Compressive Strength of Cement Grout/Mortar Mix (Cubes)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 30

COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)

Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-107 Report no. : OHDS-23-107-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 15 Jan 2023
Sampling method : Not given Date Sample Received : 16 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 12 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 12 Feb 2023
RFI No. : PTJ-SGCP-CIV-38866 ; CST RFI Date Reported : 12 Feb 2023
REF:PTJ-SGCP-CIV-39891
Location : GROUT FOR PIPE SUPPORT FOUNDATIONS PEDESTALS PS-01, P-02, PS-03, PS-10, H2S/LEL (5NOS), OPTF
SKID TYPE-1 FOUNDATIONS PEDESTALS F1 (5NOS), F3 (1NO) AT MDRK OPTF-45.
Source of Grout : Time Batched (Hrs.) : 1038
Method of Placement : MANUAL Time Sampled (Hrs.) : 1042
Temp. of Mix (°C) : 20.7 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 230968 5 5 5 25 294 2.352 118 481 6843 47.2
2 230969 5 5 5 25 293 2.344 122 497 7076 48.8
3 230970 5 5 5 25 291 2.328 117 477 6786 46.8

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
SLUMP AND TEMPERATURE TEST
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-124 Report no. : OHDS-23-124-T1
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 16 Jan 2023
Sampling method : C172 Date Sample Received : N/A
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 17 Jan 2023
Tested by : M.Abrar A(CTTA#1218) Date Test Completed : 18 Jan 2023
RFI No. : PTJ-SGCP-CIV-38829-38760-38878-38925 Date Reported : 19 Jan 2023
Location : Concrete for Brace post foundations (13nos) at South side & East side and Fence Anchor Beam (6nos) beside 5Mtr Sliding Gate at Remote
Header RH-K8.REF RFI No PTJ-SGCP-CIV-38829.for Transformer foundation (02nos) and scraper handling facility foundation (SHF) Pad
beams (02nos) and curb wall for scraper Tag D83-L-0120 at MDRK RH-B.REF RFI No PTJ-SGCP-CIV-388787. For Flange pit, Manhole
MH-1(Live area) at HARADH REMOTE HEADER K8.REF RFI No PTJ-SGCP-CIV-38760. for Stair Foundations SF(1nos) and Ladder
Foundations LF(1nos) at MDRK Remote Header-B.REF RFI No PTJ-SGCP-CIV-38925.
Method of Placement : PUMP

Time Time Mix Air Air Unit


Test Truck / Ticket Slump Volume
Sl.No. Batched Sampled Temp Content Temp Weight Remarks
# No. (mm) (M³)
(Hours) (Hours) (°C) (%) (°C) (kg/M²)
1 1 4814-20876 900 950 26 120 19 5 Sampled # 08
2 2 4814-1908318 1205 1320 30.5 170 12

Test method : ASTM C 172,ASTM C143/C143M,ASTM C1064/C1064M,ASTM C31/C31M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, Mr. Muhammed Almas Khan, Lab Manager,
(CTTA#0278) (CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-01 07 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-124 Report no. : OHDS-23-124-T2
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 16 Jan 2023
Sampling method : C172 Date Sample Received : 17 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 23 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 23 Jan 2023
RFI No. : PTJ-SGCP-CIV-39140 Date Reported : 23 Jan 2023
Location : Concrete for Brace post foundations (13nos) at South side & East side and Fence Anchor Beam (6nos) beside 5Mtr Sliding Gate at Remote
Header RH-K8.REF RFI No PTJ-SGCP-CIV-38829.for Transformer foundation (02nos) and scraper handling facility foundation (SHF) Pad
beams (02nos) and curb wall for scraper Tag D83-L-0120 at MDRK RH-B.REF RFI No PTJ-SGCP-CIV-388787. For Flange pit, Manhole
MH-1(Live area) at HARADH REMOTE HEADER K8.REF RFI No PTJ-SGCP-CIV-38760. for Stair Foundations SF(1nos) and Ladder
Foundations LF(1nos) at MDRK Remote Header-B.REF RFI No PTJ-SGCP-CIV-38925.
Source of Concrete : HACO Time Batched (Hrs.) : 900
Method of Placement : PUMP Truck or Batch No. : 4814-20876
Temp. of Mix (°C) : 26 Time Sampled (Hrs.) : 950
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 120
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 230977 15.0 29.9 176.7 12906 2443 7 600 346 4920 33.9 Type4 (Diagonal)
2 230978 15.0 30.0 176.7 12963 2445 7 661 381 5420 37.4 Type2 (Cone & Vertical)

Site curing
3 230979 15.0 29.9 176.7 12902 2442 7 689 397 5650 39.0 Type1 (Cone)
4 230980 15.0 29.9 176.7 12894 2441 7 678 391 5560 38.4 Type2 (Cone & Vertical)

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-124 Report no. : OHDS-23-124-T3
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 16 Jan 2023
Sampling method : C172 Date Sample Received : 17 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 13 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 13 Feb 2023
RFI No. : PTJ-SGCP-CIV-39938 Date Reported : 13 Feb 2023
Location : Concrete for Brace post foundations (13nos) at South side & East side and Fence Anchor Beam (6nos) beside
5Mtr Sliding Gate at Remote Header RH-K8.REF RFI No PTJ-SGCP-CIV-38829.for Transformer foundation (02nos)
and scraper handling facility foundation (SHF) Pad beams (02nos) and curb wall for scraper Tag D83-L-0120 at
MDRK RH-B.REF RFI No PTJ-SGCP-CIV-388787. For Flange pit, Manhole MH-1(Live area) at HARADH REMOTE
HEADER K8.REF RFI No PTJ-SGCP-CIV-38760. for Stair Foundations SF(1nos) and Ladder Foundations LF(1nos)
at MDRK Remote Header-B.REF RFI No PTJ-SGCP-CIV-38925.
Source of Concrete : HACO Time Batched (Hrs.) : 900
Method of Placement : PUMP Truck or Batch No. : 4814-20876
Temp. of Mix (°C) : 26 Time Sampled (Hrs.) : 950
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 120
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture Result
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 230981 15.0 30.0 176.7 12963 2445 28 866 500 7110 49.0 Type1 (Cone) Passed
2 230982 15.0 29.9 176.7 12930 2447 28 840 485 6890 47.5 Type2 (Cone & Vertical) Passed

Site curing
3 230983 15.0 29.9 176.7 12841 2430 28 798 460 6550 45.1 Type2 (Cone & Vertical) Passed
4 230984 15.0 30.0 176.7 12870 2428 28 805 464 6610 45.5 Type2 (Cone & Vertical) Passed

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
SLUMP AND TEMPERATURE TEST
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-135 Report no. : OHDS-23-135-T1
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 17 Jan 2023
Sampling method : C172 Date Sample Received : N/A
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 18 Jan 2023
Tested by : M.Abrar A(CTTA#1218) Date Test Completed : 19 Jan 2023
RFI No. : PTJ-SGCP-CIV-38928 Date Reported : 20 Jan 2023
Location : Concrete For Flange pit, Manhole MH side walls(Live area) at HARADH REMOTE HEADER K7..REF RFI No PTJ-SGCP-CIV-38928.
Method of Placement : pump

Time Time Mix Air Air Unit


Test Truck / Ticket Slump Volume
Sl.No. Batched Sampled Temp Content Temp Weight Remarks
# No. (mm) (M³)
(Hours) (Hours) (°C) (%) (°C) (kg/M²)
1 1 4814-1908348 1055 1145 30 130 20.5 05 Sampled # 08

Test method : ASTM C 172,ASTM C143/C143M,ASTM C1064/C1064M,ASTM C31/C31M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, Mr. Muhammed Almas Khan, Lab Manager,
(CTTA#0278) (CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-01 07 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-135 Report no. : OHDS-23-135-T2
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 17 Jan 2023
Sampling method : C172 Date Sample Received : 18 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 24 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 24 Jan 2023
RFI No. : PTJ-SGCP-CIV-39192 Date Reported : 24 Jan 2023
Location : Concrete For Flange pit, Manhole MH side walls(Live area) at HARADH REMOTE HEADER K7..REF RFI No PTJ-SGCP-CIV-38928.
Source of Concrete : HACO Time Batched (Hrs.) : 1055
Method of Placement : pump Truck or Batch No. : 4814-1908348
Temp. of Mix (°C) : 30 Time Sampled (Hrs.) : 1145
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 130
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231027 15.0 30.0 176.7 12949 2443 7 633 365 5190 35.8 Type4 (Diagonal)
2 231028 15.0 30.0 176.7 12937 2440 7 673 388 5520 38.1 Type2 (Cone & Vertical)

Site curing
3 231029 15.0 29.9 176.7 12881 2438 7 673 388 5520 38.1 Type2 (Cone & Vertical)
4 231030 15.0 30.0 176.7 12942 2441 7 649 374 5330 36.7 Type1 (Cone)

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-135 Report no. : OHDS-23-135-T3
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 17 Jan 2023
Sampling method : C172 Date Sample Received : 18 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 14 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 14 Feb 2023
RFI No. : PTJ-SGCP-CIV-39996 Date Reported : 14 Feb 2023
Location : Concrete For Flange pit, Manhole MH side walls(Live area) at HARADH REMOTE HEADER K7..REF RFI No
PTJ-SGCP-CIV-38928.
Source of Concrete : HACO Time Batched (Hrs.) : 1055
Method of Placement : pump Truck or Batch No. : 4814-1908348
Temp. of Mix (°C) : 30 Time Sampled (Hrs.) : 1145
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 130
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture Result
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231031 15.0 30.0 176.7 12958 2444 28 891 514 7310 50.4 Type1 (Cone) Passed
2 231032 15.0 29.9 176.7 12925 2446 28 885 511 7260 50.1 Type4 (Diagonal) Passed

Site curing
3 231033 15.0 29.9 176.7 12830 2428 28 809 467 6640 45.8 Type1 (Cone) Passed
4 231034 15.0 30.0 176.7 12861 2426 28 828 478 6790 46.8 Type2 (Cone & Vertical) Passed

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-141 Report no. : OHDS-23-141-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 17 Jan 2023
Sampling method : Not given Date Sample Received : 18 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 24 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 24 Jan 2023
RFI No. : PTJ-SGCP-CIV-38950 ; CST RFI Date Reported : 24 Jan 2023
REF:PTJ-SGCP-CIV-39193
Location : GROUT FOR PIPE SUPPORT FOUNDATIONS PEDESTALS PS-01, P-02, PS-08, H2S/LEL (4NOS), OPTF SKID
TYPE-1 FOUNDATIONS PEDESTALS F1 (5NOS), F3(1NO) AT MDRK OPTF-05.
Source of Grout : Time Batched (Hrs.) : 0830
Method of Placement : MANUAL Time Sampled (Hrs.) : 0834
Temp. of Mix (°C) : 22.1 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231075 5 5 5 25 290 2.320 84 343 4871 33.6
2 231076 5 5 5 25 293 2.344 90 367 5220 36.0
3 231077 5 5 5 25 289 2.312 80 326 4640 32.0

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-141 Report no. : OHDS-23-141-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 17 Jan 2023
Sampling method : Not given Date Sample Received : 18 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 14 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 14 Feb 2023
RFI No. : PTJ-SGCP-CIV-38950 ; CST RFI Date Reported : 14 Feb 2023
REF:PTJ-SGCP-CIV-39997
Location : GROUT FOR PIPE SUPPORT FOUNDATIONS PEDESTALS PS-01, P-02, PS-08, H2S/LEL (4NOS), OPTF SKID
TYPE-1 FOUNDATIONS PEDESTALS F1 (5NOS), F3(1NO) AT MDRK OPTF-05.
Source of Grout : Time Batched (Hrs.) : 0830
Method of Placement : MANUAL Time Sampled (Hrs.) : 0834
Temp. of Mix (°C) : 22.1 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231078 5 5 5 25 293 2.344 108 440 6264 43.2
2 231079 5 5 5 25 292 2.336 110 449 6379 44.0
3 231080 5 5 5 25 295 2.360 116 473 6728 46.4

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-142 Report no. : OHDS-23-142-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 17 Jan 2023
Sampling method : Not given Date Sample Received : 18 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 24 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 24 Jan 2023
RFI No. : PTJ-SGCP-CIV-38930 ; CST RFI Date Reported : 24 Jan 2023
REF:PTJ-SGCP-CIV-39194
Location : GROUT FOR PLATFORM FOUNDATIONS PF-01A (06NOS), PF-101 AND PIPE SUPPORT FOUNDATIONS
PS-101A, PS-101B (17NOS) SCRAPER 1 AT MDRK REMOTE HEADER-B.
Source of Grout : Time Batched (Hrs.) : 1120
Method of Placement : MANUAL Time Sampled (Hrs.) : 1125
Temp. of Mix (°C) : 23.5 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231081 5 5 5 25 289 2.312 88 359 5103 35.2
2 231082 5 5 5 25 291 2.328 86 351 4988 34.4
3 231083 5 5 5 25 288 2.304 90 367 5220 36.0

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-142 Report no. : OHDS-23-142-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 17 Jan 2023
Sampling method : Not given Date Sample Received : 18 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 14 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 14 Feb 2023
RFI No. : PTJ-SGCP-CIV-38930 ; CST RFI Date Reported : 14 Feb 2023
REF:PTJ-SGCP-CIV-39998
Location : GROUT FOR PLATFORM FOUNDATIONS PF-01A (06NOS), PF-101 AND PIPE SUPPORT FOUNDATIONS
PS-101A, PS-101B (17NOS) SCRAPER 1 AT MDRK REMOTE HEADER-B.
Source of Grout : Time Batched (Hrs.) : 1120
Method of Placement : MANUAL Time Sampled (Hrs.) : 1125
Temp. of Mix (°C) : 23.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231084 5 5 5 25 290 2.320 128 522 7423 51.2
2 231085 5 5 5 25 289 2.312 132 538 7655 52.8
3 231086 5 5 5 25 292 2.336 132 538 7655 52.8

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-155 Report no. : OHDS-23-155-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 18 Jan 2023
Sampling method : Not given Date Sample Received : 19 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 25 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 25 Jan 2023
RFI No. : PTJ-SGCP-CIV-38919 ; CST RFI Date Reported : 25 Jan 2023
REF:PTJ-SGCP-CIV-29238
Location : GROUT FOR PIPE SUPPORT FOUNDATION PEDESTAL PS201A (2NOS), PS202 (2NOS), PS203 (2NOS), PS204
(2NOS), PS205 (2NOS), PS206A (2NOS), PS207 (2NOS), PS208(2NOS), PS209 (2NOS) PFD12 (4NOS), AJB(2NOS)
AND PZVF02 (4NOS) AT MDRK-REMOTE HEADER-D.
Source of Grout : Time Batched (Hrs.) : 0920
Method of Placement : MANUAL Time Sampled (Hrs.) : 0925
Temp. of Mix (°C) : 22.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231113 5 5 5 25 285 2.280 73 298 4234 29.2
2 231114 5 5 5 25 284 2.272 78 318 4523 31.2
3 231115 5 5 5 25 286 2.288 70 285 4059 28.0

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-155 Report no. : OHDS-23-155-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 18 Jan 2023
Sampling method : Not given Date Sample Received : 19 Jan 2023
Sampled by : Iqbal H.M (CTTA#0904) Date Test Started : 15 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 15 Feb 2023
RFI No. : PTJ-SGCP-CIV-38919 ; CST RFI Date Reported : 15 Feb 2023
REF:PTJ-SGCP-CIV-40039
Location : GROUT FOR PIPE SUPPORT FOUNDATION PEDESTAL PS201A (2NOS), PS202 (2NOS), PS203 (2NOS), PS204
(2NOS), PS205 (2NOS), PS206A (2NOS), PS207 (2NOS), PS208(2NOS), PS209 (2NOS) PFD12 (4NOS), AJB(2NOS)
AND PZVF02 (4NOS) AT MDRK-REMOTE HEADER-D.
Source of Grout : Time Batched (Hrs.) : 0920
Method of Placement : MANUAL Time Sampled (Hrs.) : 0925
Temp. of Mix (°C) : 22.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231116 5 5 5 25 287 2.296 102 416 5915 40.8
2 231117 5 5 5 25 288 2.304 98 400 5684 39.2
3 231118 5 5 5 25 285 2.280 98 400 5684 39.2

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-162 Report no. : OHDS-23-162-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 19 Jan 2023
Sampling method : Not given Date Sample Received : 20 Jan 2023
Sampled by : Nauman NF (CTTA#0763) Date Test Started : 26 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 26 Jan 2023
RFI No. : PJT-SGCP-CIV-38984-38948 ; CST RFI Date Reported : 26 Jan 2023
REF:PTJ-SGCP-CIV-39268
Location : GROUT FOR SACRAPER HANDLING FACILITY PAD BEAMS (2NOS) AND FOUNDATION
PEDESTALS(2NOS) (SCRAPER AREA 20"DIA TYPE 8-20"-900#) AT TINAT GGM. FOR HS PEDESTALS (2NOS),
HORN & BEACON (1NO), CP RECTIFIER FOUNDATION (1NO) AT MLV-5 (HRDH-462) MAIN LINE VALVE
STATION.
Source of Grout : Time Batched (Hrs.) : 1324
Method of Placement : MANUAL Time Sampled (Hrs.) : 1328
Temp. of Mix (°C) : 23.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231159 5 5 5 25 290 2.320 92 375 5335 36.8
2 231160 5 5 5 25 288 2.304 86 351 4988 34.4
3 231161 5 5 5 25 287 2.296 85 347 4930 34.0

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-162 Report no. : OHDS-23-162-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 19 Jan 2023
Sampling method : Not given Date Sample Received : 20 Jan 2023
Sampled by : Nauman NF (CTTA#0763) Date Test Started : 16 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 16 Feb 2023
RFI No. : PJT-SGCP-CIV-38984-38948 ; CST RFI Date Reported : 16 Feb 2023
REF:PJT-SGCP-CIV-40076
Location : GROUT FOR SACRAPER HANDLING FACILITY PAD BEAMS (2NOS) AND FOUNDATION
PEDESTALS(2NOS) (SCRAPER AREA 20"DIA TYPE 8-20"-900#) AT TINAT GGM. FOR HS PEDESTALS (2NOS),
HORN & BEACON (1NO), CP RECTIFIER FOUNDATION (1NO) AT MLV-5 (HRDH-462) MAIN LINE VALVE
STATION.
Source of Grout : Time Batched (Hrs.) : 1324
Method of Placement : MANUAL Time Sampled (Hrs.) : 1328
Temp. of Mix (°C) : 23.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231162 5 5 5 25 289 2.312 127 518 7365 50.8
2 231163 5 5 5 25 292 2.336 125 510 7250 50.0
3 231164 5 5 5 25 290 2.320 124 506 7191 49.6

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-163 Report no. : OHDS-23-163-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 19 Jan 2023
Sampling method : Not given Date Sample Received : 20 Jan 2023
Sampled by : Asim Ali M (CTTA#0894) Date Test Started : 26 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 26 Jan 2023
RFI No. : PTJ-SGCP-CIV-39010-39005 ; CST RFI Date Reported : 26 Jan 2023
REF:PTJ-SGCP-CIV-39267
Location : GROUT FOR PIPE SUPPORT FOUNDATION PS-26(1NO),H2S(1NO) AT HARADH OPTF 1278..REF RFI NO
PTJ-SGCP-CIV-39005. FOR AIT (1NO) AT HARADH OPTF- 945.
Source of Grout : Time Batched (Hrs.) : 1324
Method of Placement : MANUAL Time Sampled (Hrs.) : 1328
Temp. of Mix (°C) : 23.8 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231165 5 5 5 25 287 2.296 99 404 5742 39.6
2 231166 5 5 5 25 289 2.312 90 367 5220 36.0
3 231167 5 5 5 25 291 2.328 93 379 5393 37.2

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-163 Report no. : OHDS-23-163-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 19 Jan 2023
Sampling method : Not given Date Sample Received : 20 Jan 2023
Sampled by : Asim Ali M (CTTA#0894) Date Test Started : 16 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 16 Feb 2023
RFI No. : PTJ-SGCP-CIV-39010-39005 ; CST RFI Date Reported : 16 Feb 2023
REF:PTJ-SGCP-CIV-40075
Location : GROUT FOR PIPE SUPPORT FOUNDATION PS-26(1NO),H2S(1NO) AT HARADH OPTF 1278..REF RFI NO
PTJ-SGCP-CIV-39005. FOR AIT (1NO) AT HARADH OPTF- 945.
Source of Grout : Time Batched (Hrs.) : 1410
Method of Placement : MANUAL Time Sampled (Hrs.) : 1415
Temp. of Mix (°C) : 21.0 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231168 5 5 5 25 292 2.336 143 583 8293 57.2
2 231169 5 5 5 25 290 2.320 142 579 8235 56.8
3 231170 5 5 5 25 289 2.312 145 591 8409 58.0

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
SLUMP AND TEMPERATURE TEST
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-181 Report no. : OHDS-23-181-T1
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 21 Jan 2023
Sampling method : C172 Date Sample Received : N/A
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 22 Jan 2023
Tested by : M.Abrar A(CTTA#1218) Date Test Completed : 23 Jan 2023
RFI No. : PTJ-SGCP-CIV-39045-39048-39049 Date Reported : 24 Jan 2023
Location : Concrete For Fence Anchor Beam (32nos)(96m),Fence Line Post (27nos)(81m) &Corner Post(2no) at Burn PIT & Haradh Remote Header
-K14.REF RFI No PTJ-SGCP-CIV-39045.for Fence Anchor Beams (24nos) 72m long North Side,Fence Line Posts (3nos)(2nd Part) North,
East Side at Tinat GGM.REF RFI No PTJ-SGCP-CIV-39048.for 6000mm Wide Drive Gate(2nos) and 1200mm Wide Walk Gate
(2nos),Fence Line Posts (3nos) and Fence Anchor Beams(8nos)(Pre-cast) BURN PIT MLV at MLV-5(HRDH-462).REF RFI No
PTJ-SGCP-CIV-39049.
Method of Placement : PUMP

Time Time Mix Air Air Unit


Test Truck / Ticket Slump Volume
Sl.No. Batched Sampled Temp Content Temp Weight Remarks
# No. (mm) (M³)
(Hours) (Hours) (°C) (%) (°C) (kg/M²)
1 1 4866-1908412 1040 1117 26 165 24.5 08 Sampled # 08
2 2 4814-1908402 1200 1315 27 175 09

Test method : ASTM C 172,ASTM C143/C143M,ASTM C1064/C1064M,ASTM C31/C31M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, Mr. Muhammed Almas Khan, Lab Manager,
(CTTA#0278) (CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-01 07 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-181 Report no. : OHDS-23-181-T2
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 21 Jan 2023
Sampling method : C172 Date Sample Received : 22 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 28 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 28 Jan 2023
RFI No. : PTJ-SGCP-CIV-39289 Date Reported : 28 Feb 2023
Location : Concrete For Fence Anchor Beam (32nos)(96m),Fence Line Post (27nos)(81m) &Corner Post(2no) at Burn PIT & Haradh Remote Header
-K14.REF RFI No PTJ-SGCP-CIV-39045.for Fence Anchor Beams (24nos) 72m long North Side,Fence Line Posts (3nos)(2nd Part) North,
East Side at Tinat GGM.REF RFI No PTJ-SGCP-CIV-39048.for 6000mm Wide Drive Gate(2nos) and 1200mm Wide Walk Gate
(2nos),Fence Line Posts (3nos) and Fence Anchor Beams(8nos)(Pre-cast) BURN PIT MLV at MLV-5(HRDH-462).REF RFI No
PTJ-SGCP-CIV-39049.
Source of Concrete : HACO Time Batched (Hrs.) : 1040
Method of Placement : PUMP Truck or Batch No. : 4866-1908412
Temp. of Mix (°C) : 26 Time Sampled (Hrs.) : 1117
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 165
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231211 15.0 30.0 176.7 12932 2440 7 691 399 5670 39.1 Type4 (Diagonal)
2 231212 15.0 29.9 176.7 12883 2438 7 708 408 5810 40.1 Type2 (Cone & Vertical)

Site curing
3 231213 15.0 30.0 176.7 12905 2434 7 701 404 5750 39.7 Type1 (Cone)
4 231214 15.0 29.9 176.7 12899 2441 7 626 361 5140 35.4 Type4 (Diagonal)

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-181 Report no. : OHDS-23-181-T3
Source of sample : HACO Lab Project No. : PH22-007
Sample description : 35MPa Date of Sampling : 21 Jan 2023
Sampling method : C172 Date Sample Received : 22 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 18 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 18 Feb 2023
RFI No. : PTJ-SGCP-CIV-40123 Date Reported : 28 Feb 2023
Location : Concrete For Fence Anchor Beam (32nos)(96m),Fence Line Post (27nos)(81m) &Corner Post(2no) at Burn PIT &
Haradh Remote Header -K14.REF RFI No PTJ-SGCP-CIV-39045.for Fence Anchor Beams (24nos) 72m long North
Side,Fence Line Posts (3nos)(2nd Part) North, East Side at Tinat GGM.REF RFI No PTJ-SGCP-CIV-39048.for
6000mm Wide Drive Gate(2nos) and 1200mm Wide Walk Gate (2nos),Fence Line Posts (3nos) and Fence Anchor
Beams(8nos)(Pre-cast) BURN PIT MLV at MLV-5(HRDH-462).REF RFI No PTJ-SGCP-CIV-39049.
Source of Concrete : HACO Time Batched (Hrs.) : 1040
Method of Placement : PUMP Truck or Batch No. : 4866-1908412
Temp. of Mix (°C) : 26 Time Sampled (Hrs.) : 1117
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 165
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture Result
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231215 15.0 29.9 176.7 12894 2441 28 914 527 7500 51.7 Type1 (Cone) Passed
2 231216 15.0 30.0 176.7 12947 2442 28 927 535 7610 52.4 Type4 (Diagonal) Passed

Site curing
3 231217 15.0 29.9 176.7 12825 2427 28 844 487 6930 47.7 Type2 (Cone & Vertical) Passed
4 231218 15.0 29.9 176.7 12812 2425 28 852 492 6990 48.2 Type1 (Cone) Passed

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-185 Report no. : OHDS-23-185-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 21 Jan 2023
Sampling method : Not given Date Sample Received : 22 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 28 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 28 Jan 2023
RFI No. : PTJ-SGCP-CIV-39008-39057-39077 ; CST RFI Date Reported : 28 Jan 2023
REF:PTJ-SGCP-CIV-39290
Location : GROUT FOR PLATFORM FOUNDATIONS PF-14 (07NOS), PF-15(01NO), PF-105 (04NOS) AND PIPE SUPPORT
FOUNDATIONS PS/F10 (02NOS) AT MDRK REMOTE HEADER-B. FOR PLATFORM FOUNDATIONS PF-01E
(02NOS) AT MDRK REMOTE HEADER-B. FOR PIPE SUPPORT FOUNDATIONS PEDESTALS PS-01, P-02,PS-03,
PS-04, H2S/LEL (5NOS), OPTF SKID TYPE-1 FOUNDATIONS PEDESTALS F1 (5NOS), F3(1NO) AT MDRK
OPTF-13
Source of Grout : Time Batched (Hrs.) : 1407
Method of Placement : MANUAL Time Sampled (Hrs.) : 1411
Temp. of Mix (°C) : 25.5 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231243 5 5 5 25 286 2.288 94 383 5452 37.6
2 231244 5 5 5 25 290 2.320 89 363 5162 35.6
3 231245 5 5 5 25 288 2.304 98 400 5684 39.2

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-185 Report no. : OHDS-23-185-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 21 Jan 2023
Sampling method : Not given Date Sample Received : 22 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 18 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 18 Feb 2023
RFI No. : PTJ-SGCP-CIV-39008-39057-39077 ; CST RFI Date Reported : 18 Feb 2023
REF:PTJ-SGCP-CIV-40124
Location : GROUT FOR PLATFORM FOUNDATIONS PF-14 (07NOS), PF-15(01NO), PF-105 (04NOS) AND PIPE SUPPORT
FOUNDATIONS PS/F10 (02NOS) AT MDRK REMOTE HEADER-B. FOR PLATFORM FOUNDATIONS PF-01E
(02NOS) AT MDRK REMOTE HEADER-B. FOR PIPE SUPPORT FOUNDATIONS PEDESTALS PS-01, P-02,PS-03,
PS-04, H2S/LEL (5NOS), OPTF SKID TYPE-1 FOUNDATIONS PEDESTALS F1 (5NOS), F3(1NO) AT MDRK
OPTF-13
Source of Grout : Time Batched (Hrs.) : 1407
Method of Placement : MAMUAL Time Sampled (Hrs.) : 1411
Temp. of Mix (°C) : 25.5 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231246 5 5 5 25 291 2.328 126 514 7308 50.4
2 231247 5 5 5 25 287 2.296 130 530 7540 52.0
3 231248 5 5 5 25 289 2.312 127 518 7365 50.8

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
SLUMP AND TEMPERATURE TEST
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-213 Report no. : OHDS-23-213-T1
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR(3)-35INP -20 Date of Sampling : 22 Jan 2023
Sampling method : C172 Date Sample Received : N/A
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 23 Jan 2023
Tested by : M.Abrar A(CTTA#1218) Date Test Completed : 24 Jan 2023
RFI No. : PTJ-SGCP-CIV-39078-39108-39047-39046 Date Reported : 25 Jan 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-A) north side near parking as per survey report inside
HDGP. .REF RFI No PTJ-SGCP-CIV-39046.for concrete paving of existing open cut trench Concrete paving area (Part-B) East side near
PIB 240A/B as per survey report inside HDGP..REF RFI No PTJ-SGCP-CIV-39047. for Brace post foundations (15nos) at South side &
North side(live area) and Fence Anchor Beam (7nos) beside 5Mtr Sliding Gate(south side) at Remote Header RH-K8..REF RFI No
PTJ-SGCP-CIV-39078. for Burnpit Control Rack Foundation(1no) and Burnpit Propane Bottle Rack Foundation TYPE-2(1no) BURN PIT
MLV-5 AT HRDH-462..REF RFI No PTJ-SGCP-CIV-39090. for line post foundations (4nos) west side at sliding gate (live area) and Bracing
post foundations (15nos) south side live area (Security fence HCIS-IV) at Remote Header K8..REF RFI No PTJ-SGCP-CIV-39108.
Method of Placement : PUMP

Time Time Mix Air Air Unit


Test Truck / Ticket Slump Volume
Sl.No. Batched Sampled Temp Content Temp Weight Remarks
# No. (mm) (M³)
(Hours) (Hours) (°C) (%) (°C) (kg/M²)
1 1 4814-1908546 0955 1035 25.5 180 22 12 Sampled # 08
2 2 4866-1908570 1105 1135 27 180 12
3 3 4814-1908573 1420 1520 27 175 06

Test method : ASTM C 172,ASTM C143/C143M,ASTM C1064/C1064M,ASTM C31/C31M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, Mr. Muhammed Almas Khan, Lab Manager,
(CTTA#0278) (CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-01 07 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-213 Report no. : OHDS-23-213-T2
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR(3)-35INP -20 Date of Sampling : 22 Jan 2023
Sampling method : C172 Date Sample Received : 23 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 29 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 29 Jan 2023
RFI No. : PTJ-SGCP-CIV-39352 Date Reported : 29 Jan 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-A) north side near parking as per survey report inside
HDGP. .REF RFI No PTJ-SGCP-CIV-39046.for concrete paving of existing open cut trench Concrete paving area (Part-B) East side near
PIB 240A/B as per survey report inside HDGP..REF RFI No PTJ-SGCP-CIV-39047. for Brace post foundations (15nos) at South side &
North side(live area) and Fence Anchor Beam (7nos) beside 5Mtr Sliding Gate(south side) at Remote Header RH-K8..REF RFI No
PTJ-SGCP-CIV-39078. for Burnpit Control Rack Foundation(1no) and Burnpit Propane Bottle Rack Foundation TYPE-2(1no) BURN PIT
MLV-5 AT HRDH-462..REF RFI No PTJ-SGCP-CIV-39090. for line post foundations (4nos) west side at sliding gate (live area) and Bracing
post foundations (15nos) south side live area (Security fence HCIS-IV) at Remote Header K8..REF RFI No PTJ-SGCP-CIV-39108.
Source of Concrete : HACO Time Batched (Hrs.) : 0955
Method of Placement : PUMP Truck or Batch No. : 4814-1908546
Temp. of Mix (°C) : 25.5 Time Sampled (Hrs.) : 1035
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 180
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231295 15.1 29.9 179.1 13053 2437 7 685 390 5550 38.2 Type4 (Diagonal)
2 231296 15.1 29.8 179.1 13022 2440 7 674 384 5460 37.6 Type1 (Cone)

Site curing
3 231297 15.1 29.8 179.1 13007 2437 7 711 405 5760 39.7 Type2 (Cone & Vertical)
4 231298 15.1 29.9 179.1 13036 2434 7 668 380 5410 37.3 Type1 (Cone)

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-213 Report no. : OHDS-23-213-T3
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR(3)-35INP -20 Date of Sampling : 22 Jan 2023
Sampling method : C172 Date Sample Received : 23 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 19 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 19 Feb 2023
RFI No. : PTJ-SGCP-CIV-40161 Date Reported : 19 Feb 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-A) north side near parking as
per survey report inside HDGP. .REF RFI No PTJ-SGCP-CIV-39046.for concrete paving of existing open cut trench
Concrete paving area (Part-B) East side near PIB 240A/B as per survey report inside HDGP..REF RFI No
PTJ-SGCP-CIV-39047. for Brace post foundations (15nos) at South side & North side(live area) and Fence Anchor
Beam (7nos) beside 5Mtr Sliding Gate(south side) at Remote Header RH-K8..REF RFI No PTJ-SGCP-CIV-39078. for
Burnpit Control Rack Foundation(1no) and Burnpit Propane Bottle Rack Foundation TYPE-2(1no) BURN PIT
MLV-5 AT HRDH-462..REF RFI No PTJ-SGCP-CIV-39090. for line post foundations (4nos) west side at sliding gate
(live area) and Bracing post foundations (15nos) south side live area (Security fence HCIS-IV) at Remote Header
K8..REF RFI No PTJ-SGCP-CIV-39108.
Source of Concrete : HACO Time Batched (Hrs.) : 0955
Method of Placement : PUMP Truck or Batch No. : 4814-1908546
Temp. of Mix (°C) : 25.5 Time Sampled (Hrs.) : 1035
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 180
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture Result
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231299 15.1 29.8 179.1 13039 2443 28 778 443 6300 43.4 Type2 (Cone & Vertical) Passed
2 231300 15.1 29.9 179.1 13070 2441 28 740 421 5990 41.3 Type1 (Cone) Passed

Site curing
3 231301 15.1 29.8 179.1 12934 2423 28 746 425 6040 41.6 Type1 (Cone) Passed
4 231302 15.1 29.8 179.1 12948 2426 28 734 418 5940 41.0 Type4 (Diagonal) Passed

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
SLUMP AND TEMPERATURE TEST
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-228 Report no. : OHDS-23-228-T1
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR (3)- 35INP-20 Date of Sampling : 23 Jan 2023
Sampling method : C172 Date Sample Received : N/A
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 24 Jan 2023
Tested by : M.Abrar A(CTTA#1218) Date Test Completed : 25 Jan 2023
RFI No. : PTJ-SGCP-CIV-39073-39070-39050-39047 Date Reported : 26 Jan 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-B) East side near PIB 240A/B as per survey report
inside HDGP..REF RFI No PTJ-SGCP-CIV-39047. for 6000mm Wide Drive Gate(2nos) and 1200mm Wide Walk Gate (2nos),Fence Line
Posts (3nos) and Fence Anchor Beams(8nos)(Pre-cast) BURN PIT MLV at MLV-5(HRDH-462). .REF RFI No PTJ-SGCP-CIV-39050.for
Line post foundations (33nos) and Corner post foundation (2nos) South side and North side (security fence HCIS-IV) at Burn pit MLV
station at 31+810 (Near MLV-3)..REF RFI No PTJ-SGCP-CIV-39070.for Brace post foundations (25nos) for security fence HCIS-IV, at
MLV-3 (HRDH-463) at KM 32+001.50..REF RFI No PTJ-SGCP-CIV-39073.
Method of Placement :

Time Time Mix Air Air Unit


Test Truck / Ticket Slump Volume
Sl.No. Batched Sampled Temp Content Temp Weight Remarks
# No. (mm) (M³)
(Hours) (Hours) (°C) (%) (°C) (kg/M²)
1 1 4814-21156 1000 1055 28 160 24 12 Sampled # 08
2 2 4866-21145 1205 1255 26.2 160 10
3 3 4814-21136 1425 1520 28 170 03

Test method : ASTM C 172,ASTM C143/C143M,ASTM C1064/C1064M,ASTM C31/C31M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, Mr. Muhammed Almas Khan, Lab Manager,
(CTTA#0278) (CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-01 07 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-228 Report no. : OHDS-23-228-T2
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR (3)- 35INP-20 Date of Sampling : 23 Jan 2023
Sampling method : C172 Date Sample Received : 24 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 30 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 30 Jan 2023
RFI No. : PTJ-SGCP-CIV-39385, 39480 Date Reported : 30 Jan 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-B) East side near PIB 240A/B as per survey report
inside HDGP..REF RFI No PTJ-SGCP-CIV-39047. for 6000mm Wide Drive Gate(2nos) and 1200mm Wide Walk Gate (2nos),Fence Line
Posts (3nos) and Fence Anchor Beams(8nos)(Pre-cast) BURN PIT MLV at MLV-5(HRDH-462). .REF RFI No PTJ-SGCP-CIV-39050.for
Line post foundations (33nos) and Corner post foundation (2nos) South side and North side (security fence HCIS-IV) at Burn pit MLV
station at 31+810 (Near MLV-3)..REF RFI No PTJ-SGCP-CIV-39070.for Brace post foundations (25nos) for security fence HCIS-IV, at
MLV-3 (HRDH-463) at KM 32+001.50..REF RFI No PTJ-SGCP-CIV-39073.
Source of Concrete : HACO Time Batched (Hrs.) : 1000
Method of Placement : PUMP Truck or Batch No. : 4814-21156
Temp. of Mix (°C) : 28 Time Sampled (Hrs.) : 1055
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 160
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231327 15.0 30.0 176.7 12950 2443 7 628 362 5150 35.5 Type4 (Diagonal)
2 231328 15.0 30.0 176.7 12964 2446 7 653 377 5360 36.9 Type1 (Cone)

Site curing
3 231329 15.0 30.0 176.7 12937 2440 7 538 310 4410 30.4 Type2 (Cone & Vertical)
4 231330 15.0 29.9 176.7 12907 2443 7 579 334 4750 32.8 Type4 (Diagonal)

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CONCRETE CYLINDERS
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-228 Report no. : OHDS-23-228-T3
Source of sample : HACO Lab Project No. : PH22-007
Sample description : AFAL-HAR (3)- 35INP-20 Date of Sampling : 23 Jan 2023
Sampling method : C172 Date Sample Received : 24 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 20 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 20 Feb 2023
RFI No. : PTJ-SGCP-CIV-40215,40311 Date Reported : 20 Feb 2023
Location : Concrete for concrete paving of existing open cut trench Concrete paving area (Part-B) East side near PIB 240A/B
as per survey report inside HDGP..REF RFI No PTJ-SGCP-CIV-39047. for 6000mm Wide Drive Gate(2nos) and
1200mm Wide Walk Gate (2nos),Fence Line Posts (3nos) and Fence Anchor Beams(8nos)(Pre-cast) BURN PIT
MLV at MLV-5(HRDH-462). .REF RFI No PTJ-SGCP-CIV-39050.for Line post foundations (33nos) and Corner post
foundation (2nos) South side and North side (security fence HCIS-IV) at Burn pit MLV station at 31+810 (Near
MLV-3)..REF RFI No PTJ-SGCP-CIV-39070.for Brace post foundations (25nos) for security fence HCIS-IV, at
MLV-3 (HRDH-463) at KM 32+001.50..REF RFI No PTJ-SGCP-CIV-39073.
Source of Concrete : HACO Time Batched (Hrs.) : 1000
Method of Placement : PUMP Truck or Batch No. : 4814-21156
Temp. of Mix (°C) : 28 Time Sampled (Hrs.) : 1055
Curing Temp. (°C) : 23±2 Structure Represented : See Location
Air Content : Slump : 160
Strength Value : 35 Mpa
Dial Compressive Strength
Sl.No. Specimen Dia. Height Area Weight Density Age
Reading Type of Fracture Result
No. (cm) (cm) (cm²) (g) (kg/m³) (Days) kg/cm² PSI MPa
(kN)
Lab curing
1 231331 15.0 29.9 176.7 12918 2445 28 811 468 6650 45.9 Type1 (Cone) Passed
2 231332 15.0 30.0 176.7 12974 2447 28 818 472 6710 46.3 Type2 (Cone & Vertical) Passed

Site curing
3 231333 15.0 30.0 176.7 12873 2428 28 730 421 5990 41.3 Type2 (Cone & Vertical) Passed
4 231334 15.0 29.9 176.7 12841 2430 28 755 436 6200 42.7 Type1 (Cone) Passed

Test method : ASTM C39/C 39M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-02 09 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-232 Report no. : OHDS-23-232-T3
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 23 Jan 2023
Sampling method : Not given Date Sample Received : 24 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 30 Jan 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 30 Jan 2023
RFI No. : PTJ-SGCP-CIV-39146-39161 ; CST RFI Date Reported : 30 Jan 2023
REF:PTJ-SGCP-CIV-39386
Location : GROUT FOR PIPE SUPPORT FOUNDATIONS PEDESTALS P-02, PS-03, PS-10, H2S/LEL (4NOS), OPTF SKID
TYPE-1A FOUNDATIONS PEDESTALS F1 (6NOS) AT MDRK OPTF-14. FOR AREA LIGHTING POLE
PEDESTALS ALF2(5NOS), ALF3 (5NOS), HS (2NOS), H2S/TIT(1NO) AND HORN BEACON (1NO) AT MLV-3
(HRDH-463) AT KM 32+001.50.
Source of Grout : Time Batched (Hrs.) : 1240
Method of Placement : MANUAL Time Sampled (Hrs.) : 1243
Temp. of Mix (°C) : 21.0 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) :7

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231359 5 5 5 25 286 2.288 107 436 6206 42.8
2 231360 5 5 5 25 289 2.312 110 449 6379 44.0
3 231361 5 5 5 25 287 2.296 104 424 6032 41.6

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025
COMPRESSIVE STRENGTH OF CEMENT GROUT/MORTAR MIX(CUBES)
Client : Petrojet
Project name : South Gas Compression Plants (SGCP) Pipelines
Sample no. : OHDS-23-232 Report no. : OHDS-23-232-T4
Source of sample : Not given Lab Project No. : PH22-007
Sample description : MASTERFLOW 522 Date of Sampling : 23 Jan 2023
Sampling method : Not given Date Sample Received : 24 Jan 2023
Sampled by : M.Abrar A (CTTA#1218) Date Test Started : 20 Feb 2023
Tested by : AbeLabanta(CTTA#0278) Date Test Completed : 20 Feb 2023
RFI No. : PTJ-SGCP-CIV-39146-39161 ; CST RFI Date Reported : 20 Feb 2023
REF:PTJ-SGCP-CIV-40216
Location : GROUT FOR PIPE SUPPORT FOUNDATIONS PEDESTALS P-02, PS-03, PS-10, H2S/LEL (4NOS), OPTF SKID
TYPE-1A FOUNDATIONS PEDESTALS F1 (6NOS) AT MDRK OPTF-14. FOR AREA LIGHTING POLE
PEDESTALS ALF2(5NOS), ALF3 (5NOS), HS (2NOS), H2S/TIT(1NO) AND HORN BEACON (1NO) AT MLV-3
(HRDH-463) AT KM 32+001.50.
Source of Grout : Time Batched (Hrs.) : 1240
Method of Placement : MANUAL Time Sampled (Hrs.) : 1243
Temp. of Mix (°C) : 21.0 Curing Temp. (°C) : 23±2
Structure Represented : Age (Days) : 28

Dimensions Compressive Strength


Sl.No. Specimen Area Weight Density Load
Remarks
No. Length Width Height (cm²) (g) (g/cc) (kN) kg/cm² PSI MPa
(cm) (cm) (cm)
Lab curing
1 231362 5 5 5 25 291 2.328 145 591 8409 58.0
2 231363 5 5 5 25 288 2.304 145 591 8409 58.0
3 231364 5 5 5 25 289 2.312 147 599 8525 58.8

Test method : ASTM C109 / C109M


Test method variations : NIL
Remarks : NIL

Mr. Abe C Labnta,Lab Supervisor, (CTTA#0278) Mr. Muhammed Almas Khan, Lab Manager, ,
(CTTA#0709)
Reviewed By Approved By

P.O Box 1736, Al-Khobar 31952,K.S.A Documents No. Revision No. Effective Date Page Sequence
Tel. 8573664/8573668/8573880, Fax. 8573144,
e-mail: [email protected] TF-C-07 05 30-01-2022 Page 1 of 1

An Independant Testing Laboratory This is digitally generated report does not require stamp/sign
Results related only to the items tested This test is accredited by ISO/IEC 17025

You might also like