Loop Test Procedure

This document provides procedures for loop testing field instruments at PT. InTI Karya Persada Tehnik. It outlines the purpose, scope of work, responsibilities, technical requirements including required tools, instruments to be tested, and the loop test procedure. The procedure involves function testing transmitters, control valves, switches and other instruments both in the field and control room. Safety precautions are also discussed such as using proper PPE, ensuring equipment is inspected, and having fall protection when working at heights.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

Loop Test Procedure

This document provides procedures for loop testing field instruments at PT. InTI Karya Persada Tehnik. It outlines the purpose, scope of work, responsibilities, technical requirements including required tools, instruments to be tested, and the loop test procedure. The procedure involves function testing transmitters, control valves, switches and other instruments both in the field and control room. Safety precautions are also discussed such as using proper PPE, ensuring equipment is inspected, and having fall protection when working at heights.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

PROCEDURE ELECTRICAL

& INSTRUMENT DEPARTEMENT

LOOP TEST PROCEDURE

PT. ASUKA ENGINEERING INDONESIA

PT. INTI KARYA PERSADA TEHNIK

LOOP TEST PROCEDURE


PROCEDURE ELECTRICAL
& INSTRUMENT DEPARTEMENT

LOOP TEST PROCEDURE

1 Purpose
The purpose of this document is to describe the loop test process and required tools
drawing, materials, inprovision Field Instrument at IKPT, this procedure
shall be applied calibration and ensure that each instrument is functionally correct and
correctly calibrated

2 Scope Of Work
The scope of work shall be covered all function testadditional capacity at IKPT

3 Responsibilities
3.1 Instrument Leader
Ensure relevant permits are raised and received prior to commencement of work with full
compliance by all instrument foreman, technician, and labour regarding excutions of work
in accordance with the IKPT project requirments and specification. Confirm the anailability
of the material, tools, equipment personnel who will carry out work

3.2 Instrument Engineers


Provide technical support to the instrument group, provide, latest revision of drawing
procedure, material specfications, standart and technical specifications

3.3 Safety
ensure that personal comply with all safety rulles and requipments in the conduts of all
instrument equipment installation activities performed in the project

4 Technical requirement
4,1 Tools for Loop Test
a_ Digital multi-meter
b. DC standard voltage and current generator
c. Standard resistance box and thermocouple
d. Hand Held Communicator for Smart Transmitters and Smart
e. Hand pump
f. Pressure gauge / digital pressure gauge
g. Precision air regulator
h. Compressor / Nitrogen with air pressure
i. Connector, Tubing of various sizes
j. Others, if any

4,2 Instrument to be Loop Test


a. Control Valve
b. On / Off Valve
c. pressure switch
d. Pressure Transmitter
e. Differential pressure transmitter
f. Temperature Transmitter (TC and RTD)
g. Mass Flow Meter
PROCEDURE ELECTRICAL
& INSTRUMENT DEPARTEMENT

LOOP TEST PROCEDURE


h. Level Transmitter
i. Pressure Gauge
j. Temperature Gauge
k. Others, if any
PROCEDURE ELECTRICAL
& INSTRUMENT DEPARTEMENT

LOOP TEST PROCEDURE

5 Loop Test Procedure


Basically, calibration shall be witnessed by Owner. Contractor shall notify for the request of
witness in advance. Should any of the tests not be witnessed, Contractor can precede the test by
themselves under the confirmation of Owner's acceptance.
5,1 General
5.1.1 Loop testing is a two-group operation. One group is to be in the field and the other
group
conform
to be
to positioned
spesification,size
in the control
or rating,
room
connection
or front of
type,
thedata
localplate
panel.
or Where
tag plate, cable
DCS/SIS/FGS
or wiring in place
is applied,
and no one
mechanical
man should
damage.
be in the rack room for troubleshooting.
Adequate remote communication tools, i.e. radio contact shall be provided.
5.1.2 Basically, Function test shall be witnessed by Owner. Contractor shall be notified
for the request of witness in advance.
5.1.3 The following documents to be referred at CCR crew.
a. P&IDs.
b. Instrument set point and range list.
c. Instrument Loop drawing (Package vendors loop drawings will be used which
are available for loop test inside package).
d. Data sheet of filed Instrument (including vendor data sheets ).
e. Location Plant.
5.1.4 Field crew should bring location plant.

5.2 Loop Test Procedure


5.2.1 For the loop testing. set air and/or electrical supplies where applicable. In particular,
the air supply pressure for control valves and the other pneumatic actuators are to be
checked that they are set correctly in accordance with the specifications. (7 kg/cm2
g as normal).
5.2.2 Control valve stroke shall be checked at field to be operated as 0-50-100-50-0%
opening from DCS or package PLC. And stroke time to be recorded. Stroke
adjustment (i.e. 0. 50 or 100%) should be performed, if necessary.
5.2.3 On-off valve function shall be checked to energize or de-energize from DCS or SIS
and confirm 0-100% open/close at site and answer back from limit switch signals on
the DCS or SIS. And stroke time to be recorded. Stroke adjustment should be
performed, if necessary.
5.2.4 For pressure switch and level switch, their contact to be manually make and/or
break for ensuring the corresponding instrument's responses.
5.2.5 For Transmitter pressure, DP,LT,etc.( analog input smart transmitter) when inject
with hand held comunicator.monitor the indication on DCS HIS or SIS EWS in
accordance to its range and note the relevant alarm activation on the alarm report
screen
5.2.6 For resistance temperature detector (RTD), confirm it to show ambient temperature
and burn-out by disconnection.
5.2.7 For thermocouple such as Type-K and Type-R, confirm it to show ambient
temperature and bum-out by disconnection.
5.2.8 Analytical fire and gas detectors and special instruments shall be checked according
PROCEDURE ELECTRICAL
& INSTRUMENT DEPARTEMENT

LOOP TEST PROCEDURE

5,3 General Note


During loop testing, the following items shall generally be confirmed or checked:
5.3.1 In the control room or at the local panel:
a. Indication and output signal level on the DCS operator station or SIS EWS,
package PLC HMI or board mounted instruments.
b. Alarm function
Note : Set points should be reviewed and implemented based on master alarm
set point list outside of loop check. Some of set points may be changed for start
up purpose etc during commissioning or start activity. Any change of set points
shall require approval by the authorized person and recorded.
c. Range (Consistency of range between field instrument and System for analog
loop) The range should be checked outside of loop check.
d. Action of controllers of DCS/Package PLC (Direct or Reverse).

5.3.2 In the field:


a. Action of control valves including associated accessories, such as solenoid
valves, limit switches, etc.
b. Range of transmitters.
c. Indication of remote mounted output gauges where applicable.
d. Loop check can be started when the following reports are submitted.
- Installation Record (with remarks of tube connection and ASUKA punch)
- Calibration Record
- Wiring Test Record

6 HSE Task Analisys and Johan


The HSE focused task analisys has identified the following risks / hazards associated with this work
and a set job hazard analysis ( johan ) forms will be prepared for each / hazard see johan doc

Safety precaution:
a. Make sure the PPE is use Correctly
b. Make sure all equipment before using it in good condition and has passed inspection.
c. Ensure all employees who work above the level attended training working at heigth.
d. Use acces up and down and work, with scaffolding that has been in the inspection.
e. Ensure full body harness is hung acces strong and above the head.
f. In the work place should be displayed safety sign.
g. Barricade the work place.
h. Fit to work for working at height location.

-----END-----