SAT - Rabigh - Final

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 269

ENGINEER’S STICKER: CONTRACTOR’S STICKER:

A0 SAT Approval RAJA RAJA MBS 24032023


‫تنقيح‬ ‫سبب االصدار‬ ‫ﺑواﺳطﺔ‬ ‫راجعها‬ ‫وافق عليها‬ ‫التاريخ‬
.REV ISSUED FOR BY CHECKED APPROVED DATE

‫المملكة العربية السعودية‬


KINGDOM OF SAUDI ARABIA
PETRO RABIGH

Project No. ‫رﻗﻢ اﻟﻤﺸﺮوع‬


4600004142
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

‫المقاول‬
ABB Electrical Industries Co. Ltd
‫المقاول‬
SAUDI ARABIA
CONTRACTOR

FACEPLATE & SAT PROCEDURE FOR 9.1 SUB


‫مقياس الرسم‬ STATION
: SCALE
DOCUMENT NO: Page Rev:
SA-100891-PSA-SAT-V001S 1 OF 95 A0
PETRO RABIGH Page: 2 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

SUB-CONTRACTOR

TITLE: Power Management System


Graphical displays and faceplates

PROJECT: PETRORABIGH

DOCUMENT NO: SA-100891-PSA-FAT-V001S

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 3 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Contents
1.0 Introduction.................................................................................................................................8
1.1 Overview...................................................................................................................................8
1.2 Project Scope............................................................................................................................8
1.3 Operator Workplace Standards.................................................................................................8
1.4 Text Font Sizes Used in Displays:............................................................................................8
2.0 GRAPHIC DISPLAYS...............................................................................................................9
2.1 9_1 Substation...........................................................................................................................9
2.1.1 9_1 SLD...........................................................................................................................9
2.1.2 9_1A SLD......................................................................................................................10
2.1.3 9_1B SLD......................................................................................................................11
2.1.4 9_1 IED DIAGNOSTICS..............................................................................................12
2.1.5 9_1A IED DIAGNOSTICS...........................................................................................12
2.1.6 9_1B IED DIAGNOSTICS................................................................................................13
2.1.7 9_1 ANNUNCIATION SCREEN......................................................................................13
2.2 8_1 Substation.........................................................................................................................14
2.2.1 8_1 SLD.........................................................................................................................14
2.2.2 8_1A SLD......................................................................................................................14
2.2.3 8_1B SLD......................................................................................................................14
2.2.4 8_1 IED DIAGNOSTICS..............................................................................................14
2.2.5 8_1A IED DIAGNOSTICS...........................................................................................14
2.2.6 8_1B IED DIAGNOSTICS............................................................................................14
3.0 IEC Faceplates...........................................................................................................................14
3.1 ASP_480V_01........................................................................................................................15
3.1.1 Main Faceplate...............................................................................................................15
3.1.2 Protection Alarm............................................................................................................15
3.1.3 Supervision Alarm.........................................................................................................17
3.1.4 Events.................................................................................................................................18
3.1.5 Measurements................................................................................................................20
3.2 BUS_TIE_4160V_01..............................................................................................................22
3.2.1 Main Faceplates.............................................................................................................22
3.2.2 Protection Alarm............................................................................................................23
3.2.3 Supervision Alarms........................................................................................................25
3.2.4 Measurements 1.............................................................................................................27
3.2.5 Measurements 2.............................................................................................................31
3.3 BUS_VT_4160V_01 -............................................................................................................35
3.3.1 Main Faceplate...............................................................................................................35
3.3.2 Protection Alarm............................................................................................................36
3.3.3 Supervision Alarm.........................................................................................................38
3.3.4 Measurements 1.............................................................................................................40

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 4 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4 BUS_VT_4160V_02..............................................................................................................42
3.4.1 Main Faceplate...............................................................................................................42
3.4.2 Protection Alarm............................................................................................................43
3.4.3 Supervision Alarm 1......................................................................................................45
3.4.4 Supervision Alarm 2......................................................................................................47
3.4.5 Measurements................................................................................................................49
3.5 MS_INC_4160V_01 - F56-MS 9.1_A05...............................................................................51
3.5.1 Main Faceplate...............................................................................................................51
3.5.2 Protection Alarms..........................................................................................................52
3.5.3 Supervision Alarms1......................................................................................................54
3.5.4 Supervision Alarms2......................................................................................................57
3.5.5 Measurements1..............................................................................................................60
3.5.6 Measurements 2.............................................................................................................64
3.6 MS_INC_4160V_01 - F56-MS 9.1_A09...............................................................................68
3.6.1 Main Faceplate...............................................................................................................68
3.6.2 Protection Alarms..........................................................................................................69
3.6.3 Supervision Alarms1......................................................................................................71
3.6.4 Supervision Alarms2......................................................................................................74
3.6.5 Measurements1..............................................................................................................77
3.6.6 Measurements 2.............................................................................................................81
3.7 OGF_4160V_01 - F56-MS 9.1_A01.....................................................................................85
3.7.1 Main Faceplates.............................................................................................................85
3.7.2 Protection Alarm............................................................................................................86
3.7.3 Supervision Alarm.........................................................................................................88
3.7.4 Measurements 1.............................................................................................................90
3.7.5 Measurements 2.............................................................................................................93
3.8 OGF_4160V_01 - F56-MS 9.1_A03.....................................................................................96
3.8.1 Main Faceplates.............................................................................................................96
3.8.2 Protection Alarm............................................................................................................97
3.8.3 Supervision Alarm.........................................................................................................99
3.8.4 Measurements 1...........................................................................................................101
3.8.5 Measurements 2...........................................................................................................104
3.9 OGF_4160V_01 - F56-MS 9.1_A11...................................................................................107
3.9.1 Main Faceplates...........................................................................................................107
3.9.2 Protection Alarm..........................................................................................................108
3.9.3 Supervision Alarm.......................................................................................................110
3.9.4 Measurements 1...........................................................................................................112
3.9.5 Measurements 2...........................................................................................................115
3.10 OGF_4160V_01 - F56-MS 9.1_A13...................................................................................118
3.10.1 Main Faceplates...........................................................................................................118
3.10.2 Protection Alarm..........................................................................................................119
3.10.3 Supervision Alarm.......................................................................................................121
3.10.4 Measurements 1...........................................................................................................123
3.10.5 Measurements 2...........................................................................................................126
3.11 OGF_4160V_01 - F56-MS 9.1_A02...................................................................................129
3.11.1 Main Faceplates...........................................................................................................129
3.11.2 Protection Alarm..........................................................................................................130
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 5 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11.3 Supervision Alarm.......................................................................................................132


3.11.4 Measurements 1...........................................................................................................134
3.11.5 Measurements 2...........................................................................................................137
3.12 OGF_4160V_01 - F56-MS 9.1_A12...................................................................................140
3.12.1 Main Faceplates...........................................................................................................140
3.12.2 Protection Alarm..........................................................................................................141
3.12.3 Supervision Alarm.......................................................................................................143
3.12.4 Measurements 1...........................................................................................................145
3.12.5 Measurements 2...........................................................................................................148
3.13 MCC_4160V_01 - F56-MCC9.1A_A02.........................................................................151
3.13.1 Main Faceplates...........................................................................................................151
3.13.2 Protection Alarm..........................................................................................................152
3.13.3 Supervision Alarm.......................................................................................................154
3.13.4 Measurements 1...........................................................................................................156
3.13.5 Measurements 2...........................................................................................................158
3.14 MCC_4160V_01 - F56-MCC9.1A_A03.........................................................................160
3.14.1 Main Faceplates...........................................................................................................160
3.14.2 Protection Alarm..........................................................................................................161
3.14.3 Supervision Alarm.......................................................................................................163
3.14.4 Measurements 1...........................................................................................................165
3.14.5 Measurements 2...........................................................................................................167
3.15 MCC_4160V_01 - F56-MCC9.1A_A04.........................................................................169
3.15.1 Main Faceplates...........................................................................................................169
3.15.2 Protection Alarm..........................................................................................................170
3.15.3 Supervision Alarm.......................................................................................................172
3.15.4 Measurements 1...........................................................................................................174
3.15.5 Measurements 2...........................................................................................................176
3.16 MCC_4160V_01 - F56-MCC9.1A_A05.........................................................................178
3.16.1 Main Faceplates...........................................................................................................178
3.16.2 Protection Alarm..........................................................................................................179
3.16.3 Supervision Alarm.......................................................................................................181
3.16.4 Measurements 1...........................................................................................................183
3.16.5 Measurements 2...........................................................................................................185
3.17 MCC_4160V_01 - F56-MCC9.1A_A06.........................................................................187
3.17.1 Main Faceplates...........................................................................................................187
3.17.2 Protection Alarm..........................................................................................................188
3.17.3 Supervision Alarm.......................................................................................................190
3.17.4 Measurements 1...........................................................................................................192
3.17.5 Measurements 2...........................................................................................................194
3.18 MCC_4160V_01 - F56-MCC9.1A_A07.........................................................................196
3.18.1 Main Faceplates...........................................................................................................196
3.18.2 Protection Alarm..........................................................................................................197
3.18.3 Supervision Alarm.......................................................................................................199
3.18.4 Measurements 1...........................................................................................................201
3.18.5 Measurements 2...........................................................................................................203
3.19 MCC_4160V_01 - F56-MCC9.1B_A02.........................................................................205
3.19.1 Main Faceplates...........................................................................................................205
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 6 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19.2 Protection Alarm..........................................................................................................206


3.19.3 Supervision Alarm.......................................................................................................208
3.19.4 Measurements 1...........................................................................................................210
3.19.5 Measurements 2...........................................................................................................212
3.20 MCC_4160V_01 - F56-MCC9.1B_A03.........................................................................214
3.20.1 Main Faceplates...........................................................................................................214
3.20.2 Protection Alarm..........................................................................................................215
3.20.3 Supervision Alarm.......................................................................................................217
3.20.4 Measurements 1...........................................................................................................219
3.20.5 Measurements 2...........................................................................................................221
3.21 MCC_4160V_01 - F56-MCC9.1B_A04.........................................................................223
3.21.1 Main Faceplates...........................................................................................................223
3.21.2 Protection Alarm..........................................................................................................224
3.21.3 Supervision Alarm.......................................................................................................226
3.21.4 Measurements 1...........................................................................................................228
3.21.5 Measurements 2...........................................................................................................230
3.22 MCC_4160V_01 - F56-MCC9.1B_A05.........................................................................232
3.22.1 Main Faceplates...........................................................................................................232
3.22.2 Protection Alarm..........................................................................................................233
3.22.3 Supervision Alarm.......................................................................................................235
3.22.4 Measurements 1...........................................................................................................237
3.22.5 Measurements 2...........................................................................................................239
3.23 MCC_4160V_01 - F56-MCC9.1B_A06.........................................................................241
3.23.1 Main Faceplates...........................................................................................................241
3.23.2 Protection Alarm..........................................................................................................242
3.23.3 Supervision Alarm.......................................................................................................244
3.23.4 Measurements 1...........................................................................................................246
3.23.5 Measurements 2...........................................................................................................248
3.24 MCC_4160V_01 - F56-MCC9.1B_A07.........................................................................250
3.24.1 Main Faceplates...........................................................................................................250
3.24.2 Protection Alarm..........................................................................................................251
3.24.3 Supervision Alarm.......................................................................................................253
3.24.4 Measurements 1...........................................................................................................255
3.24.5 Measurements 2...........................................................................................................257
3.25 ASP_INC_01........................................................................................................................259
3.25.1 Main Faceplates...........................................................................................................259
4.0 Faceplates Tabs.......................................................................................................................261
5.0 Faceplates Indications.............................................................................................................265
1.1.1 Punch points table......................................................................................................267

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 7 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 8 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1.0 INTRODUCTION

1.1 Overview
The Refinery Substations of Petro-Rabigh refinery are being upgraded in phases. As a part of this Upgrade
project – Phase 1 Stage 2, substation building at SS8.1, SS9.1, SS 12.1, SS 12.4, SS 12.5, SS 12.6, SS11 &
SS13 will be upgraded. The electrical system in all substation includes 4.16kV switchgear, Distribution
transformer for Lighting loads and other loads and MCC, 0.48kV switchgear and MCC, Uninterrupted
power supply etc.

1.2 Project Scope


The scope of PSA (Power System Automation) for Refinery Substation Upgrade Phase I Stage II comprises of
the following:
 8 Substations
o Substation 8.1
o Substation 9.1
o Substation 12.1 , 12.4 , 12.5 and 12.6
o Substation 1
o Substation 13

 Interface with existing PSA from Schneider at CCR via OPC communication. After this interface the
newly supplied PSA from ABB will serve as master PSA for existing PSA and also the new 8
Substations mentioned above

1.3 Operator Workplace Standards.


Application Bar comprises Alarm Band, Alarm Line, Current User Tool and Customer logo with a height of
68pixels.

1.4 Text Font Sizes Used in Displays:

Index Text Font

1 Graphic Display Heading Tahoma, 20, Regular, Bold

2 Bus Name Tahoma, 10, Regular, Bold

3 Consumer Name Tahoma, 10, Regular, Normal


4 Faceplate Text Tahoma, 10, Regular, Normal

Note: In overview displays the above font sizes are not followed and it was adjusted as per the space constrain
since these displays are larger.

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 9 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.0 GRAPHIC DISPLAYS


In this section graphics displays made for Rabigh will be attached the section will have the following displays

2.1 9_1 Substation

2.1.1 9_1 SLD

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 10 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.1.2 9_1A SLD

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 11 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.1.3 9_1B SLD

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 12 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.1.4 9_1 IED DIAGNOSTICS

2.1.5 9_1A IED DIAGNOSTICS

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 13 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.1.6 9_1B IED DIAGNOSTICS

2.1.7 9_1 ANNUNCIATION SCREEN

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 14 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

2.2 8_1 Substation

2.2.1 8_1 SLD

2.2.2 8_1A SLD

2.2.3 8_1B SLD

2.2.4 8_1 IED DIAGNOSTICS

2.2.5 8_1A IED DIAGNOSTICS

2.2.6 8_1B IED DIAGNOSTICS

3.0 IEC FACEPLATES


The following attached typical are used as faceplates for the respective feeders.
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 15 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.1 ASP_480V_01

3.1.1 Main Faceplate

3.1.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 16 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Auto Change Over Occurred LD0.MVGAPC4.SPCSO7.stVal
2 Auto Change Over Failed LD0.MVGAPC4.SPCSO8.stVal
3 Auto Change Over Blocked LD0.MVGAPC4.SPCSO6.stVal
4 Incomer-A Protection Trip LD0.XBGGIO115.Ind3.stVal
5 Inc-A Under Voltage 27V Trip LD0.XBGGIO115.SPCSO1.stVal
6 Incomer-B Protection Trip LD0.XBGGIO115.Ind7.stVal
7 Inc-B Under Voltage 27V Trip LD0.XBGGIO115.SPCSO2.stVal
8 Bus Tie Protection Trip LD0.XGGIO110.Ind8.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 17 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.1.3 Supervision Alarm

Serial No Signal Name LN Address Status Remarks


1 DC supply Failure
LD0.LDEV1.Devfail.stVal
2 Inc-A VT SupFail
LD0.XGGIO105.Ind5.stVal
3 Inc-B VT Sup Fail
LD0.XGGIO105.Ind6.stVal
4 Prot Setting Changed
LD0.LDEV1.SetChg.stVal
5 IED Firmware changed
LD0.LDEV1.ChgFlg.stVal
6 LD0.MMSLPRT1.ChLiv.stVa
loss of communication
l
7 IED Self-Check Fail LD0.LDEV1.Health.stVal
8 LD0.SPCGAPC2.Ind11.CtlVa
Voltage Sag
l
9 LD0.SPCGAPC2.Ind12.CtlVa
Voltage Swell
l
ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 18 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.1.4 Events

Serial
No Signal Name LN Address Status Remarks
CTRL.CBCSWI1.PosOpn.stVa
1 Status "Inc-A CB Open"
l
2 Status "Inc-A CB Close" CTRL.CBCSWI1.PosCls.stVal
3 Status "Inc-A CB Racked In" LD0.XGGIO120.Ind3.stVal
4 Status "Inc-A CB Racked Out" LD0.XGGIO120.Ind4.stVal
5 Status "MTS Open Selection LD0.XGGIO105.Ind7.stVal
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 19 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Inc-A"
CTRL.CBCSWI2.PosOpn.stVa
6 Status "Inc-B CB Open"
l
7 Status "Inc-B CB Close" CTRL.CBCSWI2.PosCls.stVal
8 Status "Inc-B CB Racked In" LD0.XAGGIO130.Ind3.stVal
9 Status "Inc-B CB Racked Out" LD0.XAGGIO130.Ind4.stVal
Status "MTS Open Selection
10 LD0.XGGIO105.Ind8.stVal
Inc-B"
CTRL.CBCSWI3.PosOpn.stVa
11 Status "Bus Tie CB Open"
l
12 Status "Bus Tie CB Close" CTRL.CBCSWI3.PosCls.stVal
13 Status "Bus Tie CB Racked In" LD0.XGGIO110.Ind4.stVal
Status "Bus Tie CB Racked
14 LD0.XGGIO110.Ind5.stVal
Out"
LD0.MVGAPC2.SPCSO4.stVa
15 Bus Tie CB Sync. Check OK
l
Status "MTS Open Selection
16 LD0.XBGGIO115.Ind6.stVal
Bustie"
17 Status "CS Remote" LD0.XBGGIO115.Ind2.stVal
18 Status "CS Local" LD0.XBGGIO115.Ind1.stVal
19 Status "ATS Auto" LD0.XGGIO105.Ind3.stVal
20 Status "ATS Manual" LD0.XGGIO105.Ind4.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 20 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.1.5 Measurements

Serial Current
Signal Name LN Address Status Remarks
No Readings
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 21 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Incomer-A
1 Voltage R-Ph LD0.VMMXU1.PPV.phsAB.cVal.mag.f
(V)
Incomer-B
2 Voltage R-Ph LD0.VAMMXU2.PPV.phsAB.cVal.mag.f
(V)
Incomer-A
3 Voltage Angle LD0.VMMXU1.PPV.phsAB.cVal.ang.f
R-Ph (deg)
Incomer-B
4 Voltage Angle LD0.VAMMXU2.PPV.phsAB.cVal.ang.f
R-Ph (deg)
5 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 22 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.2 BUS_TIE_4160V_01

3.2.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 23 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.2.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 24 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Over Current 51 Protection
1 LD0.PHLPTOC1.Op.general
Trip
Over Current 50-Stage-1
2 LD0.PHHPTOC1.Op.general
Protection Trip
Over Current 50-Stage-2
3 LD0.PHIPTOC1.Op.general
Protection Trip
4 Earth Fault 50N Protection Trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection Trip LD0.EFLPTOC1.Op.general
LD0.MVGAPC1.SPCSO5.stV
6 Lockout Relay 86 Trip
al
LD0.MVGAPC2.SPCSO1.stV
7 Auto Change Over Occurred
al
LD0.MVGAPC2.SPCSO2.stV
8 Auto Change Over Failed
al
LD0.MVGAPC2.SPCSO3.stV
9 Auto Change Over Blocked
al
ITH Limiter CB/BB/CABLE LD0.MVGAPC1.SPCSO1.stV
10
Trip al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 25 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.2.3 Supervision Alarms

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 26 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XBGGIO115.Ind7.stVal
LD0.MVGAPC1.SPCSO6.stV
3 BUS-B VT Fuse Failure
al
LD0.MVGAPC1.SPCSO7.stV
4 BUS-A VT Fuse Failure
al
Lockout Relay 86 Supervision
5 LD0.XBGGIO115.Ind6.stVal
fail
6 DC supply Failure LD0.LDEV1.Devfail.stVal
7 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
LD0.MVGAPC1.SPCSO4.stV
8 DC/AC Supply MCB Open
al
9 Protection Setting Changed LD0.LDEV1.SetChg.stVal
10 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
LD0.MMSLPRT1.ChLiv.stVa
11 loss of communication events
l
12 IED Self-Check Fail LD0.LDEV1.Health.stVal
13 voltage Sag LD0.VMMXU1.LoAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 27 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.2.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 28 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Signal Statu Remar
al LN Address Readin
Name s ks
No gs
Current R- LD0.CMMXU1.A.phsA.instCVal.mag
1
Ph (A) .f
Current Y- LD0.CMMXU1.A.phsB.instCVal.mag
2
Ph (A) .f
Current B- LD0.CMMXU1.A.phsC.instCVal.ma
3
Ph (A) g.f
Bus-A
4 Voltage R- LD0.VMMXU1.PhV.phsA.cVal.mag.f
Ph (kV)
Bus-A
5 Voltage Y- LD0.VMMXU1.PhV.phsB.cVal.mag.f
Ph (kV)
Bus-A
6 Voltage B- LD0.VMMXU1.PhV.phsC.cVal.mag.f
Ph (kV)
Bus-A
LD0.VMMXU1.PPV.phsAB.instCVal.
7 Voltage R-
mag.f
Y (kV)
Bus-A
LD0.VMMXU1.PPV.phsBC.instCVal
8 Voltage Y-
.mag.f
B (kV)
Bus-A
LD0.VMMXU1.PPV.phsCA.instCVal
9 Voltage B-
.mag.f
R (kV)
Active
10 LD0.PEMMXU1.TotW.instMag.f
Power (kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
Power
12 LD0.PEMMXU1.TotPF.instMag.f
Factor
Apparent
13 Power LD0.PEMMXU1.TotVA.instMag.f
(kVA)
Minimum
14 Active LD0.PEMIMMXU1.TotW.mag.f
Power (kW)
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 29 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Reading
us ks
No s
Maximum
15 Active Power LD0.PEMAMMXU1.TotW.mag.f
(kW)
Import Energy
16 LD0.PEMMTR1.SupWh.actVal
(kWH)
Export Energy
17 LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current R-Ph LD0.CMHAI1.DmdTddA.phsA.cVal
18
THD (%) .mag.f
Current Y-Ph LD0.CMHAI1.DmdTddA.phsB.cVal
19
THD (%) .mag.f
Current B-Ph LD0.CMHAI1.DmdTddA.phsC.cVal
20
THD (%) .mag.f
Voltage R-Ph LD0.VMHAI1.DmdThdPhV.phsA.c
21
THD (%) Val.mag.f
Voltage Y-Ph LD0.VMHAI1.DmdThdPhV.phsB.c
22
THD (%) Val.mag.f
Voltage B-Ph LD0.VMHAI1.DmdThdPhV.phsC.c
23
THD (%) Val.mag.f
24 Voltage Swell LD0.VMMXU1.HiAlm.stVal
Current Angle LD0.CMMXU1.A.phsA.instCVal.an
25
R-Ph (deg) g.f

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 30 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Reading
us ks
No s
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
26
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
27
Ph (deg) al.ang.f
BUS-A Voltage LD0.VMMXU1.PhV.phsA.cVal
28
Angle R-Ph (deg) .ang.f
BUS-A Voltage LD0.VMMXU1.PhV.phsB.cVal
29
Angle Y-Ph (deg) .ang.f
BUS-A Voltage LD0.VMMXU1.PhV.phsC.cVal
30
Angle B-Ph (deg) .ang.f
31 Bus-A Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 31 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.2.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 32 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
Bus-A Voltage LD0.VMMXU1.PhV.phsA.cVal.m
4
R-Ph (kV) ag.f
Bus-A Voltage LD0.VMMXU1.PhV.phsB.cVal.m
5
Y-Ph (kV) ag.f
Bus-A Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
Bus-A Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
Bus-A Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
Bus-A Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive Power LD0.PEMMXU1.TotVAr.instMag.
11
(kVAR) f
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Apparent Power
13 LD0.PEMMXU1.TotVA.instMag.f
(kVA)
Minimum Active
14 LD0.PEMIMMXU1.TotW.mag.f
Power (kW)

Seri Signal LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 33 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
Name s ks
No gs
Import
16 Energy LD0.PEMMTR1.SupWh.actVal
(kWH)
Export
17 Energy LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current
LD0.CMHAI1.DmdTddA.phsA.cVal.m
18 R-Ph
ag.f
THD (%)
Current
LD0.CMHAI1.DmdTddA.phsB.cVal.m
19 Y-Ph
ag.f
THD (%)
Current
LD0.CMHAI1.DmdTddA.phsC.cVal.m
20 B-Ph
ag.f
THD (%)
Voltage
LD0.VMHAI1.DmdThdPhV.phsA.cVal.
21 R-Ph
mag.f
THD (%)
Voltage
LD0.VMHAI1.DmdThdPhV.phsB.cVal.
22 Y-Ph
mag.f
THD (%)
Voltage
LD0.VMHAI1.DmdThdPhV.phsC.cVal
23 B-Ph
.mag.f
THD (%)
Voltage
24 LD0.VMMXU1.HiAlm.stVal
Swell
Current
25 Angle R- LD0.CMMXU1.A.phsA.instCVal.ang.f
Ph (deg)

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 34 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri
Current Statu Remar
al Signal Name LN Address
Readings s ks
No
Current Angle LD0.CMMXU1.A.phsB.instCVal
26
Y-Ph (deg) .ang.f
Current Angle LD0.CMMXU1.A.phsC.instCVal
27
B-Ph (deg) .ang.f
BUS-A
LD0.VMMXU1.PhV.phsA.cVal.a
28 Voltage Angle
ng.f
R-Ph (deg)
BUS-A
LD0.VMMXU1.PhV.phsB.cVal.a
29 Voltage Angle
ng.f
Y-Ph (deg)
BUS-A
LD0.VMMXU1.PhV.phsC.cVal.
30 Voltage Angle
ang.f
B-Ph (deg)
Bus-A
31 LD0.FMMXU1.Hz.instMag.f
Frequency

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 35 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.3 BUS_VT_4160V_01 -

3.3.1 Main Faceplate

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 36 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.3.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 37 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
ITH Limiter CB/BB/CABLE LD0.MVGAPC1.SPCSO1.stV
1
Trip al
LD0.LEDGGIO1.LEDSt9.stV
2 Bus-A Under Voltage 27 Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 38 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.3.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 39 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
LD0.MVGAPC1.SPCSO3.stV
1 DC/AC Supply MCB Open
al
2 VT Circuit MCB/Truck Open LD0.XGGIO110.Ind8.stVal
Protection Setting Changed
3 LD0.LDEV1.SetChg.stVal
(87B1)
Protection Setting Changed
4 LD0.LDEV1.SetChg.stVal
(REU615)
5 IED Firmware changed (87B1) LD0.LDEV1.ChgFlg.stVal
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
6
(87B1) l
IED Firmware changed
7 LD0.LDEV1.ChgFlg.stVal
(REU615)
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
8
(REU615) l
9 IED Self-Check Fail (87B1) LD0.LDEV1.Health.stVal
10 IED Self-Check Fail (REU615) LD0.LDEV1.Health.stVal
11 voltage Sag LD0.VMMXU1.LoAlm.stVal
12 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 40 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.3.4 Measurements 1

Serial Current
Signal Name LN Address Status Remarks
No Readings
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 41 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

BUS-A Voltage LD0.VMMXU1.PhV.phsA.cVal.ang.


1
Angle R-Ph (deg) f
BUS-A Voltage LD0.VMMXU1.PhV.phsB.cVal.ang.
2
Angle Y-Ph (deg) f
BUS-A Voltage LD0.VMMXU1.PhV.phsC.cVal.ang.
3
Angle B-Ph (deg) f

HITACHI Engineer PETRO Rabigh


ABB Engineer

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 42 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4 BUS_VT_4160V_02

3.4.1 Main Faceplate

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 43 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 44 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
ITH Limiter CB/BB/CABLE LD0.MVGAPC1.SPCSO1.stV
1
Trip al
LD0.LEDGGIO1.LEDSt9.stV
2 Bus-B Under Voltage 27 Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 45 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4.3 Supervision Alarm 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 46 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure (REU615) LD0.LDEV1.Devfail.stVal
LD0.MVGAPC1.SPCSO4.stV
2 DC/AC Supply MCB Open
al
3 VT Circuit MCB/Truck Open LD0.XGGIO110.Ind8.stVal
Protection Setting Changed
4 LD0.LDEV1.SetChg.stVal
(87B2)
Protection Setting Changed
5 LD0.LDEV1.SetChg.stVal
(REU615)
6 IED Firmware changed (87B2) LD0.LDEV1.ChgFlg.stVal
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
7
(87B2) l
IED Firmware changed
8 LD0.LDEV1.ChgFlg.stVal
(REU615)
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
9
(REU615) l
10 IED Self-Check Fail (87B2) LD0.LDEV1.Health.stVal
11 IED Self-Check Fail (REU615) LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal
14 VT Truck “Rack-In LD0.XGGIO110.Ind8.stVal
15 VT Truck “Rack-Out LD0.XGGIO110.Ind8.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 47 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4.4 Supervision Alarm 2

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 48 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure (REU615) LD0.LDEV1.Devfail.stVal
LD0.MVGAPC1.SPCSO4.stV
2 DC/AC Supply MCB Open
al
3 VT Circuit MCB/Truck Open LD0.XGGIO110.Ind8.stVal
Protection Setting Changed
4 LD0.LDEV1.SetChg.stVal
(87B2)
Protection Setting Changed
5 LD0.LDEV1.SetChg.stVal
(REU615)
6 IED Firmware changed (87B2) LD0.LDEV1.ChgFlg.stVal
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
7
(87B2) l
IED Firmware changed
8 LD0.LDEV1.ChgFlg.stVal
(REU615)
loss of communication events LD0.MMSLPRT1.ChLiv.stVa
9
(REU615) l
10 IED Self-Check Fail (87B2) LD0.LDEV1.Health.stVal
11 IED Self-Check Fail (REU615) LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal
14 VT Truck “Rack-In LD0.XGGIO110.Ind8.stVal
15 VT Truck “Rack-Out LD0.XGGIO110.Ind8.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 49 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.4.5 Measurements

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 50 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Current
Seria Statu Remark
Signal Name LN Address Reading
l No s s
s
BUS-B Voltage
1 LD0.VMMXU1.PhV.phsB.cVal.mag.f
Y-Ph (kV)
BUS-B Voltage
2 LD0.VMMXU1.PhV.phsC.cVal.mag.f
B-Ph (kV)
BUS-B Voltage LD0.VMMXU1.PPV.phsAB.instCVal.
3
R-Y (kV) mag.f
BUS-B Voltage LD0.VMMXU1.PPV.phsBC.instCVal.
4
Y-B (kV) mag.f
BUS-B Voltage LD0.VMMXU1.PPV.phsCA.instCVal.
5
B-R (kV) mag.f
BUS-B
6 LD0.FMMXU1.Hz.instMag.f
Frequency
BUS-B Voltage
7 Angle R-Ph
(deg) LD0.VMMXU1.PhV.phsA.cVal.ang.f
BUS-B Voltage
8 Angle Y-Ph
(deg) LD0.VMMXU1.PhV.phsB.cVal.ang.f
BUS-B Voltage
9 Angle B-Ph
(deg) LD0.VMMXU1.PhV.phsC.cVal.ang.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 51 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5 MS_INC_4160V_01 - F56-MS 9.1_A05

3.5.1 Main Faceplate

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 52 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5.2 Protection Alarms

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 53 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2 LD0.PHHPTOC1.Op.general
Protection Trip
Over Current 50-Stage-2
3 LD0.PHIPTOC1.Op.general
Protection Trip
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
Incomer-A Under Voltage 27 LD0.LEDGGIO1.LEDSt9.stV
6
trip al
LD0.MVGAPC1.SPCSO5.stV
7 Lockout Relay 86T2 trip
al
LD0.MVGAPC2.SPCSO2.stV
8 Upstream InterTrip Received
al
Bucholz (63) / Thermal (26) LD0.MVGAPC2.SPCSO7.stV
9
Protection Alarm al
Bucholz (63) / thermal (26) LD0.MVGAPC2.SPCSO8.stV
10
Protection Trip al
11 Differential 87T Protection Trip LD0.TR2HPDIF1.Op.general
LD0.MVGAPC1.SPCSO4.stV
12 Lockout Relay 86T1 Trip
al
Neutral Over Current 51 NB
13 LD0.EFHPTOC1.Op.general
Protection Trip
ITH Limiter CB/BB/CABLE LD0.MVGAPC2.SPCSO1.stV
14
Trip al
ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 54 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5.3 Supervision Alarms1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 55 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
Signal Name LN Address Status Remarks
No
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XBGGIO115.Ind5.stVal
3 Incomer VT Fuse Failure LD0.MVGAPC2.SPCSO6.stVal
Lockout Relay 86T2
4 LD0.XBGGIO115.Ind4.stVal
Supervision fail
5 DC supply Failure (50/51) LD0.LDEV1.Devfail.stVal
Lockout Relay 86T1
6 LD0.XGGIO110.Ind3.stVal
Supervision fail
7 DC supply Failure (87T) LD0.LDEV1.Devfail.stVal
8 DC supply Failure (51NB) LD0.LDEV1.Devfail.stVal
9 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
10 DC/AC Supply MCB Open LD0.MVGAPC1.SPCSO8.stVal
VT Circuit MCB/Truck
11 LD0.XGGIO105.Ind1.stVal
Open
Protection Setting Changed
12 LD0.LDEV1.SetChg.stVal
(50/51)
Protection Setting Changed
13 LD0.LDEV1.SetChg.stVal
(87T)
Protection Setting Changed
14 LD0.LDEV1.SetChg.stVal
(51NB)
IED Firmware changed
15 LD0.LDEV1.ChgFlg.stVal
(50/51)

Serial Signal Name LN Address Status Remarks


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 56 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No
loss of communication
16 LD0.MMSLPRT1.ChLiv.stVal
(50/51)
IED Firmware changed
17 LD0.LDEV1.ChgFlg.stVal
(87T)
loss of communication
18 LD0.MMSLPRT1.ChLiv.stVal
(87T)
IED Firmware changed
19 LD0.LDEV1.ChgFlg.stVal
(51NB)
loss of communication
20 LD0.MMSLPRT1.ChLiv.stVal
(51NB)
21 ERMS Active LD0.LLN0.Act2SetGr.stVal
22 IED Self-Check Fail (50/51) LD0.LDEV1.Health.stVal
23 IED Self-Check Fail (87T) LD0.LDEV1.Health.stVal
24 IED Self-Check Fail (51NB) LD0.LDEV1.Health.stVal
25 voltage Sag LD0.VMMXU1.LoAlm.stVal
26 Voltage Swell LD0.VMMXU1.HiAlm.stVal
27 VT Truck “Rack-In LD0.MVGAPC2.SPCSO6.stVal
28 VT Truck “Rack-Out LD0.MVGAPC2.SPCSO6.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 57 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5.4 Supervision Alarms2

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 58 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
Signal Name LN Address Status Remarks
No
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XBGGIO115.Ind5.stVal
3 Incomer VT Fuse Failure LD0.MVGAPC2.SPCSO6.stVal
Lockout Relay 86T2
4 LD0.XBGGIO115.Ind4.stVal
Supervision fail
5 DC supply Failure (50/51) LD0.LDEV1.Devfail.stVal
Lockout Relay 86T1
6 LD0.XGGIO110.Ind3.stVal
Supervision fail
7 DC supply Failure (87T) LD0.LDEV1.Devfail.stVal
8 DC supply Failure (51NB) LD0.LDEV1.Devfail.stVal
9 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
10 DC/AC Supply MCB Open LD0.MVGAPC1.SPCSO8.stVal
11 VT Circuit MCB/Truck Open LD0.XGGIO105.Ind1.stVal
Protection Setting Changed
12 LD0.LDEV1.SetChg.stVal
(50/51)
Protection Setting Changed
13 LD0.LDEV1.SetChg.stVal
(87T)
Protection Setting Changed
14 LD0.LDEV1.SetChg.stVal
(51NB)

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 59 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
Signal Name LN Address Status Remarks
No
IED Firmware changed
15 LD0.LDEV1.ChgFlg.stVal
(50/51)
loss of communication
16 LD0.MMSLPRT1.ChLiv.stVal
(50/51)
IED Firmware changed
17 LD0.LDEV1.ChgFlg.stVal
(87T)
loss of communication
18 LD0.MMSLPRT1.ChLiv.stVal
(87T)
IED Firmware changed
19 LD0.LDEV1.ChgFlg.stVal
(51NB)
loss of communication
20 LD0.MMSLPRT1.ChLiv.stVal
(51NB)
21 ERMS Active LD0.LLN0.Act2SetGr.stVal
22 IED Self-Check Fail (50/51) LD0.LDEV1.Health.stVal
23 IED Self-Check Fail (87T) LD0.LDEV1.Health.stVal
24 IED Self-Check Fail (51NB) LD0.LDEV1.Health.stVal
25 voltage Sag LD0.VMMXU1.LoAlm.stVal
26 Voltage Swell LD0.VMMXU1.HiAlm.stVal
27 VT Truck “Rack-In LD0.MVGAPC2.SPCSO6.stVal
28 VT Truck “Rack-Out LD0.MVGAPC2.SPCSO6.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 60 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5.5 Measurements1

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 61 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
Voltage R-Ph LD0.VMMXU1.PhV.phsA.cVal.m
4
(kV) ag.f
Voltage Y-Ph LD0.VMMXU1.PhV.phsB.cVal.m
5
(kV) ag.f
Voltage B-Ph LD0.VMMXU1.PhV.phsC.cVal.m
6
(kV) ag.f
Voltage R-Y LD0.VMMXU1.PPV.phsAB.instC
7
(kV) Val.mag.f
Voltage Y-B LD0.VMMXU1.PPV.phsBC.instC
8
(kV) Val.mag.f
Voltage B-R LD0.VMMXU1.PPV.phsCA.instC
9
(kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive Power
11 LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f

13 Frequency LD0.FMMXU1.Hz.instMag.f
Apparent
14 LD0.PEMMXU1.TotVA.instMag.f
Power (kVA)
Minimum Active
15 LD0.PEMIMMXU1.TotW.mag.f
Power (kW)

Seri Signal Name LN Address Current Stat Remar


al Readin us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 62 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No gs
Maximum
16 Active Power LD0.PEMAMMXU1.TotW.mag.f
(kW)
Import Energy
17 LD0.PEMMTR1.SupWh.actVal
(kWH)
Export Energy
18 LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current R-Ph LD0.CMHAI1.DmdTddA.phsA.cVa
19
THD (%) l.mag.f
Current Y-Ph LD0.CMHAI1.DmdTddA.phsB.cVa
20
THD (%) l.mag.f
Current B-Ph LD0.CMHAI1.DmdTddA.phsC.cV
21
THD (%) al.mag.f
Voltage R-Ph LD0.VMHAI1.DmdThdPhV.phsA.c
22
THD (%) Val.mag.f
Voltage Y-Ph LD0.VMHAI1.DmdThdPhV.phsB.c
23
THD (%) Val.mag.f
Voltage B-Ph LD0.VMHAI1.DmdThdPhV.phsC.c
24
THD (%) Val.mag.f

Serial Signal LN Address Current Statu Remar

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 63 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No Name Readings s ks
Current
LD0.CMMXU1.A.phsA.instCV
25 Angle R-
al.ang.f
Ph (deg)
Current
LD0.CMMXU1.A.phsB.instCV
26 Angle Y-
al.ang.f
Ph (deg)
Current
LD0.CMMXU1.A.phsC.instCV
27 Angle B-
al.ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsA.cVal.
28
Angle R- ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsB.cVal.
29
Angle Y- ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsC.cVal.
30
Angle B- ang.f
Ph (deg)

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 64 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.5.6 Measurements 2

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 65 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Reading
us ks
No s
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
Voltage R-Ph LD0.VMMXU1.PhV.phsA.cVal.m
4
(kV) ag.f
Voltage Y-Ph LD0.VMMXU1.PhV.phsB.cVal.m
5
(kV) ag.f
Voltage B-Ph LD0.VMMXU1.PhV.phsC.cVal.m
6
(kV) ag.f
Voltage R-Y LD0.VMMXU1.PPV.phsAB.instC
7
(kV) Val.mag.f
Voltage Y-B LD0.VMMXU1.PPV.phsBC.instC
8
(kV) Val.mag.f
Voltage B-R LD0.VMMXU1.PPV.phsCA.instC
9
(kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 66 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Statu Remar
al Signal Name LN Address Readin
s ks
No gs
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
13 Frequency LD0.FMMXU1.Hz.instMag.f
Apparent
14 LD0.PEMMXU1.TotVA.instMag.f
Power (kVA)
Minimum
15 Active Power LD0.PEMIMMXU1.TotW.mag.f
(kW)
Maximum
16 Active Power LD0.PEMAMMXU1.TotW.mag.f
(kW)
Import Energy
17 LD0.PEMMTR1.SupWh.actVal
(kWH)
Export Energy
18 LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current R-Ph LD0.CMHAI1.DmdTddA.phsA.cV
19
THD (%) al.mag.f
Current Y-Ph LD0.CMHAI1.DmdTddA.phsB.cV
20
THD (%) al.mag.f

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 67 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Readin
us ks
No gs
Current B-Ph LD0.CMHAI1.DmdTddA.phsC.cVa
21
THD (%) l.mag.f
Voltage R-Ph LD0.VMHAI1.DmdThdPhV.phsA.c
22
THD (%) Val.mag.f
Voltage Y-Ph LD0.VMHAI1.DmdThdPhV.phsB.c
23
THD (%) Val.mag.f
Voltage B-Ph LD0.VMHAI1.DmdThdPhV.phsC.c
24
THD (%) Val.mag.f
Current Angle LD0.CMMXU1.A.phsA.instCVal.a
25
R-Ph (deg) ng.f
Current Angle LD0.CMMXU1.A.phsB.instCVal.a
26
Y-Ph (deg) ng.f
Current Angle LD0.CMMXU1.A.phsC.instCVal.a
27
B-Ph (deg) ng.f
BUS Voltage
LD0.VMMXU1.PhV.phsA.cVal.ang
28 Angle R-Ph
.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal.ang
29 Angle Y-Ph
.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal.an
30 Angle B-Ph
g.f
(deg)

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 68 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6 MS_INC_4160V_01 - F56-MS 9.1_A09

3.6.1 Main Faceplate

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 69 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6.2 Protection Alarms

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 70 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Over Current 51 Protection
1 LD0.PHLPTOC1.Op.general
Trip
Over Current 50-Stage-1
2 LD0.PHHPTOC1.Op.general
Protection Trip
Over Current 50-Stage-2
3 LD0.PHIPTOC1.Op.general
Protection Trip
Earth Fault 50N Protection
4 LD0.EFHPTOC1.Op.general
trip
Earth Fault 51N Protection
5 LD0.EFLPTOC1.Op.general
trip
Incomer-A Under Voltage LD0.LEDGGIO1.LEDSt9.stV
6
27 trip al
LD0.MVGAPC1.SPCSO5.stV
7 Lockout Relay 86T2 trip
al
Upstream InterTrip LD0.MVGAPC2.SPCSO2.stV
8
Received al
Bucholz (63) / Thermal (26) LD0.MVGAPC2.SPCSO7.stV
9
Protection Alarm al
Bucholz (63) / thermal (26) LD0.MVGAPC2.SPCSO8.stV
10
Protection Trip al
Differential 87T Protection
11 LD0.TR2HPDIF1.Op.general
Trip
LD0.MVGAPC1.SPCSO4.stV
12 Lockout Relay 86T1 Trip
al
Neutral Over Current 51 NB
13 LD0.EFHPTOC1.Op.general
Protection Trip
ITH Limiter LD0.MVGAPC2.SPCSO1.stV
14
CB/BB/CABLE Trip al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 71 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6.3 Supervision Alarms1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 72 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
Signal Name LN Address Status Remarks
No
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XBGGIO115.Ind5.stVal
3 Incomer VT Fuse Failure LD0.MVGAPC2.SPCSO6.stVal
Lockout Relay 86T2
4 LD0.XBGGIO115.Ind4.stVal
Supervision fail
5 DC supply Failure (50/51) LD0.LDEV1.Devfail.stVal
Lockout Relay 86T1
6 LD0.XGGIO110.Ind3.stVal
Supervision fail
7 DC supply Failure (87T) LD0.LDEV1.Devfail.stVal
8 DC supply Failure (51NB) LD0.LDEV1.Devfail.stVal
9 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
10 DC/AC Supply MCB Open LD0.MVGAPC1.SPCSO8.stVal
VT Circuit MCB/Truck
11 LD0.XGGIO105.Ind1.stVal
Open
Protection Setting Changed
12 LD0.LDEV1.SetChg.stVal
(50/51)
Protection Setting Changed
13 LD0.LDEV1.SetChg.stVal
(87T)
Protection Setting Changed
14 LD0.LDEV1.SetChg.stVal
(51NB)
IED Firmware changed
15 LD0.LDEV1.ChgFlg.stVal
(50/51)

Serial Signal Name LN Address Status Remarks


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 73 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No
loss of communication
16 LD0.MMSLPRT1.ChLiv.stVal
(50/51)
IED Firmware changed
17 LD0.LDEV1.ChgFlg.stVal
(87T)
loss of communication
18 LD0.MMSLPRT1.ChLiv.stVal
(87T)
IED Firmware changed
19 LD0.LDEV1.ChgFlg.stVal
(51NB)
loss of communication
20 LD0.MMSLPRT1.ChLiv.stVal
(51NB)
21 ERMS Active LD0.LLN0.Act2SetGr.stVal
22 IED Self-Check Fail (50/51) LD0.LDEV1.Health.stVal
23 IED Self-Check Fail (87T) LD0.LDEV1.Health.stVal
24 IED Self-Check Fail (51NB) LD0.LDEV1.Health.stVal
25 voltage Sag LD0.VMMXU1.LoAlm.stVal
26 Voltage Swell LD0.VMMXU1.HiAlm.stVal
27 VT Truck “Rack-In LD0.MVGAPC2.SPCSO6.stVal
28 VT Truck “Rack-Out LD0.MVGAPC2.SPCSO6.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 74 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6.4 Supervision Alarms2

Serial Signal Name LN Address Status Remarks


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 75 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XBGGIO115.Ind5.stVal
3 Incomer VT Fuse Failure LD0.MVGAPC2.SPCSO6.stVal
Lockout Relay 86T2
4 LD0.XBGGIO115.Ind4.stVal
Supervision fail
5 DC supply Failure (50/51) LD0.LDEV1.Devfail.stVal
Lockout Relay 86T1
6 LD0.XGGIO110.Ind3.stVal
Supervision fail
7 DC supply Failure (87T) LD0.LDEV1.Devfail.stVal
8 DC supply Failure (51NB) LD0.LDEV1.Devfail.stVal
9 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
10 DC/AC Supply MCB Open LD0.MVGAPC1.SPCSO8.stVal
11 VT Circuit MCB/Truck Open LD0.XGGIO105.Ind1.stVal
Protection Setting Changed
12 LD0.LDEV1.SetChg.stVal
(50/51)
Protection Setting Changed
13 LD0.LDEV1.SetChg.stVal
(87T)
Protection Setting Changed
14 LD0.LDEV1.SetChg.stVal
(51NB)

Serial Signal Name LN Address Status Remarks

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 76 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No
IED Firmware changed
15 LD0.LDEV1.ChgFlg.stVal
(50/51)
loss of communication
16 LD0.MMSLPRT1.ChLiv.stVal
(50/51)
IED Firmware changed
17 LD0.LDEV1.ChgFlg.stVal
(87T)
loss of communication
18 LD0.MMSLPRT1.ChLiv.stVal
(87T)
IED Firmware changed
19 LD0.LDEV1.ChgFlg.stVal
(51NB)
loss of communication
20 LD0.MMSLPRT1.ChLiv.stVal
(51NB)
21 ERMS Active LD0.LLN0.Act2SetGr.stVal
22 IED Self-Check Fail (50/51) LD0.LDEV1.Health.stVal
23 IED Self-Check Fail (87T) LD0.LDEV1.Health.stVal
24 IED Self-Check Fail (51NB) LD0.LDEV1.Health.stVal
25 voltage Sag LD0.VMMXU1.LoAlm.stVal
26 Voltage Swell LD0.VMMXU1.HiAlm.stVal
27 VT Truck “Rack-In LD0.MVGAPC2.SPCSO6.stVal
28 VT Truck “Rack-Out LD0.MVGAPC2.SPCSO6.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 77 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6.5 Measurements1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 78 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Reading
us ks
No s
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
Voltage R-Ph LD0.VMMXU1.PhV.phsA.cVal.m
4
(kV) ag.f
Voltage Y-Ph LD0.VMMXU1.PhV.phsB.cVal.m
5
(kV) ag.f
Voltage B-Ph LD0.VMMXU1.PhV.phsC.cVal.m
6
(kV) ag.f
Voltage R-Y LD0.VMMXU1.PPV.phsAB.instC
7
(kV) Val.mag.f
Voltage Y-B LD0.VMMXU1.PPV.phsBC.instC
8
(kV) Val.mag.f
Voltage B-R LD0.VMMXU1.PPV.phsCA.instC
9
(kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive Power
11 LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f

13 Frequency LD0.FMMXU1.Hz.instMag.f
Apparent
14 LD0.PEMMXU1.TotVA.instMag.f
Power (kVA)
Minimum Active
15 LD0.PEMIMMXU1.TotW.mag.f
Power (kW)

Seri Signal Name LN Address Current Stat Remar


al Readin us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 79 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No gs
Maximum
16 Active Power LD0.PEMAMMXU1.TotW.mag.f
(kW)
Import Energy
17 LD0.PEMMTR1.SupWh.actVal
(kWH)
Export Energy
18 LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current R-Ph LD0.CMHAI1.DmdTddA.phsA.cVa
19
THD (%) l.mag.f
Current Y-Ph LD0.CMHAI1.DmdTddA.phsB.cVa
20
THD (%) l.mag.f
Current B-Ph LD0.CMHAI1.DmdTddA.phsC.cV
21
THD (%) al.mag.f
Voltage R-Ph LD0.VMHAI1.DmdThdPhV.phsA.c
22
THD (%) Val.mag.f
Voltage Y-Ph LD0.VMHAI1.DmdThdPhV.phsB.c
23
THD (%) Val.mag.f
Voltage B-Ph LD0.VMHAI1.DmdThdPhV.phsC.c
24
THD (%) Val.mag.f

Serial Signal LN Address Current Statu Remar

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 80 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No Name Readings s ks
Current
LD0.CMMXU1.A.phsA.instCV
25 Angle R-
al.ang.f
Ph (deg)
Current
LD0.CMMXU1.A.phsB.instCV
26 Angle Y-
al.ang.f
Ph (deg)
Current
LD0.CMMXU1.A.phsC.instCV
27 Angle B-
al.ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsA.cVal.
28
Angle R- ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsB.cVal.
29
Angle Y- ang.f
Ph (deg)
BUS
Voltage LD0.VMMXU1.PhV.phsC.cVal.
30
Angle B- ang.f
Ph (deg)

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 81 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.6.6 Measurements 2

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 82 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Reading
us ks
No s
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
Voltage R-Ph LD0.VMMXU1.PhV.phsA.cVal.m
4
(kV) ag.f
Voltage Y-Ph LD0.VMMXU1.PhV.phsB.cVal.m
5
(kV) ag.f
Voltage B-Ph LD0.VMMXU1.PhV.phsC.cVal.m
6
(kV) ag.f
Voltage R-Y LD0.VMMXU1.PPV.phsAB.instC
7
(kV) Val.mag.f
Voltage Y-B LD0.VMMXU1.PPV.phsBC.instC
8
(kV) Val.mag.f
Voltage B-R LD0.VMMXU1.PPV.phsCA.instC
9
(kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 83 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Statu Remar
al Signal Name LN Address Readin
s ks
No gs
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
13 Frequency LD0.FMMXU1.Hz.instMag.f
Apparent
14 LD0.PEMMXU1.TotVA.instMag.f
Power (kVA)
Minimum
15 Active Power LD0.PEMIMMXU1.TotW.mag.f
(kW)
Maximum
16 Active Power LD0.PEMAMMXU1.TotW.mag.f
(kW)
Import Energy
17 LD0.PEMMTR1.SupWh.actVal
(kWH)
Export Energy
18 LD0.PEMMTR1.DmdWh.actVal
(kWH)
Current R-Ph LD0.CMHAI1.DmdTddA.phsA.cV
19
THD (%) al.mag.f
Current Y-Ph LD0.CMHAI1.DmdTddA.phsB.cV
20
THD (%) al.mag.f

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 84 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Seri Current
Stat Remar
al Signal Name LN Address Readin
us ks
No gs
Current B-Ph LD0.CMHAI1.DmdTddA.phsC.cVa
21
THD (%) l.mag.f
Voltage R-Ph LD0.VMHAI1.DmdThdPhV.phsA.c
22
THD (%) Val.mag.f
Voltage Y-Ph LD0.VMHAI1.DmdThdPhV.phsB.c
23
THD (%) Val.mag.f
Voltage B-Ph LD0.VMHAI1.DmdThdPhV.phsC.c
24
THD (%) Val.mag.f
Current Angle LD0.CMMXU1.A.phsA.instCVal.a
25
R-Ph (deg) ng.f
Current Angle LD0.CMMXU1.A.phsB.instCVal.a
26
Y-Ph (deg) ng.f
Current Angle LD0.CMMXU1.A.phsC.instCVal.a
27
B-Ph (deg) ng.f
BUS Voltage
LD0.VMMXU1.PhV.phsA.cVal.ang
28 Angle R-Ph
.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal.ang
29 Angle Y-Ph
.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal.an
30 Angle B-Ph
g.f
(deg)

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 85 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.7 OGF_4160V_01 - F56-MS 9.1_A01

3.7.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 86 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.7.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 87 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 88 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.7.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 89 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 90 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.7.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 91 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 92 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 93 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.7.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 94 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 95 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 96 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.8 OGF_4160V_01 - F56-MS 9.1_A03

3.8.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 97 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.8.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 98 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 99 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.8.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 100 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 101 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.8.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 102 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 103 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 104 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.8.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 105 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 106 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 107 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.9 OGF_4160V_01 - F56-MS 9.1_A11

3.9.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 108 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.9.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 109 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 110 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.9.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 111 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 112 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.9.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 113 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 114 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 115 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.9.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 116 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 117 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 118 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.10 OGF_4160V_01 - F56-MS 9.1_A13

3.10.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 119 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.10.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 120 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 121 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.10.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 122 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 123 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.10.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 124 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 125 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 126 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.10.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 127 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 128 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 129 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11 OGF_4160V_01 - F56-MS 9.1_A02

3.11.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 130 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 131 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 132 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 133 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 134 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 135 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 136 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 137 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.11.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 138 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 139 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 140 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.12 OGF_4160V_01 - F56-MS 9.1_A12

3.12.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 141 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.12.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 142 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 Over Current 51 Protection Trip LD0.PHLPTOC1.Op.general
Over Current 50-Stage-1
2
Protection Trip LD0.PHHPTOC1.Op.general
Over Current 50-Stage-2
3
Protection Trip LD0.PHIPTOC1.Op.general
4 Earth Fault 50N Protection trip LD0.EFHPTOC1.Op.general
5 Earth Fault 51N Protection trip LD0.EFLPTOC1.Op.general
6 Lockout Relay 86 Trip LD0.XAGGIO130.Ind1.stVal
LD0.MVGAPC1.SPCSO1.stV
7 ITH Limiter CB/BB/CABLE Trip
al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 143 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.12.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 144 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 CB Spring Charge Low LD0.XGGIO110.Ind7.stVal
2 CB Trip Circuit Faulty LD0.XGGIO120.Ind3.stVal
3 DC supply Failure LD0.LDEV1.Devfail.stVal
Lockout Relay 86-1
4
Supervision Fail LD0.XGGIO120.Ind3.stVal
5 CB Mechanical failure LD0.XGGIO110.Ind8.stVal
6 Protection Setting Changed LD0.LDEV1.SetChg.stVal
7 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
8 loss of communication LD0.MMSLPRT1.ChLiv.stVal
LD0.SPCGAPC2.SPCSO1.ctlV
9 Select Local Command
al
LD0.SPCGAPC2.SPCSO2.ctlV
10 Select Remote Command
al
11 IED Self-Check Fail LD0.LDEV1.Health.stVal
12 voltage Sag LD0.VMMXU1.LoAlm.stVal
13 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 145 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.12.4 Measurements 1

Seri Signal Name LN Address Current Statu Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 146 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
s ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.ma
1
(A) g.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.ma
2
(A) g.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.m
3
(A) ag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.mag
4
R-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.mag
5
Y-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.mag
6
B-Ph (kV) .f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instCV
7
R-Y (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instCV
8
Y-B (kV) al.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instCV
9
B-R (kV) al.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 Power LD0.PEMMXU1.TotVAr.instMag.f
(kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy
13 LD0.PEMMXU1.WhDir.setVal (SP)
(kWH)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 147 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Reading
us ks
No s
DC/AC Supply LD0.MVGAPC1.SPCSO5.stV
15
MCB Open al
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 148 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.12.5 Measurements 2

Seri Signal Name LN Address Current Stat Remar


Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 149 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

al Readin
us ks
No gs
Current R-Ph LD0.CMMXU1.A.phsA.instCVal.
1
(A) mag.f
Current Y-Ph LD0.CMMXU1.A.phsB.instCVal.
2
(A) mag.f
Current B-Ph LD0.CMMXU1.A.phsC.instCVal.
3
(A) mag.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal.ma
4
R-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsB.cVal.ma
5
Y-Ph (kV) g.f
BUS Voltage LD0.VMMXU1.PhV.phsC.cVal.m
6
B-Ph (kV) ag.f
BUS Voltage LD0.VMMXU1.PPV.phsAB.instC
7
R-Y (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsBC.instC
8
Y-B (kV) Val.mag.f
BUS Voltage LD0.VMMXU1.PPV.phsCA.instC
9
B-R (kV) Val.mag.f
Active Power
10 LD0.PEMMXU1.TotW.instMag.f
(kW)
Reactive
11 LD0.PEMMXU1.TotVAr.instMag.f
Power (kVAR)
12 Power Factor LD0.PEMMXU1.TotPF.instMag.f
Active Energy LD0.PEMMXU1.WhDir.setVal
13
(kWH) (SP)
Reactive
LD0.PEMMXU1.VArhDir.setVal
14 Energy
(SP)
(kVARH)
DC/AC Supply
15 LD0.MVGAPC1.SPCSO5.stVal
MCB Open

Seri Signal Name LN Address Current Stat Remar


al Reading us ks
Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 150 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No s
Apparent Power LD0.PEMMXU1.TotVA.instMa
16
(kVA) g.f
Minimum Active LD0.PEMIMMXU1.TotW.mag.
17
Power (kW) f
Maximum Active LD0.PEMAMMXU1.TotW.mag
18
Power (kW) .f
Import Energy LD0.PEMMTR1.SupWh.actVa
19
(kWH) l
Export Energy LD0.PEMMTR1.DmdWh.actV
20
(kWH) al
Current Angle R- LD0.CMMXU1.A.phsA.instCV
21
Ph (deg) al.ang.f
Current Angle Y- LD0.CMMXU1.A.phsB.instCV
22
Ph (deg) al.ang.f
Current Angle B- LD0.CMMXU1.A.phsC.instCV
23
Ph (deg) al.ang.f
BUS Voltage LD0.VMMXU1.PhV.phsA.cVal
24
Angle R-Ph (deg) .ang.f
BUS Voltage
LD0.VMMXU1.PhV.phsB.cVal
25 Angle Y-Ph
.ang.f
(deg)
BUS Voltage
LD0.VMMXU1.PhV.phsC.cVal
26 Angle B-Ph
.ang.f
(deg)
27 Frequency LD0.FMMXU1.Hz.instMag.f

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 151 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.13 MCC_4160V_01 - F56-MCC9.1A_A02

3.13.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 152 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.13.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 153 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 154 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.13.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 155 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 156 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.13.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 157 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 158 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.13.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 159 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 160 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.14 MCC_4160V_01 - F56-MCC9.1A_A03

3.14.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 161 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.14.2 Protection Alarm

Serial Signal Name LN Address Status Remarks

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 162 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

No
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 163 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.14.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 164 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 165 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.14.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 166 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 167 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.14.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 168 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 169 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.15 MCC_4160V_01 - F56-MCC9.1A_A04

3.15.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 170 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.15.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 171 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 172 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.15.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 173 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 174 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.15.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 175 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 176 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.15.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 177 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 178 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.16 MCC_4160V_01 - F56-MCC9.1A_A05

3.16.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 179 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.16.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 180 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 181 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.16.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 182 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 183 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.16.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 184 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 185 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.16.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 186 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 187 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.17 MCC_4160V_01 - F56-MCC9.1A_A06

3.17.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 188 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.17.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 189 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 190 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.17.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 191 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 192 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.17.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 193 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 194 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.17.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 195 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 196 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.18 MCC_4160V_01 - F56-MCC9.1A_A07

3.18.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 197 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.18.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 198 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 199 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.18.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 200 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 201 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.18.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 202 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 203 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.18.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 204 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 205 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19 MCC_4160V_01 - F56-MCC9.1B_A02

3.19.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 206 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 207 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 208 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 209 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 210 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 211 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 212 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.19.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 213 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 214 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.20 MCC_4160V_01 - F56-MCC9.1B_A03

3.20.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 215 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.20.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 216 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 217 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.20.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 218 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 219 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.20.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 220 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 221 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.20.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 222 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 223 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.21 MCC_4160V_01 - F56-MCC9.1B_A04

3.21.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 224 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.21.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 225 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 226 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.21.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 227 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 228 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.21.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 229 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 230 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.21.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 231 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 232 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.22 MCC_4160V_01 - F56-MCC9.1B_A05

3.22.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 233 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.22.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 234 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 235 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.22.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 236 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 237 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.22.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 238 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 239 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.22.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 240 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 241 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.23 MCC_4160V_01 - F56-MCC9.1B_A06

3.23.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 242 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.23.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 243 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 244 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.23.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 245 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 246 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.23.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 247 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 248 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.23.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 249 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 250 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.24 MCC_4160V_01 - F56-MCC9.1B_A07

3.24.1 Main Faceplates

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 251 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.24.2 Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 252 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
Motor Thermal O/L 49 Protection
1
Alarm LD0.SPCGAPC1.Ind8.stVal
Motor Thermal O/L 49 Protection
2
Trip LD0.SPCGAPC1.Ind9.stVal
Motor Instantaneous O/C 50 LD0.SPCGAPC1.Ind10.stVa
3
Protection Trip l
Motor Locked Rotor 51LR LD0.SPCGAPC1.Ind11.stVa
4
Protection Trip l
Motor Negative Phase Seq. 46 LD0.SPCGAPC1.Ind12.stVa
5
Protection Trip l
Motor Startup Protection 49S LD0.SPCGAPC1.Ind13.stVa
6
Protection Trip l
Motor Ground Fault 51G Protection LD0.SPCGAPC1.Ind14.stVa
7
Trip l
Motor Under Voltage 27 Protection LD0.SPCGAPC1.Ind15.stVa
8
Trip l
Motor temp high Contactor blocked
9
Close LD0.MNSPTOC1.Blk.stVal
Motor Winding/Bearing
10
Temperature High Alarm LD0.SPCGAPC2.Ind8.stVal
Motor Winding/Bearing
11
Temperature High Trip LD0.SPCGAPC2.Ind9.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 253 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.24.3 Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 254 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial
No Signal Name LN Address Status Remarks
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
3 IED Firmware changed LD0.LDEV1.ChgFlg.stVal
4 loss of communication LD0.MMSLPRT1.ChLiv.stVal
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 255 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.24.4 Measurements 1

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 256 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Serial Current
Signal Name LN Address Status Remarks
No Readings
1 DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed
IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed
loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al
5 IED Self-Check Fail LD0.LDEV1.Health.stVal
6 voltage Sag LD0.VMMXU1.LoAlm.stVal
7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 257 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.24.5 Measurements 2

Serial Current
Signal Name LN Address Status Remarks
No Readings

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 258 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1
DC supply Failure LD0.LDEV1.Devfail.stVal
Protection Setting
2 LD0.LDEV1.SetChg.stVal
Changed

IED Firmware
3 LD0.LDEV1.ChgFlg.stVal
changed

loss of LD0.MMSLPRT1.ChLiv.stV
4
communication al

5 IED Self-Check Fail


LD0.LDEV1.Health.stVal

6 voltage Sag LD0.VMMXU1.LoAlm.stVal

7 Voltage Swell LD0.VMMXU1.HiAlm.stVal

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 259 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

3.25 ASP_INC_01

3.25.1 Main Faceplates

Serial
No Signal Name LN Address Status Remarks

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 260 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1 MCC9.1C status "CB Open" LD0.SPCGAPC1.Ind1.stVal


2 MCC9.1C status "CB Close" LD0.SPCGAPC1.Ind2.stVal
3 MCC9.1C status "CB Rack in" LD0.SPCGAPC1.Ind3.stVal
4 MCC9.1C status "CB Rack out" LD0.SPCGAPC1.Ind4.stVal
LD0.SPCGAPC1.SPCSO5.ctlV
5
MCC9.1C CB Open Command al
LD0.SPCGAPC1.SPCSO6.ctlV
6
MCC9.1C CB Close Command al

ABB Engineer HITACHI Engineer PETRO Rabigh

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 261 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

4.0 FACEPLATES TABS

To Open Alarm
List

Main Faceplate

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 262 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Protection Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 263 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

To Open Event List

Operator Note

Supervision Alarm

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 264 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Measurements

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 265 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

5.0 FACEPLATES INDICATIONS

Alarms High
Indication

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 266 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Events High
Indication

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 267 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

1.1.1 Punch points table

Cleared Date
Punch Item Cleared
Punch Item
No Sign
Planned Real

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 268 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

Cleared Date
Punch Item Cleared
Punch Item
No Sign
Planned Real

19.

20.

21.

22.

23.

24.

25.

26.

.27.

28.

29.

30.

31.

32.

33.

34.

35.

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd


PETRO RABIGH Page: 269 of 269
KINGDOM OF SAUDI ARABIA
REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT

SAT PROCEDURE FOR 9.1 SUB STATION

Rev. A0
Revision
Index

SA-100891-PSA-SAT-V001S
Date: 24-03-23

9.1 SUB STATION SAT HMI SYSTEM ACCEPTANCE CERTIFICATE

PROJECT: REFINERY SS UPGRADE, PHASE I, STAGE 2 PSA PROJECT


Project No: 4600004142

The test results have been reviewed. The tested system has functions and performance according to its
specifications with exceptions according to the List of non-conformances and changes and the Review
comments. (Punch List Attached).

Testing of all the system functionalities has been carried through operator work places are satisfactory.

Date: ……………....... Date: …………….......

_________________________ ____________________________
ABB PRC

Final Engineering Contractor Subcontractor

PETRO RABIGH ABB Electrical Industries Co. Ltd