PO Nuricon Bachal Solar System
PO Nuricon Bachal Solar System
PO Nuricon Bachal Solar System
Pak Rupees
1 Visit to UEPL Bachal field to Diagnosis and Rectification of Solar power system problem 1 85,000.00 85,000.00
****Original****
Prepared By : NAVED AHMED/AHMEDN2
Pak Rupees
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF STAMP DUTY, IF ANY, UNDER
THE STAMP ACT, 1899 AND ITS SCHEDULES. IN THE EVENT ANY ASSESSMENT OF STAMP DUTY IS
MADE AGAINST THE COMPANY, THE CONTRACTOR UNDERTAKES TO IMMEDIATELY PAY THE SAME
AND INDEMNIFY THE COMPANY AGAINST ANY COSTS, LOSSES, DAMAGES AND RISKS IN THIS
REGARD.
PAKISTAN WITHHOLDING:
======================
LOCAL WITHHOLDING TAX WILL BE DEDUCTED IN ACCORDANCE WITH THE PROVISIONS OF
RELEVANT TAX LAWS APPLICABLE IN PAKISTAN DURING THE PERFORMANCE OF CONTRACTOR’S
OBLIGATIONS UNDER THIS PURCHASE ORDER.
PAYMENT TERMS:
==============
45 DAYS AFTER DELIVERY OF GOODS / SERVICES.
ALL INVOICES FOR THE WORK PERFORMED OR GOODS DELIVERED SHALL BE RAISED WITHIN THE
TIME LIMITS MENTIONED ON THE RELEVANT PURCHASING INSTRUMENT(S). WHERE NO SUCH
INFORMATION IS GIVEN, THE TIME LIMIT SHOULD BE ASSUMED TO BE SIXTY (60) DAYS FROM
THE PERFORMANCE OF WORK OR DELIVERY OF GOODS. NO INVOICE SUBSEQUENT TO THE
ABOVE TIME LIMIT WILL BE PAID BY THE COMPANY UNLESS AGREED IN WRITING BETWEEN THE
CONTRACTOR AND COMPANY’S AUTHORIZED REPRESENTATIVE.
VARIATIONS IN SCOPE:
===================
COMPANY SHALL HAVE THE RIGHT TO INSTRUCT FROM TIME TO TIME TO ALTER, AMEND, ADD TO
OR OMIT FROM OR OTHERWISE VARY ANY OF THE WORKS/SERVICES AND CONTRACTOR AGREES
TO CARRY OUT SUCH INSTRUCTIONS. IN THE EVENT OF A REDUCTION IN THE WORKS/SERVICES
CONTRACTOR AGREES THAT THE UNIT RATES PROVIDED IN THE PURCHASE ORDER SHALL APPLY
TO THE AMENDED SCOPE OF WORK/SERVICES. IN THE EVENT OF A SUBSTANTIAL AMENDMENT/
ALTERATION TO THE WORK/SERVICES COMPANY AND CONTRACTOR SHALL MUTUALLY AGREE
REVISION OF RATES IF NECESSARY.
SPECIAL PROVISIONS:
==================
THE CONTRACTOR SHALL ENSURE COMPLETE COMPLIANCE WITH "UEP SAFETY PHILOSOPHY &
CONTRACTORS RESPONSIBILITIES" AND "HEALTH, ENVIRONMENTAL AND SAFETY POLICY" AT ALL
TIMES.
CONTRACTOR IS REQUIRED TO SUBMIT THE WORK METHODOLOGY, "TASK RISK
ASSESSMENT" (TRA) AND FOLLOW COMPANY'S SAFETY STANDARDS, POLICIES AND PROCEDURES.
****Original****
Prepared By : NAVED AHMED/AHMEDN2
Pak Rupees
PO ISSUED BY
UNITED ENERGY PAKISTAN
NTN: 3792746-9
REFERENCE: 60496
==========
PRICING IN ACCORDANCE WITH YATTACHED EMAIL QUOTATION.
CONFIRMING ORDER TO MR. FAREED BY NAVED AHMED
PO Total Value: Pak Rupees 96,050.00
****Original****
Prepared By : NAVED AHMED/AHMEDN2