20m
coarse gravels of igneous origin.

1 27.913

Dense brown silty GRAVEL with sand. D-1 14 39 SPT at 1.20 meters
Gravel is angular fine to medium of 17
mudstone and limestone origin. 22

2 26.913
--Ditto-- D-2 19 48 SPT at 2.00 meters
23
25

3 25.913
--Ditto-- D-3 16 49 SPT at 3.00 meters
20
29

4 24.913
Hard, grey, Lean CLAY. D-4 18 49 SPT at 4.00 meters
21
28
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 23.913
Dense grey fine to medium SAND with silt D-5 15 49 SPT at 5.00 meters
and angular fine gravels of limestone origin. 23
26

6 22.913

Medium dense greyish brown silty medium D-6 4 13 SPT at 6.50 meters
to coarse SAND. 7
6
7 21.913

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-137

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense greyish brown silty medium


to coarse SAND. (continued)
8 20.913
Medium dense greyish brown poorly-graded D-7 6 14 SPT at 8.00 meters
medium to coarse SAND with angular fine 6
gravels of igneous origin. 8

9 19.913

Dense grey silty fine to medium SAND with D-8 12 32 SPT at 9.50 meters
angular medium to coarse gravels of 13
limestone origin. 19
10 18.913

11 17.913
Dense, brown, clayey GRAVEL with sand. D-9 10 44 SPT at 11.00 meters
17
27

12 16.913

Dense greyish brown silty poorly-graded D-10 16 37 SPT at 12.50 meters


medium to coarse SAND. 17
20
13 15.913
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 14.913
Dense greyish brown silty poorly-graded D-11 14 42 SPT at 14.00 meters
medium to coarse SAND with sub-rounded 19
medium to coarse gravels of igneous origin. 23

15 13.913
--Ditto-- D-12 12 38 SPT at 15.00 meters
18
----End of borehole at 15.00 meters----
20

16 12.913

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-138

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3110585.378


NEOM Desalination Plant to Gayal Transmission System 35.455 E: 705786.659
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 21-Nov-21 21-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 6.00
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown well-graded GRAVEL of igneous B-1 96 Inspection Pit


origin with silt and sand. R-4 0.00~1.20m

1 34.455

Medium dense yellowish brown silty fine D-1 7 25 SPT at 1.20 meters
SAND. 14
11

2 33.455
--Ditto-- D-2 6 21 SPT at 2.00 meters
8
13

3 32.455
Very dense brown silty fine SAND (Residual D-3 50/8 100 SPT at 3.00 meters
30 Coring from
soil). R-1
3.08~4.00 meters
Brown angular fine to coarse GRAVEL and
COBBLE of granite.

4 31.455
Very dense light brown angular GRAVEL D-4 50/6 100 SPT at 4.00 meters
with silt and sand.

Very dense light brownish to greenish grey R-2 100 Coring from
poorly-graded angular fine to coarse 4.50~5.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

GRAVEL with silt and sand (residual soil).


5 30.455
--Ditto-- R-3 100 Coring from
5.00~6.00 meters

6 29.455
--Ditto-- D-5 50/4 100 SPT at 6.00 meters
Coring from
Very dense greenish grey silty fine to coarse 6.04~7.50 meters
SAND with gravel. Gravels are angular fine
to coarse of granite (residual soil).

7 28.455

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-138

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

--Ditto-- D-6 50/8 100


98 SPT at 7.50 meters
R-5 Coring from
Very dense, greenish grey, silty SAND. 7.55~9.00 meters
8 27.455

9 26.455
Very dense greenish grey sandy angular fine D-7 50/5 100
96 0 0 N.I
SPT at 9.00 meters
to medium GRAVELS of granite. Sand is fine R-6 Coring from
9.07~10.50 meters
to medium.
Medium strong greyish to pinkish brown
phaneritic brown texture GRANITE. Highly
10 25.455
weathered extremely close spaced highly
fractured.

--Ditto-- R-7 98 0 0 N.I Coring from


10.50~12.00 meters

11 24.455

12 23.455
--Ditto-- R-8 100 0 5 N.I Coring from
12.00~13.50 meters

13 22.455
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-9 99 0 0 N.I Coring from


13.50~15.00 meters

14 21.455

15 20.455
----End of borehole at 15.00 meters----

16 19.455

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-139

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3110830.359


NEOM Desalination Plant to Gayal Transmission System 33.661 E: 705350.854
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Nov-21 20-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-11-21 08:30 N.E 4.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


gravels. Gravels are rounded fine to medium 0.00~1.20m
of igneous origin.

1 32.661

Loose brown silty fine to coarse SAND with D-1 3 9 SPT at 1.20 meters
gravels. Gravels are sub-angular fine of 4
igneous origin. 5

2 31.661
--Ditto-- D-2 4 10 SPT at 2.00 meters
5
5

3 30.661
Medium dense greyish brown silty fine D-3 5 14 SPT at 3.00 meters
SAND with gravels. Gravels are 6
sub-rounded fine of igneous origin. 8

4 29.661
--Ditto-- D-4 7 17 SPT at 4.00 meters
8
9
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.661
Medium dense brown silty medium to fine D-5 8 20 SPT at 5.00 meters
SAND with gravels. Gravels are sub-angular 8
fine to medium of sandstone (decomposed 12
sandstone).

6 27.661

Medium dense, brown, well-graded SAND D-6 10 24 SPT at 6.50 meters


with silt and gravel of sandstone. 11
13
7 26.661

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-139

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Medium dense, brown, well-graded SAND


with silt and gravel of sandstone. (continued)
8 25.661
--Ditto-- D-7 11 26 SPT at 8.00 meters
13
13

9 24.661

Dense brown silty medium to fine SAND with D-8 14 32 SPT at 9.50 meters
gravels. Gravels are angular medium of 15
sandstone (decomposed sandstone). 17
10 23.661

11 22.661
Dense, brown, poorly-graded SAND with silt D-9 15 35 SPT at 11.00 meters
and gravel of sandstone. 17
18

12 21.661

--Ditto-- D-10 16 32 SPT at 12.50 meters


18
14
13 20.661
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.661
Dense brown silty fine SAND with gravels. D-11 11 37 SPT at 14.00 meters
Gravels are angular fine to medium of 16
sandstone. 21

15 18.661
--Ditto-- D-12 13 40 SPT at 15.00 meters
18
----End of borehole at 15.00 meters----
22

16 17.661

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-140

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3111075.381


NEOM Desalination Plant to Gayal Transmission System 33.604 E: 704914.981
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Nov-21 20-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 23-11-21 08:30 N.E 6.00
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown well-graded SAND with silt and B-1 Inspection Pit


gravel. 0.00~1.20m

1 32.604

Medium dense brown silty medium to fine D-1 10 26 SPT at 1.20 meters
SAND. 12
14

2 31.604
--Ditto-- D-2 11 29 SPT at 2.00 meters
13
16

3 30.604
Very dense brown weakly cemented medium D-3 17 100 SPT at 3.00 meters
to fine SAND. 35
50/13

4 29.604
Very dense, brown, silty SAND. D-4 19 100 SPT at 4.00 meters
40
50/6
Brown silty fine SAND with gravels. Gravels R-1 97 Coring from
are angular fine to coarse of SANDSTONE 4.50~5.50 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

(decomposed sandstone).
5 28.604

Changing to very dense. D-5 29 100 SPT at 5.50 meters


43
50/4
6 27.604
Very dense, brown, silty SAND (decomosed R-2 98 Coring from
SANDSTONE). 6.00~7.50 meters

7 26.604

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-140

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Very dense, brown, silty SAND (decomosed R-3 40 Coring from


SANDSTONE). (continued) 7.50~8.50 meters
--Ditto--
8 25.604

--Ditto-- R-4 40 Coring from


8.50~9.00 meters

9 24.604
Very dense brown silty medium to fine D-6 20 69 SPT at 9.00 meters
SAND. 31
38

10 23.604

Very dense brown poorly-graded fine to D-7 22 69 SPT at 10.50 meters


medium SAND. 33
36
11 22.604

12 21.604
Very dense, brown, silty SAND. D-8 20 58 SPT at 12.00 meters
27
31

13 20.604
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- D-9 22 63 SPT at 13.50 meters


30
33
14 19.604

15 18.604
--Ditto-- D-10 23 74 SPT at 15.00 meters
32
----End of borehole at 15.00 meters----
42

16 17.604

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-141

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3111320.381


NEOM Desalination Plant to Gayal Transmission System 29.605 E: 704479.148
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Nov-21 21-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 1.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

No Inspection Pit due to hard strata of D-1 50/2 100 92 0 4 N.I SPT at 0.00 meters
GYPSUM R-1 Coring from
0.02~0.50 meters
SPT conducted but no recovery
Weak thinly laminated light grey non clastic R-2 94 34 38 21.8 Coring from
0.50~1.50 meters
GYPSUM. Moderately to highly weathered
1 28.605
fractures are incipient close spaced open
clean.
Changing to dark brownish grey in color.

Very weak thinly laminated grey non clastic R-3 100 0 4 N.I Coring from
ANHYDRITE. highly to completely 1.50~3.00 meters
weathered completely fractured.
2 27.605

3 26.605
Medium strong to strong thinly laminated R-4 100 60 76 14.0 Coring from
whitish grey non clastic ANHYDRITE. 3.00~4.50 meters
Moderately weathered fractures are incipient
close to medium spaced open clean.

4 25.605

--Ditto-- R-5 100 77 84 10.3 Coring from


4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.605

6 23.605
Changing to strong. R-6 100 70 86 12.0 Coring from
6.00~7.50 meters

7 22.605

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-141

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Changing to highly fractured (fragments of R-7 95 0 0 N.I Coring from


ANHYDRITE). 7.50~9.00 meters

8 21.605

9 20.605
--Ditto-- R-8 92 0 7 N.I Coring from
9.00~10.50 meters

10 19.605

Medium strong to strong thinly laminated R-9 96 50 62 17.0 Coring from


whitish grey non clastic ANHYDRITE. 10.50~12.00 meters
Moderately weathered fractures are incipient
11 18.605
horizontal very close to medium spaced
open clean.

12 17.605
--Ditto-- become medium strong and R-10 100 13 40 37.5 Coring from
fractures become close to very close 12.00~13.50 meters
spaced.

13 16.605
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- R-11 100 11 30 39.0 Coring from


13.50~15.00 meters

14 15.605

15 14.605
----End of borehole at 15.00 meters----

16 13.605

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-142

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3111565.429


NEOM Desalination Plant to Gayal Transmission System 31.268 E: 704043.322
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 20-Nov-21 21-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 24-11-21 08:30 N.E 1.50
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Mustafa
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown fine to medium SAND with silt and B-1 Inspection Pit from
angular fine to medium gravels of igneous 0.00~0.80 meters
origin. (Inspection Pit terminated due to hard
strata of Gypsum).

Hard, creamish brown, SILT with sand. D-1 25 66 SPT at 0.80 meters
1 30.268 30
36

2 29.268
--Ditto-- D-2 50/7 100
92 18 23 34.0
SPT at 2.00 meters
R-1 Coring from
Weak thinly laminated light grey non clastic 2.07~3.00 meters
ANHYDRITE. Moderately weathered
fractures are incipient sub-horizontal very
close to close spaced open clean.
3 28.268
--Ditto-- R-2 96 14 21 37.0 Coring from
3.00~4.50 meters

4 27.268

--Ditto-- R-3 98 20 30 33.0 Coring from


from 5.60~6.00m 4.50~6.00 meters
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

become highly to completely weathered


5 26.268
(residual soil).

6 25.268
Weak thinly laminated light grey non clastic R-4 100 61 72 13.8 Coring from
ANHYDRITE. Moderately weathered 6.00~7.50 meters
fractures are incipient horizontal to
sub-horizontal very close to close spaced
open clean.
7 24.268

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-142

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Weak thinly laminated light grey non clastic R-5 100 68 72 12.4 Coring from
ANHYDRITE. Moderately weathered 7.50~9.00 meters
fractures are incipient horizontal to
8 23.268
sub-horizontal very close to close spaced
open clean. (continued)
--Ditto-- fractures are close to medium
spaced from 8.80~9.00m become highly to
completely weathered (residual soil).
9 22.268
Very weak thinly laminated dark grey non R-6 100 0 6 NI Coring from
clastic ANHYDRITE completely weathered. 9.00~10.50 meters

10 21.268

--Ditto-- R-7 100 27 32 25.0 Coring from


from 11.30~12.00m medium strong to strong 10.50~12.00 meters
thinly laminated light grey non clastic
11 20.268
ANHYDRITE. Moderately weathered
fractures are incipient horizontal close to
medium spaced open clean.

12 19.268
--Ditto-- R-8 63 36 40 21.2 Coring from
12.00~13.50 meters

13 18.268
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

--Ditto-- become weak and highly weathered. R-9 60 0 0 NI Coring from


13.50~14.00 meters

14 17.268
Dense greyish brown clayey angular fine to D-3 13 37 SPT at 14.00 meters
medium GRAVEL of coralline limestone 16
origin. 21

15 16.268
Very stiff greyish brown sandy CLAY with D-4 7 25 SPT at 15.00 meters
angular fine gravels of limestone origin. 11
14
----End of borehole at 15.00 meters----

16 15.268

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-143

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3111832.457


NEOM Desalination Plant to Gayal Transmission System 33.080 E: 703609.701
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 17-Nov-21 18-Nov-21
DRILLING EQUIPMENT: Acker AD-II (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-11-21 08:30 N.E 9.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Akmal
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty clayey fine SAND. B-1 Inspection Pit


0.00~1.20m

1 32.080

Medium dense brown silty medium to fine D-1 9 26 SPT at 1.20 meters
SAND. 12
14

2 31.080
--Ditto-- D-2 11 28 SPT at 2.00 meters
13
15

3 30.080
Dense brown poorly-graded fine to medium D-3 17 45 SPT at 3.00 meters
SAND. 21
24

4 29.080
--Ditto-- D-4 12 35 SPT at 4.00 meters
16
19
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 28.080
--Ditto-- D-5 10 36 SPT at 5.00 meters
15 Constant Head Test
21 5.00m

6 27.080
Falling Head Test at
6.00m

Dense brown well-graded fine to medium D-6 18 42 SPT at 6.50 meters


SAND with silt and gravel. Gravels are 18
sub-rounded fine of igneous origin. 24
7 26.080

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-143

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown well-graded fine to medium


SAND with silt and gravel. Gravels are
sub-rounded fine of igneous origin.
8 25.080
(continued) D-7 20 48 SPT at 8.00 meters
--Ditto-- 22
26

9 24.080

Dense brown poorly-graded fine to medium D-8 17 45 SPT at 9.50 meters


SAND with silt. 21
24
10 23.080

11 22.080
Dense brown silty fine to medium SAND with D-9 14 42 SPT at 11.00 meters
gravel. Gravels are sub-rounded fine of 18
igneous origin. 24

12 21.080

Dense brown well-graded fine to medium D-10 17 40 SPT at 12.50 meters


SAND with silt. 19
21
13 20.080
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 19.080
Changing to medium dense. D-11 8 29 SPT at 14.00 meters
10
19

15 18.080
--Ditto-- D-12 9 28 SPT at 15.00 meters
12
----End of borehole at 15.00 meters----
16

16 17.080

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-144

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3112044.671


NEOM Desalination Plant to Gayal Transmission System 22.256 E: 703167.317
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 17-Nov-21 18-Nov-21
DRILLING EQUIPMENT: CME-55 (M) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-11-21 08:30 N.E 6.00
CORE BAR.: DTCB LENGTH: 1.50m BIT: TCB DRILLER: Javed Mahmood
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty fine to medium SAND with grave B-1 Inspection Pit
and some cobbles. Gravels are sub-rounded 0.00~1.20m
fine to coarse of igneous origin.

1 21.256

Medium dense brown silty medium to fine D-1 9 24 SPT at 1.20 meters
SAND and gravels. Gravels are sub-rounded 11
medium to coarse of igneous origin. 13

2 20.256
--Ditto-- D-2 5 14 SPT at 2.00 meters
6
8

3 19.256
Dense brown silty medium to fine SAND. D-3 18 46 SPT at 3.00 meters
21
25

4 18.256
Very dense brown clayey fine SAND. D-4 16 100 SPT at 4.00 meters
36
14/4
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 17.256
--Ditto-- D-5 20 100 SPT at 5.00 meters
34 Constant Head Test
16/6 at 5.00m

Very dense brown silty fine to medium R-1 90 Coring from


SAND. 5.50~6.50 meters

6 16.256
Falling Head Test at
6.00m

Dense brown poorly-graded fine to medium D-6 14 44 SPT at 6.50 meters


SAND with silt. 18
26
7 15.256

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-144

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown poorly-graded fine to medium


SAND with silt. (continued)
8 14.256
--Ditto-- D-7 17 46 SPT at 8.00 meters
21
25

9 13.256

--Ditto-- D-8 19 49 SPT at 9.50 meters


22
27
10 12.256

11 11.256
Dense brown gravelly fine to medium SAND D-9 15 49 SPT at 11.00 meters
with silt. Gravels are sub-rounded fine to 23
medium of igneous origin. 26

12 10.256

Dense brown silty SAND. D-10 18 49 SPT at 12.50 meters


23
26
13 9.256
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 8.256
--Ditto-- D-11 13 47 SPT at 14.00 meters
19
28

15 7.256
--Ditto-- D-12 15 48 SPT at 15.00 meters
17
----End of borehole at 15.00 meters----
31

16 6.256

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-145

Test Boring Log SHEET 1 OF 3

PROJECT: ELEVATION (m.a.s.l): N: 3112168.531


NEOM Desalination Plant to Gayal Transmission System 29.785 E: 702682.844
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 17-Nov-21 18-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-11-21 08:30 N.E 12.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Asif Nadeem
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Brown silty medium to fine SAND with B-1 Inspection Pit


gravels. Gravels are sub-rounded medium of 0.00~1.20m
igneous origin.

1 28.785

Medium dense brown silty medium to fine D-1 4 11 SPT at 1.20 meters
SAND with gravels. Gravels are 5
sub-rounded fine of igneous origin. 6

2 27.785
Medium dense greyish brown silty fine to D-2 6 15 SPT at 2.00 meters
coarse SAND . 7
8

3 26.785
--Ditto-- D-3 8 17 SPT at 3.00 meters
8
9

4 25.785
Medium dense brown silty fine to medium D-4 11 26 SPT at 4.00 meters
SAND with gravels. Gravels are 12
sub-rounded fine to medium of igneous 14
origin.
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.785
--Ditto-- D-5 13 30 SPT at 5.00 meters
14 Constant Head Test
16 at 5.00m

6 23.785
Falling Head Test at
6.00m

Changing to dense. D-6 14 32 SPT at 6.50 meters


15
17
7 22.785

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-145

Test Boring Log SHEET 2 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 21.785
Dense brown poorly-graded fine to medium D-7 16 36 SPT at 8.00 meters
SAND with silt. 17
19

9 20.785

--Ditto-- D-8 17 39 SPT at 9.50 meters


19
20
10 19.785

11 18.785
--Ditto-- D-9 9 41 SPT at 11.00 meters
20
21

12 17.785

Dense brown to light brown poorly-graded D-10 17 41 SPT at 12.50 meters


medium to fine SAND with silt. 19
22
13 16.785
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 15.785
--Ditto-- D-11 13 33 SPT at 14.00 meters
15
18

15 14.785

Changing to medium dense. D-12 12 28 SPT at 15.50 meters


14
14
16 13.785

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-145

Test Boring Log SHEET 3 OF 3

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Dense brown to light brown poorly-graded


medium to fine SAND with silt. (continued)

17 12.785
Dense brownish grey silty fine to medium D-13 14 32 SPT at 17.00 meters
SAND. 15
17

18 11.785

--Ditto-- D-14 15 33 SPT at 18.50 meters


15
18
19 10.785

20 9.785
--Ditto-- D-15 19 40 SPT at 20.00 meters
20
----End of borehole at 20.00 meters----
20

21 8.785
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

22 7.785

23 6.785

24 5.785

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-146

Test Boring Log SHEET 1 OF 2

PROJECT: ELEVATION (m.a.s.l): N: 3112541.121


NEOM Desalination Plant to Gayal Transmission System 29.378 E: 702482.717
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
21J4037 Neom Compnay 17-Nov-21 17-Nov-21
DRILLING EQUIPMENT: Acker AD-II (A) GROUND WATER
SIZE & TYPE OF CASING: 5" Dia Steel Casing DATE TIME
WATER CASING
DEPTH (m.b.g.l) DEPTH (m)
DRILLING METHOD: Straight Rotary 21-11-21 08:30 N.E 6.00
CORE BAR.: - LENGTH: - BIT: - DRILLER: Ashiq
SAMPLER: S.P.T. WEIGHT: 63.50 Kg DROP: 76 cm GEOLOGIST: Abdul Aziz
SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

Greyish brown to brown silty fine to coarse B-1 Inspection Pit


SAND with gravels. Gravels are rounded fine 0.00~1.20m
to medium of igneous origin.
Brown sandy rounded fine to coarse
GRAVEL and COBBLE of igneous origin.
Sand is fine to medium.
1 28.378

Dense brown well-graded rounded fine to D-1 10 33 SPT at 1.20 meters


coarse GRAVELS of igneous origin with 15
sand and silt. 18

2 27.378
Changing to medium dense. D-2 7 17 SPT at 2.00 meters
7
10

3 26.378
Medium dense greyish brown poorly-graded D-3 6 19 SPT at 3.00 meters
SAND with gravel. 8
11

4 25.378
--Ditto-- D-4 7 22 SPT at 4.00 meters
9
13
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

5 24.378
--Ditto-- D-5 9 28 SPT at 5.00 meters
12 Constant Head Test
16 at 5.00m

6 23.378
Falling Head Test at
6.00m

Dense greyish brown sandy sub-rounded D-6 11 32 SPT at 6.50 meters


fine to medium GRAVELS. Gravels of 13
igneous origin with silt. Sand is medium 19
7 22.378
grain.

Continued Next Page D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample
RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. BH NO. N2G-BH-146

Test Boring Log SHEET 2 OF 2

PROJECT: NEOM Desalination Plant to Gayal Transmission System PROJECT NO.:


21J4037
CLIENT: Neom Compnay

SAMPLES ROCK
ELEVATION

PROFILE
DEPTH

N Value
BL/15cm

Fractured
(m)

PENET
DESCRIPTION REC RQD SCR

Index
NO. REMARKS
% % %

8 21.378
Dense greyish brown poorly-graded fine to D-7 11 32 SPT at 8.00 meters
coarse GRAVELS of igneous origin with 14
sand. Sand is fine to medium grain. 18

9 20.378

--Ditto-- D-8 13 37 SPT at 9.50 meters


16
21
10 19.378

11 18.378
--Ditto-- D-9 14 43 SPT at 11.00 meters
18
25

12 17.378

Dense greyish brown gravelly fine to D-10 13 43 SPT at 12.50 meters


medium SAND with silt. Gravels are 17
sub-rounded fine to coarse of igneous origin. 26
13 16.378
AMAALA AIRPORT ELEVATION GAYAL.GPJ RGME.GDT 31-1-22

14 15.378
--Ditto-- D-11 15 39 SPT at 14.00 meters
15
24

15 14.378
--Ditto-- D-12 18 49 SPT at 15.00 meters
21
----End of borehole at 15.00 meters----
28

16 13.378

D=SPT Sample R=Core Run U=Undisturb Sample B=Bulk Sample


TRIAL PIT LOGS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 01

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3110459.546


NEOM Desalination Plant to Gayal Transmission System
34.131 E: 706010.451
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 20-Nov-21 21-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00~0.70m Bulk Sample at 0.60m &


Creamish brown weakly cemented SAND with 1.20m
gravel, cobble and boulders. Gravels are angular to
sub-angular medium to coarse of igneous origin.
B-1
0.70~1.20m
1 Creamish brown weakly cemented GRAVEL with
cobble and boulder of igneous origin. Field CBR Test at 0.50
----Trial Pit was terminated at 1.20 meters due to B-2 meters
hard strata---- Plate Load Test at 0.50
meters
Field Density Test at 0.50 &
1.00 meters
2 Small Sample at
0.00,0.50,0.70 & 1.20m

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 02

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3109443.791


NEOM Desalination Plant to Gayal Transmission System
47.406 E: 708354.436
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 22-Nov-21 22-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown to brown silty medium to fine SAND Bulk Sample at 0.60m &
with gravel. Gravels are angular to sub-angular of 1.20m
igneous origin.
B-1
Field Density Test at
1 0.50,1.00,1.50,2.00,2.50 &
3.00 meters
Brown, silty SAND. B-2 Field CBR Test at 0.50
meters
Plate Load Test at 0.50
meters
Small Samples at
2 0.00,0.50,1.00,1.50,2.00,2.50
& 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 03

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3107161.532


NEOM Desalination Plant to Gayal Transmission System
26.436 E: 714188.028
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 25-Nov-21 25-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Unstable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00~0.70m Bulk Sample at 0.60m &


Light brown silty medium to fine SAND with gravel. 1.20m
Gravels are angular to sub-angular medium to
coarse of igneous origin.
B-1
0.70~3.00m Field Density Test at
1 Brownish grey silty medium to coarse SAND with 0.50,1.00,1.50,2.00,2.50 &
gravel. Gravels are angular medium to coarse of 3.00 meters
igneous origin. B-2 Field CBR Test at 0.50
meters
Greyish brown, poorly-graded SAND with gravel of Plate Load Test at 0.50
igneous origin. meters
Small Samples at
2 0.00,0.50,0.70,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 04

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3102390.361


NEOM Desalination Plant to Gayal Transmission System
57.762 E: 722623.159
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 27-Nov-21 27-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Unstable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brownish grey silty medium to coarse SAND Bulk Sample at 0.60m &
with gravel. Gravels are angular to sub-angular 1.20m
medium to coarse of igneous origin.
Greyish brown, poorly-graded SAND. B-1
Field Density Test at
1 0.50,1.00,1.50,2.00,2.50 &
3.00 meters
B-2 Field CBR Test at 0.50
meters
Plate Load Test at 0.50
meters
Small Samples at
2 0.00,0.50,1.00,1.50,2.00,2.50
& 3.00m

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 05

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3097809.682


NEOM Desalination Plant to Gayal Transmission System
59.183 E: 724600.318
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 28-Nov-21 28-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Unstable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown silty fine SAND. Bulk Sample at 0.60m

Light brown silty fine SAND with gravel, cobble and Field CBR Test at 0.50
boulders. Gravels, cobbles and boulders are B-1 meters
angular to sub-angular of limestone. Field Density Test at 0.50
1 meters
----Trial Pit was terminated at 0.80 meters due to
hard strata---- Small Samples at 0.00,0.50 &
0.80 meters
Plate Load Test at 0.50
meters
2

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 06

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3099047.427


NEOM Desalination Plant to Gayal Transmission System
112.208 E: 728047.499
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 29-Nov-21 29-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown silty fine SAND with gravels. Gravels Bulk Sample at 0.60m &
are angular to sub-angular of igneous origin. 1.20m

Field CBR Test at 0.50


B-1 meters
Field Density Test at
1 0.50,1.00,1.50,2.00,2.50 &
Brown, poorly-graded SAND with silt. B-2 3.00 meters
Plate Load Test at 0.50
meters
Small Samples at
0.00,0.50,1.00,1.50,2.00,2.50
2 & 3.00 meters
Reddish brown poorly-graded GRAVEL with sand.

3
-----End of Trial Pit at 3.00 meters-----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 07

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3096637.100


NEOM Desalination Plant to Gayal Transmission System
73.455 E: 728301.364
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 30-Nov-21 30-Nov-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown silty fine SAND. Bulk Sample at 0.60m &


1.20m

Brown, poorly-graded SAND with silt. B-1


Field Density Test at
1 0.50,1.00,1.50,2.00,2.50 &
3.00 meters
B-2 Field CBR Test at 0.50
meters
Brown, poorly-graded SAND. Plate Load Test at 0.50
meters
Small Samples at
2 0.00,0.50,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 08

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3093191.738


NEOM Desalination Plant to Gayal Transmission System
61.081 E: 730028.195
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 01-Dec-21 01-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Light brown to brown silty medium fine SAND with Bulk Sample at 0.60m &
gravel and cobbles. Gravels are angular to 1.20m
sub-rounded medium to coarse of igneous origin.
Field Density Test at
Greyish brown, poorly-graded GRAVEL of igneous B-1 0.50,1.00,1.50,2.00,2.50 &
origin with cobbles and sand. 3.00 meters
1 Field CBR Test at 0.50
Brown, poorly-graded SAND with gravel and
cobbles of igneous origin. B-2 meters
Plate Load Test at 0.50
meters
Small Samples at
0.00,0.50,1.00,1.50,2.00,2.50
2 & 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 09

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3088021.469


NEOM Desalination Plant to Gayal Transmission System
65.181 E: 735099.960
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 02-Dec-21 02-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.60m Bulk Sample at 0.60m &


Brownish grey silty SAND with gravel of cemented 1.20m
sand.
Field Density Test at
From 0.60~1.00m B-1 0.50,1.00,1.50,2.00,2.50 &
Brownish grey silty SAND with gravel and cobbles 3.00 meters
1 of cemented sand. Field CBR Test at 0.50
Brown, silty SAND with gravel and cobbles of meters
B-2
cemented sand. Plate Load Test at 0.50
meters
Small Samples at
0.00,0.50,0.60,1.00,1.50,2.00,2.50
2 & 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 10

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3078408.659


NEOM Desalination Plant to Gayal Transmission System
44.426 E: 739400.377
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 04-Dec-21 04-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

From 0.00~0.60m Bulk Sample at 0.60m &


Greyish brown silty medium to fine SAND with 1.20m
gravel and cobbles. Gravels are angular to
sub-angualr medium coarse of igneous origin. Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
From 0.60~3.00m
Greyish brown poorly-graded SAND with gravel 3.00 meters
1 Field CBR Test at 0.50
and cobbles of igneous origin.
Greyish brown, well-graded SAND with gravel and B-2 meters
cobbles of igneous origin. Plate Load Test at 0.50
meters
Small Samples at
0.00,0.50,0.60,1.00,1.50,2.00,2.50
2 & 3.00 meters
Greyish brown, well-graded GRAVEL with cobbles
of igneous origin with sand.

Greyish brown, well-graded GRAVEL with silt and


sand.
3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 11

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3069049.384


NEOM Desalination Plant to Gayal Transmission System
17.020 E: 743326.310
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 05-Dec-21 05-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00m ~1.00m Bulk Sample at 0.60m &


Brownish grey, silty medium to fine SAND with 1.20m
gravel. gravel are angular to subangular medium to
coarse of igneous origin. Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
3.00 meters
1
1.00m~1.20m Field CBR Test at 0.50
Light brown, slightly cemented fine SAND. B-2 meters
Brown, silty SAND with gravel.
Plate Load Test at 0.50
meters
2
Small Samples at
0.00,0.50,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 12

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3060604.533


NEOM Desalination Plant to Gayal Transmission System
51.907 E: 748747.893
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 06-Dec-21 06-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Reddish brown to greyish brown, silty fine SAND Bulk Sample at 0.60m &
with gravel, cobble and boulder. Gravels are 1.20m
angular to subrounded medium to coarse of
igneous origin. Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
Brown, clayey SAND with gravel, cobbles and
boulders of igneous origin. 3.00 meters
1
Field CBR Test at 0.50
B-2 meters

Greyish brown, poorly-graded SAND with clay and Plate Load Test at 0.50
gravel, cobble and boulder of igneous origin. meters
2
Small Samples at
0.00,0.50,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 13

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3054277.573


NEOM Desalination Plant to Gayal Transmission System
25.224 E: 752196.750
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 08-Dec-21 08-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00m ~0.70m Bulk Sample at 0.60m &


Brownish grey, silty medium to fine SAND with 1.20m
gravel, cobble and boulder. Gravels are angular to
subrounded medium to coarse of igneous origin. Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
0.70m~3.00m
Weak, brown and light greenish gre, thinly bedded, 3.00 meters
1
friable SANDSTONE. Field CBR Test at 0.50
(Recovered as poorly-graded SAND with gravel, B-2 meters
cobble and boulders).
Plate Load Test at 0.50
meters
2
Small Samples at 0.00,0.50,
0.70, 1.00,1.50,2.00,2.50 &
3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 14

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3048043.101


NEOM Desalination Plant to Gayal Transmission System
36.715 E: 754022.284
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 09-Dec-21 09-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

0.00m ~0.80m Bulk Sample at 0.60m &


Brownish grey, silty fine SAND with gravel. Gravels 1.20m
are angular to subrounded medium to coarse of
igneous origin. Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
Creamish brown, silty medium to fine SAND with 3.00 meters
1 gravel, cobble and boulder of LIMESTONE. Field CBR Test at 0.00m &
B-2 0.50 meters

Plate Load Test at 0.00m &


0.50 meters
2
Small Samples at
0.00,0.50,0.80,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


RIYADH GEOTECHNIQUE AND FOUNDATIONS CO. TP No. 15

TRIAL PIT LOG SHEET 1 OF 1

PROJECT: ELEVATION: N: 3043990.569


NEOM Desalination Plant to Gayal Transmission System
24.990 E: 755588.943
PROJECT NO.: CLIENT: DATE STARTED DATE COMPLETED
Neom Compnay
21J4037 11-Dec-21 11-Dec-21
EXCAVATION METHOD: Mechanical INSPECTOR: Sajid Ali
STABILITY: Stable GROUNDWATER: N.E
SHORING: N/A PHOTOGRAPHS: Taken

NOTE: All Depth in meters


Datum level

SAMPLE
(m)

DESCRIPTION OF STRATA LEGEND REMARKS


NO.

Brown, silty medium to fine SAND with gravel, Bulk Sample at 0.60m &
cobble and boulder. Gravels are rounded to 1.20m
subrounded of igneous origin.
Field Density Test at
B-1 0.50,1.00,1.50,2.00,2.50 &
3.00 meters
1
Field CBR Test at 0.50
Greyish brown, poorly-graded SAND with silt and B-2 meters
gravel, cobble and boulder of igneous origin.
Plate Load Test at 0.50
meters
2
Brown, silty SAND with grave, cobble and boulder Small Samples at
of igneous origin. 0.00,0.50,1.00,1.50,2.00,2.50
& 3.00 meters

3
----End of Trial Pit at 3.00 meters----

5
TRIAL PIT ERGA GAYAL.GPJ RGME.GDT 31-1-22

Sketch Plan of Trial Pits


A
6 3.00m

D 1.50m B

7
C

Vertical Datum = Ellipsoidal Height


FALLING HEAD PERMEABILITY TEST

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-146
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 2 570 568 3.47E-05
0 120 4 570 566 3.48E-05
0 180 7 570 563 4.07E-05
0 240 10 570 560 4.37E-05
0 300 12 570 558 4.20E-05
0 360 15 570 555 4.39E-05
0 420 18 570 552 4.53E-05
0 480 22 570 548 4.86E-05
0 540 25 570 545 4.92E-05
0 600 29 570 541 5.16E-05
0 720 35 570 535 5.22E-05
0 840 42 570 528 5.40E-05
0 960 48 570 522 5.43E-05
0 1080 57 570 513 5.78E-05
0 1200 62 570 508 5.69E-05
0 1500 72 570 498 5.34E-05
0 1800 78 570 492 4.85E-05
0 2400 86 570 484 4.04E-05
0 3000 92 570 478 3.48E-05
0 3600 104 570 466 3.32E-05

AVE. Permeability k = 4.60E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 3
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-145
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 575 - - TEST SETUP


0 60 20 575 555 3.50E-04
0 120 55 575 520 4.97E-04
0 180 90 575 485 5.61E-04
0 240 130 575 445 6.33E-04
0 300 200 575 375 8.44E-04
0 360 260 575 315 9.91E-04
0 420 305 575 270 1.07E-03
0 480 320 575 255 1.00E-03
0 540 340 575 235 9.82E-04
0 600 355 575 220 9.49E-04
0 720 370 575 205 8.49E-04
0 840 380 575 195 7.63E-04
0 960 390 575 185 7.00E-04
0 1080 397 575 178 6.44E-04
0 1200 400 575 175 5.88E-04
0 1500 405 575 170 4.82E-04
0 1800 410 575 165 4.11E-04
0 2400 415 575 160 3.16E-04
0 3000 418 575 157 2.56E-04
0 3600 435 575 140 2.33E-04

AVE. Permeability k = 6.56E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 2
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-144
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 575 - - TEST SETUP


0 60 5 575 570 8.63E-05
0 120 10 575 565 8.67E-05
0 180 15 575 560 8.70E-05
0 240 20 575 555 8.74E-05
0 300 24 575 551 8.42E-05
0 360 28 575 547 8.22E-05
0 420 32 575 543 8.08E-05
0 480 37 575 538 8.21E-05
0 540 41 575 534 8.12E-05
0 600 45 575 530 8.05E-05
0 720 52 575 523 7.80E-05
0 840 58 575 517 7.50E-05
0 960 63 575 512 7.16E-05
0 1080 68 575 507 6.91E-05
0 1200 74 575 501 6.80E-05
0 1500 88 575 487 6.56E-05
0 1800 100 575 475 6.29E-05
0 2400 121 575 454 5.83E-05
0 3000 139 575 436 5.47E-05
0 3600 154 575 421 5.13E-05

AVE. Permeability k = 7.47E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-143
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 575 - - TEST SETUP


0 60 20 575 555 3.50E-04
0 120 30 575 545 2.65E-04
0 180 45 575 530 2.68E-04
0 240 60 575 515 2.72E-04
0 300 70 575 505 2.56E-04
0 360 80 575 495 2.47E-04
0 420 90 575 485 2.40E-04
0 480 100 575 475 2.36E-04
0 540 115 575 460 2.45E-04
0 600 130 575 445 2.53E-04
0 720 150 575 425 2.49E-04
0 840 170 575 405 2.47E-04
0 960 190 575 385 2.48E-04
0 1080 210 575 365 2.49E-04
0 1200 225 575 350 2.45E-04
0 1500 250 575 325 2.25E-04
0 1800 275 575 300 2.14E-04
0 2400 300 575 275 1.82E-04
0 3000 330 575 245 1.69E-04
0 3600 360 575 215 1.62E-04

AVE. Permeability k = 2.41E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-142
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 620 - - TEST SETUP


0 60 4 620 616 6.39E-05
0 120 8 620 612 6.41E-05
0 180 10 620 610 5.35E-05
0 240 12 620 608 4.83E-05
0 300 14 620 606 4.51E-05
0 360 16 620 604 4.30E-05
0 420 18 620 602 4.16E-05
0 480 20 620 600 4.05E-05
0 540 22 620 598 3.97E-05
0 600 24 620 596 3.90E-05
0 720 26 620 594 3.53E-05
0 840 28 620 592 3.26E-05
0 960 30 620 590 3.06E-05
0 1080 32 620 588 2.91E-05
0 1200 35 620 585 2.87E-05
0 1500 39 620 581 2.57E-05
0 1800 45 620 575 2.48E-05
0 2400 55 620 565 2.29E-05
0 3000 65 620 555 2.19E-05
0 3600 75 620 545 2.12E-05

AVE. Permeability k = 3.76E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-141
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 6 625 619 9.53E-05
0 120 8 625 617 6.36E-05
0 180 10 625 615 5.31E-05
0 240 12 625 613 4.79E-05
0 300 14 625 611 4.48E-05
0 360 16 625 609 4.27E-05
0 420 18 625 607 4.12E-05
0 480 20 625 605 4.02E-05
0 540 21 625 604 3.75E-05
0 600 22 625 603 3.54E-05
0 720 23 625 602 3.09E-05
0 840 25 625 600 2.88E-05
0 960 27 625 598 2.73E-05
0 1080 29 625 596 2.61E-05
0 1200 31 625 594 2.51E-05
0 1500 36 625 589 2.34E-05
0 1800 39 625 586 2.12E-05
0 2400 45 625 580 1.85E-05
0 3000 55 625 570 1.82E-05
0 3600 65 625 560 1.81E-05

AVE. Permeability k = 3.70E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-140
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 620 - - TEST SETUP


0 60 8 620 612 1.28E-04
0 120 12 620 608 9.65E-05
0 180 16 620 604 8.61E-05
0 240 20 620 600 8.10E-05
0 300 25 620 595 8.13E-05
0 360 30 620 590 8.17E-05
0 420 40 620 580 9.41E-05
0 480 45 620 575 9.30E-05
0 540 50 620 570 9.23E-05
0 600 60 620 560 1.01E-04
0 720 70 620 550 9.86E-05
0 840 80 620 540 9.75E-05
0 960 88 620 532 9.45E-05
0 1080 95 620 525 9.13E-05
0 1200 103 620 517 8.97E-05
0 1500 110 620 510 7.72E-05
0 1800 118 620 502 6.95E-05
0 2400 123 620 497 5.46E-05
0 3000 129 620 491 4.61E-05
0 3600 133 620 487 3.98E-05

AVE. Permeability k = 8.47E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-139
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 19 625 606 3.05E-04
0 120 32 625 593 2.60E-04
0 180 45 625 580 2.46E-04
0 240 55 625 570 2.27E-04
0 300 65 625 560 2.17E-04
0 360 77 625 548 2.16E-04
0 420 85 625 540 2.06E-04
0 480 93 625 532 1.99E-04
0 540 110 625 515 2.12E-04
0 600 120 625 505 2.11E-04
0 720 155 625 470 2.35E-04
0 840 180 625 445 2.40E-04
0 960 195 625 430 2.31E-04
0 1080 215 625 410 2.31E-04
0 1200 230 625 395 2.27E-04
0 1500 260 625 365 2.13E-04
0 1800 285 625 340 2.00E-04
0 2400 300 625 325 1.61E-04
0 3000 325 625 300 1.45E-04
0 3600 350 625 275 1.35E-04

AVE. Permeability k = 2.16E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-138
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 620 - - TEST SETUP


0 60 10 620 610 1.61E-04
0 120 14 620 606 1.13E-04
0 180 18 620 602 9.70E-05
0 240 22 620 598 8.92E-05
0 300 26 620 594 8.46E-05
0 360 30 620 590 8.17E-05
0 420 34 620 586 7.96E-05
0 480 38 620 582 7.81E-05
0 540 42 620 578 7.70E-05
0 600 47 620 573 7.79E-05
0 720 53 620 567 7.36E-05
0 840 61 620 559 7.31E-05
0 960 71 620 549 7.51E-05
0 1080 81 620 539 7.68E-05
0 1200 88 620 532 7.56E-05
0 1500 95 620 525 6.57E-05
0 1800 105 620 515 6.11E-05
0 2400 110 620 510 4.82E-05
0 3000 118 620 502 4.17E-05
0 3600 125 620 495 3.71E-05

AVE. Permeability k = 7.83E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-137
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 20 625 605 3.21E-04
0 120 35 625 590 2.85E-04
0 180 45 625 580 2.46E-04
0 240 55 625 570 2.27E-04
0 300 66 625 559 2.20E-04
0 360 80 625 545 2.26E-04
0 420 92 625 533 2.25E-04
0 480 108 625 517 2.34E-04
0 540 120 625 505 2.34E-04
0 600 140 625 485 2.51E-04
0 720 168 625 457 2.58E-04
0 840 190 625 435 2.56E-04
0 960 215 625 410 2.60E-04
0 1080 230 625 395 2.52E-04
0 1200 245 625 380 2.46E-04
0 1500 265 625 360 2.18E-04
0 1800 285 625 340 2.00E-04
0 2400 305 625 320 1.65E-04
0 3000 321 625 304 1.42E-04
0 3600 340 625 285 1.29E-04

AVE. Permeability k = 2.30E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-136
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 620 - - TEST SETUP


0 60 21 620 599 3.40E-04
0 120 35 620 585 2.87E-04
0 180 40 620 580 2.20E-04
0 240 55 620 565 2.29E-04
0 300 66 620 554 2.22E-04
0 360 80 620 540 2.27E-04
0 420 92 620 528 2.27E-04
0 480 109 620 511 2.39E-04
0 540 122 620 498 2.41E-04
0 600 140 620 480 2.53E-04
0 720 160 620 460 2.46E-04
0 840 180 620 440 2.42E-04
0 960 200 620 420 2.40E-04
0 1080 230 620 390 2.54E-04
0 1200 248 620 372 2.52E-04
0 1500 260 620 360 2.15E-04
0 1800 280 620 340 1.98E-04
0 2400 300 620 320 1.63E-04
0 3000 325 620 295 1.47E-04
0 3600 350 620 270 1.37E-04

AVE. Permeability k = 2.29E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-135
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 22 625 603 3.54E-04
0 120 32 625 593 2.60E-04
0 180 44 625 581 2.40E-04
0 240 52 625 573 2.15E-04
0 300 63 625 562 2.10E-04
0 360 72 625 553 2.02E-04
0 420 85 625 540 2.06E-04
0 480 96 625 529 2.06E-04
0 540 110 625 515 2.12E-04
0 600 123 625 502 2.16E-04
0 720 146 625 479 2.19E-04
0 840 177 625 448 2.35E-04
0 960 196 625 429 2.32E-04
0 1080 222 625 403 2.41E-04
0 1200 248 625 377 2.50E-04
0 1500 272 625 353 2.26E-04
0 1800 293 625 332 2.08E-04
0 2400 320 625 305 1.77E-04
0 3000 344 625 281 1.58E-04
0 3600 352 625 273 1.36E-04

AVE. Permeability k = 2.20E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-134
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 15 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 615 - - TEST SETUP


0 60 25 615 590 4.10E-04
0 120 37 615 578 3.06E-04
0 180 48 615 567 2.68E-04
0 240 59 615 556 2.49E-04
0 300 69 615 546 2.35E-04
0 360 78 615 537 2.23E-04
0 420 88 615 527 2.18E-04
0 480 97 615 518 2.12E-04
0 540 110 615 505 2.16E-04
0 600 128 615 487 2.31E-04
0 720 149 615 466 2.28E-04
0 840 158 615 457 2.10E-04
0 960 179 615 436 2.12E-04
0 1080 195 615 420 2.09E-04
0 1200 223 615 392 2.22E-04
0 1500 225 615 390 1.80E-04
0 1800 229 615 386 1.53E-04
0 2400 270 615 345 1.43E-04
0 3000 285 615 330 1.23E-04
0 3600 330 615 285 1.27E-04

AVE. Permeability k = 2.19E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-133
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 10 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 610 - - TEST SETUP


0 60 9 610 601 1.47E-04
0 120 14 610 596 1.15E-04
0 180 25 610 585 1.38E-04
0 240 33 610 577 1.37E-04
0 300 45 610 565 1.51E-04
0 360 75 610 535 2.16E-04
0 420 90 610 520 2.25E-04
0 480 125 610 485 2.83E-04
0 540 142 610 468 2.91E-04
0 600 155 610 455 2.90E-04
0 720 170 610 440 2.69E-04
0 840 188 610 422 2.60E-04
0 960 199 610 411 2.44E-04
0 1080 210 610 400 2.32E-04
0 1200 230 610 380 2.34E-04
0 1500 265 610 345 2.25E-04
0 1800 300 610 310 2.23E-04
0 2400 330 610 280 1.92E-04
0 3000 355 610 255 1.72E-04
0 3600 380 610 230 1.61E-04

AVE. Permeability k = 2.10E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-132
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 620 - - TEST SETUP


0 60 50 620 570 8.31E-04
0 120 101 620 519 8.78E-04
0 180 135 620 485 8.09E-04
0 240 145 620 475 6.58E-04
0 300 160 620 460 5.90E-04
0 360 176 620 444 5.50E-04
0 420 188 620 432 5.10E-04
0 480 197 620 423 4.72E-04
0 540 100 620 520 1.93E-04
0 600 129 620 491 2.30E-04
0 720 140 620 480 2.11E-04
0 840 166 620 454 2.20E-04
0 960 178 620 442 2.09E-04
0 1080 197 620 423 2.10E-04
0 1200 225 620 395 2.23E-04
0 1500 236 620 384 1.89E-04
0 1800 270 620 350 1.88E-04
0 2400 300 620 320 1.63E-04
0 3000 325 620 295 1.47E-04
0 3600 340 620 280 1.31E-04

AVE. Permeability k = 3.81E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-131
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 15 625 610 2.40E-04
0 120 25 625 600 2.02E-04
0 180 37 625 588 2.01E-04
0 240 48 625 577 1.97E-04
0 300 59 625 566 1.96E-04
0 360 69 625 556 1.93E-04
0 420 78 625 547 1.88E-04
0 480 89 625 536 1.90E-04
0 540 99 625 526 1.89E-04
0 600 120 625 505 2.11E-04
0 720 146 625 479 2.19E-04
0 840 177 625 448 2.35E-04
0 960 192 625 433 2.27E-04
0 1080 230 625 395 2.52E-04
0 1200 265 625 360 2.72E-04
0 1500 280 625 345 2.35E-04
0 1800 290 625 335 2.05E-04
0 2400 340 625 285 1.94E-04
0 3000 350 625 275 1.62E-04
0 3600 352 625 273 1.36E-04

AVE. Permeability k = 2.07E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-130
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 15 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 615 - - TEST SETUP


0 60 29 615 586 4.77E-04
0 120 39 615 576 3.24E-04
0 180 49 615 566 2.73E-04
0 240 59 615 556 2.49E-04
0 300 69 615 546 2.35E-04
0 360 78 615 537 2.23E-04
0 420 90 615 525 2.23E-04
0 480 120 615 495 2.68E-04
0 540 129 615 486 2.58E-04
0 600 144 615 471 2.64E-04
0 720 159 615 456 2.46E-04
0 840 198 615 417 2.74E-04
0 960 220 615 395 2.73E-04
0 1080 270 615 345 3.17E-04
0 1200 265 615 350 2.78E-04
0 1500 290 615 325 2.52E-04
0 1800 298 615 317 2.18E-04
0 2400 310 615 305 1.73E-04
0 3000 340 615 275 1.59E-04
0 3600 360 615 255 1.45E-04

AVE. Permeability k = 2.57E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-129
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 15 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 615 - - TEST SETUP


0 60 10 615 605 1.62E-04
0 120 22 615 593 1.80E-04
0 180 33 615 582 1.82E-04
0 240 46 615 569 1.92E-04
0 300 58 615 557 1.96E-04
0 360 66 615 549 1.87E-04
0 420 76 615 539 1.86E-04
0 480 90 615 525 1.95E-04
0 540 99 615 516 1.93E-04
0 600 129 615 486 2.33E-04
0 720 142 615 473 2.16E-04
0 840 166 615 449 2.22E-04
0 960 177 615 438 2.10E-04
0 1080 179 615 436 1.89E-04
0 1200 190 615 425 1.83E-04
0 1500 200 615 415 1.55E-04
0 1800 232 615 383 1.56E-04
0 2400 266 615 349 1.40E-04
0 3000 300 615 315 1.32E-04
0 3600 360 615 255 1.45E-04

AVE. Permeability k = 1.83E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-128
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 25 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 625 - - TEST SETUP


0 60 10 625 615 1.59E-04
0 120 22 625 603 1.77E-04
0 180 33 625 592 1.79E-04
0 240 44 625 581 1.80E-04
0 300 56 625 569 1.85E-04
0 360 67 625 558 1.87E-04
0 420 78 625 547 1.88E-04
0 480 84 625 541 1.78E-04
0 540 98 625 527 1.87E-04
0 600 100 625 525 1.72E-04
0 720 120 625 505 1.76E-04
0 840 136 625 489 1.73E-04
0 960 149 625 476 1.68E-04
0 1080 170 625 455 1.74E-04
0 1200 199 625 426 1.89E-04
0 1500 230 625 395 1.81E-04
0 1800 270 625 355 1.86E-04
0 2400 300 625 325 1.61E-04
0 3000 320 625 305 1.42E-04
0 3600 345 625 280 1.32E-04

AVE. Permeability k = 1.74E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-127
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 10 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 610 - - TEST SETUP


0 60 15 610 595 2.46E-04
0 120 25 610 585 2.07E-04
0 180 36 610 574 2.00E-04
0 240 49 610 561 2.07E-04
0 300 60 610 550 2.05E-04
0 360 72 610 538 2.07E-04
0 420 84 610 526 2.09E-04
0 480 98 610 512 2.16E-04
0 540 100 610 510 1.97E-04
0 600 120 610 490 2.16E-04
0 720 140 610 470 2.15E-04
0 840 160 610 450 2.15E-04
0 960 172 610 438 2.05E-04
0 1080 192 610 418 2.07E-04
0 1200 199 610 411 1.95E-04
0 1500 220 610 390 1.77E-04
0 1800 260 610 350 1.83E-04
0 2400 290 610 320 1.59E-04
0 3000 320 610 290 1.47E-04
0 3600 370 610 240 1.54E-04

AVE. Permeability k = 1.98E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-126
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 10 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 610 - - TEST SETUP


0 60 9 610 601 1.47E-04
0 120 19 610 591 1.56E-04
0 180 29 610 581 1.60E-04
0 240 39 610 571 1.63E-04
0 300 48 610 562 1.62E-04
0 360 64 610 546 1.82E-04
0 420 76 610 534 1.88E-04
0 480 77 610 533 1.67E-04
0 540 96 610 514 1.88E-04
0 600 100 610 510 1.77E-04
0 720 121 610 489 1.82E-04
0 840 129 610 481 1.68E-04
0 960 142 610 468 1.64E-04
0 1080 170 610 440 1.79E-04
0 1200 190 610 420 1.84E-04
0 1500 230 610 380 1.87E-04
0 1800 270 610 340 1.92E-04
0 2400 290 610 320 1.59E-04
0 3000 330 610 280 1.54E-04
0 3600 365 610 245 1.50E-04

AVE. Permeability k = 1.71E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-125
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 15 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 615 - - TEST SETUP


0 60 20 615 595 3.27E-04
0 120 30 615 585 2.47E-04
0 180 40 615 575 2.21E-04
0 240 50 615 565 2.09E-04
0 300 70 615 545 2.39E-04
0 360 90 615 525 2.60E-04
0 420 100 615 515 2.50E-04
0 480 120 615 495 2.68E-04
0 540 140 615 475 2.84E-04
0 600 170 615 445 3.20E-04
0 720 192 615 423 3.08E-04
0 840 240 615 375 3.49E-04
0 960 270 615 345 3.57E-04
0 1080 290 615 325 3.50E-04
0 1200 320 615 295 3.63E-04
0 1500 340 615 275 3.18E-04
0 1800 360 615 255 2.90E-04
0 2400 370 615 245 2.27E-04
0 3000 390 615 225 1.99E-04
0 3600 400 615 215 1.73E-04

AVE. Permeability k = 2.78E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-124
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 100 570 470 1.91E-04
0 720 140 570 430 2.32E-04
0 840 170 570 400 2.50E-04
0 960 190 570 380 2.50E-04
0 1080 220 570 350 2.68E-04
0 1200 240 570 330 2.70E-04
0 1500 300 570 270 2.95E-04
0 1800 322 570 248 2.74E-04
0 2400 329 570 241 2.13E-04
0 3000 355 570 215 1.93E-04
0 3600 360 570 210 1.64E-04

AVE. Permeability k = 2.12E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-123
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 40 570 530 3.59E-04
0 180 50 570 520 3.02E-04
0 240 60 570 510 2.75E-04
0 300 70 570 500 2.59E-04
0 360 80 570 490 2.49E-04
0 420 90 570 480 2.43E-04
0 480 100 570 470 2.38E-04
0 540 130 570 440 2.84E-04
0 600 170 570 400 3.50E-04
0 720 190 570 380 3.34E-04
0 840 200 570 370 3.05E-04
0 960 240 570 330 3.37E-04
0 1080 260 570 310 3.34E-04
0 1200 270 570 300 3.17E-04
0 1500 300 570 270 2.95E-04
0 1800 320 570 250 2.71E-04
0 2400 335 570 235 2.19E-04
0 3000 357 570 213 1.94E-04
0 3600 397 570 173 1.96E-04

AVE. Permeability k = 2.95E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-122
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 25 570 545 4.43E-04
0 120 30 570 540 2.67E-04
0 180 40 570 530 2.40E-04
0 240 60 570 510 2.75E-04
0 300 70 570 500 2.59E-04
0 360 80 570 490 2.49E-04
0 420 90 570 480 2.43E-04
0 480 99 570 471 2.36E-04
0 540 108 570 462 2.31E-04
0 600 118 570 452 2.29E-04
0 720 135 570 435 2.23E-04
0 840 150 570 420 2.15E-04
0 960 165 570 405 2.11E-04
0 1080 180 570 390 2.08E-04
0 1200 200 570 370 2.13E-04
0 1500 225 570 345 1.98E-04
0 1800 250 570 320 1.90E-04
0 2400 275 570 295 1.63E-04
0 3000 300 570 270 1.48E-04
0 3600 325 570 245 1.39E-04

AVE. Permeability k = 2.29E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-121
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 7 570 563 1.22E-04
0 120 18 570 552 1.58E-04
0 180 29 570 541 1.72E-04
0 240 44 570 526 1.98E-04
0 300 55 570 515 2.00E-04
0 360 67 570 503 2.06E-04
0 420 79 570 491 2.11E-04
0 480 88 570 482 2.07E-04
0 540 98 570 472 2.07E-04
0 600 100 570 470 1.91E-04
0 720 127 570 443 2.08E-04
0 840 147 570 423 2.10E-04
0 960 159 570 411 2.02E-04
0 1080 170 570 400 1.94E-04
0 1200 190 570 380 2.00E-04
0 1500 230 570 340 2.04E-04
0 1800 270 570 300 2.11E-04
0 2400 290 570 280 1.76E-04
0 3000 322 570 248 1.64E-04
0 3600 334 570 236 1.45E-04

AVE. Permeability k = 1.89E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-120
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 12 570 558 2.10E-04
0 120 24 570 546 2.12E-04
0 180 36 570 534 2.15E-04
0 240 48 570 522 2.17E-04
0 300 58 570 512 2.12E-04
0 360 66 570 504 2.03E-04
0 420 96 570 474 2.60E-04
0 480 99 570 471 2.36E-04
0 540 120 570 450 2.59E-04
0 600 136 570 434 2.69E-04
0 720 176 570 394 3.04E-04
0 840 197 570 373 2.99E-04
0 960 220 570 350 3.01E-04
0 1080 246 570 324 3.10E-04
0 1200 292 570 278 3.55E-04
0 1500 320 570 250 3.26E-04
0 1800 331 570 239 2.86E-04
0 2400 344 570 226 2.28E-04
0 3000 356 570 214 1.94E-04
0 3600 367 570 203 1.70E-04

AVE. Permeability k = 2.53E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-119
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 35 570 535 6.26E-04
0 120 45 570 525 4.06E-04
0 180 55 570 515 3.34E-04
0 240 65 570 505 2.99E-04
0 300 75 570 495 2.79E-04
0 360 85 570 485 2.66E-04
0 420 95 570 475 2.57E-04
0 480 220 570 350 6.02E-04
0 540 247 570 323 6.23E-04
0 600 295 570 275 7.20E-04
0 720 300 570 270 6.15E-04
0 840 310 570 260 5.54E-04
0 960 340 570 230 5.60E-04
0 1080 345 570 225 5.10E-04
0 1200 349 570 221 4.68E-04
0 1500 360 570 210 3.95E-04
0 1800 370 570 200 3.45E-04
0 2400 385 570 185 2.78E-04
0 3000 396 570 174 2.34E-04
0 3600 400 570 170 1.99E-04

AVE. Permeability k = 4.29E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-118
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 50 570 520 9.07E-04
0 120 70 570 500 6.47E-04
0 180 60 570 510 3.66E-04
0 240 70 570 500 3.24E-04
0 300 80 570 490 2.99E-04
0 360 90 570 480 2.83E-04
0 420 98 570 472 2.66E-04
0 480 100 570 470 2.38E-04
0 540 120 570 450 2.59E-04
0 600 130 570 440 2.56E-04
0 720 140 570 430 2.32E-04
0 840 160 570 410 2.32E-04
0 960 180 570 390 2.34E-04
0 1080 190 570 380 2.23E-04
0 1200 200 570 370 2.13E-04
0 1500 220 570 350 1.93E-04
0 1800 260 570 310 2.01E-04
0 2400 290 570 280 1.76E-04
0 3000 320 570 250 1.63E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.93E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-117
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 100 570 470 1.91E-04
0 720 120 570 450 1.95E-04
0 840 130 570 440 1.83E-04
0 960 140 570 430 1.74E-04
0 1080 150 570 420 1.68E-04
0 1200 160 570 410 1.63E-04
0 1500 200 570 370 1.71E-04
0 1800 220 570 350 1.61E-04
0 2400 260 570 310 1.50E-04
0 3000 290 570 280 1.40E-04
0 3600 300 570 270 1.23E-04

AVE. Permeability k = 1.73E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-116
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 55 570 515 2.00E-04
0 360 65 570 505 1.99E-04
0 420 75 570 495 1.99E-04
0 480 85 570 485 1.99E-04
0 540 95 570 475 2.00E-04
0 600 105 570 465 2.01E-04
0 720 120 570 450 1.95E-04
0 840 140 570 430 1.99E-04
0 960 170 570 400 2.19E-04
0 1080 190 570 380 2.23E-04
0 1200 225 570 345 2.48E-04
0 1500 245 570 325 2.22E-04
0 1800 295 570 275 2.40E-04
0 2400 200 570 370 1.07E-04
0 3000 260 570 310 1.20E-04
0 3600 295 570 275 1.20E-04

AVE. Permeability k = 1.90E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-115
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 40 570 530 3.59E-04
0 180 50 570 520 3.02E-04
0 240 60 570 510 2.75E-04
0 300 70 570 500 2.59E-04
0 360 80 570 490 2.49E-04
0 420 90 570 480 2.43E-04
0 480 100 570 470 2.38E-04
0 540 120 570 450 2.59E-04
0 600 130 570 440 2.56E-04
0 720 140 570 430 2.32E-04
0 840 150 570 420 2.15E-04
0 960 170 570 400 2.19E-04
0 1080 190 570 380 2.23E-04
0 1200 200 570 370 2.13E-04
0 1500 220 570 350 1.93E-04
0 1800 240 570 330 1.80E-04
0 2400 290 570 280 1.76E-04
0 3000 300 570 270 1.48E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.46E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-114
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 110 570 460 2.12E-04
0 720 140 570 430 2.32E-04
0 840 160 570 410 2.32E-04
0 960 170 570 400 2.19E-04
0 1080 190 570 380 2.23E-04
0 1200 210 570 360 2.27E-04
0 1500 240 570 330 2.16E-04
0 1800 270 570 300 2.11E-04
0 2400 300 570 270 1.85E-04
0 3000 320 570 250 1.63E-04
0 3600 350 570 220 1.57E-04

AVE. Permeability k = 1.95E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-113
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 40 570 530 7.19E-04
0 120 50 570 520 4.53E-04
0 180 60 570 510 3.66E-04
0 240 70 570 500 3.24E-04
0 300 80 570 490 2.99E-04
0 360 90 570 480 2.83E-04
0 420 98 570 472 2.66E-04
0 480 120 570 450 2.92E-04
0 540 140 570 430 3.09E-04
0 600 160 570 410 3.25E-04
0 720 180 570 390 3.12E-04
0 840 190 570 380 2.86E-04
0 960 210 570 360 2.84E-04
0 1080 240 570 330 3.00E-04
0 1200 270 570 300 3.17E-04
0 1500 290 570 280 2.81E-04
0 1800 295 570 275 2.40E-04
0 2400 320 570 250 2.04E-04
0 3000 340 570 230 1.79E-04
0 3600 360 570 210 1.64E-04

AVE. Permeability k = 3.10E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-112
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 39 570 531 3.50E-04
0 180 50 570 520 3.02E-04
0 240 57 570 513 2.60E-04
0 300 64 570 506 2.35E-04
0 360 72 570 498 2.22E-04
0 420 85 570 485 2.28E-04
0 480 93 570 477 2.20E-04
0 540 98 570 472 2.07E-04
0 600 110 570 460 2.12E-04
0 720 129 570 441 2.11E-04
0 840 140 570 430 1.99E-04
0 960 150 570 420 1.89E-04
0 1080 160 570 410 1.81E-04
0 1200 170 570 400 1.75E-04
0 1500 180 570 390 1.50E-04
0 1800 210 570 360 1.51E-04
0 2400 240 570 330 1.35E-04
0 3000 270 570 300 1.27E-04
0 3600 300 570 270 1.23E-04

AVE. Permeability k = 2.21E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-111
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 25 570 545 4.43E-04
0 120 35 570 535 3.13E-04
0 180 40 570 530 2.40E-04
0 240 45 570 525 2.03E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 65 570 505 1.71E-04
0 480 70 570 500 1.62E-04
0 540 80 570 490 1.66E-04
0 600 90 570 480 1.70E-04
0 720 120 570 450 1.95E-04
0 840 140 570 430 1.99E-04
0 960 160 570 410 2.03E-04
0 1080 180 570 390 2.08E-04
0 1200 210 570 360 2.27E-04
0 1500 240 570 330 2.16E-04
0 1800 265 570 305 2.06E-04
0 2400 290 570 280 1.76E-04
0 3000 325 570 245 1.67E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.09E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-110
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 22 570 548 3.89E-04
0 120 31 570 539 2.76E-04
0 180 44 570 526 2.65E-04
0 240 52 570 518 2.36E-04
0 300 60 570 510 2.20E-04
0 360 65 570 505 1.99E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 95 570 475 2.00E-04
0 600 100 570 470 1.91E-04
0 720 140 570 430 2.32E-04
0 840 150 570 420 2.15E-04
0 960 160 570 410 2.03E-04
0 1080 170 570 400 1.94E-04
0 1200 180 570 390 1.87E-04
0 1500 190 570 380 1.60E-04
0 1800 200 570 370 1.42E-04
0 2400 220 570 350 1.20E-04
0 3000 240 570 330 1.08E-04
0 3600 290 570 280 1.17E-04

AVE. Permeability k = 2.01E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-109
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 100 570 470 1.91E-04
0 720 120 570 450 1.95E-04
0 840 140 570 430 1.99E-04
0 960 150 570 420 1.89E-04
0 1080 170 570 400 1.94E-04
0 1200 190 570 380 2.00E-04
0 1500 210 570 360 1.82E-04
0 1800 240 570 330 1.80E-04
0 2400 290 570 280 1.76E-04
0 3000 300 570 270 1.48E-04
0 3600 320 570 250 1.36E-04

AVE. Permeability k = 1.81E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-108
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 29 570 541 1.72E-04
0 240 38 570 532 1.70E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 110 570 460 2.12E-04
0 720 120 570 450 1.95E-04
0 840 125 570 445 1.75E-04
0 960 140 570 430 1.74E-04
0 1080 160 570 410 1.81E-04
0 1200 180 570 390 1.87E-04
0 1500 200 570 370 1.71E-04
0 1800 240 570 330 1.80E-04
0 2400 280 570 290 1.67E-04
0 3000 290 570 280 1.40E-04
0 3600 325 570 245 1.39E-04

AVE. Permeability k = 1.77E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-107
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 40 570 530 7.19E-04
0 120 50 570 520 4.53E-04
0 180 60 570 510 3.66E-04
0 240 70 570 500 3.24E-04
0 300 80 570 490 2.99E-04
0 360 90 570 480 2.83E-04
0 420 100 570 470 2.72E-04
0 480 110 570 460 2.65E-04
0 540 120 570 450 2.59E-04
0 600 140 570 430 2.78E-04
0 720 170 570 400 2.92E-04
0 840 190 570 380 2.86E-04
0 960 200 570 370 2.67E-04
0 1080 240 570 330 3.00E-04
0 1200 250 570 320 2.85E-04
0 1500 270 570 300 2.54E-04
0 1800 300 570 270 2.46E-04
0 2400 320 570 250 2.04E-04
0 3000 370 570 200 2.07E-04
0 3600 380 570 190 1.81E-04

AVE. Permeability k = 3.02E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-106
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 40 570 530 7.19E-04
0 120 50 570 520 4.53E-04
0 180 60 570 510 3.66E-04
0 240 70 570 500 3.24E-04
0 300 80 570 490 2.99E-04
0 360 90 570 480 2.83E-04
0 420 110 570 460 3.03E-04
0 480 120 570 450 2.92E-04
0 540 130 570 440 2.84E-04
0 600 140 570 430 2.78E-04
0 720 150 570 420 2.51E-04
0 840 190 570 380 2.86E-04
0 960 210 570 360 2.84E-04
0 1080 240 570 330 3.00E-04
0 1200 280 570 290 3.34E-04
0 1500 290 570 280 2.81E-04
0 1800 310 570 260 2.58E-04
0 2400 330 570 240 2.14E-04
0 3000 340 570 230 1.79E-04
0 3600 360 570 210 1.64E-04

AVE. Permeability k = 3.08E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-105
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 50 570 520 9.07E-04
0 120 70 570 500 6.47E-04
0 180 80 570 490 4.98E-04
0 240 90 570 480 4.24E-04
0 300 100 570 470 3.81E-04
0 360 110 570 460 3.53E-04
0 420 120 570 450 3.34E-04
0 480 130 570 440 3.20E-04
0 540 140 570 430 3.09E-04
0 600 150 570 420 3.02E-04
0 720 160 570 410 2.71E-04
0 840 170 570 400 2.50E-04
0 960 180 570 390 2.34E-04
0 1080 190 570 380 2.23E-04
0 1200 200 570 370 2.13E-04
0 1500 220 570 350 1.93E-04
0 1800 240 570 330 1.80E-04
0 2400 270 570 300 1.59E-04
0 3000 290 570 280 1.40E-04
0 3600 320 570 250 1.36E-04

AVE. Permeability k = 3.24E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-104
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 40 570 530 7.19E-04
0 120 50 570 520 4.53E-04
0 180 60 570 510 3.66E-04
0 240 75 570 495 3.48E-04
0 300 85 570 485 3.19E-04
0 360 96 570 474 3.04E-04
0 420 99 570 471 2.69E-04
0 480 115 570 455 2.78E-04
0 540 129 570 441 2.82E-04
0 600 142 570 428 2.83E-04
0 720 156 570 414 2.63E-04
0 840 167 570 403 2.45E-04
0 960 177 570 393 2.30E-04
0 1080 197 570 373 2.33E-04
0 1200 222 570 348 2.44E-04
0 1500 244 570 326 2.21E-04
0 1800 255 570 315 1.95E-04
0 2400 287 570 283 1.73E-04
0 3000 297 570 273 1.45E-04
0 3600 300 570 270 1.23E-04

AVE. Permeability k = 2.85E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-104
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 8 570 562 6.98E-05
0 180 12 570 558 7.01E-05
0 240 14 570 556 6.14E-05
0 300 16 570 554 5.63E-05
0 360 18 570 552 5.28E-05
0 420 20 570 550 5.04E-05
0 480 22 570 548 4.86E-05
0 540 24 570 546 4.72E-05
0 600 26 570 544 4.61E-05
0 720 28 570 542 4.15E-05
0 840 30 570 540 3.81E-05
0 960 32 570 538 3.57E-05
0 1080 33 570 537 3.27E-05
0 1200 35 570 535 3.13E-05
0 1500 38 570 532 2.73E-05
0 1800 41 570 529 2.46E-05
0 2400 45 570 525 2.03E-05
0 3000 50 570 520 1.81E-05
0 3600 55 570 515 1.67E-05

AVE. Permeability k = 4.29E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-101
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 8 570 562 6.98E-05
0 180 10 570 560 5.83E-05
0 240 12 570 558 5.25E-05
0 300 13 570 557 4.56E-05
0 360 14 570 556 4.09E-05
0 420 15 570 555 3.76E-05
0 480 16 570 554 3.52E-05
0 540 18 570 552 3.52E-05
0 600 19 570 551 3.35E-05
0 720 21 570 549 3.09E-05
0 840 23 570 547 2.91E-05
0 960 25 570 545 2.77E-05
0 1080 27 570 543 2.66E-05
0 1200 29 570 541 2.58E-05
0 1500 31 570 539 2.21E-05
0 1800 33 570 537 1.96E-05
0 2400 36 570 534 1.61E-05
0 3000 38 570 532 1.36E-05
0 3600 42 570 528 1.26E-05

AVE. Permeability k = 3.51E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-100
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 41 570 529 1.84E-04
0 300 52 570 518 1.89E-04
0 360 63 570 507 1.93E-04
0 420 74 570 496 1.96E-04
0 480 90 570 480 2.12E-04
0 540 100 570 470 2.12E-04
0 600 120 570 450 2.34E-04
0 720 130 570 440 2.13E-04
0 840 150 570 420 2.15E-04
0 960 172 570 398 2.22E-04
0 1080 200 570 370 2.37E-04
0 1200 220 570 350 2.41E-04
0 1500 260 570 310 2.41E-04
0 1800 292 570 278 2.36E-04
0 2400 327 570 243 2.11E-04
0 3000 360 570 210 1.97E-04
0 3600 369 570 201 1.72E-04

AVE. Permeability k = 2.07E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-99
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 16 570 554 1.41E-04
0 180 24 570 546 1.42E-04
0 240 29 570 541 1.29E-04
0 300 40 570 530 1.44E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 84 570 486 1.97E-04
0 540 97 570 473 2.05E-04
0 600 110 570 460 2.12E-04
0 720 129 570 441 2.11E-04
0 840 150 570 420 2.15E-04
0 960 170 570 400 2.19E-04
0 1080 192 570 378 2.25E-04
0 1200 224 570 346 2.47E-04
0 1500 250 570 320 2.28E-04
0 1800 292 570 278 2.36E-04
0 2400 300 570 270 1.85E-04
0 3000 360 570 210 1.97E-04
0 3600 370 570 200 1.72E-04

AVE. Permeability k = 1.87E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-98
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 16 570 554 2.81E-04
0 120 22 570 548 1.94E-04
0 180 33 570 537 1.96E-04
0 240 46 570 524 2.08E-04
0 300 55 570 515 2.00E-04
0 360 59 570 511 1.80E-04
0 420 67 570 503 1.76E-04
0 480 100 570 470 2.38E-04
0 540 124 570 446 2.69E-04
0 600 140 570 430 2.78E-04
0 720 165 570 405 2.81E-04
0 840 200 570 370 3.05E-04
0 960 220 570 350 3.01E-04
0 1080 237 570 333 2.95E-04
0 1200 274 570 296 3.24E-04
0 1500 300 570 270 2.95E-04
0 1800 320 570 250 2.71E-04
0 2400 350 570 220 2.35E-04
0 3000 359 570 211 1.96E-04
0 3600 379 570 191 1.80E-04

AVE. Permeability k = 2.45E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-97
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 13 570 557 2.28E-04
0 120 24 570 546 2.12E-04
0 180 34 570 536 2.03E-04
0 240 48 570 522 2.17E-04
0 300 59 570 511 2.16E-04
0 360 74 570 496 2.29E-04
0 420 90 570 480 2.43E-04
0 480 120 570 450 2.92E-04
0 540 140 570 430 3.09E-04
0 600 170 570 400 3.50E-04
0 720 192 570 378 3.38E-04
0 840 229 570 341 3.63E-04
0 960 260 570 310 3.76E-04
0 1080 290 570 280 3.90E-04
0 1200 300 570 270 3.69E-04
0 1500 330 570 240 3.42E-04
0 1800 360 570 210 3.29E-04
0 2400 370 570 200 2.59E-04
0 3000 380 570 190 2.17E-04
0 3600 400 570 170 1.99E-04

AVE. Permeability k = 2.84E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-96
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 16 570 554 2.81E-04
0 120 27 570 543 2.40E-04
0 180 39 570 531 2.33E-04
0 240 50 570 520 2.27E-04
0 300 62 570 508 2.28E-04
0 360 72 570 498 2.22E-04
0 420 82 570 488 2.19E-04
0 480 94 570 476 2.23E-04
0 540 110 570 460 2.35E-04
0 600 140 570 430 2.78E-04
0 720 150 570 420 2.51E-04
0 840 170 570 400 2.50E-04
0 960 194 570 376 2.57E-04
0 1080 230 570 340 2.84E-04
0 1200 255 570 315 2.93E-04
0 1500 270 570 300 2.54E-04
0 1800 290 570 280 2.34E-04
0 2400 320 570 250 2.04E-04
0 3000 340 570 230 1.79E-04
0 3600 350 570 220 1.57E-04

AVE. Permeability k = 2.37E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-95
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 25 570 545 4.43E-04
0 120 35 570 535 3.13E-04
0 180 45 570 525 2.71E-04
0 240 55 570 515 2.51E-04
0 300 65 570 505 2.39E-04
0 360 80 570 490 2.49E-04
0 420 96 570 474 2.60E-04
0 480 120 570 450 2.92E-04
0 540 145 570 425 3.22E-04
0 600 166 570 404 3.40E-04
0 720 197 570 373 3.49E-04
0 840 224 570 346 3.52E-04
0 960 240 570 330 3.37E-04
0 1080 260 570 310 3.34E-04
0 1200 270 570 300 3.17E-04
0 1500 290 570 280 2.81E-04
0 1800 300 570 270 2.46E-04
0 2400 329 570 241 2.13E-04
0 3000 340 570 230 1.79E-04
0 3600 370 570 200 1.72E-04

AVE. Permeability k = 2.88E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-94
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 20 570 550 1.76E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 50 570 520 1.81E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 92 570 478 2.17E-04
0 540 110 570 460 2.35E-04
0 600 130 570 440 2.56E-04
0 720 140 570 430 2.32E-04
0 840 170 570 400 2.50E-04
0 960 190 570 380 2.50E-04
0 1080 220 570 350 2.68E-04
0 1200 260 570 310 3.01E-04
0 1500 290 570 280 2.81E-04
0 1800 310 570 260 2.58E-04
0 2400 330 570 240 2.14E-04
0 3000 340 570 230 1.79E-04
0 3600 355 570 215 1.61E-04

AVE. Permeability k = 2.18E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-93
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 20 570 550 3.53E-04
0 120 30 570 540 2.67E-04
0 180 40 570 530 2.40E-04
0 240 50 570 520 2.27E-04
0 300 60 570 510 2.20E-04
0 360 70 570 500 2.16E-04
0 420 100 570 470 2.72E-04
0 480 120 570 450 2.92E-04
0 540 130 570 440 2.84E-04
0 600 150 570 420 3.02E-04
0 720 190 570 380 3.34E-04
0 840 200 570 370 3.05E-04
0 960 240 570 330 3.37E-04
0 1080 270 570 300 3.52E-04
0 1200 300 570 270 3.69E-04
0 1500 310 570 260 3.10E-04
0 1800 329 570 241 2.83E-04
0 2400 338 570 232 2.22E-04
0 3000 347 570 223 1.85E-04
0 3600 352 570 218 1.58E-04

AVE. Permeability k = 2.76E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-92
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 24 570 546 4.25E-04
0 120 40 570 530 3.59E-04
0 180 52 570 518 3.15E-04
0 240 64 570 506 2.94E-04
0 300 76 570 494 2.83E-04
0 360 84 570 486 2.62E-04
0 420 100 570 470 2.72E-04
0 480 120 570 450 2.92E-04
0 540 160 570 410 3.62E-04
0 600 170 570 400 3.50E-04
0 720 190 570 380 3.34E-04
0 840 210 570 360 3.24E-04
0 960 240 570 330 3.37E-04
0 1080 275 570 295 3.61E-04
0 1200 292 570 278 3.55E-04
0 1500 300 570 270 2.95E-04
0 1800 340 570 230 2.99E-04
0 2400 349 570 221 2.34E-04
0 3000 350 570 220 1.88E-04
0 3600 355 570 215 1.61E-04

AVE. Permeability k = 3.05E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-91
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 22 570 548 1.94E-04
0 180 34 570 536 2.03E-04
0 240 44 570 526 1.98E-04
0 300 56 570 514 2.04E-04
0 360 64 570 506 1.96E-04
0 420 77 570 493 2.05E-04
0 480 93 570 477 2.20E-04
0 540 110 570 460 2.35E-04
0 600 129 570 441 2.53E-04
0 720 140 570 430 2.32E-04
0 840 160 570 410 2.32E-04
0 960 190 570 380 2.50E-04
0 1080 229 570 341 2.82E-04
0 1200 247 570 323 2.81E-04
0 1500 294 570 276 2.87E-04
0 1800 310 570 260 2.58E-04
0 2400 324 570 246 2.08E-04
0 3000 336 570 234 1.76E-04
0 3600 344 570 226 1.52E-04

AVE. Permeability k = 2.22E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-90
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 24 570 546 4.25E-04
0 120 36 570 534 3.22E-04
0 180 47 570 523 2.83E-04
0 240 55 570 515 2.51E-04
0 300 70 570 500 2.59E-04
0 360 92 570 478 2.90E-04
0 420 110 570 460 3.03E-04
0 480 129 570 441 3.17E-04
0 540 146 570 424 3.25E-04
0 600 162 570 408 3.30E-04
0 720 200 570 370 3.56E-04
0 840 222 570 348 3.48E-04
0 960 234 570 336 3.26E-04
0 1080 240 570 330 3.00E-04
0 1200 249 570 321 2.84E-04
0 1500 270 570 300 2.54E-04
0 1800 300 570 270 2.46E-04
0 2400 340 570 230 2.24E-04
0 3000 350 570 220 1.88E-04
0 3600 370 570 200 1.72E-04

AVE. Permeability k = 2.90E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-89
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 8 570 562 6.98E-05
0 180 10 570 560 5.83E-05
0 240 12 570 558 5.25E-05
0 300 14 570 556 4.91E-05
0 360 16 570 554 4.69E-05
0 420 18 570 552 4.53E-05
0 480 20 570 550 4.41E-05
0 540 22 570 548 4.32E-05
0 600 24 570 546 4.25E-05
0 720 26 570 544 3.84E-05
0 840 28 570 542 3.55E-05
0 960 30 570 540 3.34E-05
0 1080 32 570 538 3.17E-05
0 1200 35 570 535 3.13E-05
0 1500 38 570 532 2.73E-05
0 1800 42 570 528 2.52E-05
0 2400 45 570 525 2.03E-05
0 3000 50 570 520 1.81E-05
0 3600 55 570 515 1.67E-05

AVE. Permeability k = 4.00E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-88
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 5 570 565 8.70E-05
0 120 8 570 562 6.98E-05
0 180 10 570 560 5.83E-05
0 240 12 570 558 5.25E-05
0 300 14 570 556 4.91E-05
0 360 16 570 554 4.69E-05
0 420 18 570 552 4.53E-05
0 480 20 570 550 4.41E-05
0 540 22 570 548 4.32E-05
0 600 24 570 546 4.25E-05
0 720 27 570 543 3.99E-05
0 840 30 570 540 3.81E-05
0 960 33 570 537 3.68E-05
0 1080 36 570 534 3.58E-05
0 1200 39 570 531 3.50E-05
0 1500 45 570 525 3.25E-05
0 1800 50 570 520 3.02E-05
0 2400 60 570 510 2.75E-05
0 3000 70 570 500 2.59E-05
0 3600 80 570 490 2.49E-05

AVE. Permeability k = 4.33E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-87
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 8 570 562 6.98E-05
0 180 10 570 560 5.83E-05
0 240 12 570 558 5.25E-05
0 300 13 570 557 4.56E-05
0 360 14 570 556 4.09E-05
0 420 15 570 555 3.76E-05
0 480 16 570 554 3.52E-05
0 540 17 570 553 3.32E-05
0 600 18 570 552 3.17E-05
0 720 20 570 550 2.94E-05
0 840 22 570 548 2.78E-05
0 960 23 570 547 2.54E-05
0 1080 24 570 546 2.36E-05
0 1200 25 570 545 2.22E-05
0 1500 27 570 543 1.92E-05
0 1800 29 570 541 1.72E-05
0 2400 31 570 539 1.38E-05
0 3000 33 570 537 1.18E-05
0 3600 35 570 535 1.04E-05

AVE. Permeability k = 3.38E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-86
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 8 570 562 1.40E-04
0 120 15 570 555 1.32E-04
0 180 20 570 550 1.18E-04
0 240 23 570 547 1.02E-04
0 300 28 570 542 9.95E-05
0 360 33 570 537 9.82E-05
0 420 38 570 532 9.74E-05
0 480 43 570 527 9.69E-05
0 540 48 570 522 9.66E-05
0 600 53 570 517 9.64E-05
0 720 62 570 508 9.48E-05
0 840 72 570 498 9.53E-05
0 960 82 570 488 9.59E-05
0 1080 92 570 478 9.66E-05
0 1200 102 570 468 9.74E-05
0 1500 110 570 460 8.47E-05
0 1800 119 570 451 7.71E-05
0 2400 127 570 443 6.23E-05
0 3000 135 570 435 5.34E-05
0 3600 570 570 0.00E+00

AVE. Permeability k = 9.16E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-85
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 7 570 563 1.22E-04
0 120 13 570 557 1.14E-04
0 180 18 570 552 1.06E-04
0 240 20 570 550 8.82E-05
0 300 24 570 546 8.50E-05
0 360 30 570 540 8.90E-05
0 420 35 570 535 8.94E-05
0 480 40 570 530 8.98E-05
0 540 45 570 525 9.03E-05
0 600 50 570 520 9.07E-05
0 720 57 570 513 8.67E-05
0 840 63 570 507 8.26E-05
0 960 69 570 501 7.97E-05
0 1080 77 570 493 7.96E-05
0 1200 87 570 483 8.18E-05
0 1500 97 570 473 7.37E-05
0 1800 108 570 462 6.92E-05
0 2400 118 570 452 5.73E-05
0 3000 128 570 442 5.02E-05
0 3600 570 570 0.00E+00

AVE. Permeability k = 8.13E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-84
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 22 570 548 1.94E-04
0 180 34 570 536 2.03E-04
0 240 46 570 524 2.08E-04
0 300 57 570 513 2.08E-04
0 360 69 570 501 2.12E-04
0 420 76 570 494 2.02E-04
0 480 88 570 482 2.07E-04
0 540 100 570 470 2.12E-04
0 600 120 570 450 2.34E-04
0 720 140 570 430 2.32E-04
0 840 165 570 405 2.41E-04
0 960 175 570 395 2.26E-04
0 1080 200 570 370 2.37E-04
0 1200 210 570 360 2.27E-04
0 1500 240 570 330 2.16E-04
0 1800 270 570 300 2.11E-04
0 2400 292 570 278 1.77E-04
0 3000 300 570 270 1.48E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.06E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-83
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 23 570 547 4.07E-04
0 120 44 570 526 3.97E-04
0 180 56 570 514 3.41E-04
0 240 66 570 504 3.04E-04
0 300 77 570 493 2.87E-04
0 360 84 570 486 2.62E-04
0 420 92 570 478 2.48E-04
0 480 99 570 471 2.36E-04
0 540 110 570 460 2.35E-04
0 600 140 570 430 2.78E-04
0 720 149 570 421 2.49E-04
0 840 172 570 398 2.53E-04
0 960 189 570 381 2.49E-04
0 1080 200 570 370 2.37E-04
0 1200 240 570 330 2.70E-04
0 1500 275 570 295 2.60E-04
0 1800 295 570 275 2.40E-04
0 2400 300 570 270 1.85E-04
0 3000 320 570 250 1.63E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.63E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-82
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 12 570 558 2.10E-04
0 120 24 570 546 2.12E-04
0 180 34 570 536 2.03E-04
0 240 46 570 524 2.08E-04
0 300 57 570 513 2.08E-04
0 360 68 570 502 2.09E-04
0 420 78 570 492 2.08E-04
0 480 90 570 480 2.12E-04
0 540 110 570 460 2.35E-04
0 600 124 570 446 2.42E-04
0 720 137 570 433 2.26E-04
0 840 148 570 422 2.12E-04
0 960 159 570 411 2.02E-04
0 1080 180 570 390 2.08E-04
0 1200 220 570 350 2.41E-04
0 1500 229 570 341 2.03E-04
0 1800 270 570 300 2.11E-04
0 2400 295 570 275 1.80E-04
0 3000 320 570 250 1.63E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.07E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-81
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 21 570 549 3.71E-04
0 120 31 570 539 2.76E-04
0 180 42 570 528 2.52E-04
0 240 54 570 516 2.46E-04
0 300 66 570 504 2.43E-04
0 360 78 570 492 2.42E-04
0 420 82 570 488 2.19E-04
0 480 92 570 478 2.17E-04
0 540 110 570 460 2.35E-04
0 600 124 570 446 2.42E-04
0 720 146 570 424 2.44E-04
0 840 174 570 396 2.57E-04
0 960 199 570 371 2.65E-04
0 1080 227 570 343 2.79E-04
0 1200 262 570 308 3.04E-04
0 1500 291 570 279 2.82E-04
0 1800 301 570 269 2.47E-04
0 2400 320 570 250 2.04E-04
0 3000 334 570 236 1.74E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.47E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-80
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 35 570 535 6.26E-04
0 120 46 570 524 4.16E-04
0 180 57 570 513 3.47E-04
0 240 85 570 485 3.99E-04
0 300 96 570 474 3.64E-04
0 360 110 570 460 3.53E-04
0 420 120 570 450 3.34E-04
0 480 133 570 437 3.28E-04
0 540 152 570 418 3.40E-04
0 600 163 570 407 3.33E-04
0 720 174 570 396 3.00E-04
0 840 192 570 378 2.90E-04
0 960 200 570 370 2.67E-04
0 1080 210 570 360 2.52E-04
0 1200 222 570 348 2.44E-04
0 1500 229 570 341 2.03E-04
0 1800 240 570 330 1.80E-04
0 2400 270 570 300 1.59E-04
0 3000 290 570 280 1.40E-04
0 3600 322 570 248 1.37E-04

AVE. Permeability k = 3.01E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-79
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 16 570 554 2.81E-04
0 120 27 570 543 2.40E-04
0 180 37 570 533 2.21E-04
0 240 50 570 520 2.27E-04
0 300 65 570 505 2.39E-04
0 360 77 570 493 2.39E-04
0 420 87 570 483 2.34E-04
0 480 98 570 472 2.33E-04
0 540 570 570 0.00E+00
0 600 130 570 440 2.56E-04
0 720 145 570 425 2.42E-04
0 840 167 570 403 2.45E-04
0 960 192 570 378 2.54E-04
0 1080 200 570 370 2.37E-04
0 1200 220 570 350 2.41E-04
0 1500 237 570 333 2.12E-04
0 1800 272 570 298 2.14E-04
0 2400 291 570 279 1.76E-04
0 3000 300 570 270 1.48E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.14E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-78
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 12 570 558 2.10E-04
0 120 26 570 544 2.31E-04
0 180 38 570 532 2.27E-04
0 240 49 570 521 2.22E-04
0 300 62 570 508 2.28E-04
0 360 74 570 496 2.29E-04
0 420 86 570 484 2.31E-04
0 480 99 570 471 2.36E-04
0 540 110 570 460 2.35E-04
0 600 124 570 446 2.42E-04
0 720 137 570 433 2.26E-04
0 840 160 570 410 2.32E-04
0 960 176 570 394 2.28E-04
0 1080 193 570 377 2.27E-04
0 1200 220 570 350 2.41E-04
0 1500 243 570 327 2.20E-04
0 1800 264 570 306 2.05E-04
0 2400 300 570 270 1.85E-04
0 3000 320 570 250 1.63E-04
0 3600 338 570 232 1.48E-04

AVE. Permeability k = 2.18E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-77
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 25 570 545 4.43E-04
0 120 36 570 534 3.22E-04
0 180 41 570 529 2.46E-04
0 240 48 570 522 2.17E-04
0 300 58 570 512 2.12E-04
0 360 68 570 502 2.09E-04
0 420 78 570 492 2.08E-04
0 480 88 570 482 2.07E-04
0 540 98 570 472 2.07E-04
0 600 115 570 455 2.23E-04
0 720 130 570 440 2.13E-04
0 840 145 570 425 2.07E-04
0 960 160 570 410 2.03E-04
0 1080 175 570 395 2.01E-04
0 1200 190 570 380 2.00E-04
0 1500 215 570 355 1.87E-04
0 1800 245 570 325 1.85E-04
0 2400 275 570 295 1.63E-04
0 3000 305 570 265 1.51E-04
0 3600 340 570 230 1.49E-04

AVE. Permeability k = 2.18E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-76
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 35 570 535 6.26E-04
0 120 48 570 522 4.34E-04
0 180 58 570 512 3.53E-04
0 240 73 570 497 3.38E-04
0 300 83 570 487 3.11E-04
0 360 95 570 475 3.00E-04
0 420 120 570 450 3.34E-04
0 480 140 570 430 3.48E-04
0 540 160 570 410 3.62E-04
0 600 180 570 390 3.75E-04
0 720 200 570 370 3.56E-04
0 840 225 570 345 3.54E-04
0 960 250 570 320 3.56E-04
0 1080 275 570 295 3.61E-04
0 1200 300 570 270 3.69E-04
0 1500 315 570 255 3.18E-04
0 1800 330 570 240 2.85E-04
0 2400 345 570 225 2.30E-04
0 3000 360 570 210 1.97E-04
0 3600 380 570 190 1.81E-04

AVE. Permeability k = 3.39E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-75
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 20 570 550 3.53E-04
0 120 27 570 543 2.40E-04
0 180 38 570 532 2.27E-04
0 240 50 570 520 2.27E-04
0 300 57 570 513 2.08E-04
0 360 63 570 507 1.93E-04
0 420 68 570 502 1.79E-04
0 480 75 570 495 1.74E-04
0 540 80 570 490 1.66E-04
0 600 90 570 480 1.70E-04
0 720 100 570 470 1.59E-04
0 840 120 570 450 1.67E-04
0 960 138 570 432 1.71E-04
0 1080 155 570 415 1.74E-04
0 1200 168 570 402 1.72E-04
0 1500 200 570 370 1.71E-04
0 1800 230 570 340 1.70E-04
0 2400 265 570 305 1.54E-04
0 3000 295 570 275 1.44E-04
0 3600 318 570 252 1.34E-04

AVE. Permeability k = 1.88E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-74
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 20 570 550 3.53E-04
0 120 27 570 543 2.40E-04
0 180 33 570 537 1.96E-04
0 240 37 570 533 1.66E-04
0 300 42 570 528 1.51E-04
0 360 47 570 523 1.42E-04
0 420 52 570 518 1.35E-04
0 480 56 570 514 1.28E-04
0 540 66 570 504 1.35E-04
0 600 74 570 496 1.37E-04
0 720 88 570 482 1.38E-04
0 840 120 570 450 1.67E-04
0 960 130 570 440 1.60E-04
0 1080 155 570 415 1.74E-04
0 1200 168 570 402 1.72E-04
0 1500 200 570 370 1.71E-04
0 1800 230 570 340 1.70E-04
0 2400 265 570 305 1.54E-04
0 3000 295 570 275 1.44E-04
0 3600 318 570 252 1.34E-04

AVE. Permeability k = 1.68E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-73
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 6 570 564 1.05E-04
0 120 14 570 556 1.23E-04
0 180 24 570 546 1.42E-04
0 240 32 570 538 1.43E-04
0 300 41 570 529 1.47E-04
0 360 70 570 500 2.16E-04
0 420 88 570 482 2.37E-04
0 480 120 570 450 2.92E-04
0 540 142 570 428 3.14E-04
0 600 150 570 420 3.02E-04
0 720 170 570 400 2.92E-04
0 840 187 570 383 2.81E-04
0 960 196 570 374 2.60E-04
0 1080 205 570 365 2.45E-04
0 1200 225 570 345 2.48E-04
0 1500 260 570 310 2.41E-04
0 1800 295 570 275 2.40E-04
0 2400 327 570 243 2.11E-04
0 3000 357 570 213 1.94E-04
0 3600 380 570 190 1.81E-04

AVE. Permeability k = 2.21E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-72
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 18 570 552 1.58E-04
0 180 27 570 543 1.60E-04
0 240 36 570 534 1.61E-04
0 300 47 570 523 1.70E-04
0 360 56 570 514 1.70E-04
0 420 64 570 506 1.68E-04
0 480 73 570 497 1.69E-04
0 540 82 570 488 1.70E-04
0 600 90 570 480 1.70E-04
0 720 120 570 450 1.95E-04
0 840 138 570 432 1.96E-04
0 960 155 570 415 1.96E-04
0 1080 172 570 398 1.97E-04
0 1200 190 570 380 2.00E-04
0 1500 227 570 343 2.01E-04
0 1800 260 570 310 2.01E-04
0 2400 310 570 260 1.94E-04
0 3000 350 570 220 1.88E-04
0 3600 390 570 180 1.90E-04

AVE. Permeability k = 1.81E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-74
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 11 570 559 9.62E-05
0 180 13 570 557 7.60E-05
0 240 14 570 556 6.14E-05
0 300 16 570 554 5.63E-05
0 360 20 570 550 5.88E-05
0 420 25 570 545 6.33E-05
0 480 30 570 540 6.68E-05
0 540 35 570 535 6.96E-05
0 600 38 570 532 6.82E-05
0 720 45 570 525 6.77E-05
0 840 51 570 519 6.61E-05
0 960 58 570 512 6.63E-05
0 1080 65 570 505 6.64E-05
0 1200 70 570 500 6.47E-05
0 1500 86 570 484 6.46E-05
0 1800 100 570 470 6.35E-05
0 2400 120 570 450 5.84E-05
0 3000 145 570 425 5.80E-05
0 3600 165 570 405 5.63E-05

AVE. Permeability k = 7.12E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-70
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 8 570 562 1.40E-04
0 120 15 570 555 1.32E-04
0 180 25 570 545 1.48E-04
0 240 33 570 537 1.47E-04
0 300 41 570 529 1.47E-04
0 360 50 570 520 1.51E-04
0 420 58 570 512 1.51E-04
0 480 68 570 502 1.57E-04
0 540 75 570 495 1.55E-04
0 600 84 570 486 1.57E-04
0 720 94 570 476 1.48E-04
0 840 115 570 455 1.59E-04
0 960 132 570 438 1.63E-04
0 1080 154 570 416 1.73E-04
0 1200 172 570 398 1.77E-04
0 1500 198 570 372 1.69E-04
0 1800 220 570 350 1.61E-04
0 2400 270 570 300 1.59E-04
0 3000 311 570 259 1.56E-04
0 3600 367 570 203 1.70E-04

AVE. Permeability k = 1.56E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-69
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 13 570 557 2.28E-04
0 120 22 570 548 1.94E-04
0 180 29 570 541 1.72E-04
0 240 36 570 534 1.61E-04
0 300 42 570 528 1.51E-04
0 360 48 570 522 1.45E-04
0 420 55 570 515 1.43E-04
0 480 62 570 508 1.42E-04
0 540 72 570 498 1.48E-04
0 600 76 570 494 1.41E-04
0 720 95 570 475 1.50E-04
0 840 115 570 455 1.59E-04
0 960 125 570 445 1.53E-04
0 1080 137 570 433 1.51E-04
0 1200 152 570 418 1.53E-04
0 1500 190 570 380 1.60E-04
0 1800 240 570 330 1.80E-04
0 2400 320 570 250 2.04E-04
0 3000 370 570 200 2.07E-04
0 3600 427 570 143 2.28E-04

AVE. Permeability k = 1.69E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-68
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 8 570 562 1.40E-04
0 120 15 570 555 1.32E-04
0 180 20 570 550 1.18E-04
0 240 26 570 544 1.15E-04
0 300 31 570 539 1.10E-04
0 360 38 570 532 1.14E-04
0 420 42 570 528 1.08E-04
0 480 47 570 523 1.06E-04
0 540 51 570 519 1.03E-04
0 600 58 570 512 1.06E-04
0 720 68 570 502 1.05E-04
0 840 77 570 493 1.02E-04
0 960 79 570 491 9.21E-05
0 1080 98 570 472 1.04E-04
0 1200 125 570 445 1.22E-04
0 1500 150 570 420 1.21E-04
0 1800 175 570 395 1.21E-04
0 2400 200 570 370 1.07E-04
0 3000 225 570 345 9.92E-05
0 3600 255 570 315 9.76E-05

AVE. Permeability k = 1.11E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-67
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 15 570 555 2.63E-04
0 120 25 570 545 2.22E-04
0 180 30 570 540 1.78E-04
0 240 35 570 535 1.56E-04
0 300 45 570 525 1.62E-04
0 360 55 570 515 1.67E-04
0 420 65 570 505 1.71E-04
0 480 75 570 495 1.74E-04
0 540 90 570 480 1.89E-04
0 600 110 570 460 2.12E-04
0 720 130 570 440 2.13E-04
0 840 150 570 420 2.15E-04
0 960 170 570 400 2.19E-04
0 1080 190 570 380 2.23E-04
0 1200 205 570 365 2.20E-04
0 1500 230 570 340 2.04E-04
0 1800 265 570 305 2.06E-04
0 2400 290 570 280 1.76E-04
0 3000 315 570 255 1.59E-04
0 3600 345 570 225 1.53E-04

AVE. Permeability k = 1.94E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-66
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 5 570 565 8.70E-05
0 120 10 570 560 8.74E-05
0 180 15 570 555 8.78E-05
0 240 20 570 550 8.82E-05
0 300 25 570 545 8.86E-05
0 360 35 570 535 1.04E-04
0 420 45 570 525 1.16E-04
0 480 55 570 515 1.25E-04
0 540 65 570 505 1.33E-04
0 600 75 570 495 1.39E-04
0 720 100 570 470 1.59E-04
0 840 125 570 445 1.75E-04
0 960 150 570 420 1.89E-04
0 1080 175 570 395 2.01E-04
0 1200 200 570 370 2.13E-04
0 1500 225 570 345 1.98E-04
0 1800 255 570 315 1.95E-04
0 2400 275 570 295 1.63E-04
0 3000 295 570 275 1.44E-04
0 3600 310 570 260 1.29E-04

AVE. Permeability k = 1.41E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-65
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 15 570 555 1.32E-04
0 180 25 570 545 1.48E-04
0 240 35 570 535 1.56E-04
0 300 45 570 525 1.62E-04
0 360 55 570 515 1.67E-04
0 420 65 570 505 1.71E-04
0 480 75 570 495 1.74E-04
0 540 85 570 485 1.77E-04
0 600 100 570 470 1.91E-04
0 720 125 570 445 2.04E-04
0 840 145 570 425 2.07E-04
0 960 165 570 405 2.11E-04
0 1080 175 570 395 2.01E-04
0 1200 198 570 372 2.11E-04
0 1500 222 570 348 1.95E-04
0 1800 245 570 325 1.85E-04
0 2400 265 570 305 1.54E-04
0 3000 285 570 285 1.37E-04
0 3600 570 570 0.00E+00

AVE. Permeability k = 1.68E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-64
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 8 570 562 1.40E-04
0 120 10 570 560 8.74E-05
0 180 20 570 550 1.18E-04
0 240 30 570 540 1.34E-04
0 300 40 570 530 1.44E-04
0 360 60 570 510 1.83E-04
0 420 70 570 500 1.85E-04
0 480 80 570 490 1.87E-04
0 540 90 570 480 1.89E-04
0 600 100 570 470 1.91E-04
0 720 120 570 450 1.95E-04
0 840 140 570 430 1.99E-04
0 960 160 570 410 2.03E-04
0 1080 180 570 390 2.08E-04
0 1200 200 570 370 2.13E-04
0 1500 213 570 357 1.85E-04
0 1800 230 570 340 1.70E-04
0 2400 245 570 325 1.39E-04
0 3000 260 570 310 1.20E-04
0 3600 280 570 290 1.11E-04

AVE. Permeability k = 1.65E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-63
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 8 570 562 1.40E-04
0 120 12 570 558 1.05E-04
0 180 25 570 545 1.48E-04
0 240 40 570 530 1.80E-04
0 300 60 570 510 2.20E-04
0 360 70 570 500 2.16E-04
0 420 80 570 490 2.13E-04
0 480 90 570 480 2.12E-04
0 540 100 570 470 2.12E-04
0 600 110 570 460 2.12E-04
0 720 125 570 445 2.04E-04
0 840 150 570 420 2.15E-04
0 960 175 570 395 2.26E-04
0 1080 200 570 370 2.37E-04
0 1200 225 570 345 2.48E-04
0 1500 255 570 315 2.34E-04
0 1800 280 570 290 2.23E-04
0 2400 300 570 270 1.85E-04
0 3000 320 570 250 1.63E-04
0 3600 345 570 225 1.53E-04

AVE. Permeability k = 1.97E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-61
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 13 570 557 1.14E-04
0 180 25 570 545 1.48E-04
0 240 35 570 535 1.56E-04
0 300 40 570 530 1.44E-04
0 360 50 570 520 1.51E-04
0 420 58 570 512 1.51E-04
0 480 65 570 505 1.50E-04
0 540 75 570 495 1.55E-04
0 600 85 570 485 1.60E-04
0 720 100 570 470 1.59E-04
0 840 120 570 450 1.67E-04
0 960 140 570 430 1.74E-04
0 1080 155 570 415 1.74E-04
0 1200 205 570 365 2.20E-04
0 1500 215 570 355 1.87E-04
0 1800 230 570 340 1.70E-04
0 2400 245 570 325 1.39E-04
0 3000 255 570 315 1.17E-04
0 3600 270 570 300 1.06E-04

AVE. Permeability k = 1.56E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-60
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 15 570 555 1.32E-04
0 180 30 570 540 1.78E-04
0 240 40 570 530 1.80E-04
0 300 45 570 525 1.62E-04
0 360 50 570 520 1.51E-04
0 420 60 570 510 1.57E-04
0 480 70 570 500 1.62E-04
0 540 80 570 490 1.66E-04
0 600 90 570 480 1.70E-04
0 720 100 570 470 1.59E-04
0 840 115 570 455 1.59E-04
0 960 128 570 442 1.57E-04
0 1080 138 570 432 1.52E-04
0 1200 150 570 420 1.51E-04
0 1500 160 570 410 1.30E-04
0 1800 170 570 400 1.17E-04
0 2400 180 570 390 9.37E-05
0 3000 190 570 380 8.01E-05
0 3600 200 570 370 7.11E-05

AVE. Permeability k = 1.45E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-37
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 9 570 561 1.57E-04
0 120 17 570 553 1.50E-04
0 180 25 570 545 1.48E-04
0 240 32 570 538 1.43E-04
0 300 38 570 532 1.36E-04
0 360 45 570 525 1.35E-04
0 420 51 570 519 1.32E-04
0 480 57 570 513 1.30E-04
0 540 64 570 506 1.31E-04
0 600 71 570 499 1.31E-04
0 720 81 570 489 1.26E-04
0 840 90 570 480 1.21E-04
0 960 98 570 472 1.16E-04
0 1080 105 570 465 1.12E-04
0 1200 111 570 459 1.07E-04
0 1500 124 570 446 9.69E-05
0 1800 133 570 437 8.75E-05
0 2400 145 570 425 7.25E-05
0 3000 148 570 422 5.94E-05
0 3600 151 570 419 5.07E-05

AVE. Permeability k = 1.17E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-34
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 9 570 561 1.57E-04
0 120 15 570 555 1.32E-04
0 180 20 570 550 1.18E-04
0 240 25 570 545 1.11E-04
0 300 29 570 541 1.03E-04
0 360 33 570 537 9.82E-05
0 420 37 570 533 9.47E-05
0 480 41 570 529 9.22E-05
0 540 45 570 525 9.03E-05
0 600 48 570 522 8.69E-05
0 720 54 570 516 8.19E-05
0 840 60 570 510 7.85E-05
0 960 65 570 505 7.48E-05
0 1080 69 570 501 7.08E-05
0 1200 73 570 497 6.77E-05
0 1500 83 570 487 6.22E-05
0 1800 92 570 478 5.80E-05
0 2400 109 570 461 5.24E-05
0 3000 126 570 444 4.94E-05
0 3600 142 570 428 4.72E-05

AVE. Permeability k = 8.63E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-33
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 5 570 565 8.70E-05
0 120 10 570 560 8.74E-05
0 180 19 570 551 1.12E-04
0 240 27 570 543 1.20E-04
0 300 34 570 536 1.22E-04
0 360 39 570 531 1.17E-04
0 420 44 570 526 1.13E-04
0 480 50 570 520 1.13E-04
0 540 58 570 512 1.18E-04
0 600 64 570 506 1.18E-04
0 720 71 570 499 1.10E-04
0 840 79 570 491 1.05E-04
0 960 85 570 485 9.97E-05
0 1080 91 570 479 9.55E-05
0 1200 97 570 473 9.21E-05
0 1500 108 570 462 8.30E-05
0 1800 115 570 455 7.42E-05
0 2400 123 570 447 6.00E-05
0 3000 131 570 439 5.16E-05
0 3600 133 570 437 4.37E-05

AVE. Permeability k = 9.60E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-31
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 27 570 543 4.79E-04
0 120 38 570 532 3.41E-04
0 180 49 570 521 2.96E-04
0 240 60 570 510 2.75E-04
0 300 71 570 499 2.63E-04
0 360 78 570 492 2.42E-04
0 420 85 570 485 2.28E-04
0 480 93 570 477 2.20E-04
0 540 97 570 473 2.05E-04
0 600 99 570 471 1.88E-04
0 720 107 570 463 1.71E-04
0 840 111 570 459 1.53E-04
0 960 117 570 453 1.42E-04
0 1080 122 570 448 1.32E-04
0 1200 126 570 444 1.23E-04
0 1500 134 570 436 1.06E-04
0 1800 142 570 428 9.43E-05
0 2400 144 570 426 7.19E-05
0 3000 156 570 414 6.32E-05
0 3600 210 570 360 7.57E-05

AVE. Permeability k = 1.93E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-30
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 7 570 563 1.22E-04
0 120 13 570 557 1.14E-04
0 180 20 570 550 1.18E-04
0 240 26 570 544 1.15E-04
0 300 32 570 538 1.14E-04
0 360 37 570 533 1.10E-04
0 420 42 570 528 1.08E-04
0 480 46 570 524 1.04E-04
0 540 50 570 520 1.01E-04
0 600 57 570 513 1.04E-04
0 720 63 570 507 9.64E-05
0 840 69 570 501 9.10E-05
0 960 74 570 496 8.59E-05
0 1080 78 570 492 8.08E-05
0 1200 81 570 489 7.57E-05
0 1500 87 570 483 6.54E-05
0 1800 92 570 478 5.80E-05
0 2400 99 570 471 4.71E-05
0 3000 105 570 465 4.02E-05
0 3600 109 570 461 3.49E-05

AVE. Permeability k = 8.93E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-28
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 5 570 565 8.70E-05
0 120 6 570 564 5.23E-05
0 180 8 570 562 4.65E-05
0 240 11 570 559 4.81E-05
0 300 15 570 555 5.27E-05
0 360 18 570 552 5.28E-05
0 420 25 570 545 6.33E-05
0 480 27 570 543 5.99E-05
0 540 31 570 539 6.14E-05
0 600 39 570 531 7.00E-05
0 720 44 570 526 6.61E-05
0 840 56 570 514 7.30E-05
0 960 63 570 507 7.23E-05
0 1080 71 570 499 7.30E-05
0 1200 79 570 491 7.37E-05
0 1500 95 570 475 7.20E-05
0 1800 113 570 457 7.28E-05
0 2400 154 570 416 7.78E-05
0 3000 175 570 395 7.25E-05
0 3600 193 570 377 6.81E-05

AVE. Permeability k = 6.58E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-27
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 11 570 559 9.62E-05
0 180 13 570 557 7.60E-05
0 240 14 570 556 6.14E-05
0 300 16 570 554 5.63E-05
0 360 20 570 550 5.88E-05
0 420 25 570 545 6.33E-05
0 480 30 570 540 6.68E-05
0 540 35 570 535 6.96E-05
0 600 38 570 532 6.82E-05
0 720 45 570 525 6.77E-05
0 840 51 570 519 6.61E-05
0 960 58 570 512 6.63E-05
0 1080 65 570 505 6.64E-05
0 1200 70 570 500 6.47E-05
0 1500 86 570 484 6.46E-05
0 1800 100 570 470 6.35E-05
0 2400 120 570 450 5.84E-05
0 3000 145 570 425 5.80E-05
0 3600 165 570 405 5.63E-05

AVE. Permeability k = 7.12E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-24
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 7 570 563 1.22E-04
0 120 9 570 561 7.86E-05
0 180 5 570 565 2.90E-05
0 240 109 570 461 5.24E-04
0 300 116 570 454 4.50E-04
0 360 122 570 448 3.97E-04
0 420 128 570 442 3.59E-04
0 480 135 570 435 3.34E-04
0 540 143 570 427 3.17E-04
0 600 151 570 419 3.04E-04
0 720 164 570 406 2.79E-04
0 840 169 570 401 2.48E-04
0 960 173 570 397 2.23E-04
0 1080 181 570 389 2.10E-04
0 1200 187 570 383 1.96E-04
0 1500 195 570 375 1.65E-04
0 1800 199 570 371 1.41E-04
0 2400 213 570 357 1.16E-04
0 3000 222 570 348 9.75E-05
0 3600 233 570 337 8.65E-05

AVE. Permeability k = 2.34E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-23
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 50 570 520 4.53E-04
0 180 64 570 506 3.92E-04
0 240 77 570 493 3.58E-04
0 300 86 570 484 3.23E-04
0 360 95 570 475 3.00E-04
0 420 103 570 467 2.81E-04
0 480 109 570 461 2.62E-04
0 540 115 570 455 2.47E-04
0 600 120 570 450 2.34E-04
0 720 130 570 440 2.13E-04
0 840 139 570 431 1.97E-04
0 960 147 570 423 1.84E-04
0 1080 154 570 416 1.73E-04
0 1200 159 570 411 1.62E-04
0 1500 169 570 401 1.39E-04
0 1800 177 570 393 1.22E-04
0 2400 190 570 380 1.00E-04
0 3000 201 570 369 8.59E-05
0 3600 210 570 360 7.57E-05

AVE. Permeability k = 2.42E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-22
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 2 570 568 3.47E-05
0 120 5 570 565 4.35E-05
0 180 10 570 560 5.83E-05
0 240 16 570 554 7.03E-05
0 300 22 570 548 7.78E-05
0 360 28 570 542 8.29E-05
0 420 33 570 537 8.42E-05
0 480 37 570 533 8.29E-05
0 540 40 570 530 7.99E-05
0 600 44 570 526 7.94E-05
0 720 48 570 522 7.24E-05
0 840 52 570 518 6.75E-05
0 960 56 570 514 6.38E-05
0 1080 60 570 510 6.10E-05
0 1200 64 570 506 5.88E-05
0 1500 73 570 497 5.42E-05
0 1800 80 570 490 4.98E-05
0 2400 95 570 475 4.50E-05
0 3000 106 570 464 4.06E-05
0 3600 122 570 448 3.97E-05

AVE. Permeability k = 6.23E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-21
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 7 570 563 1.22E-04
0 120 11 570 559 9.62E-05
0 180 16 570 554 9.38E-05
0 240 19 570 551 8.37E-05
0 300 21 570 549 7.42E-05
0 360 28 570 542 8.29E-05
0 420 36 570 534 9.21E-05
0 480 47 570 523 1.06E-04
0 540 62 570 508 1.26E-04
0 600 76 570 494 1.41E-04
0 720 81 570 489 1.26E-04
0 840 89 570 481 1.20E-04
0 960 92 570 478 1.09E-04
0 1080 98 570 472 1.04E-04
0 1200 107 570 463 1.03E-04
0 1500 125 570 445 9.78E-05
0 1800 153 570 417 1.03E-04
0 2400 188 570 382 9.88E-05
0 3000 214 570 356 9.30E-05
0 3600 260 570 310 1.00E-04

AVE. Permeability k = 1.04E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-20
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 31 570 539 5.52E-04
0 120 55 570 515 5.01E-04
0 180 72 570 498 4.45E-04
0 240 91 570 479 4.30E-04
0 300 102 570 468 3.90E-04
0 360 128 570 442 4.19E-04
0 420 146 570 424 4.18E-04
0 480 162 570 408 4.13E-04
0 540 177 570 393 4.08E-04
0 600 193 570 377 4.08E-04
0 720 223 570 347 4.09E-04
0 840 250 570 320 4.07E-04
0 960 281 570 289 4.19E-04
0 1080 297 570 273 4.04E-04
0 1200 307 570 263 3.82E-04
0 1500 320 570 250 3.26E-04
0 1800 334 570 236 2.90E-04
0 2400 346 570 224 2.31E-04
0 3000 357 570 213 1.94E-04
0 3600 372 570 198 1.74E-04

AVE. Permeability k = 3.81E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-19
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 5 570 565 8.70E-05
0 120 7 570 563 6.10E-05
0 180 12 570 558 7.01E-05
0 240 16 570 554 7.03E-05
0 300 25 570 545 8.86E-05
0 360 31 570 539 9.21E-05
0 420 37 570 533 9.47E-05
0 480 42 570 528 9.45E-05
0 540 46 570 524 9.24E-05
0 600 53 570 517 9.64E-05
0 720 59 570 511 8.99E-05
0 840 73 570 497 9.67E-05
0 960 80 570 490 9.34E-05
0 1080 87 570 483 9.09E-05
0 1200 94 570 476 8.90E-05
0 1500 120 570 450 9.34E-05
0 1800 142 570 428 9.43E-05
0 2400 160 570 410 8.14E-05
0 3000 174 570 396 7.20E-05
0 3600 193 570 377 6.81E-05

AVE. Permeability k = 8.58E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-18
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 21 570 549 3.71E-04
0 120 34 570 536 3.04E-04
0 180 43 570 527 2.58E-04
0 240 49 570 521 2.22E-04
0 300 54 570 516 1.97E-04
0 360 59 570 511 1.80E-04
0 420 63 570 507 1.65E-04
0 480 67 570 503 1.54E-04
0 540 71 570 499 1.46E-04
0 600 74 570 496 1.37E-04
0 720 79 570 491 1.23E-04
0 840 84 570 486 1.12E-04
0 960 88 570 482 1.04E-04
0 1080 92 570 478 9.66E-05
0 1200 96 570 474 9.11E-05
0 1500 104 570 466 7.96E-05
0 1800 112 570 458 7.20E-05
0 2400 127 570 443 6.23E-05
0 3000 136 570 434 5.39E-05
0 3600 145 570 425 4.83E-05

AVE. Permeability k = 1.49E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-17
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 17 570 553 2.99E-04
0 120 38 570 532 3.41E-04
0 180 53 570 517 3.21E-04
0 240 75 570 495 3.48E-04
0 300 97 570 473 3.69E-04
0 360 112 570 458 3.60E-04
0 420 127 570 443 3.56E-04
0 480 139 570 431 3.45E-04
0 540 145 570 425 3.22E-04
0 600 162 570 408 3.30E-04
0 720 179 570 391 3.10E-04
0 840 198 570 372 3.01E-04
0 960 227 570 343 3.14E-04
0 1080 248 570 322 3.13E-04
0 1200 293 570 277 3.56E-04
0 1500 334 570 236 3.48E-04
0 1800 376 570 194 3.55E-04
0 2400 392 570 178 2.87E-04
0 3000 445 570 125 3.00E-04
0 3600 513 570 57 3.79E-04

AVE. Permeability k = 3.33E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-16
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 18 570 552 3.17E-04
0 120 33 570 537 2.95E-04
0 180 38 570 532 2.27E-04
0 240 43 570 527 1.94E-04
0 300 47 570 523 1.70E-04
0 360 51 570 519 1.54E-04
0 420 55 570 515 1.43E-04
0 480 59 570 511 1.35E-04
0 540 64 570 506 1.31E-04
0 600 67 570 503 1.24E-04
0 720 73 570 497 1.13E-04
0 840 79 570 491 1.05E-04
0 960 85 570 485 9.97E-05
0 1080 90 570 480 9.43E-05
0 1200 94 570 476 8.90E-05
0 1500 103 570 467 7.88E-05
0 1800 111 570 459 7.13E-05
0 2400 125 570 445 6.11E-05
0 3000 142 570 428 5.66E-05
0 3600 154 570 416 5.19E-05

AVE. Permeability k = 1.35E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-15
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 230 570 340 5.10E-03
0 120 150 570 420 1.51E-03
0 180 145 570 425 9.67E-04
0 240 140 570 430 6.96E-04
0 300 120 570 450 4.67E-04
0 360 119 570 451 3.86E-04
0 420 115 570 455 3.18E-04
0 480 115 570 455 2.78E-04
0 540 225 570 345 5.51E-04
0 600 227 570 343 5.02E-04
0 720 265 570 305 5.15E-04
0 840 310 570 260 5.54E-04
0 960 330 570 240 5.34E-04
0 1080 345 570 225 5.10E-04
0 1200 360 570 210 4.93E-04
0 1500 388 570 182 4.51E-04
0 1800 412 570 158 4.22E-04
0 2400 470 570 100 4.30E-04
0 3000 495 570 75 4.01E-04
0 3600 520 570 50 4.01E-04

AVE. Permeability k = 7.74E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-14
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 35 570 535 3.13E-04
0 180 25 570 545 1.48E-04
0 240 50 570 520 2.27E-04
0 300 54 570 516 1.97E-04
0 360 57 570 513 1.73E-04
0 420 61 570 509 1.60E-04
0 480 66 570 504 1.52E-04
0 540 70 570 500 1.44E-04
0 600 76 570 494 1.41E-04
0 720 83 570 487 1.30E-04
0 840 97 570 473 1.32E-04
0 960 116 570 454 1.40E-04
0 1080 125 570 445 1.36E-04
0 1200 145 570 425 1.45E-04
0 1500 162 570 408 1.32E-04
0 1800 183 570 387 1.28E-04
0 2400 198 570 372 1.05E-04
0 3000 237 570 333 1.06E-04
0 3600 277 570 293 1.10E-04

AVE. Permeability k = 1.73E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-13
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 20 570 550 3.53E-04
0 120 34 570 536 3.04E-04
0 180 45 570 525 2.71E-04
0 240 58 570 512 2.65E-04
0 300 77 570 493 2.87E-04
0 360 92 570 478 2.90E-04
0 420 104 570 466 2.84E-04
0 480 111 570 459 2.67E-04
0 540 116 570 454 2.50E-04
0 600 120 570 450 2.34E-04
0 720 134 570 436 2.21E-04
0 840 155 570 415 2.24E-04
0 960 163 570 407 2.08E-04
0 1080 174 570 396 2.00E-04
0 1200 179 570 391 1.86E-04
0 1500 197 570 373 1.68E-04
0 1800 228 570 342 1.68E-04
0 2400 266 570 304 1.55E-04
0 3000 293 570 277 1.43E-04
0 3600 315 570 255 1.32E-04

AVE. Permeability k = 2.30E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-12
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 9 570 561 1.57E-04
0 120 14 570 556 1.23E-04
0 180 16 570 554 9.38E-05
0 240 18 570 552 7.92E-05
0 300 24 570 546 8.50E-05
0 360 27 570 543 7.99E-05
0 420 29 570 541 7.37E-05
0 480 32 570 538 7.13E-05
0 540 40 570 530 7.99E-05
0 600 44 570 526 7.94E-05
0 720 49 570 521 7.40E-05
0 840 56 570 514 7.30E-05
0 960 63 570 507 7.23E-05
0 1080 74 570 496 7.63E-05
0 1200 91 570 479 8.59E-05
0 1500 112 570 458 8.64E-05
0 1800 150 570 420 1.01E-04
0 2400 175 570 395 9.06E-05
0 3000 188 570 382 7.91E-05
0 3600 570 570 0.00E+00

AVE. Permeability k = 8.30E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-11
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 2 570 568 3.47E-05
0 120 40 570 530 3.59E-04
0 180 52 570 518 3.15E-04
0 240 62 570 508 2.84E-04
0 300 74 570 496 2.75E-04
0 360 80 570 490 2.49E-04
0 420 92 570 478 2.48E-04
0 480 100 570 470 2.38E-04
0 540 107 570 463 2.28E-04
0 600 114 570 456 2.20E-04
0 720 124 570 446 2.02E-04
0 840 135 570 435 1.91E-04
0 960 146 570 424 1.83E-04
0 1080 154 570 416 1.73E-04
0 1200 162 570 408 1.65E-04
0 1500 178 570 392 1.48E-04
0 1800 194 570 376 1.37E-04
0 2400 224 570 346 1.23E-04
0 3000 254 570 316 1.17E-04
0 3600 275 570 295 1.08E-04

AVE. Permeability k = 2.00E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-10
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 25 570 545 4.43E-04
0 120 42 570 528 3.78E-04
0 180 62 570 508 3.79E-04
0 240 80 570 490 3.73E-04
0 300 92 570 478 3.48E-04
0 360 110 570 460 3.53E-04
0 420 128 570 442 3.59E-04
0 480 142 570 428 3.54E-04
0 540 156 570 414 3.51E-04
0 600 168 570 402 3.45E-04
0 720 194 570 376 3.42E-04
0 840 220 570 350 3.44E-04
0 960 244 570 326 3.45E-04
0 1080 257 570 313 3.29E-04
0 1200 269 570 301 3.15E-04
0 1500 288 570 282 2.78E-04
0 1800 305 570 265 2.52E-04
0 2400 328 570 242 2.12E-04
0 3000 344 570 226 1.83E-04
0 3600 367 570 203 1.70E-04

AVE. Permeability k = 3.23E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-08
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 6 570 564 1.05E-04
0 120 9 570 561 7.86E-05
0 180 13 570 557 7.60E-05
0 240 17 570 553 7.48E-05
0 300 19 570 551 6.70E-05
0 360 25 570 545 7.38E-05
0 420 31 570 539 7.89E-05
0 480 36 570 534 8.06E-05
0 540 37 570 533 7.37E-05
0 600 42 570 528 7.56E-05
0 720 48 570 522 7.24E-05
0 840 56 570 514 7.30E-05
0 960 67 570 503 7.72E-05
0 1080 74 570 496 7.63E-05
0 1200 81 570 489 7.57E-05
0 1500 95 570 475 7.20E-05
0 1800 123 570 447 8.00E-05
0 2400 154 570 416 7.78E-05
0 3000 176 570 394 7.30E-05
0 3600 203 570 367 7.25E-05

AVE. Permeability k = 7.67E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-07
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 6 570 564 1.05E-04
0 120 9 570 561 7.86E-05
0 180 13 570 557 7.60E-05
0 240 15 570 555 6.59E-05
0 300 18 570 552 6.34E-05
0 360 24 570 546 7.08E-05
0 420 27 570 543 6.85E-05
0 480 29 570 541 6.45E-05
0 540 34 570 536 6.75E-05
0 600 36 570 534 6.44E-05
0 720 45 570 525 6.77E-05
0 840 49 570 521 6.34E-05
0 960 53 570 517 6.03E-05
0 1080 59 570 511 6.00E-05
0 1200 66 570 504 6.08E-05
0 1500 73 570 497 5.42E-05
0 1800 89 570 481 5.59E-05
0 2400 96 570 474 4.55E-05
0 3000 113 570 457 4.37E-05
0 3600 132 570 438 4.34E-05

AVE. Permeability k = 6.39E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-06
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 4 570 566 6.96E-05
0 120 8 570 562 6.98E-05
0 180 12 570 558 7.01E-05
0 240 16 570 554 7.03E-05
0 300 19 570 551 6.70E-05
0 360 22 570 548 6.48E-05
0 420 25 570 545 6.33E-05
0 480 28 570 542 6.22E-05
0 540 31 570 539 6.14E-05
0 600 37 570 533 6.63E-05
0 720 43 570 527 6.46E-05
0 840 49 570 521 6.34E-05
0 960 55 570 515 6.26E-05
0 1080 61 570 509 6.21E-05
0 1200 66 570 504 6.08E-05
0 1500 81 570 489 6.06E-05
0 1800 95 570 475 6.00E-05
0 2400 125 570 445 6.11E-05
0 3000 149 570 421 5.99E-05
0 3600 165 570 405 5.63E-05

AVE. Permeability k = 6.38E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-05
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 35 570 535 6.26E-04
0 120 46 570 524 4.16E-04
0 180 60 570 510 3.66E-04
0 240 71 570 499 3.29E-04
0 300 79 570 491 2.95E-04
0 360 84 570 486 2.62E-04
0 420 87 570 483 2.34E-04
0 480 95 570 475 2.25E-04
0 540 99 570 471 2.09E-04
0 600 107 570 463 2.05E-04
0 720 118 570 452 1.91E-04
0 840 138 570 432 1.96E-04
0 960 160 570 410 2.03E-04
0 1080 176 570 394 2.03E-04
0 1200 191 570 379 2.02E-04
0 1500 210 570 360 1.82E-04
0 1800 254 570 316 1.94E-04
0 2400 295 570 275 1.80E-04
0 3000 325 570 245 1.67E-04
0 3600 366 570 204 1.69E-04

AVE. Permeability k = 2.53E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-04
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 3 570 567 5.21E-05
0 120 6 570 564 5.23E-05
0 180 9 570 561 5.24E-05
0 240 12 570 558 5.25E-05
0 300 15 570 555 5.27E-05
0 360 18 570 552 5.28E-05
0 420 24 570 546 6.07E-05
0 480 27 570 543 5.99E-05
0 540 30 570 540 5.93E-05
0 600 33 570 537 5.89E-05
0 720 39 570 531 5.83E-05
0 840 45 570 525 5.80E-05
0 960 50 570 520 5.67E-05
0 1080 55 570 515 5.57E-05
0 1200 60 570 510 5.49E-05
0 1500 72 570 498 5.34E-05
0 1800 85 570 485 5.32E-05
0 2400 109 570 461 5.24E-05
0 3000 132 570 438 5.20E-05
0 3600 153 570 417 5.15E-05

AVE. Permeability k = 5.50E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-03
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 30 570 540 5.34E-04
0 120 45 570 525 4.06E-04
0 180 50 570 520 3.02E-04
0 240 56 570 514 2.55E-04
0 300 60 570 510 2.20E-04
0 360 68 570 502 2.09E-04
0 420 73 570 497 1.93E-04
0 480 77 570 493 1.79E-04
0 540 83 570 487 1.73E-04
0 600 91 570 479 1.72E-04
0 720 98 570 472 1.55E-04
0 840 106 570 464 1.45E-04
0 960 113 570 457 1.36E-04
0 1080 119 570 451 1.29E-04
0 1200 132 570 438 1.30E-04
0 1500 143 570 427 1.14E-04
0 1800 161 570 409 1.09E-04
0 2400 180 570 390 9.37E-05
0 3000 195 570 375 8.27E-05
0 3600 212 570 358 7.66E-05

AVE. Permeability k = 1.91E-04

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 1
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-02
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 3 570 567 5.21E-05
0 120 6 570 564 5.23E-05
0 180 9 570 561 5.24E-05
0 240 12 570 558 5.25E-05
0 300 15 570 555 5.27E-05
0 360 17 570 553 4.99E-05
0 420 20 570 550 5.04E-05
0 480 23 570 547 5.09E-05
0 540 25 570 545 4.92E-05
0 600 28 570 542 4.98E-05
0 720 34 570 536 5.06E-05
0 840 38 570 532 4.87E-05
0 960 42 570 528 4.73E-05
0 1080 47 570 523 4.72E-05
0 1200 52 570 518 4.72E-05
0 1500 62 570 508 4.55E-05
0 1800 72 570 498 4.45E-05
0 2400 91 570 479 4.30E-05
0 3000 110 570 460 4.24E-05
0 3600 128 570 442 4.19E-05

AVE. Permeability k = 4.85E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


FALLING HEAD FIELD PERMEABILITY TEST
Project : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM TEST NO: 4
GEOTECHNICAL INVESTIGAITON
Client : Neom

: Location : BH-01
Casing Length (cm) : 462 Dia of Casing (cm) : 12.7
Casing above ground (cm) : 20 Dia of Borehole (cm) : 10.16
Casing below ground (cm) : 550
Depth at test below ground(m) : 5.50 ~ 6.0 Water Table Depth (m) : N.E
Uncased Length (cm) : 50 (Below EGL)

Time t1 Time t2 Initial Head Final Head Permeability


Fall in Head (cm ) H H FALLING HEAD METHOD
(Seconds) (Seconds) 1 (cm) 2 (cm) k ( cm/sec )

0 - 570 - - TEST SETUP


0 60 10 570 560 1.75E-04
0 120 12 570 558 1.05E-04
0 180 14 570 556 8.19E-05
0 240 14 570 556 6.14E-05
0 300 16 570 554 5.63E-05
0 360 19 570 551 5.58E-05
0 420 20 570 550 5.04E-05
0 480 25 570 545 5.54E-05
0 540 25 570 545 4.92E-05
0 600 24 570 546 4.25E-05
0 720 27 570 543 3.99E-05
0 840 29 570 541 3.68E-05
0 960 30 570 540 3.34E-05
0 1080 35 570 535 3.48E-05
0 1200 36 570 534 3.22E-05
0 1500 32 570 538 2.28E-05
0 1800 40 570 530 2.40E-05
0 2400 53 570 517 2.41E-05
0 3000 65 570 505 2.39E-05
0 3600 80 570 490 2.49E-05

AVE. Permeability k = 5.15E-05

1. Permeability (k) has been determined using the following expression (Ref.: Lambe, T.W.,
and Whitman, R.V. (1969). Soil Mechanics. John Wiley & Sons; New York.):

Intake Factor F= 136.78


CONSTANT PERMEABILITY TEST

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.4852E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0 0.48 0.0005 8.00E-06 5.2405 2.7019E-07
2 120 0 0.97 0.001 8.08E-06 5.2405 2.7300E-07
3 180 1 1.47 0.0015 8.17E-06 5.2405 2.7582E-07
4 240 1 1.97 0.002 8.21E-06 5.2405 2.7723E-07
5 300 0 2.44 0.0024 8.13E-06 5.2405 2.7469E-07
6 360 0 2.89 0.0029 8.03E-06 5.2405 2.7113E-07
7 420 0 3.32 0.0033 7.90E-06 5.2405 2.6697E-07
8 480 0 3.75 0.0038 7.81E-06 5.2405 2.6386E-07
9 540 0 4.16 0.0042 7.70E-06 5.2405 2.6018E-07
10 600 0 4.56 0.0046 7.60E-06 5.2405 2.5668E-07
12 720 1 5.31 0.0053 7.38E-06 5.2405 2.4908E-07
14 840 1 6.09 0.0061 7.25E-06 5.2405 2.4486E-07
16 960 1 6.84 0.0068 7.13E-06 5.2405 2.4064E-07
18 1080 1 7.60 0.0076 7.04E-06 5.2405 2.3767E-07
20 1200 1 8.37 0.0084 6.98E-06 5.2405 2.3557E-07
25 1500 2 9.97 0.01 6.65E-06 5.2405 2.2448E-07
30 1800 2 11.77 0.0118 6.54E-06 5.2405 2.2084E-07
40 2400 3 14.97 0.015 6.24E-06 5.2405 2.1066E-07
50 3000 4 18.47 0.0185 6.16E-06 5.2405 2.0793E-07
60 3600 4 22.27 0.0223 6.19E-06 5.2405 2.0893E-07

K(max.)= 2.7723E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

25.00
K(avr.)= 2.4852E-07 m/sec

20.00 K(min.)= 2.0793E-07 m/sec

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-145 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.60 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.10 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 3.0849E-09 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.00 0.00 3E-06 5.00E-08 5.2405 1.7038E-09 0.000003
2 120 0.00 0.01 7E-06 5.83E-08 5.2405 1.9877E-09 0.000004
3 180 0.01 0.01 1E-05 6.67E-08 5.2405 2.2717E-09 0.000005
4 240 0.01 0.02 2E-05 7.08E-08 5.2405 2.4137E-09 0.000005
5 300 0.01 0.02 2E-05 7.67E-08 5.2405 2.6124E-09 0.000006
6 360 0.01 0.03 3E-05 8.06E-08 5.2405 2.7450E-09 0.000006
7 420 0.01 0.04 4E-05 8.33E-08 5.2405 2.8396E-09 0.000006
8 480 0.01 0.04 4E-05 8.75E-08 5.2405 2.9816E-09 0.000007
9 540 0.01 0.05 5E-05 9.26E-08 5.2405 3.1551E-09 0.000008
10 600 0.01 0.06 6E-05 9.67E-08 5.2405 3.2939E-09 0.000008
12 720 0.02 0.07 7E-05 1.01E-07 5.2405 3.4549E-09 0.000015
14 840 0.02 0.09 9E-05 1.06E-07 5.2405 3.6104E-09 0.000016
16 960 0.02 0.10 0.0001 1.08E-07 5.2405 3.6915E-09 0.000015
18 1080 0.01 0.12 0.0001 1.09E-07 5.2405 3.7230E-09 0.000014
20 1200 0.02 0.14 0.0001 1.13E-07 5.2405 3.8619E-09 0.000018
25 1500 0.03 0.17 0.0002 1.10E-07 5.2405 3.7483E-09 0.000029
30 1800 0.03 0.20 0.0002 1.08E-07 5.2405 3.6915E-09 0.00003
40 2400 0.05 0.24 0.0002 1.01E-07 5.2405 3.4501E-09 0.000048
50 3000 0.05 0.29 0.0003 9.63E-08 5.2405 3.2826E-09 0.000046
60 3600 0.05 0.34 0.0003 9.33E-08 5.2405 3.1804E-09 0.000047

K(max.)= 3.8619E-09 m/sec


CUMULATIVE WATER VOLUME (Litter)

0.40
K(avr.)= 3.0849E-09 m/sec
0.35
K(min.)= 1.7038E-09 m/sec
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-144 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.60 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.10 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.9138E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.50 0.50 0.0005 8.33E-06 5.2405 2.8396E-07
2 120 0.49 0.99 0.001 8.25E-06 5.2405 2.8112E-07
3 180 0.43 1.42 0.0014 7.89E-06 5.2405 2.6882E-07
4 240 0.60 2.02 0.002 8.42E-06 5.2405 2.8680E-07
5 300 0.50 2.52 0.0025 8.40E-06 5.2405 2.8623E-07
6 360 0.52 3.04 0.003 8.44E-06 5.2405 2.8775E-07
7 420 0.52 3.56 0.0036 8.48E-06 5.2405 2.8883E-07
8 480 0.45 4.01 0.004 8.35E-06 5.2405 2.8467E-07
9 540 0.50 4.51 0.0045 8.35E-06 5.2405 2.8459E-07
10 600 0.48 4.99 0.005 8.32E-06 5.2405 2.8339E-07
12 720 1.00 5.99 0.006 8.32E-06 5.2405 2.8349E-07
14 840 1.10 7.09 0.0071 8.44E-06 5.2405 2.8761E-07
16 960 1.15 8.24 0.0082 8.58E-06 5.2405 2.9248E-07
18 1080 1.10 9.34 0.0093 8.65E-06 5.2405 2.9469E-07
20 1200 1.11 10.45 0.0105 8.71E-06 5.2405 2.9674E-07
25 1500 2.88 13.33 0.0133 8.89E-06 5.2405 3.0282E-07
30 1800 3.00 16.33 0.0163 9.07E-06 5.2405 3.0914E-07
40 2400 5.20 21.53 0.0215 8.97E-06 5.2405 3.0568E-07
50 3000 5.50 27.03 0.027 9.01E-06 5.2405 3.0702E-07
60 3600 5.90 32.93 0.0329 9.15E-06 5.2405 3.1169E-07

K(max.)= 3.1169E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

35.00
K(avr.)= 2.9138E-07 m/sec
30.00
K(min.)= 2.6882E-07 m/sec
25.00

20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-143 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
3
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m /sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.2152E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


3 3
(min) (sec.) Litter Litter m m /Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.9 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 1.0 1.90 0.0019 1.58E-05 5.2405 5.3475E-07
3 180 1.0 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 1.1 4.00 0.004 1.67E-05 5.2405 5.6290E-07
5 300 1.0 5.00 0.005 1.67E-05 5.2405 5.6290E-07
6 360 1.0 6.00 0.006 1.67E-05 5.2405 5.6290E-07
7 420 1.0 7.00 0.007 1.67E-05 5.2405 5.6290E-07
8 480 1.0 7.98 0.008 1.66E-05 5.2405 5.6149E-07
9 540 1.0 8.97 0.009 1.66E-05 5.2405 5.6102E-07
10 600 1.0 9.97 0.01 1.66E-05 5.2405 5.6121E-07
12 720 1.8 11.77 0.0118 1.63E-05 5.2405 5.5211E-07
14 840 1.9 13.62 0.0136 1.62E-05 5.2405 5.4762E-07
16 960 1.9 15.47 0.0155 1.61E-05 5.2405 5.4425E-07
18 1080 2.0 17.42 0.0174 1.61E-05 5.2405 5.4476E-07
20 1200 2.0 19.39 0.0194 1.62E-05 5.2405 5.4573E-07
25 1500 2.7 22.09 0.0221 1.47E-05 5.2405 4.9737E-07
30 1800 2.7 24.79 0.0248 1.38E-05 5.2405 4.6514E-07
40 2400 5.5 30.29 0.0303 1.26E-05 5.2405 4.2625E-07
50 3000 5.4 35.69 0.0357 1.19E-05 5.2405 4.0180E-07
60 3600 5.3 40.99 0.041 1.14E-05 5.2405 3.8455E-07

K(max.)= 5.6290E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.2152E-07 m/sec
45.00
40.00 K(min.)= 3.8455E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-142 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.6412E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 0.10 0.10 0.0001 1.67E-06 5.2405 5.6290E-08
2 120 0.10 0.20 0.0002 1.67E-06 5.2405 5.6290E-08
3 180 0.11 0.31 0.0003 1.72E-06 5.2405 5.8166E-08
4 240 0.12 0.43 0.0004 1.77E-06 5.2405 5.9808E-08
5 300 0.10 0.53 0.0005 1.75E-06 5.2405 5.9104E-08
6 360 0.10 0.63 0.0006 1.74E-06 5.2405 5.8635E-08
7 420 0.10 0.73 0.0007 1.73E-06 5.2405 5.8300E-08
8 480 0.11 0.84 0.0008 1.74E-06 5.2405 5.8752E-08
9 540 0.10 0.94 0.0009 1.73E-06 5.2405 5.8479E-08
10 600 0.10 1.04 0.001 1.73E-06 5.2405 5.8260E-08
12 720 0.18 1.22 0.0012 1.69E-06 5.2405 5.6993E-08
14 840 0.19 1.41 0.0014 1.67E-06 5.2405 5.6491E-08
16 960 0.19 1.59 0.0016 1.66E-06 5.2405 5.5938E-08
18 1080 0.19 1.78 0.0018 1.65E-06 5.2405 5.5664E-08
20 1200 0.19 1.97 0.002 1.64E-06 5.2405 5.5389E-08
25 1500 0.49 2.46 0.0025 1.64E-06 5.2405 5.5344E-08
30 1800 0.45 2.91 0.0029 1.62E-06 5.2405 5.4563E-08
40 2400 0.85 3.76 0.0038 1.57E-06 5.2405 5.2884E-08
50 3000 0.85 4.60 0.0046 1.53E-06 5.2405 5.1820E-08
60 3600 0.84 5.44 0.0054 1.51E-06 5.2405 5.1064E-08

K(max.)= 5.9808E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

6.00
K(avr.)= 5.6412E-08 m/sec
5.00 m/sec
K(min.)= 5.1064E-08
4.00

3.00

2.00

1.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND
IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-141 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.5699E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 6.67E-07 5.2405 2.2516E-08 0.00004
2 120 0.05 0.09 9E-05 7.08E-07 5.2405 2.3923E-08 0.000045
3 180 0.05 0.14 0.0001 7.50E-07 5.2405 2.5330E-08 0.00005
4 240 0.05 0.18 0.0002 7.50E-07 5.2405 2.5330E-08 0.000045
5 300 0.05 0.23 0.0002 7.67E-07 5.2405 2.5893E-08 0.00005
6 360 0.05 0.28 0.0003 7.64E-07 5.2405 2.5799E-08 0.000045
7 420 0.05 0.33 0.0003 7.74E-07 5.2405 2.6134E-08 0.00005
8 480 0.06 0.38 0.0004 7.92E-07 5.2405 2.6738E-08 0.000055
9 540 0.06 0.44 0.0004 8.07E-07 5.2405 2.7269E-08 0.000056
10 600 0.06 0.49 0.0005 8.18E-07 5.2405 2.7638E-08 0.000055
12 720 0.07 0.56 0.0006 7.79E-07 5.2405 2.6315E-08 0.00007
14 840 0.08 0.64 0.0006 7.63E-07 5.2405 2.5773E-08 0.00008
16 960 0.09 0.73 0.0007 7.56E-07 5.2405 2.5541E-08 0.000085
18 1080 0.09 0.81 0.0008 7.52E-07 5.2405 2.5393E-08 0.000086
20 1200 0.09 0.90 0.0009 7.51E-07 5.2405 2.5358E-08 0.000089
25 1500 0.25 1.15 0.0012 7.67E-07 5.2405 2.5916E-08 0.00025
30 1800 0.25 1.40 0.0014 7.76E-07 5.2405 2.6193E-08 0.000245
40 2400 0.45 1.85 0.0018 7.69E-07 5.2405 2.5978E-08 0.00045
50 3000 0.44 2.29 0.0023 7.62E-07 5.2405 2.5736E-08 0.00044
60 3600 0.40 2.69 0.0027 7.46E-07 5.2405 2.5199E-08 0.0004

K(max.)= 2.7638E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

3.00
K(avr.)= 2.5699E-08 m/sec
2.50 m/sec
K(min.)= 2.2516E-08
2.00

1.50

1.00

0.50

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-140 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.5461E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0 0.10 0.0001 1.67E-06 5.2405 5.6290E-08
2 120 0 0.22 0.0002 1.79E-06 5.2405 6.0511E-08
3 180 0 0.33 0.0003 1.84E-06 5.2405 6.2106E-08
4 240 0 0.44 0.0004 1.84E-06 5.2405 6.2059E-08
5 300 0 0.55 0.0006 1.84E-06 5.2405 6.2031E-08
6 360 0 0.66 0.0007 1.84E-06 5.2405 6.2012E-08
7 420 0 0.77 0.0008 1.84E-06 5.2405 6.1999E-08
8 480 0 0.88 0.0009 1.84E-06 5.2405 6.2130E-08
9 540 0 0.99 0.001 1.84E-06 5.2405 6.2106E-08
10 600 0 1.10 0.0011 1.84E-06 5.2405 6.2087E-08
12 720 0 1.26 0.0013 1.75E-06 5.2405 5.9245E-08
14 840 0 1.42 0.0014 1.69E-06 5.2405 5.7134E-08
16 960 0 1.59 0.0016 1.66E-06 5.2405 5.5903E-08
18 1080 0 1.75 0.0018 1.62E-06 5.2405 5.4851E-08
20 1200 0 1.91 0.0019 1.59E-06 5.2405 5.3841E-08
25 1500 0 2.24 0.0022 1.49E-06 5.2405 5.0390E-08
30 1800 0 2.55 0.0026 1.42E-06 5.2405 4.7902E-08
40 2400 0 2.99 0.003 1.25E-06 5.2405 4.2048E-08
50 3000 0 3.42 0.0034 1.14E-06 5.2405 3.8480E-08
60 3600 0 3.85 0.0038 1.07E-06 5.2405 3.6091E-08

K(max.)= 6.2130E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

4.50
K(avr.)= 5.5461E-08 m/sec
4.00
3.50 K(min.)= 3.6091E-08 m/sec
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-139 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.1315E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.9 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 1.0 1.90 0.0019 1.58E-05 5.2405 5.3475E-07
3 180 1.0 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 1.0 3.90 0.0039 1.63E-05 5.2405 5.4882E-07
5 300 1.0 4.85 0.0049 1.62E-05 5.2405 5.4601E-07
6 360 1.0 5.85 0.0059 1.63E-05 5.2405 5.4882E-07
7 420 1.0 6.85 0.0069 1.63E-05 5.2405 5.5083E-07
8 480 1.0 7.80 0.0078 1.63E-05 5.2405 5.4882E-07
9 540 1.0 8.80 0.0088 1.63E-05 5.2405 5.5039E-07
10 600 1.0 9.80 0.0098 1.63E-05 5.2405 5.5164E-07
12 720 1.7 11.50 0.0115 1.60E-05 5.2405 5.3944E-07
14 840 1.8 13.30 0.0133 1.58E-05 5.2405 5.3475E-07
16 960 1.8 15.10 0.0151 1.57E-05 5.2405 5.3123E-07
18 1080 1.8 16.90 0.0169 1.56E-05 5.2405 5.2850E-07
20 1200 1.8 18.70 0.0187 1.56E-05 5.2405 5.2631E-07
25 1500 2.8 21.50 0.0215 1.43E-05 5.2405 4.8409E-07
30 1800 2.8 24.30 0.0243 1.35E-05 5.2405 4.5595E-07
40 2400 6.0 30.30 0.0303 1.26E-05 5.2405 4.2639E-07
50 3000 6.0 36.30 0.0363 1.21E-05 5.2405 4.0866E-07
60 3600 6.0 42.30 0.0423 1.18E-05 5.2405 3.9684E-07

K(max.)= 5.5164E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

45.00
K(avr.)= 5.1315E-07 m/sec
40.00
35.00 K(min.)= 3.9684E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.9175E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 10 10.00 0.01 1.67E-04 5.2405 5.6290E-06
2 120 10 20.00 0.02 1.67E-04 5.2405 5.6290E-06
3 180 10 29.80 0.0298 1.66E-04 5.2405 5.5914E-06
4 240 11 40.30 0.0403 1.68E-04 5.2405 5.6712E-06
5 300 11 51.30 0.0513 1.71E-04 5.2405 5.7753E-06
6 360 10 61.30 0.0613 1.70E-04 5.2405 5.7509E-06
7 420 10 71.30 0.0713 1.70E-04 5.2405 5.7335E-06
8 480 10 81.30 0.0813 1.69E-04 5.2405 5.7204E-06
9 540 10 91.30 0.0913 1.69E-04 5.2405 5.7103E-06
10 600 10 101.30 0.1013 1.69E-04 5.2405 5.7021E-06
12 720 13 114.30 0.1143 1.59E-04 5.2405 5.3616E-06
14 840 14 128.30 0.1283 1.53E-04 5.2405 5.1585E-06
16 960 14 142.30 0.1423 1.48E-04 5.2405 5.0063E-06
18 1080 14 156.30 0.1563 1.45E-04 5.2405 4.8878E-06
20 1200 14 170.30 0.1703 1.42E-04 5.2405 4.7931E-06
25 1500 16 186.30 0.1863 1.24E-04 5.2405 4.1947E-06
30 1800 16 202.30 0.2023 1.12E-04 5.2405 3.7958E-06
40 2400 19 220.80 0.2208 9.20E-05 5.2405 3.1072E-06
50 3000 19 239.60 0.2396 7.99E-05 5.2405 2.6974E-06
60 3600 20 259.60 0.2596 7.21E-05 5.2405 2.4355E-06

K(max.)= 5.7753E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

300.00
K(avr.)= 4.9175E-06 m/sec
250.00 m/sec
K(min.)= 2.4355E-06
200.00

150.00

100.00

50.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-137 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.5521E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 0.50 0.50 0.0005 8.33E-06 5.2405 2.8145E-07
2 120 0.45 0.95 0.001 7.92E-06 5.2405 2.6738E-07
3 180 0.50 1.45 0.0015 8.06E-06 5.2405 2.7207E-07
4 240 0.45 1.90 0.0019 7.92E-06 5.2405 2.6738E-07
5 300 0.50 2.40 0.0024 8.00E-06 5.2405 2.7019E-07
6 360 0.45 2.85 0.0029 7.92E-06 5.2405 2.6738E-07
7 420 0.50 3.35 0.0034 7.98E-06 5.2405 2.6939E-07
8 480 0.50 3.85 0.0039 8.02E-06 5.2405 2.7089E-07
9 540 0.50 4.35 0.0044 8.06E-06 5.2405 2.7207E-07
10 600 0.50 4.85 0.0049 8.08E-06 5.2405 2.7300E-07
12 720 0.88 5.73 0.0057 7.95E-06 5.2405 2.6855E-07
14 840 0.90 6.63 0.0066 7.89E-06 5.2405 2.6637E-07
16 960 0.93 7.55 0.0076 7.86E-06 5.2405 2.6562E-07
18 1080 0.90 8.45 0.0085 7.82E-06 5.2405 2.6425E-07
20 1200 0.95 9.40 0.0094 7.83E-06 5.2405 2.6456E-07
25 1500 1.38 10.78 0.0108 7.18E-06 5.2405 2.4261E-07
30 1800 1.40 12.18 0.0122 6.76E-06 5.2405 2.2844E-07
40 2400 2.45 14.63 0.0146 6.09E-06 5.2405 2.0581E-07
50 3000 2.75 17.38 0.0174 5.79E-06 5.2405 1.9561E-07
60 3600 3.00 20.38 0.0204 5.66E-06 5.2405 1.9115E-07

K(max.)= 2.8145E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

25.00
K(avr.)= 2.5521E-07 m/sec

20.00 K(min.)= 1.9115E-07 m/sec

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-136 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 8.5657E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 1.58 1.58 0.0016 2.64E-05 5.2405 8.9125E-07
2 120 1.67 3.25 0.0033 2.71E-05 5.2405 9.1471E-07
3 180 1.58 4.83 0.0048 2.69E-05 5.2405 9.0689E-07
4 240 1.67 6.50 0.0065 2.71E-05 5.2405 9.1471E-07
5 300 1.67 8.17 0.0082 2.72E-05 5.2405 9.1940E-07
6 360 1.58 9.75 0.0098 2.71E-05 5.2405 9.1471E-07
7 420 1.67 11.42 0.0114 2.72E-05 5.2405 9.1806E-07
8 480 1.58 13.00 0.013 2.71E-05 5.2405 9.1471E-07
9 540 1.67 14.67 0.0147 2.72E-05 5.2405 9.1731E-07
10 600 1.58 16.25 0.0163 2.71E-05 5.2405 9.1471E-07
12 720 3.00 19.25 0.0193 2.67E-05 5.2405 9.0298E-07
14 840 3.08 22.33 0.0223 2.66E-05 5.2405 8.9795E-07
16 960 3.00 25.33 0.0253 2.64E-05 5.2405 8.9125E-07
18 1080 3.00 28.33 0.0283 2.62E-05 5.2405 8.8604E-07
20 1200 3.00 31.33 0.0313 2.61E-05 5.2405 8.8187E-07
25 1500 4.50 35.83 0.0358 2.39E-05 5.2405 8.0682E-07
30 1800 4.67 40.50 0.0405 2.25E-05 5.2405 7.5991E-07
40 2400 8.33 48.83 0.0488 2.03E-05 5.2405 6.8720E-07
50 3000 9.17 58.00 0.058 1.93E-05 5.2405 6.5296E-07
60 3600 10.00 68.00 0.068 1.89E-05 5.2405 6.3795E-07

K(max.)= 9.1940E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 8.5657E-07 m/sec
70.00
K(min.)= 6.3795E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.6230E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 12 12.00 0.012 2.00E-04 5.2405 6.7547E-06
2 120 11 23.00 0.023 1.92E-04 5.2405 6.4733E-06
3 180 12 35.00 0.035 1.94E-04 5.2405 6.5671E-06
4 240 13 48.00 0.048 2.00E-04 5.2405 6.7547E-06
5 300 14 61.50 0.0615 2.05E-04 5.2405 6.9236E-06
6 360 14 75.50 0.0755 2.10E-04 5.2405 7.0831E-06
7 420 14 89.25 0.0893 2.13E-04 5.2405 7.1769E-06
8 480 15 103.75 0.1038 2.16E-04 5.2405 7.3001E-06
9 540 16 119.75 0.1198 2.22E-04 5.2405 7.4896E-06
10 600 15 134.75 0.1348 2.25E-04 5.2405 7.5850E-06
12 720 22 156.75 0.1568 2.18E-04 5.2405 7.3528E-06
14 840 24 180.75 0.1808 2.15E-04 5.2405 7.2674E-06
16 960 27 207.75 0.2078 2.16E-04 5.2405 7.3089E-06
18 1080 30 237.75 0.2378 2.20E-04 5.2405 7.4349E-06
20 1200 30 267.75 0.2678 2.23E-04 5.2405 7.5358E-06
25 1500 120 387.75 0.3878 2.59E-04 5.2405 8.7305E-06
30 1800 110 497.75 0.4978 2.77E-04 5.2405 9.3394E-06
40 2400 150 647.75 0.6478 2.70E-04 5.2405 9.1154E-06
50 3000 160 807.75 0.8078 2.69E-04 5.2405 9.0936E-06
60 3600 170 977.75 0.9778 2.72E-04 5.2405 9.1729E-06

K(max.)= 9.3394E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

1200.00
K(avr.)= 7.6230E-06 m/sec
1000.00 m/sec
K(min.)= 6.4733E-06
800.00

600.00

400.00

200.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.8730E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 5 4.50 0.0045 7.50E-05 5.2405 2.5330E-06
2 120 5 9.50 0.0095 7.92E-05 5.2405 2.6738E-06
3 180 5 14.00 0.014 7.78E-05 5.2405 2.6268E-06
4 240 6 19.50 0.0195 8.13E-05 5.2405 2.7441E-06
5 300 6 25.50 0.0255 8.50E-05 5.2405 2.8708E-06
6 360 5 30.50 0.0305 8.47E-05 5.2405 2.8614E-06
7 420 5 35.75 0.0358 8.51E-05 5.2405 2.8748E-06
8 480 7 42.75 0.0428 8.91E-05 5.2405 3.0080E-06
9 540 8 50.75 0.0508 9.40E-05 5.2405 3.1741E-06
10 600 8 59.10 0.0591 9.85E-05 5.2405 3.3267E-06
12 720 10 69.10 0.0691 9.60E-05 5.2405 3.2413E-06
14 840 10 79.35 0.0794 9.45E-05 5.2405 3.1904E-06
16 960 12 90.85 0.0909 9.46E-05 5.2405 3.1962E-06
18 1080 14 104.35 0.1044 9.66E-05 5.2405 3.2632E-06
20 1200 15 119.35 0.1194 9.95E-05 5.2405 3.3591E-06
25 1500 15 134.35 0.1344 8.96E-05 5.2405 3.0250E-06
30 1800 18 152.35 0.1524 8.46E-05 5.2405 2.8586E-06
40 2400 20 172.35 0.1724 7.18E-05 5.2405 2.4254E-06
50 3000 21 193.35 0.1934 6.45E-05 5.2405 2.1767E-06
60 3600 23 216.35 0.2164 6.01E-05 5.2405 2.0297E-06

K(max.)= 3.3591E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

300.00
K(avr.)= 2.8730E-06 m/sec
250.00 m/sec
K(min.)= 2.0297E-06
200.00

150.00

100.00

50.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-132 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.4790E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 5 5.00 0.005 8.33E-05 5.2405 2.8145E-06
2 120 5 9.50 0.0095 7.92E-05 5.2405 2.6738E-06
3 180 5 14.00 0.014 7.78E-05 5.2405 2.6268E-06
4 240 5 19.00 0.019 7.92E-05 5.2405 2.6738E-06
5 300 5 23.75 0.0238 7.92E-05 5.2405 2.6738E-06
6 360 5 28.75 0.0288 7.99E-05 5.2405 2.6972E-06
7 420 5 33.25 0.0333 7.92E-05 5.2405 2.6738E-06
8 480 5 38.25 0.0383 7.97E-05 5.2405 2.6913E-06
9 540 5 43.25 0.0433 8.01E-05 5.2405 2.7050E-06
10 600 5 48.25 0.0483 8.04E-05 5.2405 2.7160E-06
12 720 7 55.25 0.0553 7.67E-05 5.2405 2.5917E-06
14 840 8 62.75 0.0628 7.47E-05 5.2405 2.5230E-06
16 960 8 70.75 0.0708 7.37E-05 5.2405 2.4891E-06
18 1080 8 79.00 0.079 7.31E-05 5.2405 2.4705E-06
20 1200 8 87.00 0.087 7.25E-05 5.2405 2.4486E-06
25 1500 13 99.50 0.0995 6.63E-05 5.2405 2.2403E-06
30 1800 13 112.50 0.1125 6.25E-05 5.2405 2.1109E-06
40 2400 28 140.00 0.14 5.83E-05 5.2405 1.9701E-06
50 3000 30 170.00 0.17 5.67E-05 5.2405 1.9138E-06
60 3600 30 200.00 0.2 5.56E-05 5.2405 1.8763E-06

K(max.)= 2.8145E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

250.00
K(avr.)= 2.4790E-06 m/sec

200.00 K(min.)= 1.8763E-06 m/sec

150.00

100.00

50.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-132 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.3914E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 2.4 2.40 0.0024 4.00E-05 5.2405 1.3509E-06
2 120 2.2 4.60 0.0046 3.83E-05 5.2405 1.2947E-06
3 180 2.6 7.20 0.0072 4.00E-05 5.2405 1.3509E-06
4 240 2.8 10.00 0.01 4.17E-05 5.2405 1.4072E-06
5 300 2.6 12.60 0.0126 4.20E-05 5.2405 1.4185E-06
6 360 2.7 15.30 0.0153 4.25E-05 5.2405 1.4354E-06
7 420 2.9 18.20 0.0182 4.33E-05 5.2405 1.4635E-06
8 480 3.3 21.54 0.0215 4.49E-05 5.2405 1.5156E-06
9 540 3.6 25.18 0.0252 4.66E-05 5.2405 1.5749E-06
10 600 4.0 29.16 0.0292 4.86E-05 5.2405 1.6414E-06
12 720 4.4 33.56 0.0336 4.66E-05 5.2405 1.5742E-06
14 840 4.8 38.36 0.0384 4.57E-05 5.2405 1.5423E-06
16 960 5.6 43.94 0.0439 4.58E-05 5.2405 1.5459E-06
18 1080 5.3 49.26 0.0493 4.56E-05 5.2405 1.5405E-06
20 1200 6.0 55.26 0.0553 4.61E-05 5.2405 1.5553E-06
25 1500 7.0 62.26 0.0623 4.15E-05 5.2405 1.4018E-06
30 1800 7.2 69.46 0.0695 3.86E-05 5.2405 1.3033E-06
40 2400 7.4 76.86 0.0769 3.20E-05 5.2405 1.0816E-06
50 3000 8.0 84.86 0.0849 2.83E-05 5.2405 9.5535E-07
60 3600 8.4 93.26 0.0933 2.59E-05 5.2405 8.7493E-07

K(max.)= 1.6414E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

120.00
K(avr.)= 1.3914E-06 m/sec
100.00 m/sec
K(min.)= 8.7493E-07
80.00

60.00

40.00

20.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-131 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2551E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.8 1.80 0.0018 3.00E-05 5.2405 1.0132E-06
2 120 2.0 3.80 0.0038 3.17E-05 5.2405 1.0695E-06
3 180 2.2 6.00 0.006 3.33E-05 5.2405 1.1258E-06
4 240 2.4 8.40 0.0084 3.50E-05 5.2405 1.1821E-06
5 300 2.5 10.86 0.0109 3.62E-05 5.2405 1.2226E-06
6 360 2.5 13.38 0.0134 3.72E-05 5.2405 1.2553E-06
7 420 2.6 15.96 0.016 3.80E-05 5.2405 1.2834E-06
8 480 2.7 18.63 0.0186 3.88E-05 5.2405 1.3108E-06
9 540 2.8 21.47 0.0215 3.98E-05 5.2405 1.3431E-06
10 600 3.1 24.61 0.0246 4.10E-05 5.2405 1.3851E-06
12 720 3.5 28.12 0.0281 3.91E-05 5.2405 1.3191E-06
14 840 4.6 32.72 0.0327 3.90E-05 5.2405 1.3156E-06
16 960 5.6 38.27 0.0383 3.99E-05 5.2405 1.3464E-06
18 1080 6.4 44.71 0.0447 4.14E-05 5.2405 1.3982E-06
20 1200 6.8 51.51 0.0515 4.29E-05 5.2405 1.4496E-06
25 1500 8.0 59.49 0.0595 3.97E-05 5.2405 1.3394E-06
30 1800 9.2 68.69 0.0687 3.82E-05 5.2405 1.2888E-06
40 2400 16.4 85.09 0.0851 3.55E-05 5.2405 1.1974E-06
50 3000 16.8 101.89 0.1019 3.40E-05 5.2405 1.1470E-06
60 3600 16.5 118.39 0.1184 3.29E-05 5.2405 1.1106E-06

K(max.)= 1.4496E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

140.00
K(avr.)= 1.2551E-06 m/sec
120.00
K(min.)= 1.0132E-06 m/sec
100.00

80.00

60.00

40.00

20.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-130 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.0173E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.12 2.22 0.0022 1.85E-05 5.2405 6.2481E-07
3 180 1.14 3.36 0.0034 1.87E-05 5.2405 6.3044E-07
4 240 1.19 4.55 0.0046 1.90E-05 5.2405 6.4029E-07
5 300 1.20 5.75 0.0058 1.92E-05 5.2405 6.4733E-07
6 360 1.24 6.99 0.007 1.94E-05 5.2405 6.5577E-07
7 420 1.29 8.28 0.0083 1.97E-05 5.2405 6.6583E-07
8 480 1.35 9.63 0.0096 2.01E-05 5.2405 6.7752E-07
9 540 1.40 11.03 0.011 2.04E-05 5.2405 6.8980E-07
10 600 1.45 12.48 0.0125 2.08E-05 5.2405 7.0244E-07
12 720 1.67 14.15 0.0141 1.96E-05 5.2405 6.6351E-07
14 840 1.69 15.84 0.0158 1.89E-05 5.2405 6.3668E-07
16 960 1.40 17.24 0.0172 1.80E-05 5.2405 6.0634E-07
18 1080 2.00 19.24 0.0192 1.78E-05 5.2405 6.0152E-07
20 1200 2.30 21.54 0.0215 1.79E-05 5.2405 6.0610E-07
25 1500 2.90 24.44 0.0244 1.63E-05 5.2405 5.5017E-07
30 1800 4.00 28.44 0.0284 1.58E-05 5.2405 5.3353E-07
40 2400 4.20 32.64 0.0326 1.36E-05 5.2405 4.5925E-07
50 3000 4.90 37.54 0.0375 1.25E-05 5.2405 4.2257E-07
60 3600 5.26 42.80 0.0428 1.19E-05 5.2405 4.0149E-07

K(max.)= 7.0244E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 6.0173E-07 m/sec
45.00
40.00 K(min.)= 4.0149E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-129 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3971E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.10 2.10 0.0021 1.75E-05 5.2405 5.9104E-07
3 180 1.20 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.29 4.59 0.0046 1.91E-05 5.2405 6.4592E-07
5 300 1.30 5.89 0.0059 1.96E-05 5.2405 6.6309E-07
6 360 1.42 7.31 0.0073 2.03E-05 5.2405 6.8598E-07
7 420 1.49 8.80 0.0088 2.10E-05 5.2405 7.0780E-07
8 480 1.56 10.36 0.0104 2.16E-05 5.2405 7.2909E-07
9 540 1.60 11.96 0.012 2.22E-05 5.2405 7.4815E-07
10 600 1.78 13.74 0.0137 2.29E-05 5.2405 7.7331E-07
12 720 1.90 15.64 0.0156 2.17E-05 5.2405 7.3355E-07
14 840 1.92 17.56 0.0176 2.09E-05 5.2405 7.0595E-07
16 960 2.00 19.56 0.0196 2.04E-05 5.2405 6.8807E-07
18 1080 2.20 21.76 0.0218 2.01E-05 5.2405 6.8042E-07
20 1200 2.60 24.36 0.0244 2.03E-05 5.2405 6.8555E-07
25 1500 2.90 27.26 0.0273 1.82E-05 5.2405 6.1374E-07
30 1800 2.70 29.96 0.03 1.66E-05 5.2405 5.6211E-07
40 2400 5.40 35.36 0.0354 1.47E-05 5.2405 4.9757E-07
50 3000 5.60 40.96 0.041 1.37E-05 5.2405 4.6110E-07
60 3600 5.90 46.86 0.0469 1.30E-05 5.2405 4.3960E-07

K(max.)= 7.7331E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.3971E-07 m/sec
50.00 m/sec
K(min.)= 4.3960E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-128 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.4990E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.10 2.10 0.0021 1.75E-05 5.2405 5.9104E-07
3 180 1.20 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.30 4.60 0.0046 1.92E-05 5.2405 6.4733E-07
5 300 1.10 5.70 0.0057 1.90E-05 5.2405 6.4170E-07
6 360 1.40 7.10 0.0071 1.97E-05 5.2405 6.6609E-07
7 420 1.60 8.70 0.0087 2.07E-05 5.2405 6.9960E-07
8 480 1.50 10.20 0.0102 2.13E-05 5.2405 7.1769E-07
9 540 1.40 11.60 0.0116 2.15E-05 5.2405 7.2551E-07
10 600 1.46 13.06 0.0131 2.18E-05 5.2405 7.3514E-07
12 720 1.70 14.76 0.0148 2.05E-05 5.2405 6.9236E-07
14 840 2.30 17.06 0.0171 2.03E-05 5.2405 6.8593E-07
16 960 2.60 19.66 0.0197 2.05E-05 5.2405 6.9166E-07
18 1080 2.90 22.56 0.0226 2.09E-05 5.2405 7.0550E-07
20 1200 3.60 26.16 0.0262 2.18E-05 5.2405 7.3627E-07
25 1500 4.00 30.16 0.0302 2.01E-05 5.2405 6.7908E-07
30 1800 4.50 34.66 0.0347 1.93E-05 5.2405 6.5033E-07
40 2400 5.00 39.66 0.0397 1.65E-05 5.2405 5.5811E-07
50 3000 5.70 45.36 0.0454 1.51E-05 5.2405 5.1066E-07
60 3600 6.00 51.36 0.0514 1.43E-05 5.2405 4.8184E-07

K(max.)= 7.3627E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.4990E-07 m/sec
50.00 m/sec
K(min.)= 4.8184E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-127 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.2707E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.17 2.27 0.0023 1.89E-05 5.2405 6.3889E-07
3 180 1.15 3.42 0.0034 1.90E-05 5.2405 6.4170E-07
4 240 1.00 4.42 0.0044 1.84E-05 5.2405 6.2200E-07
5 300 1.20 5.62 0.0056 1.87E-05 5.2405 6.3269E-07
6 360 1.38 7.00 0.007 1.94E-05 5.2405 6.5643E-07
7 420 1.40 8.40 0.0084 2.00E-05 5.2405 6.7523E-07
8 480 1.50 9.90 0.0099 2.06E-05 5.2405 6.9637E-07
9 540 1.70 11.60 0.0116 2.15E-05 5.2405 7.2532E-07
10 600 2.50 14.10 0.0141 2.35E-05 5.2405 7.9351E-07
12 720 2.70 16.80 0.0168 2.33E-05 5.2405 7.8791E-07
14 840 2.90 19.70 0.0197 2.34E-05 5.2405 7.9195E-07
16 960 3.70 23.40 0.0234 2.44E-05 5.2405 8.2313E-07
18 1080 4.00 27.40 0.0274 2.54E-05 5.2405 8.5676E-07
20 1200 4.50 31.90 0.0319 2.66E-05 5.2405 8.9773E-07
25 1500 4.90 36.80 0.0368 2.45E-05 5.2405 8.2852E-07
30 1800 5.50 42.30 0.0423 2.35E-05 5.2405 7.9363E-07
40 2400 8.90 51.20 0.0512 2.13E-05 5.2405 7.2046E-07
50 3000 9.50 60.70 0.0607 2.02E-05 5.2405 6.8332E-07
60 3600 9.30 70.00 0.07 1.94E-05 5.2405 6.5668E-07

K(max.)= 8.9773E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 7.2707E-07 m/sec
70.00
K(min.)= 6.1919E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-126 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3793E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.20 2.30 0.0023 1.92E-05 5.2405 6.4733E-07
3 180 1.25 3.55 0.0036 1.97E-05 5.2405 6.6647E-07
4 240 1.28 4.83 0.0048 2.01E-05 5.2405 6.7956E-07
5 300 1.30 6.13 0.0061 2.04E-05 5.2405 6.8966E-07
6 360 1.33 7.45 0.0075 2.07E-05 5.2405 6.9912E-07
7 420 1.40 8.85 0.0089 2.11E-05 5.2405 7.1182E-07
8 480 1.48 10.33 0.0103 2.15E-05 5.2405 7.2677E-07
9 540 1.50 11.83 0.0118 2.19E-05 5.2405 7.3965E-07
10 600 1.53 13.36 0.0134 2.23E-05 5.2405 7.5197E-07
12 720 1.54 14.90 0.0149 2.07E-05 5.2405 6.9907E-07
14 840 1.57 16.47 0.0165 1.96E-05 5.2405 6.6217E-07
16 960 1.60 18.07 0.0181 1.88E-05 5.2405 6.3569E-07
18 1080 2.60 20.67 0.0207 1.91E-05 5.2405 6.4636E-07
20 1200 2.90 23.57 0.0236 1.96E-05 5.2405 6.6334E-07
25 1500 3.60 27.17 0.0272 1.81E-05 5.2405 6.1173E-07
30 1800 3.20 30.37 0.0304 1.69E-05 5.2405 5.6982E-07
40 2400 4.00 34.37 0.0344 1.43E-05 5.2405 4.8365E-07
50 3000 4.70 39.07 0.0391 1.30E-05 5.2405 4.3984E-07
60 3600 5.20 44.27 0.0443 1.23E-05 5.2405 4.1531E-07

K(max.)= 7.5197E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 6.3793E-07 m/sec
45.00
40.00 K(min.)= 4.1531E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-125 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.8898E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.20 1.20 0.0012 2.00E-05 5.2405 6.7547E-07
2 120 1.27 2.47 0.0025 2.06E-05 5.2405 6.9518E-07
3 180 1.19 3.66 0.0037 2.03E-05 5.2405 6.8673E-07
4 240 1.00 4.66 0.0047 1.94E-05 5.2405 6.5577E-07
5 300 1.20 5.86 0.0059 1.95E-05 5.2405 6.5971E-07
6 360 1.30 7.16 0.0072 1.99E-05 5.2405 6.7172E-07
7 420 1.40 8.56 0.0086 2.04E-05 5.2405 6.8834E-07
8 480 1.60 10.16 0.0102 2.12E-05 5.2405 7.1488E-07
9 540 1.90 12.06 0.0121 2.23E-05 5.2405 7.5428E-07
10 600 2.90 14.96 0.015 2.49E-05 5.2405 8.4209E-07
12 720 3.50 18.46 0.0185 2.56E-05 5.2405 8.6592E-07
14 840 4.00 22.46 0.0225 2.67E-05 5.2405 9.0305E-07
16 960 4.20 26.66 0.0267 2.78E-05 5.2405 9.3793E-07
18 1080 4.30 30.96 0.031 2.87E-05 5.2405 9.6818E-07
20 1200 4.70 35.66 0.0357 2.97E-05 5.2405 1.0036E-06
25 1500 4.90 40.56 0.0406 2.70E-05 5.2405 9.1324E-07
30 1800 5.20 45.76 0.0458 2.54E-05 5.2405 8.5860E-07
40 2400 10.20 55.96 0.056 2.33E-05 5.2405 7.8749E-07
50 3000 11.50 67.46 0.0675 2.25E-05 5.2405 7.5946E-07
60 3600 11.20 78.66 0.0787 2.19E-05 5.2405 7.3796E-07

K(max.)= 1.0036E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 7.8898E-07 m/sec
80.00
70.00 K(min.)= 6.5577E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-124 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.8970E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.10 2.10 0.0021 1.75E-05 5.2405 5.9104E-07
3 180 1.12 3.22 0.0032 1.79E-05 5.2405 6.0417E-07
4 240 1.14 4.36 0.0044 1.82E-05 5.2405 6.1412E-07
5 300 1.20 5.56 0.0056 1.85E-05 5.2405 6.2639E-07
6 360 1.35 6.92 0.0069 1.92E-05 5.2405 6.4883E-07
7 420 1.47 8.38 0.0084 2.00E-05 5.2405 6.7403E-07
8 480 1.67 10.05 0.0101 2.09E-05 5.2405 7.0728E-07
9 540 1.92 11.98 0.012 2.22E-05 5.2405 7.4896E-07
10 600 2.00 13.98 0.014 2.33E-05 5.2405 7.8665E-07
12 720 2.61 16.58 0.0166 2.30E-05 5.2405 7.7778E-07
14 840 2.71 19.29 0.0193 2.30E-05 5.2405 7.7555E-07
16 960 2.91 22.20 0.0222 2.31E-05 5.2405 7.8084E-07
18 1080 3.21 25.40 0.0254 2.35E-05 5.2405 7.9437E-07
20 1200 3.71 29.11 0.0291 2.43E-05 5.2405 8.1921E-07
25 1500 3.91 33.02 0.033 2.20E-05 5.2405 7.4338E-07
30 1800 4.21 37.22 0.0372 2.07E-05 5.2405 6.9840E-07
40 2400 8.30 45.52 0.0455 1.90E-05 5.2405 6.4060E-07
50 3000 8.75 54.27 0.0543 1.81E-05 5.2405 6.1099E-07
60 3600 8.45 62.72 0.0627 1.74E-05 5.2405 5.8843E-07

K(max.)= 8.1921E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 6.8970E-07 m/sec
70.00
K(min.)= 5.6290E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-123 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3635E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.14 1.14 0.0011 1.91E-05 5.2405 6.4395E-07
2 120 1.11 2.26 0.0023 1.88E-05 5.2405 6.3495E-07
3 180 1.12 3.38 0.0034 1.88E-05 5.2405 6.3420E-07
4 240 1.13 4.51 0.0045 1.88E-05 5.2405 6.3424E-07
5 300 1.20 5.71 0.0057 1.90E-05 5.2405 6.4249E-07
6 360 1.33 7.03 0.007 1.95E-05 5.2405 6.5990E-07
7 420 1.40 8.43 0.0084 2.01E-05 5.2405 6.7797E-07
8 480 1.50 9.93 0.0099 2.07E-05 5.2405 6.9841E-07
9 540 1.52 11.45 0.0114 2.12E-05 5.2405 7.1600E-07
10 600 1.53 12.98 0.013 2.16E-05 5.2405 7.3036E-07
12 720 1.70 14.68 0.0147 2.04E-05 5.2405 6.8837E-07
14 840 2.00 16.67 0.0167 1.98E-05 5.2405 6.7033E-07
16 960 2.70 19.37 0.0194 2.02E-05 5.2405 6.8153E-07
18 1080 2.98 22.35 0.0223 2.07E-05 5.2405 6.9890E-07
20 1200 2.40 24.75 0.0247 2.06E-05 5.2405 6.9656E-07
25 1500 3.10 27.85 0.0278 1.86E-05 5.2405 6.2704E-07
30 1800 3.60 31.45 0.0314 1.75E-05 5.2405 5.9008E-07
40 2400 4.60 36.05 0.036 1.50E-05 5.2405 5.0730E-07
50 3000 4.90 40.95 0.0409 1.36E-05 5.2405 4.6100E-07
60 3600 5.25 46.20 0.0462 1.28E-05 5.2405 4.3342E-07

K(max.)= 7.3036E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.3635E-07 m/sec
50.00 m/sec
K(min.)= 4.3342E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-122 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.1613E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.85 1.85 0.0019 1.54E-05 5.2405 5.2068E-07
3 180 0.90 2.75 0.0028 1.53E-05 5.2405 5.1599E-07
4 240 1.00 3.75 0.0038 1.56E-05 5.2405 5.2771E-07
5 300 1.20 4.95 0.005 1.65E-05 5.2405 5.5727E-07
6 360 1.20 6.15 0.0062 1.71E-05 5.2405 5.7697E-07
7 420 1.20 7.35 0.0074 1.75E-05 5.2405 5.9104E-07
8 480 1.15 8.50 0.0085 1.77E-05 5.2405 5.9808E-07
9 540 1.20 9.70 0.0097 1.80E-05 5.2405 6.0668E-07
10 600 1.20 10.90 0.0109 1.82E-05 5.2405 6.1356E-07
12 720 1.45 12.35 0.0124 1.72E-05 5.2405 5.7931E-07
14 840 1.50 13.85 0.0139 1.65E-05 5.2405 5.5686E-07
16 960 1.55 15.40 0.0154 1.60E-05 5.2405 5.4179E-07
18 1080 1.60 17.00 0.017 1.57E-05 5.2405 5.3162E-07
20 1200 1.60 18.60 0.0186 1.55E-05 5.2405 5.2349E-07
25 1500 2.25 20.85 0.0209 1.39E-05 5.2405 4.6950E-07
30 1800 2.40 23.25 0.0233 1.29E-05 5.2405 4.3628E-07
40 2400 3.08 26.33 0.0263 1.10E-05 5.2405 3.7055E-07
50 3000 3.20 29.53 0.0295 9.84E-06 5.2405 3.3247E-07
60 3600 3.50 33.03 0.033 9.18E-06 5.2405 3.0989E-07

K(max.)= 6.1356E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 5.1613E-07 m/sec
35.00
K(min.)= 3.0989E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-121 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.5868E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.05 1.05 0.0011 1.75E-05 5.2405 5.9104E-07
2 120 1.09 2.14 0.0021 1.78E-05 5.2405 6.0230E-07
3 180 1.10 3.24 0.0032 1.80E-05 5.2405 6.0793E-07
4 240 1.22 4.46 0.0045 1.86E-05 5.2405 6.2763E-07
5 300 1.24 5.70 0.0057 1.90E-05 5.2405 6.4170E-07
6 360 1.29 6.99 0.007 1.94E-05 5.2405 6.5577E-07
7 420 1.30 8.29 0.0083 1.97E-05 5.2405 6.6663E-07
8 480 1.00 9.29 0.0093 1.94E-05 5.2405 6.5366E-07
9 540 1.40 10.69 0.0107 1.98E-05 5.2405 6.6860E-07
10 600 1.60 12.29 0.0123 2.05E-05 5.2405 6.9180E-07
12 720 1.92 14.21 0.0142 1.97E-05 5.2405 6.6666E-07
14 840 2.50 16.71 0.0167 1.99E-05 5.2405 6.7194E-07
16 960 3.30 20.01 0.02 2.08E-05 5.2405 7.0404E-07
18 1080 3.70 23.71 0.0237 2.20E-05 5.2405 7.4152E-07
20 1200 3.90 27.61 0.0276 2.30E-05 5.2405 7.7713E-07
25 1500 4.20 31.81 0.0318 2.12E-05 5.2405 7.1627E-07
30 1800 4.78 36.59 0.0366 2.03E-05 5.2405 6.8651E-07
40 2400 8.15 44.74 0.0447 1.86E-05 5.2405 6.2957E-07
50 3000 8.25 52.99 0.053 1.77E-05 5.2405 5.9653E-07
60 3600 8.45 61.44 0.0614 1.71E-05 5.2405 5.7639E-07

K(max.)= 7.7713E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.5868E-07 m/sec
60.00
K(min.)= 5.7639E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-120 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.6218E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.12 2.22 0.0022 1.85E-05 5.2405 6.2538E-07
3 180 1.15 3.37 0.0034 1.87E-05 5.2405 6.3194E-07
4 240 1.17 4.54 0.0045 1.89E-05 5.2405 6.3846E-07
5 300 1.20 5.74 0.0057 1.91E-05 5.2405 6.4587E-07
6 360 1.37 7.10 0.0071 1.97E-05 5.2405 6.6647E-07
7 420 1.46 8.56 0.0086 2.04E-05 5.2405 6.8834E-07
8 480 1.47 10.03 0.01 2.09E-05 5.2405 7.0545E-07
9 540 1.58 11.61 0.0116 2.15E-05 5.2405 7.2582E-07
10 600 1.80 13.40 0.0134 2.23E-05 5.2405 7.5434E-07
12 720 1.92 15.32 0.0153 2.13E-05 5.2405 7.1877E-07
14 840 2.26 17.58 0.0176 2.09E-05 5.2405 7.0696E-07
16 960 2.90 20.48 0.0205 2.13E-05 5.2405 7.2061E-07
18 1080 3.30 23.78 0.0238 2.20E-05 5.2405 7.4374E-07
20 1200 3.40 27.18 0.0272 2.27E-05 5.2405 7.6506E-07
25 1500 3.90 31.08 0.0311 2.07E-05 5.2405 6.9986E-07
30 1800 4.50 35.58 0.0356 1.98E-05 5.2405 6.6765E-07
40 2400 4.27 39.85 0.0399 1.66E-05 5.2405 5.6078E-07
50 3000 4.34 44.19 0.0442 1.47E-05 5.2405 4.9744E-07
60 3600 5.00 49.19 0.0492 1.37E-05 5.2405 4.6144E-07

K(max.)= 7.6506E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.6218E-07 m/sec
50.00 m/sec
K(min.)= 4.6144E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-119 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.1371E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.27 1.27 0.0013 2.11E-05 5.2405 7.1263E-07
2 120 1.30 2.56 0.0026 2.14E-05 5.2405 7.2107E-07
3 180 1.29 3.85 0.0039 2.14E-05 5.2405 7.2276E-07
4 240 1.30 5.15 0.0052 2.15E-05 5.2405 7.2487E-07
5 300 1.32 6.47 0.0065 2.16E-05 5.2405 7.2872E-07
6 360 1.39 7.87 0.0079 2.18E-05 5.2405 7.3786E-07
7 420 1.43 9.29 0.0093 2.21E-05 5.2405 7.4712E-07
8 480 1.44 10.74 0.0107 2.24E-05 5.2405 7.5534E-07
9 540 1.50 12.24 0.0122 2.27E-05 5.2405 7.6523E-07
10 600 1.72 13.96 0.014 2.33E-05 5.2405 7.8563E-07
12 720 1.92 15.88 0.0159 2.21E-05 5.2405 7.4495E-07
14 840 2.60 18.48 0.0185 2.20E-05 5.2405 7.4306E-07
16 960 2.98 21.46 0.0215 2.24E-05 5.2405 7.5491E-07
18 1080 3.60 25.06 0.0251 2.32E-05 5.2405 7.8361E-07
20 1200 3.70 28.76 0.0288 2.40E-05 5.2405 8.0939E-07
25 1500 3.98 32.74 0.0327 2.18E-05 5.2405 7.3706E-07
30 1800 4.30 37.03 0.037 2.06E-05 5.2405 6.9484E-07
40 2400 4.69 41.73 0.0417 1.74E-05 5.2405 5.8717E-07
50 3000 5.00 46.73 0.0467 1.56E-05 5.2405 5.2605E-07
60 3600 5.70 52.43 0.0524 1.46E-05 5.2405 4.9185E-07

K(max.)= 8.0939E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 7.1371E-07 m/sec
60.00
K(min.)= 4.9185E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-118 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.1439E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.30 2.40 0.0024 2.00E-05 5.2405 6.7547E-07
3 180 1.40 3.80 0.0038 2.11E-05 5.2405 7.1300E-07
4 240 1.50 5.30 0.0053 2.21E-05 5.2405 7.4584E-07
5 300 1.40 6.70 0.0067 2.23E-05 5.2405 7.5428E-07
6 360 1.20 7.90 0.0079 2.19E-05 5.2405 7.4115E-07
7 420 1.30 9.20 0.0092 2.19E-05 5.2405 7.3981E-07
8 480 1.45 10.65 0.0107 2.22E-05 5.2405 7.4936E-07
9 540 1.50 12.15 0.0122 2.25E-05 5.2405 7.5991E-07
10 600 2.00 14.15 0.0142 2.36E-05 5.2405 7.9650E-07
12 720 2.20 16.35 0.0164 2.27E-05 5.2405 7.6695E-07
14 840 2.40 18.75 0.0188 2.23E-05 5.2405 7.5388E-07
16 960 2.60 21.35 0.0214 2.22E-05 5.2405 7.5111E-07
18 1080 3.00 24.35 0.0244 2.25E-05 5.2405 7.6147E-07
20 1200 3.50 27.85 0.0279 2.32E-05 5.2405 7.8383E-07
25 1500 3.80 31.65 0.0317 2.11E-05 5.2405 7.1263E-07
30 1800 4.00 35.65 0.0357 1.98E-05 5.2405 6.6891E-07
40 2400 8.50 44.15 0.0442 1.84E-05 5.2405 6.2130E-07
50 3000 8.60 52.75 0.0528 1.76E-05 5.2405 5.9386E-07
60 3600 9.00 61.75 0.0618 1.72E-05 5.2405 5.7931E-07

K(max.)= 7.9650E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 7.1439E-07 m/sec
60.00
K(min.)= 5.7931E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-117 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3750E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.05 2.15 0.0022 1.79E-05 5.2405 6.0511E-07
3 180 1.10 3.25 0.0033 1.81E-05 5.2405 6.0980E-07
4 240 1.20 4.45 0.0045 1.85E-05 5.2405 6.2622E-07
5 300 1.10 5.55 0.0056 1.85E-05 5.2405 6.2481E-07
6 360 1.00 6.55 0.0066 1.82E-05 5.2405 6.1449E-07
7 420 1.20 7.75 0.0078 1.85E-05 5.2405 6.2321E-07
8 480 1.30 9.05 0.0091 1.89E-05 5.2405 6.3678E-07
9 540 1.40 10.45 0.0105 1.94E-05 5.2405 6.5358E-07
10 600 1.40 11.85 0.0119 1.98E-05 5.2405 6.6703E-07
12 720 2.40 14.25 0.0143 1.98E-05 5.2405 6.6844E-07
14 840 2.80 17.05 0.0171 2.03E-05 5.2405 6.8553E-07
16 960 2.60 19.65 0.0197 2.05E-05 5.2405 6.9131E-07
18 1080 2.50 22.15 0.0222 2.05E-05 5.2405 6.9267E-07
20 1200 2.40 24.55 0.0246 2.05E-05 5.2405 6.9095E-07
25 1500 4.20 28.75 0.0288 1.92E-05 5.2405 6.4733E-07
30 1800 4.10 32.85 0.0329 1.83E-05 5.2405 6.1637E-07
40 2400 9.80 42.65 0.0427 1.78E-05 5.2405 6.0019E-07
50 3000 9.90 52.55 0.0526 1.75E-05 5.2405 5.9160E-07
60 3600 9.85 62.40 0.0624 1.73E-05 5.2405 5.8541E-07

K(max.)= 6.9267E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.3750E-07 m/sec
60.00
K(min.)= 5.8541E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-116 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 8.6309E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.30 2.40 0.0024 2.00E-05 5.2405 6.7547E-07
3 180 1.40 3.80 0.0038 2.11E-05 5.2405 7.1300E-07
4 240 1.60 5.40 0.0054 2.25E-05 5.2405 7.5991E-07
5 300 1.80 7.20 0.0072 2.40E-05 5.2405 8.1057E-07
6 360 2.00 9.20 0.0092 2.56E-05 5.2405 8.6311E-07
7 420 2.20 11.40 0.0114 2.71E-05 5.2405 9.1672E-07
8 480 2.30 13.70 0.0137 2.85E-05 5.2405 9.6396E-07
9 540 2.25 15.95 0.016 2.95E-05 5.2405 9.9758E-07
10 600 2.29 18.24 0.0182 3.04E-05 5.2405 1.0267E-06
12 720 2.90 21.14 0.0211 2.94E-05 5.2405 9.9163E-07
14 840 3.30 24.44 0.0244 2.91E-05 5.2405 9.8266E-07
16 960 3.70 28.14 0.0281 2.93E-05 5.2405 9.8999E-07
18 1080 3.90 32.04 0.032 2.97E-05 5.2405 1.0020E-06
20 1200 4.20 36.24 0.0362 3.02E-05 5.2405 1.0200E-06
25 1500 4.40 40.64 0.0406 2.71E-05 5.2405 9.1504E-07
30 1800 4.90 45.54 0.0455 2.53E-05 5.2405 8.5448E-07
40 2400 8.70 54.24 0.0542 2.26E-05 5.2405 7.6329E-07
50 3000 9.20 63.44 0.0634 2.11E-05 5.2405 7.1420E-07
60 3600 9.30 72.74 0.0727 2.02E-05 5.2405 6.8242E-07

K(max.)= 1.0267E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 8.6309E-07 m/sec
80.00
70.00 K(min.)= 6.1919E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-115 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.6434E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.30 2.40 0.0024 2.00E-05 5.2405 6.7547E-07
3 180 1.20 3.60 0.0036 2.00E-05 5.2405 6.7547E-07
4 240 1.00 4.60 0.0046 1.92E-05 5.2405 6.4733E-07
5 300 1.10 5.70 0.0057 1.90E-05 5.2405 6.4170E-07
6 360 1.20 6.90 0.0069 1.92E-05 5.2405 6.4733E-07
7 420 1.10 8.00 0.008 1.90E-05 5.2405 6.4331E-07
8 480 1.30 9.30 0.0093 1.94E-05 5.2405 6.5437E-07
9 540 1.40 10.70 0.0107 1.98E-05 5.2405 6.6922E-07
10 600 1.50 12.20 0.0122 2.03E-05 5.2405 6.8673E-07
12 720 2.00 14.20 0.0142 1.97E-05 5.2405 6.6609E-07
14 840 2.50 16.70 0.0167 1.99E-05 5.2405 6.7145E-07
16 960 3.00 19.70 0.0197 2.05E-05 5.2405 6.9307E-07
18 1080 4.00 23.70 0.0237 2.19E-05 5.2405 7.4115E-07
20 1200 4.50 28.20 0.0282 2.35E-05 5.2405 7.9368E-07
25 1500 5.00 33.20 0.0332 2.21E-05 5.2405 7.4753E-07
30 1800 5.00 38.20 0.0382 2.12E-05 5.2405 7.1675E-07
40 2400 5.50 43.70 0.0437 1.82E-05 5.2405 6.1496E-07
50 3000 6.00 49.70 0.0497 1.66E-05 5.2405 5.5952E-07
60 3600 6.00 55.70 0.0557 1.55E-05 5.2405 5.2255E-07

K(max.)= 7.9368E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.6434E-07 m/sec
60.00
K(min.)= 5.2255E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-114 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.1951E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.20 2.30 0.0023 1.92E-05 5.2405 6.4733E-07
3 180 1.00 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.30 4.60 0.0046 1.92E-05 5.2405 6.4733E-07
5 300 0.90 5.50 0.0055 1.83E-05 5.2405 6.1919E-07
6 360 1.00 6.50 0.0065 1.81E-05 5.2405 6.0980E-07
7 420 1.20 7.70 0.0077 1.83E-05 5.2405 6.1919E-07
8 480 1.30 9.00 0.009 1.88E-05 5.2405 6.3326E-07
9 540 1.25 10.25 0.0103 1.90E-05 5.2405 6.4108E-07
10 600 1.30 11.55 0.0116 1.93E-05 5.2405 6.5014E-07
12 720 2.10 13.65 0.0137 1.90E-05 5.2405 6.4029E-07
14 840 2.00 15.65 0.0157 1.86E-05 5.2405 6.2924E-07
16 960 2.50 18.15 0.0182 1.89E-05 5.2405 6.3853E-07
18 1080 3.00 21.15 0.0212 1.96E-05 5.2405 6.6140E-07
20 1200 3.50 24.65 0.0247 2.05E-05 5.2405 6.9377E-07
25 1500 3.50 28.15 0.0282 1.88E-05 5.2405 6.3382E-07
30 1800 3.70 31.85 0.0319 1.77E-05 5.2405 5.9761E-07
40 2400 7.50 39.35 0.0394 1.64E-05 5.2405 5.5375E-07
50 3000 7.40 46.75 0.0468 1.56E-05 5.2405 5.2631E-07
60 3600 7.60 54.35 0.0544 1.51E-05 5.2405 5.0989E-07

K(max.)= 6.9377E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.1951E-07 m/sec
60.00
K(min.)= 5.0989E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-113 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.0673E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.25 1.25 0.0013 2.08E-05 5.2405 7.0362E-07
2 120 1.28 2.53 0.0025 2.11E-05 5.2405 7.1206E-07
3 180 1.32 3.85 0.0039 2.14E-05 5.2405 7.2238E-07
4 240 1.20 5.05 0.0051 2.10E-05 5.2405 7.1066E-07
5 300 1.00 6.05 0.0061 2.02E-05 5.2405 6.8110E-07
6 360 1.05 7.10 0.0071 1.97E-05 5.2405 6.6609E-07
7 420 1.05 8.15 0.0082 1.94E-05 5.2405 6.5537E-07
8 480 1.00 9.15 0.0092 1.91E-05 5.2405 6.4381E-07
9 540 1.10 10.25 0.0103 1.90E-05 5.2405 6.4108E-07
10 600 1.20 11.45 0.0115 1.91E-05 5.2405 6.4452E-07
12 720 1.30 12.75 0.0128 1.77E-05 5.2405 5.9808E-07
14 840 1.26 14.01 0.014 1.67E-05 5.2405 5.6330E-07
16 960 1.40 15.41 0.0154 1.61E-05 5.2405 5.4214E-07
18 1080 2.00 17.41 0.0174 1.61E-05 5.2405 5.4445E-07
20 1200 2.50 19.91 0.0199 1.66E-05 5.2405 5.6036E-07
25 1500 3.50 23.41 0.0234 1.56E-05 5.2405 5.2710E-07
30 1800 4.00 27.41 0.0274 1.52E-05 5.2405 5.1430E-07
40 2400 8.60 36.01 0.036 1.50E-05 5.2405 5.0675E-07
50 3000 8.50 44.51 0.0445 1.48E-05 5.2405 5.0109E-07
60 3600 8.40 52.91 0.0529 1.47E-05 5.2405 4.9638E-07

K(max.)= 7.2238E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.0673E-07 m/sec
50.00 m/sec
K(min.)= 4.9638E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-112 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.3073E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.00 2.00 0.002 1.67E-05 5.2405 5.6290E-07
3 180 1.10 3.10 0.0031 1.72E-05 5.2405 5.8166E-07
4 240 1.10 4.20 0.0042 1.75E-05 5.2405 5.9104E-07
5 300 1.15 5.35 0.0054 1.78E-05 5.2405 6.0230E-07
6 360 1.20 6.55 0.0066 1.82E-05 5.2405 6.1449E-07
7 420 1.25 7.80 0.0078 1.86E-05 5.2405 6.2723E-07
8 480 1.30 9.10 0.0091 1.90E-05 5.2405 6.4029E-07
9 540 1.00 10.10 0.0101 1.87E-05 5.2405 6.3169E-07
10 600 0.90 11.00 0.011 1.83E-05 5.2405 6.1919E-07
12 720 1.00 12.00 0.012 1.67E-05 5.2405 5.6290E-07
14 840 1.20 13.20 0.0132 1.57E-05 5.2405 5.3073E-07
16 960 1.30 14.50 0.0145 1.51E-05 5.2405 5.1012E-07
18 1080 1.40 15.90 0.0159 1.47E-05 5.2405 4.9722E-07
20 1200 2.00 17.90 0.0179 1.49E-05 5.2405 5.0379E-07
25 1500 2.50 20.40 0.0204 1.36E-05 5.2405 4.5932E-07
30 1800 2.50 22.90 0.0229 1.27E-05 5.2405 4.2968E-07
40 2400 4.50 27.40 0.0274 1.14E-05 5.2405 3.8558E-07
50 3000 4.50 31.90 0.0319 1.06E-05 5.2405 3.5913E-07
60 3600 4.60 36.50 0.0365 1.01E-05 5.2405 3.4243E-07

K(max.)= 6.4029E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

45.00
K(avr.)= 5.3073E-07 m/sec
40.00
35.00 K(min.)= 3.4243E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-111 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.6197E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.25 1.25 0.0013 2.08E-05 5.2405 7.0362E-07 0.00125
2 120 1.30 2.55 0.0026 2.13E-05 5.2405 7.1769E-07 0.0013
3 180 1.35 3.90 0.0039 2.17E-05 5.2405 7.3176E-07 0.00135
4 240 1.36 5.26 0.0053 2.19E-05 5.2405 7.4021E-07 0.00136
5 300 1.40 6.66 0.0067 2.22E-05 5.2405 7.4978E-07 0.0014
6 360 1.45 8.11 0.0081 2.25E-05 5.2405 7.6085E-07 0.00145
7 420 1.49 9.60 0.0096 2.29E-05 5.2405 7.7197E-07 0.00149
8 480 1.00 10.60 0.0106 2.21E-05 5.2405 7.4584E-07 0.001
9 540 1.20 11.80 0.0118 2.19E-05 5.2405 7.3802E-07 0.0012
10 600 1.10 12.90 0.0129 2.15E-05 5.2405 7.2614E-07 0.0011
12 720 1.20 14.10 0.0141 1.96E-05 5.2405 6.6140E-07 0.0012
14 840 1.50 15.60 0.0156 1.86E-05 5.2405 6.2723E-07 0.0015
16 960 2.00 17.60 0.0176 1.83E-05 5.2405 6.1919E-07 0.002
18 1080 2.50 20.10 0.0201 1.86E-05 5.2405 6.2857E-07 0.0025
20 1200 2.70 22.80 0.0228 1.90E-05 5.2405 6.4170E-07 0.0027
25 1500 2.40 25.20 0.0252 1.68E-05 5.2405 5.6740E-07 0.0024
30 1800 3.00 28.20 0.0282 1.57E-05 5.2405 5.2912E-07 0.003
40 2400 9.30 37.50 0.0375 1.56E-05 5.2405 5.2771E-07 0.0093
50 3000 9.20 46.70 0.0467 1.56E-05 5.2405 5.2574E-07 0.0092
60 3600 9.30 56.00 0.056 1.56E-05 5.2405 5.2537E-07 0.0093

K(max.)= 7.7197E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.6197E-07 m/sec
50.00 m/sec
K(min.)= 5.2537E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-110 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.4472E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.22 1.22 0.0012 2.03E-05 5.2405 6.8673E-07
2 120 1.32 2.54 0.0025 2.11E-05 5.2405 7.1347E-07
3 180 1.42 3.96 0.004 2.20E-05 5.2405 7.4208E-07
4 240 1.23 5.19 0.0052 2.16E-05 5.2405 7.2965E-07
5 300 1.24 6.43 0.0064 2.14E-05 5.2405 7.2332E-07
6 360 1.15 7.58 0.0076 2.10E-05 5.2405 7.1066E-07
7 420 1.05 8.63 0.0086 2.05E-05 5.2405 6.9357E-07
8 480 0.92 9.55 0.0095 1.99E-05 5.2405 6.7161E-07
9 540 1.03 10.58 0.0106 1.96E-05 5.2405 6.6140E-07
10 600 1.04 11.62 0.0116 1.94E-05 5.2405 6.5380E-07
12 720 2.00 13.62 0.0136 1.89E-05 5.2405 6.3865E-07
14 840 2.00 15.62 0.0156 1.86E-05 5.2405 6.2783E-07
16 960 2.06 17.68 0.0177 1.84E-05 5.2405 6.2182E-07
18 1080 2.09 19.77 0.0198 1.83E-05 5.2405 6.1809E-07
20 1200 2.08 21.85 0.0218 1.82E-05 5.2405 6.1482E-07
25 1500 3.00 24.85 0.0248 1.66E-05 5.2405 5.5941E-07
30 1800 3.50 28.35 0.0283 1.57E-05 5.2405 5.3184E-07
40 2400 10.90 39.25 0.0392 1.64E-05 5.2405 5.5227E-07
50 3000 11.20 50.45 0.0504 1.68E-05 5.2405 5.6791E-07
60 3600 10.90 61.35 0.0613 1.70E-05 5.2405 5.7551E-07

K(max.)= 7.4208E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.4472E-07 m/sec
60.00
K(min.)= 5.3184E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-109 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3908E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.20 2.30 0.0023 1.92E-05 5.2405 6.4733E-07
3 180 1.00 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.00 4.30 0.0043 1.79E-05 5.2405 6.0511E-07
5 300 1.00 5.30 0.0053 1.77E-05 5.2405 5.9667E-07
6 360 1.20 6.50 0.0065 1.81E-05 5.2405 6.0980E-07
7 420 1.10 7.60 0.0076 1.81E-05 5.2405 6.1114E-07
8 480 1.30 8.90 0.0089 1.85E-05 5.2405 6.2622E-07
9 540 1.40 10.30 0.0103 1.91E-05 5.2405 6.4420E-07
10 600 1.50 11.80 0.0118 1.97E-05 5.2405 6.6422E-07
12 720 2.00 13.80 0.0138 1.92E-05 5.2405 6.4733E-07
14 840 2.50 16.30 0.0163 1.94E-05 5.2405 6.5537E-07
16 960 3.00 19.30 0.0193 2.01E-05 5.2405 6.7899E-07
18 1080 3.50 22.80 0.0228 2.11E-05 5.2405 7.1300E-07
20 1200 3.00 25.80 0.0258 2.15E-05 5.2405 7.2614E-07
25 1500 4.00 29.80 0.0298 1.99E-05 5.2405 6.7097E-07
30 1800 4.40 34.20 0.0342 1.90E-05 5.2405 6.4170E-07
40 2400 9.50 43.70 0.0437 1.82E-05 5.2405 6.1496E-07
50 3000 9.60 53.30 0.0533 1.78E-05 5.2405 6.0005E-07
60 3600 9.60 62.90 0.0629 1.75E-05 5.2405 5.9010E-07

K(max.)= 7.2614E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.3908E-07 m/sec
60.00
K(min.)= 5.9010E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-1108 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.9918E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.00 0.00 0 0.00E+00 5.2405 0.0000E+00
2 120 1.00 1.00 0.001 8.33E-06 5.2405 2.8145E-07
3 180 1.10 2.10 0.0021 1.17E-05 5.2405 3.9403E-07
4 240 1.20 3.30 0.0033 1.38E-05 5.2405 4.6439E-07
5 300 1.00 4.30 0.0043 1.43E-05 5.2405 4.8409E-07
6 360 1.30 5.60 0.0056 1.56E-05 5.2405 5.2537E-07
7 420 1.40 7.00 0.007 1.67E-05 5.2405 5.6290E-07
8 480 1.50 8.50 0.0085 1.77E-05 5.2405 5.9808E-07
9 540 1.10 9.60 0.0096 1.78E-05 5.2405 6.0042E-07
10 600 1.20 10.80 0.0108 1.80E-05 5.2405 6.0793E-07
12 720 1.40 12.20 0.0122 1.69E-05 5.2405 5.7228E-07
14 840 1.50 13.70 0.0137 1.63E-05 5.2405 5.5083E-07
16 960 2.00 15.70 0.0157 1.64E-05 5.2405 5.5234E-07
18 1080 2.50 18.20 0.0182 1.69E-05 5.2405 5.6915E-07
20 1200 3.00 21.20 0.0212 1.77E-05 5.2405 5.9667E-07
25 1500 3.50 24.70 0.0247 1.65E-05 5.2405 5.5614E-07
30 1800 4.00 28.70 0.0287 1.59E-05 5.2405 5.3850E-07
40 2400 8.20 36.90 0.0369 1.54E-05 5.2405 5.1927E-07
50 3000 8.30 45.20 0.0452 1.51E-05 5.2405 5.0886E-07
60 3600 8.20 53.40 0.0534 1.48E-05 5.2405 5.0098E-07

K(max.)= 6.0793E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 4.9918E-07 m/sec
50.00 m/sec
K(min.)= 0.0000E+00
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-107 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.5013E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.90 1.80 0.0018 1.50E-05 5.2405 5.0661E-07
3 180 1.10 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 1.20 4.10 0.0041 1.71E-05 5.2405 5.7697E-07
5 300 1.40 5.50 0.0055 1.83E-05 5.2405 6.1919E-07
6 360 1.20 6.70 0.0067 1.86E-05 5.2405 6.2857E-07
7 420 1.10 7.80 0.0078 1.86E-05 5.2405 6.2723E-07
8 480 1.20 9.00 0.009 1.88E-05 5.2405 6.3326E-07
9 540 1.60 10.60 0.0106 1.96E-05 5.2405 6.6297E-07
10 600 2.00 12.60 0.0126 2.10E-05 5.2405 7.0925E-07
12 720 2.50 15.10 0.0151 2.10E-05 5.2405 7.0831E-07
14 840 3.00 18.10 0.0181 2.15E-05 5.2405 7.2774E-07
16 960 3.00 21.10 0.0211 2.20E-05 5.2405 7.4232E-07
18 1080 3.50 24.60 0.0246 2.28E-05 5.2405 7.6929E-07
20 1200 4.00 28.60 0.0286 2.38E-05 5.2405 8.0494E-07
25 1500 4.50 33.10 0.0331 2.21E-05 5.2405 7.4527E-07
30 1800 4.00 37.10 0.0371 2.06E-05 5.2405 6.9611E-07
40 2400 7.80 44.90 0.0449 1.87E-05 5.2405 6.3185E-07
50 3000 7.90 52.80 0.0528 1.76E-05 5.2405 5.9442E-07
60 3600 7.70 60.50 0.0605 1.68E-05 5.2405 5.6759E-07

K(max.)= 8.0494E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.5013E-07 m/sec
60.00
K(min.)= 5.0661E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-106 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.8416E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 1.00 1.90 0.0019 1.58E-05 5.2405 5.3475E-07
3 180 1.10 3.00 0.003 1.67E-05 5.2405 5.6290E-07
4 240 1.20 4.20 0.0042 1.75E-05 5.2405 5.9104E-07
5 300 1.30 5.50 0.0055 1.83E-05 5.2405 6.1919E-07
6 360 1.20 6.70 0.0067 1.86E-05 5.2405 6.2857E-07
7 420 0.90 7.60 0.0076 1.81E-05 5.2405 6.1114E-07
8 480 1.00 8.60 0.0086 1.79E-05 5.2405 6.0511E-07
9 540 1.20 9.80 0.0098 1.81E-05 5.2405 6.1293E-07
10 600 1.40 11.20 0.0112 1.87E-05 5.2405 6.3044E-07
12 720 1.60 12.80 0.0128 1.78E-05 5.2405 6.0042E-07
14 840 2.00 14.80 0.0148 1.76E-05 5.2405 5.9506E-07
16 960 2.50 17.30 0.0173 1.80E-05 5.2405 6.0863E-07
18 1080 3.00 20.30 0.0203 1.88E-05 5.2405 6.3482E-07
20 1200 3.50 23.80 0.0238 1.98E-05 5.2405 6.6985E-07
25 1500 4.50 28.30 0.0283 1.89E-05 5.2405 6.3720E-07
30 1800 4.00 32.30 0.0323 1.79E-05 5.2405 6.0605E-07
40 2400 4.50 36.80 0.0368 1.53E-05 5.2405 5.1786E-07
50 3000 5.00 41.80 0.0418 1.39E-05 5.2405 4.7058E-07
60 3600 5.10 46.90 0.0469 1.30E-05 5.2405 4.4000E-07

K(max.)= 6.6985E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 5.8416E-07 m/sec
50.00 m/sec
K(min.)= 4.4000E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-105 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.1715E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 9.00 10.00 0.01 8.33E-05 5.2405 2.8145E-06
3 180 1.00 11.00 0.011 6.11E-05 5.2405 2.0640E-06
4 240 1.20 12.20 0.0122 5.08E-05 5.2405 1.7168E-06
5 300 1.10 13.30 0.0133 4.43E-05 5.2405 1.4973E-06
6 360 1.00 14.30 0.0143 3.97E-05 5.2405 1.3416E-06
7 420 1.20 15.50 0.0155 3.69E-05 5.2405 1.2464E-06
8 480 1.10 16.60 0.0166 3.46E-05 5.2405 1.1680E-06
9 540 1.20 17.80 0.0178 3.30E-05 5.2405 1.1133E-06
10 600 1.40 19.20 0.0192 3.20E-05 5.2405 1.0808E-06
12 720 2.00 21.20 0.0212 2.94E-05 5.2405 9.9445E-07
14 840 2.50 23.70 0.0237 2.82E-05 5.2405 9.5290E-07
16 960 3.00 26.70 0.0267 2.78E-05 5.2405 9.3933E-07
18 1080 3.50 30.20 0.0302 2.80E-05 5.2405 9.4441E-07
20 1200 3.60 33.80 0.0338 2.82E-05 5.2405 9.5129E-07
25 1500 4.50 38.30 0.0383 2.55E-05 5.2405 8.6236E-07
30 1800 5.00 43.30 0.0433 2.41E-05 5.2405 8.1245E-07
40 2400 13.20 56.50 0.0565 2.35E-05 5.2405 7.9509E-07
50 3000 13.50 70.00 0.07 2.33E-05 5.2405 7.8805E-07
60 3600 13.60 83.60 0.0836 2.32E-05 5.2405 7.8430E-07

K(max.)= 2.8145E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 1.1715E-06 m/sec
80.00
70.00 K(min.)= 5.6290E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-104 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.4198E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.20 1.20 0.0012 2.00E-05 5.2405 6.7547E-07
2 120 1.00 2.20 0.0022 1.83E-05 5.2405 6.1919E-07
3 180 1.10 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.20 4.50 0.0045 1.88E-05 5.2405 6.3326E-07
5 300 1.30 5.80 0.0058 1.93E-05 5.2405 6.5296E-07
6 360 1.40 7.20 0.0072 2.00E-05 5.2405 6.7547E-07
7 420 1.20 8.40 0.0084 2.00E-05 5.2405 6.7547E-07
8 480 1.30 9.70 0.0097 2.02E-05 5.2405 6.8251E-07
9 540 1.40 11.10 0.0111 2.06E-05 5.2405 6.9424E-07
10 600 1.50 12.60 0.0126 2.10E-05 5.2405 7.0925E-07
12 720 2.00 14.60 0.0146 2.03E-05 5.2405 6.8486E-07
14 840 2.30 16.90 0.0169 2.01E-05 5.2405 6.7950E-07
16 960 2.60 19.50 0.0195 2.03E-05 5.2405 6.8603E-07
18 1080 2.40 21.90 0.0219 2.03E-05 5.2405 6.8486E-07
20 1200 2.70 24.60 0.0246 2.05E-05 5.2405 6.9236E-07
25 1500 2.90 27.50 0.0275 1.83E-05 5.2405 6.1919E-07
30 1800 3.30 30.80 0.0308 1.71E-05 5.2405 5.7791E-07
40 2400 7.80 38.60 0.0386 1.61E-05 5.2405 5.4319E-07
50 3000 7.90 46.50 0.0465 1.55E-05 5.2405 5.2349E-07
60 3600 8.00 54.50 0.0545 1.51E-05 5.2405 5.1130E-07

K(max.)= 7.0925E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 6.4198E-07 m/sec
60.00
K(min.)= 5.1130E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-102 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.1079E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 6.67E-07 5.2405 2.2516E-08 0.00004
2 120 0.05 0.09 9E-05 7.50E-07 5.2405 2.5330E-08 0.00005
3 180 0.05 0.14 0.0001 7.50E-07 5.2405 2.5330E-08 0.000045
4 240 0.05 0.18 0.0002 7.50E-07 5.2405 2.5330E-08 0.000045
5 300 0.04 0.22 0.0002 7.33E-07 5.2405 2.4767E-08 0.00004
6 360 0.04 0.26 0.0003 7.22E-07 5.2405 2.4392E-08 0.00004
7 420 0.04 0.30 0.0003 7.14E-07 5.2405 2.4124E-08 0.00004
8 480 0.04 0.34 0.0003 7.08E-07 5.2405 2.3923E-08 0.00004
9 540 0.04 0.38 0.0004 7.04E-07 5.2405 2.3767E-08 0.00004
10 600 0.04 0.42 0.0004 7.00E-07 5.2405 2.3642E-08 0.00004
12 720 0.06 0.48 0.0005 6.60E-07 5.2405 2.2281E-08 0.000055
14 840 0.06 0.53 0.0005 6.31E-07 5.2405 2.1310E-08 0.000055
16 960 0.06 0.59 0.0006 6.15E-07 5.2405 2.0757E-08 0.00006
18 1080 0.06 0.65 0.0006 5.97E-07 5.2405 2.0170E-08 0.000055
20 1200 0.06 0.70 0.0007 5.83E-07 5.2405 1.9701E-08 0.000055
25 1500 0.06 0.76 0.0008 5.03E-07 5.2405 1.6999E-08 0.000055
30 1800 0.09 0.85 0.0008 4.69E-07 5.2405 1.5855E-08 0.00009
40 2400 0.18 1.03 0.001 4.27E-07 5.2405 1.4424E-08 0.00018
50 3000 0.19 1.22 0.0012 4.05E-07 5.2405 1.3678E-08 0.00019
60 3600 0.20 1.42 0.0014 3.93E-07 5.2405 1.3275E-08 0.0002

K(max.)= 2.5330E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

1.60
K(avr.)= 2.1079E-08 m/sec
1.40
K(min.)= 1.3275E-08 m/sec
1.20
1.00
0.80
0.60
0.40
0.20
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-101 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.7020E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 5.83E-07 5.2405 1.9701E-08
2 120 0.04 0.07 7E-05 5.92E-07 5.2405 1.9983E-08
3 180 0.04 0.11 0.0001 6.00E-07 5.2405 2.0264E-08
4 240 0.03 0.14 0.0001 5.92E-07 5.2405 1.9983E-08
5 300 0.03 0.18 0.0002 5.83E-07 5.2405 1.9701E-08
6 360 0.03 0.21 0.0002 5.78E-07 5.2405 1.9514E-08
7 420 0.03 0.24 0.0002 5.76E-07 5.2405 1.9460E-08
8 480 0.03 0.28 0.0003 5.75E-07 5.2405 1.9420E-08
9 540 0.04 0.31 0.0003 5.76E-07 5.2405 1.9451E-08
10 600 0.04 0.35 0.0003 5.78E-07 5.2405 1.9532E-08
12 720 0.04 0.39 0.0004 5.36E-07 5.2405 1.8106E-08
14 840 0.04 0.43 0.0004 5.07E-07 5.2405 1.7128E-08
16 960 0.04 0.47 0.0005 4.85E-07 5.2405 1.6394E-08
18 1080 0.04 0.51 0.0005 4.70E-07 5.2405 1.5886E-08
20 1200 0.04 0.55 0.0006 4.58E-07 5.2405 1.5480E-08
25 1500 0.07 0.62 0.0006 4.10E-07 5.2405 1.3847E-08
30 1800 0.07 0.69 0.0007 3.81E-07 5.2405 1.2853E-08
40 2400 0.15 0.84 0.0008 3.48E-07 5.2405 1.1750E-08
50 3000 0.16 1.00 0.001 3.32E-07 5.2405 1.1202E-08
60 3600 0.15 1.15 0.0011 3.18E-07 5.2405 1.0742E-08

K(max.)= 2.0264E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

1.40
K(avr.)= 1.7020E-08 m/sec
1.20
K(min.)= 1.0742E-08 m/sec
1.00

0.80

0.60

0.40

0.20

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-100 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.4118E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.98 1.88 0.0019 1.57E-05 5.2405 5.2912E-07
3 180 1.05 2.93 0.0029 1.63E-05 5.2405 5.4976E-07
4 240 1.09 4.02 0.004 1.68E-05 5.2405 5.6571E-07
5 300 1.10 5.12 0.0051 1.71E-05 5.2405 5.7641E-07
6 360 1.18 6.30 0.0063 1.75E-05 5.2405 5.9104E-07
7 420 1.19 7.49 0.0075 1.78E-05 5.2405 6.0230E-07
8 480 1.20 8.69 0.0087 1.81E-05 5.2405 6.1145E-07
9 540 1.27 9.96 0.01 1.85E-05 5.2405 6.2319E-07
10 600 1.30 11.26 0.0113 1.88E-05 5.2405 6.3382E-07
12 720 1.30 12.56 0.0126 1.74E-05 5.2405 5.8916E-07
14 840 1.39 13.95 0.014 1.66E-05 5.2405 5.6089E-07
16 960 1.40 15.35 0.0154 1.60E-05 5.2405 5.4003E-07
18 1080 1.70 17.05 0.0171 1.58E-05 5.2405 5.3319E-07
20 1200 2.00 19.05 0.0191 1.59E-05 5.2405 5.3616E-07
25 1500 2.90 21.95 0.022 1.46E-05 5.2405 4.9422E-07
30 1800 3.70 25.65 0.0257 1.43E-05 5.2405 4.8128E-07
40 2400 6.00 31.65 0.0317 1.32E-05 5.2405 4.4539E-07
50 3000 6.90 38.55 0.0386 1.29E-05 5.2405 4.3399E-07
60 3600 6.20 44.75 0.0448 1.24E-05 5.2405 4.1983E-07

K(max.)= 6.3382E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.4118E-07 m/sec
45.00
40.00 K(min.)= 4.1983E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-99 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.7376E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.15 2.25 0.0023 1.88E-05 5.2405 6.3326E-07
3 180 1.21 3.46 0.0035 1.92E-05 5.2405 6.4846E-07
4 240 1.30 4.76 0.0048 1.98E-05 5.2405 6.6985E-07
5 300 1.40 6.16 0.0062 2.05E-05 5.2405 6.9349E-07
6 360 1.60 7.76 0.0078 2.16E-05 5.2405 7.2801E-07
7 420 1.70 9.46 0.0095 2.25E-05 5.2405 7.6071E-07
8 480 1.90 11.36 0.0114 2.37E-05 5.2405 7.9931E-07
9 540 2.00 13.36 0.0134 2.47E-05 5.2405 8.3559E-07
10 600 2.40 15.76 0.0158 2.63E-05 5.2405 8.8712E-07
12 720 2.70 18.46 0.0185 2.56E-05 5.2405 8.6592E-07
14 840 3.00 21.46 0.0215 2.55E-05 5.2405 8.6284E-07
16 960 3.70 25.16 0.0252 2.62E-05 5.2405 8.8515E-07
18 1080 4.00 29.16 0.0292 2.70E-05 5.2405 9.1189E-07
20 1200 4.40 33.56 0.0336 2.80E-05 5.2405 9.4454E-07
25 1500 4.60 38.16 0.0382 2.54E-05 5.2405 8.5920E-07
30 1800 5.00 43.16 0.0432 2.40E-05 5.2405 8.0982E-07
40 2400 8.60 51.76 0.0518 2.16E-05 5.2405 7.2839E-07
50 3000 8.75 60.51 0.0605 2.02E-05 5.2405 6.8122E-07
60 3600 8.90 69.41 0.0694 1.93E-05 5.2405 6.5118E-07

K(max.)= 9.4454E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 7.7376E-07 m/sec
70.00
K(min.)= 6.1919E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-98 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.9052E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.91 0.91 0.0009 1.51E-05 5.2405 5.0998E-07
2 120 0.92 1.83 0.0018 1.52E-05 5.2405 5.1392E-07
3 180 1.00 2.83 0.0028 1.57E-05 5.2405 5.3025E-07
4 240 1.05 3.88 0.0039 1.62E-05 5.2405 5.4545E-07
5 300 2.09 5.97 0.006 1.99E-05 5.2405 6.7165E-07
6 360 1.10 7.07 0.0071 1.96E-05 5.2405 6.6290E-07
7 420 1.12 8.19 0.0082 1.95E-05 5.2405 6.5827E-07
8 480 1.16 9.35 0.0093 1.95E-05 5.2405 6.5760E-07
9 540 1.20 10.55 0.0105 1.95E-05 5.2405 6.5959E-07
10 600 1.27 11.82 0.0118 1.97E-05 5.2405 6.6512E-07
12 720 1.30 13.12 0.0131 1.82E-05 5.2405 6.1525E-07
14 840 1.50 14.62 0.0146 1.74E-05 5.2405 5.8766E-07
16 960 1.90 16.52 0.0165 1.72E-05 5.2405 5.8105E-07
18 1080 2.90 19.42 0.0194 1.80E-05 5.2405 6.0718E-07
20 1200 2.90 22.32 0.0223 1.86E-05 5.2405 6.2808E-07
25 1500 3.50 25.82 0.0258 1.72E-05 5.2405 5.8127E-07
30 1800 4.00 29.82 0.0298 1.66E-05 5.2405 5.5944E-07
40 2400 8.50 38.32 0.0383 1.60E-05 5.2405 5.3920E-07
50 3000 8.00 46.32 0.0463 1.54E-05 5.2405 5.2142E-07
60 3600 8.60 54.92 0.0549 1.53E-05 5.2405 5.1520E-07

K(max.)= 6.7165E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 5.9052E-07 m/sec
50.00 m/sec
K(min.)= 5.0998E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-97 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.7753E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.97 0.97 0.001 1.62E-05 5.2405 5.4601E-07
2 120 1.09 2.06 0.0021 1.72E-05 5.2405 5.7978E-07
3 180 1.17 3.23 0.0032 1.79E-05 5.2405 6.0605E-07
4 240 1.24 4.47 0.0045 1.86E-05 5.2405 6.2904E-07
5 300 1.31 5.78 0.0058 1.93E-05 5.2405 6.5014E-07
6 360 1.40 7.18 0.0072 1.99E-05 5.2405 6.7313E-07
7 420 1.60 8.78 0.0088 2.09E-05 5.2405 7.0563E-07
8 480 1.90 10.68 0.0107 2.22E-05 5.2405 7.5111E-07
9 540 2.20 12.88 0.0129 2.38E-05 5.2405 8.0525E-07
10 600 2.70 15.58 0.0156 2.60E-05 5.2405 8.7671E-07
12 720 3.40 18.98 0.019 2.64E-05 5.2405 8.9008E-07
14 840 3.70 22.68 0.0227 2.70E-05 5.2405 9.1169E-07
16 960 4.00 26.68 0.0267 2.78E-05 5.2405 9.3845E-07
18 1080 4.50 31.18 0.0312 2.89E-05 5.2405 9.7490E-07
20 1200 4.70 35.88 0.0359 2.99E-05 5.2405 1.0097E-06
25 1500 5.20 41.08 0.0411 2.74E-05 5.2405 9.2484E-07
30 1800 5.60 46.68 0.0467 2.59E-05 5.2405 8.7577E-07
40 2400 8.90 55.58 0.0556 2.32E-05 5.2405 7.8207E-07
50 3000 9.10 64.68 0.0647 2.16E-05 5.2405 7.2811E-07
60 3600 9.10 73.78 0.0738 2.05E-05 5.2405 6.9213E-07

K(max.)= 1.0097E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 7.7753E-07 m/sec
80.00
70.00 K(min.)= 5.4601E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.0539E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 0.97 0.97 0.001 1.62E-05 5.2405 5.4601E-07
2 120 1.00 1.97 0.002 1.64E-05 5.2405 5.5445E-07
3 180 1.11 3.08 0.0031 1.71E-05 5.2405 5.7697E-07
4 240 1.17 4.25 0.0042 1.77E-05 5.2405 5.9737E-07
5 300 1.27 5.52 0.0055 1.84E-05 5.2405 6.2087E-07
6 360 1.30 6.82 0.0068 1.89E-05 5.2405 6.3936E-07
7 420 1.40 8.22 0.0082 1.96E-05 5.2405 6.6060E-07
8 480 1.45 9.67 0.0097 2.01E-05 5.2405 6.8005E-07
9 540 1.47 11.14 0.0111 2.06E-05 5.2405 6.9643E-07
10 600 1.50 12.64 0.0126 2.11E-05 5.2405 7.1122E-07
12 720 1.59 14.23 0.0142 1.98E-05 5.2405 6.6727E-07
14 840 1.70 15.93 0.0159 1.90E-05 5.2405 6.4029E-07
16 960 2.00 17.93 0.0179 1.87E-05 5.2405 6.3062E-07
18 1080 2.27 20.19 0.0202 1.87E-05 5.2405 6.3141E-07
20 1200 2.90 23.09 0.0231 1.92E-05 5.2405 6.4989E-07
25 1500 2.99 26.08 0.0261 1.74E-05 5.2405 5.8719E-07
30 1800 3.40 29.48 0.0295 1.64E-05 5.2405 5.5312E-07
40 2400 6.90 36.38 0.0364 1.52E-05 5.2405 5.1194E-07
50 3000 6.60 42.98 0.043 1.43E-05 5.2405 4.8385E-07
60 3600 7.00 49.98 0.05 1.39E-05 5.2405 4.6888E-07

K(max.)= 7.1122E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.0539E-07 m/sec
50.00 m/sec
K(min.)= 4.6888E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-95 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.5845E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.98 1.88 0.0019 1.57E-05 5.2405 5.2912E-07
3 180 1.00 2.88 0.0029 1.60E-05 5.2405 5.4038E-07
4 240 1.09 3.97 0.004 1.65E-05 5.2405 5.5867E-07
5 300 1.20 5.17 0.0052 1.72E-05 5.2405 5.8203E-07
6 360 1.25 6.42 0.0064 1.78E-05 5.2405 6.0230E-07
7 420 1.30 7.72 0.0077 1.84E-05 5.2405 6.2079E-07
8 480 1.40 9.12 0.0091 1.90E-05 5.2405 6.4170E-07
9 540 1.60 10.72 0.0107 1.99E-05 5.2405 6.7047E-07
10 600 1.91 12.63 0.0126 2.10E-05 5.2405 7.1071E-07
12 720 2.30 14.93 0.0149 2.07E-05 5.2405 7.0015E-07
14 840 2.71 17.63 0.0176 2.10E-05 5.2405 7.0893E-07
16 960 3.40 21.03 0.021 2.19E-05 5.2405 7.3993E-07
18 1080 3.90 24.93 0.0249 2.31E-05 5.2405 7.7967E-07
20 1200 4.60 29.53 0.0295 2.46E-05 5.2405 8.3117E-07
25 1500 5.00 34.53 0.0345 2.30E-05 5.2405 7.7752E-07
30 1800 5.06 39.59 0.0396 2.20E-05 5.2405 7.4287E-07
40 2400 8.60 48.19 0.0482 2.01E-05 5.2405 6.7818E-07
50 3000 8.40 56.59 0.0566 1.89E-05 5.2405 6.3711E-07
60 3600 8.50 65.09 0.0651 1.81E-05 5.2405 6.1067E-07

K(max.)= 8.3117E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 6.5845E-07 m/sec
70.00
K(min.)= 5.0661E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-146 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3539E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.94 0.94 0.0009 1.57E-05 5.2405 5.2912E-07
2 120 1.04 1.98 0.002 1.65E-05 5.2405 5.5727E-07
3 180 1.16 3.14 0.0031 1.74E-05 5.2405 5.8916E-07
4 240 1.20 4.34 0.0043 1.81E-05 5.2405 6.1074E-07
5 300 1.27 5.61 0.0056 1.87E-05 5.2405 6.3157E-07
6 360 1.39 7.00 0.007 1.94E-05 5.2405 6.5671E-07
7 420 1.40 8.40 0.0084 2.00E-05 5.2405 6.7547E-07
8 480 1.49 9.89 0.0099 2.06E-05 5.2405 6.9588E-07
9 540 1.57 11.46 0.0115 2.12E-05 5.2405 7.1675E-07
10 600 1.66 13.12 0.0131 2.19E-05 5.2405 7.3852E-07
12 720 1.90 15.02 0.015 2.09E-05 5.2405 7.0456E-07
14 840 2.00 17.02 0.017 2.03E-05 5.2405 6.8432E-07
16 960 2.09 19.11 0.0191 1.99E-05 5.2405 6.7231E-07
18 1080 3.00 22.11 0.0221 2.05E-05 5.2405 6.9142E-07
20 1200 3.40 25.51 0.0255 2.13E-05 5.2405 7.1797E-07
25 1500 4.00 29.51 0.0295 1.97E-05 5.2405 6.6444E-07
30 1800 4.60 34.11 0.0341 1.90E-05 5.2405 6.4001E-07
40 2400 5.00 39.11 0.0391 1.63E-05 5.2405 5.5037E-07
50 3000 5.70 44.81 0.0448 1.49E-05 5.2405 5.0447E-07
60 3600 6.00 50.81 0.0508 1.41E-05 5.2405 4.7668E-07

K(max.)= 7.3852E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.3539E-07 m/sec
50.00 m/sec
K(min.)= 4.7668E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-93 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.8843E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.05 2.05 0.0021 1.71E-05 5.2405 5.7697E-07
3 180 1.10 3.15 0.0032 1.75E-05 5.2405 5.9104E-07
4 240 1.20 4.35 0.0044 1.81E-05 5.2405 6.1215E-07
5 300 1.40 5.75 0.0058 1.92E-05 5.2405 6.4733E-07
6 360 1.60 7.35 0.0074 2.04E-05 5.2405 6.8955E-07
7 420 1.71 9.06 0.0091 2.16E-05 5.2405 7.2847E-07
8 480 1.96 11.02 0.011 2.30E-05 5.2405 7.7532E-07
9 540 2.01 13.03 0.013 2.41E-05 5.2405 8.1464E-07
10 600 2.61 15.63 0.0156 2.61E-05 5.2405 8.8003E-07
12 720 5.00 20.63 0.0206 2.87E-05 5.2405 9.6790E-07
14 840 3.20 23.83 0.0238 2.84E-05 5.2405 9.5829E-07
16 960 3.40 27.23 0.0272 2.84E-05 5.2405 9.5812E-07
18 1080 4.01 31.24 0.0312 2.89E-05 5.2405 9.7694E-07
20 1200 4.60 35.84 0.0358 2.99E-05 5.2405 1.0087E-06
25 1500 4.90 40.74 0.0407 2.72E-05 5.2405 9.1730E-07
30 1800 5.00 45.74 0.0457 2.54E-05 5.2405 8.5823E-07
40 2400 10.10 55.84 0.0558 2.33E-05 5.2405 7.8580E-07
50 3000 10.30 66.14 0.0661 2.20E-05 5.2405 7.4460E-07
60 3600 10.00 76.14 0.0761 2.12E-05 5.2405 7.1431E-07

K(max.)= 1.0087E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 7.8843E-07 m/sec
80.00
70.00 K(min.)= 5.6290E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-92 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.3656E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.06 1.06 0.0011 1.77E-05 5.2405 5.9667E-07
2 120 1.10 2.16 0.0022 1.80E-05 5.2405 6.0793E-07
3 180 1.18 3.34 0.0033 1.85E-05 5.2405 6.2575E-07
4 240 1.22 4.56 0.0046 1.90E-05 5.2405 6.4128E-07
5 300 1.31 5.86 0.0059 1.95E-05 5.2405 6.6005E-07
6 360 1.40 7.26 0.0073 2.02E-05 5.2405 6.8139E-07
7 420 1.61 8.87 0.0089 2.11E-05 5.2405 7.1327E-07
8 480 1.71 10.58 0.0106 2.20E-05 5.2405 7.4415E-07
9 540 1.90 12.48 0.0125 2.31E-05 5.2405 7.8042E-07
10 600 2.61 15.09 0.0151 2.51E-05 5.2405 8.4913E-07
12 720 3.00 18.09 0.0181 2.51E-05 5.2405 8.4833E-07
14 840 3.40 21.49 0.0215 2.56E-05 5.2405 8.6384E-07
16 960 3.50 24.99 0.025 2.60E-05 5.2405 8.7900E-07
18 1080 3.50 28.49 0.0285 2.64E-05 5.2405 8.9078E-07
20 1200 3.50 31.99 0.032 2.67E-05 5.2405 9.0021E-07
25 1500 3.60 35.59 0.0356 2.37E-05 5.2405 8.0123E-07
30 1800 3.60 39.19 0.0392 2.18E-05 5.2405 7.3524E-07
40 2400 8.50 47.69 0.0477 1.99E-05 5.2405 6.7104E-07
50 3000 8.60 56.29 0.0563 1.88E-05 5.2405 6.3365E-07
60 3600 8.50 64.79 0.0648 1.80E-05 5.2405 6.0779E-07

K(max.)= 9.0021E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 7.3656E-07 m/sec
70.00
K(min.)= 5.9667E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-91 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.7289E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.92 0.92 0.0009 1.53E-05 5.2405 5.1786E-07
2 120 0.99 1.91 0.0019 1.59E-05 5.2405 5.3757E-07
3 180 1.07 2.98 0.003 1.66E-05 5.2405 5.5914E-07
4 240 1.20 4.18 0.0042 1.74E-05 5.2405 5.8752E-07
5 300 1.28 5.46 0.0055 1.82E-05 5.2405 6.1434E-07
6 360 1.39 6.85 0.0069 1.90E-05 5.2405 6.4273E-07
7 420 1.40 8.25 0.0083 1.96E-05 5.2405 6.6349E-07
8 480 1.67 9.92 0.0099 2.07E-05 5.2405 6.9820E-07
9 540 1.76 11.68 0.0117 2.16E-05 5.2405 7.3076E-07
10 600 1.92 13.61 0.0136 2.27E-05 5.2405 7.6588E-07
12 720 2.28 15.88 0.0159 2.21E-05 5.2405 7.4495E-07
14 840 2.60 18.48 0.0185 2.20E-05 5.2405 7.4306E-07
16 960 3.00 21.48 0.0215 2.24E-05 5.2405 7.5572E-07
18 1080 3.60 25.08 0.0251 2.32E-05 5.2405 7.8433E-07
20 1200 3.91 28.99 0.029 2.42E-05 5.2405 8.1600E-07
25 1500 4.20 33.19 0.0332 2.21E-05 5.2405 7.4737E-07
30 1800 4.60 37.79 0.0378 2.10E-05 5.2405 7.0912E-07
40 2400 8.01 45.80 0.0458 1.91E-05 5.2405 6.4456E-07
50 3000 8.20 54.00 0.054 1.80E-05 5.2405 6.0796E-07
60 3600 8.60 62.60 0.0626 1.74E-05 5.2405 5.8732E-07

K(max.)= 8.1600E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 6.7289E-07 m/sec
70.00
K(min.)= 5.1786E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-90 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.9953E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.10 2.10 0.0021 1.75E-05 5.2405 5.9104E-07
3 180 1.20 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.30 4.60 0.0046 1.92E-05 5.2405 6.4733E-07
5 300 1.40 6.00 0.006 2.00E-05 5.2405 6.7570E-07
6 360 1.51 7.51 0.0075 2.09E-05 5.2405 7.0465E-07
7 420 1.67 9.18 0.0092 2.19E-05 5.2405 7.3804E-07
8 480 1.92 11.10 0.0111 2.31E-05 5.2405 7.8102E-07
9 540 2.62 13.72 0.0137 2.54E-05 5.2405 8.5829E-07
10 600 2.92 16.64 0.0166 2.77E-05 5.2405 9.3688E-07
12 720 3.40 20.04 0.02 2.78E-05 5.2405 9.4022E-07
14 840 3.60 23.64 0.0236 2.81E-05 5.2405 9.5065E-07
16 960 3.90 27.54 0.0275 2.87E-05 5.2405 9.6903E-07
18 1080 4.20 31.74 0.0317 2.94E-05 5.2405 9.9270E-07
20 1200 4.60 36.34 0.0363 3.03E-05 5.2405 1.0229E-06
25 1500 4.73 41.07 0.0411 2.74E-05 5.2405 9.2475E-07
30 1800 4.90 45.97 0.046 2.55E-05 5.2405 8.6256E-07
40 2400 9.50 55.47 0.0555 2.31E-05 5.2405 7.8061E-07
50 3000 9.60 65.07 0.0651 2.17E-05 5.2405 7.3256E-07
60 3600 9.50 74.57 0.0746 2.07E-05 5.2405 6.9960E-07

K(max.)= 1.0229E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 7.9953E-07 m/sec
80.00
70.00 K(min.)= 5.6290E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-89 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.9218E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 5.83E-07 5.2405 1.9701E-08
2 120 0.04 0.08 8E-05 6.25E-07 5.2405 2.1109E-08
3 180 0.04 0.12 0.0001 6.39E-07 5.2405 2.1578E-08
4 240 0.04 0.16 0.0002 6.46E-07 5.2405 2.1812E-08
5 300 0.04 0.20 0.0002 6.57E-07 5.2405 2.2178E-08
6 360 0.04 0.24 0.0002 6.58E-07 5.2405 2.2234E-08
7 420 0.04 0.28 0.0003 6.64E-07 5.2405 2.2435E-08
8 480 0.04 0.32 0.0003 6.69E-07 5.2405 2.2586E-08
9 540 0.04 0.36 0.0004 6.72E-07 5.2405 2.2703E-08
10 600 0.04 0.41 0.0004 6.75E-07 5.2405 2.2797E-08
12 720 0.05 0.46 0.0005 6.32E-07 5.2405 2.1343E-08
14 840 0.05 0.51 0.0005 6.01E-07 5.2405 2.0304E-08
16 960 0.05 0.56 0.0006 5.78E-07 5.2405 1.9525E-08
18 1080 0.05 0.61 0.0006 5.62E-07 5.2405 1.8982E-08
20 1200 0.06 0.66 0.0007 5.52E-07 5.2405 1.8632E-08
25 1500 0.06 0.72 0.0007 4.81E-07 5.2405 1.6256E-08
30 1800 0.06 0.78 0.0008 4.36E-07 5.2405 1.4710E-08
40 2400 0.12 0.90 0.0009 3.77E-07 5.2405 1.2721E-08
50 3000 0.13 1.03 0.001 3.45E-07 5.2405 1.1641E-08
60 3600 0.15 1.18 0.0012 3.29E-07 5.2405 1.1108E-08

K(max.)= 2.2797E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

1.40
K(avr.)= 1.9218E-08 m/sec
1.20
K(min.)= 1.1108E-08 m/sec
1.00

0.80

0.60

0.40

0.20

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-88 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.0089E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 7.00E-07 5.2405 2.3642E-08
2 120 0.05 0.09 9E-05 7.25E-07 5.2405 2.4486E-08
3 180 0.04 0.13 0.0001 7.06E-07 5.2405 2.3829E-08
4 240 0.04 0.17 0.0002 6.96E-07 5.2405 2.3501E-08
5 300 0.04 0.21 0.0002 6.90E-07 5.2405 2.3304E-08
6 360 0.04 0.25 0.0002 6.86E-07 5.2405 2.3173E-08
7 420 0.04 0.29 0.0003 6.83E-07 5.2405 2.3079E-08
8 480 0.04 0.33 0.0003 6.81E-07 5.2405 2.3008E-08
9 540 0.04 0.37 0.0004 6.80E-07 5.2405 2.2954E-08
10 600 0.04 0.41 0.0004 6.82E-07 5.2405 2.3022E-08
12 720 0.05 0.45 0.0005 6.31E-07 5.2405 2.1296E-08
14 840 0.05 0.50 0.0005 5.95E-07 5.2405 2.0103E-08
16 960 0.05 0.55 0.0005 5.69E-07 5.2405 1.9209E-08
18 1080 0.05 0.59 0.0006 5.50E-07 5.2405 1.8576E-08
20 1200 0.05 0.64 0.0006 5.37E-07 5.2405 1.8125E-08
25 1500 0.07 0.71 0.0007 4.73E-07 5.2405 1.5964E-08
30 1800 0.07 0.78 0.0008 4.33E-07 5.2405 1.4617E-08
40 2400 0.18 0.96 0.001 4.00E-07 5.2405 1.3495E-08
50 3000 0.22 1.18 0.0012 3.93E-07 5.2405 1.3273E-08
60 3600 0.22 1.40 0.0014 3.89E-07 5.2405 1.3125E-08

K(max.)= 2.4486E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

1.60
K(avr.)= 2.0089E-08 m/sec
1.40
K(min.)= 1.3125E-08 m/sec
1.20
1.00
0.80
0.60
0.40
0.20
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-87 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.7483E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.04 0.04 4E-05 6.67E-07 5.2405 2.2516E-08
2 120 0.05 0.09 9E-05 7.50E-07 5.2405 2.5330E-08
3 180 0.06 0.15 0.0002 8.33E-07 5.2405 2.8145E-08
4 240 0.06 0.21 0.0002 8.75E-07 5.2405 2.9552E-08
5 300 0.06 0.27 0.0003 9.00E-07 5.2405 3.0396E-08
6 360 0.06 0.33 0.0003 9.17E-07 5.2405 3.0959E-08
7 420 0.07 0.40 0.0004 9.52E-07 5.2405 3.2165E-08
8 480 0.07 0.47 0.0005 9.79E-07 5.2405 3.3070E-08
9 540 0.07 0.54 0.0005 1.00E-06 5.2405 3.3836E-08
10 600 0.07 0.61 0.0006 1.02E-06 5.2405 3.4449E-08
12 720 0.08 0.69 0.0007 9.54E-07 5.2405 3.2226E-08
14 840 0.08 0.76 0.0008 9.07E-07 5.2405 3.0638E-08
16 960 0.08 0.84 0.0008 8.72E-07 5.2405 2.9446E-08
18 1080 0.08 0.91 0.0009 8.44E-07 5.2405 2.8520E-08
20 1200 0.08 0.99 0.001 8.25E-07 5.2405 2.7863E-08
25 1500 0.10 1.09 0.0011 7.27E-07 5.2405 2.4542E-08
30 1800 0.10 1.19 0.0012 6.61E-07 5.2405 2.2328E-08
40 2400 0.19 1.38 0.0014 5.75E-07 5.2405 1.9420E-08
50 3000 0.18 1.56 0.0016 5.20E-07 5.2405 1.7562E-08
60 3600 0.22 1.78 0.0018 4.94E-07 5.2405 1.6699E-08

K(max.)= 3.4449E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

2.50
K(avr.)= 2.7483E-08 m/sec

2.00 K(min.)= 1.6699E-08 m/sec

1.50

1.00

0.50

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-86 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.8264E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.35 0.35 0.0004 5.83E-06 5.2405 1.9701E-07
2 120 0.40 0.75 0.0008 6.25E-06 5.2405 2.1109E-07
3 180 0.40 1.15 0.0012 6.39E-06 5.2405 2.1578E-07
4 240 0.40 1.55 0.0016 6.46E-06 5.2405 2.1812E-07
5 300 0.35 1.90 0.0019 6.33E-06 5.2405 2.1390E-07
6 360 0.35 2.25 0.0023 6.25E-06 5.2405 2.1109E-07
7 420 0.35 2.60 0.0026 6.19E-06 5.2405 2.0908E-07
8 480 0.40 3.00 0.003 6.25E-06 5.2405 2.1109E-07
9 540 0.40 3.40 0.0034 6.30E-06 5.2405 2.1265E-07
10 600 0.40 3.80 0.0038 6.33E-06 5.2405 2.1390E-07
12 720 0.48 4.28 0.0043 5.94E-06 5.2405 2.0077E-07
14 840 0.49 4.77 0.0048 5.68E-06 5.2405 1.9179E-07
16 960 0.50 5.27 0.0053 5.49E-06 5.2405 1.8540E-07
18 1080 0.50 5.77 0.0058 5.34E-06 5.2405 1.8044E-07
20 1200 0.50 6.27 0.0063 5.23E-06 5.2405 1.7647E-07
25 1500 0.60 6.87 0.0069 4.58E-06 5.2405 1.5468E-07
30 1800 0.60 7.47 0.0075 4.15E-06 5.2405 1.4016E-07
40 2400 0.75 8.22 0.0082 3.43E-06 5.2405 1.1568E-07
50 3000 0.80 9.02 0.009 3.01E-06 5.2405 1.0155E-07
60 3600 0.80 9.82 0.0098 2.73E-06 5.2405 9.2127E-08

K(max.)= 2.1812E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

14.00
K(avr.)= 1.8264E-07 m/sec
12.00
K(min.)= 9.2127E-08 m/sec
10.00

8.00

6.00

4.00

2.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-85 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.4291E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.30 0.30 0.0003 5.00E-06 5.2405 1.6887E-07
2 120 0.28 0.58 0.0006 4.83E-06 5.2405 1.6324E-07
3 180 0.30 0.88 0.0009 4.89E-06 5.2405 1.6512E-07
4 240 0.28 1.16 0.0012 4.83E-06 5.2405 1.6324E-07
5 300 0.27 1.43 0.0014 4.77E-06 5.2405 1.6099E-07
6 360 0.28 1.71 0.0017 4.75E-06 5.2405 1.6043E-07
7 420 0.29 2.00 0.002 4.76E-06 5.2405 1.6083E-07
8 480 0.30 2.30 0.0023 4.79E-06 5.2405 1.6183E-07
9 540 0.30 2.60 0.0026 4.81E-06 5.2405 1.6261E-07
10 600 0.30 2.90 0.0029 4.83E-06 5.2405 1.6324E-07
12 720 0.38 3.28 0.0033 4.56E-06 5.2405 1.5386E-07
14 840 0.39 3.67 0.0037 4.37E-06 5.2405 1.4756E-07
16 960 0.40 4.07 0.0041 4.24E-06 5.2405 1.4319E-07
18 1080 0.40 4.47 0.0045 4.14E-06 5.2405 1.3979E-07
20 1200 0.40 4.87 0.0049 4.06E-06 5.2405 1.3707E-07
25 1500 0.49 5.36 0.0054 3.57E-06 5.2405 1.2068E-07
30 1800 0.50 5.86 0.0059 3.26E-06 5.2405 1.0995E-07
40 2400 1.10 6.96 0.007 2.90E-06 5.2405 9.7944E-08
50 3000 1.15 8.11 0.0081 2.70E-06 5.2405 9.1302E-08
60 3600 1.10 9.21 0.0092 2.56E-06 5.2405 8.6405E-08

K(max.)= 1.6887E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

12.00
K(avr.)= 1.4291E-07 m/sec
10.00 m/sec
K(min.)= 8.6405E-08
8.00

6.00

4.00

2.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-84 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.3800E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.20 2.30 0.0023 1.92E-05 5.2405 6.4733E-07
3 180 1.30 3.60 0.0036 2.00E-05 5.2405 6.7547E-07
4 240 1.31 4.91 0.0049 2.04E-05 5.2405 6.9053E-07
5 300 1.37 6.28 0.0063 2.09E-05 5.2405 7.0666E-07
6 360 1.40 7.68 0.0077 2.13E-05 5.2405 7.2023E-07
7 420 1.47 9.15 0.0091 2.18E-05 5.2405 7.3554E-07
8 480 1.49 10.64 0.0106 2.22E-05 5.2405 7.4844E-07
9 540 1.52 12.16 0.0122 2.25E-05 5.2405 7.6035E-07
10 600 1.54 13.70 0.0137 2.28E-05 5.2405 7.7122E-07
12 720 1.60 15.30 0.0153 2.12E-05 5.2405 7.1760E-07
14 840 1.67 16.97 0.017 2.02E-05 5.2405 6.8223E-07
16 960 1.89 18.86 0.0189 1.96E-05 5.2405 6.6337E-07
18 1080 1.92 20.78 0.0208 1.92E-05 5.2405 6.4971E-07
20 1200 2.27 23.04 0.023 1.92E-05 5.2405 6.4851E-07
25 1500 2.41 25.45 0.0254 1.70E-05 5.2405 5.7301E-07
30 1800 2.91 28.36 0.0284 1.58E-05 5.2405 5.3209E-07
40 2400 3.21 31.57 0.0316 1.32E-05 5.2405 4.4420E-07
50 3000 3.91 35.47 0.0355 1.18E-05 5.2405 3.9936E-07
60 3600 4.50 39.97 0.04 1.11E-05 5.2405 3.7502E-07

K(max.)= 7.7122E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 6.3800E-07 m/sec
45.00
40.00 K(min.)= 3.7502E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-83 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.6385E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.33 1.33 0.0013 2.21E-05 5.2405 7.4584E-07
2 120 1.38 2.70 0.0027 2.25E-05 5.2405 7.5991E-07
3 180 1.40 4.10 0.0041 2.28E-05 5.2405 7.6929E-07
4 240 1.48 5.58 0.0056 2.32E-05 5.2405 7.8454E-07
5 300 1.50 7.08 0.0071 2.36E-05 5.2405 7.9650E-07
6 360 1.59 8.67 0.0087 2.41E-05 5.2405 8.1310E-07
7 420 1.70 10.37 0.0104 2.47E-05 5.2405 8.3365E-07
8 480 1.92 12.29 0.0123 2.56E-05 5.2405 8.6468E-07
9 540 1.99 14.28 0.0143 2.64E-05 5.2405 8.9313E-07
10 600 2.00 16.28 0.0163 2.71E-05 5.2405 9.1639E-07
12 720 2.03 18.31 0.0183 2.54E-05 5.2405 8.5889E-07
14 840 2.08 20.39 0.0204 2.43E-05 5.2405 8.1966E-07
16 960 2.60 22.99 0.023 2.39E-05 5.2405 8.0867E-07
18 1080 2.70 25.69 0.0257 2.38E-05 5.2405 8.0325E-07
20 1200 3.40 29.09 0.0291 2.42E-05 5.2405 8.1862E-07
25 1500 3.60 32.69 0.0327 2.18E-05 5.2405 7.3595E-07
30 1800 3.90 36.59 0.0366 2.03E-05 5.2405 6.8647E-07
40 2400 4.25 40.84 0.0408 1.70E-05 5.2405 5.7466E-07
50 3000 5.00 45.84 0.0458 1.53E-05 5.2405 5.1602E-07
60 3600 5.10 50.94 0.0509 1.41E-05 5.2405 4.7786E-07

K(max.)= 9.1639E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 7.6385E-07 m/sec
60.00
K(min.)= 4.7786E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-82 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 7.0402E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.09 2.09 0.0021 1.74E-05 5.2405 5.8823E-07
3 180 1.20 3.29 0.0033 1.83E-05 5.2405 6.1731E-07
4 240 1.40 4.69 0.0047 1.95E-05 5.2405 6.6000E-07
5 300 1.45 6.14 0.0061 2.05E-05 5.2405 6.9124E-07
6 360 1.49 7.63 0.0076 2.12E-05 5.2405 7.1582E-07
7 420 1.50 9.13 0.0091 2.17E-05 5.2405 7.3434E-07
8 480 1.55 10.68 0.0107 2.23E-05 5.2405 7.5161E-07
9 540 1.67 12.35 0.0124 2.29E-05 5.2405 7.7254E-07
10 600 1.78 14.13 0.0141 2.36E-05 5.2405 7.9548E-07
12 720 1.92 16.06 0.0161 2.23E-05 5.2405 7.5315E-07
14 840 2.37 18.42 0.0184 2.19E-05 5.2405 7.4073E-07
16 960 2.96 21.39 0.0214 2.23E-05 5.2405 7.5235E-07
18 1080 3.41 24.79 0.0248 2.30E-05 5.2405 7.7526E-07
20 1200 3.90 28.69 0.0287 2.39E-05 5.2405 8.0756E-07
25 1500 4.20 32.89 0.0329 2.19E-05 5.2405 7.4061E-07
30 1800 4.62 37.52 0.0375 2.08E-05 5.2405 7.0390E-07
40 2400 9.50 47.02 0.047 1.96E-05 5.2405 6.6161E-07
50 3000 9.60 56.62 0.0566 1.89E-05 5.2405 6.3737E-07
60 3600 9.30 65.92 0.0659 1.83E-05 5.2405 6.1839E-07

K(max.)= 8.0756E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 7.0402E-07 m/sec
70.00
K(min.)= 5.6290E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-91 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.0635E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.01 1.01 0.001 1.68E-05 5.2405 5.6571E-07
2 120 1.00 2.01 0.002 1.67E-05 5.2405 5.6487E-07
3 180 1.11 3.11 0.0031 1.73E-05 5.2405 5.8391E-07
4 240 1.20 4.31 0.0043 1.80E-05 5.2405 6.0680E-07
5 300 1.22 5.53 0.0055 1.84E-05 5.2405 6.2279E-07
6 360 1.24 6.77 0.0068 1.88E-05 5.2405 6.3532E-07
7 420 1.30 8.07 0.0081 1.92E-05 5.2405 6.4910E-07
8 480 1.40 9.47 0.0095 1.97E-05 5.2405 6.6647E-07
9 540 1.42 10.89 0.0109 2.02E-05 5.2405 6.8123E-07
10 600 1.48 12.37 0.0124 2.06E-05 5.2405 6.9641E-07
12 720 1.57 13.94 0.0139 1.94E-05 5.2405 6.5399E-07
14 840 1.60 15.54 0.0155 1.85E-05 5.2405 6.2489E-07
16 960 1.90 17.44 0.0174 1.82E-05 5.2405 6.1363E-07
18 1080 2.60 20.04 0.02 1.86E-05 5.2405 6.2675E-07
20 1200 2.96 23.00 0.023 1.92E-05 5.2405 6.4739E-07
25 1500 3.40 26.40 0.0264 1.76E-05 5.2405 5.9446E-07
30 1800 3.60 30.00 0.03 1.67E-05 5.2405 5.6293E-07
40 2400 7.60 37.60 0.0376 1.57E-05 5.2405 5.2915E-07
50 3000 7.50 45.10 0.0451 1.50E-05 5.2405 5.0775E-07
60 3600 7.50 52.60 0.0526 1.46E-05 5.2405 4.9349E-07

K(max.)= 6.9641E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.0635E-07 m/sec
50.00 m/sec
K(min.)= 4.9349E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-80 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.2284E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.98 1.88 0.0019 1.57E-05 5.2405 5.2912E-07
3 180 0.97 2.85 0.0029 1.58E-05 5.2405 5.3475E-07
4 240 0.99 3.84 0.0038 1.60E-05 5.2405 5.4038E-07
5 300 1.00 4.84 0.0048 1.61E-05 5.2405 5.4500E-07
6 360 1.10 5.94 0.0059 1.65E-05 5.2405 5.5736E-07
7 420 1.12 7.06 0.0071 1.68E-05 5.2405 5.6780E-07
8 480 1.14 8.20 0.0082 1.71E-05 5.2405 5.7704E-07
9 540 1.20 9.40 0.0094 1.74E-05 5.2405 5.8798E-07
10 600 1.30 10.70 0.0107 1.78E-05 5.2405 6.0235E-07
12 720 1.40 12.10 0.0121 1.68E-05 5.2405 5.6763E-07
14 840 1.50 13.60 0.0136 1.62E-05 5.2405 5.4685E-07
16 960 1.60 15.20 0.0152 1.58E-05 5.2405 5.3479E-07
18 1080 1.90 17.10 0.0171 1.58E-05 5.2405 5.3478E-07
20 1200 2.40 19.50 0.0195 1.63E-05 5.2405 5.4888E-07
25 1500 2.90 22.40 0.0224 1.49E-05 5.2405 5.0440E-07
30 1800 3.60 26.00 0.026 1.44E-05 5.2405 4.8788E-07
40 2400 4.00 30.00 0.03 1.25E-05 5.2405 4.2220E-07
50 3000 4.60 34.60 0.0346 1.15E-05 5.2405 3.8955E-07
60 3600 5.00 39.60 0.0396 1.10E-05 5.2405 3.7153E-07

K(max.)= 6.0235E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.2284E-07 m/sec
45.00
40.00 K(min.)= 3.7153E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-79 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.1043E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.12 2.22 0.0022 1.85E-05 5.2405 6.2481E-07
3 180 1.14 3.36 0.0034 1.87E-05 5.2405 6.3044E-07
4 240 1.19 4.55 0.0046 1.90E-05 5.2405 6.4029E-07
5 300 1.20 5.75 0.0058 1.92E-05 5.2405 6.4733E-07
6 360 1.24 6.99 0.007 1.94E-05 5.2405 6.5577E-07
7 420 1.27 8.26 0.0083 1.97E-05 5.2405 6.6422E-07
8 480 1.30 9.56 0.0096 1.99E-05 5.2405 6.7266E-07
9 540 1.32 10.88 0.0109 2.01E-05 5.2405 6.8048E-07
10 600 1.40 12.28 0.0123 2.05E-05 5.2405 6.9124E-07
12 720 1.47 13.75 0.0138 1.91E-05 5.2405 6.4498E-07
14 840 1.67 15.42 0.0154 1.84E-05 5.2405 6.1999E-07
16 960 1.92 17.34 0.0173 1.81E-05 5.2405 6.1004E-07
18 1080 2.60 19.94 0.0199 1.85E-05 5.2405 6.2356E-07
20 1200 2.90 22.84 0.0228 1.90E-05 5.2405 6.4283E-07
25 1500 3.40 26.24 0.0262 1.75E-05 5.2405 5.9082E-07
30 1800 4.20 30.44 0.0304 1.69E-05 5.2405 5.7115E-07
40 2400 4.90 35.34 0.0353 1.47E-05 5.2405 4.9732E-07
50 3000 5.00 40.34 0.0403 1.34E-05 5.2405 4.5416E-07
60 3600 5.20 45.54 0.0455 1.27E-05 5.2405 4.2725E-07

K(max.)= 6.9124E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.1043E-07 m/sec
50.00 m/sec
K(min.)= 4.2725E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-78 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.7347E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.01 1.01 0.001 1.68E-05 5.2405 5.6571E-07
2 120 1.08 2.09 0.0021 1.74E-05 5.2405 5.8682E-07
3 180 1.10 3.19 0.0032 1.77E-05 5.2405 5.9761E-07
4 240 1.12 4.31 0.0043 1.79E-05 5.2405 6.0582E-07
5 300 1.15 5.45 0.0055 1.82E-05 5.2405 6.1367E-07
6 360 1.18 6.63 0.0066 1.84E-05 5.2405 6.2172E-07
7 420 1.18 7.81 0.0078 1.86E-05 5.2405 6.2771E-07
8 480 1.22 9.03 0.009 1.88E-05 5.2405 6.3509E-07
9 540 1.28 10.31 0.0103 1.91E-05 5.2405 6.4458E-07
10 600 1.40 11.71 0.0117 1.95E-05 5.2405 6.5893E-07
12 720 1.62 13.33 0.0133 1.85E-05 5.2405 6.2510E-07
14 840 1.78 15.11 0.0151 1.80E-05 5.2405 6.0736E-07
16 960 1.80 16.91 0.0169 1.76E-05 5.2405 5.9477E-07
18 1080 1.94 18.85 0.0188 1.75E-05 5.2405 5.8935E-07
20 1200 2.30 21.15 0.0211 1.76E-05 5.2405 5.9518E-07
25 1500 2.70 23.85 0.0238 1.59E-05 5.2405 5.3694E-07
30 1800 3.40 27.25 0.0272 1.51E-05 5.2405 5.1124E-07
40 2400 4.70 31.95 0.0319 1.33E-05 5.2405 4.4957E-07
50 3000 4.60 36.55 0.0365 1.22E-05 5.2405 4.1144E-07
60 3600 5.10 41.65 0.0416 1.16E-05 5.2405 3.9072E-07

K(max.)= 6.5893E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.7347E-07 m/sec
45.00
40.00 K(min.)= 3.9072E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-77 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.3552E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.80 1.80 0.0018 1.50E-05 5.2405 5.0661E-07
3 180 1.00 2.80 0.0028 1.56E-05 5.2405 5.2537E-07
4 240 1.20 4.00 0.004 1.67E-05 5.2405 5.6290E-07
5 300 1.10 5.10 0.0051 1.70E-05 5.2405 5.7415E-07
6 360 1.15 6.25 0.0063 1.74E-05 5.2405 5.8635E-07
7 420 1.10 7.35 0.0074 1.75E-05 5.2405 5.9104E-07
8 480 1.15 8.50 0.0085 1.77E-05 5.2405 5.9808E-07
9 540 1.15 9.65 0.0097 1.79E-05 5.2405 6.0355E-07
10 600 1.10 10.75 0.0108 1.79E-05 5.2405 6.0511E-07
12 720 1.65 12.40 0.0124 1.72E-05 5.2405 5.8166E-07
14 840 1.80 14.20 0.0142 1.69E-05 5.2405 5.7094E-07
16 960 1.80 16.00 0.016 1.67E-05 5.2405 5.6290E-07
18 1080 1.85 17.85 0.0179 1.65E-05 5.2405 5.5821E-07
20 1200 1.80 19.65 0.0197 1.64E-05 5.2405 5.5305E-07
25 1500 2.70 22.35 0.0224 1.49E-05 5.2405 5.0323E-07
30 1800 2.75 25.10 0.0251 1.39E-05 5.2405 4.7096E-07
40 2400 4.50 29.60 0.0296 1.23E-05 5.2405 4.1654E-07
50 3000 5.50 35.10 0.0351 1.17E-05 5.2405 3.9515E-07
60 3600 5.58 40.68 0.0407 1.13E-05 5.2405 3.8164E-07

K(max.)= 6.0511E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.3552E-07 m/sec
45.00
40.00 K(min.)= 3.8164E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-76 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.6191E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.10 1.10 0.0011 1.83E-05 5.2405 6.1919E-07
2 120 1.00 2.10 0.0021 1.75E-05 5.2405 5.9104E-07
3 180 1.00 3.10 0.0031 1.72E-05 5.2405 5.8166E-07
4 240 1.15 4.25 0.0043 1.77E-05 5.2405 5.9808E-07
5 300 1.20 5.45 0.0055 1.82E-05 5.2405 6.1356E-07
6 360 1.10 6.55 0.0066 1.82E-05 5.2405 6.1449E-07
7 420 1.00 7.55 0.0076 1.80E-05 5.2405 6.0712E-07
8 480 1.00 8.55 0.0086 1.78E-05 5.2405 6.0159E-07
9 540 1.00 9.55 0.0096 1.77E-05 5.2405 5.9729E-07
10 600 1.00 10.55 0.0106 1.76E-05 5.2405 5.9386E-07
12 720 1.80 12.35 0.0124 1.72E-05 5.2405 5.7931E-07
14 840 2.00 14.35 0.0144 1.71E-05 5.2405 5.7697E-07
16 960 2.10 16.45 0.0165 1.71E-05 5.2405 5.7873E-07
18 1080 2.20 18.65 0.0187 1.73E-05 5.2405 5.8322E-07
20 1200 2.20 20.85 0.0209 1.74E-05 5.2405 5.8682E-07
25 1500 3.10 23.95 0.024 1.60E-05 5.2405 5.3925E-07
30 1800 3.20 27.15 0.0272 1.51E-05 5.2405 5.0942E-07
40 2400 4.90 32.05 0.0321 1.34E-05 5.2405 4.5102E-07
50 3000 5.10 37.15 0.0372 1.24E-05 5.2405 4.1823E-07
60 3600 5.20 42.35 0.0424 1.18E-05 5.2405 3.9731E-07

K(max.)= 6.1919E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 5.6191E-07 m/sec
45.00
40.00 K(min.)= 3.9731E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-75 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.5650E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.80 1.80 0.0018 1.50E-05 5.2405 5.0661E-07
3 180 0.90 2.70 0.0027 1.50E-05 5.2405 5.0661E-07
4 240 0.80 3.50 0.0035 1.46E-05 5.2405 4.9253E-07
5 300 0.70 4.20 0.0042 1.40E-05 5.2405 4.7283E-07
6 360 0.85 5.05 0.0051 1.40E-05 5.2405 4.7377E-07
7 420 0.90 5.95 0.006 1.42E-05 5.2405 4.7846E-07
8 480 1.00 6.95 0.007 1.45E-05 5.2405 4.8902E-07
9 540 1.00 7.95 0.008 1.47E-05 5.2405 4.9722E-07
10 600 1.00 8.95 0.009 1.49E-05 5.2405 5.0379E-07
12 720 1.30 10.25 0.0103 1.42E-05 5.2405 4.8081E-07
14 840 1.40 11.65 0.0117 1.39E-05 5.2405 4.6841E-07
16 960 1.45 13.10 0.0131 1.36E-05 5.2405 4.6087E-07
18 1080 1.45 14.55 0.0146 1.35E-05 5.2405 4.5501E-07
20 1200 1.45 16.00 0.016 1.33E-05 5.2405 4.5032E-07
25 1500 2.50 18.50 0.0185 1.23E-05 5.2405 4.1654E-07
30 1800 2.50 21.00 0.021 1.17E-05 5.2405 3.9403E-07
40 2400 4.50 25.50 0.0255 1.06E-05 5.2405 3.5885E-07
50 3000 4.50 30.00 0.03 1.00E-05 5.2405 3.3774E-07
60 3600 4.50 34.50 0.0345 9.58E-06 5.2405 3.2367E-07

K(max.)= 5.6290E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 4.5650E-07 m/sec
35.00
K(min.)= 3.2367E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-74 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.4744E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.00 2.00 0.002 1.67E-05 5.2405 5.6290E-07
3 180 0.90 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 0.85 3.75 0.0038 1.56E-05 5.2405 5.2771E-07
5 300 0.90 4.65 0.0047 1.55E-05 5.2405 5.2349E-07
6 360 0.85 5.50 0.0055 1.53E-05 5.2405 5.1599E-07
7 420 0.70 6.20 0.0062 1.48E-05 5.2405 4.9856E-07
8 480 0.65 6.85 0.0069 1.43E-05 5.2405 4.8198E-07
9 540 0.80 7.65 0.0077 1.42E-05 5.2405 4.7846E-07
10 600 0.80 8.45 0.0085 1.41E-05 5.2405 4.7565E-07
12 720 1.00 9.45 0.0095 1.31E-05 5.2405 4.4328E-07
14 840 1.20 10.65 0.0107 1.27E-05 5.2405 4.2820E-07
16 960 1.20 11.85 0.0119 1.23E-05 5.2405 4.1689E-07
18 1080 1.20 13.05 0.0131 1.21E-05 5.2405 4.0810E-07
20 1200 1.15 14.20 0.0142 1.18E-05 5.2405 3.9966E-07
25 1500 2.20 16.40 0.0164 1.09E-05 5.2405 3.6926E-07
30 1800 2.40 18.80 0.0188 1.04E-05 5.2405 3.5275E-07
40 2400 4.50 23.30 0.0233 9.71E-06 5.2405 3.2789E-07
50 3000 5.00 28.30 0.0283 9.43E-06 5.2405 3.1860E-07
60 3600 5.00 33.30 0.0333 9.25E-06 5.2405 3.1241E-07

K(max.)= 5.6290E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 4.4744E-07 m/sec
35.00
K(min.)= 3.1241E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-73 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.7509E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.20 2.20 0.0022 1.83E-05 5.2405 6.1919E-07
3 180 1.10 3.30 0.0033 1.83E-05 5.2405 6.1919E-07
4 240 1.20 4.50 0.0045 1.88E-05 5.2405 6.3326E-07
5 300 1.10 5.60 0.0056 1.87E-05 5.2405 6.3044E-07
6 360 1.10 6.70 0.0067 1.86E-05 5.2405 6.2857E-07
7 420 1.00 7.70 0.0077 1.83E-05 5.2405 6.1919E-07
8 480 1.00 8.70 0.0087 1.81E-05 5.2405 6.1215E-07
9 540 1.00 9.70 0.0097 1.80E-05 5.2405 6.0668E-07
10 600 1.00 10.70 0.0107 1.78E-05 5.2405 6.0230E-07
12 720 1.80 12.50 0.0125 1.74E-05 5.2405 5.8635E-07
14 840 1.90 14.40 0.0144 1.71E-05 5.2405 5.7898E-07
16 960 2.00 16.40 0.0164 1.71E-05 5.2405 5.7697E-07
18 1080 2.00 18.40 0.0184 1.70E-05 5.2405 5.7540E-07
20 1200 2.00 20.40 0.0204 1.70E-05 5.2405 5.7415E-07
25 1500 4.50 24.90 0.0249 1.66E-05 5.2405 5.6064E-07
30 1800 4.50 29.40 0.0294 1.63E-05 5.2405 5.5164E-07
40 2400 5.00 34.40 0.0344 1.43E-05 5.2405 4.8409E-07
50 3000 5.50 39.90 0.0399 1.33E-05 5.2405 4.4919E-07
60 3600 6.00 45.90 0.0459 1.28E-05 5.2405 4.3062E-07

K(max.)= 6.3326E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 5.7509E-07 m/sec
50.00 m/sec
K(min.)= 4.3062E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-72 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.7687E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.00 2.00 0.002 1.67E-05 5.2405 5.6290E-07
3 180 1.00 3.00 0.003 1.67E-05 5.2405 5.6290E-07
4 240 1.10 4.10 0.0041 1.71E-05 5.2405 5.7697E-07
5 300 1.05 5.15 0.0052 1.72E-05 5.2405 5.7978E-07
6 360 1.02 6.17 0.0062 1.71E-05 5.2405 5.7884E-07
7 420 1.00 7.17 0.0072 1.71E-05 5.2405 5.7657E-07
8 480 1.02 8.19 0.0082 1.71E-05 5.2405 5.7626E-07
9 540 1.10 9.29 0.0093 1.72E-05 5.2405 5.8103E-07
10 600 1.05 10.34 0.0103 1.72E-05 5.2405 5.8203E-07
12 720 2.50 12.84 0.0128 1.78E-05 5.2405 6.0230E-07
14 840 2.50 15.34 0.0153 1.83E-05 5.2405 6.1677E-07
16 960 2.50 17.84 0.0178 1.86E-05 5.2405 6.2763E-07
18 1080 2.45 20.29 0.0203 1.88E-05 5.2405 6.3451E-07
20 1200 2.45 22.74 0.0227 1.90E-05 5.2405 6.4001E-07
25 1500 4.50 27.24 0.0272 1.82E-05 5.2405 6.1333E-07
30 1800 5.00 32.24 0.0322 1.79E-05 5.2405 6.0493E-07
40 2400 5.00 37.24 0.0372 1.55E-05 5.2405 5.2406E-07
50 3000 5.50 42.74 0.0427 1.42E-05 5.2405 4.8116E-07
60 3600 5.50 48.24 0.0482 1.34E-05 5.2405 4.5257E-07

K(max.)= 6.4001E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 5.7687E-07 m/sec
50.00 m/sec
K(min.)= 4.5257E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-71 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 3.8543E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.80 0.80 0.0008 1.33E-05 5.2405 4.5032E-07
2 120 0.75 1.55 0.0016 1.29E-05 5.2405 4.3624E-07
3 180 0.70 2.25 0.0023 1.25E-05 5.2405 4.2217E-07
4 240 0.71 2.96 0.003 1.23E-05 5.2405 4.1654E-07
5 300 0.76 3.72 0.0037 1.24E-05 5.2405 4.1879E-07
6 360 0.65 4.37 0.0044 1.21E-05 5.2405 4.0998E-07
7 420 0.75 5.12 0.0051 1.22E-05 5.2405 4.1172E-07
8 480 0.80 5.92 0.0059 1.23E-05 5.2405 4.1654E-07
9 540 0.90 6.82 0.0068 1.26E-05 5.2405 4.2655E-07
10 600 1.00 7.82 0.0078 1.30E-05 5.2405 4.4018E-07
12 720 1.10 8.92 0.0089 1.24E-05 5.2405 4.1842E-07
14 840 1.20 10.12 0.0101 1.20E-05 5.2405 4.0689E-07
16 960 1.20 11.32 0.0113 1.18E-05 5.2405 3.9825E-07
18 1080 1.30 12.62 0.0126 1.17E-05 5.2405 3.9465E-07
20 1200 1.35 13.97 0.014 1.16E-05 5.2405 3.9318E-07
25 1500 1.55 15.52 0.0155 1.03E-05 5.2405 3.4945E-07
30 1800 1.60 17.12 0.0171 9.51E-06 5.2405 3.2123E-07
40 2400 2.80 19.92 0.0199 8.30E-06 5.2405 2.8032E-07
50 3000 2.90 22.82 0.0228 7.61E-06 5.2405 2.5691E-07
60 3600 2.80 25.62 0.0256 7.12E-06 5.2405 2.4036E-07

K(max.)= 4.5032E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

35.00
K(avr.)= 3.8543E-07 m/sec
30.00
K(min.)= 2.4036E-07 m/sec
25.00

20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-70 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 8.5162E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.60 1.60 0.0016 2.67E-05 5.2405 9.0063E-07
2 120 1.70 3.30 0.0033 2.75E-05 5.2405 9.2878E-07
3 180 1.80 5.10 0.0051 2.83E-05 5.2405 9.5692E-07
4 240 1.60 6.70 0.0067 2.79E-05 5.2405 9.4285E-07
5 300 1.80 8.50 0.0085 2.83E-05 5.2405 9.5692E-07
6 360 1.70 10.20 0.0102 2.83E-05 5.2405 9.5692E-07
7 420 1.80 12.00 0.012 2.86E-05 5.2405 9.6496E-07
8 480 1.70 13.70 0.0137 2.85E-05 5.2405 9.6396E-07
9 540 1.80 15.50 0.0155 2.87E-05 5.2405 9.6943E-07
10 600 1.70 17.20 0.0172 2.87E-05 5.2405 9.6818E-07
12 720 2.20 19.40 0.0194 2.69E-05 5.2405 9.1001E-07
14 840 2.40 21.80 0.0218 2.60E-05 5.2405 8.7651E-07
16 960 2.50 24.30 0.0243 2.53E-05 5.2405 8.5490E-07
18 1080 2.50 26.80 0.0268 2.48E-05 5.2405 8.3809E-07
20 1200 3.50 30.30 0.0303 2.53E-05 5.2405 8.5279E-07
25 1500 4.00 34.30 0.0343 2.29E-05 5.2405 7.7229E-07
30 1800 4.50 38.80 0.0388 2.16E-05 5.2405 7.2801E-07
40 2400 5.00 43.80 0.0438 1.83E-05 5.2405 6.1637E-07
50 3000 5.50 49.30 0.0493 1.64E-05 5.2405 5.5502E-07
60 3600 6.00 55.30 0.0553 1.54E-05 5.2405 5.1880E-07

K(max.)= 9.6943E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 8.5162E-07 m/sec
60.00
K(min.)= 5.1880E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-69 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.9670E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.90 1.90 0.0019 1.58E-05 5.2405 5.3475E-07
3 180 1.00 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 1.10 4.00 0.004 1.67E-05 5.2405 5.6290E-07
5 300 1.00 5.00 0.005 1.67E-05 5.2405 5.6290E-07
6 360 1.15 6.15 0.0062 1.71E-05 5.2405 5.7697E-07
7 420 1.10 7.25 0.0073 1.73E-05 5.2405 5.8300E-07
8 480 0.90 8.15 0.0082 1.70E-05 5.2405 5.7345E-07
9 540 1.00 9.15 0.0092 1.69E-05 5.2405 5.7228E-07
10 600 1.00 10.15 0.0102 1.69E-05 5.2405 5.7134E-07
12 720 1.30 11.45 0.0115 1.59E-05 5.2405 5.3710E-07
14 840 1.35 12.80 0.0128 1.52E-05 5.2405 5.1465E-07
16 960 1.30 14.10 0.0141 1.47E-05 5.2405 4.9605E-07
18 1080 1.34 15.44 0.0154 1.43E-05 5.2405 4.8284E-07
20 1200 1.40 16.84 0.0168 1.40E-05 5.2405 4.7396E-07
25 1500 2.00 18.84 0.0188 1.26E-05 5.2405 4.2420E-07
30 1800 2.10 20.94 0.0209 1.16E-05 5.2405 3.9290E-07
40 2400 3.80 24.74 0.0247 1.03E-05 5.2405 3.4815E-07
50 3000 3.60 28.34 0.0283 9.45E-06 5.2405 3.1905E-07
60 3600 3.70 32.04 0.032 8.90E-06 5.2405 3.0059E-07

K(max.)= 5.8300E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 4.9670E-07 m/sec
35.00
K(min.)= 3.0059E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-68 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.8293E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.80 1.80 0.0018 1.50E-05 5.2405 5.0661E-07
3 180 0.90 2.70 0.0027 1.50E-05 5.2405 5.0661E-07
4 240 0.60 3.30 0.0033 1.38E-05 5.2405 4.6439E-07
5 300 0.80 4.10 0.0041 1.37E-05 5.2405 4.6157E-07
6 360 1.00 5.10 0.0051 1.42E-05 5.2405 4.7846E-07
7 420 1.10 6.20 0.0062 1.48E-05 5.2405 4.9856E-07
8 480 1.20 7.40 0.0074 1.54E-05 5.2405 5.2068E-07
9 540 1.30 8.70 0.0087 1.61E-05 5.2405 5.4413E-07
10 600 1.40 10.10 0.0101 1.68E-05 5.2405 5.6852E-07
12 720 1.45 11.55 0.0116 1.60E-05 5.2405 5.4179E-07
14 840 1.60 13.15 0.0132 1.57E-05 5.2405 5.2872E-07
16 960 1.65 14.80 0.0148 1.54E-05 5.2405 5.2068E-07
18 1080 1.70 16.50 0.0165 1.53E-05 5.2405 5.1599E-07
20 1200 1.75 18.25 0.0183 1.52E-05 5.2405 5.1364E-07
25 1500 2.00 20.25 0.0203 1.35E-05 5.2405 4.5595E-07
30 1800 2.20 22.45 0.0225 1.25E-05 5.2405 4.2123E-07
40 2400 4.20 26.65 0.0267 1.11E-05 5.2405 3.7503E-07
50 3000 4.10 30.75 0.0308 1.03E-05 5.2405 3.4618E-07
60 3600 4.10 34.85 0.0349 9.68E-06 5.2405 3.2695E-07

K(max.)= 5.6852E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

45.00
K(avr.)= 4.8293E-07 m/sec
40.00
35.00 K(min.)= 3.2695E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-67 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.0165E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.00 2.00 0.002 1.67E-05 5.2405 5.6290E-07
3 180 0.90 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 0.95 3.85 0.0039 1.60E-05 5.2405 5.4179E-07
5 300 1.00 4.85 0.0049 1.62E-05 5.2405 5.4601E-07
6 360 1.10 5.95 0.006 1.65E-05 5.2405 5.5821E-07
7 420 1.10 7.05 0.0071 1.68E-05 5.2405 5.6692E-07
8 480 1.15 8.20 0.0082 1.71E-05 5.2405 5.7697E-07
9 540 1.10 9.30 0.0093 1.72E-05 5.2405 5.8166E-07
10 600 1.00 10.30 0.0103 1.72E-05 5.2405 5.7978E-07
12 720 1.30 11.60 0.0116 1.61E-05 5.2405 5.4413E-07
14 840 1.40 13.00 0.013 1.55E-05 5.2405 5.2269E-07
16 960 1.45 14.45 0.0145 1.51E-05 5.2405 5.0837E-07
18 1080 1.40 15.85 0.0159 1.47E-05 5.2405 4.9566E-07
20 1200 1.49 17.34 0.0173 1.45E-05 5.2405 4.8803E-07
25 1500 1.80 19.14 0.0191 1.28E-05 5.2405 4.3095E-07
30 1800 1.90 21.04 0.021 1.17E-05 5.2405 3.9478E-07
40 2400 4.60 25.64 0.0256 1.07E-05 5.2405 3.6082E-07
50 3000 4.60 30.24 0.0302 1.01E-05 5.2405 3.4044E-07
60 3600 4.50 34.74 0.0347 9.65E-06 5.2405 3.2592E-07

K(max.)= 5.8166E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 5.0165E-07 m/sec
35.00
K(min.)= 3.2592E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-66 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.7938E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 0.90 1.90 0.0019 1.58E-05 5.2405 5.3475E-07
3 180 1.00 2.90 0.0029 1.61E-05 5.2405 5.4413E-07
4 240 0.89 3.79 0.0038 1.58E-05 5.2405 5.3334E-07
5 300 0.90 4.69 0.0047 1.56E-05 5.2405 5.2800E-07
6 360 1.00 5.69 0.0057 1.58E-05 5.2405 5.3381E-07
7 420 1.00 6.69 0.0067 1.59E-05 5.2405 5.3797E-07
8 480 1.00 7.69 0.0077 1.60E-05 5.2405 5.4108E-07
9 540 1.00 8.69 0.0087 1.61E-05 5.2405 5.4351E-07
10 600 1.05 9.74 0.0097 1.62E-05 5.2405 5.4826E-07
12 720 1.20 10.94 0.0109 1.52E-05 5.2405 5.1317E-07
14 840 1.30 12.24 0.0122 1.46E-05 5.2405 4.9213E-07
16 960 1.25 13.49 0.0135 1.41E-05 5.2405 4.7459E-07
18 1080 1.30 14.79 0.0148 1.37E-05 5.2405 4.6251E-07
20 1200 1.50 16.29 0.0163 1.36E-05 5.2405 4.5848E-07
25 1500 1.50 17.79 0.0178 1.19E-05 5.2405 4.0056E-07
30 1800 2.50 20.29 0.0203 1.13E-05 5.2405 3.8071E-07
40 2400 4.50 24.79 0.0248 1.03E-05 5.2405 3.4885E-07
50 3000 4.60 29.39 0.0294 9.80E-06 5.2405 3.3087E-07
60 3600 4.50 33.89 0.0339 9.41E-06 5.2405 3.1794E-07

K(max.)= 5.6290E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 4.7938E-07 m/sec
35.00
K(min.)= 3.1794E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-65 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.0501E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.85 1.75 0.0018 1.46E-05 5.2405 4.9253E-07
3 180 0.90 2.65 0.0027 1.47E-05 5.2405 4.9722E-07
4 240 0.89 3.54 0.0035 1.48E-05 5.2405 4.9816E-07
5 300 0.78 4.32 0.0043 1.44E-05 5.2405 4.8634E-07
6 360 0.75 5.07 0.0051 1.41E-05 5.2405 4.7565E-07
7 420 0.76 5.83 0.0058 1.39E-05 5.2405 4.6881E-07
8 480 0.80 6.63 0.0066 1.38E-05 5.2405 4.6650E-07
9 540 0.85 7.48 0.0075 1.39E-05 5.2405 4.6783E-07
10 600 0.80 8.28 0.0083 1.38E-05 5.2405 4.6608E-07
12 720 0.85 9.13 0.0091 1.27E-05 5.2405 4.2827E-07
14 840 0.86 9.99 0.01 1.19E-05 5.2405 4.0147E-07
16 960 0.90 10.89 0.0109 1.13E-05 5.2405 3.8295E-07
18 1080 1.00 11.89 0.0119 1.10E-05 5.2405 3.7167E-07
20 1200 1.00 12.89 0.0129 1.07E-05 5.2405 3.6265E-07
25 1500 1.40 14.29 0.0143 9.52E-06 5.2405 3.2164E-07
30 1800 1.46 15.75 0.0157 8.75E-06 5.2405 2.9543E-07
40 2400 2.50 18.25 0.0182 7.60E-06 5.2405 2.5675E-07
50 3000 2.55 20.80 0.0208 6.93E-06 5.2405 2.3411E-07
60 3600 2.60 23.40 0.0234 6.50E-06 5.2405 2.1948E-07

K(max.)= 5.0661E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

30.00
K(avr.)= 4.0501E-07 m/sec
25.00 m/sec
K(min.)= 2.1948E-07
20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-64 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 3.9298E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.90 0.90 0.0009 1.50E-05 5.2405 5.0661E-07
2 120 0.80 1.70 0.0017 1.42E-05 5.2405 4.7846E-07
3 180 0.70 2.40 0.0024 1.33E-05 5.2405 4.5032E-07
4 240 0.80 3.20 0.0032 1.33E-05 5.2405 4.5032E-07
5 300 0.80 4.00 0.004 1.33E-05 5.2405 4.5032E-07
6 360 0.79 4.79 0.0048 1.33E-05 5.2405 4.4938E-07
7 420 0.82 5.61 0.0056 1.33E-05 5.2405 4.5072E-07
8 480 0.85 6.46 0.0065 1.34E-05 5.2405 4.5419E-07
9 540 0.80 7.26 0.0073 1.34E-05 5.2405 4.5376E-07
10 600 0.80 8.06 0.0081 1.34E-05 5.2405 4.5341E-07
12 720 1.00 9.06 0.0091 1.26E-05 5.2405 4.2475E-07
14 840 1.00 10.06 0.0101 1.20E-05 5.2405 4.0428E-07
16 960 1.00 11.06 0.0111 1.15E-05 5.2405 3.8893E-07
18 1080 1.01 12.07 0.0121 1.12E-05 5.2405 3.7730E-07
20 1200 1.02 13.08 0.0131 1.09E-05 5.2405 3.6813E-07
25 1500 1.20 14.28 0.0143 9.52E-06 5.2405 3.2153E-07
30 1800 1.25 15.53 0.0155 8.63E-06 5.2405 2.9139E-07
40 2400 2.30 17.83 0.0178 7.43E-06 5.2405 2.5091E-07
50 3000 2.20 20.03 0.02 6.68E-06 5.2405 2.2550E-07
60 3600 2.30 22.33 0.0223 6.20E-06 5.2405 2.0949E-07

K(max.)= 5.0661E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

30.00
K(avr.)= 3.9298E-07 m/sec
25.00 m/sec
K(min.)= 2.0949E-07
20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-63 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.2619E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.60 0.60 0.0006 1.00E-05 5.2405 3.3774E-07
2 120 0.80 1.40 0.0014 1.17E-05 5.2405 3.9403E-07
3 180 0.85 2.25 0.0023 1.25E-05 5.2405 4.2217E-07
4 240 0.80 3.05 0.0031 1.27E-05 5.2405 4.2921E-07
5 300 0.90 3.95 0.004 1.32E-05 5.2405 4.4469E-07
6 360 0.85 4.80 0.0048 1.33E-05 5.2405 4.5032E-07
7 420 1.00 5.80 0.0058 1.38E-05 5.2405 4.6640E-07
8 480 1.00 6.80 0.0068 1.42E-05 5.2405 4.7846E-07
9 540 0.90 7.70 0.0077 1.43E-05 5.2405 4.8159E-07
10 600 0.95 8.65 0.0087 1.44E-05 5.2405 4.8690E-07
12 720 1.30 9.95 0.01 1.38E-05 5.2405 4.6673E-07
14 840 1.50 11.45 0.0115 1.36E-05 5.2405 4.6037E-07
16 960 1.55 13.00 0.013 1.35E-05 5.2405 4.5735E-07
18 1080 1.80 14.80 0.0148 1.37E-05 5.2405 4.6283E-07
20 1200 2.00 16.80 0.0168 1.40E-05 5.2405 4.7283E-07
25 1500 2.50 19.30 0.0193 1.29E-05 5.2405 4.3456E-07
30 1800 2.55 21.85 0.0219 1.21E-05 5.2405 4.0998E-07
40 2400 3.00 24.85 0.0249 1.04E-05 5.2405 3.4970E-07
50 3000 3.50 28.35 0.0284 9.45E-06 5.2405 3.1916E-07
60 3600 3.50 31.85 0.0319 8.85E-06 5.2405 2.9880E-07

K(max.)= 4.8690E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 4.2619E-07 m/sec
35.00
K(min.)= 2.9880E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-61 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 4.3601E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0 0.00 0.00 0.00 5.2405 0.00
1 60 0.80 0.80 0.0008 1.33E-05 5.2405 4.5032E-07
2 120 0.90 1.70 0.0017 1.42E-05 5.2405 4.7846E-07
3 180 1.00 2.70 0.0027 1.50E-05 5.2405 5.0661E-07
4 240 1.00 3.70 0.0037 1.54E-05 5.2405 5.2068E-07
5 300 0.80 4.50 0.0045 1.50E-05 5.2405 5.0661E-07
6 360 0.90 5.40 0.0054 1.50E-05 5.2405 5.0661E-07
7 420 0.80 6.20 0.0062 1.48E-05 5.2405 4.9856E-07
8 480 0.90 7.10 0.0071 1.48E-05 5.2405 4.9957E-07
9 540 1.00 8.10 0.0081 1.50E-05 5.2405 5.0661E-07
10 600 1.20 9.30 0.0093 1.55E-05 5.2405 5.2349E-07
12 720 1.30 10.60 0.0106 1.47E-05 5.2405 4.9722E-07
14 840 1.00 11.60 0.0116 1.38E-05 5.2405 4.6640E-07
16 960 1.20 12.80 0.0128 1.33E-05 5.2405 4.5032E-07
18 1080 1.10 13.90 0.0139 1.29E-05 5.2405 4.3468E-07
20 1200 1.00 14.90 0.0149 1.24E-05 5.2405 4.1936E-07
25 1500 1.20 16.10 0.0161 1.07E-05 5.2405 3.6250E-07
30 1800 1.30 17.40 0.0174 9.67E-06 5.2405 3.2648E-07
40 2400 2.40 19.80 0.0198 8.25E-06 5.2405 2.7863E-07
50 3000 2.60 22.40 0.0224 7.47E-06 5.2405 2.5218E-07
60 3600 2.65 25.05 0.0251 6.96E-06 5.2405 2.3501E-07

K(max.)= 5.2349E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

30.00
K(avr.)= 4.3601E-07 m/sec
25.00 m/sec
K(min.)= 2.3501E-07
20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-60 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.4073E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.00 0.00 0.00 0.00 5.2405 0.00
1 60 1.00 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.00 2.00 0.002 1.67E-05 5.2405 5.6290E-07
3 180 1.50 3.50 0.0035 1.94E-05 5.2405 6.5671E-07
4 240 1.60 5.10 0.0051 2.13E-05 5.2405 7.1769E-07
5 300 0.70 5.80 0.0058 1.93E-05 5.2405 6.5296E-07
6 360 1.00 6.80 0.0068 1.89E-05 5.2405 6.3795E-07
7 420 0.60 7.40 0.0074 1.76E-05 5.2405 5.9506E-07
8 480 1.00 8.40 0.0084 1.75E-05 5.2405 5.9104E-07
9 540 1.20 9.60 0.0096 1.78E-05 5.2405 6.0042E-07
10 600 1.25 10.85 0.0109 1.81E-05 5.2405 6.1074E-07
12 720 1.30 12.15 0.0122 1.69E-05 5.2405 5.6993E-07
14 840 0.90 13.05 0.0131 1.55E-05 5.2405 5.2470E-07
16 960 0.90 13.95 0.014 1.45E-05 5.2405 4.9077E-07
18 1080 2.00 15.95 0.016 1.48E-05 5.2405 4.9879E-07
20 1200 2.00 17.95 0.018 1.50E-05 5.2405 5.0520E-07
25 1500 3.20 21.15 0.0212 1.41E-05 5.2405 4.7621E-07
30 1800 2.60 23.75 0.0238 1.32E-05 5.2405 4.4563E-07
40 2400 4.50 28.25 0.0283 1.18E-05 5.2405 3.9755E-07
50 3000 4.60 32.85 0.0329 1.10E-05 5.2405 3.6982E-07
60 3600 4.20 37.05 0.0371 1.03E-05 5.2405 3.4759E-07

K(max.)= 7.1769E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

45.00
K(avr.)= 5.4073E-07 m/sec
40.00
35.00 K(min.)= 3.4759E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-36 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 3.0610E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.100 0.10 0.0001 1.67E-06 5.2405 5.6290E-08
2 120 0.700 0.80 0.0008 6.67E-06 5.2405 2.2516E-07
3 180 0.400 1.20 0.0012 6.67E-06 5.2405 2.2516E-07
4 240 0.900 2.10 0.0021 8.75E-06 5.2405 2.9552E-07
5 300 0.600 2.70 0.0027 9.00E-06 5.2405 3.0396E-07
6 360 0.800 3.50 0.0035 9.72E-06 5.2405 3.2836E-07
7 420 0.100 3.60 0.0036 8.57E-06 5.2405 2.8949E-07
8 480 3.60 0.0036 7.50E-06 5.2405 2.5330E-07
9 540 1.400 5.00 0.005 9.26E-06 5.2405 3.1272E-07
10 600 1.300 6.30 0.0063 1.05E-05 5.2405 3.5462E-07
12 720 1.500 7.80 0.0078 1.08E-05 5.2405 3.6588E-07
14 840 1.400 9.20 0.0092 1.10E-05 5.2405 3.6990E-07
16 960 9.20 0.0092 9.58E-06 5.2405 3.2367E-07
18 1080 2.100 11.30 0.0113 1.05E-05 5.2405 3.5337E-07
20 1200 2.400 13.70 0.0137 1.14E-05 5.2405 3.8558E-07
25 1500 2.600 16.30 0.0163 1.09E-05 5.2405 3.6701E-07
30 1800 3.200 19.50 0.0195 1.08E-05 5.2405 3.6588E-07
40 2400 3.600 23.10 0.0231 9.63E-06 5.2405 3.2507E-07
50 3000 4.400 27.50 0.0275 9.17E-06 5.2405 3.0959E-07
60 3600 5.700 33.20 0.0332 9.22E-06 5.2405 3.1147E-07

K(max.)= 3.8558E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

40.00
K(avr.)= 3.0610E-07 m/sec
35.00
K(min.)= 5.6290E-08 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-31 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.0652E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.950 2.95 0.003 4.92E-05 5.2405 1.6605E-06
2 120 2.800 5.75 0.0058 4.79E-05 5.2405 1.6183E-06
3 180 1.900 7.65 0.0077 4.25E-05 5.2405 1.4354E-06
4 240 1.850 9.50 0.0095 3.96E-05 5.2405 1.3369E-06
5 300 1.800 11.30 0.0113 3.77E-05 5.2405 1.2721E-06
6 360 1.600 12.90 0.0129 3.58E-05 5.2405 1.2102E-06
7 420 1.500 14.40 0.0144 3.43E-05 5.2405 1.1580E-06
8 480 1.600 16.00 0.016 3.33E-05 5.2405 1.1258E-06
9 540 1.700 17.70 0.0177 3.28E-05 5.2405 1.1070E-06
10 600 1.900 19.60 0.0196 3.27E-05 5.2405 1.1033E-06
12 720 2.300 21.90 0.0219 3.04E-05 5.2405 1.0273E-06
14 840 2.450 24.35 0.0244 2.90E-05 5.2405 9.7904E-07
16 960 2.700 27.05 0.0271 2.82E-05 5.2405 9.5165E-07
18 1080 3.000 30.05 0.0301 2.78E-05 5.2405 9.3972E-07
20 1200 3.200 33.25 0.0333 2.77E-05 5.2405 9.3581E-07
25 1500 4.150 37.40 0.0374 2.49E-05 5.2405 8.4209E-07
30 1800 4.600 42.00 0.042 2.33E-05 5.2405 7.8805E-07
40 2400 5.100 47.10 0.0471 1.96E-05 5.2405 6.6281E-07
50 3000 5.800 52.90 0.0529 1.76E-05 5.2405 5.9554E-07
60 3600 6.300 59.20 0.0592 1.64E-05 5.2405 5.5539E-07

K(max.)= 1.6605E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 1.0652E-06 m/sec
60.00
K(min.)= 5.5539E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-28 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.6202E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.280 0.28 0.0003 4.67E-06 5.2405 1.5761E-07
2 120 0.280 0.56 0.0006 4.67E-06 5.2405 1.5761E-07
3 180 0.270 0.83 0.0008 4.61E-06 5.2405 1.5573E-07
4 240 0.270 1.10 0.0011 4.58E-06 5.2405 1.5480E-07
5 300 0.270 1.37 0.0014 4.57E-06 5.2405 1.5423E-07
6 360 0.270 1.64 0.0016 4.56E-06 5.2405 1.5386E-07
7 420 0.270 1.91 0.0019 4.55E-06 5.2405 1.5359E-07
8 480 0.270 2.18 0.0022 4.54E-06 5.2405 1.5339E-07
9 540 0.270 2.45 0.0025 4.54E-06 5.2405 1.5323E-07
10 600 0.260 2.71 0.0027 4.52E-06 5.2405 1.5254E-07
12 720 0.510 3.22 0.0032 4.47E-06 5.2405 1.5104E-07
14 840 0.510 3.73 0.0037 4.44E-06 5.2405 1.4997E-07
16 960 0.510 4.24 0.0042 4.42E-06 5.2405 1.4917E-07
18 1080 0.500 4.74 0.0047 4.39E-06 5.2405 1.4823E-07
20 1200 0.500 5.24 0.0052 4.37E-06 5.2405 1.4748E-07
25 1500 2.470 7.71 0.0077 5.14E-06 5.2405 1.7360E-07
30 1800 2.460 10.17 0.0102 5.65E-06 5.2405 1.9082E-07
40 2400 2.460 12.63 0.0126 5.26E-06 5.2405 1.7773E-07
50 3000 4.840 17.47 0.0175 5.82E-06 5.2405 1.9668E-07
60 3600 4.810 22.28 0.0223 6.19E-06 5.2405 2.0902E-07

K(max.)= 2.0902E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

25.00
K(avr.)= 1.6202E-07 m/sec

20.00 K(min.)= 1.4748E-07 m/sec

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-24 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2970E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 3.000 3.00 0.003 5.00E-05 5.2405 1.6887E-06
2 120 2.800 5.80 0.0058 4.83E-05 5.2405 1.6324E-06
3 180 2.600 8.40 0.0084 4.67E-05 5.2405 1.5761E-06
4 240 2.700 11.10 0.0111 4.63E-05 5.2405 1.5620E-06
5 300 2.500 13.60 0.0136 4.53E-05 5.2405 1.5311E-06
6 360 2.200 15.80 0.0158 4.39E-05 5.2405 1.4823E-06
7 420 2.100 17.90 0.0179 4.26E-05 5.2405 1.4394E-06
8 480 2.300 20.20 0.0202 4.21E-05 5.2405 1.4213E-06
9 540 2.200 22.40 0.0224 4.15E-05 5.2405 1.4010E-06
10 600 2.200 24.60 0.0246 4.10E-05 5.2405 1.3847E-06
12 720 3.200 27.80 0.0278 3.86E-05 5.2405 1.3040E-06
14 840 3.400 31.20 0.0312 3.71E-05 5.2405 1.2545E-06
16 960 3.600 34.80 0.0348 3.63E-05 5.2405 1.2243E-06
18 1080 3.500 38.30 0.0383 3.55E-05 5.2405 1.1977E-06
20 1200 3.800 42.10 0.0421 3.51E-05 5.2405 1.1849E-06
25 1500 5.500 47.60 0.0476 3.17E-05 5.2405 1.0718E-06
30 1800 5.900 53.50 0.0535 2.97E-05 5.2405 1.0038E-06
40 2400 11.000 64.50 0.0645 2.69E-05 5.2405 9.0767E-07
50 3000 11.400 75.90 0.0759 2.53E-05 5.2405 8.5448E-07
60 3600 11.200 87.10 0.0871 2.42E-05 5.2405 8.1714E-07

K(max.)= 1.6887E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

100.00
K(avr.)= 1.2970E-06 m/sec
90.00
80.00 K(min.)= 8.1714E-07 m/sec
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-23 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.3459E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 3.200 3.20 0.0032 5.33E-05 5.2405 1.8013E-06
2 120 3.000 6.20 0.0062 5.17E-05 5.2405 1.7450E-06
3 180 2.700 8.90 0.0089 4.94E-05 5.2405 1.6699E-06
4 240 2.400 11.30 0.0113 4.71E-05 5.2405 1.5902E-06
5 300 2.500 13.80 0.0138 4.60E-05 5.2405 1.5536E-06
6 360 2.200 16.00 0.016 4.44E-05 5.2405 1.5011E-06
7 420 2.300 18.30 0.0183 4.36E-05 5.2405 1.4716E-06
8 480 2.500 20.80 0.0208 4.33E-05 5.2405 1.4635E-06
9 540 2.800 23.60 0.0236 4.37E-05 5.2405 1.4760E-06
10 600 3.300 26.90 0.0269 4.48E-05 5.2405 1.5142E-06
12 720 3.140 30.04 0.03 4.17E-05 5.2405 1.4091E-06
14 840 3.140 33.18 0.0332 3.95E-05 5.2405 1.3341E-06
16 960 3.700 36.88 0.0369 3.84E-05 5.2405 1.2975E-06
18 1080 3.900 40.78 0.0408 3.78E-05 5.2405 1.2753E-06
20 1200 4.100 44.88 0.0449 3.74E-05 5.2405 1.2631E-06
25 1500 4.800 49.68 0.0497 3.31E-05 5.2405 1.1186E-06
30 1800 5.600 55.28 0.0553 3.07E-05 5.2405 1.0372E-06
40 2400 6.700 61.98 0.062 2.58E-05 5.2405 8.7221E-07
50 3000 7.900 69.88 0.0699 2.33E-05 5.2405 7.8670E-07
60 3600 8.700 78.58 0.0786 2.18E-05 5.2405 7.3721E-07

K(max.)= 1.8013E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

100.00
K(avr.)= 1.3459E-06 m/sec
90.00
80.00 K(min.)= 7.3721E-07 m/sec
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-22 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2885E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 3.400 3.40 0.0034 5.67E-05 5.2405 1.9138E-06
2 120 2.000 5.40 0.0054 4.50E-05 5.2405 1.5198E-06
3 180 2.300 7.70 0.0077 4.28E-05 5.2405 1.4448E-06
4 240 2.200 9.90 0.0099 4.13E-05 5.2405 1.3932E-06
5 300 2.100 12.00 0.012 4.00E-05 5.2405 1.3509E-06
6 360 2.150 14.15 0.0142 3.93E-05 5.2405 1.3275E-06
7 420 2.600 16.75 0.0168 3.99E-05 5.2405 1.3469E-06
8 480 2.900 19.65 0.0197 4.09E-05 5.2405 1.3826E-06
9 540 2.800 22.45 0.0225 4.16E-05 5.2405 1.4041E-06
10 600 2.900 25.35 0.0254 4.23E-05 5.2405 1.4269E-06
12 720 3.000 28.35 0.0284 3.94E-05 5.2405 1.3298E-06
14 840 3.500 31.85 0.0319 3.79E-05 5.2405 1.2806E-06
16 960 4.400 36.25 0.0363 3.78E-05 5.2405 1.2753E-06
18 1080 4.800 41.05 0.0411 3.80E-05 5.2405 1.2837E-06
20 1200 5.000 46.05 0.0461 3.84E-05 5.2405 1.2961E-06
25 1500 5.800 51.85 0.0519 3.46E-05 5.2405 1.1674E-06
30 1800 6.600 58.45 0.0585 3.25E-05 5.2405 1.0967E-06
40 2400 7.400 65.85 0.0659 2.74E-05 5.2405 9.2667E-07
50 3000 7.900 73.75 0.0738 2.46E-05 5.2405 8.3027E-07
60 3600 8.700 82.45 0.0825 2.29E-05 5.2405 7.7351E-07

K(max.)= 1.9138E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

100.00
K(avr.)= 1.2885E-06 m/sec
90.00
80.00 K(min.)= 7.7351E-07 m/sec
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-21 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.8642E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 1.200 1.20 0.0012 2.00E-05 5.2405 6.7547E-07
2 120 1.400 2.60 0.0026 2.17E-05 5.2405 7.3176E-07
3 180 1.700 4.30 0.0043 2.39E-05 5.2405 8.0682E-07
4 240 1.500 5.80 0.0058 2.42E-05 5.2405 8.1620E-07
5 300 1.600 7.40 0.0074 2.47E-05 5.2405 8.3309E-07
6 360 1.500 8.90 0.0089 2.47E-05 5.2405 8.3496E-07
7 420 1.800 10.70 0.0107 2.55E-05 5.2405 8.6043E-07
8 480 1.400 12.10 0.0121 2.52E-05 5.2405 8.5138E-07
9 540 1.300 13.40 0.0134 2.48E-05 5.2405 8.3809E-07
10 600 1.500 14.90 0.0149 2.48E-05 5.2405 8.3871E-07
12 720 1.100 16.00 0.016 2.22E-05 5.2405 7.5053E-07
14 840 1.200 17.20 0.0172 2.05E-05 5.2405 6.9156E-07
16 960 1.700 18.90 0.0189 1.97E-05 5.2405 6.6492E-07
18 1080 1.800 20.70 0.0207 1.92E-05 5.2405 6.4733E-07
20 1200 1.700 22.40 0.0224 1.87E-05 5.2405 6.3044E-07
25 1500 2.000 24.40 0.0244 1.63E-05 5.2405 5.4939E-07
30 1800 2.100 26.50 0.0265 1.47E-05 5.2405 4.9722E-07
40 2400 4.300 30.80 0.0308 1.28E-05 5.2405 4.3343E-07
50 3000 4.600 35.40 0.0354 1.18E-05 5.2405 3.9853E-07
60 3600 4.900 40.30 0.0403 1.12E-05 5.2405 3.7808E-07

K(max.)= 8.6043E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 6.8642E-07 m/sec
45.00
40.00 K(min.)= 3.7808E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-20 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2970E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 1.000 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.600 2.60 0.0026 2.17E-05 5.2405 7.3176E-07
3 180 1.800 4.40 0.0044 2.44E-05 5.2405 8.2558E-07
4 240 2.100 6.50 0.0065 2.71E-05 5.2405 9.1471E-07
5 300 2.700 9.20 0.0092 3.07E-05 5.2405 1.0357E-06
6 360 3.300 12.50 0.0125 3.47E-05 5.2405 1.1727E-06
7 420 3.800 16.30 0.0163 3.88E-05 5.2405 1.3107E-06
8 480 4.100 20.40 0.0204 4.25E-05 5.2405 1.4354E-06
9 540 4.200 24.60 0.0246 4.56E-05 5.2405 1.5386E-06
10 600 5.200 29.80 0.0298 4.97E-05 5.2405 1.6774E-06
12 720 5.400 35.20 0.0352 4.89E-05 5.2405 1.6512E-06
14 840 5.900 41.10 0.0411 4.89E-05 5.2405 1.6525E-06
16 960 6.300 47.40 0.0474 4.94E-05 5.2405 1.6676E-06
18 1080 6.900 54.30 0.0543 5.03E-05 5.2405 1.6981E-06
20 1200 7.100 61.40 0.0614 5.12E-05 5.2405 1.7281E-06
25 1500 7.500 68.90 0.0689 4.59E-05 5.2405 1.5513E-06
30 1800 8.800 77.70 0.0777 4.32E-05 5.2405 1.4579E-06
40 2400 9.400 87.10 0.0871 3.63E-05 5.2405 1.2257E-06
50 3000 9.900 97.00 0.097 3.23E-05 5.2405 1.0920E-06
60 3600 10.600 107.60 0.1076 2.99E-05 5.2405 1.0095E-06

K(max.)= 1.7281E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

140.00
K(avr.)= 1.2970E-06 m/sec
120.00
K(min.)= 5.6290E-07 m/sec
100.00

80.00

60.00

40.00

20.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-19 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 8.4769E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 3.170 3.17 0.0032 5.28E-05 5.2405 1.7844E-06
2 120 2.000 5.17 0.0052 4.31E-05 5.2405 1.4551E-06
3 180 1.300 6.47 0.0065 3.59E-05 5.2405 1.2140E-06
4 240 1.200 7.67 0.0077 3.20E-05 5.2405 1.0794E-06
5 300 1.100 8.77 0.0088 2.92E-05 5.2405 9.8732E-07
6 360 1.250 10.02 0.01 2.78E-05 5.2405 9.4004E-07
7 420 1.400 11.42 0.0114 2.72E-05 5.2405 9.1832E-07
8 480 1.500 12.92 0.0129 2.69E-05 5.2405 9.0908E-07
9 540 1.100 14.02 0.014 2.60E-05 5.2405 8.7687E-07
10 600 1.200 15.22 0.0152 2.54E-05 5.2405 8.5673E-07
12 720 1.700 16.92 0.0169 2.35E-05 5.2405 7.9368E-07
14 840 1.700 18.62 0.0186 2.22E-05 5.2405 7.4865E-07
16 960 1.850 20.47 0.0205 2.13E-05 5.2405 7.2015E-07
18 1080 1.900 22.37 0.0224 2.07E-05 5.2405 6.9955E-07
20 1200 1.700 24.07 0.0241 2.01E-05 5.2405 6.7745E-07
25 1500 2.300 26.37 0.0264 1.76E-05 5.2405 5.9374E-07
30 1800 2.450 28.82 0.0288 1.60E-05 5.2405 5.4076E-07
40 2400 2.150 30.97 0.031 1.29E-05 5.2405 4.3582E-07
50 3000 2.600 33.57 0.0336 1.12E-05 5.2405 3.7793E-07
60 3600 3.200 36.77 0.0368 1.02E-05 5.2405 3.4496E-07

K(max.)= 1.7844E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

50.00
K(avr.)= 8.4769E-07 m/sec
45.00
40.00 K(min.)= 3.4496E-07 m/sec
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-18 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.4979E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.250 0.25 0.0003 4.17E-06 5.2405 1.4072E-07
2 120 0.220 0.47 0.0005 3.92E-06 5.2405 1.3228E-07
3 180 0.270 0.74 0.0007 4.11E-06 5.2405 1.3885E-07
4 240 0.200 0.94 0.0009 3.92E-06 5.2405 1.3228E-07
5 300 0.310 1.25 0.0013 4.17E-06 5.2405 1.4072E-07
6 360 0.320 1.57 0.0016 4.36E-06 5.2405 1.4729E-07
7 420 0.330 1.90 0.0019 4.52E-06 5.2405 1.5279E-07
8 480 0.330 2.23 0.0022 4.65E-06 5.2405 1.5691E-07
9 540 0.350 2.58 0.0026 4.78E-06 5.2405 1.6136E-07
10 600 0.300 2.88 0.0029 4.80E-06 5.2405 1.6211E-07
12 720 0.390 3.27 0.0033 4.54E-06 5.2405 1.5339E-07
14 840 0.500 3.77 0.0038 4.49E-06 5.2405 1.5158E-07
16 960 0.520 4.29 0.0043 4.47E-06 5.2405 1.5093E-07
18 1080 0.760 5.05 0.0051 4.68E-06 5.2405 1.5792E-07
20 1200 0.880 5.93 0.0059 4.94E-06 5.2405 1.6690E-07
25 1500 1.080 7.01 0.007 4.67E-06 5.2405 1.5784E-07
30 1800 1.450 8.46 0.0085 4.70E-06 5.2405 1.5874E-07
40 2400 1.900 10.36 0.0104 4.32E-06 5.2405 1.4579E-07
50 3000 2.270 12.63 0.0126 4.21E-06 5.2405 1.4219E-07
60 3600 2.840 15.47 0.0155 4.30E-06 5.2405 1.4513E-07

K(max.)= 1.6690E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

18.00
K(avr.)= 1.4979E-07 m/sec
16.00
14.00 K(min.)= 1.3228E-07 m/sec
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-17 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2729E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.990 2.99 0.003 4.98E-05 5.2405 1.6831E-06
2 120 2.780 5.77 0.0058 4.81E-05 5.2405 1.6240E-06
3 180 2.590 8.36 0.0084 4.64E-05 5.2405 1.5686E-06
4 240 2.690 11.05 0.0111 4.60E-05 5.2405 1.5550E-06
5 300 2.490 13.54 0.0135 4.51E-05 5.2405 1.5243E-06
6 360 2.190 15.73 0.0157 4.37E-05 5.2405 1.4757E-06
7 420 2.090 17.82 0.0178 4.24E-05 5.2405 1.4330E-06
8 480 2.290 20.11 0.0201 4.19E-05 5.2405 1.4150E-06
9 540 2.190 22.30 0.0223 4.13E-05 5.2405 1.3947E-06
10 600 2.190 24.49 0.0245 4.08E-05 5.2405 1.3785E-06
12 720 3.150 27.64 0.0276 3.84E-05 5.2405 1.2965E-06
14 840 3.340 30.98 0.031 3.69E-05 5.2405 1.2456E-06
16 960 3.590 34.57 0.0346 3.60E-05 5.2405 1.2162E-06
18 1080 3.430 38.00 0.038 3.52E-05 5.2405 1.1883E-06
20 1200 3.740 41.74 0.0417 3.48E-05 5.2405 1.1748E-06
25 1500 5.400 47.14 0.0471 3.14E-05 5.2405 1.0614E-06
30 1800 5.800 52.94 0.0529 2.94E-05 5.2405 9.9332E-07
40 2400 5.800 58.74 0.0587 2.45E-05 5.2405 8.2661E-07
50 3000 6.350 65.09 0.0651 2.17E-05 5.2405 7.3278E-07
60 3600 6.310 71.40 0.0714 1.98E-05 5.2405 6.6985E-07

K(max.)= 1.6831E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 1.2729E-06 m/sec
80.00
70.00 K(min.)= 6.6985E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-16 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.8520E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.150 2.15 0.0022 3.58E-05 5.2405 1.2102E-06
2 120 1.450 3.60 0.0036 3.00E-05 5.2405 1.0132E-06
3 180 1.220 4.82 0.0048 2.68E-05 5.2405 9.0439E-07
4 240 1.200 6.02 0.006 2.51E-05 5.2405 8.4716E-07
5 300 1.200 7.22 0.0072 2.41E-05 5.2405 8.1282E-07
6 360 1.250 8.47 0.0085 2.35E-05 5.2405 7.9462E-07
7 420 1.270 9.74 0.0097 2.32E-05 5.2405 7.8323E-07
8 480 1.170 10.91 0.0109 2.27E-05 5.2405 7.6765E-07
9 540 1.210 12.12 0.0121 2.24E-05 5.2405 7.5803E-07
10 600 1.180 13.30 0.0133 2.22E-05 5.2405 7.4865E-07
12 720 1.300 14.60 0.0146 2.03E-05 5.2405 6.8486E-07
14 840 1.350 15.95 0.016 1.90E-05 5.2405 6.4130E-07
16 960 1.390 17.34 0.0173 1.81E-05 5.2405 6.1004E-07
18 1080 1.330 18.67 0.0187 1.73E-05 5.2405 5.8385E-07
20 1200 1.270 19.94 0.0199 1.66E-05 5.2405 5.6121E-07
25 1500 1.530 21.47 0.0215 1.43E-05 5.2405 4.8341E-07
30 1800 1.610 23.08 0.0231 1.28E-05 5.2405 4.3305E-07
40 2400 3.890 26.97 0.027 1.12E-05 5.2405 3.7953E-07
50 3000 4.300 31.27 0.0313 1.04E-05 5.2405 3.5204E-07
60 3600 4.400 35.67 0.0357 9.91E-06 5.2405 3.3464E-07

K(max.)= 1.2102E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

45.00
K(avr.)= 6.8520E-07 m/sec
40.00
35.00 K(min.)= 3.3464E-07 m/sec
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-15 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 8.6418E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.300 2.30 0.0023 3.83E-05 5.2405 1.2947E-06
2 120 1.500 3.80 0.0038 3.17E-05 5.2405 1.0695E-06
3 180 1.450 5.25 0.0053 2.92E-05 5.2405 9.8507E-07
4 240 1.400 6.65 0.0067 2.77E-05 5.2405 9.3581E-07
5 300 1.200 7.85 0.0079 2.62E-05 5.2405 8.8375E-07
6 360 1.190 9.04 0.009 2.51E-05 5.2405 8.4810E-07
7 420 1.150 10.19 0.0102 2.43E-05 5.2405 8.1942E-07
8 480 1.150 11.34 0.0113 2.36E-05 5.2405 7.9790E-07
9 540 2.250 13.59 0.0136 2.52E-05 5.2405 8.4997E-07
10 600 2.270 15.86 0.0159 2.64E-05 5.2405 8.9275E-07
12 720 2.650 18.51 0.0185 2.57E-05 5.2405 8.6827E-07
14 840 3.100 21.61 0.0216 2.57E-05 5.2405 8.6887E-07
16 960 3.300 24.91 0.0249 2.59E-05 5.2405 8.7636E-07
18 1080 3.450 28.36 0.0284 2.63E-05 5.2405 8.8687E-07
20 1200 3.600 31.96 0.032 2.66E-05 5.2405 8.9951E-07
25 1500 3.880 35.84 0.0358 2.39E-05 5.2405 8.0697E-07
30 1800 4.120 39.96 0.04 2.22E-05 5.2405 7.4978E-07
40 2400 8.700 48.66 0.0487 2.03E-05 5.2405 6.8476E-07
50 3000 8.890 57.55 0.0576 1.92E-05 5.2405 6.4789E-07
60 3600 8.250 65.80 0.0658 1.83E-05 5.2405 6.1731E-07

K(max.)= 1.2947E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

80.00
K(avr.)= 8.6418E-07 m/sec
70.00
K(min.)= 6.1731E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-14 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 6.9489E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 1.300 1.30 0.0013 2.17E-05 5.2405 7.3176E-07
2 120 1.360 2.66 0.0027 2.22E-05 5.2405 7.4865E-07
3 180 1.390 4.05 0.0041 2.25E-05 5.2405 7.5991E-07
4 240 1.390 5.44 0.0054 2.27E-05 5.2405 7.6554E-07
5 300 1.430 6.87 0.0069 2.29E-05 5.2405 7.7342E-07
6 360 1.470 8.34 0.0083 2.32E-05 5.2405 7.8243E-07
7 420 1.490 9.83 0.0098 2.34E-05 5.2405 7.9047E-07
8 480 1.500 11.33 0.0113 2.36E-05 5.2405 7.9720E-07
9 540 1.520 12.85 0.0129 2.38E-05 5.2405 8.0369E-07
10 600 1.590 14.44 0.0144 2.41E-05 5.2405 8.1282E-07
12 720 1.810 16.25 0.0163 2.26E-05 5.2405 7.6225E-07
14 840 1.890 18.14 0.0181 2.16E-05 5.2405 7.2935E-07
16 960 1.930 20.07 0.0201 2.09E-05 5.2405 7.0608E-07
18 1080 1.980 22.05 0.0221 2.04E-05 5.2405 6.8955E-07
20 1200 2.040 24.09 0.0241 2.01E-05 5.2405 6.7801E-07
25 1500 3.510 27.60 0.0276 1.84E-05 5.2405 6.2144E-07
30 1800 3.700 31.30 0.0313 1.74E-05 5.2405 5.8729E-07
40 2400 3.920 35.22 0.0352 1.47E-05 5.2405 4.9563E-07
50 3000 4.180 39.40 0.0394 1.31E-05 5.2405 4.4356E-07
60 3600 5.240 44.64 0.0446 1.24E-05 5.2405 4.1879E-07

K(max.)= 8.1282E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

60.00
K(avr.)= 6.9489E-07 m/sec
50.00 m/sec
K(min.)= 4.1879E-07
40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-13 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.3040E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.730 2.73 0.0027 4.55E-05 5.2405 1.5367E-06
2 120 2.780 5.51 0.0055 4.59E-05 5.2405 1.5508E-06
3 180 2.800 8.31 0.0083 4.62E-05 5.2405 1.5592E-06
4 240 2.790 11.10 0.0111 4.63E-05 5.2405 1.5620E-06
5 300 2.770 13.87 0.0139 4.62E-05 5.2405 1.5615E-06
6 360 2.720 16.59 0.0166 4.61E-05 5.2405 1.5564E-06
7 420 2.600 19.19 0.0192 4.57E-05 5.2405 1.5431E-06
8 480 2.580 21.77 0.0218 4.54E-05 5.2405 1.5318E-06
9 540 2.540 24.31 0.0243 4.50E-05 5.2405 1.5204E-06
10 600 2.400 26.71 0.0267 4.45E-05 5.2405 1.5035E-06
12 720 3.050 29.76 0.0298 4.13E-05 5.2405 1.3960E-06
14 840 3.220 32.98 0.033 3.93E-05 5.2405 1.3260E-06
16 960 3.280 36.26 0.0363 3.78E-05 5.2405 1.2757E-06
18 1080 3.330 39.59 0.0396 3.67E-05 5.2405 1.2381E-06
20 1200 3.535 43.13 0.0431 3.59E-05 5.2405 1.2137E-06
25 1500 3.400 46.53 0.0465 3.10E-05 5.2405 1.0475E-06
30 1800 3.500 50.03 0.05 2.78E-05 5.2405 9.3863E-07
40 2400 7.500 57.53 0.0575 2.40E-05 5.2405 8.0951E-07
50 3000 7.400 64.93 0.0649 2.16E-05 5.2405 7.3092E-07
60 3600 7.300 72.23 0.0722 2.01E-05 5.2405 6.7759E-07

K(max.)= 1.5620E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

90.00
K(avr.)= 1.3040E-06 m/sec
80.00
70.00 K(min.)= 6.7759E-07 m/sec
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-12 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.5715E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.380 0.38 0.0004 6.33E-06 5.2405 2.1390E-07
2 120 0.310 0.69 0.0007 5.75E-06 5.2405 1.9420E-07
3 180 0.280 0.97 0.001 5.39E-06 5.2405 1.8200E-07
4 240 0.270 1.24 0.0012 5.17E-06 5.2405 1.7450E-07
5 300 0.260 1.50 0.0015 5.00E-06 5.2405 1.6887E-07
6 360 0.260 1.76 0.0018 4.89E-06 5.2405 1.6512E-07
7 420 0.270 2.03 0.002 4.83E-06 5.2405 1.6324E-07
8 480 0.260 2.29 0.0023 4.77E-06 5.2405 1.6113E-07
9 540 0.250 2.54 0.0025 4.70E-06 5.2405 1.5886E-07
10 600 0.250 2.79 0.0028 4.65E-06 5.2405 1.5705E-07
12 720 0.490 3.28 0.0033 4.56E-06 5.2405 1.5386E-07
14 840 0.490 3.77 0.0038 4.49E-06 5.2405 1.5158E-07
16 960 0.490 4.26 0.0043 4.44E-06 5.2405 1.4987E-07
18 1080 0.480 4.74 0.0047 4.39E-06 5.2405 1.4823E-07
20 1200 0.480 5.22 0.0052 4.35E-06 5.2405 1.4692E-07
25 1500 1.170 6.39 0.0064 4.26E-06 5.2405 1.4388E-07
30 1800 1.160 7.55 0.0076 4.19E-06 5.2405 1.4166E-07
40 2400 1.150 8.70 0.0087 3.63E-06 5.2405 1.2243E-07
50 3000 2.210 10.91 0.0109 3.64E-06 5.2405 1.2282E-07
60 3600 2.180 13.09 0.0131 3.64E-06 5.2405 1.2281E-07

K(max.)= 2.1390E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

16.00
K(avr.)= 1.5715E-07 m/sec
14.00
K(min.)= 1.2243E-07 m/sec
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-11 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 9.6545E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 2.860 2.86 0.0029 4.77E-05 5.2405 1.6099E-06
2 120 2.070 4.93 0.0049 4.11E-05 5.2405 1.3875E-06
3 180 1.640 6.57 0.0066 3.65E-05 5.2405 1.2327E-06
4 240 1.600 8.17 0.0082 3.40E-05 5.2405 1.1497E-06
5 300 1.550 9.72 0.0097 3.24E-05 5.2405 1.0943E-06
6 360 1.530 11.25 0.0113 3.13E-05 5.2405 1.0554E-06
7 420 1.470 12.72 0.0127 3.03E-05 5.2405 1.0229E-06
8 480 1.320 14.04 0.014 2.93E-05 5.2405 9.8788E-07
9 540 1.740 15.78 0.0158 2.92E-05 5.2405 9.8694E-07
10 600 1.820 17.60 0.0176 2.93E-05 5.2405 9.9070E-07
12 720 2.960 20.56 0.0206 2.86E-05 5.2405 9.6443E-07
14 840 2.880 23.44 0.0234 2.79E-05 5.2405 9.4245E-07
16 960 2.810 26.25 0.0263 2.73E-05 5.2405 9.2350E-07
18 1080 2.910 29.16 0.0292 2.70E-05 5.2405 9.1189E-07
20 1200 2.840 32.00 0.032 2.67E-05 5.2405 9.0063E-07
25 1500 2.910 34.91 0.0349 2.33E-05 5.2405 7.8603E-07
30 1800 2.930 37.84 0.0378 2.10E-05 5.2405 7.1000E-07
40 2400 5.200 43.04 0.043 1.79E-05 5.2405 6.0568E-07
50 3000 5.300 48.34 0.0483 1.61E-05 5.2405 5.4421E-07
60 3600 5.200 53.54 0.0535 1.49E-05 5.2405 5.0229E-07

K(max.)= 1.6099E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

70.00
K(avr.)= 9.6545E-07 m/sec
60.00
K(min.)= 5.0229E-07 m/sec
50.00

40.00

30.00

20.00

10.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-10 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.3331E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 3.040 3.04 0.003 5.07E-05 5.2405 1.7112E-06
2 120 2.700 5.74 0.0057 4.78E-05 5.2405 1.6155E-06
3 180 2.610 8.35 0.0084 4.64E-05 5.2405 1.5667E-06
4 240 2.460 10.81 0.0108 4.50E-05 5.2405 1.5212E-06
5 300 2.480 13.29 0.0133 4.43E-05 5.2405 1.4962E-06
6 360 2.530 15.82 0.0158 4.39E-05 5.2405 1.4842E-06
7 420 2.370 18.19 0.0182 4.33E-05 5.2405 1.4627E-06
8 480 2.400 20.59 0.0206 4.29E-05 5.2405 1.4488E-06
9 540 2.900 23.49 0.0235 4.35E-05 5.2405 1.4692E-06
10 600 3.070 26.56 0.0266 4.43E-05 5.2405 1.4951E-06
12 720 3.270 29.83 0.0298 4.14E-05 5.2405 1.3993E-06
14 840 3.400 33.23 0.0332 3.96E-05 5.2405 1.3361E-06
16 960 3.720 36.95 0.037 3.85E-05 5.2405 1.2999E-06
18 1080 3.950 40.90 0.0409 3.79E-05 5.2405 1.2790E-06
20 1200 4.010 44.91 0.0449 3.74E-05 5.2405 1.2640E-06
25 1500 4.930 49.84 0.0498 3.32E-05 5.2405 1.1222E-06
30 1800 5.700 55.54 0.0555 3.09E-05 5.2405 1.0421E-06
40 2400 11.200 66.74 0.0667 2.78E-05 5.2405 9.3919E-07
50 3000 11.100 77.84 0.0778 2.59E-05 5.2405 8.7632E-07
60 3600 10.900 88.74 0.0887 2.47E-05 5.2405 8.3252E-07

K(max.)= 1.7112E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

120.00
K(avr.)= 1.3331E-06 m/sec
100.00 m/sec
K(min.)= 8.3252E-07
80.00

60.00

40.00

20.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-09 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.5835E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.340 0.34 0.0003 5.67E-06 5.2405 1.9138E-07
2 120 0.220 0.56 0.0006 4.67E-06 5.2405 1.5761E-07
3 180 0.220 0.78 0.0008 4.33E-06 5.2405 1.4635E-07
4 240 0.310 1.09 0.0011 4.54E-06 5.2405 1.5339E-07
5 300 0.350 1.44 0.0014 4.80E-06 5.2405 1.6211E-07
6 360 0.330 1.77 0.0018 4.92E-06 5.2405 1.6605E-07
7 420 0.320 2.09 0.0021 4.98E-06 5.2405 1.6806E-07
8 480 0.340 2.43 0.0024 5.06E-06 5.2405 1.7098E-07
9 540 0.310 2.74 0.0027 5.07E-06 5.2405 1.7137E-07
10 600 0.310 3.05 0.0031 5.08E-06 5.2405 1.7168E-07
12 720 0.430 3.48 0.0035 4.83E-06 5.2405 1.6324E-07
14 840 0.540 4.02 0.004 4.79E-06 5.2405 1.6163E-07
16 960 0.570 4.59 0.0046 4.78E-06 5.2405 1.6148E-07
18 1080 0.580 5.17 0.0052 4.79E-06 5.2405 1.6168E-07
20 1200 0.630 5.80 0.0058 4.83E-06 5.2405 1.6324E-07
25 1500 0.980 6.78 0.0068 4.52E-06 5.2405 1.5266E-07
30 1800 1.250 8.03 0.008 4.46E-06 5.2405 1.5067E-07
40 2400 1.420 9.45 0.0095 3.94E-06 5.2405 1.3298E-07
50 3000 2.100 11.55 0.0116 3.85E-06 5.2405 1.3003E-07
60 3600 2.350 13.90 0.0139 3.86E-06 5.2405 1.3040E-07

K(max.)= 1.9138E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

16.00
K(avr.)= 1.5835E-07 m/sec
14.00
K(min.)= 1.3003E-07 m/sec
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-08 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.2808E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.250 0.25 0.0003 4.17E-06 5.2405 1.4072E-07
2 120 0.300 0.55 0.0006 4.58E-06 5.2405 1.5480E-07
3 180 0.270 0.82 0.0008 4.56E-06 5.2405 1.5386E-07
4 240 0.250 1.07 0.0011 4.46E-06 5.2405 1.5057E-07
5 300 0.200 1.27 0.0013 4.23E-06 5.2405 1.4298E-07
6 360 0.200 1.47 0.0015 4.08E-06 5.2405 1.3791E-07
7 420 0.200 1.67 0.0017 3.98E-06 5.2405 1.3429E-07
8 480 0.220 1.89 0.0019 3.94E-06 5.2405 1.3298E-07
9 540 0.200 2.09 0.0021 3.87E-06 5.2405 1.3072E-07
10 600 0.200 2.29 0.0023 3.82E-06 5.2405 1.2890E-07
12 720 0.400 2.69 0.0027 3.74E-06 5.2405 1.2618E-07
14 840 0.450 3.14 0.0031 3.74E-06 5.2405 1.2625E-07
16 960 0.500 3.64 0.0036 3.79E-06 5.2405 1.2806E-07
18 1080 0.500 4.14 0.0041 3.83E-06 5.2405 1.2947E-07
20 1200 0.520 4.66 0.0047 3.88E-06 5.2405 1.3115E-07
25 1500 0.580 5.24 0.0052 3.49E-06 5.2405 1.1798E-07
30 1800 0.600 5.84 0.0058 3.24E-06 5.2405 1.0958E-07
40 2400 1.200 7.04 0.007 2.93E-06 5.2405 9.9070E-08
50 3000 1.300 8.34 0.0083 2.78E-06 5.2405 9.3891E-08
60 3600 1.500 9.84 0.0098 2.73E-06 5.2405 9.2315E-08

K(max.)= 1.5480E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

12.00
K(avr.)= 1.2808E-07 m/sec
10.00 m/sec
K(min.)= 9.2315E-08
8.00

6.00

4.00

2.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-07 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.5249E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.300 0.30 0.0003 5.00E-06 5.2405 1.6887E-07
2 120 0.200 0.50 0.0005 4.17E-06 5.2405 1.4072E-07
3 180 0.250 0.75 0.0008 4.17E-06 5.2405 1.4072E-07
4 240 0.310 1.06 0.0011 4.42E-06 5.2405 1.4917E-07
5 300 0.320 1.38 0.0014 4.60E-06 5.2405 1.5536E-07
6 360 0.300 1.68 0.0017 4.67E-06 5.2405 1.5761E-07
7 420 0.330 2.01 0.002 4.79E-06 5.2405 1.6163E-07
8 480 0.310 2.32 0.0023 4.83E-06 5.2405 1.6324E-07
9 540 0.320 2.64 0.0026 4.89E-06 5.2405 1.6512E-07
10 600 0.320 2.96 0.003 4.93E-06 5.2405 1.6662E-07
12 720 0.460 3.42 0.0034 4.75E-06 5.2405 1.6043E-07
14 840 0.510 3.93 0.0039 4.68E-06 5.2405 1.5801E-07
16 960 0.530 4.46 0.0045 4.65E-06 5.2405 1.5691E-07
18 1080 0.560 5.02 0.005 4.65E-06 5.2405 1.5699E-07
20 1200 0.640 5.66 0.0057 4.72E-06 5.2405 1.5930E-07
25 1500 1.000 6.66 0.0067 4.44E-06 5.2405 1.4996E-07
30 1800 1.100 7.76 0.0078 4.31E-06 5.2405 1.4560E-07
40 2400 1.880 9.64 0.0096 4.02E-06 5.2405 1.3566E-07
50 3000 1.900 11.54 0.0115 3.85E-06 5.2405 1.2992E-07
60 3600 2.100 13.64 0.0136 3.79E-06 5.2405 1.2796E-07

K(max.)= 1.6887E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

16.00
K(avr.)= 1.5249E-07 m/sec
14.00
K(min.)= 1.2796E-07 m/sec
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-06 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.7577E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.350 0.35 0.0004 5.83E-06 5.2405 1.9701E-07
2 120 0.300 0.65 0.0007 5.42E-06 5.2405 1.8294E-07
3 180 0.230 0.88 0.0009 4.89E-06 5.2405 1.6512E-07
4 240 0.220 1.10 0.0011 4.58E-06 5.2405 1.5480E-07
5 300 0.200 1.30 0.0013 4.33E-06 5.2405 1.4635E-07
6 360 0.220 1.52 0.0015 4.22E-06 5.2405 1.4260E-07
7 420 0.230 1.75 0.0018 4.17E-06 5.2405 1.4072E-07
8 480 0.330 2.08 0.0021 4.33E-06 5.2405 1.4635E-07
9 540 0.450 2.53 0.0025 4.69E-06 5.2405 1.5824E-07
10 600 0.570 3.10 0.0031 5.17E-06 5.2405 1.7450E-07
12 720 0.640 3.74 0.0037 5.19E-06 5.2405 1.7544E-07
14 840 0.850 4.59 0.0046 5.46E-06 5.2405 1.8455E-07
16 960 0.890 5.48 0.0055 5.71E-06 5.2405 1.9279E-07
18 1080 0.970 6.45 0.0065 5.97E-06 5.2405 2.0170E-07
20 1200 1.130 7.58 0.0076 6.32E-06 5.2405 2.1334E-07
25 1500 1.500 9.08 0.0091 6.05E-06 5.2405 2.0444E-07
30 1800 1.870 10.95 0.011 6.08E-06 5.2405 2.0546E-07
40 2400 2.040 12.99 0.013 5.41E-06 5.2405 1.8280E-07
50 3000 2.500 15.49 0.0155 5.16E-06 5.2405 1.7439E-07
60 3600 2.830 18.32 0.0183 5.09E-06 5.2405 1.7187E-07

K(max.)= 2.1334E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

25.00
K(avr.)= 1.7577E-07 m/sec

20.00 K(min.)= 1.4072E-07 m/sec

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-05 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 1.1865E-06 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 1.000 1.00 0.001 1.67E-05 5.2405 5.6290E-07
2 120 1.400 2.40 0.0024 2.00E-05 5.2405 6.7547E-07
3 180 1.900 4.30 0.0043 2.39E-05 5.2405 8.0682E-07
4 240 2.100 6.40 0.0064 2.67E-05 5.2405 9.0063E-07
5 300 2.600 9.00 0.009 3.00E-05 5.2405 1.0132E-06
6 360 2.900 11.90 0.0119 3.31E-05 5.2405 1.1164E-06
7 420 3.100 15.00 0.015 3.57E-05 5.2405 1.2062E-06
8 480 3.500 18.50 0.0185 3.85E-05 5.2405 1.3017E-06
9 540 3.800 22.30 0.0223 4.13E-05 5.2405 1.3947E-06
10 600 4.100 26.40 0.0264 4.40E-05 5.2405 1.4860E-06
12 720 4.600 31.00 0.031 4.31E-05 5.2405 1.4541E-06
14 840 5.000 36.00 0.036 4.29E-05 5.2405 1.4474E-06
16 960 5.300 41.30 0.0413 4.30E-05 5.2405 1.4530E-06
18 1080 5.800 47.10 0.0471 4.36E-05 5.2405 1.4729E-06
20 1200 6.200 53.30 0.0533 4.44E-05 5.2405 1.5001E-06
25 1500 6.700 60.00 0.06 4.00E-05 5.2405 1.3509E-06
30 1800 7.000 67.00 0.067 3.72E-05 5.2405 1.2571E-06
40 2400 15.500 82.50 0.0825 3.44E-05 5.2405 1.1610E-06
50 3000 15.600 98.10 0.0981 3.27E-05 5.2405 1.1044E-06
60 3600 15.400 113.50 0.1135 3.15E-05 5.2405 1.0648E-06

K(max.)= 1.5001E-06 m/sec


CUMULATIVE WATER VOLUME (Litter)

140.00
K(avr.)= 1.1865E-06 m/sec
120.00
K(min.)= 5.6290E-07 m/sec
100.00

80.00

60.00

40.00

20.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-04 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.0546E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.430 0.43 0.0004 7.17E-06 5.2405 2.4205E-07
2 120 0.300 0.73 0.0007 6.08E-06 5.2405 2.0546E-07
3 180 0.330 1.06 0.0011 5.89E-06 5.2405 1.9889E-07
4 240 0.270 1.33 0.0013 5.54E-06 5.2405 1.8716E-07
5 300 0.290 1.62 0.0016 5.40E-06 5.2405 1.8238E-07
6 360 0.350 1.97 0.002 5.47E-06 5.2405 1.8482E-07
7 420 0.450 2.42 0.0024 5.76E-06 5.2405 1.9460E-07
8 480 0.470 2.89 0.0029 6.02E-06 5.2405 2.0335E-07
9 540 0.470 3.36 0.0034 6.22E-06 5.2405 2.1015E-07
10 600 0.560 3.92 0.0039 6.53E-06 5.2405 2.2066E-07
12 720 0.670 4.59 0.0046 6.38E-06 5.2405 2.1531E-07
14 840 0.750 5.34 0.0053 6.36E-06 5.2405 2.1470E-07
16 960 0.840 6.18 0.0062 6.44E-06 5.2405 2.1742E-07
18 1080 0.990 7.17 0.0072 6.64E-06 5.2405 2.2422E-07
20 1200 1.220 8.39 0.0084 6.99E-06 5.2405 2.3613E-07
25 1500 1.390 9.78 0.0098 6.52E-06 5.2405 2.2020E-07
30 1800 1.630 11.41 0.0114 6.34E-06 5.2405 2.1409E-07
40 2400 1.960 13.37 0.0134 5.57E-06 5.2405 1.8815E-07
50 3000 2.350 15.72 0.0157 5.24E-06 5.2405 1.7697E-07
60 3600 2.670 18.39 0.0184 5.11E-06 5.2405 1.7253E-07

K(max.)= 2.4205E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

25.00
K(avr.)= 2.0546E-07 m/sec

20.00 K(min.)= 1.7253E-07 m/sec

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-03 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.5198E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.280 0.28 0.0003 4.67E-06 5.2405 1.5761E-07
2 120 0.330 0.61 0.0006 5.08E-06 5.2405 1.7168E-07
3 180 0.320 0.93 0.0009 5.17E-06 5.2405 1.7450E-07
4 240 0.440 1.37 0.0014 5.71E-06 5.2405 1.9279E-07
5 300 0.490 1.86 0.0019 6.20E-06 5.2405 2.0940E-07
6 360 0.520 2.38 0.0024 6.61E-06 5.2405 2.2328E-07
7 420 0.600 2.98 0.003 7.10E-06 5.2405 2.3963E-07
8 480 0.730 3.71 0.0037 7.73E-06 5.2405 2.6104E-07
9 540 0.870 4.58 0.0046 8.48E-06 5.2405 2.8645E-07
10 600 0.930 5.51 0.0055 9.18E-06 5.2405 3.1016E-07
12 720 0.980 6.49 0.0065 9.01E-06 5.2405 3.0443E-07
14 840 1.060 7.55 0.0076 8.99E-06 5.2405 3.0356E-07
16 960 1.140 8.69 0.0087 9.05E-06 5.2405 3.0572E-07
18 1080 1.190 9.88 0.0099 9.15E-06 5.2405 3.0897E-07
20 1200 1.260 11.14 0.0111 9.28E-06 5.2405 3.1353E-07
25 1500 1.570 12.71 0.0127 8.47E-06 5.2405 2.8618E-07
30 1800 1.850 14.56 0.0146 8.09E-06 5.2405 2.7319E-07
40 2400 3.200 17.76 0.0178 7.40E-06 5.2405 2.4993E-07
50 3000 3.300 21.06 0.0211 7.02E-06 5.2405 2.3709E-07
60 3600 3.500 24.56 0.0246 6.82E-06 5.2405 2.3041E-07

K(max.)= 3.1353E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

30.00
K(avr.)= 2.5198E-07 m/sec
25.00 m/sec
K(min.)= 1.5761E-07
20.00

15.00

10.00

5.00

0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-02 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 2.0270E-07 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.420 0.42 0.0004 7.00E-06 5.2405 2.3642E-07
2 120 0.380 0.80 0.0008 6.67E-06 5.2405 2.2516E-07
3 180 0.320 1.12 0.0011 6.22E-06 5.2405 2.1015E-07
4 240 0.250 1.37 0.0014 5.71E-06 5.2405 1.9279E-07
5 300 0.300 1.67 0.0017 5.57E-06 5.2405 1.8801E-07
6 360 0.320 1.99 0.002 5.53E-06 5.2405 1.8669E-07
7 420 0.330 2.32 0.0023 5.52E-06 5.2405 1.8656E-07
8 480 0.500 2.82 0.0028 5.88E-06 5.2405 1.9842E-07
9 540 0.560 3.38 0.0034 6.26E-06 5.2405 2.1140E-07
10 600 0.600 3.98 0.004 6.63E-06 5.2405 2.2403E-07
12 720 0.700 4.68 0.0047 6.50E-06 5.2405 2.1953E-07
14 840 0.740 5.42 0.0054 6.45E-06 5.2405 2.1792E-07
16 960 0.850 6.27 0.0063 6.53E-06 5.2405 2.2058E-07
18 1080 0.870 7.14 0.0071 6.61E-06 5.2405 2.2328E-07
20 1200 0.860 8.00 0.008 6.67E-06 5.2405 2.2516E-07
25 1500 0.990 8.99 0.009 5.99E-06 5.2405 2.0242E-07
30 1800 1.250 10.24 0.0102 5.69E-06 5.2405 1.9214E-07
40 2400 1.800 12.04 0.012 5.02E-06 5.2405 1.6943E-07
50 3000 2.340 14.38 0.0144 4.79E-06 5.2405 1.6189E-07
60 3600 2.900 17.28 0.0173 4.80E-06 5.2405 1.6211E-07

K(max.)= 2.3642E-07 m/sec


CUMULATIVE WATER VOLUME (Litter)

20.00
K(avr.)= 2.0270E-07 m/sec
18.00
16.00 K(min.)= 1.6189E-07 m/sec
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


IN SITU PERMEABILITY FROM FLOW IN TEST

CLIENT : NEOM
PROJECT : NEOM DESALINATION TO GAYAL TRANSMISSION SYSTEM
PROJECT No. : 21J4037

TYPE OF TEST: CONSTANT HEAD


TEST LOCATION BH-01 Tested Depth= 4.50 ~ 5.50 m

Depth of G.W.L from G.L= 5.50 (m) L= 1.00 (m) Tested Length
Depth of Casing= 4.50 (m) Hc= 5.65 (m) height of water (Head)
Depth of Borehole= 5.50 (m) F= 5.2405 =2.π.L / log [(L/D)+(1+(L/D)2) 0.5] Shape Factor
Top Length of Casing above G.L= 0.15 (m) Q= Disharge m3/sec
Dia. of Casing IN [D]= 0.127 (m) Κ (aver) = 5.0787E-08 (Q / F.Hc) m/sec

Time (t) water Volume Cumulative Volume Disharge F K


(min) (sec.) Litter Litter m3 m3/Sec Shape Factor (m/sec)
0 0 0.000 0.00 0.00 0.00 5.2405 0.00
1 60 0.100 0.10 0.0001 1.67E-06 5.2405 5.6290E-08
2 120 0.110 0.21 0.0002 1.75E-06 5.2405 5.9104E-08
3 180 0.105 0.32 0.0003 1.75E-06 5.2405 5.9104E-08
4 240 0.110 0.43 0.0004 1.77E-06 5.2405 5.9808E-08
5 300 0.100 0.53 0.0005 1.75E-06 5.2405 5.9104E-08
6 360 0.105 0.63 0.0006 1.75E-06 5.2405 5.9104E-08
7 420 0.110 0.74 0.0007 1.76E-06 5.2405 5.9506E-08
8 480 0.115 0.86 0.0009 1.78E-06 5.2405 6.0159E-08
9 540 0.105 0.96 0.001 1.78E-06 5.2405 6.0042E-08
10 600 0.100 1.06 0.0011 1.77E-06 5.2405 5.9667E-08
12 720 0.120 1.18 0.0012 1.64E-06 5.2405 5.5351E-08
14 840 0.125 1.31 0.0013 1.55E-06 5.2405 5.2470E-08
16 960 0.125 1.43 0.0014 1.49E-06 5.2405 5.0309E-08
18 1080 0.120 1.55 0.0016 1.44E-06 5.2405 4.8472E-08
20 1200 0.125 1.68 0.0017 1.40E-06 5.2405 4.7143E-08
25 1500 0.140 1.82 0.0018 1.21E-06 5.2405 4.0866E-08
30 1800 0.150 1.97 0.002 1.09E-06 5.2405 3.6870E-08
40 2400 0.350 2.32 0.0023 9.65E-07 5.2405 3.2578E-08
50 3000 0.400 2.72 0.0027 9.05E-07 5.2405 3.0565E-08
60 3600 0.400 3.12 0.0031 8.65E-07 5.2405 2.9224E-08

K(max.)= 6.0159E-08 m/sec


CUMULATIVE WATER VOLUME (Litter)

4.00
K(avr.)= 5.0787E-08 m/sec
3.50
K(min.)= 2.9224E-08 m/sec
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0 500 1000 1500 2000 2500 3000 3500 4000

TIME in SECOND

* Reference. CIRIA Report 113- 1986


PRESSUREMETER TESTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 186.531 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-03 DEPTH (m) 8.00 Λ P (kPa) 2679 DATE 26/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 37.10 80
LOCATION : 3
Vm (cm ) 256.132 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 65 65 91 0.00 91.00
3 100 99 81 150 0.00 150.00 151976
4 200 124 156 200 1.10 198.90
5 300 132 248 218 1.66 216.34
6 400 136 344 227 2.21 224.79
7 500 139 441 233 2.76 230.24
8 600 140 540 237 3.31 233.69
9 700 142 638 240 3.86 236.14
10 800 142 738 242 4.42 237.58
11 900 143 837 244 4.97 239.03
12 1000 144 936 246 5.52 240.48
13 1100 145 1035 248 6.07 241.93
14 1200 146 1134 250 6.62 243.38
15 1300 146 1234 251 7.18 243.82
16 1400 147 1333 253 7.73 245.27
17 1500 148 1432 255 8.28 246.72
18 1600 148 1532 257 8.83 248.17
19 1700 149 1631 259 9.38 249.62
20 1800 150 1730 261 9.94 251.06
21 1900 150 1830 262 10.49 251.51
22 2000 151 1929 264 11.04 252.96 LOAD
23 2100 152 2028 266 11.59 254.41
24 2200 153 2127 268 12.14 255.86
25 2300 154 2226 270 12.70 257.30
26 2400 154 2326 272 13.25 258.75
27 2500 155 2425 274 13.80 260.20
28 2600 156 2524 276 14.35 261.65
29 2700 157 2623 278 14.90 263.10
30 2800 157 2723 280 15.46 264.54
31 2900 158 2822 282 16.01 265.99
32 3000 159 2921 284 16.56 267.44
33 3100 160 3020 286 17.11 268.89
34 3200 160 3120 288 17.66 270.34
35 3300 161 3219 290 18.22 271.78
36 3400 162 3318 292 18.77 273.23
37 3500 163 3417 294 19.32 274.68

Deduced of P L =

6500

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0
PRESSURE METER
MODULUS
100.0 EP = 151,976.0 kPa

50.0

0.0
0 400 738 800 1200 1600 2000 2400 2800 3200 3600 4000
2609
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 186.531 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-03 DEPTH (m) 11.00 Λ P (kPa) 2681 DATE 26/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 36.10 110
LOCATION : 3
Vm (cm ) 284.528 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 64 96 90 0.00 90.00
3 100 101 109 154 0.00 154.00 161914
4 200 123 187 197 1.10 195.90
5 300 135 275 225 1.66 223.34
6 400 141 369 239 2.21 236.79
7 500 145 465 248 2.76 245.24
8 600 148 562 255 3.31 251.69
9 700 150 660 261 3.86 257.14
10 800 152 758 266 4.42 261.58
11 900 153 857 269 4.97 264.03
12 1000 154 956 272 5.52 266.48
13 1100 155 1055 273 6.07 266.93
14 1200 155 1155 275 6.62 268.38
15 1300 156 1254 277 7.18 269.82
16 1400 157 1353 279 7.73 271.27
17 1500 158 1452 281 8.28 272.72
18 1600 158 1552 283 8.83 274.17
19 1700 159 1651 285 9.38 275.62
20 1800 160 1750 287 9.94 277.06
21 1900 161 1849 289 10.49 278.51
22 2000 161 1949 291 11.04 279.96 LOAD
23 2100 162 2048 293 11.59 281.41
24 2200 163 2147 295 12.14 282.86
25 2300 164 2246 297 12.70 284.30
26 2400 164 2346 299 13.25 285.75
27 2500 165 2445 301 13.80 287.20
28 2600 166 2544 303 14.35 288.65
29 2700 167 2643 305 14.90 290.10
30 2800 167 2743 307 15.46 291.54
31 2900 168 2842 309 16.01 292.99
32 3000 168 2942 310 16.56 293.44
33 3100 169 3041 312 17.11 294.89
34 3200 169 3141 313 17.66 295.34
35 3300 170 3240 315 18.22 296.78
36 3400 171 3339 317 18.77 298.23
37 3500 171 3439 319 19.32 299.68
38 3600 172 3538 321 19.87 301.13
39 3700 173 3637 323 20.42 302.58 Deduced of P L =

7200

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0
PRESSURE METER
MODULUS
100.0 EP = 161,914.0 kPa

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
956 3637
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 186.531 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-03 DEPTH (m) 8.00 Λ P (kPa) 2679 DATE 26/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 37.10 80
LOCATION : 3
Vm (cm ) 256.132 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 65 65 91 0.00 91.00
3 100 99 81 150 0.00 150.00 151976
4 200 124 156 200 1.10 198.90
5 300 132 248 218 1.66 216.34
6 400 136 344 227 2.21 224.79
7 500 139 441 233 2.76 230.24
8 600 140 540 237 3.31 233.69
9 700 142 638 240 3.86 236.14
10 800 142 738 242 4.42 237.58
11 900 143 837 244 4.97 239.03
12 1000 144 936 246 5.52 240.48
13 1100 145 1035 248 6.07 241.93
14 1200 146 1134 250 6.62 243.38
15 1300 146 1234 251 7.18 243.82
16 1400 147 1333 253 7.73 245.27
17 1500 148 1432 255 8.28 246.72
18 1600 148 1532 257 8.83 248.17
19 1700 149 1631 259 9.38 249.62
20 1800 150 1730 261 9.94 251.06
21 1900 150 1830 262 10.49 251.51
22 2000 151 1929 264 11.04 252.96 LOAD
23 2100 152 2028 266 11.59 254.41
24 2200 153 2127 268 12.14 255.86
25 2300 154 2226 270 12.70 257.30
26 2400 154 2326 272 13.25 258.75
27 2500 155 2425 274 13.80 260.20
28 2600 156 2524 276 14.35 261.65
29 2700 157 2623 278 14.90 263.10
30 2800 157 2723 280 15.46 264.54
31 2900 158 2822 282 16.01 265.99
32 3000 159 2921 284 16.56 267.44
33 3100 160 3020 286 17.11 268.89
34 3200 160 3120 288 17.66 270.34
35 3300 161 3219 290 18.22 271.78
36 3400 162 3318 292 18.77 273.23
37 3500 163 3417 294 19.32 274.68

Deduced of P L =

6500

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0
PRESSURE METER
MODULUS
100.0 EP = 151,976.0 kPa

50.0

0.0
0 400 738 800 1200 1600 2000 2400 2800 3200 3600 4000
2609
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 186.531 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-03 DEPTH (m) 11.00 Λ P (kPa) 2681 DATE 26/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 36.10 110
LOCATION : 3
Vm (cm ) 284.528 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 64 96 90 0.00 90.00
3 100 101 109 154 0.00 154.00 161914
4 200 123 187 197 1.10 195.90
5 300 135 275 225 1.66 223.34
6 400 141 369 239 2.21 236.79
7 500 145 465 248 2.76 245.24
8 600 148 562 255 3.31 251.69
9 700 150 660 261 3.86 257.14
10 800 152 758 266 4.42 261.58
11 900 153 857 269 4.97 264.03
12 1000 154 956 272 5.52 266.48
13 1100 155 1055 273 6.07 266.93
14 1200 155 1155 275 6.62 268.38
15 1300 156 1254 277 7.18 269.82
16 1400 157 1353 279 7.73 271.27
17 1500 158 1452 281 8.28 272.72
18 1600 158 1552 283 8.83 274.17
19 1700 159 1651 285 9.38 275.62
20 1800 160 1750 287 9.94 277.06
21 1900 161 1849 289 10.49 278.51
22 2000 161 1949 291 11.04 279.96 LOAD
23 2100 162 2048 293 11.59 281.41
24 2200 163 2147 295 12.14 282.86
25 2300 164 2246 297 12.70 284.30
26 2400 164 2346 299 13.25 285.75
27 2500 165 2445 301 13.80 287.20
28 2600 166 2544 303 14.35 288.65
29 2700 167 2643 305 14.90 290.10
30 2800 167 2743 307 15.46 291.54
31 2900 168 2842 309 16.01 292.99
32 3000 168 2942 310 16.56 293.44
33 3100 169 3041 312 17.11 294.89
34 3200 169 3141 313 17.66 295.34
35 3300 170 3240 315 18.22 296.78
36 3400 171 3339 317 18.77 298.23
37 3500 171 3439 319 19.32 299.68
38 3600 172 3538 321 19.87 301.13
39 3700 173 3637 323 20.42 302.58 Deduced of P L =

7200

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0
PRESSURE METER
MODULUS
100.0 EP = 161,914.0 kPa

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
956 3637
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 183.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-07 DEPTH (m) 8.00 Λ P (kPa) 1688 DATE 23/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 25.50 80
LOCATION : 3
Vm (cm ) 288.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 65 65 90 0.00 90.00
3 100 103 77 155 0.00 155.00 145047
4 200 124 156 197 1.00 196.00
5 300 137 243 226 1.50 224.50
6 400 143 337 240 2.00 238.00
7 500 148 432 252 2.50 249.50
8 600 151 529 260 3.00 257.00
9 700 154 626 267 3.50 263.50
10 800 156 724 274 4.00 270.00
11 900 158 822 279 4.50 274.50
12 1000 159 921 281 5.00 276.00
13 1100 160 1020 283 5.50 277.50
14 1200 160 1120 285 6.00 279.00
15 1300 161 1219 287 6.50 280.50
16 1400 162 1318 289 7.00 282.00
17 1500 163 1417 291 7.50 283.50
18 1600 163 1517 293 8.00 285.00
19 1700 164 1616 295 8.50 286.50
20 1800 165 1715 297 9.00 288.00
21 1900 166 1814 299 9.50 289.50
22 2000 166 1914 301 10.00 291.00 LOAD
23 2100 167 2013 303 10.50 292.50
24 2200 168 2112 305 11.00 294.00
25 2300 168 2212 307 11.50 295.50
26 2400 169 2311 309 12.00 297.00
27 2500 170 2410 311 12.50 298.50
28 2600 170 2510 313 13.00 300.00
29 2700 171 2609 315 13.50 301.50
30 2800 173 2707 320 14.00 306.00
31 2900 177 2803 332 14.50 317.50
32 3000 183 2897 350 15.00 335.00
33 3100 190 2990 370 15.50 354.50
34 3200 197 3083 392 16.00 376.00
35 3300 204 3176 416 16.50 399.50
36 3400 212 3268 442 17.00 425.00
37 3500 220 3360 468 17.50 450.50
38 3600 231 3449 500 18.00 482.00
39 3700 242 3538 535 18.50 516.50 Deduced of P L =
40 3800 255 3625 570 19.00 551.00
41 3900 270 3710 610 19.50 590.50
4500

PRESSUREMETER TEST CURVE

600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
350.0
TESTED BY: CHECKED BY:
M.TAHIR
300.0
250.0
PRESSURE METER
200.0
MODULUS
150.0
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
921
2609
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 183.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-07 DEPTH (m) 11.00 Λ P (kPa) 1974 DATE 23/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 50.00 110
LOCATION : 3
Vm (cm ) 224.5 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 71 89 100 0.00 100.00
3 100 97 113 145 0.00 145.00 79760
4 200 116 194 180 0.00 180.00
5 300 121 289 192 1.50 190.50
6 400 124 386 197 2.00 195.00
7 500 126 484 202 2.50 199.50
8 600 127 583 205 3.00 202.00
9 700 129 681 208 3.50 204.50
10 800 130 780 211 4.00 207.00
11 900 131 879 214 4.50 209.50
12 1000 133 977 217 5.00 212.00
13 1100 134 1076 220 5.50 214.50
14 1200 135 1175 223 6.00 217.00
15 1300 137 1273 226 6.50 219.50
16 1400 138 1372 229 7.00 222.00
17 1500 139 1471 232 7.50 224.50
18 1600 141 1569 235 8.00 227.00
19 1700 142 1668 238 8.50 229.50
20 1800 143 1767 241 9.00 232.00
21 1900 144 1866 244 9.50 234.50
22 2000 146 1964 247 10.00 237.00 LOAD
23 2100 147 2063 250 10.50 239.50
24 2200 148 2162 253 11.00 242.00
25 2300 149 2261 256 11.50 244.50
26 2400 150 2360 259 12.00 247.00
27 2500 152 2458 262 12.50 249.50
28 2600 157 2553 276 13.00 263.00
29 2700 162 2648 290 13.50 276.50
30 2800 169 2741 310 14.00 296.00
31 2900 177 2833 332 14.50 317.50
32 3000 185 2925 355 15.00 340.00
33 3100 192 3018 377 15.50 361.50
34 3200 199 3111 400 16.00 384.00
35 3300 208 3202 430 16.50 413.50
36 3400 219 3291 465 17.00 448.00
37 3500 231 3379 500 17.50 482.50
38 3600 244 3466 540 18.00 522.00
39 3700 259 3551 580 18.50 561.50 Deduced of P L =

4300

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0
PRESSURE METER
150.0 MODULUS
EP = 79,760.0 kPa
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
484 2458

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 174.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-010 DEPTH (m) 8.00 Λ P (kPa) 1675 DATE 22/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 54.50 80
LOCATION : 3
Vm (cm ) 268.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 75 55 105 0.00 105.00
3 100 117 63 180 0.50 179.50 65708
4 200 129 151 205 1.00 204.00
5 300 133 247 214 1.50 212.50
6 400 136 344 221 2.00 219.00
7 500 138 442 227 2.50 224.50
8 600 141 539 232 3.00 229.00
9 700 143 637 237 3.50 233.50
10 800 145 735 242 4.00 238.00
11 900 146 834 246 4.50 241.50
12 1000 148 932 250 5.00 245.00
13 1100 150 1030 254 5.50 248.50
14 1200 151 1129 258 6.00 252.00
15 1300 152 1228 261 6.50 254.50
16 1400 154 1326 264 7.00 257.00
17 1500 155 1425 268 7.50 260.50
18 1600 157 1523 272 8.00 264.00
19 1700 158 1622 275 8.50 266.50
20 1800 159 1721 278 9.00 269.00
21 1900 161 1819 282 9.50 272.50
22 2000 162 1918 286 10.00 276.00 LOAD
23 2100 164 2016 290 10.50 279.50
24 2200 165 2115 294 11.00 283.00
25 2300 167 2213 298 11.50 286.50
26 2400 168 2312 302 12.00 290.00
27 2500 169 2411 306 12.50 293.50
28 2600 171 2509 309 13.00 296.00
29 2700 174 2606 320 13.50 306.50
30 2800 180 2700 335 14.00 321.00
31 2900 187 2793 356 14.50 341.50
32 3000 194 2886 378 15.00 363.00
33 3100 201 2979 402 15.50 386.50
34 3200 212 3068 435 16.00 419.00
35 3300 222 3158 470 16.50 453.50
36 3400 235 3245 510 17.00 493.00
37 3500 252 3328 560 17.50 542.50
38 3600 275 3405 620 18.00 602.00
Deduced of P L =

4200

PRESSUREMETER TEST CURVE

600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
350.0 TESTED BY: CHECKED BY:
M.TAHIR
300.0
250.0
200.0 PRESSURE METER
MODULUS
150.0 EP = 65,708.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
834 2509

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 174.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-010 DEPTH (m) 11.00 Λ P (kPa) 1687 DATE 22/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 25.50 110
LOCATION : 3
Vm (cm ) 283.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 59 101 80 0.00 80.00
3 100 101 109 150 0.00 150.00 144081
4 200 135 175 220 1.00 219.00
5 300 146 264 245 1.50 243.50
6 400 149 361 252 2.00 250.00
7 500 151 459 257 2.50 254.50
8 600 153 557 262 3.00 259.00
9 700 155 655 267 3.50 263.50
10 800 156 754 271 4.00 267.00
11 900 158 852 274 4.50 269.50
12 1000 158 952 276 5.00 271.00
13 1100 159 1051 278 5.50 272.50
14 1200 160 1150 280 6.00 274.00
15 1300 161 1249 282 6.50 275.50
16 1400 161 1349 284 7.00 277.00
17 1500 162 1448 286 7.50 278.50
18 1600 163 1547 288 8.00 280.00
19 1700 164 1646 290 8.50 281.50
20 1800 164 1746 292 9.00 283.00
21 1900 165 1845 294 9.50 284.50
22 2000 166 1944 296 10.00 286.00 LOAD
23 2100 167 2043 298 10.50 287.50
24 2200 167 2143 300 11.00 289.00
25 2300 168 2242 302 11.50 290.50
26 2400 169 2341 304 12.00 292.00
27 2500 169 2441 306 12.50 293.50
28 2600 170 2540 308 13.00 295.00
29 2700 171 2639 310 13.50 296.50
30 2800 174 2736 320 14.00 306.00
31 2900 179 2831 333 14.50 318.50
32 3000 184 2926 348 15.00 333.00
33 3100 189 3021 365 15.50 349.50
34 3200 196 3114 385 16.00 369.00
35 3300 204 3206 410 16.50 393.50
36 3400 213 3297 440 17.00 423.00
37 3500 224 3386 475 17.50 457.50
38 3600 237 3473 515 18.00 497.00
Deduced of P L =

7500

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0
PRESSURE METER
150.0 MODULUS
EP = 144,081.0 kPa
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
952
2639
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 145.173 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-013 DEPTH (m) 8.00 Λ P (kPa) 1667 DATE 23/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 69.36 80
LOCATION : 3
Vm (cm ) 260.24 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 73 57 100 0.00 100.00
3 100 108 72 160 0.92 159.08 50840
4 200 122 158 188 1.84 186.16
5 300 128 252 200 2.76 197.24
6 400 133 347 210 3.68 206.32
7 500 137 443 219 4.60 214.40
8 600 140 540 227 5.52 221.48
9 700 143 637 232 6.44 225.56
10 800 145 735 237 7.36 229.64
11 900 147 833 242 8.28 233.72
12 1000 149 931 247 9.20 237.80
13 1100 151 1029 252 10.12 241.88
14 1200 153 1127 257 11.04 245.96
15 1300 155 1225 262 11.96 250.04
16 1400 157 1323 267 12.88 254.12
17 1500 159 1421 272 13.80 258.20
18 1600 161 1519 277 14.72 262.28
19 1700 163 1617 282 15.64 266.36
20 1800 165 1715 287 16.56 270.44
21 1900 167 1813 292 17.48 274.52
22 2000 168 1912 297 18.40 278.60 LOAD
23 2100 170 2010 302 19.32 282.68
24 2200 172 2108 307 20.24 286.76
25 2300 174 2206 312 21.16 290.84
26 2400 176 2304 317 22.08 294.92
27 2500 178 2402 324 23.00 301.00
28 2600 181 2499 332 23.92 308.08
29 2700 184 2596 341 24.84 316.16
30 2800 188 2692 352 25.76 326.24
31 2900 193 2787 370 26.68 343.32
32 3000 201 2879 395 27.60 367.40
33 3100 211 2969 425 28.52 396.48
34 3200 222 3058 460 29.44 430.56
35 3300 234 3146 500 30.36 469.64
36 3400 248 3232 542 31.28 510.72
37 3500 263 3317 585 32.20 552.80

Deduced of P L =

4200

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


300.0
M.TAHIR

250.0

200.0 PRESSURE METER


MODULUS
150.0
EP = 50,840.0 kPa
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
637 2304
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 145.173 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-013 DEPTH (m) 11.00 Λ P (kPa) 1769 DATE 23/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 59.44 110
LOCATION : 3
Vm (cm ) 247.12 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 73 87 100 0.00 100.00
3 100 113 97 170 0.92 169.08 61916
4 200 128 182 200 1.84 198.16
5 300 134 276 212 2.76 209.24
6 400 136 374 218 3.68 214.32
7 500 138 472 222 4.60 217.40
8 600 140 570 226 5.52 220.48
9 700 142 668 230 6.44 223.56
10 800 143 767 234 7.36 226.64
11 900 145 865 238 8.28 229.72
12 1000 147 963 242 9.20 232.80
13 1100 149 1061 247 10.12 236.88
14 1200 151 1159 252 11.04 240.96
15 1300 153 1257 256 11.96 244.04
16 1400 154 1356 260 12.88 247.12
17 1500 156 1454 264 13.80 250.20
18 1600 157 1553 268 14.72 253.28
19 1700 159 1651 272 15.64 256.36
20 1800 161 1749 277 16.56 260.44
21 1900 163 1847 282 17.48 264.52
22 2000 164 1946 286 18.40 267.60 LOAD
23 2100 166 2044 290 19.32 270.68
24 2200 167 2143 294 20.24 273.76
25 2300 169 2241 298 21.16 276.84
26 2400 172 2338 306 22.08 283.92
27 2500 177 2433 320 23.00 297.00
28 2600 182 2528 335 23.92 311.08
29 2700 190 2620 360 24.84 335.16
30 2800 199 2711 388 25.76 362.24
31 2900 209 2801 420 26.68 393.32
32 3000 222 2888 460 27.60 432.40
33 3100 236 2974 505 28.52 476.48
34 3200 252 3058 555 29.44 525.56
35 3300 272 3138 610 30.36 579.64

Deduced of P L =

3900

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0

150.0 PRESSURE METER


MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
472 2241

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 194.875 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-019 DEPTH (m) 8.00 Λ P (kPa) 2283 DATE 19/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 26.09 80
LOCATION : 3
Vm (cm ) 262.827 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 58 72 90 0.00 90.00
3 100 110 70 180 0.00 180.00 185733
4 200 125 155 210 1.04 208.96
5 300 130 250 219 1.55 217.45
6 400 133 347 226 2.07 223.93
7 500 136 444 231 2.59 228.41
8 600 138 542 236 3.11 232.89
9 700 140 640 240 3.63 236.37
10 800 142 738 244 4.14 239.86
11 900 144 836 248 4.66 243.34
12 1000 145 935 252 5.18 246.82
13 1100 147 1033 255 5.70 249.30
14 1200 147 1133 256 6.22 249.78
15 1300 148 1232 258 6.73 251.27
16 1400 149 1331 259 7.25 251.75
17 1500 150 1430 261 7.77 253.23
18 1600 150 1530 262 8.29 253.71
19 1700 151 1629 264 8.81 255.19
20 1800 152 1728 266 9.32 256.68
21 1900 152 1828 267 9.84 257.16
22 2000 153 1927 268 10.36 257.64 LOAD
23 2100 154 2026 270 10.88 259.12
24 2200 155 2125 272 11.40 260.60
25 2300 155 2225 274 11.91 262.09
26 2400 156 2324 275 12.43 262.57
27 2500 157 2423 277 12.95 264.05
28 2600 158 2522 279 13.47 265.53
29 2700 159 2621 281 13.99 267.01
30 2800 159 2721 282 14.50 267.50
31 2900 160 2820 284 15.02 268.98
32 3000 161 2919 286 15.54 270.46
33 3100 162 3018 288 16.06 271.94
34 3200 162 3118 289 16.58 272.42
35 3300 163 3217 291 17.09 273.91
36 3400 164 3316 293 17.61 275.39
37 3500 164 3416 294 18.13 275.87

Deduced of P L =

7600

PRESSUREMETER TEST CURVE

300.0
CORRECTED VOLUME READING V (cm 3)

250.0

200.0

TESTED BY: CHECKED BY:


150.0
M.TAHIR

PRESSURE METER
100.0 MODULUS
EP = 185,733.0 kPa

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
1133 3416
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 194.875 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-019 DEPTH (m) 11.00 Λ P (kPa) 2777 DATE 19/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 35.50 110
LOCATION : 3
Vm (cm ) 241.122 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 58 102 90 0.00 90.00
3 100 93 117 150 0.00 150.00 161513
4 200 120 190 200 1.04 198.96
5 300 128 282 215 1.55 213.45
6 400 131 379 221 2.07 218.93
7 500 132 478 223 2.59 220.41
8 600 133 577 225 3.11 221.89
9 700 134 676 227 3.63 223.37
10 800 135 775 229 4.14 224.86
11 900 135 875 230 4.66 225.34
12 1000 136 974 232 5.18 226.82
13 1100 137 1073 234 5.70 228.30
14 1200 138 1172 236 6.22 229.78
15 1300 139 1271 238 6.73 231.27
16 1400 140 1370 240 7.25 232.75
17 1500 141 1469 242 7.77 234.23
18 1600 142 1568 244 8.29 235.71
19 1700 143 1667 246 8.81 237.19
20 1800 144 1766 248 9.32 238.68
21 1900 144 1866 249 9.84 239.16
22 2000 145 1965 251 10.36 240.64 LOAD
23 2100 146 2064 253 10.88 242.12
24 2200 147 2163 255 11.40 243.60
25 2300 147 2263 256 11.91 244.09
26 2400 148 2362 257 12.43 244.57
27 2500 149 2461 259 12.95 246.05
28 2600 150 2560 261 13.47 247.53
29 2700 150 2660 262 13.99 248.01
30 2800 151 2759 264 14.50 249.50
31 2900 152 2858 266 15.02 250.98
32 3000 153 2957 268 15.54 252.46
33 3100 153 3057 269 16.06 252.94
34 3200 154 3156 271 16.58 254.42
35 3300 155 3255 273 17.09 255.91
36 3400 156 3354 275 17.61 257.39
37 3500 157 3453 277 18.13 258.87

Deduced of P L =

7500

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0

PRESSURE METER
100.0 MODULUS

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
676 3453
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 194.293 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-032 DEPTH (m) 8.00 Λ P (kPa) 2676 DATE 18/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 39.88 80
LOCATION : 3
Vm (cm ) 253.7555 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 54 76 80 0.00 80.00
3 100 75 105 115 0.00 115.00 140788
4 200 120 160 195 1.05 193.95
5 300 129 251 215 1.57 213.43
6 400 134 346 225 2.09 222.91
7 500 136 444 229 2.62 226.39
8 600 138 542 233 3.14 229.86
9 700 140 640 236 3.66 232.34
10 800 140 740 238 4.18 233.82
11 900 141 839 240 4.71 235.29
12 1000 142 938 242 5.23 236.77
13 1100 143 1037 244 5.75 238.25
14 1200 144 1136 246 6.28 239.72
15 1300 145 1235 248 6.80 241.20
16 1400 146 1334 250 7.32 242.68
17 1500 147 1433 252 7.85 244.16
18 1600 148 1532 254 8.37 245.63
19 1700 149 1631 256 8.89 247.11
20 1800 150 1730 258 9.41 248.59
21 1900 150 1830 260 9.94 250.06
22 2000 151 1929 262 10.46 251.54 LOAD
23 2100 152 2028 264 10.98 253.02
24 2200 153 2127 266 11.51 254.49
25 2300 154 2226 268 12.03 255.97
26 2400 155 2325 270 12.55 257.45
27 2500 156 2424 272 13.08 258.93
28 2600 157 2523 274 13.60 260.40
29 2700 157 2623 276 14.12 261.88
30 2800 158 2722 278 14.64 263.36
31 2900 159 2821 280 15.17 264.83
32 3000 160 2920 282 15.69 266.31
33 3100 161 3019 284 16.21 267.79
34 3200 162 3118 286 16.74 269.26
35 3300 163 3217 288 17.26 270.74
36 3400 163 3317 290 17.78 272.22
37 3500 164 3416 292 18.31 273.70

Deduced of P L =

6400

PRESSUREMETER TEST CURVE

300.0
CORRECTED VOLUME READING V (cm 3)

250.0

200.0

TESTED BY: CHECKED BY:


M.TAHIR
150.0

PRESSURE METER
100.0 MODULUS

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
770 3446

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 194.293 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-032 DEPTH (m) 11.00 Λ P (kPa) 1858 DATE 18/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 85.06 110
LOCATION : 3
Vm (cm ) 257.4395 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 66 94 100 0.00 100.00
3 100 104 106 165 0.00 165.00 46042
4 200 124 186 203 1.05 201.95
5 300 128 282 212 1.57 210.43
6 400 130 380 217 2.09 214.91
7 500 133 477 222 2.62 219.39
8 600 135 575 227 3.14 223.86
9 700 138 672 232 3.66 228.34
10 800 140 770 237 4.18 232.82
11 900 142 868 242 4.71 237.29
12 1000 145 965 247 5.23 241.77
13 1100 147 1063 252 5.75 246.25
14 1200 149 1161 257 6.28 250.72
15 1300 151 1259 262 6.80 255.20
16 1400 154 1356 267 7.32 259.68
17 1500 156 1454 272 7.85 264.16
18 1600 158 1552 277 8.37 268.63
19 1700 160 1650 282 8.89 273.11
20 1800 162 1748 287 9.41 277.59
21 1900 164 1846 292 9.94 282.06
22 2000 166 1944 297 10.46 286.54 LOAD
23 2100 168 2042 302 10.98 291.02
24 2200 170 2140 307 11.51 295.49
25 2300 172 2238 312 12.03 299.97
26 2400 176 2334 320 12.55 307.45
27 2500 180 2430 332 13.08 318.93
28 2600 187 2523 350 13.60 336.40
29 2700 194 2616 370 14.12 355.88
30 2800 201 2709 390 14.64 375.36
31 2900 210 2800 415 15.17 399.83
32 3000 219 2891 445 15.69 429.31
33 3100 230 2980 480 16.21 463.79
34 3200 243 3067 525 16.74 508.26
35 3300 257 3153 580 17.26 562.74

Deduced of P L =

4000

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0

150.0 PRESSURE METER


MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
380 2238

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 195.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-039 DEPTH (m) 8.00 Λ P (kPa) 2476 DATE 15/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 39.50 80
LOCATION : 3
Vm (cm ) 251.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 66 64 106 0.00 106.00
3 100 112 68 190 0.00 190.00 131181
4 200 125 155 215 1.00 214.00
5 300 129 251 222 1.50 220.50
6 400 130 350 225 2.00 223.00
7 500 132 448 228 2.50 225.50
8 600 133 547 231 3.00 228.00
9 700 134 646 234 3.50 230.50
10 800 135 745 236 4.00 232.00
11 900 136 844 238 4.50 233.50
12 1000 137 943 240 5.00 235.00
13 1100 138 1042 242 5.50 236.50
14 1200 140 1140 245 6.00 239.00
15 1300 141 1239 247 6.50 240.50
16 1400 142 1338 250 7.00 243.00
17 1500 143 1437 252 7.50 244.50
18 1600 144 1536 254 8.00 246.00
19 1700 145 1635 256 8.50 247.50
20 1800 146 1734 258 9.00 249.00
21 1900 147 1833 260 9.50 250.50
22 2000 148 1932 262 10.00 252.00 LOAD
23 2100 149 2031 264 10.50 253.50
24 2200 150 2130 266 11.00 255.00
25 2300 150 2230 268 11.50 256.50
26 2400 151 2329 270 12.00 258.00
27 2500 152 2428 272 12.50 259.50
28 2600 153 2527 274 13.00 261.00
29 2700 154 2626 276 13.50 262.50
30 2800 155 2725 278 14.00 264.00
31 2900 156 2824 280 14.50 265.50
32 3000 157 2923 282 15.00 267.00
33 3100 158 3022 284 15.50 268.50
34 3200 159 3121 286 16.00 270.00
35 3300 159 3221 288 16.50 271.50

Deduced of P L =

7500

PRESSUREMETER TEST CURVE

350.0
CORRECTED VOLUME READING V (cm 3)

300.0

250.0

200.0 TESTED BY: CHECKED BY:


M.TAHIR

150.0
PRESSURE METER
MODULUS
100.0 EP = 131,181.0 kPa

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
745 1920

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 195.238 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-039 DEPTH (m) 11.00 Λ P (kPa) 2579 DATE 15/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 32.00 110
LOCATION : 3
Vm (cm ) 235 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 42 118 66 0.00 66.00
3 100 104 106 175 0.00 175.00 165072
4 200 118 192 200 1.00 199.00
5 300 123 287 210 1.50 208.50
6 400 126 384 216 2.00 214.00
7 500 127 483 219 2.50 216.50
8 600 129 581 222 3.00 219.00
9 700 129 681 223 3.50 219.50
10 800 130 780 225 4.00 221.00
11 900 131 879 227 4.50 222.50
12 1000 132 978 229 5.00 224.00
13 1100 133 1077 231 5.50 225.50
14 1200 134 1176 233 6.00 227.00
15 1300 135 1275 235 6.50 228.50
16 1400 136 1374 237 7.00 230.00
17 1500 137 1473 239 7.50 231.50
18 1600 138 1572 241 8.00 233.00
19 1700 138 1672 242 8.50 233.50
20 1800 139 1771 243 9.00 234.00
21 1900 140 1870 245 9.50 235.50
22 2000 140 1970 246 10.00 236.00 LOAD
23 2100 141 2069 248 10.50 237.50
24 2200 142 2168 250 11.00 239.00
25 2300 143 2267 252 11.50 240.50
26 2400 144 2366 254 12.00 242.00
27 2500 145 2465 256 12.50 243.50
28 2600 146 2564 258 13.00 245.00
29 2700 146 2664 259 13.50 245.50
30 2800 147 2763 260 14.00 246.00
31 2900 148 2862 262 14.50 247.50
32 3000 149 2961 264 15.00 249.00
33 3100 149 3061 265 15.50 249.50
34 3200 150 3160 267 16.00 251.00
35 3300 151 3259 270 16.50 253.50
36 3400 153 3357 273 17.00 256.00
37 3500 155 3455 277 17.50 259.50

Deduced of P L =

7700

PRESSUREMETER TEST CURVE

300.0
CORRECTED VOLUME READING V (cm 3)

250.0

200.0

TESTED BY: CHECKED BY:


M.TAHIR
150.0

PRESSURE METER
100.0 MODULUS

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
3160
581
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 167.797 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-049 DEPTH (m) 8.00 Λ P (kPa) 1569 DATE 12/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 59.08 80
LOCATION : 3
Vm (cm ) 251.06 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 66 64 104 0.00 104.00
3 100 103 77 171 0.62 170.38 55529
4 200 120 160 205 1.24 203.76
5 300 126 254 218 1.86 216.14
6 400 129 351 224 2.48 221.52
7 500 131 449 228 3.10 224.90
8 600 133 547 232 3.72 228.28
9 700 135 645 237 4.34 232.66
10 800 138 742 242 4.96 237.04
11 900 140 840 247 5.58 241.42
12 1000 142 938 251 6.20 244.80
13 1100 144 1036 255 6.82 248.18
14 1200 145 1135 258 7.44 250.56
15 1300 147 1233 262 8.06 253.94
16 1400 148 1332 266 8.68 257.32
17 1500 150 1430 270 9.30 260.70
18 1600 152 1528 275 9.92 265.08
19 1700 154 1626 280 10.54 269.46
20 1800 156 1724 284 11.16 272.84
21 1900 158 1822 288 11.78 276.22
22 2000 160 1920 293 12.40 280.60 LOAD
23 2100 163 2017 300 13.02 286.98
24 2200 168 2112 313 13.64 299.36
25 2300 175 2205 330 14.26 315.74
26 2400 183 2297 350 14.88 335.12
27 2500 192 2388 375 15.50 359.50
28 2600 203 2477 405 16.12 388.88
29 2700 218 2562 445 16.74 428.26
30 2800 233 2647 490 17.36 472.64
31 2900 251 2729 545 17.98 527.02
32 3000 273 2807 610 18.60 591.40

Deduced of P L =

3500

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 55,529.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
351 1920

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 167.797 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-049 DEPTH (m) 11.00 Λ P (kPa) 1764 DATE 12/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 68.84 110
LOCATION : 3
Vm (cm ) 255.94 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 42 118 65 0.00 65.00
3 100 84 126 135 0.00 135.00 53912
4 200 118 192 200 1.24 198.76
5 300 127 283 219 1.86 217.14
6 400 129 381 224 2.48 221.52
7 500 131 479 227 3.10 223.90
8 600 133 577 232 3.72 228.28
9 700 135 675 237 4.34 232.66
10 800 138 772 242 4.96 237.04
11 900 140 870 247 5.58 241.42
12 1000 142 968 252 6.20 245.80
13 1100 144 1066 256 6.82 249.18
14 1200 146 1164 260 7.44 252.56
15 1300 148 1262 264 8.06 255.94
16 1400 149 1361 268 8.68 259.32
17 1500 151 1459 272 9.30 262.70
18 1600 153 1557 276 9.92 266.08
19 1700 154 1656 280 10.54 269.46
20 1800 157 1753 285 11.16 273.84
21 1900 159 1851 290 11.78 278.22
22 2000 161 1949 295 12.40 282.60 LOAD
23 2100 163 2047 300 13.02 286.98
24 2200 165 2145 304 13.64 290.36
25 2300 169 2241 315 14.26 300.74
26 2400 177 2333 335 14.88 320.12
27 2500 189 2421 365 15.50 349.50
28 2600 202 2508 400 16.12 383.88
29 2700 214 2596 435 16.74 418.26
30 2800 228 2682 475 17.36 457.64
31 2900 243 2767 520 17.98 502.02
32 3000 259 2851 570 18.60 551.40
33 3100 278 2932 625 19.22 605.78

Deduced of P L =

3600

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 53,912.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
381 2145

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 155.224 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-063 DEPTH (m) 8.00 Λ P (kPa) 1560 DATE 9/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 77.57 80
LOCATION : 3
Vm (cm ) 258.176 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 67 63 106 0.00 106.00
3 100 108 72 180 0.65 179.35 42432
4 200 123 157 210 1.30 208.70
5 300 127 253 217 1.96 215.04
6 400 129 351 222 2.61 219.39
7 500 132 448 228 3.26 224.74
8 600 135 545 234 3.91 230.09
9 700 138 642 240 4.56 235.44
10 800 140 740 245 5.22 239.78
11 900 142 838 250 5.87 244.13
12 1000 145 935 256 6.52 249.48
13 1100 148 1032 261 7.17 253.83
14 1200 150 1130 266 7.82 258.18
15 1300 152 1228 272 8.48 263.52
16 1400 155 1325 277 9.13 267.87
17 1500 157 1423 283 9.78 273.22
18 1600 160 1520 288 10.43 277.57
19 1700 162 1618 294 11.08 282.92
20 1800 165 1715 300 11.74 288.26
21 1900 167 1813 305 12.39 292.61
22 2000 169 1911 310 13.04 296.96 LOAD
23 2100 173 2007 320 13.69 306.31
24 2200 176 2104 327 14.34 312.66
25 2300 179 2201 335 15.00 320.00
26 2400 183 2297 345 15.65 329.35
27 2500 191 2389 365 16.30 348.70
28 2600 200 2480 388 16.95 371.05
29 2700 208 2572 412 17.60 394.40
30 2800 218 2662 440 18.26 421.74
31 2900 229 2751 470 18.91 451.09
32 3000 240 2840 505 19.56 485.44
33 3100 254 2926 550 20.21 529.79
34 3200 269 3011 600 20.86 579.14

Deduced of P L =

3800

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 42,432.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
351 1911

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 155.224 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-063 DEPTH (m) 11.00 Λ P (kPa) 3467 DATE 9/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 47.18 110
LOCATION : 3
Vm (cm ) 234.33 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 42 118 66 0.00 66.00
3 100 84 126 136 0.00 136.00 150380
4 200 116 194 195 1.30 193.70
5 300 123 287 209 1.96 207.04
6 400 124 386 212 2.61 209.39
7 500 125 485 214 3.26 210.74
8 600 126 584 216 3.91 212.09
9 700 127 683 218 4.56 213.44
10 800 128 782 220 5.22 214.78
11 900 129 881 222 5.87 216.13
12 1000 130 980 224 6.52 217.48
13 1100 131 1079 226 7.17 218.83
14 1200 132 1178 228 7.82 220.18
15 1300 133 1277 230 8.48 221.52
16 1400 134 1376 232 9.13 222.87
17 1500 135 1475 234 9.78 224.22
18 1600 136 1574 236 10.43 225.57
19 1700 137 1673 238 11.08 226.92
20 1800 138 1772 240 11.74 228.26
21 1900 139 1871 242 12.39 229.61
22 2000 140 1970 244 13.04 230.96 LOAD
23 2100 141 2069 246 13.69 232.31
24 2200 142 2168 248 14.34 233.66
25 2300 142 2268 250 15.00 235.00
26 2400 143 2367 252 15.65 236.35
27 2500 144 2466 254 16.30 237.70
28 2600 145 2565 256 16.95 239.05
29 2700 146 2664 258 17.60 240.40
30 2800 147 2763 260 18.26 241.74
31 2900 148 2862 262 18.91 243.09
32 3000 149 2961 264 19.56 244.44
33 3100 150 3060 266 20.21 245.79
34 3200 151 3159 268 20.86 247.14
35 3300 152 3258 270 21.52 248.48
36 3400 152 3358 272 22.17 249.83
37 3500 153 3457 274 22.82 251.18
38 3600 154 3556 276 23.47 252.53
39 3700 155 3655 278 24.12 253.88 Deduced of P L =
40 3800 156 3754 280 24.78 255.22
41 3900 157 3853 282 25.43 256.57
7300
42 4000 158 3952 284 26.08 257.92

PRESSUREMETER TEST CURVE

320.0
CORRECTED VOLUME READING V (cm 3)

280.0

240.0

200.0
TESTED BY: CHECKED BY:
M.TAHIR
160.0

PRESSURE METER
120.0
MODULUS
EP = 150,380.0 kPa
80.0

40.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
386
3952
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 142.000 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-074 DEPTH (m) 8.00 Λ P (kPa) 661 DATE 6/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 97.00 80
LOCATION : 3
Vm (cm ) 385.5 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 81 49 130 0.00 130.00
3 100 110 70 185 1.00 184.00 16685
4 200 148 132 265 2.00 263.00
5 300 167 213 311 3.00 308.00
6 400 179 301 341 4.00 337.00
7 500 185 395 355 5.00 350.00
8 600 191 489 370 6.00 364.00
9 700 196 584 385 7.00 378.00
10 800 202 678 400 8.00 392.00
11 900 207 773 415 9.00 406.00
12 1000 212 868 430 10.00 420.00
13 1100 218 962 445 11.00 434.00
14 1200 228 1052 475 12.00 463.00

LOAD

Deduced of P L =

1400

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0 PRESSURE METER


MODULUS
150.0
EP = 16,685.0 kPa
100.0

50.0

0.0
0 200 400 600 800 1000 1200
301
962

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 142.000 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-074 DEPTH (m) 11.00 Λ P (kPa) 2063 DATE 6/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 63.00 110
LOCATION : 3
Vm (cm ) 262.5 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 58 102 90 0.00 90.00
3 100 107 103 178 1.00 177.00 69466
4 200 125 185 215 2.00 213.00
5 300 133 277 231 3.00 228.00
6 400 134 376 235 4.00 231.00
7 500 136 474 239 5.00 234.00
8 600 138 572 243 6.00 237.00
9 700 140 670 247 7.00 240.00
10 800 142 768 251 8.00 243.00
11 900 144 866 255 9.00 246.00
12 1000 145 965 259 10.00 249.00
13 1100 147 1063 263 11.00 252.00
14 1200 149 1161 267 12.00 255.00
15 1300 151 1259 271 13.00 258.00
16 1400 152 1358 275 14.00 261.00
17 1500 154 1456 279 15.00 264.00
18 1600 156 1554 283 16.00 267.00
19 1700 157 1653 287 17.00 270.00
20 1800 159 1751 291 18.00 273.00
21 1900 161 1849 295 19.00 276.00
22 2000 163 1947 299 20.00 279.00 LOAD
23 2100 164 2046 303 21.00 282.00
24 2200 166 2144 307 22.00 285.00
25 2300 167 2243 311 23.00 288.00
26 2400 169 2341 315 24.00 291.00
27 2500 171 2439 319 25.00 294.00
28 2600 174 2536 326 26.00 300.00
29 2700 177 2633 335 27.00 308.00
30 2800 183 2727 350 28.00 322.00
31 2900 191 2819 370 29.00 341.00
32 3000 200 2910 395 30.00 365.00
33 3100 211 2999 425 31.00 394.00
34 3200 223 3087 460 32.00 428.00
35 3300 235 3175 495 33.00 462.00
36 3400 248 3262 535 34.00 501.00
37 3500 262 3348 577 35.00 542.00
38 3600 276 3434 620 36.00 584.00
Deduced of P L =

4200

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 69,466.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
376 2439

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 150.237 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-081 DEPTH (m) 8.00 Λ P (kPa) 1862 DATE 4/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 73.50 80
LOCATION : 3
Vm (cm ) 255.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 65 65 103 0.00 103.00
3 100 103 77 170 0.50 169.50 53286
4 200 121 159 205 1.00 204.00
5 300 127 253 217 1.50 215.50
6 400 129 351 221 2.00 219.00
7 500 132 448 226 2.50 223.50
8 600 134 546 230 3.00 227.00
9 700 135 645 234 3.50 230.50
10 800 137 743 238 4.00 234.00
11 900 139 841 242 4.50 237.50
12 1000 141 939 246 5.00 241.00
13 1100 144 1036 251 5.50 245.50
14 1200 145 1135 255 6.00 249.00
15 1300 148 1232 260 6.50 253.50
16 1400 150 1330 264 7.00 257.00
17 1500 151 1429 268 7.50 260.50
18 1600 153 1527 272 8.00 264.00
19 1700 155 1625 277 8.50 268.50
20 1800 157 1723 281 9.00 272.00
21 1900 159 1821 285 9.50 275.50
22 2000 161 1919 290 10.00 280.00 LOAD
23 2100 163 2017 295 10.50 284.50
24 2200 165 2115 300 11.00 289.00
25 2300 167 2213 304 11.50 292.50
26 2400 171 2309 312 12.00 300.00
27 2500 175 2405 322 12.50 309.50
28 2600 180 2500 335 13.00 322.00
29 2700 186 2594 350 13.50 336.50
30 2800 194 2686 370 14.00 356.00
31 2900 202 2778 392 14.50 377.50
32 3000 212 2868 418 15.00 403.00
33 3100 223 2957 450 15.50 434.50
34 3200 235 3045 485 16.00 469.00
35 3300 249 3131 530 16.50 513.50

Deduced of P L =

4200

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 53,256.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
351 2213

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 150.237 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-081 DEPTH (m) 11.00 Λ P (kPa) 3368 DATE 4/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 52.00 110
LOCATION : 3
Vm (cm ) 238 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 51 109 80 0.00 80.00
3 100 108 102 180 0.50 179.50 133177
4 200 122 188 207 1.00 206.00
5 300 125 285 212 1.50 210.50
6 400 126 384 214 2.00 212.00
7 500 127 483 216 2.50 213.50
8 600 128 582 218 3.00 215.00
9 700 129 681 220 3.50 216.50
10 800 130 780 222 4.00 218.00
11 900 131 879 224 4.50 219.50
12 1000 132 978 226 5.00 221.00
13 1100 133 1077 228 5.50 222.50
14 1200 134 1176 230 6.00 224.00
15 1300 134 1276 232 6.50 225.50
16 1400 135 1375 234 7.00 227.00
17 1500 136 1474 236 7.50 228.50
18 1600 137 1573 238 8.00 230.00
19 1700 138 1672 240 8.50 231.50
20 1800 139 1771 242 9.00 233.00
21 1900 140 1870 244 9.50 234.50
22 2000 141 1969 246 10.00 236.00 LOAD
23 2100 142 2068 248 10.50 237.50
24 2200 143 2167 250 11.00 239.00
25 2300 144 2266 253 11.50 241.50
26 2400 145 2365 255 12.00 243.00
27 2500 146 2464 257 12.50 244.50
28 2600 147 2563 259 13.00 246.00
29 2700 148 2662 261 13.50 247.50
30 2800 149 2761 263 14.00 249.00
31 2900 150 2860 265 14.50 250.50
32 3000 151 2959 267 15.00 252.00
33 3100 152 3058 269 15.50 253.50
34 3200 153 3157 271 16.00 255.00
35 3300 154 3256 273 16.50 256.50
36 3400 154 3356 275 17.00 258.00
37 3500 155 3455 277 17.50 259.50
38 3600 156 3554 279 18.00 261.00
39 3700 157 3653 281 18.50 262.50 Deduced of P L =
40 3800 158 3752 283 19.00 264.00
7200

PRESSUREMETER TEST CURVE

320.0
CORRECTED VOLUME READING V (cm 3)

280.0

240.0

200.0
TESTED BY: CHECKED BY:
M.TAHIR
160.0

PRESSURE METER
120.0
MODULUS
EP = 133,177.0 kPa
80.0

40.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
384
3752
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 150.237 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-089 DEPTH (m) 8.00 Λ P (kPa) 881 DATE 4/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 40.50 80
LOCATION : 3
Vm (cm ) 300.25 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 48 82 75 0.00 75.00
3 100 103 77 170 0.50 169.50 48330
4 200 134 146 230 1.00 229.00
5 300 145 235 255 1.50 253.50
6 400 151 329 268 2.00 266.00
7 500 156 424 278 2.50 275.50
8 600 158 522 283 3.00 280.00
9 700 160 620 288 3.50 284.50
10 800 162 718 293 4.00 289.00
11 900 165 815 298 4.50 293.50
12 1000 167 913 303 5.00 298.00
13 1100 169 1011 308 5.50 302.50
14 1200 171 1109 313 6.00 307.00
15 1300 173 1207 318 6.50 311.50
16 1400 175 1305 323 7.00 316.00
17 1500 177 1403 328 7.50 320.50
18 1600 180 1500 335 8.00 327.00
19 1700 186 1594 350 8.50 341.50
20 1800 194 1686 370 9.00 361.00
21 1900 203 1777 395 9.50 385.50
22 2000 214 1866 425 10.00 415.00 LOAD
23 2100 226 1954 460 10.50 449.50
24 2200 239 2041 500 11.00 489.00
25 2300 253 2127 545 11.50 533.50
26 2400 269 2211 600 12.00 588.00

Deduced of P L =

2800

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
PRESSURE METER
200.0 MODULUS
150.0 EP = 48,330.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400
522 1403

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 150.237 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-089 DEPTH (m) 11.00 Λ P (kPa) 1381 DATE 4/12/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 35.00 110
LOCATION : 3
Vm (cm ) 273.5 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 45 115 70 0.00 70.00
3 100 98 112 160 0.50 159.50 84857
4 200 134 176 230 1.00 229.00
5 300 141 269 245 1.50 243.50
6 400 143 367 250 2.00 248.00
7 500 146 464 256 2.50 253.50
8 600 147 563 259 3.00 256.00
9 700 149 661 262 3.50 258.50
10 800 150 760 265 4.00 261.00
11 900 151 859 268 4.50 263.50
12 1000 153 957 271 5.00 266.00
13 1100 154 1056 274 5.50 268.50
14 1200 155 1155 277 6.00 271.00
15 1300 157 1253 280 6.50 273.50
16 1400 158 1352 283 7.00 276.00
17 1500 159 1451 286 7.50 278.50
18 1600 161 1549 289 8.00 281.00
19 1700 162 1648 292 8.50 283.50
20 1800 163 1747 295 9.00 286.00
21 1900 165 1845 298 9.50 288.50
22 2000 166 1944 301 10.00 291.00 LOAD
23 2100 170 2040 310 10.50 299.50
24 2200 176 2134 325 11.00 314.00
25 2300 183 2227 343 11.50 331.50
26 2400 192 2318 365 12.00 353.00
27 2500 203 2407 395 12.50 382.50
28 2600 216 2494 430 13.00 417.00
29 2700 230 2580 470 13.50 456.50
30 2800 244 2666 515 14.00 501.00
31 2900 259 2751 565 14.50 550.50
32 3000 275 2835 620 15.00 605.00

Deduced of P L =

3400

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 84,857.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800
563 1944

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 147.728 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-098 DEPTH (m) 8.00 Λ P (kPa) 1064 DATE 29/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 68.73 80
LOCATION : 3
Vm (cm ) 256.852 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 54 76 85 0.00 85.00
3 100 101 79 165 0.75 164.25 32609
4 200 111 169 183 1.50 181.50
5 300 118 262 196 2.26 193.74
6 400 124 356 209 3.01 205.99
7 500 130 450 220 3.76 216.24
8 600 133 547 227 4.51 222.49
9 700 137 643 234 5.26 228.74
10 800 140 740 241 6.02 234.98
11 900 144 836 248 6.77 241.23
12 1000 147 933 255 7.52 247.48
13 1100 150 1030 262 8.27 253.73
14 1200 153 1127 269 9.02 259.98
15 1300 157 1223 276 9.78 266.22
16 1400 160 1320 283 10.53 272.47
17 1500 163 1417 290 11.28 278.72
18 1600 166 1514 297 12.03 284.97
19 1700 169 1611 304 12.78 291.22
20 1800 172 1708 310 13.54 296.46
21 1900 176 1804 320 14.29 305.71
22 2000 182 1898 335 15.04 319.96 LOAD
23 2100 189 1991 352 15.79 336.21
24 2200 202 2078 385 16.54 368.46
25 2300 215 2165 422 17.30 404.70
26 2400 228 2252 460 18.05 441.95
27 2500 240 2340 500 18.80 481.20
28 2600 255 2425 550 19.55 530.45
29 2700 269 2511 605 20.30 584.70

Deduced of P L =

3100

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 32,609.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800
547 1611

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 147.728 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-098 DEPTH (m) 11.00 Λ P (kPa) 1642 DATE 29/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 120.22 110
LOCATION : 3
Vm (cm ) 283.596 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 64 96 100 0.00 100.00
3 100 101 109 165 0.75 164.25 29741
4 200 114 196 188 1.50 186.50
5 300 120 290 200 2.26 197.74
6 400 125 385 211 3.01 207.99
7 500 130 480 220 3.76 216.24
8 600 134 576 228 4.51 223.49
9 700 138 672 236 5.26 230.74
10 800 142 768 244 6.02 237.98
11 900 145 865 251 6.77 244.23
12 1000 149 961 259 7.52 251.48
13 1100 152 1058 267 8.27 258.73
14 1200 156 1154 275 9.02 265.98
15 1300 160 1250 283 9.78 273.22
16 1400 163 1347 291 10.53 280.47
17 1500 167 1443 299 11.28 287.72
18 1600 170 1540 307 12.03 294.97
19 1700 174 1636 315 12.78 302.22
20 1800 177 1733 323 13.54 309.46
21 1900 180 1830 330 14.29 315.71
22 2000 183 1927 337 15.04 321.96 LOAD
23 2100 186 2024 345 15.79 329.21
24 2200 189 2121 353 16.54 336.46
25 2300 192 2218 361 17.30 343.70
26 2400 198 2312 375 18.05 356.95
27 2500 205 2405 395 18.80 376.20
28 2600 214 2496 420 19.55 400.45
29 2700 226 2584 455 20.30 434.70
30 2800 237 2673 490 21.06 468.94
31 2900 251 2759 535 21.81 513.19
32 3000 264 2846 585 22.56 562.44
33 3100 278 2932 640 23.31 616.69

Deduced of P L =

3100

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 29,741.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
576 2218

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 167.235 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-104 DEPTH (m) 8.00 Λ P (kPa) 1653 DATE 28/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 93.50 80
LOCATION : 3
Vm (cm ) 279.75 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 62 68 100 0.00 100.00
3 100 102 78 170 0.50 169.50 38315
4 200 118 162 200 1.00 199.00
5 300 125 255 214 1.50 212.50
6 400 129 351 222 2.00 220.00
7 500 133 447 230 2.50 227.50
8 600 136 544 236 3.00 233.00
9 700 139 641 242 3.50 238.50
10 800 142 738 248 4.00 244.00
11 900 145 835 254 4.50 249.50
12 1000 148 932 260 5.00 255.00
13 1100 150 1030 266 5.50 260.50
14 1200 153 1127 272 6.00 266.00
15 1300 156 1224 278 6.50 271.50
16 1400 159 1321 284 7.00 277.00
17 1500 162 1418 290 7.50 282.50
18 1600 164 1516 296 8.00 288.00
19 1700 167 1613 302 8.50 293.50
20 1800 170 1710 308 9.00 299.00
21 1900 172 1808 314 9.50 304.50
22 2000 175 1905 320 10.00 310.00 LOAD
23 2100 178 2002 326 10.50 315.50
24 2200 180 2100 332 11.00 321.00
25 2300 183 2197 338 11.50 326.50
26 2400 188 2292 350 12.00 338.00
27 2500 196 2384 370 12.50 357.50
28 2600 207 2473 400 13.00 387.00
29 2700 221 2559 438 13.50 424.50
30 2800 235 2645 480 14.00 466.00
31 2900 250 2730 530 14.50 515.50
32 3000 265 2815 585 15.00 570.00

Deduced of P L =

3600

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0
PRESSURE METER
200.0 MODULUS
150.0 EP = 38,315.0 kPa

100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
544 2197

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 167.235 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-104 DEPTH (m) 11.00 Λ P (kPa) 1471 DATE 28/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 52.50 110
LOCATION : 3
Vm (cm ) 260.25 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 62 98 100 0.00 100.00
3 100 104 106 175 0.50 174.50 59271
4 200 123 187 210 1.00 209.00
5 300 129 281 222 1.50 220.50
6 400 131 379 227 2.00 225.00
7 500 134 476 233 2.50 230.50
8 600 136 574 237 3.00 234.00
9 700 138 672 241 3.50 237.50
10 800 140 770 245 4.00 241.00
11 900 142 868 249 4.50 244.50
12 1000 144 966 253 5.00 248.00
13 1100 146 1064 257 5.50 251.50
14 1200 148 1162 261 6.00 255.00
15 1300 150 1260 265 6.50 258.50
16 1400 152 1358 269 7.00 262.00
17 1500 154 1456 273 7.50 265.50
18 1600 156 1554 277 8.00 269.00
19 1700 157 1653 281 8.50 272.50
20 1800 159 1751 285 9.00 276.00
21 1900 161 1849 289 9.50 279.50
22 2000 163 1947 293 10.00 283.00 LOAD
23 2100 165 2045 297 10.50 286.50
24 2200 168 2142 304 11.00 293.00
25 2300 172 2238 314 11.50 302.50
26 2400 177 2333 324 12.00 312.00
27 2500 183 2427 340 12.50 327.50
28 2600 192 2518 360 13.00 347.00
29 2700 202 2608 385 13.50 371.50
30 2800 213 2697 415 14.00 401.00
31 2900 225 2785 450 14.50 435.50
32 3000 241 2869 500 15.00 485.00
33 3100 257 2953 555 15.50 539.50

Deduced of P L =

3750

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 59,271.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800
574 2045

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 199.095 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-111 DEPTH (m) 8.00 Λ P (kPa) 1450 DATE 27/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 93.86 80
LOCATION : 3
Vm (cm ) 240.2405 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 59 71 92 0.00 92.00
3 100 73 107 115 0.00 115.00 31859
4 200 82 198 130 0.00 130.00
5 300 88 292 140 0.00 140.00
6 400 93 387 150 0.00 150.00
7 500 99 481 160 0.00 160.00
8 600 105 575 170 0.00 170.00
9 700 110 670 180 0.00 180.00
10 800 114 766 187 0.00 187.00
11 900 121 859 200 6.69 193.31
12 1000 124 956 207 7.43 199.57
13 1100 128 1052 214 8.17 205.83
14 1200 132 1148 221 8.92 212.08
15 1300 135 1245 228 9.66 218.34
16 1400 139 1341 235 10.40 224.60
17 1500 142 1438 242 11.15 230.86
18 1600 146 1534 249 11.89 237.11
19 1700 149 1631 256 12.63 243.37
20 1800 152 1728 263 13.37 249.63
21 1900 155 1825 270 14.12 255.88
22 2000 159 1921 277 14.86 262.14 LOAD
23 2100 162 2018 284 15.60 268.40
24 2200 165 2115 291 16.35 274.65
25 2300 168 2212 298 17.09 280.91
26 2400 171 2309 305 17.83 287.17
27 2500 177 2403 320 18.58 301.43
28 2600 185 2495 340 19.32 320.68
29 2700 195 2585 365 20.06 344.94
30 2800 205 2675 392 20.80 371.20
31 2900 216 2764 425 21.55 403.45
32 3000 226 2854 460 22.29 437.71
33 3100 239 2941 510 23.03 486.97
34 3200 251 3029 575 23.78 551.22
35 3300 258 3122 630 24.52 605.48

Deduced of P L =

3800

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 31,859.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
2309
859
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 199.095 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-111 DEPTH (m) 11.00 Λ P (kPa) 1660 DATE 27/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 72.37 110
LOCATION : 3
Vm (cm ) 251.7265 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 61 99 95 0.00 95.00
3 100 91 119 146 0.00 146.00 48002
4 200 106 204 172 0.00 172.00
5 300 116 294 190 0.00 190.00
6 400 123 387 205 2.97 202.03
7 500 129 481 215 3.72 211.29
8 600 131 579 220 4.46 215.54
9 700 134 676 225 5.20 219.80
10 800 136 774 230 5.94 224.06
11 900 139 871 235 6.69 228.31
12 1000 141 969 240 7.43 232.57
13 1100 144 1066 245 8.17 236.83
14 1200 146 1164 250 8.92 241.08
15 1300 148 1262 255 9.66 245.34
16 1400 151 1359 260 10.40 249.60
17 1500 153 1457 265 11.15 253.86
18 1600 155 1555 270 11.89 258.11
19 1700 158 1652 275 12.63 262.37
20 1800 160 1750 280 13.37 266.63
21 1900 162 1848 285 14.12 270.88
22 2000 165 1945 290 14.86 275.14 LOAD
23 2100 167 2043 295 15.60 279.40
24 2200 169 2141 300 16.35 283.65
25 2300 171 2239 305 17.09 287.91
26 2400 175 2335 315 17.83 297.17
27 2500 181 2429 330 18.58 311.43
28 2600 189 2521 350 19.32 330.68
29 2700 198 2612 373 20.06 352.94
30 2800 208 2702 400 20.80 379.20
31 2900 220 2790 440 21.55 418.45
32 3000 233 2877 485 22.29 462.71
33 3100 244 2966 535 23.03 511.97
34 3200 254 3056 590 23.78 566.22
35 3300 260 3150 648 24.52 623.48

Deduced of P L =

3750

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 48,002.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200 3600
579 2239
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 157.737 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-120 DEPTH (m) 8.00 Λ P (kPa) 1855 DATE 24/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 104.50 80
LOCATION : 3
Vm (cm ) 260.25 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 68 62 98 0.00 98.00
3 100 104 76 160 0.50 159.50 37550
4 200 120 160 193 1.00 192.00
5 300 125 255 203 1.50 201.50
6 400 128 352 210 2.00 208.00
7 500 131 449 216 2.50 213.50
8 600 134 546 222 3.00 219.00
9 700 136 644 228 3.50 224.50
10 800 139 741 234 4.00 230.00
11 900 141 839 240 4.50 235.50
12 1000 144 936 246 5.00 241.00
13 1100 146 1034 252 5.50 246.50
14 1200 149 1131 258 6.00 252.00
15 1300 151 1229 264 6.50 257.50
16 1400 154 1326 270 7.00 263.00
17 1500 156 1424 276 7.50 268.50
18 1600 158 1522 282 8.00 274.00
19 1700 160 1620 288 8.50 279.50
20 1800 163 1717 294 9.00 285.00
21 1900 165 1815 300 9.50 290.50
22 2000 167 1913 306 10.00 296.00 LOAD
23 2100 169 2011 312 10.50 301.50
24 2200 171 2109 318 11.00 307.00
25 2300 173 2207 324 11.50 312.50
26 2400 176 2304 332 12.00 320.00
27 2500 179 2401 342 12.50 329.50
28 2600 185 2495 362 13.00 349.00
29 2700 195 2585 395 13.50 381.50
30 2800 205 2675 432 14.00 418.00
31 2900 215 2765 475 14.50 460.50
32 3000 226 2854 520 15.00 505.00
33 3100 237 2943 570 15.50 554.50

Deduced of P L =

3800

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0

150.0 PRESSURE METER


MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
352
2207
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 157.737 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-120 DEPTH (m) 11.00 Λ P (kPa) 1771 DATE 24/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 63.00 110
LOCATION : 3
Vm (cm ) 254.5 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 70 90 102 0.00 102.00
3 100 113 97 178 0.50 177.50 59035
4 200 127 183 208 1.00 207.00
5 300 133 277 221 1.50 219.50
6 400 135 375 225 2.00 223.00
7 500 137 473 229 2.50 226.50
8 600 139 571 233 3.00 230.00
9 700 140 670 237 3.50 233.50
10 800 142 768 241 4.00 237.00
11 900 144 866 245 4.50 240.50
12 1000 145 965 249 5.00 244.00
13 1100 147 1063 253 5.50 247.50
14 1200 148 1162 257 6.00 251.00
15 1300 150 1260 261 6.50 254.50
16 1400 152 1358 265 7.00 258.00
17 1500 153 1457 269 7.50 261.50
18 1600 155 1555 273 8.00 265.00
19 1700 156 1654 277 8.50 268.50
20 1800 158 1752 281 9.00 272.00
21 1900 159 1851 285 9.50 275.50
22 2000 161 1949 289 10.00 279.00 LOAD
23 2100 162 2048 293 10.50 282.50
24 2200 164 2146 297 11.00 286.00
25 2300 167 2243 305 11.50 293.50
26 2400 170 2340 315 12.00 303.00
27 2500 174 2436 327 12.50 314.50
28 2600 178 2532 340 13.00 327.00
29 2700 183 2627 355 13.50 341.50
30 2800 188 2722 372 14.00 358.00
31 2900 193 2817 390 14.50 375.50
32 3000 200 2910 415 15.00 400.00
33 3100 209 3001 450 15.50 434.50
34 3200 219 3091 490 16.00 474.00
35 3300 231 3179 540 16.50 523.50

Deduced of P L =

4200

PRESSUREMETER TEST CURVE

550.0

500.0
CORRECTED VOLUME READING V (cm 3)

450.0

400.0

350.0
TESTED BY: CHECKED BY:
300.0 M.TAHIR
250.0

200.0

150.0
PRESSURE METER
MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
375 2146

PRESSURE APPLIED TO BOREHOLE WALL (kPa)


PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 152.994 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-129 DEPTH (m) 8.00 Λ P (kPa) 1759 DATE 23/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 98.42 80
LOCATION : 3
Vm (cm ) 272.084 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 71 59 103 0.00 103.00
3 100 108 72 167 0.53 166.47 38368
4 200 125 155 202 1.06 200.94
5 300 133 247 219 1.60 217.40
6 400 135 345 225 2.13 222.87
7 500 138 442 231 2.66 228.34
8 600 141 539 237 3.19 233.81
9 700 143 637 243 3.72 239.28
10 800 146 734 249 4.26 244.74
11 900 148 832 255 4.79 250.21
12 1000 150 930 261 5.32 255.68
13 1100 153 1027 267 5.85 261.15
14 1200 155 1125 273 6.38 266.62
15 1300 157 1223 279 6.92 272.08
16 1400 160 1320 285 7.45 277.55
17 1500 162 1418 291 7.98 283.02
18 1600 164 1516 297 8.51 288.49
19 1700 166 1614 303 9.04 293.96
20 1800 168 1712 309 9.58 299.42
21 1900 170 1810 315 10.11 304.89
22 2000 172 1908 321 10.64 310.36 LOAD
23 2100 174 2006 327 11.17 315.83
24 2200 176 2104 333 11.70 321.30
25 2300 179 2201 340 12.24 327.76
26 2400 182 2298 350 12.77 337.23
27 2500 188 2392 370 13.30 356.70
28 2600 195 2485 395 13.83 381.17
29 2700 202 2578 422 14.36 407.64
30 2800 210 2670 452 14.90 437.10
31 2900 218 2762 485 15.43 469.57
32 3000 227 2853 525 15.96 509.04
33 3100 238 2942 575 16.49 558.51

Deduced of P L =

3800

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0
PRESSURE METER
150.0 MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
345
2104
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 152.994 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-129 DEPTH (m) 11.00 Λ P (kPa) 1862 DATE 23/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 84.89 110
LOCATION : 3
Vm (cm ) 255.318 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 70 90 100 0.00 100.00
3 100 112 98 175 0.53 174.47 46110
4 200 124 186 200 1.06 198.94
5 300 129 281 210 1.60 208.40
6 400 131 379 215 2.13 212.87
7 500 133 477 220 2.66 217.34
8 600 135 575 225 3.19 221.81
9 700 138 672 230 3.72 226.28
10 800 140 770 235 4.26 230.74
11 900 142 868 240 4.79 235.21
12 1000 144 966 245 5.32 239.68
13 1100 146 1064 250 5.85 244.15
14 1200 148 1162 255 6.38 248.62
15 1300 150 1260 260 6.92 253.08
16 1400 152 1358 265 7.45 257.55
17 1500 154 1456 270 7.98 262.02
18 1600 156 1554 275 8.51 266.49
19 1700 158 1652 280 9.04 270.96
20 1800 160 1750 285 9.58 275.42
21 1900 161 1849 290 10.11 279.89
22 2000 163 1947 295 10.64 284.36 LOAD
23 2100 165 2045 300 11.17 288.83
24 2200 167 2143 305 11.70 293.30
25 2300 169 2241 310 12.24 297.76
26 2400 172 2338 320 12.77 307.23
27 2500 176 2434 332 13.30 318.70
28 2600 183 2527 355 13.83 341.17
29 2700 192 2618 385 14.36 370.64
30 2800 202 2708 420 14.90 405.10
31 2900 212 2798 460 15.43 444.57
32 3000 223 2887 507 15.96 491.04
33 3100 234 2976 557 16.49 540.51

Deduced of P L =

3900

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0

150.0 PRESSURE METER


MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
379
2241
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 203.733 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-133 DEPTH (m) 8.00 Λ P (kPa) 1566 DATE 22/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 72.00 80
LOCATION : 3
Vm (cm ) 254 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 74 56 110 0.00 110.00
3 100 108 72 170 0.00 170.00 45648
4 200 123 157 200 0.00 200.00
5 300 130 250 215 1.50 213.50
6 400 133 347 220 2.00 218.00
7 500 135 445 225 2.50 222.50
8 600 137 543 230 3.00 227.00
9 700 139 641 235 3.50 231.50
10 800 142 738 240 4.00 236.00
11 900 144 836 245 4.50 240.50
12 1000 146 934 250 5.00 245.00
13 1100 148 1032 255 5.50 249.50
14 1200 151 1129 260 6.00 254.00
15 1300 153 1227 265 6.50 258.50
16 1400 155 1325 270 7.00 263.00
17 1500 157 1423 275 7.50 267.50
18 1600 159 1521 280 8.00 272.00
19 1700 161 1619 285 8.50 276.50
20 1800 163 1717 290 9.00 281.00
21 1900 165 1815 295 9.50 285.50
22 2000 167 1913 300 10.00 290.00 LOAD
23 2100 169 2011 306 10.50 295.50
24 2200 172 2108 313 11.00 302.00
25 2300 175 2205 321 11.50 309.50
26 2400 179 2301 330 12.00 318.00
27 2500 182 2398 340 12.50 327.50
28 2600 188 2492 355 13.00 342.00
29 2700 194 2586 372 13.50 358.50
30 2800 200 2680 390 14.00 376.00
31 2900 209 2771 415 14.50 400.50
32 3000 220 2860 450 15.00 435.00
33 3100 237 2943 500 15.50 484.50

Deduced of P L =

4000

PRESSUREMETER TEST CURVE

600.0

550.0
CORRECTED VOLUME READING V (cm 3)

500.0

450.0

400.0

350.0 TESTED BY: CHECKED BY:


M.TAHIR
300.0

250.0

200.0
PRESSURE METER
150.0 MODULUS
100.0

50.0

0.0
0 400 800 1200 1600 2000 2400 2800 3200
347
1913
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
PRESSUREMETER TEST
(ASTM D4719)
PROJECT: NEOM DESALINATION PLANT VOLUME(Vi)cm3 203.733 TEST TYPE A

VOLUME(Vo)cm3 535 TYPE OF PROBE


CLIENT : NEOM COMPANY
G
CALIBRATION NO. : ( 1 ) POISSON RATIO 0.33 PROBE SIZE BX
BH NO : BH-133 DEPTH (m) 11.00 Λ P (kPa) 1664 DATE 22/11/2021
Λ V (cm )
3 HYD.ST. PRESSURE(kPa)
PROJECT NO. : 21J4037 76.50 110
LOCATION : 3
Vm (cm ) 264.25 READING DURATION(SEC) 60
PRESSURE PRESSURE PRESSURE VOLUME VOLUME CORRECTED PRESSUREMETER
READ
NO.

READING CORRECTION ON BH WALL READ CORRECTION VOLUME MODULUS


PR ( Kpa ) Pc( Kpa) (kPa) cm3 VC cm3 V cm3 Ep (kPa)
1 0 0 0 0 0.00 0.00
2 50 74 86 110 0.00 110.00
3 100 110 100 175 0.00 175.00 46244
4 200 128 182 210 1.00 209.00
5 300 134 276 223 1.50 221.50
6 400 136 374 228 2.00 226.00
7 500 139 471 233 2.50 230.50
8 600 141 569 238 3.00 235.00
9 700 143 667 243 3.50 239.50
10 800 145 765 248 4.00 244.00
11 900 147 863 253 4.50 248.50
12 1000 150 960 258 5.00 253.00
13 1100 152 1058 263 5.50 257.50
14 1200 154 1156 268 6.00 262.00
15 1300 156 1254 273 6.50 266.50
16 1400 158 1352 278 7.00 271.00
17 1500 160 1450 283 7.50 275.50
18 1600 162 1548 288 8.00 280.00
19 1700 164 1646 293 8.50 284.50
20 1800 166 1744 298 9.00 289.00
21 1900 168 1842 303 9.50 293.50
22 2000 170 1940 308 10.00 298.00 LOAD
23 2100 172 2038 313 10.50 302.50
24 2200 175 2135 320 11.00 309.00
25 2300 179 2231 330 11.50 318.50
26 2400 184 2326 345 12.00 333.00
27 2500 191 2419 363 12.50 350.50
28 2600 198 2512 383 13.00 370.00
29 2700 205 2605 405 13.50 391.50
30 2800 217 2693 440 14.00 426.00
31 2900 233 2777 490 14.50 475.50
32 3000 251 2859 545 15.00 530.00
33 3100 269 2941 600 15.50 584.50

Deduced of P L =

3700

PRESSUREMETER TEST CURVE

650.0
600.0
CORRECTED VOLUME READING V (cm 3)

550.0
500.0
450.0
400.0
TESTED BY: CHECKED BY:
350.0 M.TAHIR
300.0
250.0
200.0 PRESSURE METER
150.0
MODULUS
EP = 46,244.0 kPa
100.0
50.0
0.0
0 400 800 1200 1600 2000 2400 2800 3200
374
2038
PRESSURE APPLIED TO BOREHOLE WALL (kPa)
DOUBLE CYCLE PLATE LOAD TESTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 01
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 22.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.36
20 2448.0 0.87 1.26 20 2448.0 0.87 7.46
30 3723.0 1.32 2.54 30 3723.0 1.32 8.59
40 5028.6 1.78 3.78 40 5028.6 1.78 9.56
50 6201.6 2.19 4.99 50 6201.6 2.19 10.63
60 7486.8 2.65 6.38 60 7486.8 2.65 11.04
70 8588.0 3.04 8.08 70 8588.0 3.04 12.41
80 8924.6 3.16 10.57 80 8924.6 3.16 15.02
70 8588.0 3.04 10.10 70 8588.0 3.04 14.77
60 7486.8 2.65 9.66 60 7486.8 2.65 14.36
50 6201.6 2.19 9.19 50 6201.6 2.19 14.02
40 5028.6 1.78 8.68 40 5028.6 1.78 13.73
30 3723.0 1.32 8.02 30 3723.0 1.32 13.29
20 2448.0 0.87 7.18 20 2448.0 0.87 13.09
0 0.0 0.00 6.36 0 0.0 0.00 12.26

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
8924.6 3.16 10.57 6.36
UNSOAKED

2nd Load Cycle


8924.6 3.16 15.02 12.26
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 01
(Test Date: 22.11.2021)

Pressure (kpa)
0 0.5 1 1.5 2 2.5 3 3.5
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0

16.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 02
DESCRIPTION : Light brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 24.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 3.14
30 3723.0 1.32 1.07 30 3723.0 1.32 4.60
60 7486.8 2.65 1.99 60 7486.8 2.65 5.84
80 9924.6 3.51 2.76 80 9924.6 3.51 7.07
100 12627.6 4.47 3.44 100 12627.6 4.47 7.28
120 15136.8 5.35 4.13 120 15136.8 5.35 8.47
140 17605.2 6.23 5.29 140 17605.2 6.23 9.71
120 15136.8 5.35 5.14 120 15136.8 5.35 9.64
100 12627.6 4.47 4.94 100 12627.6 4.47 9.53
80 9924.6 3.51 4.68 80 9924.6 3.51 9.36
60 7486.8 2.65 4.42 60 7486.8 2.65 9.17
30 3723.0 1.32 4.17 30 3723.0 1.32 8.74
0 0.0 0.00 3.14 0 0.0 0.00 8.41

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 5.29 3.14
UNSOAKED

2nd Load Cycle


17605.2 6.23 9.71 8.41
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 02
(Test Date: 24.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 03
DESCRIPTION : Light Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 25.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.24
30 3723.0 1.32 1.70 30 3723.0 1.32 5.63
60 7486.8 2.65 2.68 60 7486.8 2.65 7.27
80 9924.6 3.51 3.28 80 9924.6 3.51 8.52
100 12627.6 4.47 3.98 100 12627.6 4.47 10.00
120 15136.8 5.35 4.65 120 15136.8 5.35 11.43
140 17605.2 6.23 5.53 140 17605.2 6.23 13.02
120 15136.8 5.35 5.54 120 15136.8 5.35 12.92
100 12627.6 4.47 5.45 100 12627.6 4.47 12.82
80 9924.6 3.51 5.35 80 9924.6 3.51 12.69
60 7486.8 2.65 5.26 60 7486.8 2.65 12.44
30 3723.0 1.32 4.84 30 3723.0 1.32 12.05
0 0.0 0.00 4.24 0 0.0 0.00 11.51

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 5.53 4.24
UNSOAKED

2nd Load Cycle


17605.2 6.23 13.02 11.51
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 03
(Test Date: 25.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 04
DESCRIPTION : Light brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 27.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 14.91
30 3723.0 1.32 1.34 30 3723.0 1.32 16.39
60 7486.8 2.65 3.20 60 7486.8 2.65 18.27
80 9924.6 3.51 5.51 80 9924.6 3.51 20.62
100 12627.6 4.47 9.91 100 12627.6 4.47 21.76
120 15136.8 5.35 13.40 120 15136.8 5.35 23.87
140 17605.2 6.23 17.13 140 17605.2 6.23 26.21
120 15136.8 5.35 17.04 120 15136.8 5.35 26.14
100 12627.6 4.47 16.61 100 12627.6 4.47 26.02
80 9924.6 3.51 16.29 80 9924.6 3.51 25.92
60 7486.8 2.65 15.96 60 7486.8 2.65 25.75
30 3723.0 1.32 15.57 30 3723.0 1.32 25.50
0 0.0 0.00 14.91 0 0.0 0.00 25.06

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 17.13 14.91
UNSOAKED

2nd Load Cycle


17605.2 6.23 26.21 25.06
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 04
(Test Date: 27.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0

10.0
Settlement (mm)

15.0

20.0

25.0

30.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 05
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 28.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 2.53
30 3723.0 1.32 1.22 30 3723.0 1.32 2.99
60 7486.8 2.65 1.77 60 7486.8 2.65 3.36
80 9924.6 3.51 3.04 80 9924.6 3.51 3.51
100 12627.6 4.47 3.27 100 12627.6 4.47 3.67
120 15136.8 5.35 3.56 120 15136.8 5.35 3.81
140 17605.2 6.23 3.72 140 17605.2 6.23 4.09
120 15136.8 5.35 3.63 120 15136.8 5.35 4.01
100 12627.6 4.47 3.50 100 12627.6 4.47 3.93
80 9924.6 3.51 3.36 80 9924.6 3.51 3.87
60 7486.8 2.65 3.21 60 7486.8 2.65 3.80
30 3723.0 1.32 3.10 30 3723.0 1.32 3.72
0 0.0 0.00 2.53 0 0.0 0.00 2.95

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 3.72 2.53
UNSOAKED

2nd Load Cycle


17605.2 6.23 4.09 2.95
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 05
(Test Date: 28.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

0.5

1.0

1.5
Settlement (mm)

2.0

2.5

3.0

3.5

4.0

4.5
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 06
DESCRIPTION : Light brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 29.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.33
30 3723.0 1.32 2.16 30 3723.0 1.32 9.79
60 7486.8 2.65 4.01 60 7486.8 2.65 12.27
80 9924.6 3.51 5.32 80 9924.6 3.51 13.67
100 12627.6 4.47 6.37 100 12627.6 4.47 15.54
120 15136.8 5.35 7.72 120 15136.8 5.35 17.36
140 17605.2 6.23 8.35 140 17605.2 6.23 19.60
120 15136.8 5.35 8.31 120 15136.8 5.35 19.53
100 12627.6 4.47 8.26 100 12627.6 4.47 19.51
80 9924.6 3.51 8.19 80 9924.6 3.51 19.43
60 7486.8 2.65 8.11 60 7486.8 2.65 18.67
30 3723.0 1.32 7.88 30 3723.0 1.32 18.63
0 0.0 0.00 6.33 0 0.0 0.00 18.01

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.35 6.33
UNSOAKED

2nd Load Cycle


17605.2 6.23 19.60 18.01
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 06
(Test Date: 29.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0
Settlement (mm)

10.0

15.0

20.0

25.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 07
DESCRIPTION : Light brown, silty SAND. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 30.11.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 14.81
30 3723.0 1.32 4.79 30 3723.0 1.32 16.13
60 7486.8 2.65 6.29 60 7486.8 2.65 17.74
80 9924.6 3.51 9.47 80 9924.6 3.51 18.78
100 12627.6 4.47 12.02 100 12627.6 4.47 19.91
120 15136.8 5.35 14.46 120 15136.8 5.35 21.01
140 17605.2 6.23 17.32 140 17605.2 6.23 22.40
120 15136.8 5.35 17.28 120 15136.8 5.35 22.35
100 12627.6 4.47 17.24 100 12627.6 4.47 22.31
80 9924.6 3.51 17.10 80 9924.6 3.51 22.19
60 7486.8 2.65 17.02 60 7486.8 2.65 22.10
30 3723.0 1.32 16.49 30 3723.0 1.32 21.79
0 0.0 0.00 14.81 0 0.0 0.00 20.27

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 17.32 14.81
UNSOAKED

2nd Load Cycle


17605.2 6.23 22.40 20.27
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 07
(Test Date: 30.11.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0
Settlement (mm)

10.0

15.0

20.0

25.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 08
DESCRIPTION : Light brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 01.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.51
30 3723.0 1.32 2.40 30 3723.0 1.32 9.36
60 7486.8 2.65 4.14 60 7486.8 2.65 11.75
80 9924.6 3.51 4.77 80 9924.6 3.51 13.69
100 12627.6 4.47 5.49 100 12627.6 4.47 15.65
120 15136.8 5.35 7.20 120 15136.8 5.35 17.87
140 17605.2 6.23 8.27 140 17605.2 6.23 19.22
120 15136.8 5.35 8.23 120 15136.8 5.35 19.09
100 12627.6 4.47 8.16 100 12627.6 4.47 19.14
80 9924.6 3.51 8.04 80 9924.6 3.51 18.98
60 7486.8 2.65 7.95 60 7486.8 2.65 18.78
30 3723.0 1.32 7.66 30 3723.0 1.32 18.46
0 0.0 0.00 6.51 0 0.0 0.00 17.15

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.27 6.51
UNSOAKED

2nd Load Cycle


17605.2 6.23 19.22 17.15
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 08
(Test Date: 01.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0
Settlement (mm)

10.0

15.0

20.0

25.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 09
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 02.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 6.72
30 3723.0 1.32 2.38 30 3723.0 1.32 8.19
60 7486.8 2.65 4.32 60 7486.8 2.65 8.95
80 9924.6 3.51 4.63 80 9924.6 3.51 9.66
100 12627.6 4.47 6.12 100 12627.6 4.47 10.39
120 15136.8 5.35 7.98 120 15136.8 5.35 11.18
140 17605.2 6.23 8.51 140 17605.2 6.23 11.95
120 15136.8 5.35 8.46 120 15136.8 5.35 11.92
100 12627.6 4.47 8.39 100 12627.6 4.47 11.84
80 9924.6 3.51 8.27 80 9924.6 3.51 11.66
60 7486.8 2.65 8.16 60 7486.8 2.65 11.45
30 3723.0 1.32 7.83 30 3723.0 1.32 11.00
0 0.0 0.00 6.72 0 0.0 0.00 10.11

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 8.51 6.72
UNSOAKED

2nd Load Cycle


17605.2 6.23 11.95 10.11
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 09
(Test Date: 02.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0

14.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 10
DESCRIPTION : Greyish brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 04.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.61
30 3723.0 1.32 1.62 30 3723.0 1.32 5.35
60 7486.8 2.65 3.48 60 7486.8 2.65 6.31
80 9924.6 3.51 4.46 80 9924.6 3.51 6.87
100 12627.6 4.47 5.30 100 12627.6 4.47 7.44
120 15136.8 5.35 5.98 120 15136.8 5.35 7.74
140 17605.2 6.23 6.60 140 17605.2 6.23 8.45
120 15136.8 5.35 6.56 120 15136.8 5.35 8.42
100 12627.6 4.47 6.50 100 12627.6 4.47 8.37
80 9924.6 3.51 6.46 80 9924.6 3.51 8.20
60 7486.8 2.65 5.94 60 7486.8 2.65 8.14
30 3723.0 1.32 5.50 30 3723.0 1.32 7.87
0 0.0 0.00 4.61 0 0.0 0.00 7.44

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 6.60 4.61
UNSOAKED

2nd Load Cycle


17605.2 6.23 8.45 7.44
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 10
(Test Date: 04.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

1.0

2.0

3.0
Settlement (mm)

4.0

5.0

6.0

7.0

8.0

9.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 11
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 05.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 21.28
30 3723.0 1.32 3.06 30 3723.0 1.32 23.29
60 7486.8 2.65 6.27 60 7486.8 2.65 27.29
80 9924.6 3.51 8.93 80 9924.6 3.51 27.67
100 12627.6 4.47 13.08 100 12627.6 4.47 33.30
120 15136.8 5.35 15.97 120 15136.8 5.35 36.02
140 17605.2 6.23 19.65 140 17605.2 6.23 37.31
120 15136.8 5.35 19.54 120 15136.8 5.35 37.28
100 12627.6 4.47 19.47 100 12627.6 4.47 37.20
80 9924.6 3.51 19.51 80 9924.6 3.51 37.07
60 7486.8 2.65 19.55 60 7486.8 2.65 36.83
30 3723.0 1.32 19.82 30 3723.0 1.32 36.37
0 0.0 0.00 21.28 0 0.0 0.00 35.02

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 19.65 21.28
UNSOAKED

2nd Load Cycle


17605.2 6.23 37.31 35.02
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 11
(Test Date: 05.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0

10.0
Settlement (mm)

15.0

20.0

25.0

30.0

35.0

40.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 12
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 06.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 13.92
30 3723.0 1.32 3.88 30 3723.0 1.32 14.91
60 7486.8 2.65 7.34 60 7486.8 2.65 14.97
80 9924.6 3.51 9.14 80 9924.6 3.51 15.27
100 12627.6 4.47 11.07 100 12627.6 4.47 15.49
120 15136.8 5.35 13.38 120 15136.8 5.35 15.60
140 17605.2 6.23 15.68 140 17605.2 6.23 16.21
120 15136.8 5.35 15.31 120 15136.8 5.35 16.18
100 12627.6 4.47 15.26 100 12627.6 4.47 16.14
80 9924.6 3.51 15.18 80 9924.6 3.51 16.09
60 7486.8 2.65 15.12 60 7486.8 2.65 16.00
30 3723.0 1.32 14.92 30 3723.0 1.32 15.90
0 0.0 0.00 13.92 0 0.0 0.00 14.96

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 15.68 13.92
UNSOAKED

2nd Load Cycle


17605.2 6.23 16.21 14.96
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 12
(Test Date: 06.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

2.0

4.0

6.0
Settlement (mm)

8.0

10.0

12.0

14.0

16.0

18.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 13
DESCRIPTION : Brownish grey, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 08.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 2.92
30 3723.0 1.32 1.50 30 3723.0 1.32 3.76
60 7486.8 2.65 2.64 60 7486.8 2.65 4.52
80 9924.6 3.51 3.26 80 9924.6 3.51 4.72
100 12627.6 4.47 3.75 100 12627.6 4.47 5.19
120 15136.8 5.35 4.11 120 15136.8 5.35 5.63
140 17605.2 6.23 4.50 140 17605.2 6.23 5.86
120 15136.8 5.35 4.47 120 15136.8 5.35 5.86
100 12627.6 4.47 4.43 100 12627.6 4.47 5.81
80 9924.6 3.51 4.36 80 9924.6 3.51 5.74
60 7486.8 2.65 4.25 60 7486.8 2.65 5.54
30 3723.0 1.32 3.77 30 3723.0 1.32 5.13
0 0.0 0.00 2.92 0 0.0 0.00 3.96

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 4.50 2.92
UNSOAKED

2nd Load Cycle


17605.2 6.23 5.86 3.96
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 13
(Test Date: 08.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

1.0

2.0
Settlement (mm)

3.0

4.0

5.0

6.0

7.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 14
DESCRIPTION : Brownish grey, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 09.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 4.53
30 3723.0 1.32 1.14 30 3723.0 1.32 5.23
60 7486.8 2.65 2.16 60 7486.8 2.65 5.85
80 9924.6 3.51 2.91 80 9924.6 3.51 6.54
100 12627.6 4.47 3.92 100 12627.6 4.47 7.86
120 15136.8 5.35 4.46 120 15136.8 5.35 9.00
140 17605.2 6.23 5.13 140 17605.2 6.23 10.02
120 15136.8 5.35 5.11 120 15136.8 5.35 9.99
100 12627.6 4.47 5.08 100 12627.6 4.47 9.97
80 9924.6 3.51 5.01 80 9924.6 3.51 9.90
60 7486.8 2.65 4.93 60 7486.8 2.65 9.79
30 3723.0 1.32 4.74 30 3723.0 1.32 9.58
0 0.0 0.00 4.53 0 0.0 0.00 8.51

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 5.13 4.53
UNSOAKED

2nd Load Cycle


17605.2 6.23 10.02 8.51
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 14
(Test Date: 09.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

2.0

4.0
Settlement (mm)

6.0

8.0

10.0

12.0
UNSOAKED SOAKED
PLATE LOAD TEST
(DIN - 18134)
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
TEST NO. : 1 LOCATION : TP - 15
DESCRIPTION : Brown, silty SAND with gravel. DEPTH : -
Plate Dia. : 60 cm NORTHNG : -
Jack Capacity : 25 ton EASTING : -
Plate Area : 2827.8 cm2 Elevation : -
Dial Gauge Least Count : 0.01 mm Test Date : 11.12.2021
Tested By : Mazhar/Nouman
Test Data
LOADING / UNLOADING Average Settlement LOADING / UNLOADING Average Settlement
(Bar) (kg) Pressure UNSOAKED (Bar) (kN) Pressure SOAKED *
1st Cycle 2nd Cycle
kg/cm 2 (mm) kpa (mm)
0 0 0 0.00 0 0 0.00 18.98
30 3723.0 1.32 1.37 30 3723.0 1.32 19.64
60 7486.8 2.65 6.03 60 7486.8 2.65 20.41
80 9924.6 3.51 9.95 80 9924.6 3.51 20.90
100 12627.6 4.47 14.04 100 12627.6 4.47 21.90
120 15136.8 5.35 17.28 120 15136.8 5.35 22.65
140 17605.2 6.23 21.28 140 17605.2 6.23 24.40
120 15136.8 5.35 21.23 120 15136.8 5.35 24.36
100 12627.6 4.47 21.18 100 12627.6 4.47 24.30
80 9924.6 3.51 21.08 80 9924.6 3.51 24.20
60 7486.8 2.65 20.87 60 7486.8 2.65 23.97
30 3723.0 1.32 20.39 30 3723.0 1.32 23.77
0 0.0 0.00 18.98 0 0.0 0.00 22.86

* The area around plate was soaked for two(2) hours before starting second cycle.

Residual
Plate Settlement at Maximum
2
Maximum Load (kN) Maximum Pressure (kg/cm ) Settlement upon
Pressure (mm)
Unloading (mm)
1st Load Cycle
17605.2 6.23 21.28 18.98
UNSOAKED

2nd Load Cycle


17605.2 6.23 24.40 22.86
SOAKED
NEOM Company
NEOM Desalination Plant to Gayal Transmission System
TP - 15
(Test Date: 11.12.2021)

Pressure (kpa)
0 1 2 3 4 5 6 7
0.0

5.0

10.0
Settlement (mm)

15.0

20.0

25.0

30.0
UNSOAKED SOAKED
PERCOLATION TEST

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 22.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 01

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250 300 350 400
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 0.5 min
Time for 75% Outflow (tp75): 249 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.41E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 29.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP-02

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 3 min
Time for 75% Outflow (tp75): 16 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.75E-02 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 21.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 03

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 7.0 min
Time for 75% Outflow (tp75): 19.0 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.16E-02 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 21.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 04

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 6.7 min
Time for 75% Outflow (tp75): 13.3 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 4.51E-02 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 21.12.2021
DESCRIPTION : Silty SAND TEST NO.: TP - 05

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 5 10 15 20 25 30 35 40
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 0.5 min
Time for 75% Outflow (tp75): 16.5 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.64E-02 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 20.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 06

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 40 min
Time for 75% Outflow (tp75): 100 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.00E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 20.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP-07

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 10 20 30 40 50 60 70 80 90
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 12 min
Time for 75% Outflow (tp75): 45 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 1.33E-02 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 19.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 08

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 10 min
Time for 75% Outflow (tp75): 80 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 7.50E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 19.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 09

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 12 min
Time for 75% Outflow (tp75): 98 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.12E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 18.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 10

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 14 min
Time for 75% Outflow (tp75): 70 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 8.57E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 18.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 11

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160 180 200
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 32 min
Time for 75% Outflow (tp75): 91 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.59E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 16.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP-12

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 22 min
Time for 75% Outflow (tp75): 74 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 8.11E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 16.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP - 13

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250 300 350
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 50 min
Time for 75% Outflow (tp75): 190 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 3.16E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 15.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP-14

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 50 100 150 200 250 300 350 400 450
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 60 min
Time for 75% Outflow (tp75): 255 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 2.35E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


PERCOLATION TEST
CLIENT : NEOM Company PROJECT NO. : 21J4037
NEOM Desalination Plant to Gayal
PROJECT : Transmission System DATE : 15.12.2021
DESCRIPTION : Silty SAND with gravel TEST NO.: TP-15

1.40

1.20
Infiltration Rate (Inner Ring) cms/min.

1.00

0.80

0.60

0.40

0.20

0.00
0 20 40 60 80 100 120 140 160
Time in min.

Trial Pit Length: 3 m


Trial Pit Width: 1.5 m
Trial Pit Depth: 3 m
Standing Water Level at T=0: 1.5 BGL
Effective Storage Depth: 1.5 BGL
75% Effective Depth (Vp75): 1.13 BGL
25% Effective Depth (Vp25): 0.38 BGL
Time for 25% Outflow (tp25): 18 min
Time for 75% Outflow (tp75): 90 min
Volume of Water Outflowing (Vp75-Vp25) 6.75 m3
Internal Surface Area to 50% of effective depth (ap50): 11.25 m2
Soil Infiltration Rate: 6.67E-03 m/s

REMARKS : Soil Infiltration Rate Testing test carried out in accordance with BRE Digest 365

TESTED BY : Sajid Ali CHECHKED BY : Waseem


INSITU CBR TESTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 01 REPORT DATE : 16.12.2021
TEST DEPTH : 0.5 m TEST DATE : 22.11.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


250
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 200
Bearing Value (lb/in2)
0.0000 0.00 0 0
0.0250 7.00 64 21
150
0.0500 14.00 128 43
0.0750 20.00 183 61
100
0.1000 25.00 229 76 8
0.1500 34.00 311 104
0.2000 42.00 385 128 9 50

0.2500 49.00 449 150


0.3000 56.00 513 171 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 62.00 568 189
Penetration (in)
0.4000 66.00 604 201

REMARKS : CBR value at 0.1" = 8 CBR value at 0.2" = 9


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 02 REPORT DATE : 16.12.2021
TEST DEPTH : 0.5 m TEST DATE : 22.11.2021
MATERIAL DESCRIPTION : Light brown, silty SANd with gravel.

BEARING RATIO DATA


300
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
250

0.0000 0.00 0 0 Bearing Value (lb/in2)


200
0.0250 7.00 64 21
0.0500 14.00 128 43
150
0.0750 20.00 183 61
0.1000 27.00 247 82 8
100
0.1500 37.00 339 113
0.2000 47.00 430 143 10 50
0.2500 56.00 513 171
0.3000 65.00 595 198 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 76.00 696 232
Penetration (in)
0.4000 83.00 760 253

REMARKS : CBR value at 0.1" = 8 CBR value at 0.2" = 10


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 03 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 25.11.2021
MATERIAL DESCRIPTION : Light brown, silty SANd with gravel.

BEARING RATIO DATA


300
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
250

Bearing Value (lb/in2)


0.0000 0.00 0 0
200
0.0250 10.00 92 31
0.0500 18.00 165 55
150
0.0750 25.00 229 76
0.1000 35.00 321 107 11
100
0.1500 47.00 430 143
0.2000 59.00 540 180 12 50
0.2500 65.00 595 198
0.3000 70.00 641 214 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 75.00 687 229
Penetration (in)
0.4000 80.00 733 244

REMARKS : CBR value at 0.1" = 11 CBR value at 0.2" = 12


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 04 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 27.11.2021
MATERIAL DESCRIPTION : Light brown, silty SANd with gravel.

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100

Bearing Value (lb/in2)


0.0000 0.00 0 0
80
0.0250 4.00 37 12
0.0500 7.00 64 21
60
0.0750 10.00 92 31
0.1000 13.00 119 40 4
40
0.1500 18.00 165 55
0.2000 22.00 201 67 4 20
0.2500 26.00 238 79
0.3000 29.00 266 89 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 32.00 293 98
Penetration (in)
0.4000 34.00 311 104

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 05 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 28.11.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


250
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 200
Bearing Value (lb/in2)
0.0000 0.00 0 0
0.0250 5.00 46 15
150
0.0500 10.00 92 31
0.0750 17.00 156 52
100
0.1000 23.00 211 70 7
0.1500 32.00 293 98
0.2000 39.00 357 119 8 50

0.2500 48.00 440 147


0.3000 57.00 522 174 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 65.00 595 198
Penetration (in)
0.4000 70.00 641 214

REMARKS : CBR value at 0.1" = 7 CBR value at 0.2" = 8


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 06 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 29.11.2021
MATERIAL DESCRIPTION : Light brown, silty SANd with gravel.

BEARING RATIO DATA


180
Penetration Dial Load Bearing Bearing
Gauge value Ratio 160
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
140
Bearing Value (lb/in2)
0.0000 0.00 0 0
120
0.0250 6.00 55 18
0.0500 9.00 82 27 100

0.0750 12.00 110 37 80

0.1000 15.00 137 46 5


60
0.1500 22.00 201 67
40
0.2000 28.00 256 85 6
0.2500 35.00 321 107 20

0.3000 43.00 394 131 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 48.00 440 147
Penetration (in)
0.4000 52.00 476 159

REMARKS : CBR value at 0.1" = 5 CBR value at 0.2" = 6


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 07 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 30.11.2021
MATERIAL DESCRIPTION : Light brown, silty SAND.

BEARING RATIO DATA


60
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
50

Bearing Value (lb/in2)


0.0000 0.00 0 0
40
0.0250 2.00 18 6
0.0500 4.00 37 12
30
0.0750 5.00 46 15
0.1000 6.00 55 18 2
20
0.1500 8.00 73 24
0.2000 10.00 92 31 2 10
0.2500 12.00 110 37
0.3000 14.00 128 43 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 16.00 147 49
Penetration (in)
0.4000 18.00 165 55

REMARKS : CBR value at 0.1" = 2 CBR value at 0.2" = 2


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 08 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 01.12.2021
MATERIAL DESCRIPTION : Light brown, silty SANd with gravel.

BEARING RATIO DATA


160
Penetration Dial Load Bearing Bearing
Gauge value Ratio 140
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)

0.0000 0.00 0 0 Bearing Value (lb/in2) 120

0.0250 4.00 37 12 100

0.0500 8.00 73 24
80
0.0750 12.00 110 37
0.1000 15.00 137 46 5 60

0.1500 20.00 183 61


40
0.2000 25.00 229 76 5
20
0.2500 30.00 275 92
0.3000 35.00 321 107 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 41.00 375 125
Penetration (in)
0.4000 47.00 430 143

REMARKS : CBR value at 0.1" = 5 CBR value at 0.2" = 5


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 09 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 02.12.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio 120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)
0.0000 0.00 0 0 100

0.0250 4.00 37 12
80
0.0500 7.00 64 21
0.0750 10.00 92 31
60
0.1000 13.00 119 40 4
0.1500 17.00 156 52 40

0.2000 20.00 183 61 4


20
0.2500 24.00 220 73
0.3000 29.00 266 89 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 34.00 311 104
Penetration (in)
0.4000 39.00 357 119

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 10 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 04.12.2021
MATERIAL DESCRIPTION : Greyish brown, silty SAND with gravel.

BEARING RATIO DATA


100
Penetration Dial Load Bearing Bearing
90
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR) 80
Bearing Value (lb/in2)
0.0000 0.00 0 0 70
0.0250 5.00 46 15
60
0.0500 8.00 73 24
50
0.0750 10.00 92 31
40
0.1000 12.00 110 37 4
30
0.1500 15.00 137 46
0.2000 18.00 165 55 4 20

0.2500 21.00 192 64 10

0.3000 25.00 229 76 0


0.0 0.1 0.2 0.3 0.4 0.5
0.3500 28.00 256 85
Penetration (in)
0.4000 30.00 275 92

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 11 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 08.12.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


80
Penetration Dial Load Bearing Bearing
Gauge value Ratio 70
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2) 60
0.0000 0.00 0 0
0.0250 2.00 18 6 50

0.0500 5.00 46 15
40
0.0750 7.00 64 21
0.1000 9.00 82 27 3 30

0.1500 12.00 110 37


20
0.2000 15.00 137 46 3
10
0.2500 17.00 156 52
0.3000 19.00 174 58 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 21.00 192 64
Penetration (in)
0.4000 23.00 211 70

REMARKS : CBR value at 0.1" = 3 CBR value at 0.2" = 3


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 12 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 06.12.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


120
Penetration Dial Load Bearing Bearing
Gauge value Ratio
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
100

0.0000 0.00 0 0 Bearing Value (lb/in2)


80
0.0250 5.00 46 15
0.0500 9.00 82 27
60
0.0750 11.00 101 34
0.1000 13.00 119 40 4
40
0.1500 16.00 147 49
0.2000 20.00 183 61 4 20
0.2500 24.00 220 73
0.3000 29.00 266 89 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 32.00 293 98
Penetration (in)
0.4000 34.00 311 104

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 13 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 08.12.2021
MATERIAL DESCRIPTION : Brownish grey, silty SAND with gravel.

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio 120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)

0.0000 0.00 0 0 Bearing Value (lb/in2) 100

0.0250 5.00 46 15
80
0.0500 8.00 73 24
0.0750 11.00 101 34 60
0.1000 13.00 119 40 4
0.1500 17.00 156 52 40

0.2000 20.00 183 61 4


20
0.2500 24.00 220 73
0.3000 29.00 266 89 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 33.00 302 101
Penetration (in)
0.4000 38.00 348 116

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 4


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 14 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 09.12.2021
MATERIAL DESCRIPTION : Brownish grey, silty SANd with gravel.

BEARING RATIO DATA


350
Penetration Dial Load Bearing Bearing
Gauge value Ratio 300
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)
0.0000 0.00 0 0 250

0.0250 21.00 192 64


200
0.0500 30.00 275 92
0.0750 41.00 375 125
150
0.1000 50.00 458 153 15
0.1500 62.00 568 189 100

0.2000 72.00 659 220 15


50
0.2500 79.00 723 241
0.3000 87.00 797 266 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 96.00 879 293
Penetration (in)
0.4000 105.00 962 321

REMARKS : CBR value at 0.1" = 15 CBR value at 0.2" = 15


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
TEST REPORT
FIELD CALIFORNIA BEARING RATIO
ASTM D4429-09a

CLIENT: NEOM Company PROJECT NO.: 21J4037


PROJECT: NEOM Desalination Plant to Gayal Transmission System
TEST LOCATION : TP - 15 REPORT DATE : 16.12.2021
TEST DEPTH : 0.50 m TEST DATE : 11.12.2021
MATERIAL DESCRIPTION : Brown, silty SANd with gravel.

BEARING RATIO DATA


140
Penetration Dial Load Bearing Bearing
Gauge value Ratio 120
(in) Reading (Lbs.) (lb/in2) (Cor.CBR)
Bearing Value (lb/in2)
0.0000 0.00 0 0 100

0.0250 5.00 46 15
80
0.0500 8.00 73 24
0.0750 11.00 101 34
60
0.1000 14.00 128 43 4
0.1500 19.00 174 58 40

0.2000 23.00 211 70 5


20
0.2500 27.00 247 82
0.3000 32.00 293 98 0
0.0 0.1 0.2 0.3 0.4 0.5
0.3500 36.00 330 110
Penetration (in)
0.4000 39.00 357 119

REMARKS : CBR value at 0.1" = 4 CBR value at 0.2" = 5


Proving Ring Factor = 9.158 lbs/Div.

TESTED BY: Sajid CHECKED BY/REVIEWED BY: Syed Asad Abbas

APPROVED BY:
LAB. IN-CHARGE

RGF-JED-PHY-SOIL-08-05
20.01.2020
ELECTRICAL RESISTIVITY TESTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 01
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 01
TESTED BY : Tayyab DATE : 23.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 3.450 21.677 3.61 22.682
2.0 12.57 3.390 42.600 3.430 43.103
3.0 18.85 2.530 47.689 2.880 54.287
5.0 31.42 2.200 69.115 2.410 75.712

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 60%
REMARKS :

80.0

70.0

60.0
Resistivity ( Ohm/m )

50.0

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
E~W N~S
1.00 #

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 02
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 02
TESTED BY : Tayyab DATE : 23.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 2.260 14.200 2.19 13.760
2.0 12.57 1.522 19.126 1.674 21.036
3.0 18.85 1.250 23.562 1.268 23.901
5.0 31.42 0.780 24.504 0.900 28.274

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 60%
REMARKS :

30.0

25.0
Resistivity ( Ohm/m )

20.0

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
E~W N~S
1.00 #

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 03
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 03
TESTED BY : Tayyab DATE : 23.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 3.980 25.007 3.37 21.174
2.0 12.57 2.770 34.809 2.410 30.285
3.0 18.85 1.916 36.116 1.790 33.741
5.0 31.42 0.880 27.646 1.097 34.463

O
WEATHER CONDITION : Sunny & Hot Temp. : 18 C Humidity : 50%
REMARKS :

40.0

35.0

30.0
Resistivity ( Ohm/m )

25.0

20.0

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 04
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 04
TESTED BY : Tayyab DATE : 23.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 2.380 14.954 3.01 18.912
2.0 12.57 1.999 25.120 2.160 27.143
3.0 18.85 1.501 28.293 1.806 34.042
5.0 31.42 0.832 26.138 1.045 32.830

O
WEATHER CONDITION : Sunny & Hot Temp. : 19 C Humidity : 38%
REMARKS :

40.0

35.0

30.0
Resistivity ( Ohm/m )

25.0

20.0

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 05
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 05
TESTED BY : Tayyab DATE : 24.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 3.140 19.729 3.46 21.740
2.0 12.57 0.995 12.504 0.898 11.285
3.0 18.85 0.706 13.308 0.575 10.838
5.0 31.42 0.318 9.990 0.276 8.671

O
WEATHER CONDITION : Sunny & Hot Temp. : 13 C Humidity : 61%
REMARKS :

25.0

20.0
Resistivity ( Ohm/m )

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 06
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 06
TESTED BY : Tayyab DATE : 24.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 7.530 47.312 6.66 41.846
2.0 12.57 3.020 37.950 4.280 53.784
3.0 18.85 2.620 49.386 2.770 52.213
5.0 31.42 2.260 71.000 1.719 54.004

O
WEATHER CONDITION : Sunny & Hot Temp. : 17 C Humidity : 50%
REMARKS :

80.0

70.0

60.0
Resistivity ( Ohm/m )

50.0

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 07
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 07
TESTED BY : Tayyab DATE : 24.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 6.400 40.212 6.76 42.474
2.0 12.57 4.150 52.150 5.030 63.209
3.0 18.85 3.010 56.737 3.780 71.251
5.0 31.42 2.190 68.801 2.610 81.996

O
WEATHER CONDITION : Sunny & Hot Temp. : 17 C Humidity : 50%
REMARKS :

90.0

80.0

70.0
Resistivity ( Ohm/m )

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 08
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 08
TESTED BY : Tayyab DATE : 24.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 7.040 44.234 7.36 46.244
2.0 12.57 3.510 44.108 3.140 39.458
3.0 18.85 2.380 44.862 2.610 49.197
5.0 31.42 2.000 62.832 1.908 59.942

O
WEATHER CONDITION : Sunny & Hot Temp. : 20 C Humidity : 34%
REMARKS :

70.0

60.0
Resistivity ( Ohm/m )

50.0

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 09
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 09
TESTED BY : Tayyab DATE : 23.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 2.130 13.383 3.21 20.169
2.0 12.57 1.080 13.572 1.221 15.344
3.0 18.85 1.011 19.057 1.109 20.904
5.0 31.42 0.816 25.635 0.765 24.033

O
WEATHER CONDITION : Sunny & Hot Temp. : 21 C Humidity : 34%
REMARKS :

30.0

25.0
Resistivity ( Ohm/m )

20.0

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 10
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 10
TESTED BY : Tayyab DATE : 25.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 145.100 911.690 125.40 787.911
2.0 12.57 65.300 820.584 48.600 610.726
3.0 18.85 26.000 490.088 19.300 363.796
5.0 31.42 8.950 281.173 7.090 222.739

O
WEATHER CONDITION : Sunny & Hot Temp. : 14 C Humidity : 54%
REMARKS :

1,000.0

900.0

800.0
Resistivity ( Ohm/m )

700.0

600.0

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 11
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 11
TESTED BY : Tayyab DATE : 25.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 117.800 740.159 121.00 760.265
2.0 12.57 50.500 634.602 56.400 708.743
3.0 18.85 25.300 476.894 27.000 508.938
5.0 31.42 5.570 174.987 7.880 247.558

O
WEATHER CONDITION : Sunny & Hot Temp. : 14 C Humidity : 54%
REMARKS :

800.0

700.0

600.0
Resistivity ( Ohm/m )

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 12
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 12
TESTED BY : Tayyab DATE : 25.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 108.300 680.469 115.60 726.336
2.0 12.57 60.600 761.522 64.000 804.248
3.0 18.85 32.100 605.071 35.800 674.814
5.0 31.42 2.980 93.619 4.030 126.606

O
WEATHER CONDITION : Sunny & Hot Temp. : 14 C Humidity : 54%
REMARKS :

900.0

800.0

700.0
Resistivity ( Ohm/m )

600.0

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 13
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 13
TESTED BY : Tayyab DATE : 25.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 50.200 315.416 47.60 299.080
2.0 12.57 32.100 403.380 29.900 375.734
3.0 18.85 21.500 405.265 18.000 339.292
5.0 31.42 10.150 318.872 7.750 243.473

O
WEATHER CONDITION : Sunny & Hot Temp. : 14 C Humidity : 54%
REMARKS :

450.0

400.0

350.0
Resistivity ( Ohm/m )

300.0

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 14
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 14
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 21.000 131.947 22.50 141.372
2.0 12.57 17.240 216.644 16.910 212.497
3.0 18.85 12.760 240.520 12.260 231.096
5.0 31.42 9.800 307.876 8.870 278.659

O
WEATHER CONDITION : Sunny & Hot Temp. : 18 C Humidity : 54%
REMARKS :

350.0

300.0
Resistivity ( Ohm/m )

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 16
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 16
TESTED BY : Tayyab DATE : 26.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 65.400 410.920 61.60 387.044
2.0 12.57 36.000 452.389 33.210 417.329
3.0 18.85 23.900 450.504 21.000 395.841
5.0 31.42 14.100 442.965 12.200 383.274

O
WEATHER CONDITION : Sunny & Hot Temp. : 17 C Humidity : 42%
REMARKS :

500.0

450.0

400.0
Resistivity ( Ohm/m )

350.0

300.0

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 17
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 17
TESTED BY : Tayyab DATE : 26.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 74.600 468.726 71.30 447.991
2.0 12.57 49.100 617.009 45.000 565.487
3.0 18.85 25.300 476.894 23.900 450.504
5.0 31.42 16.000 502.655 12.700 398.982

O
WEATHER CONDITION : Sunny & Hot Temp. : 17 C Humidity : 40%
REMARKS :

700.0

600.0
Resistivity ( Ohm/m )

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 18
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 18
TESTED BY : Tayyab DATE : 26.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 318.000 1998.053 205.00 1288.053
2.0 12.57 160.600 2018.159 155.000 1947.787
3.0 18.85 212.000 3996.106 199.000 3751.062
5.0 31.42 66.900 2101.725 50.300 1580.221

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 41%
REMARKS :

4,500.0

4,000.0

3,500.0
Resistivity ( Ohm/m )

3,000.0

2,500.0

2,000.0

1,500.0

1,000.0

500.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 19
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 19
TESTED BY : Tayyab DATE : 26.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 21.300 133.832 24.90 156.451
2.0 12.57 18.800 236.248 21.000 263.894
3.0 18.85 16.420 309.510 18.600 350.602
5.0 31.42 10.860 341.177 13.190 414.376

O
WEATHER CONDITION : Sunny & Hot Temp. : 18 C Humidity : 41%
REMARKS :

450.0

400.0

350.0
Resistivity ( Ohm/m )

300.0

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 20
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 20
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 27.000 169.646 28.10 176.558
2.0 12.57 21.510 270.303 23.100 290.283
3.0 18.85 11.200 211.115 9.100 171.531
5.0 31.42 7.810 245.358 8.310 261.066

O
WEATHER CONDITION : Sunny & Hot Temp. : 12 C Humidity : 42%
REMARKS :

350.0

300.0
Resistivity ( Ohm/m )

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 21
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 21
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 7.990 50.203 8.22 51.648
2.0 12.57 5.730 72.005 6.000 75.398
3.0 18.85 4.490 84.635 4.610 86.896
5.0 31.42 2.140 67.230 2.710 85.137

O
WEATHER CONDITION : Sunny & Hot Temp. : 14 C Humidity : 42%
REMARKS :

100.0

90.0

80.0
Resistivity ( Ohm/m )

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 22
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 22
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 186.900 1174.327 150.50 945.619
2.0 12.57 86.800 1090.761 83.400 1048.035
3.0 18.85 37.400 704.973 34.200 644.655
5.0 31.42 9.830 308.819 7.950 249.757

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 42%
REMARKS :

1,400.0

1,200.0
Resistivity ( Ohm/m )

1,000.0

800.0

600.0

400.0

200.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 23
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 23
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 24.500 153.938 26.91 169.081
2.0 12.57 18.850 236.876 20.160 253.338
3.0 18.85 14.050 264.836 15.230 287.079
5.0 31.42 6.450 202.633 7.760 243.788

O
WEATHER CONDITION : Sunny & Hot Temp. : 17 C Humidity : 41%
REMARKS :

350.0

300.0
Resistivity ( Ohm/m )

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 24
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 24
TESTED BY : Tayyab DATE : 27.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 217.000 1363.451 449.00 2821.150
2.0 12.57 70.100 880.903 81.720 1026.924
3.0 18.85 28.900 544.752 30.800 580.566
5.0 31.42 10.370 325.783 13.200 414.690

O
WEATHER CONDITION : Sunny & Hot Temp. : 11 C Humidity : 40%
REMARKS :

3,000.0

2,500.0
Resistivity ( Ohm/m )

2,000.0

1,500.0

1,000.0

500.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 25
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 25
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 93.100 584.965 90.70 569.885
2.0 12.57 40.000 502.655 34.910 438.692
3.0 18.85 22.600 426.000 19.640 370.205
5.0 31.42 11.400 358.142 11.000 345.575

O
WEATHER CONDITION : Sunny & Hot Temp. : 12 C Humidity : 45%
REMARKS :

700.0

600.0
Resistivity ( Ohm/m )

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 26
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 26
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 83.900 527.159 88.60 556.690
2.0 12.57 49.800 625.805 52.460 659.232
3.0 18.85 28.800 542.867 27.710 522.321
5.0 31.42 20.000 628.319 19.850 623.606

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 47%
REMARKS :

700.0

600.0
Resistivity ( Ohm/m )

500.0

400.0

300.0

200.0

100.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 27
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 27
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 30.700 192.894 35.41 222.488
2.0 12.57 7.330 92.111 9.000 113.097
3.0 18.85 2.760 52.025 3.120 58.811
5.0 31.42 0.562 17.656 0.781 24.536

O
WEATHER CONDITION : Sunny & Hot Temp. : 16 C Humidity : 47%
REMARKS :

250.0

200.0
Resistivity ( Ohm/m )

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 28
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 28
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 34.000 213.628 37.61 236.311
2.0 12.57 27.500 345.575 28.000 351.858
3.0 18.85 21.200 399.611 22.210 418.649
5.0 31.42 13.490 423.801 14.200 446.106

O
WEATHER CONDITION : Sunny & Hot Temp. : 19 C Humidity : 45%
REMARKS :

500.0

450.0

400.0
Resistivity ( Ohm/m )

350.0

300.0

250.0

200.0

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 29
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 29
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 21.500 135.088 25.41 159.656
2.0 12.57 14.720 184.977 16.000 201.062
3.0 18.85 9.100 171.531 11.130 209.796
5.0 31.42 5.860 184.097 7.000 219.911

O
WEATHER CONDITION : Sunny & Hot Temp. : 19 C Humidity : 45%
REMARKS :

250.0

200.0
Resistivity ( Ohm/m )

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 30
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 30
TESTED BY : Tayyab DATE : 29.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 17.740 111.464 19.41 121.957
2.0 12.57 13.800 173.416 14.200 178.442
3.0 18.85 9.930 187.176 10.500 197.920
5.0 31.42 4.410 138.544 5.110 160.535

O
WEATHER CONDITION : Sunny & Hot Temp. : 20 C Humidity : 43%
REMARKS :

250.0

200.0
Resistivity ( Ohm/m )

150.0

100.0

50.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
SOIL ELECTRICAL RESISTIVITY MEASUREMENTS
DATA SHEET
CLIENT : NEOM Company PROJECT NO.: 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
LOCATION : N2G-BH - 31
EASTING : - NORTHING : - ELEVATION : -
TEST LOCATION : N2G-BH - 31
TESTED BY : Tayyab DATE : 30.01.2022
TEST APPARATUS : (MEGGER DET-2)
ELECTRODE CONFIGURATION: Wenner Configuration

ELECTRODE k=2Πa RESISTANCE Ω= 2 Π a R RESISTANCE Ω= 2 Π a R


"a" N~S N~S E~W E~W
SPACING (m) (Ohms) (Ohms-m) (Ohms) (Ohms-m)
1.0 6.28 4.740 29.782 5.90 37.071
2.0 12.57 3.860 48.506 4.000 50.265
3.0 18.85 1.460 27.520 1.920 36.191
5.0 31.42 0.830 26.075 0.991 31.133

O
WEATHER CONDITION : Sunny & Hot Temp. : 13 C Humidity : 41%
REMARKS :

60.0

50.0
Resistivity ( Ohm/m )

40.0

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 0 0
Probe Spacing ( m ) #REF!
1.00 #
E~W N~S

TESTED BY CHECKED BY
Tayyab Assad Abbas
THERMAL RESISTIVITY TESTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


APPENDIX-B

LABORATORY TESTING
RESULTS

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


PARTICLE SIZE DISTRIBUTION

BOREHOLES

D O C U M E N T C O D E : 11-180000-4800000121-RGF-GEO-RPT-000001 REVISION CODE: 01


P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 001 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 27.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 29.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 001 DEPTH (m) : 0.50~1.50 SAMPLE NO. : R-2
SAMPLE DESCRIPTION : Grey, poorly-graded GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : N-17


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 1532.8
2" Wt. (Soil + Can) Dry (gm.) : 1513.2
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 19.6
3/4" 159.6 13.3 87 Wt. Can (gm.) : 316.7
3/8" 845.6 70.7 29 Wt. (Soil) Dry (gm.) : 1196.5
#4 1110.0 92.8 7 Water Content (%) : 1.64
# 10 1147.0 95.9 4 CLASSIFICATION

# 20 1154.3 96.5 4 ( ASTM D3282-09/D2487-10 )


# 40 1158.6 96.8 3 GP
# 60 1162.0 97.1 3 Dry Wt. of soil before washing

# 100 1165.0 97.4 3 = 1196.5


# 200 1166.5 97.5 3 Dry Wt. of soil After washing

PAN 1166.9 = 1166.9


Total Soil Wt. (gm.) 1196.5

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 13.34 79.43 3.09 0.97 0.66 2.51
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 001 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 27.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 29.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 001 DEPTH (m) : 9.00~10.50 SAMPLE NO. : R-8
SAMPLE DESCRIPTION : Grey, well-graded GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : ABA


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 1500.7
2" 00.0 0.0 100 Wt. (Soil + Can) Dry (gm.) : 1477.0
1
1 /2" 294.5 24.1 76 Wt. Water (gm.) : 23.7
3/4" 913.3 74.8 25 Wt. Can (gm.) : 256.4
3/8" 1059.7 86.8 13 Wt. (Soil) Dry (gm.) : 1220.6
#4 1121.0 91.8 8 Water Content (%) : 1.94
# 10 1182.5 96.9 3 CLASSIFICATION

# 20 1200.2 98.3 2 ( ASTM D3282-09/D2487-10 )


# 40 1205.9 98.8 1 GW
# 60 1208.7 99.0 1 Dry Wt. of soil before washing

# 100 1210.4 99.2 1 = 1220.6


# 200 1211.0 99.2 1 Dry Wt. of soil After washing

PAN 1211.4 = 1211.4


Total Soil Wt. (gm.) 1220.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 74.82 17.84 4.22 1.92 0.42 0.79
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 002 REPORT DATE : 19.01.2022
SAMPLING DATE : - TEST START DATE : 15.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 17.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 002 DEPTH (m) : 15.50~15.95 SAMPLE NO. : D - 13
SAMPLE DESCRIPTION : Brown, clayey SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-24


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 169.1
2" Wt. (Soil + Can) Dry (gm.) : 147.1
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 22.0
3/4" 12.1 9.8 90 Wt. Can (gm.) : 24.0
3/8" 19.1 15.5 84 Wt. (Soil) Dry (gm.) : 123.1
#4 20.3 16.5 84 Water Content (%) : 17.87
# 10 24.5 19.9 80 CLASSIFICATION

# 20 32.3 26.2 74 ( ASTM D3282-09/D2487-10 )


# 40 45.5 37.0 63 SC
# 60 53.3 43.3 57 Dry Wt. of soil before washing

# 100 60.7 49.3 51 = 123.1


# 200 68.7 55.8 44 Dry Wt. of soil After washing

PAN 69.1 = 69.1


Total Soil Wt. (gm.) 123.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 9.83 6.66 3.41 17.06 18.85 44.19
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 002 REPORT DATE : 19.01.2022
SAMPLING DATE : - TEST START DATE : 15.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 17.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 002 DEPTH (m) : 17.00~17.45 SAMPLE NO. : D - 14
SAMPLE DESCRIPTION : Brown, Sandy Lean CLAY.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : K-18


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 175.3
2" Wt. (Soil + Can) Dry (gm.) : 150.1
1
1 /2" Wt. Water (gm.) : 25.2
3/4" 00.0 0.0 100 Wt. Can (gm.) : 25.5
3/8" 06.5 5.2 95 Wt. (Soil) Dry (gm.) : 124.6
#4 08.1 6.5 93 Water Content (%) : 20.22
# 10 14.1 11.3 89 CLASSIFICATION

# 20 22.9 18.4 82 ( ASTM D3282-09/D2487-10 )


# 40 37.4 30.0 70 CL
# 60 45.8 36.8 63 Dry Wt. of soil before washing

# 100 53.1 42.6 57 = 124.6


# 200 60.7 48.7 51 Dry Wt. of soil After washing

PAN 60.9 = 60.9


Total Soil Wt. (gm.) 124.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 6.50 4.82 18.70 18.70 51.28
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 002 REPORT DATE : 19.01.2022
SAMPLING DATE : - TEST START DATE : 15.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 17.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 002 DEPTH (m) : 1.00~1.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, poorly-graded GRAVEL with silt & sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BL


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 189.2
2" Wt. (Soil + Can) Dry (gm.) : 179.9
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 9.3
3/4" 70.7 45.1 55 Wt. Can (gm.) : 23.0
3/8" 106.8 68.1 32 Wt. (Soil) Dry (gm.) : 156.9
#4 123.2 78.5 21 Water Content (%) : 5.93
# 10 131.1 83.6 16 CLASSIFICATION

# 20 137.1 87.4 13 ( ASTM D3282-09/D2487-10 )


# 40 141.2 90.0 10 GP-GM
# 60 144.2 91.9 8 Dry Wt. of soil before washing

# 100 146.8 93.6 6 = 156.9


# 200 148.8 94.8 5 Dry Wt. of soil After washing

PAN 149.3 = 149.3


Total Soil Wt. (gm.) 156.9

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 45.06 33.46 5.04 6.44 4.84 5.16
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 002 REPORT DATE : 19.01.2022
SAMPLING DATE : - TEST START DATE : 15.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 17.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 002 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : PE


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 177.1
2" Wt. (Soil + Can) Dry (gm.) : 158.4
1
1 /2" Wt. Water (gm.) : 18.7
3/4" 00.0 0.0 100 Wt. Can (gm.) : 21.8
3/8" 13.6 10.0 90 Wt. (Soil) Dry (gm.) : 136.6
#4 28.3 20.7 79 Water Content (%) : 13.69
# 10 51.9 38.0 62 CLASSIFICATION

# 20 68.6 50.2 50 ( ASTM D3282-09/D2487-10 )


# 40 78.7 57.6 42 SM
# 60 86.8 63.5 36 Dry Wt. of soil before washing

# 100 95.0 69.5 30 = 136.6


# 200 102.1 74.7 25 Dry Wt. of soil After washing

PAN 102.4 = 102.4


Total Soil Wt. (gm.) 136.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 20.72 17.28 19.62 17.13 25.26
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 003 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 003 DEPTH (m) : 19.50~19.95 SAMPLE NO. : D - 16
SAMPLE DESCRIPTION : Brown, clayey SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : JBR


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 163.5
2" Wt. (Soil + Can) Dry (gm.) : 138.7
1
1 /2" Wt. Water (gm.) : 24.8
3/4" Wt. Can (gm.) : 22.7
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 116.0
#4 04.8 4.1 96 Water Content (%) : 21.38
# 10 22.5 19.4 81 CLASSIFICATION

# 20 45.1 38.9 61 ( ASTM D3282-09/D2487-10 )


# 40 55.8 48.1 52 SC
# 60 62.8 54.1 46 Dry Wt. of soil before washing

# 100 69.0 59.5 41 = 116.0


# 200 75.2 64.8 35 Dry Wt. of soil After washing

PAN 75.6 = 75.6


Total Soil Wt. (gm.) 116.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 4.14 15.26 28.71 16.72 35.17
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 003 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 003 DEPTH (m) : 25.50~25.95 SAMPLE NO. : D - 20
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-26


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 188.7
2" Wt. (Soil + Can) Dry (gm.) : 155.9
1
1 /2" Wt. Water (gm.) : 32.8
3/4" Wt. Can (gm.) : 24.0
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 131.9
#4 04.9 3.7 96 Water Content (%) : 24.87
# 10 26.6 20.2 80 CLASSIFICATION

# 20 52.0 39.4 61 ( ASTM D3282-09/D2487-10 )


# 40 79.5 60.3 40 SM
# 60 90.2 68.4 32 Dry Wt. of soil before washing

# 100 97.4 73.8 26 = 131.9


# 200 104.2 79.0 21 Dry Wt. of soil After washing

PAN 104.6 = 104.6


Total Soil Wt. (gm.) 131.9

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.71 16.45 40.11 18.73 21.00
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 003 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 003 DEPTH (m) : 2.00~2.45 SAMPLE NO. : D-3
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-06


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 213.8
2" Wt. (Soil + Can) Dry (gm.) : 190.6
1
1 /2" Wt. Water (gm.) : 23.2
3/4" 00.0 0.0 100 Wt. Can (gm.) : 27.2
3/8" 06.6 4.0 96 Wt. (Soil) Dry (gm.) : 163.4
#4 10.7 6.5 93 Water Content (%) : 14.20
# 10 19.9 12.2 88 CLASSIFICATION

# 20 36.1 22.1 78 ( ASTM D3282-09/D2487-10 )


# 40 106.7 65.3 35 SM
# 60 123.4 75.5 24 Dry Wt. of soil before washing

# 100 130.4 79.8 20 = 163.4


# 200 137.9 84.4 16 Dry Wt. of soil After washing

PAN 138.3 = 138.3


Total Soil Wt. (gm.) 163.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 6.55 5.63 53.12 19.09 15.61
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 003 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 003 DEPTH (m) : 7.75~9.00 SAMPLE NO. : R-2
SAMPLE DESCRIPTION : Reddish brown, Lean CLAY with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BR-2


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 883.3
2" Wt. (Soil + Can) Dry (gm.) : 824.4
1
1 /2" Wt. Water (gm.) : 58.9
3/4" 00.0 0.0 100 Wt. Can (gm.) : 253.0
3/8" 13.1 2.3 98 Wt. (Soil) Dry (gm.) : 571.4
#4 20.2 3.5 96 Water Content (%) : 10.31
# 10 33.6 5.9 94 CLASSIFICATION

# 20 50.1 8.8 91 ( ASTM D3282-09/D2487-10 )


# 40 66.7 11.7 88 CL
# 60 80.0 14.0 86 Dry Wt. of soil before washing

# 100 97.9 17.1 83 = 571.4


# 200 159.9 28.0 72 Dry Wt. of soil After washing

PAN 160.4 = 160.4


Total Soil Wt. (gm.) 571.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.54 2.35 5.79 16.31 72.02
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 003 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 003 DEPTH (m) : 15.45~15.65 SAMPLE NO. : U-1
SAMPLE DESCRIPTION : Brown, Sandy SILT.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AS-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 212.7
2" Wt. (Soil + Can) Dry (gm.) : 175.0
1
1 /2" Wt. Water (gm.) : 37.7
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.2
3/8" 01.3 0.9 99 Wt. (Soil) Dry (gm.) : 152.8
#4 12.8 8.4 92 Water Content (%) : 24.67
# 10 22.8 14.9 85 CLASSIFICATION

# 20 31.7 20.7 79 ( ASTM D3282-09/D2487-10 )


# 40 36.9 24.1 76 ML
# 60 40.1 26.2 74 Dry Wt. of soil before washing

# 100 43.3 28.3 72 = 152.8


# 200 48.4 31.7 68 Dry Wt. of soil After washing

PAN 48.7 = 48.7


Total Soil Wt. (gm.) 152.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 8.38 6.54 9.23 7.53 68.32
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 004 REPORT DATE : 18.01.2022
SAMPLING DATE : - TEST START DATE : 14.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 16.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 004 DEPTH (m) : 11.00~11.45 SAMPLE NO. : D - 10
SAMPLE DESCRIPTION : Brown, silty, calyey SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BX


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 149.3
2" Wt. (Soil + Can) Dry (gm.) : 133.0
1
1 /2" Wt. Water (gm.) : 16.3
3/4" 00.0 0.0 100 Wt. Can (gm.) : 24.3
3/8" 03.9 3.6 96 Wt. (Soil) Dry (gm.) : 108.7
#4 18.2 16.7 83 Water Content (%) : 15.00
# 10 30.4 28.0 72 CLASSIFICATION

# 20 40.1 36.9 63 ( ASTM D3282-09/D2487-10 )


# 40 50.2 46.2 54 SC-SM
# 60 62.2 57.2 43 Dry Wt. of soil before washing

# 100 69.3 63.8 36 = 108.7


# 200 74.6 68.6 31 Dry Wt. of soil After washing

PAN 74.9 = 74.9


Total Soil Wt. (gm.) 108.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 16.74 11.22 18.22 22.45 31.37
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 004 REPORT DATE : 18.01.2022
SAMPLING DATE : - TEST START DATE : 14.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 16.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 004 DEPTH (m) : 14.00~14.45 SAMPLE NO. : D - 12
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : YR


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 257.1
2" Wt. (Soil + Can) Dry (gm.) : 228.1
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 29.0
3/4" 20.8 10.1 90 Wt. Can (gm.) : 22.7
3/8" 40.7 19.8 80 Wt. (Soil) Dry (gm.) : 205.4
#4 60.2 29.3 71 Water Content (%) : 14.12
# 10 101.4 49.4 51 CLASSIFICATION

# 20 129.7 63.1 37 ( ASTM D3282-09/D2487-10 )


# 40 143.0 69.6 30 SM
# 60 157.1 76.5 24 Dry Wt. of soil before washing

# 100 165.5 80.6 19 = 205.4


# 200 172.0 83.7 16 Dry Wt. of soil After washing

PAN 172.6 = 172.6


Total Soil Wt. (gm.) 205.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 10.13 19.18 20.06 20.25 14.12 16.26
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 004 REPORT DATE : 18.01.2022
SAMPLING DATE : - TEST START DATE : 14.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 16.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 004 DEPTH (m) : 1.00~1.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, silty GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-40


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 242.6
2" Wt. (Soil + Can) Dry (gm.) : 224.6
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 18.0
3/4" 58.2 29.5 71 Wt. Can (gm.) : 27.3
3/8" 92.0 46.6 53 Wt. (Soil) Dry (gm.) : 197.3
#4 107.2 54.3 46 Water Content (%) : 9.12
# 10 120.5 61.1 39 CLASSIFICATION

# 20 131.5 66.6 33 ( ASTM D3282-09/D2487-10 )


# 40 143.4 72.7 27 GM
# 60 155.6 78.9 21 Dry Wt. of soil before washing

# 100 164.8 83.5 16 = 197.3


# 200 171.7 87.0 13 Dry Wt. of soil After washing

PAN 172.1 = 172.1


Total Soil Wt. (gm.) 197.3

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 29.50 24.84 6.74 11.61 14.34 12.98
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 004 REPORT DATE : 18.01.2022
SAMPLING DATE : - TEST START DATE : 14.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 16.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 004 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : TW


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 254.3
2" Wt. (Soil + Can) Dry (gm.) : 226.7
1
1 /2" Wt. Water (gm.) : 27.6
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.5
3/8" 22.9 11.2 89 Wt. (Soil) Dry (gm.) : 204.2
#4 45.4 22.2 78 Water Content (%) : 13.52
# 10 103.3 50.6 49 CLASSIFICATION

# 20 119.8 58.7 41 ( ASTM D3282-09/D2487-10 )


# 40 134.9 66.1 34 SM
# 60 150.1 73.5 26 Dry Wt. of soil before washing

# 100 159.7 78.2 22 = 204.2


# 200 168.1 82.3 18 Dry Wt. of soil After washing

PAN 168.5 = 168.5


Total Soil Wt. (gm.) 204.2

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 22.23 28.35 15.48 16.26 17.68
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 005 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 005 DEPTH (m) : 0.00~0.45 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Brown, clayey GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : TL


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 177.8
2" Wt. (Soil + Can) Dry (gm.) : 151.9
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 25.9
3/4" 19.2 14.6 85 Wt. Can (gm.) : 20.6
3/8" 41.4 31.5 68 Wt. (Soil) Dry (gm.) : 131.3
#4 52.8 40.2 60 Water Content (%) : 19.73
# 10 67.2 51.2 49 CLASSIFICATION

# 20 84.0 64.0 36 ( ASTM D3282-09/D2487-10 )


# 40 89.0 67.8 32 GC
# 60 93.4 71.1 29 Dry Wt. of soil before washing

# 100 99.4 75.7 24 = 131.3


# 200 103.2 78.6 21 Dry Wt. of soil After washing

PAN 104.4 = 104.4


Total Soil Wt. (gm.) 131.3

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 14.62 25.59 10.97 16.60 10.81 21.40
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 005 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 005 DEPTH (m) : 11.00~11.45 SAMPLE NO. : D - 10
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : YZ


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 134.0
2" Wt. (Soil + Can) Dry (gm.) : 119.6
1
1 /2" Wt. Water (gm.) : 14.4
3/4" Wt. Can (gm.) : 19.3
3/8" Wt. (Soil) Dry (gm.) : 100.3
#4 00.0 0.0 100 Water Content (%) : 14.36
# 10 03.7 3.7 96 CLASSIFICATION

# 20 40.9 40.8 59 ( ASTM D3282-09/D2487-10 )


# 40 62.5 62.3 38 SM
# 60 73.7 73.5 27 Dry Wt. of soil before washing

# 100 80.9 80.7 19 = 100.3


# 200 86.1 85.8 14 Dry Wt. of soil After washing

PAN 86.1 = 86.1


Total Soil Wt. (gm.) 100.3

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 3.69 58.62 23.53 14.16
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 005 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 005 DEPTH (m) : 15.50~15.95 SAMPLE NO. : D - 13
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-18


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 132.0
2" Wt. (Soil + Can) Dry (gm.) : 119.3
1
1 /2" Wt. Water (gm.) : 12.7
3/4" Wt. Can (gm.) : 27.8
3/8" Wt. (Soil) Dry (gm.) : 91.5
#4 00.0 0.0 100 Water Content (%) : 13.88
# 10 04.1 4.5 96 CLASSIFICATION

# 20 36.9 40.3 60 ( ASTM D3282-09/D2487-10 )


# 40 56.4 61.6 38 SM
# 60 66.8 73.0 27 Dry Wt. of soil before washing

# 100 72.7 79.5 21 = 91.5


# 200 77.2 84.4 16 Dry Wt. of soil After washing

PAN 77.2 = 77.2


Total Soil Wt. (gm.) 91.5

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 4.48 57.16 22.73 15.63
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 005 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 005 DEPTH (m) : 21.50~21.95 SAMPLE NO. : D - 17
SAMPLE DESCRIPTION : Grey, well-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-99


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 211.6
2" Wt. (Soil + Can) Dry (gm.) : 201.4
1
1 /2" Wt. Water (gm.) : 10.2
3/4" Wt. Can (gm.) : 28.6
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 172.8
#4 17.5 10.1 90 Water Content (%) : 5.90
# 10 50.4 29.2 71 CLASSIFICATION

# 20 91.6 53.0 47 ( ASTM D3282-09/D2487-10 )


# 40 134.7 78.0 22 SW-SM
# 60 151.2 87.5 13 Dry Wt. of soil before washing

# 100 157.8 91.3 9 = 172.8


# 200 161.6 93.5 6 Dry Wt. of soil After washing

PAN 162.2 = 162.2


Total Soil Wt. (gm.) 172.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 10.13 19.04 48.78 15.57 6.48
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 005 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 005 DEPTH (m) : 5.00~5.45 SAMPLE NO. : D-6
SAMPLE DESCRIPTION : Brown, clayey SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : SRA


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 186.3
2" Wt. (Soil + Can) Dry (gm.) : 171.3
1
1 /2" Wt. Water (gm.) : 15.0
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.5
3/8" 15.1 10.1 90 Wt. (Soil) Dry (gm.) : 148.8
#4 29.6 19.9 80 Water Content (%) : 10.08
# 10 44.3 29.8 70 CLASSIFICATION

# 20 59.2 39.8 60 ( ASTM D3282-09/D2487-10 )


# 40 73.3 49.3 51 SC
# 60 84.9 57.1 43 Dry Wt. of soil before washing

# 100 93.1 62.6 37 = 148.8


# 200 98.6 66.3 34 Dry Wt. of soil After washing

PAN 99.4 = 99.4


Total Soil Wt. (gm.) 148.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 19.89 9.88 19.49 17.00 33.74
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 006 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 20.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 006 DEPTH (m) : 14.00~14.45 SAMPLE NO. : D - 12
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : K-6


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 171.8
2" Wt. (Soil + Can) Dry (gm.) : 146.9
1
1 /2" Wt. Water (gm.) : 24.9
3/4" Wt. Can (gm.) : 26.9
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 120.0
#4 04.0 3.3 97 Water Content (%) : 20.75
# 10 08.9 7.4 93 CLASSIFICATION

# 20 17.7 14.8 85 ( ASTM D3282-09/D2487-10 )


# 40 43.2 36.0 64 SM
# 60 73.6 61.3 39 Dry Wt. of soil before washing

# 100 93.2 77.7 22 = 120.0


# 200 101.4 84.5 16 Dry Wt. of soil After washing

PAN 102.4 = 102.4


Total Soil Wt. (gm.) 120.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.33 4.08 28.58 48.50 15.50
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 006 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 20.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 006 DEPTH (m) : 2.00~2.45 SAMPLE NO. : D-3
SAMPLE DESCRIPTION : Brown, well-graded GRAVEL with silt & sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AB-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 232.4
2" Wt. (Soil + Can) Dry (gm.) : 220.0
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 12.4
3/4" 49.0 25.0 75 Wt. Can (gm.) : 23.9
3/8" 83.8 42.7 57 Wt. (Soil) Dry (gm.) : 196.1
#4 108.3 55.2 45 Water Content (%) : 6.32
# 10 128.4 65.5 35 CLASSIFICATION

# 20 142.9 72.9 27 ( ASTM D3282-09/D2487-10 )


# 40 156.1 79.6 20 GW-GM
# 60 165.9 84.6 15 Dry Wt. of soil before washing

# 100 173.4 88.4 12 = 196.1


# 200 178.8 91.2 9 Dry Wt. of soil After washing

PAN 179.9 = 179.9


Total Soil Wt. (gm.) 196.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 24.99 30.24 10.25 14.13 11.58 8.82
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 006 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 20.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 006 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, well-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : SA


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 187.8
2" Wt. (Soil + Can) Dry (gm.) : 177.4
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 10.4
3/4" 39.6 26.2 74 Wt. Can (gm.) : 26.0
3/8" 42.6 28.1 72 Wt. (Soil) Dry (gm.) : 151.4
#4 49.9 33.0 67 Water Content (%) : 6.87
# 10 71.4 47.2 53 CLASSIFICATION

# 20 94.2 62.2 38 ( ASTM D3282-09/D2487-10 )


# 40 109.6 72.4 28 SW-SM
# 60 119.4 78.9 21 Dry Wt. of soil before washing

# 100 128.0 84.5 15 = 151.4


# 200 134.6 88.9 11 Dry Wt. of soil After washing

PAN 135.6 = 135.6


Total Soil Wt. (gm.) 151.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 26.16 6.80 14.20 25.23 16.51 11.10
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 006 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 18.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 20.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 006 DEPTH (m) : 9.50~9.95 SAMPLE NO. : D-9
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : G


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 155.3
2" Wt. (Soil + Can) Dry (gm.) : 134.1
1
1 /2" Wt. Water (gm.) : 21.2
3/4" Wt. Can (gm.) : 27.1
3/8" Wt. (Soil) Dry (gm.) : 107.0
#4 00.0 0.0 100 Water Content (%) : 19.81
# 10 02.3 2.1 98 CLASSIFICATION

# 20 10.6 9.9 90 ( ASTM D3282-09/D2487-10 )


# 40 44.3 41.4 59 SM
# 60 68.9 64.4 36 Dry Wt. of soil before washing

# 100 83.6 78.1 22 = 107.0


# 200 92.5 86.4 14 Dry Wt. of soil After washing

PAN 93.0 = 93.0


Total Soil Wt. (gm.) 107.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 2.15 39.25 45.05 13.55
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 007 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 007 DEPTH (m) : 1.20~1.65 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : Y-6


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 224.6
2" Wt. (Soil + Can) Dry (gm.) : 191.2
1
1 /2" Wt. Water (gm.) : 33.4
3/4" 00.0 0.0 100 Wt. Can (gm.) : 21.5
3/8" 05.9 3.5 97 Wt. (Soil) Dry (gm.) : 169.7
#4 09.2 5.4 95 Water Content (%) : 19.68
# 10 15.8 9.3 91 CLASSIFICATION

# 20 21.9 12.9 87 ( ASTM D3282-09/D2487-10 )


# 40 22.8 13.4 87 SM
# 60 35.7 21.0 79 Dry Wt. of soil before washing

# 100 84.6 49.9 50 = 169.7


# 200 138.3 81.5 19 Dry Wt. of soil After washing

PAN 138.5 = 138.5


Total Soil Wt. (gm.) 169.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 5.42 3.89 4.12 68.06 18.50
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 007 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 007 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-6
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : CU


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 198.0
2" Wt. (Soil + Can) Dry (gm.) : 172.4
1
1 /2" Wt. Water (gm.) : 25.6
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.0
3/8" 08.0 5.3 95 Wt. (Soil) Dry (gm.) : 150.4
#4 18.7 12.4 88 Water Content (%) : 17.02
# 10 24.9 16.6 83 CLASSIFICATION

# 20 28.3 18.8 81 ( ASTM D3282-09/D2487-10 )


# 40 30.9 20.5 79 SM
# 60 39.4 26.2 74 Dry Wt. of soil before washing

# 100 72.9 48.5 52 = 150.4


# 200 102.2 68.0 32 Dry Wt. of soil After washing

PAN 102.3 = 102.3


Total Soil Wt. (gm.) 150.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 12.43 4.12 3.99 47.41 32.05
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 007 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 007 DEPTH (m) : 14.50~15.50 SAMPLE NO. : R-5
SAMPLE DESCRIPTION : Light brown, clayey SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : PAT


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 973.0
2" Wt. (Soil + Can) Dry (gm.) : 935.0
1
1 /2" Wt. Water (gm.) : 38.0
3/4" 00.0 0.0 100 Wt. Can (gm.) : 283.2
3/8" 04.5 0.7 99 Wt. (Soil) Dry (gm.) : 651.8
#4 22.7 3.5 97 Water Content (%) : 5.83
# 10 50.1 7.7 92 CLASSIFICATION

# 20 101.7 15.6 84 ( ASTM D3282-09/D2487-10 )


# 40 181.6 27.9 72 SC
# 60 279.7 42.9 57 Dry Wt. of soil before washing

# 100 327.1 50.2 50 = 651.8


# 200 369.3 56.7 43 Dry Wt. of soil After washing

PAN 369.5 = 369.5


Total Soil Wt. (gm.) 651.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.48 4.20 20.17 28.80 43.34
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 008 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 008 DEPTH (m) : 15.00~15.45 SAMPLE NO. : D - 12
SAMPLE DESCRIPTION : Brown, clayey SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : HS


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 207.8
2" Wt. (Soil + Can) Dry (gm.) : 186.3
1
1 /2" Wt. Water (gm.) : 21.5
3/4" Wt. Can (gm.) : 21.8
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 164.5
#4 06.5 4.0 96 Water Content (%) : 13.07
# 10 23.2 14.1 86 CLASSIFICATION

# 20 41.6 25.3 75 ( ASTM D3282-09/D2487-10 )


# 40 57.9 35.2 65 SC
# 60 75.6 46.0 54 Dry Wt. of soil before washing

# 100 95.0 57.8 42 = 164.5


# 200 109.3 66.4 34 Dry Wt. of soil After washing

PAN 109.5 = 109.5


Total Soil Wt. (gm.) 164.5

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.95 10.15 21.09 31.25 33.56
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 008 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 008 DEPTH (m) : 1.00~1.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : YZ


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 189.4
2" Wt. (Soil + Can) Dry (gm.) : 171.7
1
1 /2" Wt. Water (gm.) : 17.7
3/4" 00.0 0.0 100 Wt. Can (gm.) : 19.3
3/8" 24.3 15.9 84 Wt. (Soil) Dry (gm.) : 152.4
#4 46.1 30.2 70 Water Content (%) : 11.61
# 10 63.5 41.7 58 CLASSIFICATION

# 20 73.8 48.4 52 ( ASTM D3282-09/D2487-10 )


# 40 82.1 53.9 46 SM
# 60 91.1 59.8 40 Dry Wt. of soil before washing

# 100 100.1 65.7 34 = 152.4


# 200 111.4 73.1 27 Dry Wt. of soil After washing

PAN 111.6 = 111.6


Total Soil Wt. (gm.) 152.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 30.25 11.42 12.20 19.23 26.90
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 008 REPORT DATE : 29.01.2022
SAMPLING DATE : - TEST START DATE : 25.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 27.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 008 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, clayey SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : LPK


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 151.5
2" Wt. (Soil + Can) Dry (gm.) : 121.9
1
1 /2" Wt. Water (gm.) : 29.6
3/4" 00.0 0.0 100 Wt. Can (gm.) : 23.3
3/8" 05.3 5.4 95 Wt. (Soil) Dry (gm.) : 98.6
#4 08.6 8.7 91 Water Content (%) : 30.02
# 10 14.4 14.6 85 CLASSIFICATION

# 20 21.4 21.7 78 ( ASTM D3282-09/D2487-10 )


# 40 28.8 29.2 71 SC
# 60 37.1 37.6 62 Dry Wt. of soil before washing

# 100 48.4 49.1 51 = 98.6


# 200 58.0 58.8 41 Dry Wt. of soil After washing

PAN 58.1 = 58.1


Total Soil Wt. (gm.) 98.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 8.72 5.88 14.60 29.61 41.18
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 009 REPORT DATE : 26.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 24.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 009 DEPTH (m) : 10.50~10.95 SAMPLE NO. : D-4
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : C-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 225.5
2" Wt. (Soil + Can) Dry (gm.) : 221.0
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 4.5
3/4" 06.9 3.6 96 Wt. Can (gm.) : 30.6
3/8" 26.8 14.1 86 Wt. (Soil) Dry (gm.) : 190.4
#4 33.7 17.7 82 Water Content (%) : 2.36
# 10 45.1 23.7 76 CLASSIFICATION

# 20 53.5 28.1 72 ( ASTM D3282-09/D2487-10 )


# 40 75.8 39.8 60 SM
# 60 112.7 59.2 41 Dry Wt. of soil before washing

# 100 151.2 79.4 21 = 190.4


# 200 159.2 83.6 16 Dry Wt. of soil After washing

PAN 160.2 = 160.2


Total Soil Wt. (gm.) 190.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 3.62 14.08 5.99 16.12 43.80 16.39
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 009 REPORT DATE : 26.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 24.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 009 DEPTH (m) : 13.50~13.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BB


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 210.7
2" Wt. (Soil + Can) Dry (gm.) : 201.4
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 9.3
3/4" 05.4 3.1 97 Wt. Can (gm.) : 27.0
3/8" 24.6 14.1 86 Wt. (Soil) Dry (gm.) : 174.4
#4 31.9 18.3 82 Water Content (%) : 5.33
# 10 39.9 22.9 77 CLASSIFICATION

# 20 50.8 29.1 71 ( ASTM D3282-09/D2487-10 )


# 40 75.2 43.1 57 SM
# 60 105.3 60.4 40 Dry Wt. of soil before washing

# 100 138.0 79.1 21 = 174.4


# 200 146.8 84.2 16 Dry Wt. of soil After washing

PAN 147.7 = 147.7


Total Soil Wt. (gm.) 174.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 3.10 15.19 4.59 20.24 41.06 15.83
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 042 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 28.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 30.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 042 DEPTH (m) : 0.00~1.20 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : C-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 194.0
2" Wt. (Soil + Can) Dry (gm.) : 185.0
1
1 /2" Wt. Water (gm.) : 9.0
3/4" 00.0 0.0 100 Wt. Can (gm.) : 23.9
3/8" 18.4 11.4 89 Wt. (Soil) Dry (gm.) : 161.1
#4 30.7 19.1 81 Water Content (%) : 5.59
# 10 49.5 30.7 69 CLASSIFICATION

# 20 75.2 46.7 53 ( ASTM D3282-09/D2487-10 )


# 40 109.4 67.9 32 SP-SM
# 60 138.2 85.8 14 Dry Wt. of soil before washing

# 100 149.2 92.6 7 = 161.1


# 200 152.6 94.7 5 Dry Wt. of soil After washing

PAN 152.9 = 152.9


Total Soil Wt. (gm.) 161.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 19.06 11.67 37.18 26.82 5.28
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 042 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 28.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 30.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 042 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, well-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : NCP


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 214.5
2" Wt. (Soil + Can) Dry (gm.) : 188.1
1
1 /2" Wt. Water (gm.) : 26.4
3/4" 00.0 0.0 100 Wt. Can (gm.) : 24.5
3/8" 05.8 3.5 96 Wt. (Soil) Dry (gm.) : 163.6
#4 18.5 11.3 89 Water Content (%) : 16.14
# 10 32.8 20.0 80 CLASSIFICATION

# 20 71.4 43.6 56 ( ASTM D3282-09/D2487-10 )


# 40 106.8 65.3 35 SW-SM
# 60 129.7 79.3 21 Dry Wt. of soil before washing

# 100 143.1 87.5 13 = 163.6


# 200 151.1 92.4 8 Dry Wt. of soil After washing

PAN 151.3 = 151.3


Total Soil Wt. (gm.) 163.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 11.31 8.74 45.23 27.08 7.64
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 042 REPORT DATE : 30.01.2022
SAMPLING DATE : - TEST START DATE : 28.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 30.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 22.2 C HUMIDITY : 40%
BOREHOLE NO. : N2G-BH - 042 DEPTH (m) : 9.50~9.95 SAMPLE NO. : D-9
SAMPLE DESCRIPTION : Brown poorly-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BD


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 187.4
2" Wt. (Soil + Can) Dry (gm.) : 168.3
1
1 /2" Wt. Water (gm.) : 19.1
3/4" 00.0 0.0 100 Wt. Can (gm.) : 25.2
3/8" 28.5 19.9 80 Wt. (Soil) Dry (gm.) : 143.1
#4 45.5 31.8 68 Water Content (%) : 13.35
# 10 47.8 33.4 67 CLASSIFICATION

# 20 49.5 34.6 65 ( ASTM D3282-09/D2487-10 )


# 40 63.1 44.1 56 SP-SM
# 60 99.5 69.5 30 Dry Wt. of soil before washing

# 100 124.6 87.1 13 = 143.1


# 200 134.6 94.1 6 Dry Wt. of soil After washing

PAN 134.9 = 134.9


Total Soil Wt. (gm.) 143.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 31.80 1.61 10.69 49.97 5.94
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 011 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 21.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 23.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 011 DEPTH (m) : 1.20~1.65 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : C-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 223.5
2" Wt. (Soil + Can) Dry (gm.) : 192.4
1
1 /2" Wt. Water (gm.) : 31.1
3/4" Wt. Can (gm.) : 23.9
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 168.5
#4 05.9 3.5 96 Water Content (%) : 18.46
# 10 23.8 14.1 86 CLASSIFICATION

# 20 55.2 32.8 67 ( ASTM D3282-09/D2487-10 )


# 40 105.2 62.4 38 SP-SM
# 60 141.4 83.9 16 Dry Wt. of soil before washing

# 100 153.4 91.0 9 = 168.5


# 200 158.5 94.1 6 Dry Wt. of soil After washing

PAN 158.7 = 158.7


Total Soil Wt. (gm.) 168.5

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.50 10.62 48.31 31.63 5.93
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 011 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 21.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 23.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 011 DEPTH (m) : 5.00~5.45 SAMPLE NO. : D-5
SAMPLE DESCRIPTION : Brown, well-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : Q-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 185.1
2" Wt. (Soil + Can) Dry (gm.) : 163.7
1
1 /2" Wt. Water (gm.) : 21.4
3/4" Wt. Can (gm.) : 28.0
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 135.7
#4 02.8 2.1 98 Water Content (%) : 15.77
# 10 04.5 3.3 97 CLASSIFICATION

# 20 33.5 24.7 75 ( ASTM D3282-09/D2487-10 )


# 40 72.8 53.6 46 SW-SM
# 60 94.7 69.8 30 Dry Wt. of soil before washing

# 100 114.5 84.4 16 = 135.7


# 200 123.1 90.7 9 Dry Wt. of soil After washing

PAN 123.3 = 123.3


Total Soil Wt. (gm.) 135.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 2.06 1.25 50.33 37.07 9.29
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 011 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 21.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 23.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 011 DEPTH (m) : 9.50~9.95 SAMPLE NO. : D-8
SAMPLE DESCRIPTION : Brown, well-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-97


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 201.5
2" Wt. (Soil + Can) Dry (gm.) : 178.3
1
1 /2" Wt. Water (gm.) : 23.2
3/4" Wt. Can (gm.) : 24.6
3/8" Wt. (Soil) Dry (gm.) : 153.7
#4 00.0 0.0 100 Water Content (%) : 15.09
# 10 02.8 1.8 98 CLASSIFICATION

# 20 46.1 30.0 70 ( ASTM D3282-09/D2487-10 )


# 40 85.4 55.6 44 SW-SM
# 60 115.7 75.3 25 Dry Wt. of soil before washing

# 100 133.9 87.1 13 = 153.7


# 200 140.7 91.5 8 Dry Wt. of soil After washing

PAN 140.9 = 140.9


Total Soil Wt. (gm.) 153.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 1.82 53.74 35.98 8.46
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 012 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 012 DEPTH (m) : 15.50~15.95 SAMPLE NO. : D - 12
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : ABO


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 238.3
2" Wt. (Soil + Can) Dry (gm.) : 215.4
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 22.9
3/4" 25.2 13.1 87 Wt. Can (gm.) : 23.7
3/8" 35.5 18.5 81 Wt. (Soil) Dry (gm.) : 191.7
#4 43.3 22.6 77 Water Content (%) : 11.95
# 10 62.9 32.8 67 CLASSIFICATION

# 20 93.7 48.9 51 ( ASTM D3282-09/D2487-10 )


# 40 123.7 64.5 35 SP-SM
# 60 153.5 80.1 20 Dry Wt. of soil before washing

# 100 169.8 88.6 11 = 191.7


# 200 177.9 92.8 7 Dry Wt. of soil After washing

PAN 178.2 = 178.2


Total Soil Wt. (gm.) 191.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 13.15 9.44 10.22 31.72 28.27 7.20
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 012 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 012 DEPTH (m) : 21.50~21.95 SAMPLE NO. : D - 16
SAMPLE DESCRIPTION : Reddish brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : NCP


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 220.2
2" Wt. (Soil + Can) Dry (gm.) : 199.5
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 20.7
3/4" 16.4 9.4 91 Wt. Can (gm.) : 24.5
3/8" 33.0 18.9 81 Wt. (Soil) Dry (gm.) : 175.0
#4 33.8 19.3 81 Water Content (%) : 11.83
# 10 48.0 27.4 73 CLASSIFICATION

# 20 63.7 36.4 64 ( ASTM D3282-09/D2487-10 )


# 40 83.1 47.5 53 SM
# 60 122.2 69.8 30 Dry Wt. of soil before washing

# 100 139.1 79.5 21 = 175.0


# 200 148.2 84.7 15 Dry Wt. of soil After washing

PAN 148.5 = 148.5


Total Soil Wt. (gm.) 175.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 9.37 9.94 8.11 20.06 37.20 15.31
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 012 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 012 DEPTH (m) : 2.00~2.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, poorly-graded GRAVEL with silt & sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AB


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 257.8
2" Wt. (Soil + Can) Dry (gm.) : 240.4
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 17.4
3/4" 56.1 25.8 74 Wt. Can (gm.) : 22.6
3/8" 107.3 49.3 51 Wt. (Soil) Dry (gm.) : 217.8
#4 121.9 56.0 44 Water Content (%) : 7.99
# 10 138.4 63.5 36 CLASSIFICATION

# 20 160.5 73.7 26 ( ASTM D3282-09/D2487-10 )


# 40 183.9 84.4 16 GP-GM
# 60 195.2 89.6 10 Dry Wt. of soil before washing

# 100 200.0 91.8 8 = 217.8


# 200 203.8 93.6 6 Dry Wt. of soil After washing

PAN 204.2 = 204.2


Total Soil Wt. (gm.) 217.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 25.76 30.21 7.58 20.89 9.14 6.43
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 012 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 012 DEPTH (m) : 8.00~8.45 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Grey, poorly-graded SAND with silt.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : C-9


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 237.7
2" Wt. (Soil + Can) Dry (gm.) : 205.4
1
1 /2" Wt. Water (gm.) : 32.3
3/4" Wt. Can (gm.) : 27.9
3/8" Wt. (Soil) Dry (gm.) : 177.5
#4 00.0 0.0 100 Water Content (%) : 18.20
# 10 07.1 4.0 96 CLASSIFICATION

# 20 32.9 18.5 81 ( ASTM D3282-09/D2487-10 )


# 40 97.9 55.2 45 SP-SM
# 60 141.1 79.5 21 Dry Wt. of soil before washing

# 100 158.0 89.0 11 = 177.5


# 200 165.5 93.2 7 Dry Wt. of soil After washing

PAN 166.0 = 166.0


Total Soil Wt. (gm.) 177.5

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 4.00 28.62 60.62 6.76
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 013 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 013 DEPTH (m) : 2.00~2.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : DN


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 198.3
2" Wt. (Soil + Can) Dry (gm.) : 190.4
1
1 /2" Wt. Water (gm.) : 7.9
3/4" 00.0 0.0 100 Wt. Can (gm.) : 24.3
3/8" 32.9 19.8 80 Wt. (Soil) Dry (gm.) : 166.1
#4 49.6 29.9 70 Water Content (%) : 4.76
# 10 67.5 40.6 59 CLASSIFICATION

# 20 96.4 58.0 42 ( ASTM D3282-09/D2487-10 )


# 40 119.8 72.1 28 SP
# 60 145.6 87.7 12 Dry Wt. of soil before washing

# 100 155.8 93.8 6 = 166.1


# 200 160.0 96.3 4 Dry Wt. of soil After washing

PAN 161.6 = 161.6


Total Soil Wt. (gm.) 166.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 29.86 10.78 31.49 24.20 3.67
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 013 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 013 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-5
SAMPLE DESCRIPTION : Brown, poorly-graded GRAVEL with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : CA


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 184.6
2" Wt. (Soil + Can) Dry (gm.) : 174.6
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 10.0
3/4" 17.9 11.6 88 Wt. Can (gm.) : 20.9
3/8" 65.8 42.8 57 Wt. (Soil) Dry (gm.) : 153.7
#4 79.0 51.4 49 Water Content (%) : 6.51
# 10 91.0 59.2 41 CLASSIFICATION

# 20 105.6 68.7 31 ( ASTM D3282-09/D2487-10 )


# 40 122.8 79.9 20 GP
# 60 138.2 89.9 10 Dry Wt. of soil before washing

# 100 145.0 94.3 6 = 153.7


# 200 147.7 96.1 4 Dry Wt. of soil After washing

PAN 148.9 = 148.9


Total Soil Wt. (gm.) 153.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 11.65 39.75 7.81 20.69 16.20 3.90
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 013 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 013 DEPTH (m) : 11.00~11.45 SAMPLE NO. : D-9
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AB


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 219.5
2" Wt. (Soil + Can) Dry (gm.) : 200.7
1
1 /2" Wt. Water (gm.) : 18.8
3/4" 00.0 0.0 100 Wt. Can (gm.) : 21.6
3/8" 24.8 13.8 86 Wt. (Soil) Dry (gm.) : 179.1
#4 40.1 22.4 78 Water Content (%) : 10.50
# 10 55.8 31.2 69 CLASSIFICATION

# 20 81.4 45.4 55 ( ASTM D3282-09/D2487-10 )


# 40 104.5 58.3 42 SM
# 60 133.4 74.5 26 Dry Wt. of soil before washing

# 100 149.3 83.4 17 = 179.1


# 200 157.1 87.7 12 Dry Wt. of soil After washing

PAN 158.2 = 158.2


Total Soil Wt. (gm.) 179.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 22.39 8.77 27.19 29.37 12.28
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 014 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 014 DEPTH (m) : 1.20~1.65 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : JJ


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 275.3
2" Wt. (Soil + Can) Dry (gm.) : 271.6
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 3.7
3/4" 59.1 23.7 76 Wt. Can (gm.) : 21.8
3/8" 79.2 31.7 68 Wt. (Soil) Dry (gm.) : 249.8
#4 101.7 40.7 59 Water Content (%) : 1.48
# 10 128.8 51.6 48 CLASSIFICATION

# 20 150.7 60.3 40 ( ASTM D3282-09/D2487-10 )


# 40 166.2 66.5 33 SM
# 60 180.5 72.3 28 Dry Wt. of soil before washing

# 100 196.0 78.5 22 = 249.8


# 200 212.2 84.9 15 Dry Wt. of soil After washing

PAN 212.6 = 212.6


Total Soil Wt. (gm.) 249.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 23.66 17.05 10.85 14.97 18.41 15.05
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 014 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 014 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, clayey SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : A-20


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 187.9
2" Wt. (Soil + Can) Dry (gm.) : 177.2
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 10.7
3/4" 12.7 8.2 92 Wt. Can (gm.) : 22.8
3/8" 22.6 14.6 85 Wt. (Soil) Dry (gm.) : 154.4
#4 41.2 26.7 73 Water Content (%) : 6.93
# 10 62.9 40.7 59 CLASSIFICATION

# 20 80.4 52.1 48 ( ASTM D3282-09/D2487-10 )


# 40 91.9 59.5 40 SC
# 60 102.1 66.1 34 Dry Wt. of soil before washing

# 100 110.9 71.8 28 = 154.4


# 200 118.9 77.0 23 Dry Wt. of soil After washing

PAN 119.4 = 119.4


Total Soil Wt. (gm.) 154.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 8.23 18.46 14.05 18.78 17.49 22.99
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 014 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 014 DEPTH (m) : 11.00~12.00 SAMPLE NO. : R-2
SAMPLE DESCRIPTION : Reddish brwon, Sandy SILT.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : SS


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 1190.6
2" Wt. (Soil + Can) Dry (gm.) : 1057.0
1
1 /2" Wt. Water (gm.) : 133.6
3/4" 00.0 0.0 100 Wt. Can (gm.) : 328.0
3/8" 12.3 1.7 98 Wt. (Soil) Dry (gm.) : 729.0
#4 18.8 2.6 97 Water Content (%) : 18.33
# 10 27.9 3.8 96 CLASSIFICATION

# 20 42.7 5.9 94 ( ASTM D3282-09/D2487-10 )


# 40 65.4 9.0 91 ML
# 60 128.5 17.6 82 Dry Wt. of soil before washing

# 100 175.8 24.1 76 = 729.0


# 200 241.7 33.2 67 Dry Wt. of soil After washing

PAN 242.6 = 242.6


Total Soil Wt. (gm.) 729.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 2.58 1.25 5.14 24.18 66.84
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 014 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 014 DEPTH (m) : 13.72~15.00 SAMPLE NO. : R-4
SAMPLE DESCRIPTION : Reddish brown, gravelly Lean CLAY with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : DP


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 1043.8
2" Wt. (Soil + Can) Dry (gm.) : 925.7
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 118.1
3/4" 121.8 19.5 81 Wt. Can (gm.) : 300.0
3/8" 128.6 20.6 79 Wt. (Soil) Dry (gm.) : 625.7
#4 131.3 21.0 79 Water Content (%) : 18.87
# 10 134.8 21.5 78 CLASSIFICATION

# 20 142.9 22.8 77 ( ASTM D3282-09/D2487-10 )


# 40 155.2 24.8 75 CL
# 60 208.7 33.4 67 Dry Wt. of soil before washing

# 100 232.9 37.2 63 = 625.7


# 200 258.1 41.2 59 Dry Wt. of soil After washing

PAN 258.6 = 258.6


Total Soil Wt. (gm.) 625.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 19.47 1.52 0.56 3.26 16.45 58.75
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 014 REPORT DATE : 27.01.2022
SAMPLING DATE : - TEST START DATE : 23.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 25.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 014 DEPTH (m) : 18.27~19.50 SAMPLE NO. : R-7
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BW


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 2370.3
2" Wt. (Soil + Can) Dry (gm.) : 2054.7
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 315.6
3/4" 40.6 2.2 98 Wt. Can (gm.) : 210.4
3/8" 223.2 12.1 88 Wt. (Soil) Dry (gm.) : 1844.3
#4 315.4 17.1 83 Water Content (%) : 17.11
# 10 392.8 21.3 79 CLASSIFICATION

# 20 499.8 27.1 73 ( ASTM D3282-09/D2487-10 )


# 40 702.7 38.1 62 SM
# 60 1123.2 60.9 39 Dry Wt. of soil before washing

# 100 1477.3 80.1 20 = 1844.3


# 200 1554.7 84.3 16 Dry Wt. of soil After washing

PAN 1555.9 = 1555.9


Total Soil Wt. (gm.) 1844.3

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 2.20 14.90 4.20 16.80 46.20 15.70
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 015 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 015 DEPTH (m) : 3.00~3.45 SAMPLE NO. : D-3
SAMPLE DESCRIPTION : Greyish , clayey SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : Z-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 191.6
2" Wt. (Soil + Can) Dry (gm.) : 165.1
1
1 /2" Wt. Water (gm.) : 26.5
3/4" Wt. Can (gm.) : 28.0
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 137.1
#4 03.7 2.7 97 Water Content (%) : 19.33
# 10 16.6 12.1 88 CLASSIFICATION

# 20 24.8 18.1 82 ( ASTM D3282-09/D2487-10 )


# 40 38.2 27.9 72 SC
# 60 62.6 45.7 54 Dry Wt. of soil before washing

# 100 75.1 54.8 45 = 137.1


# 200 83.2 60.7 39 Dry Wt. of soil After washing

PAN 83.2 = 83.2


Total Soil Wt. (gm.) 137.1

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.000 10.000 1.000 0.100 0.010 0.001
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 2.70 9.41 15.75 32.82 39.31
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 015 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 015 DEPTH (m) : 5.00~5.45 SAMPLE NO. : D-5
SAMPLE DESCRIPTION : Reddish brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AG


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 124.1
2" Wt. (Soil + Can) Dry (gm.) : 108.5
1
1 /2" Wt. Water (gm.) : 15.6
3/4" 00.0 0.0 100 Wt. Can (gm.) : 24.1
3/8" 03.5 4.1 96 Wt. (Soil) Dry (gm.) : 84.4
#4 05.8 6.9 93 Water Content (%) : 18.48
# 10 07.6 9.0 91 CLASSIFICATION

# 20 11.2 13.3 87 ( ASTM D3282-09/D2487-10 )


# 40 20.9 24.8 75 SM
# 60 43.6 51.7 48 Dry Wt. of soil before washing

# 100 53.9 63.9 36 = 84.4


# 200 60.0 71.1 29 Dry Wt. of soil After washing

PAN 60.0 = 60.0


Total Soil Wt. (gm.) 84.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 6.87 2.13 15.76 46.33 28.91
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 015 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 015 DEPTH (m) : 9.50~9.95 SAMPLE NO. : D-8
SAMPLE DESCRIPTION : Brown, Lean CLAY with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BD


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 198.7
2" Wt. (Soil + Can) Dry (gm.) : 165.8
1
1 /2" Wt. Water (gm.) : 32.9
3/4" 00.0 0.0 100 Wt. Can (gm.) : 25.2
3/8" 01.9 1.4 99 Wt. (Soil) Dry (gm.) : 140.6
#4 02.2 1.6 98 Water Content (%) : 23.40
# 10 04.2 3.0 97 CLASSIFICATION

# 20 08.8 6.3 94 ( ASTM D3282-09/D2487-10 )


# 40 18.8 13.4 87 CL
# 60 29.1 20.7 79 Dry Wt. of soil before washing

# 100 35.8 25.5 75 = 140.6


# 200 39.9 28.4 72 Dry Wt. of soil After washing

PAN 39.9 = 39.9


Total Soil Wt. (gm.) 140.6

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 1.57 1.42 10.38 15.01 71.62
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 015 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 015 DEPTH (m) : 11.00~11.45 SAMPLE NO. : D-9
SAMPLE DESCRIPTION : Brown, silty SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : BN


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 271.9
2" Wt. (Soil + Can) Dry (gm.) : 234.7
1
1 /2" Wt. Water (gm.) : 37.2
3/4" Wt. Can (gm.) : 22.7
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 212.0
#4 07.2 3.4 97 Water Content (%) : 17.55
# 10 34.1 16.1 84 CLASSIFICATION

# 20 49.0 23.1 77 ( ASTM D3282-09/D2487-10 )


# 40 142.8 67.4 33 SM
# 60 161.5 76.2 24 Dry Wt. of soil before washing

# 100 171.9 81.1 19 = 212.0


# 200 177.8 83.9 16 Dry Wt. of soil After washing

PAN 178.8 = 178.8


Total Soil Wt. (gm.) 212.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 3.40 12.69 51.27 16.51 16.13
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 015 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 015 DEPTH (m) : 9.95~10.26 SAMPLE NO. : U-1
SAMPLE DESCRIPTION : Brown, Lean CLAY with sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AB


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 254.9
2" Wt. (Soil + Can) Dry (gm.) : 228.5
1
1 /2" Wt. Water (gm.) : 26.4
3/4" Wt. Can (gm.) : 22.6
3/8" Wt. (Soil) Dry (gm.) : 205.9
#4 00.0 0.0 100 Water Content (%) : 12.82
# 10 03.1 1.5 98 CLASSIFICATION

# 20 07.2 3.5 97 ( ASTM D3282-09/D2487-10 )


# 40 17.1 8.3 92 CL
# 60 29.8 14.5 86 Dry Wt. of soil before washing

# 100 40.7 19.8 80 = 205.9


# 200 50.2 24.4 76 Dry Wt. of soil After washing

PAN 50.6 = 50.6


Total Soil Wt. (gm.) 205.9

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.000 10.000 1.000 0.100 0.010 0.001
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - - 1.51 6.80 16.08 75.62
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 016 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 016 DEPTH (m) : 0.00~1.20 SAMPLE NO. : B-1
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : CA


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 1648.3
2" Wt. (Soil + Can) Dry (gm.) : 1641.4
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 6.9
3/4" 121.4 8.8 91 Wt. Can (gm.) : 264.0
3/8" 228.3 16.6 83 Wt. (Soil) Dry (gm.) : 1377.4
#4 322.3 23.4 77 Water Content (%) : 0.50
# 10 426.3 30.9 69 CLASSIFICATION

# 20 510.0 37.0 63 ( ASTM D3282-09/D2487-10 )


# 40 603.2 43.8 56 SP
# 60 1100.9 79.9 20 Dry Wt. of soil before washing

# 100 1319.1 95.8 4 = 1377.4


# 200 1342.4 97.5 3 Dry Wt. of soil After washing

PAN 1343.1 = 1343.1


Total Soil Wt. (gm.) 1377.4

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 8.81 14.59 7.55 12.84 53.67 2.54
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 016 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 016 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-6
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : AS-1


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 243.5
2" Wt. (Soil + Can) Dry (gm.) : 226.2
1
1 /2" Wt. Water (gm.) : 17.3
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.2
3/8" 57.2 28.0 72 Wt. (Soil) Dry (gm.) : 204.0
#4 65.7 32.2 68 Water Content (%) : 8.48
# 10 78.4 38.4 62 CLASSIFICATION

# 20 95.4 46.8 53 ( ASTM D3282-09/D2487-10 )


# 40 114.3 56.0 44 SM
# 60 136.6 67.0 33 Dry Wt. of soil before washing

# 100 148.1 72.6 27 = 204.0


# 200 150.3 73.7 26 Dry Wt. of soil After washing

PAN 151.4 = 151.4


Total Soil Wt. (gm.) 204.0

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 32.21 6.23 17.60 17.65 26.32
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 016 REPORT DATE : 22.01.2022
SAMPLING DATE : - TEST START DATE : 19.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 21.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 016 DEPTH (m) : 11.00~11.45 SAMPLE NO. : D-9
SAMPLE DESCRIPTION : Brown, poorly-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : YQ


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 268.3
2" Wt. (Soil + Can) Dry (gm.) : 248.8
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 19.5
3/4" 22.2 9.9 90 Wt. Can (gm.) : 24.0
3/8" 62.8 27.9 72 Wt. (Soil) Dry (gm.) : 224.8
#4 90.9 40.4 60 Water Content (%) : 8.67
# 10 112.4 50.0 50 CLASSIFICATION

# 20 130.4 58.0 42 ( ASTM D3282-09/D2487-10 )


# 40 154.5 68.7 31 SP-SM
# 60 181.7 80.8 19 Dry Wt. of soil before washing

# 100 194.6 86.6 13 = 224.8


# 200 201.3 89.5 10 Dry Wt. of soil After washing

PAN 202.2 = 202.2


Total Soil Wt. (gm.) 224.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 9.88 30.56 9.56 18.73 20.82 10.45
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 017 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 017 DEPTH (m) : 12.50~12.95 SAMPLE NO. : D - 10
SAMPLE DESCRIPTION : Brown, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : EF


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 224.7
2" Wt. (Soil + Can) Dry (gm.) : 209.8
1
1 /2" Wt. Water (gm.) : 14.9
3/4" 00.0 0.0 100 Wt. Can (gm.) : 38.0
3/8" 23.4 13.6 86 Wt. (Soil) Dry (gm.) : 171.8
#4 34.5 20.1 80 Water Content (%) : 8.67
# 10 47.0 27.4 73 CLASSIFICATION

# 20 63.3 36.8 63 ( ASTM D3282-09/D2487-10 )


# 40 82.4 48.0 52 SM
# 60 115.2 67.1 33 Dry Wt. of soil before washing

# 100 136.3 79.3 21 = 171.8


# 200 143.2 83.4 17 Dry Wt. of soil After washing

PAN 144.4 = 144.4


Total Soil Wt. (gm.) 171.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 20.08 7.28 20.61 35.39 16.65
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 017 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 017 DEPTH (m) : 2.00~2.45 SAMPLE NO. : D-2
SAMPLE DESCRIPTION : Light grey, poorly-graded SAND.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : MZ


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 180.7
2" Wt. (Soil + Can) Dry (gm.) : 172.8
1
1 /2" Wt. Water (gm.) : 7.9
3/4" Wt. Can (gm.) : 23.0
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 149.8
#4 00.9 0.6 99 Water Content (%) : 5.27
# 10 01.2 0.8 99 CLASSIFICATION

# 20 02.0 1.3 99 ( ASTM D3282-09/D2487-10 )


# 40 29.0 19.4 81 SP
# 60 83.2 55.5 44 Dry Wt. of soil before washing

# 100 136.9 91.4 9 = 149.8


# 200 145.7 97.3 3 Dry Wt. of soil After washing

PAN 146.7 = 146.7


Total Soil Wt. (gm.) 149.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 0.60 0.20 18.56 77.90 2.74
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 017 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 017 DEPTH (m) : 6.50~6.95 SAMPLE NO. : D-6
SAMPLE DESCRIPTION : Grey, poorly-graded SAND with silt & gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : S-2


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 208.1
2" Wt. (Soil + Can) Dry (gm.) : 192.9
1
1 /2" Wt. Water (gm.) : 15.2
3/4" 00.0 0.0 100 Wt. Can (gm.) : 27.2
3/8" 72.6 43.8 56 Wt. (Soil) Dry (gm.) : 165.7
#4 75.5 45.6 54 Water Content (%) : 9.17
# 10 78.6 47.4 53 CLASSIFICATION

# 20 82.4 49.7 50 ( ASTM D3282-09/D2487-10 )


# 40 87.1 52.6 47 SP-SM
# 60 119.4 72.1 28 Dry Wt. of soil before washing

# 100 145.7 87.9 12 = 165.7


# 200 152.1 91.8 8 Dry Wt. of soil After washing

PAN 153.3 = 153.3


Total Soil Wt. (gm.) 165.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 45.56 1.87 5.13 39.23 8.21
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 018 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 018 DEPTH (m) : 1.20~1.65 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Grey, silty SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : K-8


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 242.7
2" Wt. (Soil + Can) Dry (gm.) : 218.9
1
1 /2" Wt. Water (gm.) : 23.8
3/4" Wt. Can (gm.) : 26.2
3/8" 00.0 0.0 100 Wt. (Soil) Dry (gm.) : 192.7
#4 34.4 17.9 82 Water Content (%) : 12.35
# 10 42.6 22.1 78 CLASSIFICATION

# 20 45.2 23.5 77 ( ASTM D3282-09/D2487-10 )


# 40 46.8 24.3 76 SM
# 60 65.9 34.2 66 Dry Wt. of soil before washing

# 100 140.5 72.9 27 = 192.7


# 200 168.4 87.4 13 Dry Wt. of soil After washing

PAN 169.4 = 169.4


Total Soil Wt. (gm.) 192.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 17.85 4.26 2.18 63.10 12.61
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 018 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 018 DEPTH (m) : 14.00~14.45 SAMPLE NO. : D - 11
SAMPLE DESCRIPTION : Brown, clayey SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : RG


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 186.4
2" Wt. (Soil + Can) Dry (gm.) : 170.4
1
1 /2" Wt. Water (gm.) : 16.0
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.6
3/8" 33.8 22.9 77 Wt. (Soil) Dry (gm.) : 147.8
#4 47.5 32.1 68 Water Content (%) : 10.83
# 10 70.0 47.4 53 CLASSIFICATION

# 20 89.1 60.3 40 ( ASTM D3282-09/D2487-10 )


# 40 102.3 69.2 31 SC
# 60 112.5 76.1 24 Dry Wt. of soil before washing

# 100 120.0 81.2 19 = 147.8


# 200 123.5 83.6 16 Dry Wt. of soil After washing

PAN 134.4 = 134.4


Total Soil Wt. (gm.) 147.8

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- - 32.14 15.22 21.85 14.34 16.44
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 018 REPORT DATE : 23.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 018 DEPTH (m) : 8.00~8.45 SAMPLE NO. : D-7
SAMPLE DESCRIPTION : Brown, well-graded GRAVEL with silt & sand.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : CP


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 189.8
2" Wt. (Soil + Can) Dry (gm.) : 176.7
1
1 /2" 00.0 0.0 100 Wt. Water (gm.) : 13.1
3/4" 24.1 15.7 84 Wt. Can (gm.) : 23.0
3/8" 53.7 34.9 65 Wt. (Soil) Dry (gm.) : 153.7
#4 74.3 48.3 52 Water Content (%) : 8.52
# 10 93.7 61.0 39 CLASSIFICATION

# 20 108.4 70.5 29 ( ASTM D3282-09/D2487-10 )


# 40 118.7 77.2 23 GW-GM
# 60 127.3 82.8 17 Dry Wt. of soil before washing

# 100 133.4 86.8 13 = 153.7


# 200 136.1 88.5 11 Dry Wt. of soil After washing

PAN 137.4 = 137.4


Total Soil Wt. (gm.) 153.7

100
90
Percent Passing by Weight

80
70
60
50
40
30
20
10
0
100.00 10.00 1.00 0.10 0.01
Grain-size in Millimeters

% +3" % Gravel % Sand % Fine


Coarse Fine Coarse Medium Fine Silt Clay
- 15.68 32.66 12.62 16.27 11.32 11.45
TESTED BY : Ameer Usman CHECKED BY / REVIEWED BY : Syed Asad Abbas

APPROVED BY:
(Lab. Incharge)
Copyright of this document is owned by RGF, it may not be reproduced except with prior written permission from the company.

RGF-JED-PHY-SOIL-01-03
20.01.2020
P.O. Box 9182, Jeddah 21413, KSA Telephone: +966 (12) 6715621 / 6176860 Fax: +966 (12) 6715426 Email: [email protected]
Location: Garnatha St. near Arbaeen St. intersection, Mushrefah District, Jeddah

TEST REPORT
PARTI CLE SI ZE DI STRI BUTI ON (GRADATI ON) OF SOI LS USI NG SI EVE ANALYSI S
ASTM -D6913/D6913M-17
CLIENT : NEOM Company PROJECT NO. : 21J4037
PROJECT : NEOM Desalination Plant to Gayal Transmission System
SAMPLE SOURCE : N2G-BH - 019 REPORT DATE : 24.01.2022
SAMPLING DATE : - TEST START DATE : 20.01.2022
SAMPLE RECEIVING DATE : - TEST FINISH DATE : 22.01.2022
O
SAMPLED BY : - ENV. CONDITION TEMP. : 25.5 C HUMIDITY : 45%
BOREHOLE NO. : N2G-BH - 019 DEPTH (m) : 1.20~1.65 SAMPLE NO. : D-1
SAMPLE DESCRIPTION : Greyish brown, poorly-graded SAND with gravel.

WEIGHT RETAINED PASSING


SIEVE No. SPECIFICATION WATER CONTENT (ASTM D2216-19)
RETAINED (gm.) (%) (%)

3" Can No. : CV


1
2 /2" Wt. (Soil + Can) Wet (gm.) : 258.9
2" Wt. (Soil + Can) Dry (gm.) : 257.6
1
1 /2" Wt. Water (gm.) : 1.3
3/4" 00.0 0.0 100 Wt. Can (gm.) : 22.0
3/8" 32.9 14.0 86 Wt. (Soil) Dry (gm.) : 235.6
#4 56.0 23.8 76 Water Content (%) : 0.55
# 10 106.3 45.1 55 CLASSIFICATION

# 20 167.0 70.9 29 ( ASTM D3282-09/D2487-10 )


# 40 211.4 89.7 10 SP
# 60 227.1 96.4