This inspection and test plan outlines the quality control process for installing protection wire mesh at a rock stabilization project in NEOM, Saudi Arabia. It describes reviewing submittals like method statements and shop drawings. It involves inspecting materials upon receipt to ensure specifications are met. Tests will be performed on the wire mesh to check dimensions and properties. Execution of the installation work will be inspected, including survey layout and site preparation, to ensure compliance with approved plans and specifications.

Uploaded by

Vishnudas Mg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
202 views3 pages

Protection Wire Mesh ITP

This inspection and test plan outlines the quality control process for installing protection wire mesh at a rock stabilization project in NEOM, Saudi Arabia. It describes reviewing submittals like method statements and shop drawings. It involves inspecting materials upon receipt to ensure specifications are met. Tests will be performed on the wire mesh to check dimensions and properties. Execution of the installation work will be inspected, including survey layout and site preparation, to ensure compliance with approved plans and specifications.

Uploaded by

Vishnudas Mg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

INSPECTION AND TEST PLAN FOR INSTALLATION OF PROTECTION WIREMESH

NEOM QUALITY MANAGEMENT SYSTEM Main


Mofarreh Alharbi & Partners & BATCO JV
NEOM QMS-PRO-005-001 CONSTRUCTION OF PROJECT (ITP) FOR Contractor:
INSTALLATION OF PROTECTION WIRE MESH Sub-Contractor: N/A
Rev.
Contract No.: 4800000657/00 Contract Design & Build of Rock Stabilization Wadi Interceptors ITP No.: 02-181100-4800000657-MAH-CIV-ITP-004 02 Date: 09/12/2023
No.:
Title:

Level of Participation Points


SL Controlling Document/ Acceptance
Activity Phase Inspection / Test Method Remarks
No. Reference Standard Criteria 3rd Party Main ETSD
PMC
Laboratory Con. NEOM Q&E

1 Document Review
Method Statement Reference No Approved Method
1.1 Method Statement Document Review 02-181100-4800000657-MAH- Statement In Code A or H R/H S
CIV-MST-000004 Code B with comments
1.2 Shop Drawing Document Review As- Per Approved Shop Drawing Approved Shop Drawing H R/H S
Approved Material
Material Submittal Reference No
Submittal , Manufacturer
1.3 Material Approval Document Review 02-181100-4800000657-MAH- H R/H S
Test Certificates, Delivery
CIV-MAT-000004
Notes
Prequalification of Inspection & Approved in Code A or
1.4 Document Review Approved Laboratory H R/H R/H
Testing Laboratory / Third Party Code B with comments
#02-710000-0000100113-
1.5 Calibration of Equipment’s Document Review Calibration Certificates ACM-QMN-REG- S S S
000003_01
2 Material Receiving Inspection, Sampling and Testing
Approved Material
List all Required Materials
Inspection Request (MIR)
Received on site
2.1 Document Review/ Material inspection Material Submittal /MIR MIR checklist #02-710000- H W W
Steel Wire mesh, rock nails, steel
0000100113-ACM-QMN-
plates, nuts ,steel cables etc.
TMP-000007_1
NEOM Bay Specification Section NEOM Bay Specification
2.2 Material Storage and Handling Visual Inspection H S S
017843/1.4 Section 017843/1.4
Internal diameter- 2.14-
2.16 mm
Technical Specification Book 5 External Diameter- 2.90
02-181100-4800000657-MAH- mm
2.3 Wire mesh Testing Conforming to EN-10223-3 H H H H
DES-RPT-00011˗B Tensile Strength – 350-
Clause No 1.3.2 550N/mm2
Elongation –Min 8%

3 Execution of Work

Approved Survey ITP/ NEOM Bay


Approved WIR as per
3.1 Survey Setting Out Survey inspection / Visual inspection Specification 017330 Section 3.3 H H W
approved survey ITP
& 3.4
Technical Specification Book 5
Site Cleaning and preparation, as 02-181100-4800000657-MAH- Approved/Signed checklist
3.2 Visual Inspection H W W
per survey details DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No.1.3.3
Technical Specification Book 5
02-181100-4800000657-MAH- Approved/Signed checklist
3.3 Lapping and overlapping of wires Visual Inspection H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No.1.3.3
Technical Specification Book 5
02-181100-4800000657-MAH- Approved/Signed checklist
3.4 Installation of Wire Mesh Visual Inspection H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No.1.3.3
Technical Specification Book 5
3.5 Drilling of rock Nails Visual Inspection 02-181100-4800000657-MAH- Approved/Signed checklist H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)

Legend:

S: Responsible for carrying out random surveillance of inspection or


H: Contractor must not proceed without approval. R: Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
test/Random Check.

DOCUMENT CODE : NEOM-NEN-SOP-008_FRM11 REVISION CODE: 01.00 P AGE 1 OF 3


©NEOM [2021]. All rights reserved.
INSPECTION AND TEST PLAN FOR INSTALLATION OF PROTECTION WIREMESH
NEOM QUALITY MANAGEMENT SYSTEM Main
Mofarreh Alharbi & Partners & BATCO JV
NEOM QMS-PRO-005-001 CONSTRUCTION OF PROJECT (ITP) FOR Contractor:
INSTALLATION OF PROTECTION WIRE MESH Sub-Contractor: N/A
Rev.
Contract No.: 4800000657/00 Contract Design & Build of Rock Stabilization Wadi Interceptors ITP No.: 02-181100-4800000657-MAH-CIV-ITP-004 02 Date: 09/12/2023
No.:
Title:

Level of Participation Points


SL Controlling Document/ Acceptance
Activity Phase Inspection / Test Method Remarks
No. Reference Standard Criteria 3rd Party Main ETSD
PMC
Laboratory Con. NEOM Q&E

Clause No. 1.3.3

Technical Specification Book 5


02-181100-4800000657-MAH- Approved/Signed checklist
3.6 Installation of Rock Nails Visual Inspection H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No. 1.3.3
1) .Comp strength: Min
As per
30 MPa for 7 days & 40
ASTM C 940
MPa for 28 days.
ASTM C 939
2)Bleeding :Max 0.50%
ASTM C 138 Technical Specification Book 5
Grouting For Rock Nails after 3 hours
ASTM C 109 02-181100-4800000657-MAH-
3.7 Grout Testing – Fluidity, Bleeding, 3) Fluidity: Max. 30 H H H H
At a frequency of Six Cubes per day 3 for DES-RPT-00011˗B
Comp. strength seconds
Clause No. 1.4.4
7 days and 3 for 28 days , daily Fluidity 4) Expansion: Max 4%
and bleeding test will be conducted 5)Specific gravity: Min 1.95
6)Chloride content; <0.1%
of cement weight
Technical Specification Book 5
02-181100-4800000657-MAH- Approved/Signed checklist
3.8 Fixing of Plates & Eye nuts Visual Inspection H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No.1.3.3
Technical Specification Book 5
02-181100-4800000657-MAH- Approved/Signed checklist
3.9 Installation of cable Visual Inspection H W W
DES-RPT-00011˗B (JV-CIV-ICL-004-01)
Clause No.1.3.3
Technical Specification Book 5
02-181100-4800000657-MAH- Work Inspection Request
4.0 Final Inspection Visual Inspection H W W
DES-RPT-00011˗B
Clause No. 1.3.3
4 Final Approval
Technical Specification Book 5
All records signed off and closed, As-Built 02-181100-4800000657-MAH-
4.1 Submission of WIR Approved WIR H H H
Records DES-RPT-00011˗B
Clause No. 1.3.3
Approved Survey ITP/ NEOM Bay
4.2 Inspection for As Built Survey Survey inspection / Visual inspection Specification 017330 Section 3.3 Approved WIR, survey ITP H H W
&3.4
ITP Approval Signature
Sub-Contractor (If Applicable) Main Contractor PMC NEOM Q&E
Name: Name: KAILASH PATIL Name: Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:


GENERAL NOTES:
The first (3) of each inspection or testing activities listed require 100% participation of client site inspection personnel. After this period, client inspection may adjust the level of client participation based on the contractor's performance.
Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client representative in attendance.
Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.

Legend:

S: Responsible for carrying out random surveillance of inspection or


H: Contractor must not proceed without approval. R: Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
test/Random Check.

DOCUMENT CODE : NEOM-NEN-SOP-008_FRM11 REVISION CODE: 01.00 P AGE 2 OF 3


©NEOM [2021]. All rights reserved.
INSPECTION AND TEST PLAN FOR INSTALLATION OF PROTECTION WIREMESH
NEOM QUALITY MANAGEMENT SYSTEM Main
Mofarreh Alharbi & Partners & BATCO JV
NEOM QMS-PRO-005-001 CONSTRUCTION OF PROJECT (ITP) FOR Contractor:
INSTALLATION OF PROTECTION WIRE MESH Sub-Contractor: N/A
Rev.
Contract No.: 4800000657/00 Contract Design & Build of Rock Stabilization Wadi Interceptors ITP No.: 02-181100-4800000657-MAH-CIV-ITP-004 02 Date: 09/12/2023
No.:
Title:

Level of Participation Points


SL Controlling Document/ Acceptance
Activity Phase Inspection / Test Method Remarks
No. Reference Standard Criteria 3rd Party Main ETSD
PMC
Laboratory Con. NEOM Q&E
Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative doesn’t come on time for inspection, the activity can proceed.
Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.
Review/Hold: QA/QC team shall review and approve all required documents before commencement of the work.

Legend:

S: Responsible for carrying out random surveillance of inspection or


H: Contractor must not proceed without approval. R: Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
test/Random Check.

DOCUMENT CODE : NEOM-NEN-SOP-008_FRM11 REVISION CODE: 01.00 P AGE 3 OF 3