This document provides a job safety analysis for loading and unloading materials using a boom truck at the Neom Construction Project site in Al Khuribah. It identifies potential hazards such as incompetent operators, suspended loads, unauthorized personnel, and defective equipment. Control measures are outlined like only allowing authorized operators with certifications, using certified lifting equipment and accessories, having competent riggers on site during lifts, erecting barricades, and more. Personnel are prohibited from the fall zone and lifts must stop during high winds or over the vehicle's rated capacity. Proper PPE and following traffic rules are also required.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
84 views2 pages
Jha Format
This document provides a job safety analysis for loading and unloading materials using a boom truck at the Neom Construction Project site in Al Khuribah. It identifies potential hazards such as incompetent operators, suspended loads, unauthorized personnel, and defective equipment. Control measures are outlined like only allowing authorized operators with certifications, using certified lifting equipment and accessories, having competent riggers on site during lifts, erecting barricades, and more. Personnel are prohibited from the fall zone and lifts must stop during high winds or over the vehicle's rated capacity. Proper PPE and following traffic rules are also required.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
Logo JOB SAFTEY ANALYSIS Client logo
Project Name Neom Construction Project JSA NO:- Sample 01
Project Location Al Khuribah
Activity: -Loding and unloading of material
Step Hazard Control Measures
• Incompetent Driver/operator •Only authorised operator to operate boom truck with valid • Suspended load TUV certificate and driver license. • Lifting equipment shall only be operated and maintained • Unauthorized personnel by qualified personnel such as those designated and Loading and • Moving vehicles authorized. unloading of material • Defective tools and equipment • Ensure that lifting equipment and lifting accessories are using boom truck third party certified. • Mechanical/hydraulic failure • Boom truck equipment and riggers must have proof of • Adverse weather condition competency third party certifications (TUV). • Over speeding • Competent rigger should be available on site during • Overloading of materials and passenger. lifting. • Collision of vehicles, • A flagman should always be available during use and transit of the lifting equipment. • People hit by vehicle. • Barricades or caution lines, and notices, are erected to • Incompetent drive and operator. prevent all employees from entering the fall zone. • Falling of loads and damaged property. • No employees, are permitted in the fall zone. • Personnel injury. • Swing radius of the crane must be identified and • Miscommunication of rigger,flagman and operator. barricaded. • All lifting accessories must be regularly inspected and third party certified. • All lifting operations should s top when wind gusts/speed is above 30km/hr. • The boom truck must not be operated in excess of its rated capacity. • Wear appropriate PPE’S. • Drive s lowly and follow the traffic rules also use